HomeMy WebLinkAbout20181249 Ver 2_Impact changes_20200117R-2828 Impact Changes by Permit Site The avoidance and minimization efforts incorporated into the final design resulted in reduction of 0.56 acre of permanent wetland impact as detailed in Table A. Table A. R-2828 Permanent Wetland Impact Comparison to Preliminary Impacts NRTR ID Preliminary R-2828 Design Impacts (acres) Revised R-2828 Design hnpacts (acres) Change (acres) 1 WCD (ISOLATED) 0.11 0.16 0.05 3 WCE (1/2) 0.53 0.55 0.02 5 WCF 1 0.03 0.03 0 6 WCH 0.05 0.06 0.01 7 WCI 0.84 0.79 -0.05 8 WO 0.11 0.13 0.02 9 WCL 0.22 0.22 0 10 WCM 0 <0.01 <0.01 11 WCQ 0.03 0.11 0.08 12 WCR 0.06 0.06 0 13 WCV 0 0.03 0.03 13 WCW 0.04 0.04 0 13A/14/15A/17 WCZ (1/2) 1.8 1.97 0.17 N/A WDE 0.01 0 -0.01 18 WDB 2.41 2.57 0.16 18A WWD 0.55 0.29 -0.26 U-1 WDC 0 0.08 0.08 21 WDF 0.2 0.26 0.06 23 WDG (1) 3.58 3.30 -0.28 27 WDH 2.79 2.8 0.01 31 WDJ 0.41 0.47 0.06 33 WDM 0.42 0.41 -0.01 34 WDN 0.02 <0.01 -0.02 36 WDO 0.7 0.78 0.08 38 WDP 0.02 0.02 0 39 WDS 0.08 0.08 0 40A WDR 0.09 0.09 0 44/45/47/48 WDV 0.62 0.54 -0.08 N/A WDW 0.12 0 -0.12 N/A WDX 0.01 0 -0.01 49 WDY 0 <0.01 <0.01 Table A. R-2828 Permanent Wetland Impact Comparison to Preliminary Impacts Si NRTR ID Preliminary R-2828 Design Impacts (acres) Revised R-2828 Design Impacts (acres) Change (acres) 50A WDZ 0.61 0.65 0.04 51A WEA 0.28 0.29 0.01 54/75/76 WEC 2.33 2.04 -0.29 N/A WED 0.09 0 -0.09 N/A WEW 0.02 0 -0.02 77 WEY 0 0.06 0.06 80 WEV 0.02 0.03 0.01 81 WEU 0 0.04 0.04 N/A WFD 0.01 0 -0.01 82 WFN (2) 0.09 <0.01 -0.09 83 WFF 0 <0.01 <0.01 N/A WFC 0.02 0 -0.02 N/A WEL 0.03 0 -0.03 N/A WEJ 0.13 0 -0.13 N/A WNQ 0.01 0 -0.01 N/A WQC 0.01 0 -0.01 N/A WQA 0.01 0 -0.01 N/A WEF 0.02 0 -0.02 Total -0.56 The avoidance and minimization efforts incorporated into the final design resulted in reduction of 3,736 LF acre of permanent stream impact as detailed in Table B. Table B. R-2828 Permanent Jurisdictional Stream Impact Comparison to Preliminary Impacts Site # NRTR ID Preliminary R-2828 Design Impacts I Revised R-2828 Design Impacts I Change 1 2 SBP 576 614 38 N/A SBQ 107 0 -107 3 SBR 431 587 156 6 SBU 218 173 -45 7 SBS 28 27 -1 10 SBY 493 546 53 11 SBX 430 532 102 14 1 SCC 377 400 23 14 SCK 168 283 115 18B SCF 55 64 9 19 SCG 0 10 10 26 SCL 1252 1077 -175 26A SCM 330 331 1 28 SCN 183 213 30 30/31 SCQ 761 803 42 32 SCP 451 430 -21 35 SCT 442 507 65 37 SCV 470 449 -21 41 SCY 2250 1937 -313 40B SCZ 65 52 -13 40 SDB 99 54 -45 40 SEC 79 93 14 50 SDJ 442 408 -34 51 SDK 26 53 27 52 SDL 656 627 -29 53 SDM 1093 995 -98 76 SDO 1129 1101 -28 N/A SDQ 792 0 -792 73 SDR 139 67 -72 57A SDS 0 50 50 57 SET 1469 920 -549 56 SDV 777 518 -259 55 SDW 1051 846 -205 59 SDX 209 37 -172 70 SCB (1) 0 20 20 82 SEH 0 15 15 83 SEK 123 30 -93 84 SEL 183 80 -103 82A SEM 868 422 -446 87/88 SES 350 284 -66 79 SET 919 607 -312 85 SEV 78 88 10 N/A SNK 456 0 -456 N/A SNO 61 0 61 Total Change 3736 The avoidance and minimization efforts incorporated into the final design resulted in reduction of 159,118 square It (Zone 1: 107,366 and Zone 2: 51,752 square ft) of Riparian Buffer impact detailed in Table C. Table C. R-2828 Riparian Buffer Impacts (sq. ft.) Comparison to Preliminary Impacts Mitigation Allowable Allowable Total Wetlands Impacts Requirement with with Allowable^ Impacts^ in Requiring miti anon^ mitigation— Buffer^^ Mitigation Zone 1 Difference -274,880 171,176 -27,701 -130,865 4,202 -107,366 Prelim - Revised 400,742— 719,618— 158,938— 1,279,298— 165,456— 954,904- 125,862 891,334 131,237 1,148,433 169,658 847,538 Zone 2 Difference -129,376 78,098 -10,869 -62,147 474 -51,752 Prelim - Revised (201,606 — (453,399 — (97,484 — (752,489 — (78,142 — (576,863 — 72,230 1 531,497 1 86,61 690,342) 1 78,61 525,111 * Impacts other than Road Crossing. **Road Crossing, ^ Includes utility impacts, ^^ Allowable non-mitigable butter impacts have been deducted from wetlands in buffers Compensatory Mitigation The avoidance and minimization efforts incorporated into the final design resulted in reduction of compensatory mitigation for permanent impacts to riparian wetlands of 1.20 acres (38.52-37.32), 17,578 (40,172 - 22,594) linear feet of streams, and 399,725 (3,730,006 - 3,330,281) square feet of buffers from the preliminary design. There is an increase in the compensatory mitigation for non - riparian wetlands impacts to 0.06 (0.08 -0.14) acres. The increase in impacts is a result of a calculation error in the original application. Impact details can be found in Table D. Table D. R-2828 Previously Requested Compensatory Mitigation Comparison to Revised Mitigation Type Riparian Wetlands ^ (ac) Non- Riparian Wetlands (ac) Isolated Wetlands (ac) IStreams[ - Of) Riparian Buffer Calculation (sq. - ---------- Riparian Buffer Total (sq. ft.) Zone 1 Zone 2 Neuse River Basin -1.20 0.06 0 -17,578 -322,098 -77,627 -399,725 (HUC 03020201 ^ Includes utility impacts, ^^ Allowable non-mitigable buffer impacts have been deducted from wetlands in buffers Commented [MWI]: Consider footnote: The revised amount no longer includes impacts to intermittent streams.