Loading...
HomeMy WebLinkAboutNCC200205_ESC Approval Submitted_20200117ROY COOPER Governor MICHAEL S. REGAN secretary S. DANIEL SMITH Director Hainoa, LLC ATTN: Clint Tolbert, Project Manager P.O. Box 82545 Lincoln, NE 68501 NORTH CAROLINA Environmental Quality January 13, 2020 LETTER OF APPROVAL RE: Project Name: Dormie Club - Phase 1 Cottages Acres Approved: 2 Project ID: MOORE-2020-029 County: Moore, City: West End, Address: Beulah Hill Church Road River Basin: Cape Fear Stream Classification: Other Submitted By: LKC Engineering, PLLC Date Received by LQS: December 10, 2019 Plan Type: Express Dear Mr. Tolbert The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act (hereinafter Act) states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 3 0 days 15 P tY pp g tY PP pp P Y ( days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucasPricderingov or Paul Clark at Paul.clark(@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources A ^� E Q. Fayetteville Regional office 1 225 Green Street, Suite 714 ( Fayetteville, North Carolina 28301 NO1i 111 CFNOI iN o�.�Rauwn+w.nr\ 910.433.3300 Letter of Approval with Modifications Hainoa, LLC January 13, 2020 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Title 15A NCAC 413.0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan, including the use of equipment and technology owned and operated by the Department, (e.g., survey equipment, vehicles, unmanned aerial vehicles, etc.) North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jodi Pace, EI Regional Engineering Associate Land Quality Section Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet cc: Philip Picerno, LKC Engineering, PLLC (Electronic Copy) Debra Ensminger, Moore County Planning (Electronic Copy) Fayetteville Regional Office file