January 3, 2020
LETTER OF APPROVAL
City of Raleigh
Attn: Diane Sauer, PRCR Director
222 West Hargett Street
Raleigh, NC 27601
RE: Project Name: City of Raleigh — River Bend Park
Acres Approved: 4.96
Project ID: WAKE-2019-008
County: Wake
City: Raleigh
Address: Penny Creek Road
River Basin: Neuse
Stream Classification: Other
Submitted By: CLH Design, P.A.
Date Received by LQS: December 19, 2019
Plan Type: Revised
Dear Ms. Sauer:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must
be posted at the job site. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC
4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC
issued prior to the commencement of any land disturbing activity on the above -named project. The
NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to
Annette Lucas at Annette. lucaskncdenr. gov or Paul Clark at Paul. clarkkncdenr. gov. After you
submit a complete and correct NOI Form, a COC will be emailed to you within three business
days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, a
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Raleigh Regional Office 11628 Mai] Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609
NOR— CARLINA
oeaemmemNFnwron,re�ui n�a\ / 919-791.4200
Letter of Approval
City of Raleigh
January 3, 2020
Page 2 of 3
$100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.l(a) of our right of periodic inspection
to insure compliance with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file
at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the
acreage will be a violation of this permit and would require a revised plan and additional
application fee. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Letter of Approval
City of Raleigh
January 3, 2020
Page 3 of 3
Your cooperation is appreciated.
Sincerely,
Dylan Reinhardt
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
cc: Zak Pierce, CLH Design, P.A. (clhdesign2clhdesignpa.com) Electronic Copy
Diane B. Sauer, PRCR Director (Diane.B.Sauergraleighnc.gov) Electronic Copy
Regional Office file