Loading...
HomeMy WebLinkAbout20041791 Ver 1_COMPLETE FILE_20041103MEMORANDUM TO: John Dorney Regional Contact: Barnett, Kevin Non-Discharge Branch WQ Supervisor: Earrest Westall Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Bernie Edwards County Madison Project Number 04 1791 County2 Recvd From APP Region Asheville Received Date 11/3/04 Recvd By Region Project Type pond construction Certificates Stream Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. Stream O Y -@N F- 6-96-10-1 WSII HQW 40,304. F 260.00 Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? O Y ON Did you request more info? O Y ON Have Project Changes/Conditions Been Discussed With Applicant? O Y O N Is Mitigation required? O Y O N Recommendation: O Issue (0 Issue/Cond O Deny Provided by Region: Latitude (ddmmss) 355028 Longitude (ddmmss) 823038 Comments: Issued ARO - 12/3/2004 - KHB cc: Regional Office Central Office Page Number 1 Facility Name Bernie Edwards County Madison Project Number 04 1791 Comments (continued from page 1): Regional Contact: Barnett, Kevin Date: cc: Regional Office Page Number 2 Central Office Triage Check List Date: I t 10y Projetct Name: Bern ee Ed wg v6 DWQ#: 0 ?-171/ County: /l/ iJ so h To: RI ARO ? FRO ? MRO ? RRO Kevin Barnett ? WaRO Ken Averitte ? WiRO Alan Johnson ? WSRO Mike Horan Tom Steffens and Kyle Barnes Noelle Lutheran Daryl Lamb From: C-apry fie-7?h Telephone : (919) 7IL 327 The file attached is being forwarded to \*our for your evaluation. Please call if you need as *stance. Stream length impacted ? Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern re sfrlc+rn le„4 tL aCC vra ?C ? ?-? So, i5 yn.'f?.y-sa,?i`s.. ?' 4f'v Comments: A I So. Neel{ ,ot,` F: y oY. Fla n mam Dism WuP, P( CIVIL ENGINEERING • PROJECT MANAGEMENT October 28, 2004 North Carolina Department of Environmental Resources Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 1 p41791? RE: Private Pond and Dam Edwards Parcel - Madison County Regards, 02@2" U W?f ?-=3 po? • 6`004 WET D dDS40S - 4'VATtR QUALITY AtdDSTO'UJWyATER PvXH Please fmd enclosed, (7) seven copies of a Pre-Construction Notification Application (Nationwide Permit) for the development of a pond with a low hazard / non-Dam Safety Act impoundment dam on an un-named stream in Madison County. We have also included (7) seven sets of proposed plans, including hydraulic calculations, and a review fee check in the amount of $475.00. I trust that this information will suffice as notification for for the proposed work and for any review and/or comments which you are required to perform Please do not hesitate to call us with any questions or comments that you may have. hincerely, PAYMENT es Mock RECEIVED Mercer Design Group, P.C. P.O. Box 1516 Weaverville, NC 28787 Phone: 828-645-7o88 Fax: 828-645-7714 E-mail: mercerdesign@charter.net C 0PY mam D1116 H 410 u P. D( CIVIL ENGINEERING • PROJECT MANAGEMENT October 28, 2004 Mr. Steve Chapin U.S. Army Corps of Engineers 151 Patton Avenue, Room 143 Asheville, NC 28801-5006 RE: Private Pond and Dam Edwards Parcel - Madison County Dear Mr. Chapin, Please find enclosed, the Pre-Construction Notification Application (Nationwide Permit) for the development of a pond with a low hazard / non-Dam Safety Act impoundment dam I have included one original and one copy of the application and one set of the proposed plans including calculations. I trust that this information will suffice for your needs but please do not hesitate to call me with any questions or comments that you may have. Sincerely, ames Mock Mercer Design Group, P.C. P.O. Box 1516 Weaverville, NC 28787 Phone: 828-645-7088 Fax: 828-645-7714 E-mail: mercerdesignWharter net Mat Dism 6AOUP. P( CIVIL ENGINEERING . PROJECT MANAGEMENT October 28, 2004 North Carolina Wildlife Resource Commission Mountain Region Coordinator 20830 Great Smoky Mtn. Expressway Waynesville, NC 28786 RE: Private Pond and Dam Edwards Parcel - Madison County Regards, Please find enclosed, a copy of a Pre-Construction Notification Application (Nationwide Permit) for the development of a pond with a low hazard / non Dam Safety Act impoundment dam on a un-named stream in Madison County. We have included one set of proposed plans including hydraulic calculations. T trust that this information will suffice as notification for for the proposed work and for any review and/or comments which you are required to perform Please do not hesitate to call us with any questions or comments that you may have. Sincerely, James Mock Mercer Design (croup, P.C. ;° P tV0 V 3 2004 P.O. Box 1516 Weaverv7le, NC 28787 Phone: 828-645-7o88 Fax: 828-645-77.4 FrmaB: mercerdesign@charter.net a? dj y ? k J Office Use Only: Form version October 2001 041791 USACE Action ID No. DWQ No, If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. I. Processing 1. Check all of the approval(s) requested for this project: NO V 0 t"1 ? Section 404 Permit ? Section 10 Permit IY?LAf1DSAtSD3k$O?,,,?,?TcRBAH X 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII -- Mitigation), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: Mr. Bernie Edwards Mailing Address: P.O. BOX 402 Mars Hill, NC 28754 Telephone Number: 828-645-5657 Fax Number: E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Marvin Mercer, P.E. Company Affiliation: Mercer Design Group, P.C. Mailing Address: P.O. Box 1516 Weaverville, N.C. 28787 Telephone Number: 828-645-7088 Fax Number: 828-645-7714 E-mail Address: Page 5 of 12 i" 77 M. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: PRIVATE POND - EDWARDS PARCEL 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 9758-94-5158 4. Location County: MADISON Nearest Town: MARS HILL Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): FROM MARS HILL: I-26 NORTH TO ROUTE 19 EAST• NORTH ONTO SR 1525 (OSCAR YOUNG ROAD) 5. Site coordinates, if available (UTM or Lat/Long): N/A (Note -- If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: WOODED AND (1) SINGLE FAMILY RESIDENCE 7. Property size (acres): 52 8. Nearest body of water (stream/river/sound/ocean/lake): Un-Named Stream 9. River Basin: FRENCH BROAD (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basins map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 6 of 12 10. Describe the purpose of the proposed work: CONSTRUCT LOW HAZARD AND NON- SAFETY ACT DAM AND 0.33AC POND 11. List the type of equipment to be used to construct the project: BULL DOZER AND TRACK EXCAVATOR 12. Describe the land use in the vicinity of this project: UNDEVELOPED MOUNTAIN WOODLAND IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. NIA V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Wetland Impacts Wetland Impact Site Number (indicate on ma Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** N/A • List each impact separately and identify temporary unpacts. impacts mdude, out are not umrtea to: me Manrzea clearing, gaamg, my excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ss 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rase Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 14800-358-9616, or online at http://«tiww.fema.eov. **• List a wetland type that best describes wetland to be impacted (e.g, freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, eta) List the total acreage (estimated) of existing wetlands on the property: NIA Total area of wetland impact proposed: N/A 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? lease specify) DAM 80 UN-NAMED 3 PERINIAL POND 180 UN-NAMED 3 PERINIAL ' List each impact separately and identtly temporary unpacm impacts man=e, Due are not lumicu w. cauverw anu asbwauw ni -i - dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/pin), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at N,%-%N-%N.usas.2ov. Several internet sites also allow direct download and printing of USGS maps (e g., «yyNV.topozone.com, Nvww'.mapguest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 260 LF Page 8 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc N/A -A ;A-,#;fv t... imewrla imnwtq inamie- }Ng am not lln llted to: fill. excavation. dredging, "a& Lau. a.4I-- aatwra..,1a? w... ----j ""'•!"'•"'J ""! flooding, drainage, bulkheads, eta 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands X stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): EARTHEN DAM WITH COLD WATER INTAKE, 25 YR STORM OVER FLOW 100 YR STORM OVERFLOW AND EMERGENCY SPILLWAY Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): AESTHETIC Size of watershed draining to pond: 52 AC Expected pond surface area: 0.33 AC VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. MINIMAL DAM LENGTH AND POND AREA VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at littp:flh2o.enr.state.ne.us/ncwetlands/stnngide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions' and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at littp: />>2o.enr.state.nc.iis/Nvrp/index.litm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): NIA Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Page 10 of 12 Yes ? No X If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No X If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. * Zone Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total • Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. Page 11 of 12 N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. NIL EXISTING IMPERVIOUS, NONE PROPOSED XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and. disposition (non discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. NONE GENERATED XUL Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No X Is this an after-the-fact permit application? Yes ? No X XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). NIA Applicant/Agenfs Signature DAte (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 Office Use Only:: 041791 Form Version October 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. I. Processing 1. Check all of the approval(s) requested for this project. ? Section 404 Permit N O V 0 3 ? 004 ? Section 10 Permit X 401 Water t Certification DEN R - D STOnhi?li`?TtR6 }N NATER E Quality Y?CiL'iPii?S A??eD S7GRAtrCN ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: Mr. Bernie Edwards Mailing Address: P.O. BOX 402 Mars Hill, NC 28754 Telephone Number: 828-645-5657 Fax Number: E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Marvin Mercer, P.E. Company Affiliation: Mercer Design Group, P.C. Mailing Address: P.O. Box 1516 Weaverville, N.C. 28787 Telephone Number: 828-645-7088 Fax Number: 828-645-7714 a U 1 1. E-mail Address: Page 5 of 12 mow. III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided 1. Name of project: PRIVATE POND - EDWARDS PARCEL 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 9758-94-5158 4. Location County: MADISON Nearest Town: MARS HILL Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): FROM MARS HILL: I-26 NORTH TO ROUTE 19 EAST, NORTH ONTO SR 1525 (OSCAR YOUNG ROAD) 5. Site coordinates, if available (UTM or Lat/L.ong): N/A (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: WOODED AND (1) SINGLE FAMILY RESIDENCE 7. Property size (acres): 52 8. Nearest body of water (stream/river/sound/ocean/lake): Un-Named Stream 9. River Basin: FRENCH BROAD (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at httl2:Hh2o.enr.state.nc.us/admin/maps/.) Page 6 of 12 10. Describe the purpose of the proposed work: CONSTRUCT LOW HAZARD AND NON- SAFETY ACT DAM AND 0.33AC POND 11. List the type of equipment to be used to construct the project: BULL DOZER AND TRACK EXCAVATOR 12. Describe the land use in the vicinity of this project: UNDEVELOPED MOUNTAIN WOODLAND IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Wetland Impacts Wetland Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, tart are not limited to: meclranizred cleanng, gradmg, tut, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both struchue and flooding. ** I00-Year floodplains are identified through the Federal EmaTency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-app oved local floor lain maps. Maps are available through the FEMA Map Service Center at 1-500-358-9616, or online at httn://«-%,v%.fema.g-. *** List a wetland type that best describes wetland to be impacted (e.g, freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on map) Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? RLcify) i DAM 80 UN-NAMED 3 PERINIAL POND 180 UN-NAMED 3 PERINUL * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net losstgain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at N%1ti-Xv.us-'s.gov. Several internet sites also allow direct download and printing of USGS maps (cg, «xvw.topozone.com, Nv%vxv.ma quest.com, eta). Cumulative impacts (linear distance in feet) to all streams on site: 260 LF Page 8 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc N/A # list each impact separately and identify temporary impacts Impacts include, but ace not limited to: tui, excavauon, dredging, flooding, drainage, bulkheads, eta 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands X stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): EARTHEN DAM WITH COLD WATER INTAKE, 25 YR STORM OVER FLOW 100 YR STORM OVERFLOW AND EMERGENCY SPILLWAY Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): AESTHETIC Size of watershed draining to pond: 52 AC Expected pond surface area: 0.33 AC VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. MINIMAL DAM LENGTH AND POND AREA VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://li2o.enr.state.ne.us/ncwetiands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions' and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http:/ni2o.eiir.state.iic.us/xvrp/index.litm if use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): NIA Amount of Riparian wetland mitigation requested (acres): NIA Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Page 10 of 12 Yes ? No X If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No X If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone i extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. Page 1 I of 12 N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. NIL EXISTING IMPERVIOUS. NONE PROPOSED X11. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. NONE GENERATED XHL Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No X Is this an after-the-fact permit application? Yes ? No X XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 Q O PR/VA T"E EDWARD'S PA S/TE ENG/NE MADISON COUNTY, NORTH CAROL O N N m Z O 5 w a ~ O Z 11111f1Unllrf `~~~tt ~ ry~~9 ~ 17 iii y: 9758-94-5158 ' N ra n Z; ~W N v ~,0 i~~ ~~rrflllllflllt 1` L ~ L L _ _ ~ ~ ~ O i ~ ~ ~ ~ Z O N s W n ~ a m ~ ~ ~ m ; { ~ a U m 4I ~ f" m° m a'~ v o U _ O Z - _ _ -A - j~ z u ~wr 4 ~ !-a r ~ W n ~ ~ d d , r j Z (A N ~a = ~ F 19 ~ ~ zQ~~ ~ ~ ~ H Q?o~~ v ~ ~o~~ m w Zai~B ti Q In In _ _ f MnRSXa = G MV~~L v a ~ ~ c - a ~~aoao ~ ~ • t\p~NN ~ ~0~~ N 1..~1 G9 Iff Z ~ ~ x .m `o a xJOX~ W m J L O p ~ w 5a~ E yi z o ~ u ~ aQ ~ ~ w a M VICINITY MA Not To Scale Q Z J , 0 Q v 0 z J W m~~c~~ D~sich 6~ouP. IVIL ENGINEERING • PROJECT MANAGE MERCER DESIGN GROUP CIVIL ENGINEERING-PROJECT MAN U U Z Q ~NAGEMEN Q, r~~, ~ - ~ I U) Q W n.. t p .,,,,F ~ W i I ~ • W z ~w~ 0 U W w F m ~ ~ o Z U ~s ~ ~ U mo McMAHAN SURVEYING, SURVEYOR WEAVERVILLE, N BEFOF~ YOU DKlll CALL 1-800-d32-~4Q4A (`r} ITS THE LAW o Z z U Al o m o L t. Y I ~O i 1520 / LJNE BEARING DISTANCE ~ la ~ ~0 ~ 20 A,~3 ~2 Lt N 60'5144 E 64.20 ~o q Q ~ . ~ l ~ ~ O KEF G~'' L2 5 67'52 01 E 186.31 o ki 0 KENNETH I,. WILSON, JR. ~ 10~ l3 S 63'02 49 a'"o ~ E 91.58 ~ ~ t 90/634 ~ ~NtJS L4 S 36'07 25 E 176.43 I o ~ ' ~ ARM L5 S 11'13 55 ~ ~ 3Z E 129.19 ~ ~ 522 ~ i - 15 ~`1, ~ • 1, L6 S 213 MACK BOONE 3 07 E 115.62 1 3• E ~ L7 S 33'27 22 E 62.76 0 ~ .yRS • / 120/552 l8 S 41'0707 x i + b5 ~ ~ ~ >es. E 57.21 ~ ~ ~ " ,r/ •eoo L9 S 4132 27 E 93.28 0 1 23 1 i35~ ~ A •Ip 2 ~ 14 HICKORY ~ , ~ ,1 , ~ S L10 S 00'04 55 E 200.44 r .Q ~1, `i~ S' L11 S 11'30 54 W 115.65 / , ?s 7 i ,~Jl ~ /r ~ L12 S 29'3315 w 187.71 +~1 ~ L13 S 21'41 45 W 183.94 357 ~ i 1525 • ~ ` ~ L14 S 14'01 33 W 113.45' Z • 1354 j ~ - 152 0 .0 1357 .537 / L 5 N 0747 58 W 204.92 2 ~ r~ L16 N 08'40 53 W 97.61 ~ i 0 0 0 * L17 N 23'40 38 W 178.61 N if 09 2 r' ~ 1524 3 ~ 0 ii. ~ 13' WHITE OAK Lib N 18'0523 W 141.97 m ~ .0 , , r N i ~ • l19 N 15'2308 0 ~ E 129.41 ~ r . ~6 r ' S I r` .03 7 9 • 0 L20 N 09'29 09 E 187.63 \ I 1353 ,5 ~ 8 I ~ 5~ ~ i I 1609 30 j' 6 LEGEND f l2 t N OT07 to ~ 39 E 250.89 Z e~1 L22 N 10'39 31 E 71.27 O ! I I , '4-03 .02 1355 354 ~ ~ - i - ~d`.' l23 N 1 O3 20 W 59.54' to ' ' ~ f f \ i~ s L24 N 33 25 W 53.32 S ~t9. I ~ I ~ ~ ~ lssl o I I i . I 9 , ~ .d / L25 N 22'23 45• W 179.72 ~ / l26 S 45'32 36 W 186.55 ! i ~ ? ~ • • • 5/tj REBAR UNLESS OTHERWISE I 1606 t r I ~ a SS OTHERWISE NOTED (FOUND) , ~ .g ~ n ~ 153 ~1• ..........................MOUND of stoNls S ~ o r ~ ~ (En 5 S jam. L27 S 48'36 58 W 111.77 • L28 S O . G' N ~ 60'28 50 W 47.46 Z •o ~ i i ~ 0 541 15 ,90 0 • • 3/4 IRON PIPE (FOUND) ~ , 609 160 ~ ~ ~ r FOUND) ~ % ~ L29 S 52"42 36 W 52.76 't r ~ ~ ~ l \ ..+..i 0 ...........................1/2 IRON PIPE (FOUND) ~ i ? ~ ~ FOUND ~ N m L30 S 3749 1 s W 78.08 ~ ~ N ~ L31 S 25'5054 W 42.98 TREE SPECIES AND DIAM ~ ` ~ z___ ` ~ 160 0 ( ETER AS ~ i~o ; 154 ' D DIAMETER AS NOTED) • G% m 'm ~ L32 S 18'45 ' i - ~ FENCE POST ~ r .29 • ~ ~ ~ 1535 . % 24" a; , ~ 45 W 56.30 • - OAK SNMP ~ MACK JR. L33 S 18'3410 W 50.57 uiui~ui~ 4 i ~ 1552 1 x: ~,eoo 0 ...........................1/2 REt3AR WfM L0. CAP (SEt) I.O. CAP (SET) ' . L34 S 26'48'10 W 36.51 MARKED 14 WHITE OAK 135/259, TRACT II ~ ~ 0 3163 ~ ~ R r ~p ~ 0 UNMARKED POINT'!. I 4 r / a 24 OAK STUMP N: ze4,eo0 L35 S 34 24 24 W 99.82 ~ • • • • • • a, Las S 37' ~ ~ • ~ 54 31 W 55.44 ~~~'y; p ~ ~ r UTILITI' POLE WITH OVERHEAD LINE ~ r_ \ OVERHEAD LINES L37 S 28'32 42 W ~ ~ • ~ d'• 50.43 : o~ a e,' 1 t ] ~ 4 FENCE l38 S 1535 37 W 63.96 ;y ao ~ t 3 5 ro a o •d V! n 2 7 iv p 1538 ~ 4;• P I ~ 6 II $ 1 ~ ~ 'I I' 'I I' ca 2 213 I - ~ ~ MARKED 30" WHITE OAK • 1 St i 5 f .,0 5,. ~ 1 1560 ~s ~ I I ~ 1 • nnn ~a 1 5 ~ ~ 1530 ~ ~ D . 2 s / 155 / o - • 10" HICKORY " fir' / ~ TAMMIE YOUNG 12 BLACK GUM, \ \ 1530 ~ oo ~ ~ ..1541 :1540 - D.B.2s7/896 59.08 AC. r'r' s'rG ~ ~ ~ b t 1609 i 1 1548 - 1 P.B. 4/821, TRACT 6 , f0 O 107/499, 124/317 ~ 195/469 i ~ N = O r s i~ ~ ~ ~ ~ ~ ~ N o e'd, .r/ III N ,29 ~2 ~SS 15 9 ' ~ ~ ~ ;.._1621, 6" WHITE OAK ~ O D: ~ / -o~ %r. I ~ m +I I+ O ~ H %p ~ ~ U t/2• NEBAR 'ryI' M O I Y ~ 0 0 m ~ J. C o ~ ~ 41 m U ti m W p Ot > 0 41 m L ~ 0 O v ~ N.T.S. rr ~e~oo a MARKED 13' WH1TE OAK • s,. g _ a o y tA, : w ~ ~ Fi MouND of sroNES (sEr) IN : - I u w HOLLOW POPLAR STUMP AT MARKED 24 RED OVIIC • ~ ENGINEER'S NO TES. HEAD OF HOLLOW Z~ W n O • ~ • ~ ~ r~ Z d ~ , n 1. THE ENdNEER HAS MADE DILIGENT ATTEMPTS TO LOCATE EXISTING UTILITIES. IT IS THE RESPON • ~ ~b = HQO ~ V) N SIBIIITY TO FlELD VERIFY THE LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION AND TO NOTE ANY CONFLICTS. ANY DAMAGE TO UT1U11ES INCU • 38' ~ ~ ~ ~i Z Q OD m POPLAR RRED DURING CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIREQ u~- 74 TIMELY MANNER AND AT THE ' y ~ ~ QZCp~ C F ~~on~ CTOR S EXPENSE. CALL CAROLINA ONE-CALL AT LEAST 48 HOURS PRIOR TO DIGGING (EXCLUDES WEEKENDS AND HOLIDAYS AT 1-800-632-4949 ~i ~ U Onn;; o 2. THESE PLANS WERE PREPARED BY: MERCER DESIGN GROUP, PC, 113 MAIN ST. P.O. BOX 1516, YYEAVERVILLE NORTH CAROLINA 28787; PHONE (828) " a o 0 . 12 DEAD V LOCUST ~ a I I ~ 645-7088, FAX (828) 645-7714; CONTACT: MARVIN MERCER, P.E. • t\p~NN ~ .-000aO f ~ c~ a z a~ 3. THE EXISTING TOPOGRAPHIC MAPPING FOR THIS PLAN WAS PROVIDED BY FlELD SURVEY BY MCMAH AN do ASSOCIATES, PA (LAND SURVEYORS) ON OR ~ W.E. HILL ~ ~ z .m ~v ~ 90/122 ~ X W C U ABOUT AUGUST OF 2004. RIGHT-OF-WAYS AND PROPERTY LINES WERE OBTAINED FROM FIELD SURVEY DATA. Y a QJOX~ 4. ALL CONSTRUCTION ITEMS CONTAINED IN THIS DESIGN PACKAGE SHALL BE PERFORMED BY A N.C. n o "eu ~ w °D S a m to ~ ~ w . ~ E LICENSED FACTOR AND SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WI1H APPLICABLE N.C. BUILDING CODE. a , • MARKED s4 RED oAK z o w. .r 'r"~ a+ ftf~ ~ V V a Q 5. NO PORTION OF THE PROJECT SITE LIES WITHIN REGULATED. FLOOD ZONE A S DETERMINED BY FEMA. • + ~ 6. IT IS ANTICIPATED THAT CUT AND FlLL VOLUMES WILL BE c'ALA . _ • - • - - ' • wIRKED 24• RED oac w ! a , NCED ON SITE. ANY 60RROW SOIL, IF REQUIRED SHALL BE OBTAINED FROM ~ naxoo PERMITTED SITES ONLY. IF NECESSARY, THE CONTRACTOR SHALL SUBMIT 1HE PERMIT NUMBER OF THE BORROW SITE TO THE NCDENR EROSION CONTROL OFFlCE. O ! p' r , n ~ w: ~ea:~oo o ~ ~ • ~ ~ a 7. THE CONTRACTOR SHALL MAKE ALL EXCAVATIONS IN ACCORDANCE VMTH THE RULES AND REGULATI ONS PROMULGATED BY 1HE DEPARTMENT OF . ~ ~ Q; z 15 l ~ to - J LABOR, OCCUPATION SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION. THE CONTRACTOR SHALL FURNISH P UT IN PLACE, AND MAINTAIN SUCH !1 O SHEETING, BRACING, ETC. AS MAY BE NECESSARY TO SUPPORT THE SIDES OF THE EXCAVATION AND TO PREVENT ANY MOVEMENT OF EARTH WHICH • ~!i ~ MAPLE CL ss!J Q COULD IN ANY WAY DIMINISH THE WIDTH OF THE EXCAVATION TO LESS THAN THAT NECESSARY FOR PROPER CONS TRUCTION, OR COULD OTHERWISE INJURE OR DELAY THE WORK, OR ENDANGER ADJACENT STRUCTURES, ROADS, UTILITIES, OR OTHER IMPRO 81 ~ U WARREN C. ANGERS biJ 3 VEMENT. ~,lf 254/310 ~ 8. ALL CUT ANO FlLL SLOPES SHALL HAVE A MAXIMUM SLOPE OF 2 T 0 1. U ~ ~ N ~ Q i _m z r ~ ; 9. THE MADISON COUNTY PIN NUMBER FOR THIS PROPERTY' IS 9758-94-5158. THE OWN ER/DEVELOPER OF T'H1S PROPERTY IS MR BERNIE EDWARDS. ats.4 ~ ° ~ N J g• - N 81'3)'4 ~ 330 ~ _ 10. THE LIMITS OF DISTURBANCE HAVE BEEN SHOWN ON THE PLAN. THE TOTAL AREA TO BE DISTURBED FOR TH IS PROJECT IS 0.30 ACRES. 6 : ~ .39' ~ to 11. THE ESTIMATED COMPLETION TIME OF THIS PROJECT IS FEBRUARY OF 2005. ~ (TOTi1L) e ~ W Q V = = U ~ 12. THE PROPERTY IS LOCATED IN THE MARS HILL TOWNSHIP. - Z ~ ~ , 9 . ~ REFERENCE POMT '1f Q w (n 9~ SEE SITE PLAN ~ , J - . .J ' 8IIRVEY 1r'OR Z x: ~e2,+oo ~~yNy ~I .Te 0 i, BOHBY r.. u~usueu CERTIFY THAT: THIS - - Put wAS ow s T ~ Pu WAS oRAwN Q Z UNDER IIY DIRECT SUPERVISK)N FROM AN ACTUAL SURVEY WIDE UNI JRVEY MADE UNDER 3, 16' PRNATE R ~ ~IIB Q /W Q YY SUPERVISION, DEED DESCRIP110N RECORDED IN DEED BOOK _SEE PAGE~L, PLAT BOOK_ . PAGE_ :TWIT THE BOUNDARI iEEO BOOK • SEE 199/766 NOT SURVEYED ARE CLEARLY INDICATED AS DRAWN FR011 INFORIdAT10 r THE BourlaaRla Fr Z M GEED BOOK_ .PAGE ;THAT THE RATIO OF PRECISION ROM INFORIdATION ~ . W 7 ~ o of PRECISION As f a N0. 4 TOIIYNSHIP CALCUUTED IS 1: 10.000 ;TWIT THIS PLAT WAS PREPARED IN ~ PREPARED IN y;~ ACCORDANCE YIIITH G.S. 47-30 AS AMENDED. MADISON COUNTY a. l w111~ESS MY ORIGINAL SIGNATURE, REGISTRATION NUMBER AID SEAL THIS~DAY OF~RUARY , A.O., •20~,. BE1t ANO sEAL STE1+E w~.uAMS NORTH CAROLINA ~ J 199/766 do 278/318 Z GRAPHIC SCALE ~ Q SURVE1fOR: aoo U F ,h~ o too Sao ~ ~ REGISTRATION NUMBER: i , z ~ W o z ~ Z N~ W I ~ C~ i inch = 200 l't. ~ ~ FIIFD FOR REGISTRATION ON THE DAY OF , 200_ AT_ O'CLOCK-.M., AND RECORDED IN , 200_ ~ ~ 4 lli(nIIAT.TA t\T p. ~ ccnnT. m„n „ , REGISTER OF DEEDS ._IIr~N COUNT P.O. BOX 1296 . s r DISM courmr srr nATZ . . rMvMff io, 2004 By DEPUTY a WEAVERVILLE N.C. 28787 0 i i 828-845-5554 R69L4LD o ft 781.600 FAX: 828-845-3041 ° z ~i ft 761NO 8 4) 4) ~ Q r t o W a i 1 1 l 1 1 ~ 1 1 1 ~ ~ 1 1 ~ ~ I ~ fl 1 a 0 i ~ ~ NOTE: ALL CMP PIPE, FABRICATIONS AND ~ 1 APPURTENANCES SHALL BE HOT DIP ~ ~ ~ t > > . GALVANIZED AND OR FULLY COATED WITH ~ ~ 1 / ~ LIMITS OF OAM CONSTRUCTION ' COAL TAR EPOXY (OR EQUAL) ON ALL ~ ` ~ \ (LAND DISTURBANCE) EXPOSED SURFACES. SLUICE GATE HANDWHEEL M OR Y ILT FEN G \ . R ~ ~ TOTAL AREA 0.3 ACRES 1 \ 1 i 1 \ \ 1 \ z ` \ \ \ \ \ \ \ ~ ` \ \ z \ o ~ 4 \ \ \ ~ \ ~ SECONDARY DISCHARGE ~ \ \ \ sn \ \ N " f ' Ol \ ~5 BARS AT 6 E.W. GRATE EL. 496.0 \ \ \ ' \ \ . m WELDED AT ALL INTERSECTIONS f ` . \ 1 (HOT-DIP GALV. AFTER FABRICA110N) \ ~ . ~~ff~t ..M•• tf/ OR APPROVED MANUFACTURED GRILL ASSY. f 5~`•..Y.. \ O 24 CULVERT EL.481 ~ i ~ • \ \ fA 2 X4 X1/4 ANGLE (GRILL FRAME) PRIMARY DISCHARGE .;I;..,~~,•,• t;;.r \ " ~ ~ ry.~ ~ T.O.P. EL. 494.0 24 CULVERT EL. 481b., •~.;a;•; \ - ~ t.~...f;•~~ GRAPHIC SCALE W "v~ \ \ \ ~ \ ~ o to ~ ~ ~ ] f \ 4 ~ ; 98 0 ~ ~ 2 \ft'1.. ~ ~ II < ~ ~ 5 BAR SPACER "'.y }:i 'r 1 - ` > 1 WELDED TO 24 CMP ^ ~ ~~~~~,~„~;r ~ ix i~r < >A' \ A V.AF N I ENERGY DISIPATOR '~,t~~. • 0 . • ~ (GAL TER BE 0 NG) ' 1 inch = 20 fk $ i W ~i R 4 Q~R 97.0 ~a 4 .,y:~. 12 WIDE X 30 LONG ~ ~ F ' ~ ~ ~ 1, a - ~ 1 x: , .1 ~ ~ - ~ v ~ r ~ r o MoQU aR > • 5- " _ _ L UNIT RETAINING/ENDWALL ~9 ti ~ ; ~ • , 48 GALV. CMP OVERFLOW RISER ~ ~ 480 o (SEE DETAILS SHEET 2 OF 2) ~ ~ ~ . . c ~ ~ 0~.. ' rn TEMPORARY SIf;T FENCING - ' c ~ • f ~ ~N r ~.~r I ~ \ ~ i ~ UtV~fi~~INV.vl~l.. X2.0 v \ " j I~ ep i 24 GALV. CMP INTAKE RISER o ~ ~ ~ t ~ 1. ~ GATE ACTUATOR EXENSION rn ~ ~ , ~ ~ f~, ~ ' WITH INTERMEDIATE SUPPORTS ~ ~ m ` ' ~ ' V` V err ++c ~ , \ \ \ \ \ rrrrunu++ . o ' ~ ' ~ fiRIMA CMi1RGE OLD A EL 94.0\ AS REC REFERENCE PE~INT X ~ \ ~ ~ `,ai ~ ~ - ai t - - i . - ~ OMMENDED BY • , ~ o ~ a ~ \ GATE MANUFACTURER PROPERTY LINE. POINT \ ~ ~ ~ `x`" ' ~ ~ ' ~ rn ~ ( ) ~ ~ ~ < ~ o ~i ~ ~ `CG~P! SCPIARG ro v < ~ ,~`1 ARl'~'q( E 25YR\STOR EL X496.0 ~ N ~ . , V ( ~ ~ Ali:,•'FEI~S SCI ET) \ \ SEE GEN AN ~ ~ ~ ' ~ rn ~ ~ ' • ' N . WELD T R ERAL PL SHEET C-1 rn ' ` r, t \ \ ~ rn, r CMP RISER) ~ ~ < ; a ~ Qa, e} ~ r' ~ 1 ,y~ G' A ~ Z ~ ~ ~ O , ~ i S ~ ~ 2 ~ O PERFORA110N = 30~ FREE ~ ~ , ~ ' \ r , \ \ \ \ \ ~ All N 'a TE AIL N SURFACE OPENING 00 - ~ . 00 R ~ ~ • ` > ~ ~ % i' ` t \ i ~ ' \ \ ~ m ~ . ~ w i. ...ti;. ~ ; 00 00 Y ~ :c~~;~ ~ U ~ .Q ~ 1 ~ ti ~ i 1 I~ ~ \ t A A V A \ \ O 00 00 ~ `r• \ iG ~ ~ 1 , . j r i t ' ~ \ \ \ \ ~ t z o, f ,y•. a, ~ ~ ~ a ;r< ~ ~A \ Op A m 3 0 0 0 0 Q K 24 X2 CMP TEE WITH ~ ~y.. ~ ~ 00 RIVETED COUPLING BANDS 00 ~ Q w ; ~ , ~ , , ~i<° t~ C' ~ A' ~ ) r~9 ~ ~ ~ , A V A ~ a o m 5 v ( ~ \ \ ~ 00 00 a 3 2 00 _ 000 w ~ \ • r ~A ~r OED ~ T: ~ ~ 7 WASHED ROCK FILL • ' , , ybLU APP~t ~ r126,AU~ GF<," > ; ~ ~ i~ IN 0 24 ALUMINUM DRAIN GATE .f.. i 0 0 ~ (WITH CMP SPIGOT) BOLTED ~ ~ < < CM TEE 'e. h;, 1' i,. 1 24" CMP D ARGE 0 TO P ~ ~ ~ ~ 1 ~ C A ~ t ~ ~ ~ ~ f WATERMAN AC-31 OR ~o:••~ , a ( EQUAL) w p . -i. , t T • .i ) ~ ~ 1 i ) \ \ i ~ r, r• ~ r r'~J \ ) ~ f j C ~ ri ~j ~ 1 t r i C ~ ~ k A~ ~ _ _ - ~ • ~g--~; o PROPOSED GRADE < ; ~ / t i' Z Q d. p ~ C rte: \ ~ ` l ~ r 'i " } ~ ~ , y ~ Z ~ r C i ! , ~ i ~ ~ ; t :.i.:••V••••r• TOP OF BASE SLAB , r r 'L.~~ ~ Li .b. w .t ^'Y • 7"~ it ' ~ 1 ~ , ; : , . , _ . ~ ~o ELEV. 481.75 . ~ ~ r w k R' ' ``~:~~;~;f••~••,... ; ~ r`` 4"X4"X 5 16" 6" LONG GALV. STL. •:a:. ~ 00 ~ / ( ) < : ~ ~ , ANCHOR TABS WELD ~•"r• ~r ~ ED TO 48 CMP `s r \ ~ ~ i ~ 6X6 SQ. PRECAST CONC. BASE ' ^ i,: w RISER;(4) REQUIRED MIN. ~ = - _n z PAD WITH (4) 1/2" GALV. J-BOLT ~w.;:, FOR RISER ANCHORS X408 E.W. 6.00' f 24 CMP INV. EL 482.0 . f ~ I 510 _ ~ W SCALE: 1 2' SCALE 1 20' df ' p;'!A: K '1' j .t'~ ~L II • t.9r:!•'•?•S.r .i •`Y .r~i t.' y ~ F~ My i' •y~ ~ti.+f"''~'~•!. Cry, ••~i a.v:a~~'S v s '.,4 • 'i,.. hr i.•. Q I Z ;u. J ° Q Q U UNDISTURBED EARTH NOTE ALL D PRO OSED 10' GRAVEL R AD 504 AM EMBANKM NT FILL NY W i;.:~' ~ , SPILLWAY L. 499.0 ~ 504 APP VED BY T PIPE ( i ' _ 502' HE ENGIN R. PLACE . PIP G ° E RATE (S ILAR z •,~;'i: TRENCH WALL co AN MPACT IN 8 LIFT TO 8~ OF 0 FLOW SEC NDARY DISCHARGE 50 J J 500 MAX. DRY DENSITY. • _ CMP PIPE • 'ii ~ .-FLOW RIMARY DISCHARGE 5 J 0 49 i rR 8 w Q ' TRENCH WALL A;,. io PROPO ED GRAD -::~::~~.t ' - SE DETAI U LS THIS SHEE ~ U 4 E . i, 4X4 RIP-RA PAD Z PAD - ~ ®2:1 AX. SLOPE sir{l::_i(i.; ..,..i~ Q w 496 494 ~ AN11-SEEP OLLAR J )LLAR d. UNDISTURBED EARTH , : Q 3" J I_.' " 494 L:';~i~.. 24 CM RISER ' 49 ' 2 12 . , ~ ~ RETAININ /END WALL PLAH VIEW ~ . ~ 40 t.:.. 12" " 12 488 ,L,; - Q i ,,~i,, a~,;., 4 L.F PERFORATED TRENCH WALL UNDISTURBED 488 ~ s - w 486 EARTH " ~ 18' CMP OVERFLO CULVERT 4 CULVERT O.D.+12 (80TH CULVE TS 484 SEE DETAI THIS SHEET EX ST. C EEK GRADE ~ ~,i ~','i,'(:~ ~~}i. ii. ' } .x'717 r} 7 r}!; f 1 i . ~I ..~11 ~l' 'f. '~7. ~ !rd"`f~ , ~ ~ r- 7. 7ffl ~•1 f ,Cr, ~ - 4 4 11 ~A•~ rJ ~ r;r I r l :llr~ ~!I I t I t' ' I ~t l/r, ! '•A' t` Q - ~ r X111 1 ! ~I 1;: ! ~ ~I~ ~~f.r r~r ~rll!!!~%~ifl ~;i(,: I'~ I! 'Jr !II , ,.ILL ~ "i `i+ l,.l, if I;, ...Y~~ r r r i1. r '1 i, 7 rl 7 i. '•t.? 48 , . _ fir' ~r,'4rr ~rf 1 ! ~!1 ,I, J;:~ !I: JI ~ r I 1~ Il, II~~,; °J,1~ ,IlIJ t, ~ „ ,1-, :I !f~ •(I .7 ~Jl r~, .I:,r~ I :1 ~7 i~' I I~ir 'i~'(l' + I ! l I h: 11T ~ h8 L.F.® 2.5% 4 ° r• ~ ~ 4 0 , f:: 80 L.F. 1.25 .,•y.•, ~ P OP. GRADE z ° 1,.,:. ~ ~ ~t-. • 2 CMP CULVERT 480 ° Z 478 - ~ . ~ , oQ - INV. EL. 482.25 a ~ N ~ > 478 N ~o SECTION A - A 47 ~ 12 WIDE X 30 LONG WA HED ROCK BASE 6 INV. EL. 2 "CMP 482.0 24" AL MINUM SLUICE GATE NOTES: 1. CONCRETE SHALL BE 3000 P.S.I. - 47 6 ~ aFiN~nar~Nr. coal i RC N„ d R6GC 1~" r w d7d n,cc,n ~ Tnn ~c•rr _ _ _ „.....v n.rw.a. v- I- T --N v TL &..n. T / T UI0.3ir-M 1VR JCC 3. REINFORCING BARS SHALL BE DEFORMED ' HAND EEL RISER AND TIED TOGETHER. CALCULATI NS) -C mmm 474 0 o 0 rer~ R EQUAL) I ANTI-SEEP COU AR DETAIL 472 6 Z 472 ~ z 470 SCALE: NTS u o c 40 U)L- a i FREE DRAINING GRANULAR FILL (~57 WASHED STONE OR APPROVED MATERIAL -MIN. 12" WIDE BEHIND WALL} ENCASED IN MIRIFI t 44N FILTER FABRIC TO PREVENT MIGRATION OF SOIL MATERIALS. a REDI-ROCK TOP BLOCK (TYP) 0 .a • •d. d• i / / / , • •g • 4 • / . . ~ R • . ~ \ . / ~ • / . / a.. ~ / . . • ~ 'd \ ~ d / ~ - e A STANDARD REDI ROCK .d• BLOCK d A ~ rn d_ 4; tp 3.0° O • 9 I ~ ~ .d Q. . 1114" ~ ,a Q~ A • m • • • a - T ID 200 GEO-GRID ~ A REDI ROCK / STRA AGR Z • • " OR APPROVED EQUAL (TYP) a, O R G ~ _ N 5 o a ~ P~ w I 1 i M a ' ap Blocks ap Blocks SECTION A-A G° e F) (optional) P" (optional) ~ CUT GEO-GRID AROUND THE TWO ad • / ~ . COGa Z CONCRETE DOME SHEAR KEYS e • e \ ~ ~ ~ 0.50' • \ ~ ~ ~ ao.rs ~ / ~ Y 18.00' ITN u f rr?rrg1 a ~ a : /i. / / / / . ~ /~~4 • d ~ ~ ~ 1.00' 1' iii a r . i/ Infifi Sod 'y .a / , a• • \ ? N C00 -I DO ca W~~ X - :m Q^ 2~ . d d 1 / i is • REDI-ROCK BOTTOM ~ .00' 5.00' - :w p :~d BLOCK UNIT (TYP a x.00' d Q . i 0 J~ . ~i g'-g" 41"Middle Block Calculations for SRWaII '~~~f,,, Ilfllll 6" •a (TYPICAL GEOGRID LENGTH) ~ . ' Retaining Wan :v ° ••a ~ ~ ~ ~ o d • a- Blocks I a s.ao~ p~ ~ ~ ~ o //i- OCx ~ -=i ~ ~ p o ~ \ ~ ~ i/ x COMPACTED TO 95 / ~ ~ BACKFlLL SHALL BE Ps ~ I N " STANDARD PROCTOR IN 8 LIFTS (1YP) ~ ~ COG: ~ w 4 IHARD-PERFORATED PVC PIPE ENCASED IN EXISTING SITE MATERIAL OR APPROVED 5 -0 " " Q O 12 X 12 CROSS SECTION OF #57 WASHED MATERIAL) STONE WRAPPED IN FILTER FABRIC. INSTALL 27.50" H PIPE WITH MINIMUM tX SLOPE TO DAYLIGHT Free St Free Standing 27 s o z3.oa• Y n v u 5' x t' COMPACTED AGGREGA {FLEXIBLE PIPE IS NOT ACCEPTABLE) Wall BI• Wall Blocks ~6.~" c - m 3 fill Sail o' a ~ m ° 'u LEVELING PAD AND RETAINING WALL FOOTING (TYP) ND GEOGRID TO FRONT OF ~ ~ O m U d 6.00" REDI-ROCK EILOCK (TYP) NOTE: If the Freestanding Portion of the W. Portion of the Wali is to be Used as a Traffic Guard PRIOR TO THE COMMENCEMENT OF ANY WORK, THE BASE SOIL MUST BE tESTED The Freestanding Block Waq MUST BE Eq~ ST BE E ui With a Restraint Cable System. rq MU q Aped X coc x AND IT MUST BE VERIFIED IN WRITING BY THE GEOTECHNICAL ENGMEER THAT A This Would Be A S cial Condition And Wo A SOIL BEARING CAPACITY OF 2,500 P.S.F. OR GREATER 1S PRESENT. IF THIS ~ ondition And Would Require Coord'mation Wdh The Engineer W U n. Q ~ ASE SOIL BEARWG CAPACITY DOES NOT MRIALLY EXIST, THE BASE SOIL MUST To Provide A Seperate Design. e ~9 P W leer tmmediatety If This Condition Occurs Ot Is Desired. " 0 ~ BE REMEDIATED AND AMMENDED BASED UPON THE RECOMMENDATION OF THE 'Please Contact The Engineer tmmediatet} GEOTECHNICAL ENGINEER, SO AS TO ACNEIVE THE 2,500 P.S.F. MINIMUM. ~,'EQUIREMENT. 28 Middle Block Calculations for SRWaII c~. 4 ~ z ~N d N O zsao 0 w w ~ ~ 3 ~1 A 21 $hOCK ~ a ? ~ .PS IN WALL INSTALLATION h ~ o ~ _ L REINFORCED REDI-ROCK WALL SECTION ~ z ~ STEPS IN W~ ~ TYPICA r , r , V U ~pnf`~ _ 4 t:ENTER of trRAVITY GEOMETRY w . ~ i I 0" Ild OVERALL HEIGHT PERS ,;.•40 TO 13 tSPECTIVE VIEW ti 2QtAlA v = 0 MU~~~ a V ~ ~~Ilc ~ NN ~ STEEL OR WDDD P[ L OR WOOD PBST ~ 0 N z ~ D Z n HIRE FABRIC • PIPE DUl E FABRIC D4 x J O X V • y FILTER FABRIC J W mJt 0 0 tER FABRIC - ~ W Saw E ~IE ~ z O~ . ~ , UTLET PROTECTION (ENtRGY DISSIPATDR) Lo RIP-RAP D N ~ a S ~F,~gg~,. ALL EROSION MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH 0 a O Y• N IN Apron as ~ FI TATE N A DIMENT CONTROL POLI TH ~ z REQUIREMENTS OF THE S OF OTHCAROLgJ SE CIES. E d50 Apron Wldth Aron ~ a , A~, WING CONSTRUCTION SEQUENCE SHAH BE COMPILED WITH FOR ALL WORK. ~-li w EXISTING FOLLO Tailwater Discharge Duttet a P ~ a ~,0`~ Rlp Rap Length ~ X hlcknes ~ `D 3~ E Condition Q10yr Dlarheter (W) ~J~j~ / o E GROl1ND ~ Slze (La> Aron ~»~y~ RIPRAP (@ p / ~ ~ LOVE 1. OBTAIN LAND-DISTRIBUTING PERMITS. ~ Duttet) ~ a 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY NCDENR. a z 7.4 cfs 24" 15" 30' 26' 23" 30" A MIN. 5 3. OBTAIN CERTIFlCATE OF COMPLIANCE THROUGH ON-SITE INSPECTION BY A o ANCHOR FI 4 `--ANCHOR FABRIC REPRESENTATIVE OF NCDENR. a AS SHOWN AS SHOWN U SECTION TYPICAL CONC. SECTION 4. PROCEED WITH CLEARING AND GRUBBING AND FILLING OPERATIONS. FLARED END 5. SEED AND MULCH DENUDED AREA WITHIN 15 WORKDAYS AFTER FINISH GRADES ARE o SECTION , VARIABLE AS DIRECTED BY THE EI fED BY THE ENGINEER (10' MAX.) ESTABLISHED. SEED AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED ~ z ISOMETRIC VIEVIf T~ ~ SEEDBED AT THE FOLLOWING RATES PER ACRE: ~ BOTTOM TIME 4,000 LBS. _ STRAND MIN. 10 FERTILIZER (10-10-10)1,000 LBS. to J A A GA., TYP, KY-31 FESCUE 100 IBS. ; ~ ,W a STAY WIRES, ANI~ WII STRAW MULCH 60-80 B S U ~ ANCH~ WIRE FABRIC TO ~ U - 12' SPACING WDDD POST WAD POST WITH MIN, a SECURELY FOR WINTER SEEDING ADD TO THE ABOVE: Z MIN. 14 GA. FENCING ST FENCING STAPLES PER POST ANCHOR RYE GRAIN 10 LBS. ~ FABRIC TO CROWN VETCH 15 - 20 LBS. Q • 0 WIRE WITH FOR ALL SLOPES 2 TO 1 OR STEEPER ADD TO THE ABOVE: ~ ~ W to w ~ WIRE TIES a SERICEA LESPEDEZA 40 LBS. w ~ 3 ~ IF HYDRO SEEDING I~ USED, WOOD CELLULOSE MAY BE SUBSTITUTED FOR STRAW J _ a w MULCH AT THE RATE OF 1,000 LBS. PER ACRE. ~ Q M do =PIPE DIA ~ ~ 6. 1T IS RECOMMENDED FOR CONTRACTOR TO STOCKPILE TOPSOIL AT ASSIST IN ~ La =APRON LENGTH W GRASSING. ~ Q w =APRON WIDTH 3 X PIPE f MIN Q d =APRON DEPfH PLAN ~F 7. IT IS ANTICIPATED THAT THIS PROJECT WILL BE COMPLETED EXPEDITIOUSLY, ~ a N MAX, WIRE FIL' FILTER FABRIC TO BE w ti THEREFORE NEGATING ANY EFFECT THAT IEtI~PORARY SEEDING WOULD HAVE ON POLYPROPYLENE NYLON, a F°a CT. TH PERMANENT SEEDING SPEgFlCAT10N SHOWN ON THE PLAN SHOULD BE W ~ ~ ~ n FABRIC MESH PDL M 3 d OPENING SIZE PDL POLYESTER OR POLY- y PROJE E = 36 SQ. IN, ETH La MAN ADE ATE. - ~ ETHYLENE YARN OF ~ MANUFACTURER TO BE W SLOPE 0 7i ~pyy APP APPROVED BY ENGINEER 8. MAINTAIN SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. Z E E~~, NATION TICN ! ~ 'Q LEVA NDTES~ 9. DO NOT REMOVE SOIL EROSION CONTROL MEASURES UNT1L PERMANENT GROUND COVER ~ w IS ESTABUSHED. o ~ 1, THE CONTRACTOR SHALL MAENTAIN ALL SILT FENCING BY REMOVING AND U ~ W HAINTAIN ALL DISPOSING DF SILT ACCUMULATIONS AS rILTER FABRIC SHALL BE REPLACED WI NULATIONS AS DIRECTED BY THE ENGINEER. 10. REQUEST FINAL APPROVAL BY NCDENR. Z ~ U REPLACED WHEN IT HAS DETERIORATED TO SUCH N z (n d SECTION A-A EXTENT THAT IT REDUCES THE EFFECT] T VENESS OF THE SILT FENCE. - ~ ~ THE EFFEC I 11. IF COMPLETION DATE GOES BEYOND ENTER DATE, THE C~ITRACTOR SHALL MAINTAIN o Q NOTES: Q tr IVE A MINIMUM TENSILE STRENGTH (E 20% MAX. TEMPORARY GROUND COVER AS REQUIRED. ~ o Flter blanket FILTER FA~IC SHALL HAVE A MINIMUM SEE APPROPRIATE SCHEDULE FOR DIMDrSK)NS ELONGATION) OF 301bs/LIN. IN„ WIRE F N. DV„ WIRE FABRIC REQUDZED. 1. La is the length of the riprap apron. 3. IF EXTRA STRENGTH FABRIC IS UTILIZE = 12. THE CONTRACTOR SHALL CONTROL ALL "DUST" BY PERIODIC WATERING AND SHALL tIC IS UTILIZED <MIN. TENSILE STRENGTH 2. d = 1.5 times the maximum stone diameter but 50 lbs/LIN, IN. E MAX. 20X ELONGATION IX ELONGATION), WIRE FABRIC IS OPTIMAL, PROVIDE ACCESS AT ALL 11MES FOR PROPERTY OWNERS WITHIN THE PROJECT AREA MAXIMUM PAST SPACING = 6 FEET, 6 FEET, AND FOR EMERGENCY VEHICLES. w _ riot ia~zi Mull v 0 3. A filter blanket or filter fabric should be POSTS SHALL BE 4' DIA, PINE, 2' DIA, installed between the rira and soil foundation. 4. P P p UNLESS OTHERWISE APPROVED BY ENGI PINE, 2' DIA. OAK OR 1.33 lb/LF STEEL BY ENGINEER, o OVED o z z IL- TEMPORARY S m moo R Y SILT FENCE n o PIPE OUTLET ENERGY DISSIPATOR NOT TO SCALE NOT TO SCALE 7 N a 0 SCALE