Loading...
HomeMy WebLinkAbout820679_Inspection_20191230Am LULU Division of Water Resources Facility Number 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: f Q Arrival Time: ` �� d Departure Time: Q2OC1 County: h a Farm Nae: S 1 s 2' mOwner Email: Owner Name: �/I, ou Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: f�N�"r �115 Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other W it Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer C% Non -Layer Design Current Dry Poultry Capacity Pon. Layers Non -Layers Pullets Turkeys Turkey Pouets Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Region: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes P No ❑ NA ❑ NE ❑ Yes ❑ No [:]Yes [:]No ❑ Yes ❑ No ❑ Yes a No ❑ Yes D, No NA ❑ NE NA ❑ NE DqNA El NE ❑ NA ❑ NE ❑NA ❑NE Page I of 3 21412015 Continued Facility Number: 2- Date of Inspection: d Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No 99 T❑ ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): 1 y Observed Freeboard (in):� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? 0 Yes 4 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes P No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No YN [:INA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes R] No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes rV No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window I ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): rt"4 U-1TVKW/14 % , ��h L uyltrsy­e( 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes M No ❑ NA ❑ NE 15. Doe's the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes LL3 No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ;Q No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes R No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes V�g No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [ENO ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes M No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑NA ❑NE ❑ NA ❑ NE Page 2 of 3 21412015 Continued SIOZ/b/Z £fo £ a-Qnd pl1v" :04ECI , :a.rnluuSiS ioloodsul/iomolAQN :auoud { ,nV } :aureN zo;oadsuj/jamatna-d A BJ vdo?U -0-?IQjV w 3 fAqgQ,4 I (i[essaaau su saZud Iuuoi;ippu asn) suogun;ls uiulnxa npaq o; 4111au33o ssulmu.ip asnl •s;uauiwoa Iaglo xuu To suoi;upuaumioaa.1 iuuolY; ;►ppu fuu ao/puu s tamsuu SDI Buu ululdx� :(# uosanb o; as;aa) s;uauiuio0 aN ❑ dN ❑ oN sQA ❑ LX3ua2?u Ourus Oul Xq Iisin dn-mollo3 u omnbaz f4iliou3 oul soo(I -t£ gN ❑ dN ❑ ON SOA ❑ 43niluluosardw olis-uo up Tim uoilaadsui/maina.r ssnosip of Iiu3 .roloodsul/jamainag oul prQ •££ ffN ❑ dN ❑ ON [M soA ❑ �,IWAkV0 io Iiuuod arll3o ommidwoo-uou Osnuo uoium polou suialgoid Iuuoilippu fuu ojoM •Z£ :jQlgjO ❑ Puod 0fuzolS/aOO2u7 ❑ plaid uoiluoilddy ❑ HN ❑ dN ❑ oN sa, ❑ •molaq xoq Olui.idorddu Oul 3Ioogo `sa,C31 �XIIIIou3 aul Iu Ism suiuzp olil oopjinsgns oQ -I £ (uorluoilddu-.rano `suralgord pruogoag `o2jutlosip `•a•i) Lliuirod gN ❑ dN ❑ oN [A soA ❑ oul fq paiinbar su suorlunlis Xoua2.r3ura JO Oog3O Iuu012?32l aul S3ilou oI iiu3 , l!pou3 aul PIQ •0£ •fClaluipauuui anrluluosardaz Xliluna mV Iuuoifai u louluoo `sox31 -6Z aN ❑ vN ❑ ox !] soA ❑ 4unouoo Slilunb riu io iopo up osod XIilioE3 agl pip uoiloodsui ogl3o auzil agl IV 4Iuuuou uugl .rOg&q wom lugl solur SIilulzouz lrodar puu aN ❑ vN ❑ oN , , s3A ❑ Iuaumoop io/puu srnoq bZ glim sluuziuu puap3o osodsip XIiodoid of IIu3 Sliliou3 aul PIQ •8Z sanssl .iaq;p gN ❑ dN ❑ ON 9 soA ❑ LuoiluogilzOo (.Ld ld) sluouissossu ssol sruogdsogd u omoos of Iiu3 fliliou3 Oul PIQ -LZ gN ❑ dN ❑ oN Eg saA ❑ �@2jugo ui zolundo pagil.rao ,ilanilou uu 3o UOIIUluauznoop Opinoid Iiu3 Xliiiou3 oql PIQ •9Z :oouurlduioo-uou Burluoipui XaA.rns Isig3o olup pup (s)a.rnloruls Isi7 uooOul Xuu ui slanal o2pnls Iuuilduuo-uoN ❑ slanal oSpnls io3 Vod u dolanap of arnliud❑ Xanms a2?pnls lunuuu OIOlduroo of amliu3 ❑ •molaq (so)xoq oluiidorddu aril aN ❑ dN ❑ oN soA ❑ 3loarlo `sofj1 LoOpnls of polulaz suoilipuoo liuuad ulim oouuilduzoo 3o Ino Silliou3 oql sI 'SZ aN ❑ dN ❑ ON soA ❑ Lliuuod aril fq pazmboi su luaurdmbo uorluailddu Olsum oluzq!juo Ol Iiu3 f,lllioE3 aul piQ 'bZ 0 2 p moi;aa sul jo a;u(I- :.iagmnN fliliavj