Loading...
HomeMy WebLinkAbout20200074 Ver 1_Shoreline Stabilization_20200113'� �?va000nf State of North Carolina Department of Environment and Natural Resources Division of Water Resources WaterResourCes 1SA NCAC 02H GS00 — Water Quality certification, Shoreline Stabilization _::YAa OtL .F1i T:.i QUPaTY FORM: SSGP 02-2017 Shoreline Stabilization Application Form 40 Three copies of the application (including attachments) and the application fee should � � to: If sending via US Postal Service Karen Higgins DWR-401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 if sending via delivery service (UPS, Fe Fir �f Karen Higgins DWR-401 & Buffer Pe 512 N. Salisbury Street Raleigh, NC 27604 lA V 1 3 2020 A. Applicant Information 115A NCAC 02H .0502(a)j 1. Owner Information Name: (, h r, -r fiC., N n:j , LLG Mailing Address: i?:g lax'a Gf Al0 K'/aa/�n/l'Z,7.?oX1r Telephone Number: 91n-5QL-?32f Fax Number. E-mail Address: ILAkiIoo Dr Ja..lu.�+br�.com 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://wwwsaw usace.armv mil/Portals/59/docs/regulatory/regdocs/Permfs/SAMPLE AGENT AUTHORQ ATION FORM.pdf) Name: Company Affiliation: Mailing Address: Telephone Number. E-mail Address. Fax Number: B.. Project Information f15A NCAC 02H .0502(a) & (bl) 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 &.7YAWNW, 101MOO I Ito VwvAm or, T 1 rut? qe' A 701 - Ant a Owe SPAVIIN Who 19 lot — SVT,;' vri.31WAYM 100 TIN yy to! Mrs it 0 QShR WAN m, ;VA Soo lvkl vdaw f told ''Y' a-'niA MAW aid WAS Inv - AS CO . jsl q4 xqaUQ"'-". loin: 300051 aawnjo XASM; wKwim autos nctwnmy aft 0 -9 0 a. Attu a photograph of the shoreline/ buf%r proposed to be stabilized. (Include" a scale of some sort a yard stick, shovel handle, etc.) 4, vocation of the property (where work is flu be conducted) County: n2g4iQ=mr V Nearest town: 44 +. c. ,' Ma d� Lake/ river/ ocean a4"t to pmpert : Property size (acres)- Subdue name or site address (include phase/lot number): -T4 A u Directions to site - please include road names and numbers, landmarks, etc: See- M 8 0 - Latitude (in dedmarl degrees) ,,,-2,?*�,V Longitude (deamd degrrees)- �• S. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc): fe, S, ;Jp n4,' ) = 6. gibe proposed Work (include discussion as to how hardoft of shoreline has been avoided, or why it -is necessary] SAr-e h'n0 7. Will work be conducted from land? '/ From water? Q ti. Total amount of impacts blow the normal pool !aloe level / Normal Water Level Permanent impacts (including all excavation, ba ddill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: 9. Total amount of impacts above the normal pool Make level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap retaining walls, etc) in square feet: Z)e 6c /2© t2Ff Temporary Impacts (temporary clearing, construction corridor) In square fleet __.alI 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 5o feet landward to be impacted (number oftnees for instance): Some- A, Prov.y&d 11. Signature _ 2:f IZ/1c l,201? owner/Agents Signature r15A NCAC 02H .oso2mi Date Agent's.*natmm is valid only if an and iodtadon kn er from the owner is pMvided FORM: SSGP o2-2M7 Page 2 of 4 •,� =atss::.- 9bu�3a;- .b'?\ i;L:�Yi " 3 {71 f:y?UG+TC 1;,;�`r;'� '19"t;IsitNf:, S!'h"?b ilg6ljt:i#U"a!3 �:; .±�lzftfi;. t -:3103 ,sih!lstl :>4'Citi.. ,)i9i]2 cloy S =S k' v.. >ryH.0 �:'i!'.s:'.IY+'.!5h'.'. :/G {,L! � h'p:r/il 319tiWt `� "a; :'•'j�;i:1C`�^j _ _._..__...,:..._... :Vl`:.rlt„G ^id >ns:.r.�ka: "- 4ao a��:.. ,.•; :+''Amur; 1vt'+.!+Tarlq c: '-..vhmi}'?97bt* ne io i n w rf);t i db'lu;' :."}I:-- '.�itinlf;•�i^:! ,2 �a^.+:ln ;"^E �^,'i6fl at6'+?�'.3(3txi.^.Ii1 ::269�Q • 9: +Y.: i12f ^�1'=t4Si a Ia:n +a.ui --but ••::"+;. a:tf{�:i ?i3 X'fYi /mu Xf?16'.�Jk• ": "f.*'ict r°.,rrii'snr.. 'rA aa.0 bne..t �rirzUre e,U sdn�t�`".. . `` � ?ygCDt9V9k!ti;' .;s7tYlUit:a;} nyxl yj 9fi[t5Y•)(:7 s i,9nf119fl+3l1 W, ,' '102C not ux "l _nbuLm) *tow bwogf, s+iho!K' '1 s! J iw Io ,b4L+fe* .� �, t92c,'�a ntfrY? � �f;n6! E?i!!'!3 �Y3?.WL�fK'!', 9ti `ti•� ,,"EiYJ .. 4tvl sw':' IfYfilO!R <=tw k nul tijo i Mai wft, -.N" wni!!d?If bgtni to'rnum,t; ia• 10'r r . ai •. :itil .; •.11 ( :!:-> .2t; ryv -v"ll '- irl :Q!� 'Jii d:IfJiJi ' '!!:'^. 1!+ v9 i�:, �i'%1b1/i:N1E� 21�G'ii►+t 7�iT, i'�118'� i+t: a"7sY6 `•"i5"i 1 19i;+llV t'.:i}^' +;yu71 %'t . y; f,' i::, %fj ili-.n wi, 311? Woods 21'7dQilLl �l �4i:)1T6 i6.t(r`� .e -�99� J'�'.Lp2 nt {l�Ylll:?'� "+9tt:3:!'7t `u7 .'a�lhG9t? (t6'tC;'.'7il�N zhbci'!Ia r'!t-'ti.kjt^ti`: • ... ;:3�Ky 1 i"dQ'+.,, x+Ys'!O'; i,�¢flnik ., f:! kow, ,4yn:u 'i.-*4r rllr bw,4iq ti se n?r"!!;'+ bntii -,jJw3i It fee S(i "G u ; ) f z v7 . ,'s:,i�':�'•_ \?1Ni'r '.ifU S{l•?'{t1`S;i s' "•OliDSI'.+.."::hii+'R �i •+�!!� hilt.* CS 4".,.1'+!y't +i :ii:"yiP•. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation C. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Plan View FORM: SSGP 02-2017 E Plan View Lake lAt Full Pond/ Normal Water Level) Lake wncnwxmm Ee..n ExL%dn`Dock zwft.7k 3h.mh _ 1Ra ptlR Page 3 of 4 ,. 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing necesary Existing bank 10 ft. bank 2a hei8ht oy FORM: SSGP 02-2017 Page 4 of 4 , a 1 a yt 1 • . j ' ""` � � I ' ` v im ��. W Vy ,•,,.,, :^��� .r�•'j-�� � �� a �� t�% '• Y- � ji � J\ ♦ r r- 1 A i*j{ors${�� M1 � M` '9!� op rv� mil• "not MUM 0 r M� _ as Z vooc10 ,-"I : l ti ff Mg 'OF co" �