Loading...
HomeMy WebLinkAbout20200068 Ver 1_Stream Call Letter_20200110August 1, 2019 Carlos Bagley, PE Red Line Engineering, PC 1401 Aversboro Rd. Suite 210 Garner, NC 27529 Subject: Neuse River Buffer Call NBR# NB 19-010 Project Name: Johnson Tract (NC Pin# 164200-90-1234) Location / Directions: Raleigh Rd. between Elevation Rd. and Old School Rd. Subject Stream: S-1 Little Bernal Branch (C; NSW) S-2 Bernal Branch (C; NSW) Determination Date: July 25, 2019 Staff: Charles Pender Feature Stream Type (E/I/P)* Not Subject Subject Start @ Stop @ Soil Survey USGS Topo Latitude (Dec. Degrees) Longitude (Dec. Degrees) S-1 E n/a. 35.45231 -78.50135 S-2 P Subject through out..Conced ed by applicant. 35.45393 -78.49445 *E/I/P = Ephemeral / Intermittent/ Perennial Explanation: The feature(s) listed above that are checked “Subject” to the Johnston County Neuse Riparian Buffer Ordinance (Section 14-393 Johnston County Code of Ordinances) has or have been approximately shown on either the Soil Survey of Johnston County, North Carolina (1994) or the most recent version of the 1:24,000 (7.5 minute) quadrangle topographic maps prepared by the United States Geologic Survey (USGS), and have been located on the property and possess characteristics that qualify it to be a stream. Each feature that is checked “Not Subject” has been determined not to be a stream or is not present on the property. There may be other streams located on your property that do not show up on the maps referenced above but still may be considered jurisdictional according to the US Army Corps of Engineers and/or the North Carolina Division of Water Resources. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by Johnston County may request a determination by the Director of the Division of Water Resources c/o the 401 and Buffer Permitting Unit, or its successor. An appeal request must be made within sixty (60) days of the date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director must be submitted in writing with a copy of this letter to: North Carolina Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 This determination is final and binding unless, as detailed above, a request for an appeal has been made in writing within sixty (60) days. The owner/future owners should notify the Division of Water Resources (including any Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corps of Engineers Raleigh Regulatory Field Office at (919) 554-4884 and the Division of Water Resources 401 & Buffer Permitting Unit at (919) 791-4200. If you have any questions regarding this determination, please feel free to contact Charles Pender at (919) 209-8333 or via email at charles.pender@johnstonnc.com. Sincerely, Charles Pender, Jr. Engineering and Environmental Technician