HomeMy WebLinkAbout20061617 Ver 7_Approval Letter_20200110ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
January 10, 2020
Town of Wendell
Attn: Marvin Collins, Town Manager
15 E. Fourth Street
Wendell, NC 27591
NORTH CAROLINA
Environmental Quality
DWR #06-1617 v7
Wake County
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS
AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER
PROTECTION RULES (15A NCAC 02B .0233) WITH ADDITIONAL CONDITIONS
Wendell Falls Outfall D
Dear Mr. Collins:
You have our approval for the impacts listed below for the purpose described in your
application received by the Division of Water Resources (Division) on October 7, 2019 with
payment received on October 9, 2019 with additional information received on December 23,
2019. These impacts are covered by the attached Water Quality General Certification Number
4133 and the conditions listed below. This certification is associated with the use of
Nationwide Permit Number 12 once it is issued to you by the U.S. Army Corps of Engineers.
Please note that you should get any other federal, state or local permits before proceeding with
your project, including those required by (but not limited to) Sediment and Erosion Control,
Non -Discharge, and Water Supply Watershed regulations.
This approval requires you to follow the conditions listed in the enclosed certification and the
following additional conditions:
1. The following impacts are hereby approved provided that all of the other specific and
general conditions of the Certification and Buffer Rules are met. No other impacts are
approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)] and15A NCAC
02B .0233(8)]
^_ North Cztrolina Oeparttr€ent of E.nvimntnental Quality Division of Water- Resources
+� Ow Raleigh Regional Offices s 3600 Barrett Drive { Raleigh, Nofth Carolina 27609
tom' D_E
0�0r;M—W*.Ji\ �/'"� 919.791.4200
Wendell Falls Outfall D
DWR #06-1617 v
401 AND BUFFER APPROVAL
Page 3 of 5
2. Compensatory Mitigation Using a Private Mitigation Bank
Mitigation must be provided for the proposed impacts as specified in the table below. The
Division has received a Statement of Availability letter from EBX-Neuse I, LLC Neuse Riparian
Buffer Umbrella Mitigation Bank (EBX-Neuse 1), RES Neuse Buffer and Nutrient Offset
Umbrella Mitigation Bank (RES), RES Poplar Creek Buffer & Nutrient Offset Umbrella
Mitigation Bank or EBX Upper Neuse Riparian Buffer Umbrella Mitigation Bank (EBX) to
meet this mitigation requirement. The specific bank site to be debited will be Arrington
Bridge I, Buffalo Branch, Selma Mill, Cedar Grove, Hatley, Ezell, Polecat, Hannah Bridge,
Meadow Spring, Uzzle, Poplar Creek and Stone Creek all located in HUC 03020201. Until
the EBX-Neuse I, RES or EBX receives and clears your payment, and proof of payment has
been provided to this Office, no impacts specified in this Authorization Certificate shall
occur. For accounting purposes, this Authorization Certificate authorizes payment to EBX-
Neuse I, RES, or EBX to meet the following compensatory mitigation requirement [15A
NCAC 02H .0506 (b)(6)1:
Compensatory
Bank Sponsor
River & Sub -basin
Mitigation Required
Number
Buffer -Zone 1
3,864 (square feet)
EBX-Neuse I, RES
03020201-Not in Falls
or EBX
Lake Watershed
The permittee shall report to the Raleigh Regional Office any noncompliance with this
certification, any violation of stream or wetland standards [15A NCAC 02B .0200] including
but not limited to sediment impacts, and any violation of state regulated riparian buffer
rules [15A NCAC 02B .0200]. Information shall be provided orally within 24 hours (or the
next business day if a weekend or holiday) from the time the applicant became aware of the
circumstances. A written submission shall also be provided within 5 business days of the
time the applicant becomes aware of the circumstances. The written submission shall
contain a description of the noncompliance, and its causes; the period of noncompliance,
including exact dates and times, if the noncompliance has not been corrected, the
anticipated time compliance is expected to continue; and steps taken or planned to reduce,
eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the
written submission requirement on a case -by -case basis.
4. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within
these boundaries approved under this authorization shall be clearly marked with orange
warning fencing (or similar high visibility material) for the areas that have been approved to
infringe within the buffer, wetland or water prior to any land disturbing activities to ensure
compliance with 15 NCAC 02H .0500. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC
02H .0507 (c)]
Please send one (1) copy of the petition to DWR:
If sending by First Class Mail
via the US Postal Service:
Karen Higgins
NC DWR —401 & Buffer Permitting
Branch
1617 Mail Service Center
Raleigh, NC 27699-1617
Wendell Falls Outfall D
DWR #06-1617 v
401 AND BUFFER APPROVAL
Page 5 of 5
If sending via delivery service
(e.g. UPS, FedEx):
Karen Higgins
NC DWR — 401 & Buffer Permitting
Branch
512 N. Salisbury Street
Raleigh, NC 27604
This letter completes the review of the Division under section 401 of the Clean Water Act and
the Neuse Riparian Buffer Rules as described in 15A NCAC 02B .0233. Please contact Stephanie
Goss at 919-791-4256 or stephanie.goss@ncdenr.gov if you have any questions or concerns.
Sincerely,
Scott Vinson, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
Enclosure: GC 4133
cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade
Drive, Ste. 105; Wake Forest, NC 27597
DWR RRO 401 file
DWR 401 & Buffer Permitting Unit via Laserfiche
Perry Isner via e-mail at perryisner@wetlands-waters.com