HomeMy WebLinkAboutNCG140253_Inspection_20200113ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
January 14, 2020
Southern Equipment Company, Inc.
Attn: W. Gerald Thornton
PO Box 1150
Raleigh, NC 27602
Argos Ready Mix (Carolinas) Corp.
Attn: Secretary of State
PO Box 29622
Raleigh, NC 29622
Argos Ready Mix (Carolinas) Corp
3015 Windward Plaza Suite 200
Alpharetta, GA 30005-8996
Coastal Precast Systems, LLC
Attn: Paul Ogorchock
5125 Hwy 421 North
Wilmington, INC 28401-2251
Concrete Innovation Services, LLC
1316 Yacht Drive
Chesapeake, VA 23320
NORTH CAROLINA
Environmental Quality
Subject: Compliance Evaluation Inspection
NPDES General Stormwater Permit NCG140000
Certificate of Coverage NCG140253
Ready Mix Concrete Company Wilmington Plant #6
New Hanover County
Dear Permittee:
On January 13, 2020, Brian Lambe from the Wilmington Regional Office of the Division of Energy,
Mineral, and Land Resources (DEMLR), conducted a compliance evaluation inspection for Ready Mix
Concrete Company Wilmington Plant #6 located New Hanover County, North Carolina. The site drains
to Cape Fear River, which is currently classified as Class C Waters in the Cape Fear River Basin.
The following observations were noted during the DEMLR inspection (please see the attached
addendum for additional information about your permit):
1) Stormwater Pollution Prevention Plan (SPPP)
A Stormwater Pollution Prevention Plan (SPPP) has not been developed, recorded, and properly
implemented.
Yes ❑ No ■
2) Qualitative Monitoring
Qualitative monitoring has not been conducted and recorded in accordance with permit requirements.
Yes ❑ No ■
3) Analytical Monitoring
Analytical monitoring has not been conducted and recorded in accordance with permit requirements.
Yes ❑ No ■
D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
,,// Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
��aF^^�+^d� / 910.796.7215
Stormwater Permit No. NCG 140253
Page 2 of 2
Other Observations:
The ownership of the permit has changed. Please submit ownership change forms or submit a new
application.
Thank you for your assistance and cooperation during this inspection. Please be advised that violations
of the NPDES Stormwater General Permit may be subject to a civil penalty assessment of up to
$25,000.00 per day for each violation. If you have any questions, comments, or need assistance with
understanding any aspect of your permit, please do not hesitate to contact Daniel Sams or me at
(910)796-7215 or Brian.Lambe@ncdenr.gov
Sincerely
Vlan Lambe
Environmental Specialist
Land Quality Section
Attachments:
1. BIMS Inspection Checklist
cc: WIROFiles — Land Quality
Central Files — Laserfiche
Permit: NCG140253
SOC:
County: New Hanover
Region: Wilmington
Contact Person: Bobby Steele
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 01/14/2020
Primary Inspector: Brian P Le
Secondary Inspector(s):
Compliance Inspection Report
Effective: 08/01/17 Expiration: 06/30/22 Owner: Southern Equipment Company Inc
Effective: Expiration: Facility: Ready Mix Concrete Company - Wilmington Plant #E
5125 US Hwy 421 N
Entry
Title: Regional Manager
Certification:
Wilmington INC 28401
Phone: 910-762-9190
Phone:
11:30AM Exit Time: 12:10PM
Phone:
Reason for Inspection: Roat"76- Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater=astewater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
permit: NCG140253 Owner -Facility: Southern Equipment Company Inc
Inspection Date: 01/14/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Inspection was cut short by key employee being sick and the commencement of heavy rain. The facility must schedule a
compliance inspection immediately.
The Stormwater Pollution Prevention Plan was not available during inspection along with sampling data.
The NPDES140000 permit is currently held by Southern Equipment Company, Inc., who was merged into Argos Ready Mix
Corp. The site is currently owned by Concrete Innovation Services LLC. The state stormwater is being modified. The permit
is held by Coastal Precast Systems, LLC. Please submit owner change form.
Page 2 of 3
Permit: NGG140253 Owner -facility: Southern Equipment Company Inc
Inspection Date: 01/14/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑
N ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑
E ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑
E ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑
E ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
0 ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑
0 ❑ ❑
# Does the facility provide all necessary secondary containment?
❑
0 ❑ ❑
# Does the Plan include a BMP summary?
❑
0 ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑
0 ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑
0 ❑ ❑
# Does the facility provide and document Employee Training?
❑
0 ❑ ❑
# Does the Plan include a list of Responsible Pady(s)?
❑
0 ❑ ❑
# Is the Plan reviewed and updated annually?
❑
E ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑
0 ❑ ❑
Has the Slomlwater Pollution Prevention Plan been implemented?
❑
0❑ ❑
Comment. Previous inspection requested updates to the SPPP. Please contact this office to schedule a
review of the SPPP.
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment: No record available.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical mondonng? ❑ 0 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑
Comment: No record of 2019 on database. 2018-2015 denotes no discharge. Previous inspection
requested review of discharge points.
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
❑
0 ❑ ❑
# Were all outfalls observed during the inspection?
❑
0 ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
❑
❑ ❑
Comment. Please schedule a compliance inspection with this office
Page 3 of 3