Loading...
HomeMy WebLinkAbout20200058 Ver 1_BR-0120_Permit_Drawings_BUFFER_20191204_20200114C Ln af w Vi o_ a T O N 02 m O Cl Q U O L U Cl- N N O O m C CD See Sheet IA For Index of Sheets S "T' S—" FR T EEFeReNCe N NO. 9EEETs STATE OOFNO]I TH CAROILINA N.C- BR-0120 1 30 �N� s �'� � 4 w .. ®F \ DIVISION OF HIGHWAYS aT"T8FR0.1.Na 48829.1.1 F."FRO].Na nascnwrioN WA PE 48829.2.1 WA RNV, UTILITIES 48829.3.1 WA CONSTRUCTION P PITT CO LINTY �o Js ✓�D %11 D BUFFERS IMPACTS LOCATION: BRIDGE 730123 ON SR 1552 (TUCKER BULLOCK RD) PERMIT • 9° OVER MEADOW BRANCH 1ZI04/2019 b J BUFFER DRAWING V ti g agJ�o ���` TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE SHEET 1 OF 5 y Js ® PROJECT LOCATION , �. ✓�Oa _JuNTv ?" BEAUFORT COUNTY m DETOUR _ VICINITY MAP 0����������� rn , 4 BEGIN TIP PROJECT BR-0120 G INVESTMENTS -L- STA. 11+50.00��� `* �F I I END TIP PROJECT BR-0120 NIL -L-STA. j"i' i'YY 1\kY i 16+10.00 -L- SR 1552 (TUCKER-B LLO�K �L i 10+00 — — — —15+00 -- TO SR /550 --- ------------------ — BRIDGE _ ___________ ________ --- _____________ I� Ce C C 'Y E 'YL T [� O/ BE6I D4 -L- TA. 13+20.17 � l STA. 13+92.42 �. THIS IS NOT A CONTROL OF ACCESS PROJECT. PRELIMINARY PLANS DOCUMENT NOT CONSIDERED FINAL DO NOT USE FOR CONSTRUCTION UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared In the Office of: HYDRAULICS ENGINEER 50 25 0 50 100 ADT 2016 = 50 V = 55 MPH T = 6%O* LENGTH ROADWAY TIP PROJECT BR-0120 = 0.073 MILES NC FIRM LICENSE No: 0-1808 KCA301 FWVWt''5 0 $ suite N 2 KISINGERCAMao xelel9N G 2T°°' a ASSOCIATES 919)882-1839 ---------- --- ®§®�p� �® 2018 STANDARD SPECIFICATIONS LENGTH STRUCTURES TIP PROJECT BR-0120 = 0.014 MILES � o PLANS (*TTST 3%O + DUALS 3%O) P.E. 50 25 0 50 100 LOCAL FUNC CLASS = RURAL TOTAL LENGTH — TIP PROJECT BR-0120 0.087 MILES RIGHT OF WAY DATE: SEPTEMBER 12, 2019 JONATHAN LANGSTON, PE SIGNATURE, ROADWAY DESIGN ENGINEER PROJECT ENGINEER PROFILE (HORIZONTAL) O SUB —REGIONAL TIER V 10 5 0 10 20 NCDOT CONTACT. DAVID STUTTS, PE LETTING DATE: MARCH 17, 2020 ALLEN MCSWAIN --- PROJECT DESIGN ENGINEER SMU PROJECT MANAGER PE PROFILE (VERTICAL) SIGNATURE: ��� ® ALLOWABLE IMPACTS ZONE 1 lop o� o of alp � ALLOWABLE IMPACTS ZONE 2 \ R- � �� L4� �U1 GT i fO\� �e� ki, \ �1 ern ........................................ BM1 ELEVATION = 24. 93 \� V N 715991 E 2533024 BL STATION 32.22.00 T` RR SPIKE SET IN 18" PINE ........................................ SITE 1 TOP F WA R EL: 18. IL2 AM, 12-6 s6, i + -k - *,S .s E _E -------- D -- -----� ----------------- E BRIDGE TO SR 1550______________________1552_fTUCKE BULLOCK ROJ l4 GR _ _______g_______ SR 1552 !T CKER BULLOCK RDJ ......... -7 Q. . . . i' i' i t 'k + 'k -k 4' 4' I 'Y ' Ae i Ae i I 'k �k �k I A> Y Y W W W y L Y Y Y PROJECT REFERENCE NO. SHEET NO. BR-0120 4 @W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 1f�I81E1LdIvIIN ][$� 1R1L.�NS DO NOT VSH FO CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PXEPAXEO IN NG FIXM LICENSE Xa: C-t6gfi c or. E gFFI E K 3oi (,igF,ysa soo St., K�ISINGER CAMPO XalaigM1, INC 37601 ASSOCIATES (P19)362a639 BUFFER DRAWING SHEET 20F5 L- 5R l 52 ( ER MEDOW BRA - -PT K -IFf9o7w- 145 - K -L3 116 .0 - - - -P1 K -i5 116 - - VC = 8 VC = 18' VC = 18' - - — - - - - --- --- - B S E GI A.1 GRADE 5 --- - -- --- BEGIN TA. BRIDGE 3+2 .17 EN ST BRI .13+ GE 2.42 END G AD 0 = 5,1 .00 EL = 25.37 EL 25. 0' STA.16 EL=2396' 10. (+)0.40 0% (-JlJ 007 20 - - - - t - -d - BEGIN S - - 100 oo� _ 4.1' o. - SUR - - ENO - ITCH -RT 5R—�-- 22.0' SEL = 18.65 _ _ _ _ BE — CH E ---- +)O. 0 0°. — - -- - - 20 10 - - ILt=1 — I — .. - A ll+71 - YR W -L- -L PROPOSED EL = -A- ELEV= YED - - - - - - 25 YR W EL- 2.Y NWSEL = 18 - 7' OBS ON RVED 5-OS 19 = .2' - 44+ - - - - - - - - - - - --- - - - -Et BA - K STA R A ILIZA - ON - - - - - - - -- - - - - - - - - - - FOR STRUCTURE PLANS, SEE S-ITHRU S-2C - - - - LL- 10 11 12 13 14 15 16 17 0 ALLOWABLE IMPACTS ZONE 1 SITE 1 ENLARGEMENT ALLOWABLE IMPACTS ZONE 2 1 — —k/ o ---- --- �.1 T s RE upp 6N 11 ifgommm IN- m7�-�WNOWIBM ro PROJECT REFERENCE NO. SHEET NO. BR-0/20 4 PoW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINA RY PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PEEPRXEOINOF /^ NC FIRM LICENSE NI: , T.E OFFICE R`v 301 FByettev1110 bt.t. - Suite 1600 KISINGERCASSOCIAMPO E0(0 s)e82C]03501 BUFFER DRAWING SHEET 3 OF 5 S NG R/IN ------------------------------------- --------------------------- Im LJ ------------------------ T - --�\�L �)L AL :)L LL �k �l RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size / Type CROSSING IMPACT BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) 1 12+70.96 / 13+09.30 -L- Roadway Crossing X 193 135 328 1 13+09.30 / 14+03.30 -L- 70' Prop Bridge X 67 1038 1105 1 14+03.30 / 14+23.93 -L- Roadway Crossing X 366 2 368 TOTALS*: 626 1175 1801 0 0 0 0 0 NOTES: Revised 2018 Feb WETLANDS IN BUFFER IMPACTS SUMMARY SITE Structure WETLANDS IN BUFFERS NO. STATION (FROM/TO) Size / Type ZONE 1 (ft') ZONE 2 (ft) 1 13+09.30 / 14+03.30 -L- 70' Prop Bridge 665 55 1 14+03.30 / 14+23.93 -L- Roadway Crossing 0 212 ITOTAL: 1 665 1 267 1 (Revised 2018 Feb NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 11/19/2019 Pitt BR-0120 48829.1.1 SHEET 5 OF 5