HomeMy WebLinkAbout20200058 Ver 1_BR-0120_Permit_Drawings_20191220_20200114Highway North Carolina Department of Transportation
Stormwater }
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 48829.1.1 TIP No.: BR-0120 County(ies): Pitt Page 1 of 1
General Project Information
WBS Element:
48829.1.1
ITIP Number: BR-0120
Project Type: Bridge Replacement
Date: 11/21/2019
NCDOT Contact:
David Stutts, PE
Contractor / Designer:
Kisinger Campo & Associates
Address:
1000 Birch Ridge Drive
Raleigh, North Carolina 27610
Address:
301 Fayettville St.,
Suite 1500
Raleigh, NC 27604
Phone:
(919) 707-6400
Phone:
(919) 882-7839
Email:
dstutts ncdot.pov
Email:
I imcnulty6a kcaeng.com
City/Town:
Stokes
County(ies):
Pitt
River Basin(s):
Tar -Pamlico
CAMA County?
No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
459 ft. Surrounding Land Use: JAgricultural
Proposed Project
Existing Site
Project Built -Upon Area (ac.)
0.3 ac.
0.3 ac.
Typical Cross Section Description:
The proposed typical section on either side of the bridge will be normal crown with cross
slope of 0.025, and consist of two 10' lanes with 3' paved shoulder and 3:1 side slopes
to existing ground. The bridge typical section will be supered towards RT with a 0.025
cross slope, and consist of two 10' lanes with 2'-6" shoulder.
Existing roadways consists of two 11' lanes, with 3' unpaved shoulders.
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 50 Year: 2016
Existing: 50 Year: 2016
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
The project consists of improving roadway approaches as well as replacing the existing bridge. Existing drainage systems consist of low capacity roadside ditches and
overland flow, all draining to wetlands and Meadow Branch. The existing bridge currently drains off the edge of the bridge directly to Meadow Branch. All existing drainage
systems impacted by the proposed bridge replacement will be replaced with a proposed drainage system. Proposed drainage will be designed to maintain the same drainage
patterns as the existing condition. Dissipator pads are provided at pipe outlets and areas where ditches outlet concentrated flow within buffer zones. Shoulder berm and gutter
will be used to convey runoff from the bridge where it will be collected in the proposed inlets and discharged outside the buffer zone.
Waterbody Information
Surface Water Body (1): Meadow Branch
NCDWR Stream Index No.:
28-103-8-1
NCDWR Surface Water Classification for Water Body
Primary Classification:
Class C
None
Supplemental Classification:
Swamp Waters (Sw)
(NSW)
Other Stream Classification:
Impairments:
Aquatic T&E Species?
Comments:
NRTR Stream ID:
N/A Buffer Rules in Effect: Tar -Pamlico
Project Includes Bridge Spanning Water Body?
1yes
Deck Drains Discharge Over Buffer?
INo Dissipator Pads Provided in Buffer?
I Yes
Deck Drains Discharge Over Water Body?
INo
(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
See Sheet 1A For Index of Sheets
30%�A4
Js
w�
®e0SQ
\✓•
�
�� J
�w
7
J
m
�
�
m
JN
A �
y
` P
fm A
A
�A O4 O7N
Plfl
•,
J�A
A
!lOiG
00
9F,
i
9�
A
J
\
�
J�
f
Y
TUCKER -BULLOCK
RD. Jf ® \tea
J�
1V
ti
A
PROJECT
LOCATION
N
/
PITT COUNTY
BEAUFORT COUNTY
-
o :f
L
N
DETOUR
VICINITY MAP
STATE OF . 1 O R T I'1 CA R O l . l l
DIVISION CAI. HIGHWAYS
PITT COUNTY
LOCATION. BRIDGE 730123 ON SR 1552 (TUCKER BULLOCK RD)
OVER MEADOW BRANCH
TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE
RTATB
RTAT6 PRODIGY REFERENCE N0.
NO.
WETS
N.C.
BR-0120
1
ATE PRO].N0.
P.APRO3.N0.
DeRCR�1'ION
48829.1.1
WA
PE
48829.2.1
WA
PW, UTILITIES
48829.3.1
2020001
CONSTRUCTION
9
O 2
m0
/�o
�O
E E t 'Y E I t t t t irx
BEGIN TIP PROJECT BR-0120 `*
-L- STA. 11+50.00
END TIP PROJECT BR-0120
1
ki k �,k-
-L- SR 1552 (TUCKER-B CLOCK �I
10+00 15+00
TO SR /550 --- ------------------ ----_--_----- ---- --- ,
BRIDGE __________________________-I---
____________________________________ I�___
_________-__ ______________
lk k i i i I k AL�L k E t�
WETLAND &
STREAM IMPACTS
12202019
PERMIT DRAWING
SHEET 1 OF 11
PRELIMINARY PLANS DOCUMENT NOT CONSIDERED FINAL
DO NOT USE FOR CONSTRUCTION UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
Prepared In the Office of:
HYDRAULICS ENGINEERw,,.u00,,,,,
CAao'%,
NC FIRM LICENSE No: 0-1E08
KCA301 Fayettville2.:'EESS/p••.,r
�� Oa'��••••••'•/�ti'ei,
50 25 0 50 100
ADT 2016 = 50
LENGTH ROADWAY TIP PROJECT BR-0120 = 0.073 MILES
ENite 15°°
KISINGER CA RaleigN�NC 2T 1
R1R>eaz-EESE
•4
i SEAL =
B8®�py�
V = 55 MPH
T = 6%*
LENGTH STRUCTURES TIP PROJECT BR-0120 = 0.014 MILES
R ASSOCIATES
• 043571
®�
2018 STANDARD SPECIFICATIONS
PLANS
(*TTST 3°/D + DUALS 3%)
50 25 0 50 100
LOCAL
FUNC CLASS = RURAL
TOTAL LENGTH TIP PROJECT BR-0120 = 0.087 MILES
RIGHT OF WAY DATE:
SEPTEMBER 12, 2019
JONATHAN LANGSTON, PE
SIGNATURE: EEInuuL010
��
ROADWGINEERAY SIGN
N9•;
PROJECT ENGINEER
PROFILE (HORIZONTAL)
SUB —REGIONAL TIER
;:ate°
SEAL
®�
O�
10 5 0 10 20
DAVID STUTTSPE
NCDOT CONTACT' ,
SMU PROJECT MANAGER
LETTING DATE:
MARCH 17, 2020
ALLEN MCSWAIN
co: 045983 o?
—
------ -- '-�G' I NE`�'• �.`
9
VNAgp��
PROJECT DESIGN ENGINEER
PROFILE (VERTICAL)
A.
SIGNATURE:
a
N
9
m
m
m
c�
mr
'r
r
SEE
N(na
NX]
X
m0F
UNd
Nr
U0
WN(
Q�s
oc� (
PROJECT REFERENCE NO. SHEET NO.
-L- BR-0120 4
PI Sto I5+76.52
L = 6' 34' 19.8" (RT) RN+ SHEET NO.
F DENOTES FILL IN ROADWAY DESIGN HYDRAULICS
D = 322'13.2' 0Q-p� WETLAND ENGINEER ENGINEER
T = /976� a�pOo� 7 DENOTES EXCAVATION
R = 1.700.00' �6 va IN WETLAND
�
Lr = 0RY \ `�� �� ® DENOTES TEMPORARY ��uo xoT se Fo CONSTRUMONNS
Lr= /20' IMPACTS IN SURFACE WATER
/2 0
PJ�y SNpSti h� 9 DENOTES MECHANIZED
CLEARING
i 'x 'Y Ile k 'x i i i
CPO 4tQ J' J! J'
m i fFiY SIR�WJ aFFi F%
� ��
� � D� QIIO�P¢ 1�3J- ��o DOCUMENT NOT CONSIDERED FINAL
\ UNLESS ALL SIGNATURES COMPLETED
J �
NG FIRM LICENSE No: t.,
........................................ E gFF1cE oF. KC>h
3g1 Fayetteville St.,
BM1 ELEVATION - 24.93 saite lsgg
N } } } i i R< i / KISINGER CAMPO RaleigM1, NC P]601
/ =STA104+19 L RT N 715991 E 2533024 ASSOCIATESo cfs
BL STATION 32.22.00A&G INVESTMENTS J, ' fps RR SPIKE SET IN 18" PINE
DB 3035 PG 39 T<;''� J' 8- J' J' T< J< J- J! p........................................
PB 43 PG 149 �� ������� �� � ���e PERMIT DRAWING
SHEET 2 OF 11
S 'Y J, 'x 'Y 'Y 'Y i i i 1 1 1 - N' -k i
SITE I���
T WA R EL 18. � —
N AM. 12-6 B6. � � � � � � � N' N' N' #gam y ._
s w ESE
BMI
-----� m
__________________________ I RIDG _________ BL-5
TO SR 1550 SR 1552 (rUCKE BULLOCK024 S'T'C�U.CY E - --- - _
----------------------SR 1552 (lUCKfR BULLOCK ROJ
__________
__ WW � —� � — _ 70 SR 155/
cj-E
�
\1 1 Nam I kSITE 3
MARJORIE R. BARNHILL *-� �� J< SITE 2
D8 1093 PG 744�/
PB2PG 259 �J-J-�����J<�����������
/�Akl#�
L k -k -k - -kJOE S SHRADER
'k -k Nk'k A I�l k I-k�� �/ STA = 14+22 L RT DB1411PG412
--k J' -k -k-1 - k Q10 = 0.2 Cfs PB2PG 259
J' z I -k
V10 = 0.9 fps O
R' �k k t�k �k �k I I I N' i i 'k'k 'r i i L1
\ L L L J Y J y Y W W+ W W+ y Y y Y L L y y+ L L+ y, y j
till
-
-
BM1
N
ELEVATION
715991
=
E 2533024
24.93
--
-L- SR 1552 (OVER MEADOW BRANCH)
HI
FFF`t`F
-
EL STATION 32+22.00
RR SPIKE SET IN 18" PINE
-
-
ta
---
Pl
K=145
EL
VC
DS
= 11+90.00 -
= 25.06' -
= 80'
> 55 up
Pl = 13+40.00
K=116
EL - 25 66'
VC = 180'
LQS > 55 MPH -
Pt = 15+20.00
K=116
EL = 23.59'
VC = 180'
DS ) 55 MPH
--
-
* --
-
-
-
-
-
-
-
—
-
_
r:
-
BE:l
EL
GRADE:
-BEGIN
BR
DGE
EN
BRIDGE
END-GRADE1
DO
ip
=
5.1
1
EL =
25.37
EL
25.
0'
STA .16
EL=2396'
l- 10.
(+
0.40
0%20
(-)0.
00.
---
)0.--
-- -
_
—
—
+)0.
0 0'.
2
—
—
-
-
-
-
BEGIN
S
100
--
D
rCH
ED
4.1'
ES
EL=
SUR
END
STA /
ELEV=
Y
-
-
ITCH RT
+68 -L-
22.0'
SEL = 18.65
WSEt- = I8
-
-
-
7'
I'
-
-EEJ
I
I
---
I
CLASS
BE
-
OBS
ON
-
BA
---
II
CH E
RVED
5-OS
K STA
I
I
RIP R
. 19.5'
P
= .2'
—_
ION
---
I
STRUCTURE HYDRAULIC DATA BRIDGE
DESIGN DISCHARGE = 700 CFS
DESIGN FREQUENCY = 25 YRS
DESIGN MN ELEVATION = 223 FT
BCE DF/REQUENGE'Y l00 YRS
BASE FREQUENCY
ELEVATION = /00 r r
OVERTOPPING DISCHARGE = 1225
OVERTOPPING FREQUENCY = 50+
OVERTOPPING ELEVATION = 23.9
A /1*
Elr
YR W
-
25
-L-
PROPO
EL =
YR W
lO
01
-
-
-
-
I
ILIZA
---
-
-
-
FOR STRUCTURE PLANS, SEE S-ITHRU S-20
---
I
I
--
I
I
---
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
II
I
I
I
I
I
I
10 11 12 13 14 15 16 17
z
0
_N
N
m
m
c
F F
DENOTES FILL IN
WETLAND
DENOTES EXCAVATION
IN WETLAND
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
DENOTES MECHANIZED
CLEARING
SITE 1 ENLARGEMENT
PROJECT REFERENCE NO.
SHEET NO.
BR-0/20
4
RW SHEET NO.
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
Il�I81E1LIIA�IIN
II8�
1�LANS
W NOT USE PO
CONSTRUCTION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGGNNATURES COMPLETED
OC
E OFFICE OF. K` 301—F5 Ste v1a5110e St.,
BISASSOG—ES Se(919AMPO
)8E2C7.3. 1
AL :�L
/ PERMIT DRAWING
-1 SHEET 3 OF 11
A-/-r!br%
.. ..�.. .. ..
S NG R/VV
MAN
■■■1 \ , -� it
:1 1� N. ����■10■��II� ijG��7i��8■l,- ti7 1'.1 17 D 13 1�
--I -+— - E�- � L --iA-
SCALE:�����"���
1"=20,f
--E4� - R / vv
MLJW
-L-
P1 Sto 15+76.52
L = 6° 34' 19.8" (RT) c�
D = 322'13.2' 0Q-p�
T = /976� a�pOo�
R = 1,700.00' �p ya
SE= 47 \ e `�� �j P�
Lr= /20' F, � / � �
90
m i f Viy WR II IT 10s..:.
\�I IJ' J'DO 410tP¢ 193 QPo .;� � J' ��
\ \+1 L�4 QkP�193 1DOCUMENT
/ 'V
........................................�' �' �/.NC
J< J' J' J' i/ BM1 ELEVATION - 24. 93
iy< } } } } } -k N 715991 E 2533024
� -k A STA = 14 +19 L RT BL STATION 32.22.m0
A&G INVESTMENTS � k \ �a -` �. VI 0.7 fps RR SPIKE SET IN 18" PINE
D3035 PG 39 \� � � � � ii -`� � � � � � � � � � � J<± � � J' �
43 PG 149 � � � � (, -k � � � � � � E � � � � � � e.......................................
/T / \ k A, -k-k -.1,� w�1
T A RAJ
N AM. k
= BMI
- - c---------
------ m--------------------- 4'c
TO SR 1550 _ _ _ _ _ _ _ _ _ 52 (lUCK�R BULLOCK ROJ - -- _
SR 1552_(rUCKE 243T'C�O.(YE _ _ ____c_
_____________ a
_
MAR . ARNHILL D 1093 PG 744 /�'r k 1 kA
PIS PG 259
JOE S SHRADER
FAQ Q O = 0.2 cfs L RT DB PB 211PG 259
N' N' N' N' -k - N' � i A, i z& i N' i N'
IV-k-k-k�--1,--1,-k fps O
W+ W W+ y Y y+ L L y y
PROJECT REFERENCE NO. SHEET NO.
BR-0120 4
RNS SHEET NO.
F DENOTES FILL IN ROADWAY DESIGN HYDRAULICS
WETLAND ENGINEER ENGINEER
7 DENOTES EXCAVATION
IN WETLAND
® DENOTES TEMPORARY uo xoT se ao CONSTRUMONN�
IMPACTS IN SURFACE WATER
DENOTES MECHANIZED
CLEARING
NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
FIRM LILEN6E X0: L 150
301FayettevvlleSt.,2
,
KCsaita1s99
XISINGER CAMPO 8a1giggh, NC 27601
8ASSOCIATES ( )882-7839
PERMIT DRAWING
SHEET 4OF11
—
—
BM1
N
ELEVATION
715991
=
E 2533024
24.93
--
—L— SR 1552 (OVER MEADOW BRANCH)
Eta
—
BL STATION 32+22.00
RR SPIKE SET IN 18" PINE
—
—
---
PI
K=145
EL
VC
DS
= 1I+90.00 —
= 25.06' —
= 80'
> 55 MPH
Pl = 13+40.00
K=116 AllK=116
EL = 25.66'
VC = 180'
DS > 55 MPH —
Pl = 15+20.00
EL = 23.59'
VC = 180'
PH—
DS ) 55 M40
4g:
--
—
* --
I
—
—
—
—
—
4gg
—
—
—
_
30
Bl:-:GIPJ
El-
G RAD
-BEGIN
BRIDGE
END
BRIDGE
END GRADE
0
_
_
30
=
5.1
EL =
25.37
EL
25.
0'
STA.16
EL=2396'
10.
_
(+
0.40
0%
(—)/J
00%
_
_RTF
—
— —
10
0
-
-
-
BEGIN
S
100
--
D
rCH
ED
4X
ES
EL=
SUR
END
STA l
ELEV=
Y
-
-
ITCH RT
+68 -L-
22.0'
SEL = 18.65
WSEt- = 18
-
-
7'
I'
-
-
I
I
C
BE
OBS
ON
BA
---
ASS II
CH E
RVED
5-OS
K STA
I
I
RIP R
. 19.5'
P
- .2'
—_
ION
---
I
STRUCTURE HYDRAULIC DATA BRIDGE
DESIGN DISCHARGE = 700 CFS
DESIGN FREQUENCY = 25 YRS
DESIGN HW ELEVATION = 22Z FT
BASE DF/REQUENCY l00 YRS
BASE liV✓ ELEVATION = 24J r r
OVERTOPPING DISCHARGE = 1225
OVERTOPPING FREQUENCY = 50+
OVERTOPPING ELEVATION = 23.9
A 11+
YR W
-
25
-L-
PROPO
EL =
YR W
10
lO
T*]�EV-
�
-
-
+ttt--
-
I
---
I
ILIZA
---
-
-
-
FOR STRUCTURE PLANS, SEE S—ITHRU S-20
---
I
I
--
I
I
---
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
II
I
I
I
I
I
I
10 11 12 13
14 15 16 17
PROJECT REFERENCE NO. SHEET NO.
BR-0120 4
F F DENOTES FILL IN RNI SHEET NO.
WETLAND ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
SITE I ENLARGEMENT
W NOT USE PO CONSTRUCTION
DENOTES EXCAVATION �� y
IN WETLAND
— - UNLESS ALL
SIGNATURES
E OFFICE OF. SIGNATURES COMPLETED
GNK&391F5.St
.
Ste l
ga27691KSINGER CAMPODENOTES TEMPORARY 8 ASSOCI-ES
(919)882-]839
IMPACTS IN SURFACE WATER PERMIT DRAWING
SHEET 5 OF 11
DENOTES MECHANIZED `� A-/
CLEARING
S N R/W
w ♦ ■ � ^ -+-\ \
___________________________
/mi
cv
`O
0 5 10
PROD. REFERENCE
NO. SHEET NO.
N
BR-0120
X-1
0
1
1
0
1
0
0
40
-
1
20
ittt0
0
1
0
1
0 1
0 I
u
i u
u
—
---r\ III III
1+
1 1, 1 1 T
r%
FF
1, \ I / 1 A 1 goll
C\ IIII I N II
III
—
S 1
1 r rT
1=CI
./
6
..�.
0
-1
�
I
li
m
-
-
- -
--
-
-
-
I -
i
-
-
-
-
TFFR
-
- - -
-
-
-
---
---
---
---
-------
---
-
---
--
--
--- 4 -------
-------
--
-
---
-------
---
0.025
0.025
n
TF
_
--
—
------
—
57=
24
93 _
3:�
—
----
_
—
— —
lilt
Eli
-
---
---
--- ----
---
12
---
+
-----
0.00
-
Al
-
-
- -
-
-
-
-------
-------
-----
-----
A]
I
l�
T�Vii
-o
_--
__
—
_--_—__
_
_
0.027
0.017
g.
_
Hill
E
a
S
0
N
0
Ir
0
m
C
O
/
Hill
0
G
J
CT
—
0
o
—
—
W
—
—
—
TFI
Wdliitit
i—
—
—
—
—
—
—
—
—
— —
—
N
-
-
V
(L
N
O
m
N
1p
-
Hill
TM
r
O]
O]M
�lnU
�XY
�NQ
Nn
-
'
PRELI
(NARY PLANS
Um
WN
O� C
Q:
o�C
1
0
0
1
0
1
1
0
0
0 50
40
20
1
1
20
40
50
60
0
1
0
1
0 1
0 1
0
0 5 10 PROD. REFERENCE
NO. SHEET NO.
N
BR-0120
X-2
0
1
1
0
1
0
0
40
-
0
0
1
1
2
0
50
100
To
I
u
i
u 1
u
► 1 II'r
m,n1\.1
P� In
A, \
/ 1 A 1 /'��
1
I
GG
Gl
GG
GOo
7
=�',EE
;''
v
-
-
-
--
-
-
- -
-
-
-
--
-
3;
-
-
- -
-
-
-
---
---
--- ---
-------
--
t_
0.
25
0.025
-
-
---
/
2423
-
-
-G
#
ak
a-
— -------
HH
_
wo
I ro
-
---
wa
- _
- -
_
- _
- -
.
LO0
I
hill
E
e
N
0
TH
K
0
W_�
nt_�_
--
#
FL_
--- - -------
C
3
Q
----------
---
O
/
y
C
N
C
�
V
---
-
--
-
------
- -
---
W
I
IRC
7+
f,
-
HE
T4
i
3�
LLl
d
i_LL
T
-
-
I
- -_ -
-
- — -
- -
ti
Q
.n
I
M
0.
25
0.025
+111
N
O
m
N
m
-----
--,H+44
Hill
hill
4��
Ttr
O]
m^
12
+
O.oO
�^
�Q
GNU
�XY
44
�0F
�NQ
N^
Um
WN
O� C
00C
0
1
0
1
1
0
0
0 50
40
1
20
AID50
60
0
100
1
0 5 10
PROL REFERENCE
NO. SHEET NO.
N
�
BR-0120
X-3
0
1
1 1
0
1
0
0
40
01
D
20
100
1
0
120
1
u
1 u
U
-
F
o>
z�
as
J�
i
0.)25
0.025
-
23
tt
-
419
4
14
+- 0.00
-
-
-
Mill
- -
-
-
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
c
m
0.025
0.025
—
E
ti
m
N
0
K
0]
C
Q
I Hill
13
+ 2.42
o-
--
-
-
--
W
n
""I
TA
iT*
I
- -
�
i
I
i
.000000.
oo
--
_
—
—
—
1391
11
-
d
N
O
m
N
m
O]
O]M
GNU
�XY
�0F
�NQ
N^
Um
WN
O� C
o�C
0
130
1
1
0
0
0 50
40
1
20
40
50
60
0
100
1
`O
0 5 10
PROD. REFERENCE
NO. SHEET NO.
N
�
BR-0120
X-4
0
1
1+41
0
1
0
0
40
-
1
D
20
0
0
100
1
0 120
I
u l
u
u
1 bf
j 1
EL \/\/
\JI 11'
1 1\ II 11 .
1 1 1I %-11
-
-
-
--
-�-
-
-
-
-
i
---
---
---
---
-------
--
i
- I
'n
�-
------
-
2360
----
---_.
lot
-
19
+-
-
-
-
-
-
-
a
-
-
-
..
--
-
-
-
-
-
-
-
-
-
- -
-
wo
1m
-
---
--
--
--
-
w
u
-
-
-
-
- -t---
--
C
rn
;
I
y
--
-
-41
23 34
-
--L-
E
e
N
0
K
O]
fu
m
C
3
Q
15
+ 0.00
---
-
--
------
---
y
C
E
-
-
-
C
0
C
W
H
-
r
FT
-
-
- -
W
d
Z
�
im
m
q
i
n
tiH
-
T
d
N
O
m
N
m
I
Hill
Hill
O]
O]M
-------------
----
--
---
--
-�Q
NU
-XY
olQ
N^
Um
WN
O� C
Q:
o�C
1
0
0
1
0
1
1
0
0
0 50
40
20
1
1
20t4
40
50
60
0
1
0
`O
0 5
10 PROD. REFERENCE NO.
SHEET NO.
N11110111
�
BR-0120
X-5
H
0
1
1
0
1
0
0
40
-
1
20ttt-t
0
0
1
0
1
0
I
u
u
V
q
n1 1�' I
► 1 119•
P� F1
I, \
/ 1 A A /'��
III
F� 1�' I
1 1�� II
m,n n l
/ ♦ 11 II 1
1 1 Ff
L�� 1 \J-1.
,C► 4/\./ 1 1\JI II
11' 1 1 +I \..%
3111
1 IC:':.I 10
MAW
It
N
R
E
T
0
------------
—
--
x
--_--_
—
—
--
2396
-
----
E
S
0
N
0
-
-
K
0]
m
C
Q
44
O FTFF
/
ti
0
E
C
C
W
H
-
- _
-
- -
W
d
Q
n
M
_
-
O
m
T
IL
N
Tt
m
O]
its
4
—
—
—
—
— —
—
�M
W�
~n
nQ
U
MxY
�NQ
N^
WN
O� C
Q:
1
0
0
1
0
1
1
02
0
0 50
40
20
1
1
20
40
50
60
0
1
0
00C
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
13+18.04 / 13+46.98 -L-
Proposed Bridge
< 0.01
< 0.01
< 0.01
2
13+59.43 / 14+10.66 -L-
Proposed Bridge
< 0.01
< 0.01
0.01
< 0.01
3
14+00.00 / 15+22.71 -L-
Roadway/Rip Rap pad
< 0.01
TOTALS*:
< 0.01
0.02
0.02
0.02
*Rounded totals are sum of actual impacts
NOTES:
Permanent Fill in Wetlands = 218 sf
Revised 2018 Feb