Loading...
HomeMy WebLinkAbout20191745 Ver 1_Scotland C106 - NC 144 Let Plans_20200110DocuSign Envelope ID: OE3C98BE-75E9-4B4F-B6EE-1FD594OE82DD O O C) N 00 0 L T i DW rn 3:O CD -0 CV D z o� U� 0��i See Sheet I For Index of Sheets �P� I \,3- ECT SATE CATIO,11t5 1323 144 1429 1321 a� � Old Laurel Presbyterian 1323 VICINITY MAP OFF -SITE DETOUR ROUTE N. T. STATE OF NORTH ('ARC>fJ[NA DIIT'I,5'ION OF HR-31HWAYS SCOTLAND COUNTY LOCATION.- CULVERT 106 OVER JORDAN CREEK 011I 111C 144 (OLD WIRE ROAD) TYPE OF WORK: GRADING, DRAI11lAGE, PAVING & RCBC BEGIN PROJECT 15408.1083803 -L- Sta. 12 + 00.00 ?o Z�z \00. A ,O `\ Imo \ ETL NA �77 BEGIN y1ETLANp$ �� \ K + + CONSTRUCTION EAS� , -Y- POT Sta.11 +,�50.,00 IV � �`' - IS SR 1323 WETLANDS '. 15�... )S - is TO IS 11D ROAD - 13T*1�T��{7 R6AJD �� ANDS�H it �y LAUgELm BEGIN RCBC 7 -I- POC Sta. 15 + 47.00 STATE STATE PROJECT REFERENCE NO. SHEET NO, TOTAL SHEETS N.C. 15408.1083803 1 STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION 15408.1083803 PE n p �o END PROJECT 15408.1083803 -I- Sta. 18 + 30. 00 JORDA11l CREEK I I I J US 15/501 TO'TLAND�' WET IDS `!! •t 4_1 I OLD*-,��.� - -�«4- �' +V +VWETLl21DS \,t� + + TL4NDS y I I END RCBC -I- POC Sta. 15 + 77.00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PLANS PREPARED BY: PLANS PREPARED FOR: HYDRAULICS ENGINEE ENGINEERING DIVISION OF HIGHWAYS MI ENGINEERING .�"�0`� ••��/ •�:YA GRAPHIC SCALES DESIGN DATA PROJECT LENGTH " CAR01 C p 1011 SCHAUB DRIVE, SUITE 100 ('� 0•• DIVISION O W1RALEIGH, NC 27606 • • C ADT 2 013 = 2 900 3220 GLEN ROYAL RD. RALEIGH, NC 27617 FIRM PE1NUMBER: P-0671 =```\ •'Q� �ql''; 50 25 Q 50 1 0Q TELE 919.788.0224 FAX 919.788.0232 I21 DOT Drive - ;•� SEAL ADT 2025 = 5800 LENGTH ROADWAY PROJECT 15408.1083803 = 0.113 mi NC LICENSE#P-0189 Carthage, NC 28327 10/14/2019 040302 :: o� Y ned Docu K — O/O Si b 2018 STANDARD SPECIFICATIONS s PLANS Et(� �t,v�u'�4FiTH D0/O 434337520358403... P•�•� �� �� ii ,,�Tap LENGTH STRUCTURE PROJECT 15408.1083803 = 0.006 mi SIGNATURE. 50 25 0 50 100 T = 7 % * RIGHT OF WAY DATE: BRIAN A. WILES, PE a V = MPH JUNE 6 2019 PROJECT ENGINEER ROADWAY DESIGN •o��N•CARo�//, �� o ENGINEERo''••. 9 Q PROFILE (HORIZONTAL) TTST = DUAL TOTAL LENGTH OF PROJECT 15408.1083803 = 0.119 mi �'��� sEAL�9!•' = ��p o Q°�� 10/14/2019 (a�� l0 5 0 l0 20 FUNC CLASS = LETTING DATE: 16689 DocuSi ned by: '•F �• MAJOR COLLECTOR TIM WELCH, PE 9 SUBREGIONAL TIER NCDOT CONTACT T�.AW:I�. .,ti''••• ••''�,. PROFILE (VERTICAL) DIV 8 BRIDGE PROGRAM MANAGER RR90nOFFA2F34nF P.N,,�A;;; N SIGNATURE: DocuSign Envelope ID: DED390B6-4298-43D8-83B5-AD7F44OBD690 GENERAL NOTES: INDEX OF SHEETS SHEET NUMBER SHEET GRADE LINE: 1 TITLE SHEET GRADING AND SURFACING: 1A INDEX OF SHEETS, GENERAL NOTES AND STANDARD DRAWINGS 1B CONVENTIONAL SYMBOLS 2A-1 PAVEMENT SCHEDULE, TYPICAL SECTIONS, PAVED SHOULDER AND WEDGING DETAILS 2A-2 TYPICAL SECTIONS 2C-1 GUARDRAIL INSTALLATION - SHEET 6 OF 8 3B-1 SUMMARIES OF EARTHWORK, ASPHALT PAVEMENT REMOVAL AND GUARDRAIL 3D-1 DRAINAGE SUMMARY 4 PLAN SHEET 5 PROFILE SHEET RW-01 THRU RW-04 RIGHT OF WAY SHEETS TMP-1 THRU TMP-4 TRAFFIC MANAGEMENT PLANS EC-1 THRU EC-5 EROSION CONTROL PLANS RF-1 THRU RF-3 REFORESTATION DETAIL SHEETS UO-1 THRU UO-2 UTILITIES BY OTHERS PLANS X-1 THRU X-13 CROSS SECTIONS C-1 THRU C-5 CULVERT PLANS CLEARING: 2018 SPECIFICATIONS EFFECTIVE: 01-16-2018 REVISED: THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. GRADE LINES MAY BE ADJUSTED AT THEIR BEGINNING AND ENDING AND AT STRUCTURES AS DIRECTED BY THE ENGINEER IN ORDER TO SECURE A PROPER TIE-IN. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. SUPERELEVATION: ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH STD. NO. 225.04 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS. SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. SIDE ROADS: THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSAY WORK TO PROVIDE SUITABLE CONNECTIONS WITH ALL ROADS, STREETS, AND DRIVES ENTERING THIS PROJECT. THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS INVOLVED. GUARDRAIL: THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL. TEMPORARY SHORING: SHORING REQUIRED FOR THE MAINTENANCE OF TRAFFIC WILL BE PAID FOR AS "EXTRA WORK" IN ACCORDANCE WITH SECTION 104-7. UTILITIES: UTILITY OWNERS ON THIS PROJECT ARE Windstream -Communications, and City of Lourinburg - Communications. ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS. RIGHT-OF-WAY MARKERS: ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT. TEMPORARY DIVERSIONS WETLAND REPAIRS: THE TEMPORARY DIVERSIONS IN THE WETLAND AREAS WILL BE RESTORED TO PRECONSTRUCTION SLOPE AND CONTOURS. EXCAVATED MATERIAL SHALL BE STRATEGICALLY STOCKPILED AND PROTECTED. THIS MATERIAL WILL BE USED TO BACKFILL THE EXCAVATED AREAS TO THE ORIGINAL DENSITY. THE AREA WILL THEN BE RESEEDED WITH THE APPROPRIATE NATIVE WETLAND SEED MIX. CENGINEERING 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE 919.788.0224 FAX 919.788.0232 NC LICENSE #P-0189 EFF . 01 -1 6-201 8 REV. 2018 ROADWAY ENGLISH STANDARD DRAWINGS The following Roadway Standards as appear in "Roadway Standard Drawings" Highway Design Branch - N. C. Department of Transportation - Raleigh, N. C., Dated January, 2018 are applicable to this project and by reference hereby are considered a part of these plans: STD.NO. TITLE DIVISION 2 - EARTHWORK 200.03 Method of Clearing - Method III 225.02 Guide for Grading Subgrade - Secondary and Local 225.04 Method of Obtaining Superelevation - Two Lane Pavement DIVISION 3 - PIPE CULVERTS 300.01 Method of Pipe Installation DIVISION 8 - INCIDENTALS 806.01 Concrete Right -of -Way Marker 806.02 Granite Right -of -Way Marker 838.01 Concrete Endwall for Single and Double Pipe Culverts - 15" thru 48" Pipe 90 Skew 838.11 Brick Endwall for Single and Double Pipe Culverts - 15" thru 48" Pipe 90 Skew 862.01 Guardrail Placement 862.02 Guardrail Installation 876.01 Rip Rap in Channels 876.02 Guide for Rip Rap at Pipe outlets 876.04 Drainage Ditches with Class 'B' Rip Rap cQ BOUNDARIES AND PROPERTY.- State Line County Line Township Line ----- ----- City Line Reservation Line Property Line Existing Iron Pin O Computed Property Corner Property Monument El ECM Parcel/Sequence Number @ Existing Fence Line -X X X- Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary - - - -WLB- - - - Proposed Wetland Boundary WLB Existing Endangered Animal Boundary EAB Existing Endangered Plant Boundary EPB Existing Historic Property Boundary HPB Known Contamination Area: Soil S �- Potential Contamination Area: Soil - S �t - Known Contamination Area: Water - W Potential Contamination Area: Water - - W-Contaminated Site: Known or Potential BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap O Sign S Well W Small Mine Foundation 0 Area Outline Cemetery fi Building School Church Dam HYDROLOGY.- Stream or Body of Water Hydro, Pool or Reservoir -- Jurisdictional Stream —is Buffer Zone 1 Bz I Buffer Zone 2 Bz 2 Flow Arrow < -- --- Disappearing Stream , Spring a Wetland Proposed Lateral, Tail, Head Ditch � FLOW False Sump S°][°A°lI°'IE OF NORTH C ARO][_,IN A9 DIVISION nF HIGHWAYS CONVENTIONAL PLAN SHEET SYMBOLS RAILROADS.• Note: Not to Scale *S. U.E. = Subsurface Utility Engineering Standard Gauge - RR Signal Milepost Switch RR Abandoned RR Dismantled CSX THANSPORTATION 0 MILEPOST 35 0 SWITCH RIGHT OF WAY & PROJECT CONTROL: Secondary Horiz and Vert Control Point Primary Horiz Control Point 0 Primary Horiz and Vert Control Point 10 Exist Permanent Easment Pin and Cap 0 New Permanent Easement Pin and Cap 0 Vertical Benchmark Existing Right of Way Marker 0 Existing Right of Way Line New Right of Way Line R New Right of Way Line with Pin and Cap R New Right of Way Line with Concrete or Granite R/W Marker New Control of Access Line with Concrete C/A Marker Existing Control of Access New Control of Access Existing Easement Line New Temporary Construction Easement New Temporary Drainage Easement New Permanent Drainage Easement New Permanent Drainage / Utility Easement New Permanent Utility Easement New Temporary Utility Easement New Aerial Utility Easement ROADS AND RELATED FEATURES: Existing Edge of Pavement Existing Curb — iIV 0 W ins � M1 TDE PDE DUE PUE TUE AUE Proposed Slope Stakes Cut - - - C - - - Proposed Slope Stakes Fill - - - F - - - Proposed Curb Ramp cR Existing Metal Guardrail T T T Proposed Guardrail T T T T Existing Cable Guiderail n n n Proposed Cable Guiderail n n n n Equality Symbol a Pavement Removal VEGETATION.• Single Tree Single Shrub Hedge Woods Line Orchard Vi neya rd EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall - MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES. - POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H-Frame Pole U/G Power Line LOS B (S.U.E.*) U/G Power Line LOS C (S.U.E.*) U/G Power Line LOS D (S.U.E.*) TELEPHONE: Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Pedestal Telephone Cell Tower U/G Telephone Cable Hand Hole U/G Telephone Cable LOS B (S.U.E.*) - U/G Telephone Cable LOS C (S.U.E.*) - U/G Telephone Cable LOS D (S.U.E.*) - U/G Telephone Conduit LOS B (S.U.E.*) U/G Telephone Conduit LOS C (S.U.E.*) U/G Telephone Conduit LOS D (S.U.E.*) U/G Fiber Optics Cable LOS B (S.U.E.*) U/G Fiber Optics Cable LOS C (S.U.E.*) U/G Fiber Optics Cable LOS D (S.U.E.*) 12? 12? 12? 0 Vineyard CONC ) CONC WW CONC HW Ll CB O S O ❑T HH - - - -T- - - - T — ---TC— — -— --TC-- TC -T FO- - - - -T FO- - T FO WATER: Water Manhole Water Meter o Water Valve 0 Water Hydrant �0 U/G Water Line LOS B (S.U.E*) - - - -W____ U/G Water Line LOS C (S.U.E*) - -W- - U/G Water Line LOS D (S.U.E*) W Above Ground Water Line A/G Water - TV: TV Pedestal TV Tower U/G TV Cable Hand Hole "H U/G TV Cable LOS B (S.U.E.*) - - - -TV- - - U/G TV Cable LOS C (S.U.E.*) - -TV- - U/G TV Cable LOS D (S.U.E.*) TV U/G Fiber Optic Cable LOS B (S.U.E.*) - - - -TV FO- - - U/G Fiber Optic Cable LOS C (S.U.E.*) - -TV FO- U/G Fiber Optic Cable LOS D (S.U.E.*) TV FO- GAS: Gas Valve 0 Gas Meter U/G Gas Line LOS B (S.U.E.*) - - - -G- - - - U/G Gas Line LOS C (S.U.E.*) - -G- - U/G Gas Line LOS D (S.U.E.*) Above Ground Gas Line A/G Gas SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer SS Forced Main Line LOS B (S.U.E.*) SS Forced Main Line LOS C (S.U.E.*) SS Forced Main Line LOS D (S.U.E.*) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line LOS B (S.U.E.*) U/G Tank; Water, Gas, Oil Underground Storage Tank, Approx. Loc. AIG Tank; Water, Gas, Oil Geoenvironmental Boring U/G Test Hole LOS A (S.U.E.*) Abandoned According to Utility Records End of Information O ss A/G Sanitary Sewer - - - -FSS- - - - FSS FSS • 0 0 0 ?UTL 0 UST 0 AATU R E.O.I. DocuSign Envelope ID: 82043F64-4547-4FBD-8A00-4E59A867DF82 Or DocuSign Envelope ID: 39A59DAD-DB19-4FEB-A35B-26CBB5D7B50E m O- c�l OL c\ O-)C DocuSign Envelope ID: 9BF25CDD-B63C-4E7F-AC36-01C69C792E1D 0 oTm C H Z MC) 0 x Hz�=D --i =0> m �zxV _ cn O 0 ZHOrTI n=�z H 1 � � H O z HEET 6 OF 8 862DO2 6" 2 rr 41/ rr 41/ rr r_11/nrr W-BEAM MIDSPAN PANEL SPLICE 2%2" X 11/8" ( TYP . SPLICE BOLT SLOTS 25'-Orr r_11/nrr / 4" X 21/2" (TYP. ) POST BOLT SLOTS r_11/nrr STANDARD W-BEAM GUARDRAIL 8 ►► 6,► STANDARD LINE POST r--, r-, WOOD OFFSET BLOCK (FOR WOOD POSTS) 2/2►►X3/ it I SLOT CID 7 %2 it ±1/8 SHORT WOOD BREAKAWAY POST 8 ►► 1" /$►► DIA CENTERED L V. ON 6" SIDE -------------------- ----- r , I T I /8►► DIA. 3 ►► 1 3 ►► : I SOIL PLATE 3/4" DIA. I r----------------- I O I I I I I LO co T STEEL TUBE TS 6 x8 xO.1875 - SYSTEM PARTS IDE r_11/nrr 1 i 11ln 1 / rr 211 ►►+ ►► 16 16 r I _ + 23/4 ►►+ 16rr r\ _ I 0 it PLAN I 2 16 �r + 1/$ ►► _ 0 ►► I FRONT ROUTED OFFSET BLOCK LO co 411 i DIA. ' ' I I HOLES %6" DIA. HOLES IDE "W6" STEEL POST �FES $ SEAL DocuSign f.by:'. 022966 �.���� NG I NE •'p��� S73F3D17DCDL'A�,..' �I ' Ow, 10/14/2019 z O U) � Q Q R H � � V L.LJ0-HZ 00U)= wQQL= U � O Q =~zw H U LLcr OJ O O Cn z ,H �> � H LU 0 SHEET 6 OF 8 862DO2 L E c9 L) cv co 0 L CL 7L 3 O� Q cal O Z \ Occ OL� LL C\1/ U COMPUTED BY: DATE: PROJECT REFERENCE NO. SHEET NO. CHECKED BY:BAW DATE: STATE OF NORTH CAROLINA 15408.1085805 3D-1 DIVISION OF HIGHWAYS LIST OF PIPES, END WALLS, ETC. (FOR PIPES 48" & UNDER) J 0- � N o. N ENDWALLS Q V m 't w � NON m �' O Z m v 00 wQ� J ~ z O , V Z) 2 O p v~i p ABBREVIATIONS Z DRAINAGE PIPE C.S. PIPE R.C. PIPE R.C. PIPE 0 STD. 838.01 Z V x Z p u � N M Z O w Lu w L C.B. CATCH BASIN STATION ULu (RCP, CSP, CAAP, HDPE, or PVC) CLASS III CLASS IV Q STD. 8 11 p v O c~" U � O t FRAME, GRATES ,~,, O O v m N.D.I. NARROW DROP INLET O STD. 838.80 LL O z+ ~ a AND HOOD w N o w p m D.I. DROP INLET O (UNLESS p a N STANDARD 840.03 V w a N `n `" O O u NOTED O Z N N G.D.I. GRATED DROP INLET J N O v OTHERWISE) O z z Nv N G.D.I. (N.S.) GRATED DROP INLET O w J J Lu V V _ o LIN. . N ° v m O 3 � O z Z cn 3 Cv D m J.B. (NARROW SLOT)z JUNCTION BOX SIZE Q u w w w w a 12" 15" 18" 24" 30" 36" 42" 48" U c�i> a w a p 12" 15" 18" 24" 30" 36" 42" 48" 12" 15" 18" 24" 30" 36" 42" 48" 12" 15" 18" 24" 30" 36" 42" 48" > w w CU. YDS. `n A B w p `�' ~ N O m Lu CL 11 M.H. MANHOLE O CL O > Z > z 1 N w V �u V w 2 w cn g w J j a a- d a � ce O cn M o 3 �' 3 O � d V N Z TRAFFIC BEARING w N _ N _ z z o O o :z w � V T.B.D.I. DROP INLET THICKNESS OR GAUGE � O � O O O � v � � o 0 00 Q o 00 w Z cn a p H w w -i w _ CL w 00 J O Q O TRAFFIC BEARING O Z z Z Z v v v v o a` o o, a p p a a = p p TYPE OF GRATE Q N O c� T B J B O ~ O p O p O O o o 0 0 0 0 'o 0 0 0 o o �j u, p N w p cn CJ d Vi u V Q ''' = Z Q O o N z a m V = p _ p m cL = p = p Q Z U z V O Lu a JUNCTION BOX p p r° ui V 0 Q O ~ O O p OU V a REMARKS E F G V 13 + 14 -Y- CL 0401 0402 213.0 212.8 72 3.4 42 TOTALS 72 3.4 42 DocuSign Envelope ID: BD67A588-5182-4735-AA5B-OC8501064AE7 Z 0 w w CT 001 (7 V) i () (V CO 0 L 2 i m 6� O 3< CV � C(N f V Nn L L P1 Sto 12 +72.64 P1 Sto 16 +34.68 P1 Sto 19 +14.82 A = 25° 36' 02.0" (LT) A = 10° 34' 52.1" (LT) A = /* 57' 46.7" (LT) D = 4° 46' 28.7" D = 5° 27' 24.3" D = /* 54' 35.5" L = 536.18" L = 193.91' L = 102.78' T = 272.64' T = 97.23' T = 51.40' R = 1,200.00' R = 1,050.00' R = 3,000.00' �O -L- POC Sta. 12 + 00.00 BEGIN CONSTRUCTION +75.00 55.00' O .i� ��ii, 5.00 \ET�L�ANbS O: �O� / � n Qo Q) o o � Q)SPECIAL CUT BASE DITCH W/RIP RAP 0 Q, SEE DETAIL 'B' Q SPECIAL CUT BASE DITCH ) SEE DETAIL 'A' BM#1 / BL T 9+64 76' LEFT EV 216.92' JAMES GIBSON RR SPIKE IN ASE OF 24" PINE THE DB 621 PG 96 �36.18 +00.00 80.00, +00.00 80.00, /P 55.00' /" W Raw - WOODS qY ____ o . 71 w�TLAN\\T a -k/- �' `� h o _ V_ C C `� \NG Raw \ \ ^v T FO _ JAMES GIBSON _4 a DB 621 PG 96 -!- #T Sfo. l7 ,I'7- +oo o \ / WOODS NATURAL CHANNEL 30. O'ETLANDS� SEE DETAIL 'C' (RIP RAP IN 4_1 BASE NO[�SHOVy I) \�__Y- *.00 -Y- POT Sta. 11 + 5 0. 00 BEGIN CONSTRUCTION- . 33� 31.8„ � JS Sp 1321- � LL H CHURCH GOAD - � LA RE AVE[) ROA D P TO LA�O 4- EXIST�O R/w��/ C V WE LANDS � • I 4 i Co 1 0 N � m � OLD LAUREL PRE BYTERIAN CHURCH o NO DEE FOUND r� a +7 0 � i, 10 E EXISTING RCP W/HW BEANE WRIGHT PARTNERS, LLC DB 1290 PG 77 2 N 1� N + N a A. +- V7 - �� _•n�i�11�7�!G��7�Y WOODS �d// 1 S 36.24'33" E 41.03'- 11 TONS CL B RIP RAP W/28 SY GEOTEXTILE U U � U CL 1 \ -Y - P1 Sto 12 +45.01 P1 Sto /5 +41.05 A = 4° 50' 53.3" (LT) A = 66° 04' 4/.0" (LT) D = 4° 46' 28.7" D = 76° 23' 39.7" L = 94.56' L = 86.50' 47 30' - 48 78' PROJECT REFERENCE NO. SHEET NO. E N G I N E E R I N G 15408.1085803 4 SCOTLAND COUNTY C106 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE 919.788.0224 FAX 919.788.0232 ��.�``��CARp'''�.,� NC LICENSE #P-0189 �O`o`�� •'••"'••• N •CARp��N �. oFtssloti9 9 °moo;o��ss/o*,.. P MI ENGINEERING = = _ ' ' � SEAL ! - ��� FqL qr•: • = QocuSi a oaSigned 00 1011 SCHAUB DRIVE, SUITE 100 gi�i8'89 � � _�• 0�0302iml RALEIGH, NC 27606 UI' •c�� Q(919) 851-6606 '�� ��++ AAl1 `��� k. ��s�//s ((F ,.•'C• _�q` r FIRM PE NUMBER: P 0671 �gLLEN .o' °%�FITH JE���,' 10/23/2019 10%7'3'%2'b19 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 N ti N � N O d; + N Ln L � _ 1 0 0 V) CL CL I I � j I J 2@14' RCBC W/BEVELS BURIED 1' W/SILLS / US INV.=203.0' DS INV. 203.0' I SLOPE= .0% I I I Io N FILL WIT NATIVE MATERIAL 3 I I "' `° I I I +37.45 80.00, +3/.36 & SJEANNE WARWICK• j DSO, 22 A 80.00, & DB 139 PG 2IPG 9 6 II 30.00, w T L /AND I +6342 1 I WOODS 50.00, I - R _ N EE PRO NDA P� °" II EXISTING R/W _ __ _ _ =� F� TO US 15/501 `� �WETLA'NDS `/ F 4- WETLANDS- Z p ROA AT Cu u2 CULirill4 - - -- e -� G� C 144 23 PAVE - 0 o �< cV O o O� v o - �CULVERT SEPERATION �o 0 0 .i vosk1NG R/w o - N F y 3-8'(H)x9'(W)CONCRETE n +63.42 C --GRE-1J• �� .. _ - =w� WOODS 30.00, u�8 uuo - - - + 5. cuL cu WWI END*BURIEQ, °' `� .� WETL�IDS 1 5.00' N • � C9 .a JOSEPH WARWICK, JR. & JEANNE WARWICK CRE IS T HBO DB 1323 PG 166 LL m +31.56 MB9PG219 WOODS 30.00, & +00.00 75.00' 3 I CL II RIP RAP 90.00' -L- POT Sta. 18 + 30.00 BANK STABILIZATION LENGTH=20 FT CL II RIP RAP END CONSTRUCTION 5 S I2°26'52" W EST.=7 TON, 22 SY GEOTEXTILE BANK STABILIZATION 31.95' LENGTH = 20 FT +37.45 EST. = 23 TON, 53 SY GEOTEXTILE 75.00' +37.45 90.00, DETAIL A SPECIAL CUT BASE DITCH ( Not to Scale) Natural o< Front Ground 3. Ditch j D Slope LB Ij Min. D=1.0 Ft. B - 4.0 Ft. FROM -L- STA. 12 + 00 TO STA. 14 + 50 LT DETAIL D CUT DITCH ( Not to Scale) Front o� Ditch Natural R'1 Mgt Slope Ground Min. D=1.0 Ft. T - T - R = 1,200.00" R = 75.00' FROM -Y- STA. 13 + 25 TO STA. 13 + 75 RT PROPOSED PAVEMENT REMOVAL DETAIL B SPECIAL CUT BASE DITCH ( Not to Scale) Natural O� Front Ground .7 D \o�cel Slope d Ditch Geotextile B Min. D=1.0 Ft. Max. d =1.0 Ft. B = 4.0 Ft. Type of Liner= CL B Rip -Rap FROM -L- STA. 14 + 50 TO STA. 15 + 00 LT EST. 26 TONS CL B RIP RAP, 70 SY GEOTEXTILE DETAIL C NATURAL CHANNEL DETAIL Natural Material ( Not to Scale) in Base Natural Ot Front Ground �' j D 3 O�<e� Slope d Ditch Geotextile B Min. D=1.5 Ft. Max. d =1.0 Ft. B = 4.0 Ft. Type of Liner= CL B Rip -Rap COUNTERSUNK (BASE) FROM -Y- STA. 12+25 TO STA. 13+25 LT 58 TONS CL B RIP RAP, 153 SY GEOTEXTILE FOR PROFILE, SEE SHEET 5 STATE STATE PROJECT REFERENCE NQ SHEET I TOTAL NO. SHEETS P" H STATE OF NORTH CAROLINA IN.C. DIVISION OF HIGHWAYS SURVEY CONTROL, EXISTING CENTERLINES, RIGHT OF WII> PROPERTY TIES SCOTLAND COUNTY BEGIN PROJECT 15408.1083803 -I- Sta. 12 + 00.00 ?o q�� 13z3 �jlL �.d -L- BEGIN CONSTRUCTION -Y- POT Sta.11 + 50.00 SR 1323 TO AND RLA ROAD 1VIcF� SRy1321 RCH ROAD U UREL HILL CH LA BEGIN RCBC -L- POC Sta. 15 + 47.00 JORDAN CREEK NC 144 OLD WIRE ROAD END RCBC -L- POC Sta. 15 + FiNAPA 1/i END PROJECT 15408.1083803 -L- Sta. 18 + 30.00 TO US 15/501 15408.108303 or DATUM DESCRIPTION Prepared in the Office of. THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT GRAPHIC SCALE IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY ®� �►®f p� NCDOT FOR MONUMENT "82C106-2" PROFESSIONAL LAND 50 25 0 50 100 WITH NAD 83/NSRS 2011 STATE PLANE GRID COORDINATES OF SOLUTIONS SURVEYOR NORTHING: 395025.499(ft) EASTING: 1859819.165(ft) ,�.•��N,cAR0�4,, ��0�cARo�'•,, ELEVATION: 244.746(ft)•GEL ;oF�s S ioN9�9'''': g PLANS THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT :ENGINEERING•: = m: OF NC, INSEAL C. =y (GROUND TO GRID) IS: 0.9998922932 - NO. C-1938 L-3996 THE N.C. LAMBERT GRID BEARING AND ,: o� '�� �o�•: ��a ��' DISTANCE IZ LOCALIZED HORIZONTAL GROUND TANCE FROM 'L,�'9j'•.. ,•� 'as••'�° suR��:• �; 11 " + 20I8 STANDARD SPECIFICATIONS ���i,,�F. AUTN�; ��� ��i III CENN�J; op 82CI06-2 TO -L- STATION 12 00.00 IS N 76-42'30.2" E 892.1529(ft) RIGHT OF WAY DATE: LETTING DATE: ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES JUNE 65 2019 SEPTEMBER 10, 2019 VERTICAL DATUM USED IS NAVD 88 SIGNATURE: Date: SURVEY CONTROL SHEET WI EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION �'o lgli,QF l yell � BM#I BL STA 9+64 76'LEFT ELEV 216.92' RR SPIKE IN BASE OF 24" PINE TREE Er TO L�RINB�RG o. — ro US 15/501 i E 3 pAVE� G� N 34 55' 12' .. 144 2 � NC BL-103 T ---T--� --� ��- I I I I --=--T- NOTES: 132•IB7 N 36' 52• 58 E — — 4 I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM. 4 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. IF FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. • V) Z 0 w W 0- 0- co In (9 U N co 0 i D- / 3 0 rr / to C ro 3 n- U Z (-o U CD (_0 CD (V 0 0 a� 0 L CL O( O( 3( iL pj i O 0 0-)(n O 0- CV N- n O wL V)Q OU ( i -L- POC Sta. 12 + 00.00 BEGIN CONSTRUCTION O +75.00 T° -Z- 304a ti,Z" vF (3 JAMES GIBSON DB 621 PG 96 0o�N I, Parks H. Icenhour, a Professional Land Surveyor in the state of North Carolina hereby certify to the best of my knowledge and belief that the following work item(s) (Base map Compilation, R/W Staking) performed under my responsible charge meet NCDOT Survey Standards as directed in the NCDOT Location & Surveys guidelines and procedures. I further certify that the data compiled came from available surveys/mapping performed by others and provided to me by NCDOT and do not certify to the accuracy or quality of the individual data sources. I further certify that the right of way and permanent easement points shown herein and outlined in the tables shown hereon (localized coordinates, station/offset) have been checked and are accurate representations of the right of way and permanent easement points depicted on the corresponding highway plans. I also certify that the right of way and permanent easement points shown herein have been field monumented under my supervision from existing survey controlprovided by others that the depicted property data shown herein were surveyed by others and these monuments denote the right of way and easement boundaries at the time of staking which may be subject to change due to right of way revisions (See deeds for final determination). Witness my original signature, registration number and seal this 9th day of September, 2019. ----------------------------- L-3996 Professional Land Surveyor PLS # Seal 0 N + p + ko C 1- 5 + O p nILn O w to C J +36✓8 QL o N _ F- ► +00A0 80.W 1 1 +37.45 M to OL CC U J 1 i80.W �I 1 80.W a +3i36 ► SJEANNE WARKV�I�R C ► 30A0' & -� DB 1323 PG 166 ► 8ODa 1 MB 9 PG 219 _► R N 2�5; t ► +63.42 3R P D „ .,` 30.W to CREEK IS PROPE OUNDARY E EXIS"MG R'W r0 u5 15/50► N � PROJECT REFERENCE NO. SHEET NO. 15408.108303 RW04 Location and Survevs SOLUTIONS PROJECT SURVEYOR C A R p� ��i. CAR pl��i,, ���``�H, 41 :ENGINEERING'; 9 �•' mC OF NC, INC. NO. C-1938 �� t SEAL :v : L-3996 SUR • J,��. ,�'••.,,•.• •,.. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED IGH WATER MARK BY . MAPPING 30.5 - ELEV 215.8' + 2 308' - _ � RO AY Ei�Sr�HC ¢ 5 E 144 23 PAVED ,,.� �„�. ULI w� CLL5 R,w C�vNC wW 36' - - C N JAMES GIBSON i - 1 I T- _ Z- - o - DB 621 PG 96 —Y— PT StO, /3 f78Y77 CULVERT SEP EX1SI1NG R/W +OOAO — — _ I 13-8'(H)x9'(W)CONCKL I t WOODS 1 30:00' / + I:S-�z 5t coNcTww +63.42 --I:: CO wW No R c WOODS 30.W ULII -Y- +15.00 a, 45A0' 00 -Y- POT Sta. 11 + 50.00 i R o -�`" � JOSEPH WAR wwICCK R. BEGIN CONSTRUCTION RiW � � E �' CREEK IS TY & JEANNE WAR*116 EX ", DB 1323 PG 166 E -L - +5489 E +3136 MB 9 PG 219 �SR 12► E �`'-` 75W ' WOODS 30A & CHu �OAD —Y— +38.00 +00.00 75.W L R L HILL p 0 ROAfaN y pD o -y- +70A0 62.W +36J8 90.00' �c � P �- � - 30A0' 75A0' � -L- POT Sta. 18 + 30 00 quRINBu —Y— +Q0Q0 ro L � ' 40„pp, ,;`;rk�""- �1• 6'Sr w END CONSTRUCTION EXISTING R/W 1. +37.45 WOODS 75rW S 36°24'33' E +37.45 90.00' N Ln Ln W N 0 a BEANE WRIGHT PARTNERS, LLC OLD LAUREL PRE BYTERIAN CHURCH o DB 1290 PG 77 NO DE FOUND 2 N N d+ + N O- ' O � � V) O C 1 � I O NOTES: I.IF FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. 2. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM. DocuSign Envelope ID: ED003AF5-6963-418D-81A0-93B4A6C371B2 L n 0 N 00 i w U O L L O U U L Uw 0-)�a o (Dz ('\J LQ� LLJ \~V) \ � c�ri w 1 STATE OF NORTH st='A1RO1L1INA DIVISION OF Ell"'HWAYS TRANSPORTATION MANAGEMENT PLAN SCOTLAND i -----, P PROJECT SITE 1323 IS 1325 1321 1301 1323 1321 - v-Z��a 4 " Old Laurel Presbyterian %1323 I 15 5 01 VICINITY MAP �I 144 1429 ,l l 1323 j i I DETOUR ROUTE COUNTY LOCATION: CULVERT 106 OVER JORDAN CREEK ON NC 144 (OLD WIRE ROAD) TYPE OF WORK: GRADING, DRAINAGE, PAVING, & STRUCTURE P a PLANS PREPARED BY: NCDOT CONTACTS: ON O F y, Gy�L OF N y O R T / BRIAN A. WILES, PE TIM WELCH, PE - s c 2 rn z 0O PROJECT MANAGER DIV. 8 BRIDGE PROGRAM MANAGER m o -o O O 7 O WORK ZONE SAFETY & MOBILITY 10 T OF TRNNAb tiF "from the MOUNTAINS to the COAST" TRAFF�G I1VDEX 0,F SHEETS SHEET NO. TMP-1 TMP-1A TMP-1B TMP-2 TMP-3 TMP-4 TITLE TITLE SHEET, VICINITY MAP, AND INDEX OF SHEETS LIST OF APPLICABLE ROADWAY STANDARD DRAWINGS, AND LEGEND TRANSPORTATION OPERATIONS PLAN: (MANAGEMENT STRATEGIES, GENERAL NOTES, AND LOCAL NOTES) SPECIAL SIGN DESIGN OFF -SITE DETOUR ROAD CLOSURE DETAIL AND DETOUR SIGNS PLANS PREPARED FOR: DIVISION OF HIGHWAYS DIVISION 8 121 DOT Drive Carthage, NC 28327 PLANS PREPARED BY: CENGINEERING 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE 919.788.0224 FAX 919.788.0232 NC LICENSE #P-0189 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Docu Signed by: APPROVED: A W:.&4 8890DOFEAMUDE... DA TE: 10/14/2019 11111111/,,, , ,V1 o� .CAR0j��•,. S S I SEAL 9l�. SEAL = 16689 4L LEN��;. 1111 SHEET INTO, TMP-1 V W O DocuSign Envelope ID: ED003AF5-6963-418D-81A0-93B4A6C371B2 PROD. REFERENCE NO. SHEET NO. 15408.1083803 TMP-1A ROADWAY STANDARD DRAWINGS THE FOLLOWING ROADWAY STANDARDS AS N.C. DEPARTMENT OF TRANSPORTATION ARE APPLICABLE TO THIS PROJECT AND A PART OF THESE PLANS: SHOWN IN "ROADWAY STANDARD DRAWINGS" - RALEIGH, N.C., DATED JANUARY 2018 BY REFERENCE HEREBY ARE CONSIDERED STD. NO. TITLE 1101.03 TEMPORARY ROAD CLOSURES 1101.11 TRAFFIC CONTROL DESIGN TABLES 1110.01 STATIONARY WORK ZONE SIGNS 1145.01 BARRICADES 1205.01 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS 1205.02 PAVEMENT MARKINGS - TWO-LANE AND MULTI -LANE ROADWAYS 1205.04 PAVEMENT MARKINGS - INTERSECTIONS 1261.01 GUARDRAIL AND BARRIER DELINEATORS - INSTALLATION SPACING 1261.02 GUARDRAIL AND BARRIER DELINEATORS - TYPES AND MOUNTING 1262.01 GUARDRAIL END DELINEATION c 0 Q 75 Q0 0 N 03 U / O L O C-) 0 O L �W CT��Q o Oz NL1:1:� ~� mr-r LEGEND GENERAL ---------• EXIST. PVMT . NORTH ARROW PROPOSED PVMT. FINAL PAVEMENT MARKING THERMOPLASTIC PAVEMENT MARKING LINES (4"1 90 mils) 15800 LF THERMOPLASTIC PAVEMENT MARKING LINES (4"3 120 mils) 15800 LF PERMANENT RAISED PAVEMENT MARKERS 15 EACH CENGINEERING 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE 919.788.0224 FAX 919.788.0232 NC LICENSE #P-0189 Docu Signed by: APPROVED: r 9,z" A Wai 8890DOFEA2FUDE... DATE: 10/14/2019 SEAL TRAFFIC CONTROL DEVICES BARRICADE (TYPE III) TEMPORARY SIGNING SEAL � 16689 LLEN �� •`�, DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED STATIONARY SIGN ON O F y/G NORrN . y c� co 2 tL m 0 O v O o�_ 2 ti O �O T OF TRPAo G NF TRAFF\G ROADWAY DRAWINGS STANDARD & LEGEND DocuSign Envelope ID: ED003AF5-6963-418D-81A0-93B4A6C371B2 PROJ. REFERENCE NO. SHEET NO. 15408.1083803 TMP-113 c m 75 u 0 u N co C� 0 L c 0 L �w CT-) Q 0 0z N Lw ~� mr-r MANAGEMENT STRATEGIES -CLOSE NC 144 (OLD WIRE ROAD) & SR 1321 (LAUREL HILL CHURCH ROAD) AND DETOUR TRAFFIC OFF -SITE -MAINTAIN LOCAL ACCESS TO ALL RESIDENCES AND BUSINESSES BETWEEN CLOSURE POINTS AT ALL TIMES DURING CONSTRUCTION GENERAL NOTES CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN THE DETAIL DRAWINGS, STANDARD DETAILS, AND ROADWAY DETAILS ARE NOT ATTAINABLE TO MEET FIELD CONDITIONS OR RESULT IN DUPLICATE OR UNDESIRED OVERLAPPING OF DEVICES. MODIFICATION MAY INCLUDE: MOVING, SUPPLEMENTING, COVERING, OR REMOVAL OF DEVICES AS DIRECTED BY THE ENGINEER. THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF THE CONSTRUCTION PROJECT EXCEPT WHEN OTHERWISE NOTED IN THE PLAN OR DIRECTED BY THE ENGINEER. SIGNING A) PROVIDE SIGNING AND DEVICES REQUIRED TO CLOSE THE ROAD ACCORDING TO THE ROADWAY STANDARD DRAWINGS AND TRANSPORTATION MANAGEMENT PLANS. PROVIDE SIGNING REQUIRED FOR THE OFF -SITE DETOUR ROUTE AS SHOWN IN THE TRANSPORTATION MANAGEMENT PLANS. B) COVER OR REMOVE ALL SIGNS AND DEVICES REQUIRED TO CLOSE THE ROAD WHEN ROAD CLOSURE IS NOT IN OPERATION. COVER OR REMOVE ALL SIGNS REQUIRED FOR THE OFF -SITE DETOUR WHEN THE DETOUR IS NOT IN OPERATION. C) ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR TO ALTERING ANY TRAFFIC PATTERN. LOCAL NOTES 1) NOTIFY THE ENGINEER AT LEAST 30 DAYS PRIOR TO ANY TRAFFIC PATTERN ALTERATION. 2) NOTIFY THE SCOTLAND SCHOOLS TRANSPORTATION OFFICE OF THE BRIDGE REMOVAL 30 DAYS PRIOR TO ROAD CLOSURE. 3) NOTIFY THE SCOTLAND COUNTY EMERGENCY MANAGEMENT OF THE BRIDGE REMOVAL 30 DAYS PRIOR TO ROAD CLOSURE. PHASING STEP 1) USING RSD 1101.03, SHEET 1 OF 9 AND TMP-4, CLOSE NC 144 (OLD WIRE ROAD) AND SR 1321 (LAUREL HILL CHURCH RD) AND DETOUR TRAFFIC OFF -SITE AS SHOWN ON TMP-3. MAINTAIN ACCESS TO ALL RESIDENCES AND BUSINESSES BETWEEN CLOSURE POINTS. STEP 2) REMOVE THE EXISTING STRUCTURE. STEP 3) CONSTRUCT THE PROPOSED STRUCTURE AND ROADWAY. STEP 4) PLACE FINAL PAVEMENT MARKINGS. STEP 5) OPEN NC 144 (OLD WIRE ROAD) AND SR 1321 (LAUREL HILL CHURCH RD) TO TRAFFIC AND REMOVE ALL WORK ZONE TRAFFIC CONTROL DEVICES. ENGINEERING 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE 919.788.0224 FAX 919.788.0232 NC LICENSE #P-0189 Docu Signed by: APPROVED: 8890DOFEA2EMDE._. DATE: 10/14/2019 ��`�� CAR01 SEAL SEAL 16689 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ON O F H/C \�� F N O R T /y O C,9 c 2 m o v O O � � a �A ti N e GO 1 r s OF TRP tiF TRAFF�G TRANSPORTATION OPERATIONS PLAN DocuSign Envelope ID: ED003AF5-6963-418D-81A0-93B4A6C371B2 PROJ. REFERENCE NO. SHEET NO. 15408.1083803 1 TMP-2 SIGN NUMBER: SP-1 TYPE: STATIONARY QUANTITY: SEE PLANS SIGN WIDTH: 4-6" HEIGHT: HEIGHT : 1'- 6" TOTAL AREA: 6.8 Sq.Ft. BORDER TYPE: INSET RECESS: 0.47" WIDTH: 0.63" RADII: 1.5" NO. Z BARS: LENGTH: BACKG COLOR: Fluorescent Orange COPY COLOR: Black MAT'L: 0.080" (2.0 mm) ALUMINUM USE NOTES: 1,2 1.Legend and border shall be direct applied black non -reflective sheeting. 2.Background shall be NC GRADE B fluorescent orange retroref lective sheeting. LETTER POSITIONS DESIGN BY: TAG PROJECT ID: ID BORDER R=1 .5►► TH=O.63 ►► IN=0.47►► a CHECKED BY: LOCATION: 4' 6 " Old Wire Road 6.75" 40.5►► 6.75►► Sep 09, 2019 DIV: DIV 6 m 5" 5% 6 5" Spacing Factor is 1 unless specified otherwise Letter locations are panel edge to lower left corner Series/Size Text Length 0 1 d W i r e R 0 a d C 2000 6.7 10.6 12 14.6 19.6 24 25.6 27.6 30.2 35.2 38.6 41.6 44.7 40.5 FILENAME: SIGN DESIGNS - Work Zone c N U (9 O_ U N 00 1-1 U 0 L F 0 U 0 0 L �w 0-) Q O 0z N L� ~� mr-r ENGINEERING 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE 919.788.0224 FAX 919.788.0232 NC LICENSE #P-0189 NORTH CAROLINA D.O.T. SIGN DETAIL Docu Signed by: APPROVED: FF.A Wa" 8890DOFEA2EUDE..., DATE: 10/14/2019 ♦♦�����,CAROI •� SEAL !� SEAL = 16689 :,�,���•,, FNG I N •• DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ON O F HIG NORTy C q 4'0 '9 40 �. s � 2 v m 0 O O 7 ti e O lO T O F T R PNS G HF TRAFF\G SPECIAL SIGN DESIGN DocuSign Envelope ID: ED003AF5-6963-418D-81A0-93B4A6C371B2 PROJ. REFERENCE NO. SHEET NO. 15408.1083803 TMP-3 �-o 0 u CAI 00 1-1 U O L F O C-) C) �w 0-) Q o uz N L� ~� JR v- y A1 IEN��,,,,,F T R PNSe o GO DOCUMENT NOT CONSIDERED FINAL tiF TRAFF�G UNLESS ALL SIGNATURES COMPLETED DocuSign Envelope ID: ED003AF5-6963-418D-81A0-93B4A6C371B2 PROJ. REFERENCE NO. SHEET NO. 15408.1083803 TMP-4 NC 144 Old Wire Road F 0 ' ROAD CLOSED 500 FT W2 0-3 48" X 48" 91 c 0 N 03 C� / 0 L c 0 L �w o �Q '-� L� Lew N/u� � oo� mF1, SR 1323 McFarland Rd r�- TI K SR 1323 McFarland Rd 0 NC 144 Old Wire Road O 0 0 SR 1324 1 Church Rd laurel H11 �o ROAD CLOSED AHEAD W20-3 48" X 48" NEXT RIGHT SP-4R 42" X 12" E R11-2 48" x 30" TYPE III BARRICADE(S) 0 STA. 11+50± tinn'+ 0 C106 STA. 18+00± L ' D C NC 144 Old Wire Road T LO 0 NC 144 Old Wire Road � B A C7I `Shd jg� �C 9 STA. 11+00± G D ROAD <9A CLOSED DET AHEAD <AHE> W2 0-3 22 0-348" X 48" 8" X 48" ' ROAD CLOSED .AHEAD \-/4W20-3 8" X 48" NEXT LEFT SP-4L 42" X 12" (:F R11 -4 60" x 30" ROAD CLOSED TO THRU TRAFFIC END DETOUR M4-8 A 24" X 18" 0 TYPE III BARRICADE O O � 144 Ml -5 Old Wire Road 54" 5X 18" DETOUR M4-8 24" X 12" M6-1 21" X 15" H R11 -4 60" x 30" ROAD CLOSED TO THRU TRAFFIC M4-10L DETOUR 48" x 18" TYPE III BARRICADE CENGINEERING 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE 919.788.0224 FAX 919.788.0232 NC LICENSE #P-0189 144 M1-5 Old Wire Road " 54 54X 18" DETOUR M4-8 24" X 12" M6-1 L 21" X 15" I DocuSigned by: APPROVED: 8890DOFEA2EMDF... DATE; 10/14/2019 ♦♦♦.♦tN,CARpI'�i,� SEAL !� SEAL = 16689 �'�,��'i•�' FAG � N E��; -*C")�: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED O F H/C ON F NORTy h.� �� S'0 � 2 0 m o -o — O O7 �F oe ? ti N e GO 1 r s O� RF tiOFTF TRAF��G R11 -4 60" x 30" ROAD CLOSED TO THRU TRAFFIC DETOUR TYPE III BARRICADE 0 M4-10R 48 x 18" ROAD CLOSURE DETAIL and DETOUR SIGNS L F to U W CD U (V 00 / 0 0 Q Ln N iff} C� o °Q NU7 L� 2W 0* � ifff /lfl Cr 144 PROJECT SATE LOCATION �c.k 1325 1429 1323 - 1321-- 1323 �a�; a /" 01?1 4 ` Old /" 0 Laurel Presbyterian \ 1323 1321 1321 1301 15 501 VICINITY MAP OFF -SITE DETOUR LOCATION: CULVERT 106 OVER JORDAN CREEK 0111 NC 144 (OLD WIRE ROAD) ROUTE N T.S. TYPE OF WORD: GRADING, DRAINA GE, PAVING & RCBC GRAPHIC SCALE PLANS PROFILE (HORIZONTAL) 0 PROFILE (VERTICAL) THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY WITH THE REGULATIONS SET FORTH BY THE NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE APRIL 1, 2019 AND ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCES. 1111� ffi, I I U11 I W,80 "00 0 T L A N D C �`UDU N T Y BEGIN PROJECT 15408.1083803 -L- Sta. 12 + 00.00 ?o 4f���,L �.+ `F' r + K BEGIN CONSTRUCTION J -Y- POT Sta.11 +,�50.�0 . . . . . -. _ -'S ,S - TO Sis LAUg m BEGIN RCBC -L- POC Sta. 15 + 47.00 Prepored in the Office of: MI ENGINEERING, PLLC 1011 SCHA UB DR, SUITE 100 RALEIGH, NC 27606 Designed by, BILL JERNIGA11t, JR., PE 3395 NAME LEVEL III CERTIFICATION NO. n p �o END PROJECT 15408.1083803 -I- Sta. 18 + 30. 00 JORDA11l CREEK jm VS 15/501 /� y N - 8:1 -- all � � 4 4 / / S l END RCBC -L- POC Sta. 15 + 77.00 Reviewed in the Office of: ROADSIDE ENVIRONMENTAL UNIT I South Wilmington St. Raleigh, NC 27611 2019 STANDARD SPECIFICATIONS Reviewed by: AARON HARPER, PE STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. 15408.1085805 EN STATE PROJ. NO. F. A. PROD. NO. DESCRIPTION EROSION AND SEDIMENT CONTROL MEASURES SfJ.11 Description mhol 1630.03 Temporary Silk Ditch------------------- TSD 1630.05 Temporary Diversion --------------------- - - - - - TD 1605.01 Temporary Silt IFence--------------------- 1606.01 Special Sediment Control Fence 1622.01� Temporary Berms and Slope Drains - - - - - - - - - - - - 4- 4- - - - - - - - 1630.02 Silt Basin Type B --------------------------- -----� 1L033.011 Temporary Rock Silt Check Type=A------------------ Temporary Rock Silt Check Type -A with Matting and Po➢yacry➢amide (I�A1� ).................... 1633.02 Temporary Rock Silt Check Type-B - - - - - - - - - -' Wattle/ Coir Fiher Wattle EW- -----------------------------------) - CFW Wattle / Coir Fnher Wattle with Po➢yacry➢amide (PAM)-------------------------------------- ]1654.011 Temporary Rock Sediment Dam Type -A- - - - - - - - - - - - ooa o 0 1¶1634.0¶2 Temporary Rock Sediment Dam Type-B- - - - :) JL6¢D5.®]1®cJl� Pipe Inlet Sediment Trap Type -A °� 635.02 Rock Pipe Iln➢ec Sediment Trap Type-I�-- o $ o00 630.04 Stilling Basin ---------------------------------------- o°000°o 630.06 Special Stilling Basin ----------------_____ Roc➢g Inlet Sediment Trap. .632.01E Type A--- ---------------------- A 632.02 Type B --------------------------------- B LLJ .632.03 Type --------------------------- C LJ Skimmer Basin ------------------------------------------------ Tiered Skimmer Basin ----------------------------- Ilnfil6ration Basin----- --------------- ------ Roadway Standard Drawings THIS PROJECT CONTAINS EROSION CONTROL PLANS FOR CLEARING AND GRU3ING PHASE OF CONSTRUCTION. The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2018 and the latest revison thereto are applicable to this project and by reference hereby are considered a part of these plans. 1604.01 Railroad Erosion Control Detail 1605.01 Temporary Silt Fence 1606.01 Special Sediment Control Fence 1607.01 Gravel Construction Entrance 1622.01 Temporary 31erms and Slope Drains 1630.01 Riser -lasin 1630.02 Silt 31asin Type 1630.03 Temporary Silt Ditch 1630.04 Stilling 3asin 1630.05 Temporary Diversion 1630.06 Special Stilling 3asin 1631.01 Matting Installation 1632.01 Rock Inlet Sediment Trap Type A 1632.02 Rock Inlet Sediment Trap Type 1632.03 Rock Inlet Sediment Trap Type C 1633.01 Temporary Rock Silt Check Type A 1633.02 Temporary Rock Silt Check Type 1634.01 Temporary Rock Sediment Dam Type A 1634.02 Temporary Rock Sediment Dam Type -3 1635.01 Rock Pipe Inlet Sediment Trap Type A 1635.02 Rock Pipe Inlet Sediment Trap Type 1640.01 Coir Fiber -3affle 1645.01 Temporary Stream Crossing OF HIGHWAYS NORTH CAROLINA SOIL STABILIZATION TIM.EFRAMES SITE DESCRIFTION STABILIZATION TIME TIMEFRAME EXCEFTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE SLOPES STEEPER THAN Sal 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 201914 DAYS ARE ALLOWED. SLOPES 3olOR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50'IN LENGTH,, ALL OTHER AREAS WITH SLOPES FLATTER THAN 401 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES. DIVISION OF HIGHWAYS STATE OF N SOIL STABILIZATION SUMMARY SHEET MATTING FOR EROSION CONTROL MATTING FOR EROSION CONTROL CONST SHEET NO. LINE FROM STATION TO STATION SIDE ESTIMATE (SY) 4 -�- 12+00 14+50 L,T 205 5UE TOTAL 350 M I SGE��ANE U5 MATT I N6 TO 0E I N51A 1.E0 A5 01 KE 1E0 by THE NG I NEEK 6290 TOTAL 6495 5AY 7000 CONST SHEET NO. LINE FROM STATION TO STATION SIDE ESTIMATE (SY) COIR FIBER 2' (MAX . ) MATTING COIR FIBER WATTLE POLYACRYLAMIDE (PAM) SLOPE ISOMETRIC VIEW 2' UPSLOPE CTAVC CROSS SECTION VEE DITCH 2 IN. See Inset C r EDGE OF PAVEMENT NATURAL GROUND 2' DOWNSLOPE STAKE 2' UPSLOPE STAKE NATURAL GROUND J MATTING - - � 2' DOWNSLOPE CROSS SECTION STAKE TRAPEZOIDAL DITCH FLOW WITH DETAIL NOTES: USE MINIMUM 12 IN. DIAMETER COIR FIBER (COCONUT FIBER) WATTLE. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE STANDARD SPECIFICATIONS. PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT TO BE APPLIED TO EACH WATTLE. INITIALLY APPLY 2 OUNCES OF ANIONIC OR NEUTRALLY CHARGED PAM OVER WATTLE WHERE WATER WILL FLOW AND 1 OUNCE OF PAM ON MATTING ON EACH SIDE OF WATTLE. REAPPLY PAM AFTER EVERY RAINFALL EVENT THAT IS EQUAL TO OR EXCEEDS 0.50 IN. INSET A AM (1 oz.) INSET B oz. 'AI (1 oz.) TOP VIEW INSET C TEMPORARY ROCK SILT CHECK TYPE ' A ' WITH EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM) SEDIMENT CONTROL STONE STRUCTURAL STONE 1' MIN �✓�o 0 EXCELSIOR MATTING PLAN �2/3 CHANNEL WIDTH SECTION A -A EXCELSIOR MATTING 0 A See Inset A NOTES: INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN ACCORDANCE WITH ROADWAY STANDARD DRAWING N0. 1633 - 01. USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE. PRIOR TO POLYACRYLAMIDE A SOIL SAMPLE MATERIAL, AND TO BE APPLIED FROM PROJECT ANALYZE FOR TO EACH ROCK INITIALLY APPLY TO TOP OF MATTING EVENT THAT EQUALS (PAM) APPLICATION, OBTAIN LOCATION, AND FROM OFFSITE APPROPRIATE PAM FLOCCULANT SILT CHECK. 4 OUNCES OF SECTION AND OR EXCEEDS INSET A CLASS B STONE POLYACRYLAMIDE (PAM) AFTER EVERY RAINFALL 0.50 INCHES. 1MIN- - 0 0 00000 O o O D O D H = 2 M7:02: Oo 00 0o Oo O o o O D 0 O D O D O o O 00 O 00 O 00 O 00 O 00 6�F� -,=� W I I F 6Fff I E I E I E -ff F�fl :F�f 1=1 6ffl SECTION B-B EXCELSIOR MATTING CLASS B STONE NOT TO SC/\LE1 I I I PROJECT REFERENCE NO. SHEET NO. CLEARING GRUBBING PLAN ENGINEERING 15408.1083803 EC-04/CONST.04 I C � SCOTLAND COUNTY C106 I ROADWAY DESIGN HYDRAULICS -L 3220 GLEN ROYAL RD. RALEIGH, NC 27617 ENGINEER ENGINEER Pl Sto 12+72e64 Pl Sto 16+34e68 Pl Sto 19+14e82 0,�� TELE 919.788.0224 FAX 919.788.0232 0 = 25° 36' 02." (LT) p = /0° 34' 52.1" (LT) p = l5746.7(LT) ° ' " „ �, NC LICENSE #P-0189 INCOMPLETE PLANS D=44628.7 D=52724.3 D=15435.5 I L = 536e18' L = 193e9/' L = 102.78' ix�P �® N®� U�>E®� �� w ACQUISITION T = 272.64' T = 97.23' T = 51.40' R = 1,200.00" R = 1,050e00' R = 3,000.00" I PO I I I I DOCUMENT NOT CONSIDERED FINAL \Q UNLESS ALL SIGNATURES COMPLETED I I Q I QO CLEARING AND GRUBBING xQ EROSION CONTROL FOR �Q O CONSTRUCTION SHEET 04 I QV I I N N -L- POC Sta. 12 + 00.00 li rn o BEGIN CONSTRUCTION ►n + o O o � + CCL )* 11-- � p 1 O p CL J SPECIAL CUT BASE DITCH W/RIP RAP 1 +75.00 SEE DETAIL 'B' Q, 1 4 55.00' SPECIAL CUT BASE DITCH I I J 2914' ' RCBC WBEVELS \ `-1 � 4 SEE DETAIL 'A' \I I BURIED 1' W/SILLS To `� - � �i.00 . 1 / - \ N1#I - US IqV.-203.0' < \� 0.00' \ B� T -4+64 76' \F� `- \ _ `-, `� `� / EV 2 �2 �1 \ DS INV. 203.0' Z �<< \\ RR S�IKE IN ASE �F 24" PI \/ SLOPE= .0% �'�- `(� �\ I \ \\ �� JAME GIBSON NE Tb E ` dry `� `� / C r3�./� \, -N ; VFI\L WIT , N TIVE MATERIAL I J J J I J DB 6 P\G 96 r, \, \ 0 J +00.00 \ 80.00 j +37.45 I / / w \ \ \\ �\�\\��� r 80.00' \ i 80.00' (I� J + �•3 I JOSEPH,WARWICK, JR ` J _\ \ �g\ 1 +00.00 I I l l ` 30.0 ' & JEANNE WARWICK \ orr \ 55 '' \ / / \ C W6b� l r �1� a - „ MB 9 PG 219 \/ DB 1323 PG' 166 / / I Z2° / 2 V � � o +63.42 \xv- rr`4o�\ \ o a c R s l �Po 4-1 W o - - \ \ \\\ \ \ \T �z \� \ _ l l I v \ d �'° J EXISTING pPN is �? � � US I55/50I Nk R r MA / I I �^ J p y F \4 ELEv 2I5.8 s a J l �' o Z \� ` r J.v\ I� / -/ / -� 1\= AVE ROA AY N 144 4-1 VGA/{yam\ V -c,• zIL JAMES GIBSON ° _ _ 77,ji�- - DB 621 PG 96 -Y- #T `�i/7\ - - e CULVERT SEPERATI01� - - - - �o `� y - J/ De l \ - ozz - i -5iz- 3-8'(H)x9'(W)CONCRETE I ✓2„ e • �No o D s \ 1 NATURAL CHANNEL" �H `n2 i\ C eSEE DETAIL 'C' R o _ WOiODSRAP IN L 8c BASEcucu j 00 0 S 1 -Y- POT Sta. 11 + 50.00 -� BEGIN CONSTRUCTION _ �rw - - - = _ - -- ti JOS JEA° WARWICK JR. _ N f .51L-> -Z,S� / � e T o \ / � / / & JEANNE WARWICK - - - i - -� - e ��, �1e8" N - - - \ L -91Z= a _ d DB 1323 PG 166 = -, 2 +3/.36 MB 9 PG 219 3000' & - - L a ®- SR 132 WOODS � - y w o C: CHURCH / �- , J h =i + p� I r� / '+00.00 75.00' 3 L HILL-- z6 / I I' / RE 221 R� \ - - -� _ _ - -Y , `+7 0 � i 62.00 +36J8 / -� � / o % . ( � CL311,RIP RAP 90.00' -L- POT Sta. 18 + 30.00 URG ��2'�� - _ = J CUT DITCH \ _ �- - - 0 LAURINB - - BAN9C STABILIZATION / 2,&' / v � � -Y � +D .00 SEE DE- J LENGTH=20 FT CL II RIP RAP END CONSTRUCTION \� / T / / �� - �� 2,6-,y - REMO E EXISTING _ �\CL �3II"1RCP W/HW 4 •� �3 21 y / BANK STABILIZATION / / - Exls1��� v = 2 SY GEOTEXTILE I N� 7 TON, LENGTH-20 FT 12 E T 2 215- WOPDs � -- �� + 7.45 EST. - 23 TON, 53 SY GEOTEXTILE / ' N /� - , �2 J `�1i J J / - s 36 - +37.45 � J 90.00, 11 TONS CL B RIP RAP W/28 SY GEOTEXTILE 00 o i DETAIL A DETAIL B DETAIL C 1 p BEANE WRIGHT PARTNERS, LLC SPECIAL CUT BASE DITCH SPECIAL N UTa BaASIE DITCH NATURALNOcH° DB 1290 PG 77ANNEL DETAIL OLD LAUREL PRE BYTERIAN CHURCH o (Notta scale) Natural Material / - in Base 0 NO DEE FOUND + 2 N Ground 3•� ��e� Ditch Natural , D ��ayt Slope Natural D ��O�l P t Front 1 Front FrontGround v' `�' e< Ground �'• e< Slope I 1� CV D Fed Slope d Ditch d Ditch U Min. D =1.0 Ft. Geotextile B Geotextile B C + CV B-4.0 Ft. Min. D=1.0 Ft. Min. D=1.5 Ft. o = - Max. d = 1.0 Ft. Max. d = 1.0 Ft. � CD Max. Ft. B=4.0 Ft. o 0e FROM -L- STA. 12 + 00 TO STA. 14 + 50 LT L +- Type of Liner= CL B Rip -Rap Type of Liner= CL B Rip -Rap COUNTERSUNK (BASE) w CD U FROM -L- STA. 14 + 50 TO STA. 15 + 00 LT FROM -Y- STA. 12 + 25 TO STA. 13 + 25 LT c9 U U EST. 26 TONS CL B RIP RAP, 70 SY GEOTEXTILE 58 TONS CL B RIP RAP, 153 SY GEOTEXTILE I U 1 NOTE: V 1 I � r' o I E- U P1 Sto 12 +45e01 P/ Sto 13 +41.05 } p = 40 30; 53.3" (LT) p = 660 04 ; 4/.0" (LT) 10 D = 4 46 28e7 D = 76 23 39.7 Qo� L = 94.56' L = 86.50' N� T - 47 30' T - 48 78' " FROM -Y- STA. 13 + 25 TO STA. 13 + 75 RT I I o R = 1,200e00" R = 75.00 L O-0 I= FOR PROFILE, SEE SHEET 5 I � UU I \ EA I � ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ I I I CULVERT CONSTRUCTION SEQUENCE STA. 15 + 62 -L- 1. CONSTRUCT SPECIAL STILLING BASIN PER NCDOT STANDARDS AT LOCATION SHOWN 2. CONSTRUCT IMPERVIOUS DIKES AND DIVERSION CHANNEL AS SHOWN. DIVERSION CHANNEL TIE—INS SHOULD BE ISOLATED FROM JS FLOW. INSTALL 84" TEMPORARY PIPE AND BACKFILL 3. DIVERT CHANNEL FLOW THROUGH TEMPORARY DIVERSION CHANNEL AND PIPE. NOTES: 1) All excavation shall be performed in only dry or isolated IMPERVIOUS areas of the work zone. 2) Impervious dikes are to be used to isolate work from D I KE�- stream flow when necessary. 3) Maintenace of stream flow operations shall be incidental to the work. This includes polyethylene sheeting, diversion �h pipes, pumps and hoses. , 4) Pumps and hoses shall be of sufficient size to dewater the work area. C/ 41 4 �o l� SLZ 0 -9LZ�°I 8 ° LLZ Ljt�f�l ~` _ _ 6lZ --- ---- - I we �20 _ PROJECT REFERENCE NO. SHEET NO. 15408.1085803 EC-4A ILW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER 4. CONSTRUCT CULVERT AND CHANNEL IMPROVEMENTS. 5. REMOE IMPERVIOUS DIKES AND ALLOW FLOW THROUGH RCBC. 6. REMOVE STILLING BASIN AND TEMPORARY PIPE. FILL TEMPORARY DIVERSION CHANNEL TO EXISTING ELEVATIONS. 7. COMPLETE PROPOSED ROADWAY CONSTRUCTION. JOSEPH?�WARWICK9 JR° OD TEMPORARY CHANNEL & JEAf�NE WARWICK TQ CHANGE WITH LINER DB 1323 PG 166 tigoti M B 9 PC 219 e% I le tiq - I Vu INV-209.4 26 - - - - 84 INCHTEMPORARYGIL - - -81Z- PIPE _ _ — I `1 % -- -- 1Z BURIED 1.0' T F o - - - : c� --------8LZ Obi N SPECIAL o r bLz STILLING I �216 BASIN 215 \� ----- _ - ( � ) w� WOODS - 2 ( CN v — INv 2a .4 _ TIE TO EXIST. - ' 2 7 1 215 I N 1L — ,- 5 t�21 I 1, — N & JEAN / 9lZ lZ T E E DB 13 217 — W— M B 219--_ ( N _— 213 >— — °°— TEMPORARY CHANNEL WOODS ( Not to Scale) IMPERVIOUS ° — � oo _r N TEMPORARY DE— NaturalNatural DIKE _ —� }° ° `' Ground q N FLEXIBLE Ground _ _ �° o �- WATERING ?. � HOSE PUMP R M 5 E EXISTING N G - - 214 i Min. D 2. o Ft. 3 "RCP W/HW m S ��-f a �� = 6 0 Ft. s _ `�,�� � B �l- 215 tll —�� WOODS _ — , Type of Liner= Geotextile w° Zit 209 SCALE: 1„ — 20 I I I PROJECT REFERENCE NO. SHEET NO. I �ENGINEERING 15408.1085805 EC-05/CONST.04 co FINAL PLAN _ SCOTLAND COUNTY C106 I ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 3220 GLEN ROYAL RD. RALEIGH, NC 27617 P1 Sto 12+72.64 P1 Sto 16+34.68 P1 Sto 19+14.82 0,�� TELE 919-788.0224 FAX 919-788.0232 p = 25° 36' 02.0" (LT) p = /0° 34' 52.1" (LT) p = l° 57' 46.7" (LT) NC LICENSE #P-0189 I D = 4 46 28.7 D = 5 27 24.3 D = l 54 35.5 `ti INCOMPLETE PLANS I L - 536.18' L = 193.91" L = 102.78" P DO NOT USE FOR R / W ACQUISITION T = 272.64" T = 97.23' T = 51.40' R = 1,200.00' R = 1,050.00' R = 3,000.00' I PO I I I I DOCUMENT NOT CONSIDERED FINAL \O UNLESS ALL SIGNATURES COMPLETED I I O I 0 I OO. I X I \ O I I - I QV I I N y O O C\3 -L- POC Sta. 12 + 00.00 II ,.� m o BEGIN CONSTRUCTION p N q�Ln + O p � p Ln p I O p c CL vp �p SPECIAL CUT BASE DITCH W/RIP RAP p I 75.00 SEE DETAIL 'B' � � I I +1 I � 4- 55.00' 1 J 1 I SPECIAL CUT BASE DITCH 1 J 2@14' RCBC WBEVELS I \ `-1 ` SEE DETAIL 'A' I I BURIED V W/SILLS To O •� 5.00 / g� T 9B 64 76' DEFT US INV.-203.0' `- � `� 0.0 / EV 216092' U DS INV. 203.0' I I Z / RR SPIKE IN ASE OF 24" PINE THE ;� v SLOPE= .0% 3 I I O \ JAMES GIBBON �56.18 I � `� � / o N ; FILL WIT NATIVE MATERIAL I I \ DB 621 PG 96 � � I +00.00 80.00' +37.45 I I > \ \ z *31.36 JOSEPH WARWICK, JR. Lu 410 egg \ +00.00 80.00 80.00 30.00' & & JEANNE 323 PG WARWICK W I C K BI I I \ \ c 80.00, MB 9 PG 219 I Io +63.42 1 \ \qo \ R w Nt-R 30.00 4WODS - - _ F _ �\ o\ / �/ v oEE PRO B�JNDAR �/ �/ �/ �/ °� EXIs11NG R/W_ - =\\ TO /501 Fo - - _ Ev 215.8 Z 1/ F _ �_ j�\SAVED N r ROA AY Fo _ - _ cuLz cuu4 - - -C o , �Q'� 23 P - c R JAMES GIBBON \ - - MTL o - - - v o o _ --- DB 621 PG 96 -Y -%pe 17 .7\ \K�g� \ \ e „ cuLVERT sEPERATIONExis�iN� R/w o. F WOODS +0iol \ . \ ` 80/ 3-8'(H)x9'(W)CONCRETE ---- NATURAL CHANNEL 30�HW- s Hw cEz 3- $,\ SEE DETAIL 'C' CONC �d8 +63.42 (RIP RAP IN `� C o M up o s uu _ - - - -wE WOODS 30.00 BASE NOT�SHO/ S 2 4 � � 5+5.00' y- + .00� 1 9 = j 4/ 4/ 4/ 4 `�/ 4/ O, _ _ 212.E\� C) / o `�/ ` - `v-/ y S- -Y- POT Sta. 11 + 50.00co �`� _W - \ f 2 BEGIN CONSTRUCTION _ R/W I, v-21 W .� & EPHJEA WARWICK, JR. & JEANNE WARWICK x , " N E CRE 1 Is RT to DB 1323 PG 166 - - 33 �� E -�- _ = - „ f3/.36 MB 9 PG 219 1g �SR 1321 --- _ - - - /b07 `�/ I WOODS 30.00,& I � \I LL CHURCH 'TOAD - - W +00.00 75.00' 3 w AY - - +36J8 a 90.00, � LA REL QED ROA\� -Y- +7 0 62.00 � CL II RIP RAP -L- POT Sta. 18+30.00 PA i CUT DITCH TO LA \ C � \/ - ` V -y- +0 .00 SEE DET B NGTH=ANK 210FT LIZATION CL 11 RIP RAP END CONSTRUCTION e� REM O E EXISTING 40.00' - \ ^�r BANK STABILIZATION n NK 3� RCP W/HW m S S 12°26'52" W EST.=7 TON, 22 SY GEOTEXTILE LENGTH=20 FT I (n EXIST�� %� ,, 31.95' +37.45 EST. = 23 TON, 53 SY GEOTEXTILE w i WOODS 75.00' S 36°24'33" E +37.45 (_0 I xv `/ I 90.00, 11 TONS CL B RIP RAP W/28 SY GEOTEXTILE co U) M rT A 11 n M rT ♦ 11 / I O 1 m • � n p BEANE WRIGHT PARTNERS, LLC OLD LAUREL PRE BYTERIAN CHURCH m o DB 1290 PG 77 o NO DEE FOUND I L 2 N - I c �+ + c CV I o 2 O - - o O, 7 FROM -L- STA. 12 + 00 TO STA. 14 + 50 LT B = 4.0 Ft. B = 4.0 Ft. L +- Type of Liner= CL B Rip -Rap Type of Liner= CL B Rip -Rap COUNTERSUNK (BASE) w O U FROM -L- STA. 14 + 50 TO STA. 15 + 00 LT FROM -Y- STA. 12 + 25 TO STA. 13 + 25 LT (� U EST. 26 TONS CL B RIP RAP, 70 SY GEOTEXTILE 58 TONS CL B RIP RAP, 153 SY GEOTEXTILE I c: vi ro I r' �- o o _Y _ I U P1 Sto 12 +45.01 P/ Sto /5 +41.05 40 30, 53.3" (LT) p = 660 04 ; 4/.0" (LT ) D = 4 46 28.7 D = 76 23 39.7 �� L = 94.56' L = 86.50' Nco T - 47 30' T - 48 78' INSTALL MATTING FOR EROSION CONTROL IN THE � � . FROM -Y- STA. 13+25 TO STA. 13+75 RT PROPOSED DITCH LINE. o R = 1,200.00 R = 75.00 CT)L O-0 ILI I � FOR PROFILE, SEE SHEET 5 vU I �z ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ I I I I PLANTING DETAILS SEEDLING / LINER 3AREROOT PLANTING DETAIL HEALING IN 1. Locate a healing -in site in a shady, well protected area. 2. Excavate a flat bottom trench 12 inches deep and provide drainage. 3. -31ackfill the trench with 2 inches well rotted sawdust. Place a 2 inch layer of well rotted sawdust at a sloping angle at one end of the trench. 4. Place a single layer of plants against the sloping end so that the root collar is at ground level. 5. Place a 2 inch layer of well rotted sawdust over the roots maintaining a sloping angle. 6. Repeat layers of plants and sawdust as necessary and water thoroughly. DI-331LE PLANTING METHOD USING THE K-3C PLANTING 3AR 1. Insert planting bar 2. Remove planting bar as shown and pull handle and place seedling at toward planter. correct depth. Am 4. Pull handle of bar 5. Push handle forward toward planter, firming firming soil at top. soil at bottom. PLANTING NOTES: PLANTING 3AG During planting, seedlings shall be kept in a moist canvas bag or similar container to prevent the root systems from drying. K3C PLANTING -jAR Planting bar shall have a blade with a triangular cross section, and shall be 12 inches long, 4 inches wide and 1 inch thick at center. ROOT PRUNING All seedlings shall be root pruned, if necessary, so that no roots extend more than 10 inches below the root collar. 3. Insert planting bar 2 inches toward planter from seedling. 6. Leave compaction hole open. Water thoroughly. STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. 15408.1083803 RF-1 STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION ❑ TYPE 1 STREAM3ANK REFORESTATION SHALL �E PLANTED 3 FT. TO 5 FT. PLANTING LIVE STAKES PLANTING DETAIL LIVE STAKE SQUARE CUT BUDS (FACING l LIVE CUTTING (1/2"-2" DIAMETER) - 3 Feet ANGLE CUT 3 COIR FIBER MAT LIVE STAKES EXISTING/PROPOSED ,iR\\� GROUND EXISTING/PROPOSED STREAMBED BANK STABILIZATION WITH LIVE STAKES NOTE - LIVE STAKES SHALL BE SPACED APPROXIMATELY 4 FEET ON CENTER LIVE STAKES SHALL BE DRIVEN UNTIL APPROXIMATELY 3/4 OF LIVE STAKE IS WITHIN GROUND DETAILS 3AREROOT PLANTING DETAIL DI-33LE PLANTING METHOD USING THE IOC PLANTING 33AR 1. Insert planting bar 2. Remove planting bar as shown and pull handle and place seedling at toward planter. correct depth. 00 4. Pull handle of bar toward planter, firming soil at bottom. 5. Push handle forward firming soil at top. PLANTING NOTES: PLANTING 3AG During planting, seedlings shall be kept in a moist canvas bag or similar container to prevent the root systems from drying. K1C PLANTING 3AR Planting bar shall have a blade with a triangular cross section, and shall be 12 inches long, 4 inches wide and 1 inch thick at center. ROOT PRUNING All seedlings shall be root pruned, if necessary, so that no roots extend more than 10 inches below the root collar. 3. Insert planting bar 2 inches toward planter from seedling. 6. Leave compaction hole open. Water thoroughly. ON CENTER, RANDOM SPACING, AVERAGING 4 FT. ON CENTER, APPROXIMATELY 2724 PLANTS PER ACRE. ❑ TYPE 2 STREAM3ANK REFORESTATION SHALL �E PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING, AVERAGING 8 FT. ON CENTER, APPROXIMATELY 680 PLANTS PER ACRE. ❑ NOTE: TYPE 1 AND TYPE 2 STREAM-3ANK REFORESTATION SHALL �E PAID FOR AS "STREAM-3ANK REFORESTATION" STREAM_jANK REFORESTATION MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING: TYPE 1 50% SALIX NIGRA 50% CORNUS AMOMUM TYPE 2 25% LIRIODENDRON TULIPIFERA 25% PLATANUS OCCIDENTALIS 25% PRUNUS SEROTINA 25% �ETULA NIGRA "LACK WILLOW 2 ft - 3 ft LIVE STAKES SILKY DOGWOOD 2 ft - 3 ft LIVE STAKES TULIP POPLAR SYCAMORE -31ACK CHERRY RIVER 3IRCH ❑ SEE PLAN SHEETS FOR AREAS TO 3E PLANTED 12 in - 18 in -3"R 12 in - 18 in 311 12 in - 18 in 3R 12 in - 18 in 3R STREAM-3ANK REFORESTATION DETAIL SHEET 1 OF 2 N.C.D.O,T, -ROADSIDE ENVIRONMENTAL UNIT DIRECTION OF FLOW ANCFtivn� viv 1 CENTERS COIR FIBER MATTING ANCHORS ON 3' CENTERS EXTEND MATTIN TO NWSEL MATTTAId`_ PLAN ---------------------- v ------------------- �N STREAM BED COIR VIEW TYPICAL 18„ (TYP) ANCHORS ON 1' CENTERS IN TRENCH MATTING SHALL BE PLACED IN TRENCH AND BACKFILLED ANCHORS ON 1 CENTERS CROSS SECTION FIBER MATTING DETAIL HORS ON CENTERS ANCHORS ON 1 CENTERS FLOODPLAIN/ EXISTING GROUND MIN 2" x 2" (nominal) WOODEN STAKE 1" 12-19AV #10 STEEL REINFORCEMENT BAR 4' 411 IAMETER 24" 1" (nominal) STAPLE . It ANCHOR OPTIONS STREAM-3ANK REFORESTATION DETAIL SHEET 2 OF 2 NOT TO SCALE c co pa N F 0) n 0 0 4- 0 L) N 00 i 0 L i 0 m L a� c w i �w o> C) N-Z (_o�\ PROJECT S LOCATIOJ \� 1325 \rid 7 1323 132 01 1323 1321 1321 \ a,t�a 4 " Old Laurel Presbyterian 1323 144 it 16-1 VICINITY' MAP OFF -SITE DETOUR GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) �STATE OF NORTH CAROLINADIVISION OF HIGHWAYS UTILITIES BY OTHERS PLAIL VS SCOTLAND COUNTY LOCATION: CULVERT 106 OVER JORDAN CREEK ON NC 144 (OLD WIRE ROAD) TYPE OF WORK: UTILITY RELOCATION ROUTE NIT, BEGIN PROJECT 15408.1083803 -L- Sta. 12 + 00.00 ?o � y \ \ \ WET 14 N*S {y[TLAN �� \ v ry \ c� BEGIN CONSTRUCTION 15408.1083803 UO-1 'NOTE: ALL UTILITY WORK SHOWN ON THIS SHEET WILL BE DONE BY OTHERS. NO PAYMENT WILL BE MADE TO THE CONTRACTOR FOR UTILITY WORK ,SHOWN ON THIS SHEET. p �o END PROJECT 15408.1083803 -I- Sta. 18 + 30. 00 JORDAN CREEK I I I 1 � 1 � J TO VS _15/5011 ) is ����/ 1' � � WETL IDS --- � WE�LANDSc / i 5 ' y y� ETLA DS 4_1 ! ETLdNDS ¢�� -WIRE 4 -Y- POT Sta.11 + 50.00 - " " .—js / --%'S + "v 1323 WETLANDS _ \..- —is_-- — TO S ND gOf1I� _y\S _ `� �q. _ `C-B— `�WETL4kNDS .V I,A N1cFAg� — _- SRY13i1B gC� g6AD \ 5 cHU I+l LAUREL HILL BEGIN RCBC INDEX OF SHEETS SHEET NO.: DESCRIPTION: UO-1 UO-2 TITLE SHEET UBO PLAN SHEET -L- POC Sta. 15 + 48.xx UTILITY OWNERS WITH CONFLICTS (A) COMMUNICATIONS - CITY OF LAURINBURG (B) COMMUNICATIONS - WINDSTREAM \ END RCBC -L- POC Sta. 15 + 76.xx PREPARED IN THE OFFICE OF: CENGINEERING 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE 919.788.0224 FAX 919.788.0232 NC LICENSE #P-0189 UTILITIES PROJECT ENGINEER Mary Jo Lee, P.E. DIVISION OF HIGHWAYS DIVISION 8 121 DOT DRIVE CARTHAGE, NC 28327 JAMIE YOW DIVISION CONTACT #1 TRAVIS MORGAN, PE DIVISION CONTACT #2 TIM WELCH, PE DIVISION CONTACT #3 DIVISION CONTACT #4 1 ■ 1 ■ ). C i C L P1 Sta 12 +72.64 Pl Sto 16 +34.68 Pl Sto 19 +14.82 p = 25° 36' 02.0" (LT) p = /0° 34' 52.1" (LT) p = /* 57' 46.7" (LT) D = 4° 46' 28.7" D = 5° 27- 24.3" D = /* 54' 35.5" L = 536.18' L = 193.91" L = 102.78" T = 272.64" T = 97.23' T = 51.40' R = 1,200.00' R = 1,050.00' R = 3,000.00' �o \ -4Y ANS \\\ 4-, `v- JAMES GIBSON DB 621 PG 96 -Y_T S n_ 1 woods 3vv v NATURAL CHANNEL SEE DETAIL 'C' (RIP RAP IN BASE NOTOHOV�N) Y_ + 5.00 y 4-, Aboll _. Y- POT Sta. 11 + 50.00 4/- Nv- _W\f br-UIN (.,UNb 1 KU(.. 1 IUN vvL I LH 3-x � is L R L HILL CHO 22' PA To LA G _ OLD LAUREL PRE NO DEI 11 TONS CL B RIP RAP W/28 SY GEOTEXTILE LENGTH-20 FT CL II RIP RAP EST. = 7 TON, 22 SY GEOTEXTILE BANK STABILIZATION LENGTH = 20 FT +37.45 EST.=23 TON, 53 SY GEOTEXTILE 75.00' FROM -L- STA. 12 + 00 TO STA. 14 + 50 LT —y — ( Not to Scale) P1 Sto 12+45.01 P/ Sto 13+41.05 Fro � °< Slo Slo p = 4° 30' 53.3" (LT) p = 66° 04' 4/.0" (LT ) Natural Mgt D = 4° 46' 28.7" D = 76° 23' 39.7" Ground .7 D F\Q L = 94.56' L = 86.50' Min. D =1.0 Ft. T = 47.30' T = 48.78' R = 1,200.00" R = 75.00' FROM -Y- STA. 13 + 2 5 TO STA. 13 + 75 RT L.J. L I /-%1 L lJ SPECIAL CUT BASE DITCH ( Not to Scale) Min. D=1.0 Ft. Max. d = 1.0 Ft. B = 4.0 Ft. EST. 26 TONS CL B RIP RAP, 70 SY GEOTEXTILE PROJECT REFERENCE NO. SHEET NO. 15408.1083803 UO-2 THIS SHEET CORRESPONDS TO RDY- 4 UTILITIES BY OTHERS ALL PROPOSED UTILITY WORK SHOWN ON THIS SHEET WILL BE DONE BY OTHERS. NO PAYMENT WILL BE MADE TO THE CONTRACTOR FOR PROPOSED UTILITY WORK SHOWN ON THIS SHEET. Dr1T C&- 14 1 12n nn LIVV t.VI`%)II\V<.IIVIN VL IP'UL t. NATURAL CHANNEL DETAIL Jatural Material ( Not to Scale) n Base Min. D=1.5 Ft. Max. d = 1.0 Ft. B=4.0 Ft. 58 TONS CL B RIP RAP, 153 SY GEOTEXTILE ENGINEERING 3220 GLEN ROYAL RD. RALEIGH, NC 27617 TELE 919.788.0224 FAX 919.788.0232 NC LICENSE #P-0189 \/ M 16MA MIN HeOM FIM�l IJ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1■1■G■■■■■■■■■■■■■■■■■■■■■■■■I.1■'��_�f�i�■■■■■■■■■■■■■■■■\JOVirr■■■■■■■�..��C�:G��:.�■�ii��ii:��\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I/. ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1■1■■■■■■■■■■■\!!!!liCl:i'c�C�iii����■■■■■■■■■■■■■\!!!!■I:I:GGiiii■■■�■I��■■■■■■■■■■■■■YC�C!■■■■■■■■■■■\'�\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!�_Y■il:iiii■■■■■C�iiii■■■■■■■■■■■!!!!!!lliiiii■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■i�\■■■■■■■■■■■■■■C■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■GI■■■■II■■■■�!�G�r■!■!!!lCl:liiiii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■C�\■■■■■■■■■■■C■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�.n■■■■■....min::::i■■■■■■n■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!n■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■��n■■■■■■■!n■t•�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■I/Ili%■■■■■■■■■■■■■■■■■■u■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■��\■■I■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■riL.....!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..!!!..l..........!l..........l.l.........!!l...!l.........l..!l........!_- �\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■/Gil■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�ill!\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\\C�■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■/IiI■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■i�\■■■■lisr■■■■■■■■■ril��`�i:iGi��C�CGiii■■■■■■■■■■■■■■■■■■ ■■■■■AG■■■■■■■■■■■■ECG:C�=�=_�C�C�!!!!■!��!!�!!!!!!\�\!\!■■/GY■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■i■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■V■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■llii�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■G% ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Y�\■■■■■■■■■■■■■■■■\!!�CGGi■■■■■■■■■■■■■■■■■■■■I■■iGrCrY■ViWGirrY■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■G!■G■■■G\G■�■►':�1■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iiiilG=Gitr■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■CrYCrY■Vi`■G■■Yir■■■■■■■ii�ll!■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■III\■■I■■■'II_�■■■Ilfl■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ -MENINEWALTREW Mk Ir Is M 16MA MIN HeOM FIM�l