HomeMy WebLinkAboutNCC200148_NOI Application_20200114Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 1/13/2020 10:07:08 AM (NCG01 NOI Submission)
Approve by Clark, Paul 1/13/2020 10:26:20 AM (Review- Construction NOI 20491)
• The task was assigned to Clark, Paul by round robin distribution 1/13/2020 10:07 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: January 15, 2020 5:00
PM 1/13/2020 10:07 AM
Submit by McCoy, Suzanne 1/14/2020 7:22:18 AM (Payment Verification for NCC200148)
* Holly Ntemann
• McCoy, Suzanne assigned the task to McCoy, Suzanne 1/14/2020 7:21 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: February 24, 2020 5:00
PM 1/13/2020 10:26 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
1. Project Name * Cape Fear CCP 1985 Basin Haul Road Design Plan
2. County* Chatham
3. Highway or Street 500 CP&L Road
Address * Street narre only is acceptable if no address number assigned yet
4. City or Township* Moncure
5. State * NC
6. Zip Code * 27559
7. Latitude * Enter the latitude in decimal degrees
35.5900
8. Longitude* Enter the longitude in decimal degrees (M. ST be negative)
-79.0370
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
01/20/2020
Estimated Construction Project Start Date
10. Date to End*
01/29/2021
Estimated Construction Project End Cute
11. SIC (Primary)*
Industrial (1541)
Standard Industrial Classification for Developrrent
12. Acres to be
4.32
disturbed*
(including off -site borrow and waste areas)
13. Total site area 1,066.00
(acres) *
14. Post-
0.50
construction
(Estimated)
impervious area
(acres) *
NCC Project
NCC-CHATH-2020-Cape Fear CCP 1985 Basin Haul Road Design
Tracking ID
Plan
Assigned automatically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Cape Fear River
Waterbody* INbrre of waterbody into which storrrwater runoff will discharge
15b. Waterbody 18-(1)
Index No.* NCWaterbody Index Nirrber
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Duke Energy
Name *
2. First Name* Issa
IF Corporation, enter Fbgistered Agent First Barre
3. Last Name* Zarzar
If Corporation, enter F3egistered Agent Last %rre
3b. Title GM CCP Project Management
4. Permitee E-mail issa.zarzar@duke-energy.com
Address *
5. Permittee 919.546.7574
Telephone No.*
6. Permittee Mailing Street Address
Address* 410 South Wilmington Street
Address Line 2
City
Raleigh
Fbstal / Zip Code
27601-1849
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
V Yes
Street Address
410 South Wilmington Street
Address Line 2
City
Raleigh
Fbstal / Zip Code
27601-1849
State / Frovince / Faegion
NC
Country
us
State / Frovince / Fbgion
NC
Country
us
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Type of
Non -Government
Ownership *
2. Primary Site
Jessica
Contact - First
Name *
3. Primary Site
Gaskin
Contact - Last
Name *
4. Title
Project Manager
5. Site Contact E-
jessica.gaskin@duke-energy.com
mail Address*
6. Site Contact
919.516.1917
Telephone No.*
7. Organization
CCP Project Management
Name
8. Site Contact
Street Address
Mailing Address*
500 C P and L Road
Address Line 2
City
Moncure
Fbstal / Zip Code
27559
9. Consultant Name
(Optional)
First and Last narre
10. Consultant E-
This person will be copied on all correspondence.
mail
11. Consultant
Telephone No.
State / Rovince / Fbgion
NC
Country
us
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 06/27/2019
Approved *
2. E&SC Plan Project CHATH-2019-009
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Raleigh (RRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan CHATH-2019-009 LOA w mods.pdf 365.1 KB
Approval Wst be RDFfornal
letter/documentation
6. NOI Certification NOI Certification Form - Cape Fear 1985 Haul Road
Form 49.39KB
- Zarzar.pdf
Wst be RDFfornal
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6E (i) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name * Issa J Zarzar
Title GM CCP Project Management
Organization Duke Energy
Date * 01 /13/2020
F. Tracking and COC Info
NOI Tracking No. 20491
NC Reference No. NCG01-2020-0148
Uses 'count number' variable (incremrented by SP)
Certificate of NCC200148
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 148
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)