Loading...
HomeMy WebLinkAbout20191305 Ver 1_More Info Received Email_20200110Moore, Andrew W From: Jeremy Cobb <jeremy.cobb@broadwaygroup.net> Sent: Friday, January 10, 2020 12:36 PM To: Moore, Andrew W Cc: Melissa Ballard; Kelly Steele; mcampbell arcco.org; 'David.W.Brown@usace.army.mil'; Mcdaniel, Chonticha Subject: [External] RE: Request for Additional Information 3, Highlands Retail Development Project, Macon County (DWR Project #20191305) Attachments: 86195030 - Dollar General Highlands SHWT.pdf, Highlands Site Design Plans rev01-20-20.pdf; Highlands, NC Stormwater Management Report rev01 10 20.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to nc. ov Andrew, Please see the attached letter from the Geotechnical engineer, and revised civil plans and stormwater report dated 01- 10-2019. On December 11, 2019 we received your comments related to our 401 Water Quality Certification Application. Those comments are in the email below and I'll address those comments here: The changes made from the September 26 and November 22 plan sets were due to the discovery that there needed to be 2 feet of separation between the bottom of the stormwater control system and the SHWT. In order to try and meet this requirement, we changed the site grading by raising the F.F.E. by 1.5 feet (which required additional/increased retaining wall heights) as well as changing the model of the chamber system to a smaller chamber. Because the chamber model was smaller, we needed to add additional chambers to make sure we had the equivalent volume to the previous system. 2. & 3. To simply things, it was decided that we needed to perform additional borings in the location of the underground detention system and have the SHWT firmly established. This will eliminate the need for a construction time verification of the SHWT, where it would have been too late to change the design if it were deemed necessary. The results of the additional borings are provided in the attached letter from the Geotechnical Engineer. Due to the results of the additional borings in the area of the underground detention system, we did have to further modify the design to meet the 2' separation requirement. The elevation of the system was raised by 0.75 feet, and some of the chambers moved location. These changes are reflected in the plans and report dated 01-10-2020. Please let us know if you have any questions or need anything further. Thanks, Jeremy A. Cobb, P.E. Civil Engineer Broadway Management, LLC 216 Westside Square Huntsville, AL 35801 (P) 256-533-7287 (F) 256-533-7236 From: Moore, Andrew W [mailto:andrew.w.moore@ncdenr.gov] Sent: Wednesday, December 11, 2019 11:52 AM To: Melissa Ballard Cc: Jeremy Cobb; mcampbell arcco.org; 'David.W.Brown@usace.army.mil'; Mcdaniel, Chonticha Subject: Request for Additional Information 3, Highlands Retail Development Project, Macon County (DWR Project #20191305) Melissa, On September 27, 2019, the Division of Water Resources (Division) received your application dated September 26, 2019, requesting a 401 Water Quality Certification from the Division for the subject project. On October 24 and 28, 2019, the Division received your response to the Division's October 16, 2019, request for additional information. On November 26, 2019, December 2, 2019, and December 3, 2019, the Division received your response to the Division's November 5, 2019, request for additional information. The application is on hold until the following items are addressed: 1. The Division received the Highlands Site Design Plans rev11-22-19, which appears to show proposed elevations associated with the stormwater management system approximately 2 feet higher than the plans received September 27, 2019. In addition, it appears that additional detention chambers are proposed in the most recent revision. Please provide a narrative description of the changes made in the design of the stormwater system between the two revisions and a description of how the proposed elevations will be achieved. [15A NCAC 02H .0506(b)(5)] 2. It appears that borings B-3 and B-8 were used to determine the approximate groundwater elevation and approximate seasonal high water table (SHWT) in the location of the proposed stormwater control system. The Geothechnical Engineering Report indicates that groundwater levels for the borings were identified for the short duration the borings were allowed to remain open and that longer observations may be required to define groundwater levels. Redoximorphic features were not evaluated in B-3 or B-8 to identify the SHWT at these locations. The Geothechnical Engineering Report only identified the SHWT at B-9. Please explain how the data reported in the Geothechnical Engineering Report are adequate to ensure the minimum 2-foot offset from the SHWT will be met in the location of the proposed stormwater management system. [15A NCAC 02H .0506(b)(5)] 3. As there does not appear to be a boring in the footprint of the stormwater control detention system, and the SHWT appears to have been inferred from a cross-section between two potentially unstabilized groundwater elevations and/or a third boring location, will an on -site confirmation of the SHWT be conducted during construction of the stormwater management system? [15A NCAC 02H .0506(b)(5)] Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received, the Division will be unable to approve the application and it will be returned. Feel free to contact me if you have any questions or would like to discuss further. Andrew W. Moore, PG Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.Moore(@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. January 9, 2020 The Broadway Group, LLC 216 West Side Square Huntsville, Alabama 35804 Attn: Ms. Kelly Steele, Due Diligence Coordinator P: 256-533-7287 E: Kelly.Steele@broadwaygroup.net Seasonal High Water Table (SHWT) Dollar General Store Highlands, North Carolina Terracon Project Number: 86195030 Dear Ms. Steele: Irerracon We understand that detention chambers have been proposed on the subject project and in order to meet the permit requirements, there should be a minimum 2-foot distance between bottom of detention chamber and the Seasonal High Water Table (SHWT). To determine the SHWT, two (2) hand auger borings were performed at the proposed detention chamber location at the site. Please refer to attached boring location plan for the location details. The soil samples in the borings were observed for redoximorphic features of the soil profile to estimate the SHWT levels in the vicinity of the proposed underground detention area. Redoximorphic features (a gray or bluish -gray colored soil matrix) and mottles are formed by the process of reduction, translocation, and/or oxidation of iron and manganese oxides as the water table fluctuates. A soil layer exhibiting redoximorphic features can be representative of the SHWT level. Based on our observations, redoximorphic features indicating SHWT were observed in boring HA-1 at a depth of 1.5 feet and in boring HA-2 at a depth of 1.75 feet, below existing grades. The boreholes were observed while drilling for the presence and level of groundwater. The groundwater at the time of drilling in borings HA-1 and HA-2 was observed at a depth of 3 feet below ground surfaces. Due to the low permeability of the soils encountered in the borings, a relatively long time may be necessary for a groundwater level to develop and stabilize in a borehole in these materials. Longer observations in piezometers or observation wells sealed from the influence of surface water are often required to define groundwater levels in materials of this type. If you should have any questions or comments regarding the contents of this document, please feel free to contact us at 864-292-2901. Sincerely, Terracon Consultants, Inc. r r Maggie McKenney, E.I.T. Geotechnical Staff Engineer Enclosed: Boring Location Plan Nr in K. r-uani, P.E. Geotechnical Department Manager Terracon Consultants, Inc. 72 Pointe Circle Greenville, South Carolina 29615 P [864] 292 2901 F [864] 292 6361 terracon.com LEGEND: NOTES: CC TROL I RtW"Q I T TKI 40 5rr/ 1. THE EXPLORATION POINTS WERE H INV. IN f,12 E) 'D2' SELECTED AND LOCATED IN THE FIELD BY A HAND AUGER BORING (APPROX. LOCATION INVINV. IN (Z' H INV. .. OUT (in AD TERRACON ENGINEER USING GPS REDD qX2 TE IN= #4 �02529 CULVERT IN STREAM INSTALLATION DETAIL COORDINATES OBTAINED USING OVERLAY OF I HD E 1021.91) SITE PLAN ON GOOGLE EARTH TIA. NOT TO SCXE INV. OUT (12" HDAL 4021.80 V_ INV. DO, 2.THE BORING LOCATION PLAN WAS ­01 -7 PREPARED BASED ON PROPOSED DEVELOPMENT LOCATION AND LAY -OUT F. DA�' REO'D 6 M CURB / PROVIDED BY THE BROADWAY GROUP, LLC. c-40 In T `74U 52, II j fle '12 OPE 2 TE IN�� 0 -P g"A' Z; Q'Q Our IN, �61 e 4022. 1BW CONCRETE 402— .4 .PSTMR PAD W`T11 S' DO PRIVACY PENCE to \D��,ARIJE ROOF DRAINS ON PAVEMENT SURFACE, 2*2 4N;. dVE' REO'O� '�X2 GRAINIZT 05 DE IN �15; 4022.4� "";7 f POPOSED BUILDING ­4MOM20 P—M.. 911'0,0 SQ. FT. 111 1:17- 40 41 F.F.E. 4027.50 BOLLARD WTH AOCESSBX I7ITRAK6E RARKNG sGPi I J R G, ACCEWELEJ HA-4 _R'O �&K RAMPI -P I �11� 1. 1 15 KV.-d P I D� REQ 0 1]LF. IRS 4 9W '/ , 0 PROPOSED P X At I i 10* HDPE S: Do go "E"ON S: Do DISTURB UNTIL IN C­ 271 OUT 2' HD E) 40 1.50 J IT �PREOO B CC REVP 2X2 GRAT =c 4Q21_2� On K&E INV. Oa\(W HD�PE) OV 'in D-1.2-2 �7 Lin D R gIDIUS I PROWME 7 �_W­r (1g, D L 0 AIL ON % U.S. 'HIGHWAY 64 f m,35 w qr—t. -- R PEDR WNO 840.31 efP 51 W 2307 . . . . . .. 'MV. OUT (48- CWP),4019.03 60' �UEMC R.O.W. ------ INV. Project Manager: Project No. BORING LOCATION PLAN Exhibit ND 86195030 DIAGRAM IS FOR GENERAL LOCATION Drawn by: mm Scale: N.T.S. Irerracon ONLY, AND IS NOT INTENDED FOR Checked by: File Name: Consulting Engineers & Scientists Proposed Dollar General Store CONSTRUCTION PURPOSES ND Highway 64 & Cherrywood Drive A-2 Approved by: Date: 72 Pointe Circle Greenville, South Carolina29615 Highlands, North Carolina I I INIDII 1/8/202011 PH. (864)292-2901 FAX. (864) 292-6361 U050 HWY 64 REVISIONS 03-27-2019 INITIAL DATE 06-06-2019 REVISED LANDSCAPE PLAN TO ADD VEGETATION AROUND WET POND PER WATERSHED REVIEW COMMITTEE COMMENTS. 09-26-2019 REVISED BUILDING AND PARKING LOT LAYOUT TO REDUCE IMPACT TO STREAM BUFFERS. 10-24-2019 ADDED CULVERT IN STREAM INSTALLATION DETAIL PER NCDEQ COMMENT. ADDED NOTES AND CHANGED STABILIZATION TIMELINE ON ESPC SHEETS PER NCWRC COMMENTS. 11-22-2019 RAISED F.F.E. BY 1.5 FEET AND CHANGED CHAMBER MODELS TO GAIN 2 FOOT SEPARATION FROM CHAMBER GRAVEL BED TO SHWT PER NCDEQ COMMENTS. 01-10-2020 REARRANGED CHAMBER LAYOUT AND RAISED CHAMBER BED 0.75 FEET TO CORRESPOND WITH RESULTS OF SHWT FIELD DETERMINATION. CASHIERS R OA D & CHERRYWOOD DRIVE HIGHLANDS I MA CON NC COUNTY C '{ fn n o� Q Northland cr�,•,w 3� Communications Reclamation 4 0 O- i� O2 F a � PROJECT LOCATION Community Bible Church 9 vo c:le VI U1 IN I I Y IVI HF �:)LHLL: Thy PREPARED FOR0 : 0919191 Group Commercial Real Estate Development 216 Westside Square • Huntsville, AL 35801 Phone: 12561533-7287 • Fax: 12561533-7236 O N O N O I N r o N � W U I I = Q o o w O u7 w O m o z w �;: L C/-) w Q I- > w rr Q w = 0 o rr C/-) W U O Q c�0zz Q�z WW<z = O U� 0 U Q — Q LLI U z %%N'C'AR'. _ S 045539 •'Q1-10-202p •.HGINE! �- •0 ,�FM Y A. 00 SHEET LIST TABLE NUMBER TITLE 1 COVER SHEET 2 CONSTRUCTION NOTES & LEGEND 3 DEMOLITION PLAN 4 SITE PLAN 5 INITIAL PHASE ESPC PLAN 6 INTERMEDIATE PHASE ESPC PLAN 7 FINAL PHASE ESPC PLAN 8 STORMWATER MANAGEMENT PLAN 9 PROFILES 10 LANDSCAPE PLAN 11 LAYOUT PLAN 12 CONSTRUCTION DETAILS 13 ESPC NOTES 14 ESPC DETAILS 1 15 ESPC DETAILS 2 co\s T R !.:! c T I 0 \I GENERAL NOTES 1. THE CONTRACTOR IS TO PREVENT THE DESTRUCTION OF ALL SURVEY MONUMENTS, BENCH MARKS, PROPERTY CORNERS AND ALL OTHER SURVEY POINTS. WHERE THE REMOVAL OF SUCH POINTS IS NECESSARY FOR THE ACCOMPLISHMENT OF THE WORK, THE CONTRACTOR IS TO INFORM THE ENGINEER IN WRITING, PRIOR TO THE DISTURBANCE OF ANY POINT, AND IS NOT TO DISTURB THE POINT UNTIL WRITTEN PERMISSION TO DO SO HAS BEEN ISSUED BY THE ENGINEER. 2. ALL EXISTING TREES OUTSIDE OF THE LIMITS OF WORK ARE TO BE PROTECTED DURING THE ACCOMPLISHMENT OF THE WORK, AND ARE NOT TO BE DAMAGED IN ANY MANNER. 3. CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING STREET THAT IS CREATED DURING CONSTRUCTION ACTIVITIES. 4. ALL BOULDERS, DEBRIS, EXCESS CONSTRUCTION MATERIALS, MATERIAL GENERATED FROM DEMOLITION OF EXISTING STRUCTURES AND FACILITIES, OR TRASH ARE TO BE REMOVED FROM SITE AT CONTRACTOR'S EXPENSE. 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY OWNERS AND DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES ON THIS PROJECT, WHETHER SHOWN ON THE PLANS OR NOT, BEFORE COMMENCING WORK. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. 6. PAVEMENT CUTS SHALL BE REPAIRED WITH NCDOT PAVING DETAIL AS SHOWN ON APPROVED PLAN. 7. ALL TRAFFIC CONTROL DEVICES SHALL BE ERECTED AND MAINTAINED IN CONFORMANCE WITH THE MANUAL ON UNIFORM TRAFFIC -CONTROL DEVICES (M.U.T.C.D.), LATEST EDITION. 8. SIDEWALK RAMPS ARE TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) SPECIFICATIONS. 9. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOBSITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 10. THE DUTY OF THE ENGINEER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE. 11. WITH REGARD TO THE STORMWATER MANAGEMENT SYSTEM CAPACITY, NO WARRANTY IS EXPRESSED OR IMPLIED FOR STORMS OF GREATER INTENSITY, DURATION OR FREQUENCY THAN THOSE INDICATED IN THESE PLANS OR ACCOMPANYING CALCULATIONS. EARTHWORK GENERAL NOTES 1. SITE TOPOGRAPHY MAPS AND OTHER TOPOGRAPHIC DATA SHOWN ON THE PLANS OR INCLUDED IN THE SPECIFICATIONS ARE FOR THE INFORMATION OF THE CONTRACTOR. THE CONTRACTOR SHALL MAKE SUCH ADDITIONAL INVESTIGATIONS AS REQUIRED TO ACQUAINT HIMSELF ADEQUATELY WITH THE SITE TOPOGRAPHY, AND THE SUBSURFACE SOIL CONDITIONS FOR PREPARATION OF HIS BID, AND FOR THE SUCCESSFUL EXECUTION OF THE WORK. 2. ALL PROPOSED CONTOUR ELEVATIONS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADE. 3. PROTECTION OF WORK: THE CONTRACTOR IS TO BE SOLELY RESPONSIBLE FOR THE PROTECTION OF HIS WORK. SUCH GRADING IS THE RESPONSIBILITY OF THE CONTRACTOR AND WILL BE AT NO ADDITIONAL COST TO THE OWNER. THE OWNER MAY DIRECT THE CONTRACTOR TO PERFORM NECESSARY GRADING AND DRAINAGE TO PREVENT SURFACE RUN OFF FROM DAMAGING THE WORK. 4. ALL EARTH FILL SHALL BE COMPACTED TO 98% OF THE MAXIMUM DRY DENSITY, PLUS OR MINUS 2% OF OPTIMUM MOISTURE (ASTM-D6798), EXCEPT FOR EARTH FILLS UNDER PAVEMENT WHICH ARE TO COMPLY WITH PAVING SPECIFICATIONS. 5. EARTH FILL SHALL BE PLACED IN UNIFORM LAYERS OR LIFTS NOT EXCEEDING 6" COMPACTED THICKNESS. 6. THE CONTRACTOR SHALL INSTALL AND MAINTAIN ALL EROSION & SEDIMENT CONTROL BEST MANAGEMENT PRACTICES IN ACCORDANCE WITH THE NCDEQ EROSION AND SEDIMENT CONTROL PROGRAM. LEGEND OF MEASURES FOR EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT CEP CONSTRUCTION EXIT PAD LS LINED SWALE LG LAND GRADING OP OUTLET PROTECTION TSG TOPSOILING RS RIPRAP-LINED SWALE CHS CHEMICAL STABILIZATION SD SUBSURFACE DRAIN DSF DUNE SAND FENCE TSD TEMPORARY SLOPE DRAIN DVP DUNE VEGETATION PLANTING BGIP BLOCK AND GRAVEL INLET PROTECTION DW DUNE WALKOVER BFB BRUSH/FABRIC BARRIER DC DUST CONTROL RPIP ROCK PIPE INLET PROTECTION ECB EROSION CONTROL BLANKET FS FILTER STRIP GK GROUNDSKEEPING FB FLOATING TURBIDITY BARRIER MU MULCHING RD ROCK FILTER DAM PS PERMANENT SEEDING SB SEDIMENT BARRIER PV PRESERVATION OF VEGETATION SBN SEDIMENT BASIN RW RETAINING WALL SST STRAW BALE SEDIMENT TRAP SVG SHRUB, VINE, AND GROUNDCOVER BA BIORETENTION AREA SOD SODDING PP POROUS PAVEMENT TS TEMPORARY SEEDING SDB STORMWATER DETENTION BASIN TP TREE PLANTING ON DISTURBED AREAS BZ BUFFER ZONE CS COMPOST SOCK CHECK DAM CS CHANNEL STABILIZATION DV DIVERSION SDC STREAM DIVERSION CHANNEL DS DROP STRUCTURE SP STREAMBANK PROTECTION GS GRASS SWALE TSC TEMPORARY STREAM CROSSING m z W �;: w cn Q 1— > m Q w 0 o m 0 z W CD W J Cn W I— O z O F- U z O U LL_I O O O c�ozz o Q �z WW<z = O CO O Q — Q W U = z 1C'A R �.oFEoO ssi�i ' 045539 ••Q1-10-202p •0 ; ""ff eMY A. G� 111 It;���` r w O N w W LEGEND R.O.W. RIGHT OF WAY BC BACK OF CURB - —100 — - EXISTING CONTOURS — PHONE — OVERHEAD TELEPHONE LINE CENTERLINE FL FLOW LINE 100 PROPOSED CONTOURS — UGP — UNDERGROUND TELEPHONE LINE EOP EDGE OF PAVEMENT INV. INVERT — WAi — WATER LINE ❑T TELEPHONE PEDESTAL IPF IRON PIN FOUND SAN. SANITARY WATER METER — F.O. FIBER OPTIC LINE CMF CONCRETE MONUMENT FOUND MH MANHOLE N WATER VALVE 0 FIBER OPTIC PEDESTAL M.B.L. MINIMUM BUILDING LINE C.O. CLEAN OUT FIRE HYDRANT — GAS — UNDERGROUND GAS LINE TYP. TYPICAL ARV AIR RELEASE VALVE — OHE — OVERHEAD ELECTRIC LINE © GAS VALVE EG EXISTING GRADE RCP REINFORCED CONCRETE PIPE — UGE UNDERGROUND ELECTRIC LINE ry-y-y-y-y-" TREE LINE FG FINISHED GRADE CMP CORRUGATED METAL PIPE Cob UTILITY POLE F­1 ROAD SIGN F.F.E. FINISHED FLOOR ELEVATION HDPE HIGH -DENSITY POLYETHYLENE LIGHT POLE TS TOP OF SIDEWALK PVC POLYVINYL CHLORIDE E GUY WIRE TP TOP OF PAVEMENT CONC. CONCRETE NOTES 1. THIS LOT CONTAINS 2.24 ACRES, MORE OR LESS. o N 2. THIS LOT IS NOT ZONED. n 3. THIS PROPERTY IS TAX PARCEL 7551-12-5837 RECORDED IN DEED BOOK D-37, PAGE 159 AND IN � PLAT CARD 8675, HIGHLANDS TOWNSHIP, MACON w COUNTY, NORTH CAROLINA. u 4. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY KING ENGINEERING OF CONCORD, INC., CONCORD, FT NORTH CAROLINA. , EXISTING 18" CMP WETLAND AREA 2 (TO REMAIN) (0.029 ACRES) N 47'35'23" F 45' , WETLAND AREA 1 / • ; \ J / \ — — ; ; ; ; . ; ; /. / , I ,/ I I \ \ (0.025 ACRES) / / ; . \ / '� ; t ' t�; ; ; �' a \ / ti, MPCL INV 4017.9s�' / / / i '(APPROX OCATI \\ 24/ i40 / / / ; • ; INV. 401P.00 \ ) \ \ EXISTING TREES m, 4p'O \RE\MAIN) X �� EX. DROP INLET GRATE 4022.17m CMp / %' ;F / ✓ ' \ \ \ �' �I /' I \ cj INV. OUT (18" HDPE) 4017.88 - - -402 � / III I I I ✓ R60/ 1 66 \ I I VIII I 1 1 05 1 I \ II •- � .� \ — — — / / 4p2� I � I � � I // I I�I�I IIII j I i i 'I iW I . i — — IIi IIi / \ 1 1 II 1�1111I IIII I i I I I �1 to i REf�fllry / IIII I i can I I I EX. SAN. SEWER EASEMENT ' ' / I I r? ; ' 1T� I I I TO BE VACATED AND ,I / / / I I SEWER LINE REROUTED/ CD 4 �\ REMOVE E S �\ \ / O= I TREES_ / ��� //% / 40 Lo '703R_ _ \ ///J I I / / / d-/ J \\ 036-1 WOOD SIG —'O fir— \ —-7 / // / / \ — ��------- 4 / \�� ��\\� �//(T /REMAIN I-RE40VE EXISTING REMOVE EXISTING REMOVE EXISTIN&,' — / 4.56'19/� U. S. /HIGH WAY 64 WOOD —FENCE \ \ / \ \ GRAVEL WOOD FENCE � � ,3 " W 25.10' -S 3 \ S 47. " " R� on A n " �4' \\ 58.5 S 39'0 ----- -^°/ 6 27 W \ 33.28 I S 45'47 51 W 123.07 S 45'29'14" W �9.46 I S 45'01 35 W 94.6 S 42'05'44" W EX' 48" CMP' 60' PUBLIC R.O.W. , - - ---_ O O M M M M M M M M N N 4p26� / m INV. 4020.17 N� / 0 ONE HE OHE OHE - OHE OHE OH NOTES 1. THIS LOT CONTAINS 2.24 ACRES, MORE OR LESS. 2. THIS LOT IS NOT ZONED. 3. THIS PROPERTY IS TAX PARCEL 7551-12-5837 RECORDED IN DEED BOOK D-37, PAGE 159 AND IN PLAT CARD 8675, HIGHLANDS TOWNSHIP, MACON COUNTY, NORTH CAROLINA. FINISHED PAVEMENT GRADE REQ'D PAVEMENT AND BASE PER PLANS DENSE GRADED BASE #78 STONE OR 4. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED APPROVED EQUAL , BY KING ENGINEERING OF CONCORD, INC., CONCORD, 0O O 48" CMP NORTH CAROLINA. O O ' O O O O O INVERT COUNTER SUNK 9.6" WETLAND AREA 2 BELOW EXISTING STREAMBED , O O O (0.029 ACRES) ' PARKING LOT CONSTRUCTION NOTES - - - - - ` 1. HEAVY DUTY PAVEMENT (PER APPROPRIATE DETAIL INSTALLATION NOTES: / / / /-� \ N 47'3523' F 258-45' , 1. CULVERTS SHALL BE INSTALLED IN SUCH A MANNER THAT THE ORIGINAL z SHOWN ON CONSTRUCTION DETAILS SHEET) TO BE STREAM PROFILE IS NOT ALTERED AND ALLOWS FOR AQUATIC LIFE MOVEMENT / • '; : ,`: • '; : : I' \ / DURING LOW FLOWS ' / / T R Q OUTLET CONTROL BO ' USED IN DRIVEWAYS, ACCESS AISLES, AND VEHICULAR °ry�� W •LAND AREA 1 / \ / ; : : • ; : >�' ;',': : • : • I / 1 2. THE DIMENSION, PATTERN, AND PROFILE OF THE STRAM ABOVE AND BELOW / \ TOP 4026.0 PARKING STALLS. CULVERT SHALL NOT BE MODIFIED BY WIDENING THE SREAM CHANNEL OR BY / / (0.025 ACRES) / ; . INV. IN (�12" H PE) 402 1. • r; : : • '; I' a \ / ,��0 / i / �k. MP \ i �� / INV 4017.9,4" REDUCING THE DEPTH OF THE STREAM DURING CONSTRUCTION ACTIVITY. / tiL / INV. IN N" H E)4 1. '� 3. FOR CULVERTS WITH DIAMETER LESS THAN OR EQUAL TO 48 INCHES, 20% OF / /°° / / / %; (APPROX OCATI ) INV. OUT (18% Y) 4 .90 ' : I • =/p / I \ ,'� �� ,404/ 2. HEAVY DUTY CONCRETE PAVEMENT TO BE USED IN THE CULVERT SHALL BE PLACED BELOW THE STREAMBED ELEVATION TO ALLOW AREAS OF DUMPSTER AND DELIVERY PADS. FOR LOW FLOW PASSAGE OF WATER AND AQUATIC LIFE. ,k° / ; ; : • \ \ W' INV. 401P.00 \ \ \ I h i°° ° ; : REQ'D GF OP 14025.32 I \ \ \ W' �°� J ' / /� I i I i FX 3. CONCRETE CURB REQUIRED ALONG EDGE OF PARKING / • 4,9' - \ 8"C EX. DROP INLET CULVERT IN STREAM INSTALLATION DETAIL / %. ; ; . ,-0. IN (15" HID 4022.79 I `\ 1 ;/ \ "'p GRATE 4022.17 TO PROTECT PERIMETER LANDSCAPING. NOT TO SCALE / �: • /`� INV. OUT (12" HDPk) 4022.69 \ \\ \ ; ; �� i \ //�, ; INV. OUT (18" HDPE) 4017.88 / \ h REQ'D RETAINING WALL \ \ �, INV. OUP 402i.�' FG=4022.50 (DESIGN- - OTHERS)- - - - - - - J \ - \ �i - TW=4025.50 ��- �FG=4022.50 - iW=0T2W¢=.540f126L7- FiG=�2-21 \ -------- - = .0- 00 1-4020TW=4025.50 N=40250 i \ XpceFG-4023.75 �_ -FGr \ T=0425.79 I 110 22 / FG=4023.75 - 402 I = 2 7 E `( / ' i %� // TW=4026.50 - _ TW=4026 50- \ \ REQ'D 6" \ / = 24. 0 DISTANCE VARIES / i i-' \�R�\Nv�PR/'Y / / FG=4024.00 FG=402_ 5 I I FG 140 0 ' / CURB \ ® I I ' I I RE Q SLOPED PAVED HEADWALL (4:1) E �R / - - INV 4015.12 SEE PLANS / i' N �� �' / Gip / ItQ'D PRIVATE _ _ - _ - �$C=4'b 6.02 I W# 02 0?�\ II I I / / , 1�Ai ER SjPPLY WEIyL/ _ _ - - - / REQ'9 57 L.F OF - �L�40 5.52 I o�, i , FG=4023.55 / EX. CROSS SLOPE MATCH EXISTING 1 / / , / (DESIGN BY OTFiERS) _ FG=4023.5 C=4 26.55 / 1 HDPE/ p / I I 701, - - - - - CROSS SLOPE / j , / / / / - TW=-402.6_50 JFL 4C26.05 �/ 0. 0% SLOPE w i ? o ------------- 4.1 Mq v / FG= 26.37 BC=402 / d 40 6.12 I 1 % X FG=4025.25 '§C-402�7 20� .' \ FL=402 5 / / o - 0 5.62 I =4�I / I SWq(E E ��'� y TW�4027.0% FL=,P 6.70 \ Qa o / r = =4026.8b/ I0I FG�02 I 36-FG= 026.45 BC=4 7 G 4 A FL=40 .67 023'I REQ'D 75 L.F. OF L4026/REQ' 2X2 GRATE INLETS#3 -FG=4025.5� 48" CMP m / / BC=4026:7TOP .6LE@ F 4 3. r I ' ' ® 1.00% SLOPE x m � / / / _ - -6�F � _ �° � ° �, / FL=4e126.2o INV. OUT (15 FiT3Pf) 4023.10 FG=4o25. I I I o / / P @C=4027 1CL BC=4 2 41 8 \ O 2" BITUMINOUS CONCRETE SURFACE COURSE rm 3 / r 51R� BC= 02�C6- \ FL�4026.56 16'XT8' CONCRETE 4025.78b I 1 I� ✓ VEV�I REF, 610, 29.5C, NCDOT 2018 SPECIFICATIONS O f*1 / EO 1 a L=4 6.41/ I I 4 / / / / Rg FL=406.76 a \ \ \ �QD MPSTER PAD WITH 6' TS=4027.30 Q I FG=40 5.86 l l� I EG=4g2>�•82 O3" BITUMINOUS CONCRETE SURFACE COURSE ' �°L�/ / / / / ��Q%5�� gOt;FEI 7 ° ° ° TS=402%.�0 / /' PRIVACY FENCE TP=4026.80 I Ili I I I I N REF, 610, 119.00, NCDOT 2018 SPECIFICATIONS / L� / 2y' Epp ° TP=4026. / I I FG=4024. O 4 ° I I l FG 402 . 1 O0.04 - 0.08 GAL./S.Y. TACK COAT AS REQUIRED BY SPECS / / /° /-' /(p(E� ' / / / a / a ° ° / / ° ° ° a� I l = ALL MATERIALS ARE TO BE IN ACCORDANCE WIT SECTION / 4-' 605 OF NCDOT 2012 SPECIFICATIONS / / �er�°y 30 � / F 4025.75 \ Dl qHQR6E ROOF DRAINS ON PAVEMENT SURFAI;E\ / I I C= 17-4024.241 m O5" LAYER OF "BLACK BASE" NCDOT REF. B25.00 OF SPECS / / �'� / i ' / T 4026.75 i / l / a / / I F -40 I 1 I I I l I I I ALL MATERIALS SHALL BE IN ACCORDANCE WITH SECTION / / �'/ �'r1 / - / / I / I ►A� p, I , I I 1 R Q'D STD. HEADWALL #2 600 OF NCDOT 2018 SPECIFICATIONS MANUAL, COMPACTION '� / / �' `� / 15'X23'/ CAEfE REQ'D X2 GRATE INLET #5 ° dL I I I / / - / � \ C 5.52 I ti / , 1 I l I I I V. 4015.88 TO 100% PROCTOR DENSITY � / / �-� � /� / - DELIVER tFj�EA \ TOP 4025.37 5.52 P° INV. OUT (15'�HDPE) 41022.75- TOP 6" OF SUBGRADE IS TO BE COMPACTED TO 100% - % / / , _ / / / / \ ° EA 11I 11 PROCTOR DENSITY. BELOW TOP 6" IS TO BE COMPACTED - I \ / I �.\ TO 95% PROCTOR DENSITY AS DETERMINED BY AASHTO �'p /� - / / - 402 50I T-99 COMPACTION TEST. '/ ' :'- - - - �' / / / / / / I / II TW=402 .50 \ I I I Il m 1 FG=402.50TYP. NCDOT RADIUS IMPROVEMENT SECTION TW=4026.00 //R0'OSED BUILDING NOT TO SCALE I I cq TW=4025.50 \ 111 l I I . -' /_. -_' - _ , � - - - � r � ' , ► ' ► 92TMO SQ• FT•C= 2 . I FG=4020.50 I I 1 F- 2 I 11�1 I F.F.E* ;4 0 2 7.5 0 = 0 . FG=4020.50 1 III lq,, I�,1 , , , ; Fc14o1111 I I\ / , l I I REQ'D 331r� 11 II 15 HDPE RQ D RE ANING 11 1 I I I I I I I ' I I NCE PARKING SIGN ACCESSIBLE ( �� ) I 0.50% �L, �I BOLLARD WITH I G=4 26.0 ENTRA I I l I I I I I I GN B OTH R II I I \ ,I I 1.11I 1II l IIi w / BC 40 6.11 FG=402.25 A II ACCESSIBLq 402 .61 I to REQJUNCTIpo SIDEWALK RAMPTOP 4 514 �jp 0\ ° ° a 4 -INV. I 15(/�1T 40.56 °INV. 0 \°° °\\° ° ° 4 TS=40 REQ'4 .F1 // OF4°° °° °FG 402 .35X a TS=4 2.30 °° ° \ � TP=40 HD pH P � L25 Be 30 " // FL 4026 U TS=40 7 80 TP=4 26.80, 01. 6 TP=40 REQ'D JUNCTION B X #1 PR�PQSED SEPTIC AR FG=4\-FG=4026.97 OP 40 6.29 2 FG=4021.25 / / • II1 II I Ii I I I lI I TW=4024.50 /� I / I I I DESIGN BY -OTHERS; DO NOT C= 271 \ \`- \ \\ �\ �`� IN V. IN ( 8" HD E) 40 2.63 1 O=4022.G0_ / / /', / I ' ,� I I DISTURB UNTIL INST,ALEA/TION FL= 026. 2 \ \ \ �\ INV. OUT ( 2" HD E) 40 2.53 - W=4025.00 (' o? I L= 027. _ - \ _� _ �FG= _26>6 FG=40 6.63 �'10 ' /� I `I-� - ' / I F = 022 ' =� l L= 02 7 REQp 2X2 GRATE�INLEZ 1 \� 1 ) / R�Q'D'78 IL.F/ OF �E OF ?� ' l / / / I _3 \\ " TOP\4026.1 7\ / / / / // /' //® 1.50%SLOPE R�_l , \A�5\.OP� \ // / i / I '�� W I -4032- - (\o o INV. OUT ( HDPE) 402/ - - o5p% XFG=4026.50 O �,/ r,y / _ BC=4026.50 LLRE FL=4026.00 F 4 26. //// / ��� 10 m r� INV 017.04 EA WALL - \ ,� BC=4027.62 - / r' ti / , / / / / RE D v BC=4026.82 FL=4027.12 4p23� \ / rj FL=4026.32 Y 0 /// j / IG \ I / /_ \�\\�G3 ---- �j� f C=4 7.10 --_-�� �� BC�4026>4/ / / BC=4027.29 �� RMD 2X2 GRAT - - - R- -FL =40 .24 / F = 2 -40 21�.79 FL= 26.60 .96 4036/ I I / ---- - �'� 2 / / \ / R RADIUS I MOVEMENT \\ \�-� /' / // /' // / / / ---� �� --- - 7- �FNV`OUT (18" HDPE) 4022.86 / ---�g s--- / / --- - -----4024----- REQ'D 1 �\ ,('SSE �YPICAL D AIL ON Or - / // // / < \`� ----- --- -�4$"-£kl__- /1,IIS,�HEET) -, / �_ 2 -- ®/14.2/3% SLOPEINV. 4019.13 / / oN _ <- - _ l _ _ _ - _ _ - --4025-- 02 - _ - FG=4024.86 �o� U.S. /HIGHWAY 64 3 „ ,0 s 4; �s S 39'0 ' 3 25. ° O O Q oO °�6 EXISTING GRADE O O q.,I 42'05'44" W -58-.5 RQoGgv S 477" W S 45'2S 45'47 51 W 123.07 S 45-29'14" W �94601'35" W94.64EX' 48 CMP` -PER DR WING 840.31 lb ' 4p2s4U24.08 "-INV. OUT (48" CMP60PUBLIC R.O.W. 4019.03 oNE / N� / m INV. 4020.17 N� / 0 ONE _.._ ., rn HIT OHE OHE - OHE OHE PARKING REQUIREMENTS RETAIL STORE: REQUIRED SPACES: PROVIDED SPACES: ADA REQUIRED HANDICAP SPACES: PROVIDED HANDICAP SPACES: REQUIRED VAN ACCESSIBLE SPACES: PROVIDED VAN ACCESSIBLE SPACES: N/A 9100 SQ. FT. ENGINEER'S OPINION OF EARTHWORK N/A CUT: 990 CU. YD. 28 SPACES FILL: 5175 CU. YD.* 2 NOTE: VOLUMES DO NOT ACCOUNT FOR SHRINK/SWELL, BUILDING DEMOLITION, REMOVAL OF UNSUITABLE MATERIAL, 2 UTILITY INSTALLATION, ETC. 1 *ADJUSTED TO INCLUDE AN ESTIMATED TOPSOIL REPLACEMENT 2 VOLUME OF 745 CU. YD. (BASED ON AN ASSUMED 6" OF TOPSOIL ACROSS FILL AREAS OF SITE). I'l) O O N n w cn z LIJ U_ J LL NOTES 1. THIS LOT CONTAINS 2.24 ACRES, MORE OR LESS. 2. THIS LOT IS NOT ZONED. 3. THIS PROPERTY IS TAX PARCEL 7551-12-5837 RECORDED IN DEED BOOK D-37, PAGE 159 AND IN PLAT CARD 8675, HIGHLANDS TOWNSHIP, MACON COUNTY, NORTH CAROLINA. EROSION CONTROL IMPLEMENTATION SCHEDULE INITIAL PHASE 1. INSTALL CONSTRUCTION EXIT PAD (CEP) AND TYPE "A" SILT FENCE (SB), DOUBLE ROW WHERE INDICATED. 2. CLEAR TREES AS NEEDED. 3. STRIP AND STOCKPILE TOPSOIL (TSG), AND REMOVE UNSUITABLE MATERIAL. 4. TEMPORARY SEEDING TO BE INSTALLED ON AREAS WHERE GRADING AND STABILIZATION OPERATIONS HAVE CEASED AND WILL NOT RESUME FOR 5 WORKING DAYS, OR 7 CALENDAR DAYS, WHICHEVER IS SHORTER. IF A QUALIFYING RAIN EVENT IS 4. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED EXPECTED, TEMPORARY STABILIZATION SHALL BE ACHIEVED PRIOR TO THE RAIN EVENT. BY KING ENGINEERING OF CONCORD, INC., CONCORD, NORTH CAROLINA. ' WETLAND AREA 2 (0.029 ACRES) NATURE OF CONSTRUCTION ACTIVITY PRECONSTRUCTION CONDITIONS. THE SITE IS A 2.24 ACRE PIECE OF IN 47'35'23" 45' PROPERTY LOCATED ON THE SOUTHWEST SIDE OF U.S. 64 (CASHIERS URD.) AND CHERRWOOD DR., IN MACON COUNTY NORTH CAROLINA. IT IS �� / / / / �'� \ \ \ \ //// . • ; : • • :. • • :. • ; : • • ; . ' : •,'• ; . � ' • • ; . • • :. • ' I � • ,�/ \ ,' A PREVIOUSLY DEVELOPED SITE WITH GRAVEL DRIVEWAY. THE REMAINING W� LAND AREA 1 PORTIONS OF THE LOT ARE COVERED WITH GRASS AND TREES. THERE (0.025 ACRES) / 1 \ , : • . j a \ / ARE TWO STREAMS AND TWO WETLAND AREAS PRESENT ONSITE. THERE / / kotiti, IS AN UNNAMED TRIBURARY TO BIG CREEK THAT RUNS FROM SOUTH TO / / / / \ / I =/o; \ �4024/ U NORTH ALONGSIDE CHERRYWOOD DRIVE. THERE IS ANOTHER UNNAMED / / / ko�1' / /%: ; ; : \ \ �� W' '� �, / r I TRIBUTARY TO BIG CREEK THAT RUNS FROM WEST TO EAST NEAR THE / I I NORTHERN PROPERTY LINE THAT FORMS TWO WETLAND AREAS BEFORE IT FLOWS INTO THE CREEK ADJACENT TO CHERRYWOOD DRIVE. ONSITE / '` �k°19' ; . : • \ LIMIT OF 1-1 \I Q�: ; SOILS ARE CLASSIFIED AS CULLASAJA-TUCKASEGEE COMPLEX, / i ; . ; . / - \ �DISTURBANC� , \ \ \ h; �I I/ \ HYDROLOGIC SOIL GROUP A, AND UDORTHENTS, HYDROLOGIC SOIL GROUP i / / �; : i '�; : �` ; :. / / \ \ \ \ �; �� / ✓ / I \ �v C. THE SITE GENERALLY SLOPES FROM SOUTH TO NORTH AT ABOUT 4.7%. SURFACE RUNOFF FLOWS NORTH TO THE WETLAND AREA, BEFORE // /, �/ ,U - / -�1��--------- ---- FLOWING INTO THE UNNAMED TRIBUTARY TO BIG CREEK. / , S� _ o�� _ J- / / .' / / J — — 1- 1-4020� — — ° POSTCONSTRUCTION CONDITIONS: THIS PROJECT CONSISTS OF / / .c,� /�,� i i'�LJ�v11T OF J - - - - CONSTRUCTING A 9100 SQ.FT. RETAIL STORE WITH A 28-SPACE PARKING , !.' i / - _402�- - ��e / /,- Y y� DfSTITRBANCE - - \ \ r LOT AND TRUCK DELIVERY AREA. THE REMAINING AREAS WILL BE /j -0 \ \ I \ \ 1111 III LANDSCAPED WITH SOD. DRAINAGE FROM THE ROOF WILL BE DISCHARGED ON THE SURFACE AND DIRECTED TOWARDS THE CURB LINE OF THE REAR / !' O�NQ �R�e� �`' U - - o , / I \ / / SB I Ub / ROMP I I I I / PARKING LOT AREA. ALL PARKING LOT AREAS WILL BE SLOPED TO DRAIN STORMWATER TO ONE OF FIVE GRATE INLETS LOCATED IN THE /'' % 6 __-°�\ PARKING LOT. THOSE INLETS WILL BE CONNECTED TO AN 18" HDPE PIPE NETWORK THAT WILL CONVEY STORMWATER TO AN UNDERGROUND SB DOUBLE ROW% /a°ry TS MU DETENTION CHAMBER SYSTEM LOCATED EAST OF THE BUILDING, NEAR �- / \ TSG 1 \ THE DRIVEWAY. PROPOSED SLOPES OF THE PARKING LOT RANGE FROM / ,- j �� - - / ,9�/ \ \ - - / °;' /°� ON i II I I 1.0% TO 3.5%, WHILE THE REMAINING GRASSED AREAS WILL BE GRADED TO A MAXIMUM SLOPE OF 4:1 H: V (25%). r—/i/ ��' I / / 11;�I1►16� I I I /�\ IN ORDER TO TREAT THE FIRST INCH OF STORMWATER RUNOFF ReE� , / GENEREATED FROM THE DEVELOPMENT, THE UNDERGROUND DETENTION / ti� / / / No\s�� FFER �' ° / / \ \ / / // ° CHAMBER SYSTEM WILL INCLUDE A SEPARATOR ROW SYSTEM WHICH WILL REMOVE 80% OF THE TOTAL SUSPENDED SOLIDS (TSS) FROM THE \U) I STORMWATER. THE SEPARATOR ROW IS WRAPPED IN FILTER FABRIC, / / / �� ' 30 // \ / / / / \ \ / 1 I / I I'�II'I I m� AND THE SYSTEM IS DESIGNED SO THAT STORMWATER ENTERING THE CHAMBERS MUST FLOW THROUGH THE SEPARATOR ROW FIRST, FILTERING 80% OF THE TSS BEFORE FLOWING DOWNWARD AND FILLING THE GRAVEL BED AND THEN THE ADJOINING CHAMBERS. l° TO CONTROL THE INCREASED DISCHARGES DUE TO THIS DEVELOPMENT, THE ON -SITE STORMWATER WILL BE DETAINED IN AN UNDERGROUND DETENTION CHAMBER SYSTEM. THE CHAMBER SYSTEM WILL CONSIST OF 89 CULTEC R-150XLHD CHAMBERS EMBEDDED IN A GRAVEL BED. THE AREA OF DISTURBANCE / I I \ /' \ 11II OUTFLOW WILL BE CONTROLLED BY THE USE OF 6"X6" ORIFICE AND AN 'UU ''- - - - �' 1 I I I I \ 1.03 ACRES 18"X12" WEIR IN THE OUTLET CONTROL BOX LOCATED NEAR THE NORTHEAST END OF THE PARKING LOT. THE ORIFICES WILL FORCEIIIII', /\ ' / I I I \ LIMIT OF I I , o STORMWATER TO BACK UP AND BE STORED IN THE CHAMBERS. ,-� / � � � I I / I / / to I I , DISCHARGE FROM THE OUTLET CONTROL BOX WILL BE DIRECTED TO THE LIMIT OF - _ - - _ / I I / / I \ I DISTURBS NORTHEAST, WHERE IT WILL DISCHARGED ON THE SURFACE, AND FLOW - DIS-TURBANCE TO THE WETLAND AREA ADJACENT TO THE UNNAMED TRIBUTARY TO BIG �4°2�' I I I I I / TS MU CREEK. o0 _ I I 1, I I I I ,t _ ° 1 I I Ill I \ 1 r_\ I '� I I SITE ESTIMATES - - - - \ I ( I I'II I PRECONSTRUCTION IMPERVIOUS AREA: 7.0% - _ ° - J \ l ( l\ \ \ \\ \ \\ TS\ MU POSTCONSTRUCTION IMPERVIOUS AREA: 39.3% SB DOUBLE ROW \ \ \U \ \ \ ) \ // /, l,/ /l�� \ \ \ PRbPQSED SEPTIC AREA �' \ \ \ �� �� CEP DESIGN BY -OTHERS; DO NGT \ \ \ \\ \ �� �� - - _ / /I I I O \ - _ \ DISTURB UNTIL INSTyALEATION TS MU I \/ / I = I I o ----- oAll \ / / I \>CD / I / I \�-4o32-- \ / MiJ / / I ` / �\ I / `�I \ D � \\ --/� // I L,J / -------,�\ \\ \ \\ / _ Lo ,v/ �y it --4024--------- 36 41 ' ' U.S. HIGHWAY 64 1p \ I 1 I LIMIT OF / I W 25. S 3456'�9/% / \ \ I I I I I I DIISTURBANCE, / \ 58.5 ` S 39' '3 " 10 (� �_ o _ S 47' 6'27" W 33.28' / 1 v S 45'01'35" W 94.64' S 45.47 51 W 123.07 S 45.29'14" W 9.46 \ S 42'05 44" W 60, PUBLIC R.O.W. 4026,\- -- - - 0 m OHE OHE - OHE OHE ESPC NOTES 1. BECAUSE THE SITE IS DEFINED AS A 'HIGH QUALITY WATER ZONE', STABILIZTION WITH GROUND COVER SHALL BE ACHIEVED AS SOON AS PRACTICAL, BUT IN ANY EVENT ON ALL AREAS OF THE SITE WITHIN 5 WORKING DAYS OR 7 CALENDAR DAYS, WHICHEVER IS SHORTER, FROM THE LAST LAND DISTURBING ACT. 2. IF A QUALIFYING RAIN EVENT IS EXPECTED, TEMPORARY STABILIZATION SHALL BE ACHIEVED PRIOR TO THE RAIN EVENT. 3. BECAUSE THE SITE DRAINS TO STREAMS OCCUPIED BY WILD BROOK TROUT, NO IN -STREAM ACTIVITIES SHALL TAKE PLACE BETWEEN OCTOBER 15 AND APRIL 15 DUE TO BROOK TROUT SPAWNING SEASON. 4. ANY MATTING OR ESPC PRODUCTS SHOULD BE FREE OF NYLON MESH, AS IT IS SLOW TO DEGRADE AND CAN ENTANGLE WILDLIFE. / 0N� 0 0 N I n w z w u LT NOTES EROSION CONTROL IMPLEMENTATION SCHEDULE 1. THIS LOT CONTAINS 2.24 ACRES, MORE OR LESS. INTERMEDIATE PHASE o 1. BEGIN GRADING SITE IN THE BUILDING AND PARKING AREAS. o 2. THIS LOT IS NOT ZONED. 2. CONSTRUCTION EXIT PAD (CEP), DOUBLE ROW OF TYPE "A" SILT N FENCE (SB), TEMPORARY SEEDING (TS) TO REMAIN AND MAINTAINED AS NEEDED AS GRADING PROGRESSES. 3. THIS PROPERTY IS TAX PARCEL 7551-12-5837 3. INSTALL COMPOST SOCK CHECK DAMS (CS) IN CHANNELS WHERE STORM DRAIN OUTLET PROTECTION DESIGN RECORDED IN DEED BOOK D-37, PAGE 159 AND IN INDICATED. FLOW DATA FOR 25—YR, 24 HOUR STORDM—E1VET- 8NIN cwn PLAT CARD 8675, HIGHLANDS TOWNSHIP, MACON 4. INSTALL UTILITIES (STORM, SANITARY, AND WATER). STORM PIPE Q25 = 4.77 CFS z COUNTY, NORTH CAROLINA. OUTLET TO BE STABILIZED WITH OUTLET PROTECTION (OP). T = 3.94 < 0SEC AILWATER 0.5D; w u 5. PROTECT GRATE INLETS WITH BLOCK & GRAVEL INLET PROTECTION MINIMUM TAILWATER CONDITION APPLIES 4. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED (BIP) AFTER INSTALLATION. APRON DESIGN: / BY KING ENGINEERING OF CONCORD, INC., CONCORD, 6. CONCRETE WASHOUT (GK) TO BE ESTABLISHED AND MAINTAINED La = 9 FT ' W, = 3*D = 4.5 FT NORTH CAROLINA. AS NECESSARY ONCE CONCRETE POURING BEGINS. W2 = D+La = 10.5 FT d50 = 4 IN., CLASS 1 WETLAND AREA 2 (0.029 ACRES) NATURE OF CONSTRUCTION ACTIVITY PRECONSTRUCTION CONDITIONS: THE SITE IS A 2.24 ACRE PIECE OF N 47'35'23" 45' PROPERTY LOCATED ON THE SOUTHWEST SIDE OF U.S. 64 (CASHIERS RD.) AND CHERRWOOD DR., IN MACON COUNTY NORTH CAROLINA. IT IS �� / / / / /'� \ � \ \ //,/ • ; : • • :. • ::. • ; : • ::. • : •,'• ; . � • • ; . • ::. • ' I � • ,�/ \ ,' A PREVIOUSLY DEVELOPED SITE WITH GRAVEL DRIVEWAY. THE REMAINING \�ETLAND AREA 1 PORTIONS OF THE LOT ARE COVERED WITH GRASS AND TREES. THERE (0.025 ACRES) / 1 , : • . j a \ / ARE TWO STREAMS AND TWO WETLAND AREAS PRESENT ONSITE. THERE IS AN UNNAMED TRIBURARY TO BIG CREEK THAT RUNS FROM SOUTH TO / / / / \ / =/a; \ �4024/ / NORTH ALONGSIDE CHERRYWOOD DRIVE. THERE IS ANOTHER UNNAMED �"; / r I TRIBUTARY TO BIG CREEK THAT RUNS FROM WEST TO EAST NEAR THE NORTHERN PROPERTY LINE THAT FORMS TWO WETLAND AREAS BEFORE IT OP FLOWS INTO THE CREEK ADJACENT TO CHERRYWOOD DRIVE. ONSITE / / '` �k01� \ \ \I� /�' / /II \ �v I' i ': / / �— SOILS ARE CLASSIFIED AS CULLASAJA-TUCKASEGEE COMPLEX, / i ; . :. / \ LIMdT OF , \ \ \ h; �; SB u R�bNV \ HYDROLOGIC SOIL GROUP A, HYDROLOGIC SOIL GROUP // �' ' i �': >< . :. / / DIST RBANCE AND UDORTHENTS, / . • � . • �.: • . • — �/-/ / \ \ C. THE SITE GENERALLY SLOPES FROM SOUTH TO NORTH AT ABOUT / / �. • _ _ - -- -' / 4.7%. SURFACE RUNOFF FLOWS NORTH TO THE WETLAND AREA, BEFORE / / / �i -_ - / �--------- ---- FLOWING INTO THE UNNAMED TRIBUTARY TO BIG CREEK. °,� — �- _ _ _ _ _ I / I I o / �— — —I�4 — — /' O — , I / POSTCONSTRUCTION CONDITIONS: THIS PROJECT CONSISTS OF // / � �' / U Ui'-U IT OF '-4020— r _ — o / o _ _ — — \ g l / I I l / i ,��0 / CONSTRUCTING A 9100 SQ.FT. RETAIL STORE WITH A 28-SPACE PARKING , / / — — v y/ DfSTITRBANCE — —4°2 > LOT AND TRUCK DELIVERY AREA. THE REMAINING AREAS WILL BE / / // /i // — — — = — — — — — — —40 LANDSCAPED WITH SOD. DRAINAGE FROM THE ROOF WILL BE DISCHARGED ON THE SURFACE AND DIRECTED TOWARDS THE CURB LINE OF THE REAR PARKING LOT AREA. ALL PARKING LOT AREAS WILL BE SLOPED TO / 1 PM�� >- / / / / — — - - - - - ■ / _ / ° J DRAIN STORMWATER TO ONE OF FIVE GRATE INLETS LOCATED IN THE \ I / PARKING LOT. THOSE INLETS WILL BE CONNECTED TO AN 18" HDPE PIPE NETWORK THAT WILL CONVEY STORMWATER TO AN UNDERGROUND / / / / / / \ BGIP o DETENTION CHAMBER SYSTEM LOCATED EAST OF THE BUILDING, NEAR THE DRIVEWAY. PROPOSED SLOPES OF THE PARKING LOT RANGE FROM o�' / / / o� j I III I 1.0% TO 3.5%, WHILE THE REMAINING GRASSED AREAS WILL BE GRADED / // — — — — — �' / / \ \ - SIB DQOTBLE ROW o / / �k / ; CE TO A MAXIMUM SLOPE OF 4:1 H: V (25%). �� /� — — —_FAR / TS MU / — — BGIP I _ \ / / /INZ I IN ORDER TO TREAT THE FIRST INCH OF STORMWATER RUNOFF GENEREATED FROM THE DEVELOPMENT, THE UNDERGROUND DETENTION / ti� / / / No�s��- FFER I' CHAMBER SYSTEM WILL INCLUDE A SEPARATOR ROW SYSTEM WHICH WILL /'°otiti/ / / 25 �� \ / / ° I \ �k - / / 7 I P REMOVE 80% OF THE TOTAL SUSPENDED SOLIDS (TSS) FROM THE / / / / /k°� /, / / / / o \ I I I I I II �/ I I ::E STORMWATER. THE SEPARATOR ROW IS WRAPPED IN FILTER FABRIC, AND THE SYSTEM IS DESIGNED SO THAT STORMWATER ENTERING THE / / / ,-3°� , / , / // / \ I ' LIMI1� F CHAMBERS MUST FLOW THROUGH THE SEPARATOR ROW FIRST, FILTERING ,� // ,/ // ti� / /— / / // I % ', ►p , I II i I II DISTU BAN E 80% OF THE TSS BEFORE FLOWING DOWNWARD AND FILLING THE GRAVEL BED AND THEN THE ADJOINING CHAMBERS. o ° \\ // -GK- C CRF�1`� H TO CONTROL THE INCREASED DISCHARGES DUE TO THIS DEVELOPMENT, THE ON -SITE STORMWATER WILL BE DETAINED IN AN UNDERGROUND DETENTION CHAMBER SYSTEM. THE CHAMBER SYSTEM WILL CONSIST OF % \ / / / / ,402�' / / N ) / I / / TS MU 89 CULTEC R-150XLHD CHAMBERS EMBEDDED IN A GRAVEL BED. THE \ �.' / '�\ / / / / / / o III / . / I ■ \ I �II I I OUTFLOW WILL BE CONTROLLED BY THE USE OF 6"X6" ORIFICE AND AN / / / / / — — — — / o I I / I Illill I I. I I I 18 X12 WEIR IN THE OUTLET CONTROL BOX LOCATED NEAR THE ,' \ j — — — — _ . / s� / NORTHEAST END OF THE PARKING LOT. THE ORIFICES WILL FORCE ,-'/ / /40Z ) I III I \ o IIIIIIII;I I I I I I ', STORMWATER TO BACK UP AND BE STORED IN THE CHAMBERS. / / / I I I I I I / ' LIMIT OF 0 DISCHARGE FROM THE OUTLET CONTROL BOX WILL BE DIRECTED TO THE LIMIT OF — _ — — I I I AREfa OF DISTURBANCE I I DISTURB�f� NORTHEAST, WHERE IT WILL DISCHARGED ON THE SURFACE, AND FLOW - DISTURBANCE — — ' I I I ' I TO THE WETLAND AREA ADJACENT TO THE UNNAMED TRIBUTARY TO BIG 4p2� / / I I I I I I // 1.32 ACRES ell I ', I I',II \',II I I I I 11 l ul CREEK. I I I I // to I 0 0 — — I I ( UNDERGROUND DETENTION SYSTEM TO BE ' I ' I' I I I ' ,o I SITE ESTIMATES — — / o — — — — — / \ I I I ( l \ PROTECTED FROM SEDIMENTATION AT ALL I IIIII I I I I ' PRECONSTRUCTION IMPERVIOUS AREA: 7.0% — _ / \ I ( \ \ ' Ij I I I II I I TIMES DURING CONSTRUCTION; POSTCONSTRUCTION IMPERVIOUS AREA: \ \ 39.3% — — — / �4°se ADDITIONAL MEASURES MAY BE REQUIRED o I — , S� I I 1I�1 I ' • `" I I _ \� / I I SO D LIB OW \ \ \ ` \ \ \ 4027 I pry a �/ �/'' / I / / (� II � I \ \ PRbRG1SED SEPTIC AR DESIGN BY OTI �RS• DO NGT \ \ \ \ \ \ �� �� BGIP \ ® — — / / ' /' // M I 0 0 I II I \ DISTURB UNTIL INSTyAL-EATION \ ` — \ \ — \ / y T= GI ��. I TS U — — — — — — \ _ — \PIS PR MU 2, //%/// / / I I . J ODI I \�-4032-- \\(\o 0 0 0 —4023\ \ ///// N N jr I/ W \4038 �\ / i I I / `�--- �2 /--------7---- TS MU 24_— —402 I I ry LIMIT OF / ; U. S. HIGHWAY 64 _ ,3 " w 25.10' 3456��%% S, \ \ I I I I I I DIISTURBANCE,' (� / CS \ 58.5 S 39'0 - o \ S 47' 6'27" W 33.28' / I v S 45'01'35" W 94.64' \ �o \ S 45.47 51 W I123.07 I I S 45*29'14" W 9.46 I \ \ S 42'05 44" W gp M d � NE a� �\ a o to o 0 0 0 0 0 0 4p26� O 60 PUBLIC R.O.W. - m OHE OHE - OHE OHE ESPC NOTES 1. BECAUSE THE SITE IS DEFINED AS A 'HIGH QUALITY WATER ZONE', STABILIZTION WITH GROUND COVER SHALL BE ACHIEVED AS SOON AS PRACTICAL, BUT IN ANY EVENT ON ALL AREAS OF THE SITE WITHIN 5 WORKING DAYS OR 7 CALENDAR DAYS, WHICHEVER IS SHORTER, FROM THE LAST LAND DISTURBING ACT. 2. IF A QUALIFYING RAIN EVENT IS EXPECTED, TEMPORARY STABILIZATION SHALL BE ACHIEVED PRIOR TO THE RAIN EVENT. 3. BECAUSE THE SITE DRAINS TO STREAMS OCCUPIED BY WILD BROOK TROUT, NO IN -STREAM ACTIVITIES SHALL TAKE PLACE BETWEEN OCTOBER 15 AND APRIL 15 DUE TO BROOK TROUT SPAWNING SEASON. 4. ANY MATTING OR ESPC PRODUCTS SHOULD BE FREE OF NYLON MESH, AS IT IS SLOW TO DEGRADE AND CAN ENTANGLE WILDLIFE. NOTES 1. THIS LOT CONTAINS 2.24 ACRES, MORE OR LESS. 2. THIS LOT IS NOT ZONED. 3. THIS PROPERTY IS TAX PARCEL 7551-12-5837 RECORDED IN DEED BOOK D-37, PAGE 159 AND IN PLAT CARD 8675, HIGHLANDS TOWNSHIP, MACON COUNTY, NORTH CAROLINA. EROSION CONTROL IMPLEMENTATION SCHEDULE FINAL PHASE 1. MAINTAIN CONSTRUCTION EXIT PAD (CEP), DOUBLE ROW OF TYPE "A" SILT FENCE (SB), AND TEMPORARY SEEDING (TS) AS SITE GRADING PROGRESSES. 2. GRADE PARKING LOT AND CONSTRUCT BUILDING PAD. BASE, PAVING AND BUILDING ARE TO BE INSTALLED AFTER UTILITY CONSTRUCTION IS COMPLETED. 3. INSTALL SOD (SOD) ON AREAS INDICATED AS SOON AS PRACTICABLE. APPROPRIATE PLANT MATERIAL SHALL BE INSTALLED AREA BY AREA AS SITE WORK PERMITS. 4. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED 4. CLEAN STORM STRUCTURES. INSTALL ANY OTHER PERMANENT BMP. ' BY KING ENGINEERING OF CONCORD, INC., CONCORD, 5. DEMUCK ALL STRUCTURAL BMP'S AND SAFELY DISPOSE OF NORTH CAROLINA. MATERIAL. MAINTAIN SILT FENCE (SB) UNTIL VEGETATION HAS ' ACHIEVED 100% COVERAGE ACROSS SITE WITH 85% DENSITY, THEN ' REMOVE. NATURE OF CONSTRUCTION ACTIVITY PRECONSTRUCTION CONDITIONS. THE SITE IS A 2.24 ACRE PIECE OF / / — N 47.35'23" 45' PROPERTY LOCATED ON THE SOUTHWEST SIDE OF U.S. 64 (CASHIERS \ / /RD.) AND CHERRWOOD DR., IN MACON COUNTY NORTH CAROLINA. IT IS �� / / / / / \ \ \ //,/ ; : • ::. ; : : ; . ; : •' ; . ' . • ; . I ,'/ \ A PREVIOUSLY DEVELOPED SITE WITH GRAVEL DRIVEWAY. THE REMAINING PORTIONS OF THE LOT ARE COVERED WITH GRASS AND TREES. THERE ARE TWO STREAMS AND TWO WETLAND AREAS PRESENT ONSITE. THERE / otiti / '� <'' : : • \ \ J // �' \ I / IS AN UNNAMED TRIBURARY TO BIG CREEK THAT RUNS FROM SOUTH TO ���4024/ NORTH ALONGSIDE CHERRYWOOD DRIVE. THERE IS ANOTHER UNNAMED �o % . • �� �, 1 / TRIBUTARY TO BIG CREEK THAT RUNS FROM WEST TO EAST NEAR THE / I \\ )\ \ \ \ NORTHERN PROPERTY LINE THAT FORMS TWO WETLAND AREAS BEFORE IT FLOWS INTO THE CREEK ADJACENT TO CHERRYWOOD DRIVE. ONSITE / • ; / \�40 : • J — / I \ \ �' / / /�I \ ,,?; SOILS ARE CLASSIFIED AS CULLASAJA—TUCKASEGEE COMPLEX, / i ; . ; . / \ OP , \ \ \ h; co;cVv HYDROLOGIC SOIL GROUP A, AND UDORTHENTS, HYDROLOGIC SOIL GROUP / / ' ' i ' :` . :. / LIM C. THE SITE GENERALLY SLOPES FROM SOUTH TO NORTH AT ABOUT / i �� �___---' / / • • .y(' ' _ _--- � � DIST RBANC�-'� 4.7%. SURFACE RUNOFF FLOWS NORTH TO THE WETLAND AREA, BEFORE // // // __---- / --------- ---- - \ FLOWING INTO THE UNNAMED TRIBUTARY TO BIG CREEK. -- 1— --- —'-402° —'-- r r r kk rk k /rr POSTCONSTRUCTION CONDITIONS: THIS PROJECT CONSISTS OF OF CONSTRUCTING A 9100 SQ.FT. RETAIL STORE WITH A 28—SPACE PARKING 4021 DSTLJR� NCE / / LOT AND TRUCK DELIVERY AREA. THE REMAINING AREAS WILL BE —40 LANDSCAPED WITH SOD. DRAINAGE FROM THE ROOF WILL BE DISCHARGED / `� f-\� / _ D� r k rl k r k r k \ r k k k r 0 r k ik k r k k? r r l 4 • r III I I ON THE SURFACE AND DIRECTED TOWARDS THE CURB LINE OF THE REAR I ' PARKING LOT AREA. ALL PARKING LOT AREAS WILL BE SLOPED TO DRAIN STORMWATER TO ONE OF FIVE GRATE INLETS LOCATED IN THE PARKING LOT. THOSE INLETS WILL BE CONNECTED TO AN 18" HDPE -/1 G / / / / / / r, r k k r k r r r r r r n PIPE NETWORK THAT WILL CONVEY STORMWATER TO AN UNDERGROUND /� r k k r k \k k k r k kl I\ DETENTION CHAMBER SYSTEM LOCATED EAST OF THE BUILDING, NEAR y / / / % r r ' ' THE DRIVEWAY. PROPOSED SLOPES OF THE PARKING LOT RANGE FROM / 1.0% TO 3.5%, WHILE THE REMAINING GRASSED AREAS WILL BE GRADED TO A MAXIMUM SLOPE OF 4:1 H: V (25%). 4� IN ORDER TO TREAT THE FIRST INCH OF STORMWATER RUNOFF a GENEREATED FROM THE DEVELOPMENT, THE UNDERGROUND DETENTION ° CHAMBER SYSTEM WILL INCLUDE A SEPARATOR ROW SYSTEM WHICH WILL O ' REMOVE 80% OF THE TOTAL SUSPENDED SOLIDS (TSS) FROM THE / / / k°� / -cfpl r/ k k r a / a ° a/ / ° d° STORMWATER. THE SEPARATOR ROW IS WRAPPED IN FILTER FABRIC, / / // /n�� ' 30 r r r r \ / / / / \ / r k r r k r I I m I i \ AND THE SYSTEM IS DESIGNED SO THAT STORMWATER ENTERING THE / / ,,-� / 2 r k k k III k r LIMI1� F CHAMBERS MUST FLOW THROUGH THE SEPARATOR ROW FIRST, FILTERING .,� / / ,' �� / r k r� / / / < 1 / k ., ►,A r r a / I I DISTU BAN E 80% OF THE TSS BEFORE FLOWING DOWNWARD AND FILLING THE GRAVEL BED AND THEN THE ADJOINING CHAMBERS. TO CONTROL THE INCREASED DISCHARGES DUE TO THIS DEVELOPMENT, .�.TOj/� / i/ i k©D THE ON —SITE STORMWATER WILL BE DETAINED IN AN UNDERGROUND \ • /,.='C / —4026 / r r�C r r r r / / / / / I m I ' / I r r k I I r DETENTION CHAMBER SYSTEM. THE CHAMBER SYSTEM WILL CONSIST OF 89 CULTEC R-150XLHD CHAMBERS EMBEDDED IN A GRAVEL BED. THE OUTFLOW WILL BE CONTROLLED BY THE USE OF 6"X6" ORIFICE AND AN /� ' / / / / — — — rrr kok k r a k k / I I \ \ / r k II�II I I� I �1- C I 18"X12" WEIR IN THE OUTLET CONTROL BOX LOCATED NEAR THE '— — — — _ . — / / / ' ra ` ` k _ I I I a I II I I rrkrkr k I IIIII� l I NORTHEAST END OF THE PARKING LOT. THE ORIFICES WILL FORCE II, IIIII ;I I I I ', STORMWATER TO BACK UP AND BE STORED IN THE CHAMBERS. / / / k r k k k r �k k / I I I I I k k r LIMIT OF 1' 1 DISCHARGE FROM THE OUTLET CONTROL BOX WILL BE DIRECTED TO THE LIMIT OF _ _ — — k ' I I I ARE/, OF DISTURBANCE I k k Ik k DISTURBX' NORTHEAST, WHERE IT WILL DISCHARGED ON THE SURFACE, AND FLOW — DISTURBANCE — — r '; I I I I III II I 'I TO THE WETLAND AREA ADJACENT TO THE UNNAMED TRIBUTARY TO BIG I I I I // 1.32 ACRES I rrr k k I I',11 I, I I I I I 1 kkk k kkk k k r k I I I / so I w I CREEK. ,,,, /._---,- ,krrrkkk I I I / � \ I I I I I >! .-�._: \._- r �._ ;' k l SITE ESTIMATES --__== PRECONSTRUCTION IMPERVIOUS AREA: 7.0% POSTCONSTRUCTION IMPERVIOUS AREA: 39.3%_ ° Q° PR(5POSED SEPTIC AREA _ r r k r r \ \ \ \ \ \ \ \ \ — 2 \ \ \ ----- --- (DESIGN BY OTHERS; DO NOT 1, I I iIQ AO0O DISTURB UNTIL INSTALLATION . 91S R aNGEU� III \ m \ ry \ �\ \ `�-------- - - r? o�C'f M k k r k k k 4 r r k r k ki r r r 02 `° �4 3 D 0 61, \ — 7 / / / i / ' r k r k r Jc-- r—+. r—T r r rr r k ry— k�.4.24 . — -r T� r—� --kr / i r I r ¢ 3 — / / / r t r r t r r r r—Ic Tk—Ir- k r k r k r r r r r k r r r r k r k r r r r k r k r r r k r r r r r r r r r r r r r ,�. �r k r�FT Ji 0 5— / / ` ` r r r r k r r r r r k r k r k r k r r k r r r k r—k r Y t� — k r r r k r k r r �2 \ k k k k k k r k r k r r r k k k k r k�. J—r \\ \\ k k r k k r k k k k r r r r r k k k k k k r k r k k k / � � \ I / , U.S. HIGHWAY 64 " 10 S / I I I I I I I LIMIT OF I 9ro 3 W 34yo19// / \ \ I I DIISTURBANCE, / \ \ \ ` 58.5 S 3 25. ° / I C \ \ S 42'05'44" W S 47' 627" W 33.28' I S 45'01 35' W 94.64 \ �o g 7 I I S 45'4�7 51 W I123.07 I I d I S 45*29'14" W 19.46 \\\ o 0 60' PUBLIC R.O.W. 4p26,\— — _ , OHE OHE - OHE OHE ESPC NOTES 1. BECAUSE THE SITE IS DEFINED AS A 'HIGH QUALITY WATER ZONE', STABILIZTION WITH GROUND COVER SHALL BE ACHIEVED AS SOON AS PRACTICAL, BUT IN ANY EVENT ON ALL AREAS OF THE SITE WITHIN 5 WORKING DAYS OR 7 CALENDAR DAYS, WHICHEVER IS SHORTER, FROM THE LAST LAND DISTURBING ACT. 2. IF A QUALIFYING RAIN EVENT IS EXPECTED, TEMPORARY STABILIZATION SHALL BE ACHIEVED PRIOR TO THE RAIN EVENT. 3. BECAUSE THE SITE DRAINS TO STREAMS OCCUPIED BY WILD BROOK TROUT, NO IN —STREAM ACTIVITIES SHALL TAKE PLACE BETWEEN OCTOBER 15 AND APRIL 15 DUE TO BROOK TROUT SPAWNING SEASON. 4. ANY MATTING OR ESPC PRODUCTS SHOULD BE FREE OF NYLON MESH, AS IT IS SLOW TO DEGRADE AND CAN ENTANGLE WILDLIFE. pN' ENE / ONE 0 0 c\1 I n w z w u FT NOTES 1. THIS LOT CONTAINS 2.24 ACRES, MORE OR LESS. 2. THIS LOT IS NOT ZONED. 3. THIS PROPERTY IS TAX PARCEL 7551-12-5837 RECORDED IN DEED BOOK D-37, PAGE 159 AND IN PLAT CARD 8675, HIGHLANDS TOWNSHIP, MACON COUNTY, NORTH CAROLINA. 4. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY KING ENGINEERING OF CONCORD, INC., CONCORD, NORTH CAROLINA. WETLAND AREA 2 ' FLOOD ZONE NOTES (0•029 ACRES) , 1. THIS PROPERTY IS LOCATED IN FLOOD HAZARD ZONE �� - - - - - - N 4T35'23" 58.45' �� X (OUT-UNSHADED).- 2. ZONE "X" (OUT -UNSHADED) DENOTES AREAS TO BE � REQ'D OUTLET CONTROL BOX ' DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL WETLAND AREA �1 / / TOP 4026.00 ; CHANCE FLOODPLAIN. / / (0.025 ,ACRES) / ; : MP INV. IN (12" HDPE) 4022,40, ; ; ; ; ; .. ; ; .. / otiti / c ' INV. IN ($" HDPE) 4f?21. t :I' INV 4017.9s� I 3. PROPERTY SHOWN ON FIRM PANEL 371007551 OOJ, / / / ; .�, (APPfZOX LocATI ) INv. our (18'�, P) 40Z1:90 : •'' ' I l ; l v 024/ EFFECTIVE APRIL 19, 2010. Z-1I INV. 401P.00 Z. REQ'D 2X2 GRATE INLET #4 TOP 4025.32 CM EX. DROP INLET / / ; . • ' / P GRATE 4022.17 INV. IN (15" HDPE) 4022.79 HDPE) 4022.69 INV. OUT (18" HDPE) 4017.88 / �' / • ' �. • . - � INV. OUT (12" \ \ \ \ \ \ Qi of � / / \ �+ � I � / �' • ' --- �- INV. OUT 4021.75�; FG=4022.50 4_ XFG=4 / - TW=4025.50 _ 022.50 TW= 4026' _ IW=40 5.2 _ _ o>' WATER QUALITY CALCULATIONS � ,'�," ice, \/ � - _ �0L402o- ,Fc 4022=.75 _' - --- - _ - .00 __ TW 4025.50 - _ 00=4025.00 Iro- SITE IMPERVIOUS AREA (A) 31,890 SQ. FT. (0.732 ACRES, 0.001143 SQ.MI.) FG-4023.75 - - - 75 _ /, , , - BG=4026.29- .022 - - - - FG� �I TW 4025 �j IMPERVIOUS AREA CURVE NUMBER (CN) = 98 / y y� TW=4026.50 _ - - - FL'4025.79 g I l 0 WATER QUALITY DESIGN STORM EVENT PRECIPITATION DEPTH (P) = 1" T =4 o26.5o W=4026.5a L REI 6" W � 2 4. ,o i __ _ SCS DISCRETE CURVE NUMBER METHOD: / = I I I S = (1000/CN)-10 Qwv = - '* / /� / / FG=4024.00 _ _ - - = 0 M PROFILE B "o + _ v/ / � � FG 40 .0 i' I i EQI 4015.12 SLOPD PAVED HEADWALL (4: 1) S = (1000/98)-10 = 0.2041 / , i y / --- _ - - - $F'P�--4025.52 i W 02 0�0� f ,- i O � i REQ'D 57 L.F: OF I FG=4023.55 i - TW=4026_SO �FL=4026. 5 I Ld • / Qwv = -������ / - � �' � , / - BC=4Q26. 5 � 15' HDPE, w Qwv = = 0.7909 INCHES -% / - - CaD` 0.50% SLOPE � w p * / i - - FIG 26.37 BC=402 ' 1 /='4026.12 WATER QUALITY VOLUME (WQV) Qwv A / FG=4025.25 BC=4027.20 FL=402 5 4oz`� / p_ -40 5.62 -A' (0.7909 IN. 0.0833 ') (31,890 SQ.FT.) / TW�4027.00. 'FL=4 26.70 - a o� io BC=4 8.17 FG4 = 2101 CU. FT. / _ - . �' 4026.8 cv� _ G= 02 36 * * i FG-4026.45 ti TW 4-26T75 FL 40 67 4023.40 REQ'D 75 L.F. OF THE WQV WILL BE TREATED BY AN SEPARATOR ROW CONFIGURATION OF THE UNDERGROUND / // FG-4025.50_ -- L=4026.31 BC=4026:70 `REQ'D 2X2 GRATE INLET #3 F - 48" CMP - / TOP 4025_69 w C� DETENTION CHAMBERS. �� / j j - - EP - - _-�� _ BC=4 26:141 / / FL=4026.20 INV. OUT (15 HDPE) 4023.10 BORING FG-4025 1 ®1.00% SLOPE �R M BC-4027�26� BC-4027:06 _ 4025.78 � 4023.93 I � E , - FL=40 6.76� / TS=4027.30FG=40 5.86 q I� SEPARATOR ROW SIZING CALCULATIONS: / /� / / / / ��� Rg a 5 ,R / FL' 4026.56 FL-4�76.41 = HA-1 I I =402> .82 UNIT PEAK DISCHARGE u 662 CFS SQ.MI. IN. �� y / / �6� a TS=4027.30 / / / - o (q) _ / / 01 � � 0 � f� % TP-4026.80 FROM EXHIBIT 5-III IN TR-55 i TP-4026.80 i FG-4024. I ( E, ASSUMED FOR HIGHEST PEAK FLOW: �E a a a - O \ To = 0.1 HR. AND Tt = 0.0 HR. / _' E(F / / DISCHARGE ROOF DRAINS ON PAVEMENT SURFACE C 17 4024.241 m I \ WATER QUALITY PEAK FLOW (Qw) = qu * A * Qwv / / k� 30"- F 4025.75 I I a �o�' T 4026.75 // / REQ'D ��X2 GRATE INLET #5 F -40 = 662 CFS/SQ.MI./IN. * 0.001143 SQ.MI. * 0.7909 IN. � , / / / ��,/ / / / < ►A� �, II' � I / � � R INV. OUT 15",HDPE 4022.75 , � � IN, TREATMENT RATE = 0.06 CFS PER CHAMBER TOP 4025.37 ( ) 0 60 CFS / / / / C 6.02 PER MANUFACTURER) REMOVAL RATE, e /1� _� - / - _ / / / / / / // / / I =402 50� ( / - / i / ,; TW=402 .50 NO. OF CHAMBERS REQ'D = 0.60 CFS / 0.06 CFS PER CHAMBER m _ 10 CHAMBERS � ��= ' � - °� - - PROPOSED BUILDING '�, � � FG=4020.50 N0. OF CHAMBERS PROVIDED - 20 � �,'� �� / TW=4026.00 j/ o I I I a TW=4025.50 i - FT. FG=4020.509,100 SQ.1 F z- d % ' 1 0 L 5 O = TW=4024.50 �i ��II I i� I IICFG=�,40 .41 i F. F. E. • i - 0 FG=4020.50 � i i 0 � RING � � '� � �" �� �/ A-2 REQ'D 33 L.�',� I 15" HDPE �02 I ® 0.50% i G=4 26.0 I I I I TW=4024.25 II 111 I I w 0 6 p FG=4021.25 �� I I I 1 00 I M I -INV. N0(�5"4�HIi B�, I REQ'D JUNCTIO I Box # FIG 402 .35 a A < e a n a _ P)�40 �.6 a a � � ' - � - � INV OUT 10 H P � � a A a\\VAAA ��A A a e - �� REQ'D 4 L.F.,�O / �56� \ \ \ ----� f TS=40 Fl I I l r BC 402__ 30 TP=4 0w �10" HDPE \ \ PRbPQ \ \ TP=fO 6.80 TP=4026.80 REQ Q JUNCTION BOX ®1.00% SLOPS - i FL 402 8� - - \ ` TS=40 7 30 TS=4Q27.30 \ SED SEPTIC ARE X #1 FG=4021.25 \ \ TOP 4026.29 � FG-40 6.97 \ - IN TW-4024.50 (DESIGN BY OT ERS DO NOT \ \ \ V. IN 18" HDPE 4022.63 ® / \ c- 27.1 - A ( ) G=4022.oD // / I �o� I DISTURB UNTIL INSTILLATION FL-_ 026. 2 _ _ \ \ XFG-402 INV. OUT (12" HDPE) 4022.53 fW=4025.00 - - - - - - - - XFG_ 2616 - = �� `, / // / ; �J C= 027. i / REQ D �78 L.F.I OF 6.63 �� �// �� /F��40242 �Q L= 02 7 l _ REQD 2X2 GRATE --INLET #1 \\ v - o 0 o INV. OUT 18' HDPE 4fl23.37 / / / // / / / 0 0 50%pSL O 'b A� OQE E r/ l / � � �� TOP 4026.12 / MM SLOPE STORM PROFILE 'A' W - - - _ -4032- - ( ) #_ �5p% XFG=4026.50 ; �' ��� I O - - � ® _ BC=4026.50 = 2 5 � / = R - F \ RE (y -- -- BC=4027.62 FL=4026.on 4 26. 5 4'� �"' r' N r�i ° T IN .. / �� = FL-4027.12 BC-4026.82 /PUR i Lo C=4 7.10 BC=406 6 / / BC=4027.29 REQ'D 2X2 GRAT - ------ -- U - - - / FL= 26.60 --- - FL=4026:24 / - FL �4Q2 TOP--40267 40 26.79 ���026- BP .96 r ��, / - - - _ - - - �� 036\ \ - / / / / / / / - 2 INV. OUT (18" HDPE) 4022.86 co /m _ \ -- --- - - - -- REQ'D 1 F / 2 - -- r- 7 3 / - � 48" CM -402 - - - - - ®/14.2,3%SLOPE INV. 4019.13 / oN - � Fc=4024.86 - � � 37 46 . l U. S HIGHWAY 64 39.E s 34.5 \ / W 25.10 S 4T 6'27" W 33.28' S 45'01'35" W 94.64' S 42'05'44" W 58.5$ , \ F.: ww8wRE4'{Y JUNCTION k Q I S 45'4I7 51 W 1123.07 I I S 45-29'14' W ?9.46 EX. 48" CMP' , - - - -PER N - - DRAWING 840.31 0 0 0 0 0 0 o PUBLIC I [� I ('� R.O.W.02 - _- -OUT ( 8 ' 60 1 UBLIC Rs �- _----- INV. OUT (48" CMP)i4019.03 n INV. 4020.17 PRECONSTRUCTION DEVELOPED AREA DISCHARGE EVENT DISCHARGE (CFS) 2-yr 5.82 5-yr 10.04 10-yr 13.73 25-yr 19.30 50-yr 24.12 100-yr 29.03 POSTCONSTRUCTION DEVELOPED AREA DISCHARGE EVENT DISCHARGE (CFS) 2-yr 5.81 5-yr 9.14 10-yr 12.14 25-yr 17.58 50-yr 22.83 100-yr 28.16 UNDERGROUND DETENTION CHAMBER SUMMARY EVENT INFLOW (CFS) DISCHARGE (CFS) ELEVATION (FEET) STORAGE (CU.FT.) 2-yr 4.59 1.29 4023.40 3,229 5-yr 5.69 1.83 4023.69 3,991 10-yr 6.55 2.56 4023.86 4,382 25-yr 7.76 4.10 4024.14 4,883 50-yr 8.75 5.45 4024.34 5,219 100-yr 9.73 6.78 4024.52 5,501 GRAVEL BED TOP EL. 4024.54 MIN. PAVEMENT GRADE EL. 4025.21 100-YR STORAGE EL. 4024.52 25-YR STORAGE EL. 4024.14 SEPARATOR GRAVEL BED I PERFORATED ROW BOTTOM UNDERDRAIN EL. 4022.00 INV. 4022.00 TYPICAL UNDERGROUND DETENTION SECTION NOT TO SCALE UNDERGROUND DETENTION BED UNDERGROUND STORMWATER DETENTION CHAMBERS TOTAL STORAGE VOLUME MIN. FINISHED GROUND TOP ELEVATION GRAVEL BED TOP ELEVATION CHAMBER TOP ELEVATION CHAMBER BOTTOM ELEVATION GRAVEL BED BOTTOM ELEVATION 89 - CULTEC R-150XLHD 5061 C.F. 4025.21 4024.54 4024.04 4022.50 4022.00 � ONE TOP OF WALL EL. 40: �Q'D STD. HEADWALL #2 V. 4015.88 6"X6" ORIFICE INV. 4022.00 18"X12" WEIR INV. 4023.50 CONCRETE ORIFICE WALL TOP EL. 4024.50 5"X12" WEIR JV. 4023.5 6"X6" ORIFICE INV. 4022.0 FRONT VIEW �o o" � N 4_ 00 N U N M O Z PLAN VIEW OUTLET CONTROL BOX DETAILS NOT TO SCALE 0 0 N n Ld z LLJ U_ J LL HP STA = 0+68.41 HP EL = 4025.79 PVI STA = 0+65.23 PVI EL = 4025.86 10.00' VC M M 00 N N r� O N O N (0 0 N r` O O 't 4040 LP STA = 0+27.62 LJ li.l U m m W W 4040 4035 P 1 STA VI 10 10.0 0+30. 4VC VC 4035 4030 O �po +o N � O +N 4030 n r 4025 Id Oi >> m w rL >> w 4025 p ° 4020 4020 4015 4015 4010 REQ'D INV. 4 48" CM D15.60 4010 1 4005 4005 O o � o r0 O N O ro O (D O ff� or-� N It N 0 L) 6 3 N � -t 0) Ln O Co 4 3 N � 0) n r- Co 4 O N -t 0) � Co L6 O N 4- 00 I- In N � 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 DRIVEWAY PROFILE- H: 1 " = 20' V: 1 " = 10' O 4040 o 4040 ZLL Ij 4035 _ Ldc 4035 O O Ln Lj N 4030 N N N 4030 ono �z 4025 � a-� Z - o z 4025 4020 4020 E ' 57 L.F. OF — — ® 0. 0% SL PE 12' HDPE 4015 0.50% SLOPE 4015 CHAMB R SYS EM 4010 4010 Ln N 0-) CO N r7 CO • 00 LD U-) o 00 O LO N � • 00 N r) LO cD Ln • co 00 00 r, O - N O 7 Ln N ro � o Ln C14 L(s o Ln NO Lt7 NO Ln o Un o NO Un o Ln o NO CO CO N N It N N N N N't N �t N 't N It N N 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 STORM PROFILE 'B' H: 1 " = 20' V: 1" = 10' 4045 0 n 4045 4040 N N 0 Ll O N CV O 0 4040 x w 4035 - ~ w w w LD o_ m Z w 0- _ _= 4035 o 4030 N O64 z n- Z O o " 0 Z 4030 N 0 N H 4025 w o z ~- Ld > > z z 4025 o I 4020 Q D 43 L.F. O — 4020 4015 LOP 1 ® 0.50 HD PE SLOPE 4015 ° SLOPEE0.50% 4010 LTEC D AMBER TENTIO SYSTE 4010 C O O It CV 0 00 N O O N O O N r N CO O N't O O (0 n L6 N CO O N 't O N 7 In N (D O N O LO 0 CO N N CO O N't O I, m 0 N N CO O N 't O Ln 0"t N N CO O N 't O 0 r7 N N CO O N It O n m N N N CO O N It O r7 LD M N N CO O N O O �r� N N CO O N It O -s Lo N N CO O N O O (D Ln N CO O N � O 0) 0 N O N CO O N O M Cp It Ln N 4040 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 STORM PROFILE 'A' H: 1" = 20' V: 1 " = 10' Ln N "i N 4040 J O Z W X O I w 4035 u m w o 4035 Of CD t r` Un O EE = " O 4030 X PO N U�= � — �- 4030 O,t O o 0 d- Z O 4025 uj P ? uj Of �' '_ 4025 4020 R 4020 Q'D 33 L.F. OF 0.50% SLOPE 4015 R Q'D 4 L.F. OF 4015 1.00% SLOPE 4010 4010 C AMBER SYSTEIV 4005 4005 O I� 7 ro 4- tD M 00 Cfl Co r7 0 00 0i N 0 ai CO oUn O N Un O N L6 3 N N 3 N 0+00 0+10 0+20 0+30 0+40 0+50 STORM PROFILE 'C' H: 1 " = 20' V: 1" = 10' 4040 X O o O m N N o O o w 4040 4035 O U J o 0 2 00 4035 4030 N p- O a Q J 0_ Z �U z 4030 4025 CULTEC z CY o w iui 3 x 0 4025 DETEN ION 4020 AM Nil III III 111111111, 4020 — 4015 1 ® 0.83 HDP ° SLOPE 4015 4010 ©2.5 up 8" HDP %SLOP 4010 to o O Ln w I- o N 00 ro Ln Ln o N O O CD N —0+20 -0+10 0+00 0+10 0+20 0+30 0+40 STORM PROFILE 'D' H: 1 " = 20' V: 1 " = 10' b M o d LJ w Z3:- O OJ (.7 Z O Fob F w Lj >m3 0_w0 X O ¢w %0]W NMw m 4040 mC) 4040 4040 w 7 3 0 .. 4040 4035 O co � `" 44 J 4035 4030IL a O� to z o 4030 Lid 4J 4025 4025 4020 4020 4015 4015 REV 12 L. 48" MAP 4010 14.23% SL OPE 4010 4005 4005 N N M N 0) N r7 N r-, 7 4 0 NN O O0 M0 Do O 0+00 0+10 0+20 0+30 0+40 0+50 STORM PROFILE 'E' H: 1" = 20' V: 1 " = 10' 4035 O o..m w `` w U- o�- ww N W u 4035 4030 U I Fw ¢w Z a 0 =03 w z OW 4030 4025 m � FINISHEDw GRADE o a 4025 4020 M M 4020 4015 m ¢ CULTE CHAM DETENTI ER SYSTE N 4015 4010 AF APPROX PROX. GR SH UNDWATER EXISTING GRADE 4010 4005 4005 0) CO O Ci o N t O LO 00 o N 0 0 0) rM rl� C5 C0 o N t 0 0 U) rM roC5 C6 o N t 0 0 N rM ro C5 Cfl o N t 0 0 0) rM N C5 o N O Lr7 N Cfl N 0 0 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 SOIL BORING PROFILE- H: 1" = 20' V: 1" = 10' CD CD N I W z LLB U_ J LL_ NOTES 1. THIS LOT CONTAINS 2.24 ACRES, MORE OR LESS. o C\1 2. THIS LOT IS NOT ZONED. n 3. THIS PROPERTY IS TAX PARCEL 7551-12-5837 RECORDED IN DEED BOOK D-37, PAGE 159 AND IN � PLAT CARD 8675, HIGHLANDS TOWNSHIP, MACON w COUNTY, NORTH CAROLINA. c� J 4. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED / 12 BY KING ENGINEERING OF CONCORD, INC., CONCORD, NORTH CAROLINA. WETLAND AREA 2 (0.029 ACRES) / N 47'35'23" E 2,98-45' /koy� W�(LAND AR EiA 1 /! (0.02 jA(CRES) / k°titi' / / ,,mac!:;;:.; \ \ \ �—// �.••'.••;••'.••'••'.•''.•',••'.••'••':� �/ \ I / cy / I \ / REQ / / ; ••,i�!: • ' ; � _ _ _ � y 'D RETAINING WALL (DESIGN�B'P OTHERS) / / / i!�\/ ice/ _ �1 �40�� � � � � — r � � r r r �r r •r` r r rl r r / I I I / O o /r / / / � / / / � � / Y y j j � \ I — 1 -- — �40'Ll� i r r 0 r � � r r� r � r r r r -►- � r e � r � 'f9 � r I I / / I � / —402 r r r r r r r r r r r r r /'1 //�! L�N� PRE/ /• �� �� / /�---\ ---- r r r r r a r\r r r r r r d r r r �OD r I r r r r v. `\ � r r r r® � r r �r r r r C r� r / r / 1 I I p a r I 4 r r I vIt Q'D PRIVATE r r ` r r r r l r r r r r r r ...♦. r/r / r r r r r v��\ II , r r r 1 I / WAfIER SUPPLY WEIyL/ (DESIGN BY OTHERS) r r d SOD rrr1r�rr rrrr / / / rr r\rr rr r r \ REQ'D 6"/ / r r r= r r rrr a j // CURT/ (�—__ / / / \ / I \ \ \ \ \ / / 16'X18' CONCRETE d I / \ �QD MPSTER PAD WITH 6' PRIVACY FENCE I \ I I N r/ o / _ ° d d d d \ a O \ \ II I II �/ I m I \ \ DI �HQR6E ROOF DRAINS ON PAVEMENT SURFA`GE r � r/ r r r r 15'X23'/ / CREfE / e DELIVERP�R�EA \ SOD. e \ ''� / \ / / � —= — —4026 r r r jr r r / / I J /r •. r r r r 4C� ,I r r r /O R0�'OSED BUILDING I/ \ a I r I Ir r r r 0 11 I I r r l ----/ rrr rC4r r r r r I r r I I I I, Irl r r 9 TO-10 SQ* FT. rr F.F.E. ;4027.50 \ \ — / r r r �. r i. a re r r ' I ' I I ► , � , r � � ► I111II III ` I/ I I �` s BOLLARD WITH ACCESSIBLE R D RE A�NING ENTRANCE PARKING SIGN / I ( GN Y� T R )r IIIII, II1 i I I Lu \\ - -- - , _�.=-jr=---- •� ^��R5C6yk y K� - .n, r r r r r r r r r r I I Ico r r r rrrrr \ I I I I l ACCESSIBLq \ I r r I',II , I I I I \ \ \ - ---- -- ---= ------------------ -- - r r r r r r r . — — r r \ l ( l \ \ \ SIDEWALK RAMP\ \ r r r r — j Iibo ll \ I d- r r r r 3'A e d\ ° a o a o \ I 4 r 1/ // / 1 I I I I I (A • I r o e \oa ° ° oe\\ \ \ Q\ © j r \ \ \ \ � •F_� / / � r r r r r �Y._ / Or / / �Q/ � / \ \ \ \ \ PRdPOSED SEPTIC AREA 2 ' I / I (DESIGN BY OTHERS; DO NOT O /' // I I O r \ \ \ \ DISTURB UNTIL INSTALLATION '/ r 11 `J \ / lO \ J \ \ \ \ •-�> ! r .. r r r \ \ 7\ i / / rr��\rr\ r \ ` \ a-_ _____-_ --Y------' — REQYD �r; r r M ti V \4p23 r r\ r r / ( r r r �Q r I / — � \ \ �\ •.�\ __�_ �_\ _._ -•-"t-'---�--. \ � � -,r ._- � _._--r � j / � /r r. � / / / / � / / / Rw uj Lc /r r r r r r O, Dr \¢p`3B r r 7 \ // r r r r r r r r r �r (rt r R RADIUS I MOVEMENT / 6— / r r r r r r r r _r- �r r r r r r r r -- — / �, _ r r r r r _ r r r r r r r r4524— r r r _ r r r (SEE TYPICAL D AIL ON / r rr-Y r r r r r e■ r r r r r r r r r r r r r r r r r r r r r r r rr� r-r r r e Ar rrr r =\r r r r r r r r . r . .rrrrrrr r r r—t r r r rrrr r rrrrrrr /THIS SHEET) _ �C2 r--r• � r � r \ \ \ — — / g 34•g6.19 % 37 46 /lp U.S. / HIGHWAY 64 58 S 39�0.3" W 25.10 \ S 42 05 44 W 58. S 47' 6 27 W 33,28' " S 45'01 35' W 94.64' \ / �o g M I I S 45'47 51 W ,123.07 I I d I S 45*29'14" W 19.46 1 \\\ 60' PUBLIC R.O.W. \_ ___---- -- 4p26� O r� - OHE OHE PARKING REQUIREMENTS RETAIL STORE: REQUIRED SPACES: PROVIDED SPACES: ADA REQUIRED HANDICAP SPACES: PROVIDED HANDICAP SPACES: REQUIRED VAN ACCESSIBLE SPACES: PROVIDED VAN ACCESSIBLE SPACES: N/A 9100 SQ. FT. N/A 28 SPACES 2 2 1 2 OHE OHE pN' ENE I I I I 1 I � / I I / / / / oN� NOTES 1. THIS LOT CONTAINS 2.24 ACRES, MORE OR LESS. 2. THIS LOT IS NOT ZONED. 3. THIS PROPERTY IS TAX PARCEL 7551-12-5837 RECORDED IN DEED BOOK D-37, PAGE 159 AND IN PLAT CARD 8675, HIGHLANDS TOWNSHIP, MACON COUNTY, NORTH CAROLINA. 4. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY KING ENGINEERING OF CONCORD, INC., CONCORD, NORTH CAROLINA. S 4 - OHE OHE PARKING REQUIREMENTS RETAIL STORE: REQUIRED SPACES: PROVIDED SPACES: ADA REQUIRED HANDICAP SPACES: PROVIDED HANDICAP SPACES: REQUIRED VAN ACCESSIBLE SPACES: PROVIDED VAN ACCESSIBLE SPACES: S 45'47'51" W 123. N/A 9100 SQ. FT. N/A 30 SPACES 2 2 1 2 WETLAND AREA 1 (0.025 ACRES) WETLAND AREA 2 / (0.029 ACRES) / '35'23" E 2 8.45' / / I � ml WI I I / Q�21 11 J I 1 I W I 1 I m I O I 1? I ' I r•1.' 1 ' — RETAINING WALL I fir I �REQ'D 1 • _ _ � 1 I I (DSIGN_ ------ oN c 1 d. / ft -- -- - - ------- - - - --- �' I I I O co 1 i I / J G%p REQ'D PRIVATE _ - - _ _ _ — �NNPM , WATER SUPPLY WELL - - - - (DESIGN BY OTHERS), O 0 12 SF ACES ° I d 3.79' REQ'D 6" CURB M 9vFF�R44 18.62' e 16'X18' CONCRETE R �RBEQ cn 01 ' UFFER oo ° 30 �O d Glop, o a r m X J so, DUMPSTER PAD WITH 6' o U, WOOD PRIVACY FENCE O ° 112.75' e A o ° 131'-3" a EXT. SLAB 15'X23' CONCRETE d0 DELIVERY AREA PROPOSED BUILDING 92100 SQ. FT. F.F.E. 4027.50 ENTRANCE ACCESSIBLE SIDEWALK RAMP 20.87' e a ° ° (Q ° d O° e d d Oe ° °d e a d d e °° O d ° 156.6 o 0 9 SPACES 0 4. 1 9.00' 9.00' L 10.00' boo , 41 o � o � REQ'D 6" CURB 182.12' rn O c1 S 45*29'14" W 99. U.S. HIGHWAY 64 60' PUBLIC R.O.W. BOLLARD WITH ACCESSIBLE PARKING SIGN 5.00' e d s d e d v d d " a a a s 7 SPAC 9.00' TYP. S 45'01'35" W 94.64 O E I I I I I I •. I I I I I I I I o 1 T I I I i I I o 143.95' I ARROW VEMENT I I I O I I O I I I o = I I I I O 00 I I I 0 I I I I i o I N I REQ'D DBL YEL OW : � O I STRIPING 'oo, I I 25.8 ' Q m 1 I I I I I I u I I 1 I I ' lb I I REQ'D 0' I o I I STOP B R I O I I 1 I I I I I = I I a) I I I I 00 I I W I I I I 0• I 1 I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I 1 I I I I I I I I I I I 1 Y II I II I I W I I I to ® I I / / / I 1 cYI • 01 0' I / i I �oo, I , PYLON wEX. ION i i SIGN I 1 = REA' RADIUS I PROVEMENT / (SkE -TYPICAL D TAIL ON SHE /t 4) 46 25.10' S 34�56'19i \S 3.0 9'3" W '05'44" W 58.5 - / O m OHE OHE pN' ENE / ONE CD CD N n LIJ z w U_ J LT STA O6" 3000 PSI CONCRETE OREINFORCING AS RECOMMENDED BY GEOTECHNICAL CONSULTANT C0 O 6" LAYER OF DENSE GRADED LIMESTONE BASE COURSE, COMPACTED TO 100% PROCTOR DENSITY. ®SUBGRADE TO BE COMPACTED TO 98% PROCTOR DENSITY AS DETERMINED BY AASHTO T-99 COMPACTION TEST. SEE GEOTECHNICAL REPORT FOR ADDITIONAL INFORMATION. HEAVY DUTY CONCRETE PAVEMENT DETAIL NOT TO SCALE rinncu rn ri nno c" GRADING @ SLAB DETAIL NOT TO SCALE O2" ASPHALT WEARING COURSE O 2" ASPHALT BINDER COURSE 6 3000 PSI CONCRETE N O5"�{ 3 0.10 GAL./S.Y. EMULSIFIED ASPHALT OR 0.07 GAL./S.Y. TACK COAT. ®28 DAYS PAVEMENT SECTION 00 ® 8" LAYER OF DENSE GRADED LIMESTONE BASE COURSE, COMPACTED TO 100% PROCTOR DENSITY. PER PLANS OSUBGRADE TO BE COMPACTED TO 98% PROCTOR DENSITY AS DETERMINED BY AASHTO T-99 COMPACTION TEST. SEE GEOTECHNICAL REPORT FOR ADDITIONAL INFORMATION. HEAVY DUTY ASPHALT PAVEMENT DETAIL NOT TO SCALE 4x4 FRONT 1x6 2x4 TOP VIEW 1x6 NOTES 1. WOOD TO BE TREATED PINE. USE GALVANIZED NAILS FOR FASTENING. 2. NUMBER OF BOARDS WILL VARY DEPENDING ON SPACE BETWEEN BOARDS AND ACTUAL WIDTH OF BOARDS. 4x4 1x6 2x4 44 6" CONCRETE CURB NOT TO SCALE SOLID OR GRATE LID R, FRAAAF (PE w > INVERT CHANN (PRECAST FIELD PLACED) INVERT CHANNEL (oorf'ACT no FI INVERT PLAN PRECAST INLET BOX NOTES 1. ALL CONCRETE SHALL BE CLASS "A" AND DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI @ 28 DAYS. 2. ALL REINFORCING STEEL TO BE PER PRECAST MANUFACTURER. 3. WALL AND SLAB THICKNESSES ARE MINIMUMS AND MAY BE INCREASED AT THE DISCRETION OF THE PRECAST MANUFACTURER. 4. PIPE MAY CONNECT WITH INLET BOX FROM ANY DIRECTION AND AS MANY CONNECTIONS MAY BE MADE AS NECESSARY AS LONG AS MINIMUM SPACING BETWEEN PIPES IS MAINTAINED. 5. DIAMETER MAY BE INCREASED AS NEEDED TO ACCOMMODATE NUMBER OF CONNECTING PIPES, PIPE SIZES AND ANGLES. 6. ALL CIRCULAR SECTIONS TO BE SEALED WITH RUBBER GASKETS. 7. SIZING AND LOCATION OF LIFTING DEVICES SHALL BE THE RESPONSIBILITY OF THE PRECAST MANUFACTURER IN ORDER TO ASSURE SAFETY AND BALANCED HANDLING DURING TRANSPORTATION AND INSTALLATION OF THE INLET BOX. LIFTING HOLES THAT PASS COMPLETELY THROUGH WALL OR SLAB SHALL BE SEALED BY FILLING WITH MORTAR AFTER INSTALLATION. 8. REQUIRED INVERT CHANNELS MAY BE PREFORMED OR FIELD CONSTRUCTED. CHANGES IN DIRECTION OF FLOW SHALL HAVE A TRUE CURVE AS LARGE A RADIUS AS SIZE WILL PERMIT AND BE FINISHED UP TO THE CENTER OF PIPE. 9. ALL PIPE/ORIFICE OPENINGS IN PRECAST INLET BOXES SHALL BE PREFORMED BY THE MANUFACTURER OR CORED IN THE FIELD. PRECAST ROUND INLET BOX DETAILS BACKFILL TO BE MOUNDED TO VARIES ALLOW FOR SETTLEMENT NOT TO SCALE FINISHED PAVEMENT GRADE —I I II11=1I1=1I1=1I1=1I1=1I1-111=111=111=111=111=11I= 111)7 III '� SLOPEAS 2"-3" 1"-2" =III —III —III —III —III —III III —III —III— —III— REQUIRED PER DIRT —II I —II I —II I —II I —III II I —II I —II I —II I-- II OSHA REGULATIONS a a BACKFILL SPACE —1 I I-1 I I-1 I I-1 I I-1 I —II1=1I11=1I11=III I M I I-1 I M I 1=11 I—I I I—III—III—III-1 I COMPACTED SOIL IN 12" d A a s , °, a a a o =111=111=111 11 Hill Hill ��i/��i/��i/��i/��i/��i/��i�i/��i LAYERS TO 85% STANDARD PROCTOR DENSITY ae O O O O O O O 0 O O N jTHIS \\\\\\\\\ POTION TO E HAND U O u O QC 0 O 0 O 0 0 0 0 COMP ACTED WITH -HELD MECHANICAL TAMPERS 0 0 0 0 C§ 0 0 0 0 N FRONT VIEW REAR VIEW O O O O O 0 0 0 0 0 Q #78 STONE OR O O O O O O O O O O O O 0 O APPROVED EQUAL 0 O 0 O 0 O O PE OUT O PE OUT O 12" MIN. PRIVACY FENCE DETAILS DIAMETER O o 12" MIN. 12" MIN. DIAMETER O o 12" MIN. NOT TO SCALE O O O O 00000 0000 00000 0000 00000 0000 00000 0000 12" MIN. 12" MIN. NON —TRAFFIC AREAS TRAFFIC AREAS STORM SEWER PIPE BEDDING DETAILS NOT TO SCALE STANDARD STATE APPROVED HANDICAPPED SIGNAGE INSTALLED ON A METAL COLUMN AT THE PROPER HEIGHT REQUIRED PROVIDE ADDITIONAL SIGNAGE BELOW THE HANDICAPPED SIGN AS REQUIRED PER REGULATIONS BOLT SIGNS TO GALVANIZED z METAL PIPE COLUMN 6" DIAMETER CONCRETE FILLED STEEL TUBE PAINTED YELLOW CONCRETE SURROUND AROUND PIPE COLUMN IIII ����'QIIIIIILI i f GRAVEL BACKFILL BEYOND CONCRETE PIPE COLLAR 24" �NOMINAL� 0 0 0 0 0 0 0 0 0 z 0 0 0 N O 0 0 0 z HT 0 0 0 0 0 0 0 0 %"x6" OPENINGS (NOMINAL) FRAME PER MANUFACTURER �24" NOMINAL NOTES 1. GRATE TO HAVE A HEAVY DUTY LOAD RATING OR BETTER. 2. GRATE TO PROVIDE A MINIMUM OF 216 SQ.IN. OF OPEN AREA. 3. DIMENSIONS SHOWN ARE NOMINAL AND WILL VARY BY MANUFACTURER. 2'x2' GRATE INLET DETAILS NOT TO SCALE SINGLE HEADWALL DIMENSIONS D A B C E F G 12"/15" 2'-11" 2'-3" 1'-3" 5'-1" 1'-11" 0'-6" 18" 3'-2" 2'-6" 1'-3" 5'-4" 1'-11" 0'-9" 24" 3'-8" 3'-0" 1'-6" 6'-3" 2'-3" 1'-0" 30" 4'-2" 3'-6" 2'-0" 7'-8" 3'-0" 1'-0" 36" 4'-8" 4'-0" 2'-6" 9'-0" 3'-9" 1'-0" 42" 5'-2" 4'-6" 3'-0" 10'-4" 4'-8" 1'-6" 48" 5'-8" 5'-0" 3'-6" 11'-8" 5'-5" 1'-6" WHERE ARCH TYPE PIPE IS SPECIFIED, HORIZONTAL DIMENSION "A" FOR HEADWALLS SHALL CONFORM TO THE HORIZONTAL SPAN OF THE Y4" GR00`'r^ EVENLY SPACED FRAME PER MANUFACTURER �24" NOMINAL NOTES 1. SOLID LID TO HAVE A HEAVY DUTY LOAD RATING OR BETTER. 2. DIMENSIONS SHOWN ARE NOMINAL AND WILL VARY BY MANUFACTURER. SOLID COVER DETAILS NOT TO SCALE o a r #5 BARS IN END WALL PIPE AND DIMENSIONS DEPENDENT ON VERTICAL DIMENSIONS SHALL #5 BARS ® 12" CONFORM TO THE VERTICAL HEIGHT OF THE PIPE. 6" O.C. EACH WAY IN WING WALLS REQ'D PAVEMENT AND PLAN BASE PER PLANS #5 BARS IN 6" F A END WALL #5 BARS IN DENSE GRADED BASE #5 BAR END WALL 1 � 1 'I 1 D i ~----� ___ #5 BARS ® 12" o EACH WAY ' ' 1 i i IN WING WALLS 1 , 1 1 '------------------ ' L #5 BARS IN - „ -� END WALL #5 BARS ® 10" O.C. EACH 6" WAY IN FLOOR, TURNED E UP INTO WING WALLS FRONT SECTION STANDARD CONCRETE ENDWALL DETAILS NOT TO SCALE 2.00' OUTSIDE 2.00' 7 �DIAMETER� 7 0 0 - - - - - - - - - - T I I I ow I I �Ld I on 00 I I 8" TURNDOWN o 4" EDGES 4" ELEVATION } S�Opf pf pt,%S 1.5" CLEAR 4x4-W2.9xW2.9 ` - ` L4" 8" TURNDOWN WELDED WIRE FABRIC ow \� ���� EDGE (TURN INTO W TURNDOWN EDGES) 03 SLOPE PAVED ENDWALL CONSTRUCTION NOTES 1. ALL CONCRETE SHALL BE CLASS "A" AND DEVELOP A i% o MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI ® 28 + • c; DAYS. 1 2. USE %4" CHAMFER ON ALL EXPOSED CONCRETE EDGES. 7° 3. ENDWALL WIDTH MAY BE EXPANDED AS NECESSARY TO ACCOMMODATE MULTIPLE PIPE BARRELS. BARRELS SHOULD HAVE MINIMUM OF 1' OF CLEARANCE BETWEEN OUTSIDE WALLS. SECTION ACCESSIBLE PARKING, ACCESS RAMP 8c ACCESS AISLE DETAILS NOT TO SCALE ACCESSIBLE PARKING SIGN DETAIL NOT TO SCALE CONCRETE PIPE COLLAR DETAIL NOT TO SCALE CONCRETE SLOPE PAVED ENDWALL DETAILS NOT TO SCALE glW 0 0 ❑1 � w W W W W 0 0 s LL] Z W W Q J w x ZNoou °Zz amU F Q W In Nz wfnW z ¢❑ X< m co2 O> a ll1 LL W p w W 0) w ❑m00 3P-= �JJ X K o N F m X W m F zpz 6 o w uo a m Fm J Jw Q r0 Z W O= 2 0D E E Z O Q „ J r W p x Q w X Z W W p O W 2 2 J .3 r / /ry■/ LL W a W ��Wi/ ~ w ~z - II-_ =Wa J Xo0 LL, =z ❑ W W Q 0 _ X w O V Y O J W Z J V a a WOU JW aZ �o H❑ TW 2 W U LL Q // X O w of 7) N W 'L r J F9 O 0 Z Q � W ��yy LL 0; a Z fw a �WLu �-P i V I— _ J _ �k <m W % mw �JrJS O U O Q W W = W O W W LL W ❑ m Waa 2 W U¢= U K° �i 3Wy < O9 Z O ❑ O- = Z a a W > Z mp OLLz a aLL Qz z0 z 3o 0uj g E Z) J Z w �In UNamw (V F � m It 0 m d W W U -.0 0w Z z O 0 Z < J wzr 9 - ? 6 p m EZ M I �w zoE o ON ON_E Q q o W ❑ y W o Ql W�m = Q z W mam a� dam p5oz w U W W U OW=� JW9C7 ¢w U2 OH Z 02 O a ^ LL �0 E mK KW O ~ _ W U 0z0 WU=N 0❑� W ~ W W J'L m N J 0LL� a. m W wx m CD o LL O � 0 c ® W m Z O Z W Lu W 0 ❑ co Z Lu L.i W J � Lu J U [n f- Z C� O Z } m W Z W Of U IL ❑ fn vJ °� z H 00 V 0 Z 2 O_ Do J c'ia _ D�� O U Lf) r � (L LU Ill (L z J r=^ a E LL U Ta E Q _ mxLL W �IL ? 8W 0 UW❑ Z� Z �� W = Q LL E m� w n mWC7 OWW O�J aLL ¢ [• a K iQ vz N a Oo w �H o % z�W �z ll Z Z LLF� F0 g V v = �U dw OU UZ 0 a g / w >❑W E� E s WW_Z¢x �� zc �W'/A� o U Uo �_c�i O °z° O 3a2w EE E E W. wZ wT. v/ E❑ UN ~W O y J U ZQUU O� N v N f p Z YJ J❑ //� U rNi Vl EZ fA �' S y �N W O E m II/\ �n Uw W UHkz NN �_ in W w m Q W QZ �V'/^/ ❑ g �Q W N = W? N2Q owmw �o c m o Zgi W~ NW VI N y U .�� dya W y OE U= N F2 a0 W o �d ro WW¢ d. (9 zQ z E w �� mo m FE �U `■ LL 3U� W ZmPIE Om �aa m� mw O E g =o E� u❑i �i� �z r E o LL w0 0 z 30p Fa F- LL O a F EU ❑ m= _ �y E U W2F W UZaZ mF ¢mod Z m ,+ oZq E N zo O- LL u'�1 'p YLL W F70(7 nw 7U V z o aw �Q E E KLL y E QOz LL �rc aw \\ \ \ \ /\� 00'ip �a i0 i u �= of E m0 mw O x E u �xzp = Uai❑ �< /`� zF9> >w Yw J W m0 0 �d �c N F- W �U /\\\ W Woo ❑x W J ¢ ,�-, Z. f°i10 a JF-F J O=W Q�O QQU Ri �F E❑ Z LL IL MW �� 0 �} = \� / � ? g ? E o Z Va~/ go~O� Q = cw❑ LL �� i��- p a �aa0 �J � L) z UZ�F= 3 p U 1y (�_. WtYm Wa w� EQ a0 NE 1.� cd H W �U m 0a 0wvi �❑ 3• o �° J❑>2^ ❑w�aw 2 a / N�O �~ �U= = m0 N Z Z J z0>Oa =rxd� a 0 m �'o. \\ =mm Im�I=g Nm W m o wxgea xm wU z_ o ��\ �� / w 0❑w ❑ F 0 N 1D Z ❑ ��� r dw❑ UwwUp F ZUOp w-_� U W E �` U �� Ez m¢ W�mwCL aJ •f Y J W Q a- WVp pJ m T EW z /� Ew W�� moix0m Zm W Z O�w KQoO~ 2 Z OC. JJ¢JUU rcJoZZ�z wxwz_w z i /` o U WmO° ¢u�a¢� a 2 U Z❑ 0�mU� mC7d'oU 0 nm w /� b� zwm a r~ W O O cn Fr.r❑ E =WO�a = c=i= mZ ZH0 W z Z ❑ a W �' �ZaW UJ d'�6 �m ¢ % % A W wC7 >¢ ❑ O 0 poT.� w010� �J/ NO d /i // /� U Z�� Z oo�� _O H fcA WN (!J m Ir w iN� U� W �j0 /� �U y /� C9 Z) 0 E juWfaz vp-i vLLz �N�RdFp owc<i _ =wWz a W H W c UZaf�fA r / o EoQ J WNJ� O! W Z Z \ \� r' ~ m o X z j >_ co wJ ��/� � t /\ _� NJO C W V+0L L U)Z W w ( W W ( w (( a `\\\�ju 5 \ W z5 \� � cow = it\� z o w � oLO J w � JX p W O O O S J o J W E!/ 0 o w p ii / ! / m // / / m // i 2 \i / / I/ ( m / (( 1c RN E � ° k' U F YY C $ V 0U 2d rc wo z z o °o ° m _ ? w° 1 U 2 Z. U o r o 2 m 0 'zz w F ? W-w 8 w � ¢ p oz Q ¢JO = �o 5 'a Oo E z WJLL $T aJ OMo O O i t y�Y} Z )O O U n Q U u ~O w - r°o mE 2 w w S ¢3 o Z a y�{ J e 1y Uw wp W.m �� O O i g zi �i R� h� G¢ a a 22 O io4 O fo w Z UD ¢ z i w >y U w �wr wa3 m g w wp m -3 m3 m �i J m IE p w Wwp m J __ _ LLgw �- V l, p p w� w 5 0� p N m Y " ro n .0 W E W Z LL 2 a H = Y $ r 'a8 E ' w Z< g w h E mE Et V _ = 00 N ' OU o UEz ° _ U w3 z�ge m� _ �.r• w 8r w o L o 00 8 � <� mp = K � ;n� m� Nw m zx 10w W Fw z xo LLma 3� a `�w $ WY °¢ i o r2a EL pW m 53w o 2� F U'U' JON 2. =a 1.10 10j000Jp 2� N Uo�/+ u 00 4 y0 UU� oW� 22yq wZ G' OH f wZ wF w pw z wow o � W �p LLxLLi pi �F¢�zo a m�nn w: W �� ? wrcrc i p yR" H G = - -1' OE opW OU P, 0p w m prc a� _w° ze 0 i se o RZ 1 o oa po:m m m m H wLL w N.. w` = o E� p ° gwz3 F� ww wwww �w ��� Z RW ww U3 U U Up iEE o i u U��j w f u u_ f w ~ .z N o ° 05 ° a oZ. w i d $ ffo _ � OF Y S g o m z �No z E i $ % 0 U . F U . NNrc 0 F- U Yw a Z 5 - Z. = t 9 F f a a a W W if 1 w z -Z w Qn x x I > p goo x x � x x m ttttw °z i m r o o w o o z t-.iw o no ° WN w -H ' 9ps Oww E 4 E O L J z E Z.- >_ S z w0 �� Z� _ S. : s �¢w s �o - O _- U W f S w u n O N E; gd 6 wouq ow i w¢ 3g e y s o wm a= I 6 o0 c; L m R E a irc 1 4 zr mp Ew mg z i i0 w= w� L JU ZO oprw HB <w _ w� i° wsi z �LLz UU U iZ p< �� H DO > Z ¢5 Y gig g H 9a ,99.6E $R j $ 9 w� c� w oa o w w� ww� o3 oom wn� G �s c w WOapWW�i� L M1'F R = O 'Rain Rr �OW _ =o w°R 'wX u Z� ~¢ f W'^mr W H Z W W W= V / JNz J�W in Q W H Z LLww Sri 0: 0 3: Z J 600 W 0— EE (i �i yr (( �. mCD maOf i Omm d - W H W W oEo W~W W Wfn❑ ❑ ( U O- Lu �� /� o CiWd �'� `! Z W W W d w `V� vow �°O in N W dLL /< ww� wwr Z 0 cn W �y ❑W a /\. � wSo N LL F LL 2 ~ ❑ Z J nW x� �� mom"' �'❑oF E LL J R' W 0— wW oQ �oJ /\ puU pw U E U �Q N a z 8WH v LL W �LU _0 W W Z Ufn V UIr o LU 'm /,/ ��i ��/. /, Z_ woi>� 03 Jz H H or- 13 W W C7 Q U ¢° o�x, �wa0 = `5 f Z W Z W W = zwdU�iamF_ J z Q Vc�=zoz� w�00 O WO ZW >_= g U WxdLI UKNd2Fa o w ❑ W Z U) O w N W L = Z Q❑ z 5 N W Z ~ W Q N o � iU O i WO t 0 0 0 i O O 1.1. w E E z ww px Itz z N U,oW W°w d.❑CD 7 aOLL a w N W O N � Z LLo W 20 UU W W J w W / Zn ULL r (/ Lu W m w 00 2 WXo J � Uc OE a) E WO n ff Z V oz W N W �' LLW aZ a� 0 zg�cn co0V c 00wHuj — JU = W nz �w00�¢ z cn❑❑a aoE Ow JO a n E I W U � U d ao-> O oL� O U m Ow. N m `Vzm O J Of W as moz LL O < 0mI d Cn Q a Q❑¢ Z ¢ W LL W N W Z V F W j p Jmoo W J J N O ~ w 0 p 'F 0Za w m7� Roi 3?� -Z a 00 O irb N yWW ¢m a zpo� a Z�z wm _Uo W Q Z W !n p - O N O o_uiOC �0 W UW >U EW= E¢~ =U Exp E¢K d Z a Z Q O z U fn Q 2❑ U' LL 0 pp O z z 39 `8 cjt6 zpOLL >a xm `�3'z`z �E Wm W� W'0 3U m =E� g a Z a' d W U W �j 9 X Z F N <d ad E J�UOz¢a�mw❑ ❑U=>i �ooNnUUW Jugx UO�N�m _O UZQ= F� JQLL WQH J = UJ ❑ 1 ZJwZ0/L cm0 0❑UZWz Or U Z w WWO =�00Z�= JJQ E ZJ =2d W O < Ozd 9 V a. > o E T ❑ ozN ui CD Wco _ aZ�J/ o U O a o 00 Ci C r` N �u J LO as ♦�■ �ij?m CD r. >Z W� a - FL 12 r x 0 w------------------ ::::• m o W a W X W 2 1, U IWL 00 li J V W w WLLI 0 UCD J F-W 00 J oo U U KW° W o N N U w EOT. I� K (1)0 O 7 LL W '-' �o 'Q coY U �7 Jm usO O W co Od Wo V d 2 W W F W Z (�J jU r2 \ KWZ Ua Em H \ \ 88 co W W \\ o . / oom zo 3 0 7 \\ � U / REQ'D OUTLET CONTROL BOX TOP 4026.00 INV. IN (12" HDPE) 4022.40 INV. IN (6" HDPE) 4018.00 INV. OUT (18" HDPE) 4021.90 REQ'D 2X2 GRATE INLET #4 TOP 4025.32 INV. IN (15" HDPE) 4022.79 INV. OUT (12" HDPE) 4022.69 RETAINING WALL D D D D PIPE COL DETAIL ON f 12) REQ'D WOVEN GEOTEXTILE OVER BEDDING STONE FOR SCOUR PROTECTION AT NLET CHAMBERS AND `L ,RNAL MANIFOLD ,,��'�•,� 6" HDPE UNDERDRAIN FC-24 FEED CONNECTOR TYP.) REQ'D 37 L.F. OF 12" HDPE 0 0.50% SLOPE \ n GRAVEL BED EXTENTS MIN. PER DETAILS n. AL REQ'D WO OVER BED[ SCOUR PROT INLET CHAW INTERNAL AT AND OLD 0 Do t CONC. PIPE COLLAR (SEE DETAIL ON (\ SHEET 12) RETAINING WALL CONC. PIPE COLLAR (SEE DETAIL ON SHEET 12) REQ'D JUNCTION BOX #2 TOP 4025.14 INV. IN (15" HDPE) 4022.56 INV. OUT (10" HDPE) 4022.56 REQ'D 4 L.F. OF 10" HDPE 0 1.007. SLOPE REQ'D JUNCTION BOX #1 TOP 4026.29 INV. IN (18" HDPE) 4022.63 INV. OUT (12" HDPE) 4022.53 CULTEC UNDERGROUND DETENTION BED SCALE: 1 " = 10' GENERAL NOTES THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND DISTURBING ACTIVITIES. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANING AND DESIGN MANUAL. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE MEASURES ARE FUNCTIONING PROPERLY. FAILURE TO INSTALL, OPERATE, OR MAINTAIN ALL EROSION CONTROL MEASURES WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB UNTIL SUCH MEASURES ARE CORRECTED BACK TO THE APPROVED EROSION CONTROL PLANS. THE SITE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL MEASURES INCLUDING REPLACING OR REPAIRING ANY DAMAGED DEVICES DUE TO ANY CONSTRUCTION ACTIVITY BY OTHERS. DURING CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE TO ENSURE THAT LAND STRIPPED OF ITS NATURAL GROUND COVER IS EXPOSED ONLY IN SMALL QUANTITIES AND LIMITED DURATIONS, BEFORE PERMANENT EROSION PROTECTION IS ESTABLISHED. SEDIMENT SHALL NOT BE WASHED INTO INLETS. IT SHALL BE REMOVED AND DISPOSED/STABILIZED SO THAT IT WILL NOT ENTER INLETS. EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE APPROVED PLANS IF DRAINAGE PATTERNS DURING THE CONSTRUCTION ARE DIFFERENT FROM THE PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL BE REPORTED TO THE DESIGN PROFESSIONAL IMMEDIATELY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING BARRIERS AT THE TOE OF SLOPES UNDER CONSTRUCTION. THESE BARRIERS SHALL BE AS SHOWN IN THE PLANS. THESE BARRIERS MAY BE RELOCATED AND REUSED AFTER PERMANENT SLOPE STABILIZATION BECOMES FULLY ESTABLISHED. AS THEY ARE RELOCATED, ANY DEFECTIVE MATERIALS IN THE BARRIER SHALL BE REPLACED. IN ADDITION, ALL DEBRIS AND SILT AT THE PREVIOUS LOCATION SHALL BE REMOVED. CUT AND FILL SLOPES ARE NOT TO EXCEED 2:1 H: V. INLET SEDIMENT PROTECTION MEASURES SHALL BE INSTALLED ON ALL STORM STRUCTURES AS THEY ARE CONSTRUCTED. STORM DRAIN OUTLET PROTECTION SHALL BE PLACED AT ALL OUTLET HEADWALLS AS SOON AS THE HEADWALL IS CONSTRUCTED. CHECK DAMS SHALL BE INSTALLED IN AREAS OF CONCENTRATED FLOWS AS SHOWN ON THE PLAN. ALL DRAINAGE SWALES SHALL BE STABILIZED AS SOON AS FINAL GRADE IS ACHIEVED. ALL GRADED AREAS SHALL BE APPLIED WITH VEGETATIVE COVER AS SOON AS FINAL GRADE IS ACHIEVED. GENERAL GROUNDSKEEPING NOTES THE MATERIAL STAGING AREA SHOULD BE LOCATED AWAY FROM VEHICULAR TRAFFIC, NEAR THE CONSTRUCTION ENTRANCE, AND AWAY FROM WATERWAYS OR STORM DRAINS. ALL MATERIALS STORED ON —SITE SHOULD BE STORED IN A NEAT, ORDERLY MANNER IN THEIR APPROPRIATE CONTAINERS AND UNDER A ROOF OR OTHER ENCLOSURE, OR COVERED FOR PROTECTION FROM PRECIPITATION. AN EFFORT SHOULD BE MADE TO STORE ONLY ENOUGH PRODUCTS TO DO THE JOB. PRODUCTS SHOULD BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL MANUFACTURER'S LABEL. A LIST OF MATERIALS SHOULD BE COMPILED FOR ITEMS THAT WILL BE STORED ON —SITE DURING CONSTRUCTION ALONG WITH APPROPRIATE MATERIAL SAFETY DATA SHEETS. WHENEVER POSSIBLE, ALL OF A PRODUCT SHOULD BE USED UP BEFORE DISPOSING OF THE CONTAINER. MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL MUST BE FOLLOWED (SEE MATERIAL SAFETY DATA SHEET). THE SITE SUPERINTENDENT MUST INSPECT DAILY TO ENSURE PROPER USAGE, STORAGE AND DISPOSAL OF MATERIALS. FERTILIZERS NEED TO BE APPLIED ONLY IN THE MINIMUM AMOUNTS RECOMMENDED BY THE MANUFACTURER. ALL PAINT CONTAINERS NEED TO BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT SHALL NOT BE DUMPED INTO THE STORM SEWER SYSTEM BUT SHOULD BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURER'S INSTRUCTIONS IN ACCORDANCE WITH FEDERAL AND STATE LAW. THE SITE SHOULD BE KEPT CLEAN AND WELL GROOMED (TRASH PICKED UP REGULARLY, WEEDS MOWED AND SIGNS MAINTAINED). OFFSITE FUGITIVE SPRAY FROM DUST CONTROL, SAND BLASTING AND PRESSURE WASHING MUST BE MINIMIZED TO THE EXTENT POSSIBLE. LOCATE ACTIVITIES THAT GENERATE ODORS AND NOISE AS FAR FROM SURROUNDING PROPERTIES AS POSSIBLE (INCLUDING PORTABLE TOILETS, BURN SITES, FUELING AREAS, EQUIPMENT REPAIR AREAS AND DUMPSTERS). SOLID MATERIALS, INCLUDING BUILDING MATERIALS, SHALL NOT BE DISCHARGED TO WATERS OF THE STATE. INSPECTION SCHEDULE AND PROCEDURES CORRECTIVE ACTION REQUIREMENTS ALL LAND DISTURBING ACTIVITIES REQUIRED TO HAVE AN APPROVED POORLY FUNCTIONING BMP'S, NON —COMPLIANT DISCHARGES, OR ANY o EROSION AND SEDIMENTATION CONTROL PLAN SHALL CONDUCT SELF OTHER DEFICIENCIES OBSERVED DURING MONTHLY OR PRECIPITATION cv INSPECTIONS FOR INITIAL INSTALLATION OR MODIFICATION OF ANY CONTROLS EVENT INSPECTIONS WILL BE CORRECTED AS SOON AS POSSIBLE. DESCRIBED IN A APPROVED PLAN. IN ADDITION, PERIODIC AND RAIN —EVENT REPAIRS, REPLACEMENT, AND MAINTENANCE WILL BE IMPLEMENTED WITHIN SELF INSPECTIONS ARE REQUIRED BY THE FEDERAL STORMWATER DISCHARGE FIVE DAYS OF THE INSPECTION, UNLESS PREVENTED BY UNSAFE PERMIT. ITEMS (1) AND (2) OF THIS RULE APPLY TO THE SELF INSPECTIONS CONDITIONS. TEMPORARY CONTAINMENT MEASURES WILL BE EMPLOYED IN � REQUIRED BY G.S. 113A-54.1(e) WHILE ITEM (3) APPLIES TO SELF THE EVENT OF A BREACH OF A SEDIMENT BASIN OR PERIMETER BARRIER. w INSPECTIONS REQUIRED BY THE NCG010000 PERMIT. THESE MEASURES WILL BE IMPLEMENTED WITHIN 24 HOURS FOLLOWING u THE INSPECTION. PERMANENT CORRECTIVE MEASURES WILL BE (1) FOR INSPECTIONS UNDER G.S. 113A-54.1, THE INSPECTION SHALL BE IMPLEMENTED WITHIN FIVE DAYS FOLLOWING THE INSPECTION. THE PERFORMED AFTER THE IMPLEMENTATION OF EACH OF THE OPERATOR MUST CONTACT ADEM IF THE MEASURES CANNOT BE FOLLOWING COMPONENTS OF A PROJECT PLAN: IMPLEMENTED WITHIN THE TIME ALLOWED. (A) INSTALLATION OF LAND DISTURBANCE, PERIMETER EROSION AND SEDIMENT CONTROL MEASURES; IF THERE IS A BMP DEFICIENCY/FAILURE OR NON —COMPLIANT DISCHARGE (B) CLEARING AND GRUBBING OF EXISTING GROUND COVER; THAT CAUSES OR CONTRIBUTES TO A VIOLATION OF APPLICABLE WATER (C) INSTALLATION OF TEMPORARY OR PERMANENT SEDIMENT AND QUALITY STANDARDS, THE OPERATOR IS REQUIRED TO VISUALLY MONITOR EROSION CONTROL MEASURES TO INCLUDE GROUND COVER AND NOTIFY NCDEQ REGIONAL OFFICE WITHIN 24 HOURS OF BECOMING PURSUANT TO G.S. 113A-57(2); AWARE OF SUCH DISCHARGE. (D) COMPLETION OF STORM DRAINAGE FACILITIES; IN THE EVENT THAT POLLUTANTS ARE DEPOSITED OFF —SITE OR IN A (E) COMPLETION OF ALL LAND DISTURBING ACTIVITY, CONSTRUCTION WATERBODY OR STORMWATER CONVEYANCE, THE OPERATOR WILL TAKE OR DEVELOPMENT, INCLUDING PERMANENT GROUND COVER ALL REASONABLE STEPS TO REMOVE, TO THE MAXIMUM EXTENT ESTABLISHMENT AND REMOVAL OF ALL TEMPORARY MEASURES BY THE PRACTICAL, THE POLLUTANT: OWNER/DEVELOPER OR OTHER FINANCIALLY RESPONSIBLE PARTY; 1. RECOVERED POLLUTANTS IN THE FORM OF PETROLEUM, CONSTRUCTION (F) TRANSFER OF OWNERSHIP OR CONTROL OF THE TRACT OF LAND DEBRIS, OR HOUSEHOLD RUBBISH WILL BE DISPOSED OF PROPERLY IN FOR WHICH THE EROSION AND SEDIMENTATION CONTROL PLAN HAS ACCORDANCE WITH FEDERAL AND STATE LAW. BEEN APPROVED AND WORK HAS BEGUN. THE NEW OWNER OR 2. RECOVERED POLLUTANTS IN THE FORM OF SEDIMENT ARE TO BE PERSON IN CONTROL SHALL CONDUCT AND DOCUMENT INPSECTIONS REMOVED AND SPREAD ON —SITE IN DISTURBED AREAS NOT UNTIL THE PROJECT IS PERMANENTLY STABILIZED AS IN SUB —ITEM PERMANENTLY STABILIZED, OR DISPOSED OF WITH THE SOLID WASTE IN (1)(c) OF THIS RULE. A PERMITTED CONSTRUCTION & DEMOLITION LANDFILL. AREAS OF OFF —SITE SEDIMENT REMOVAL ARE TO BE PERMANENTLY STABILIZED (2) DOCUMENTATION OF INSPECTIONS PERFORMED UNDER ITEM (1) SHALL ONCE REMOVAL IS COMPLETE. INCLUDE: (A) VERIFICATION OF ALL EROSION AND SEDIMENTATION CONTROL MEASURES, PRACTICES AND DEVICES, AS CALLED FOR IN THE APPROVED CONSTRUCTION SEQUENCE AND THE EROSION AND SEDIMENTATION CONTROL PLAN. (B) A RECORD OF THE REQUIRED INFORMATION ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, PRACTICE OR DEVICE SHOWN ON THE APPROVED PLAN. (C) A RECORD OF SIGNIFICANT DEVIATIONS FROM THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN, AND A DESCRIPTION OF HOW THOSE DEVIATIONS WILL ENHANCE THE APPROVED PLAN, OR COMPLY WITH THE PLAN AFTER APPROPRIATE CORRECTIVE ACTIONS. A SIGNIFICANT DEVIATION MEANS AN OMISSION, ALTERATION, OR ADDITION OR RELOCATION OF AN EROSION OR SEDIMENTATION CONTROL MEASURE THAT IS EXPECTED TO MEET OR ENHANCE THE INTENDED PERFORMANCE OF THE MEASURE. (D) THE NAME, ADDRESS, AFFILIATION, TELEPHONE NUMBER, AND SIGNATURE OF THE PERSON CONDUCTING THE INSPECTION AND THE DATE OF THE INSPECTION SHALL BE INCLUDED, WHETHER ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR AN INSPECTION REPORT. ANY RELEVANT LICENSES AND CERTIFICATIONS MAY BE INCLUDED. ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE ON THE SITE. ALL INSPECTION DOCUMENTATION SHALL BE MADE AVAILABLE ON THE SITE FOR AT LEAST 30 CALENDAR DAYS AND MAINTAINED UNTIL PERMANENT GROUND COVER HAS BEEN ESTABLISHED. (3) WHEN SITES ARE ALSO COVERED UNDER THE NPDES CONSTRUCTION GENERAL PERMIT (NCG 010000), THAT PERMIT REQUIRES SELF INSPECTIONS ON A MINIMUM 7—DAY BASIS AFTER CERTAIN RAIN EVENTS ALONG WITH DIFFERENT SPECIFICATIONS FOR MAINTENANCE OF THOSE RECORDS. PIPE OUTLET TO WELL-DEFINED CHANNEL CONSTRUCTION EXIT PAD NOTES 1. A STABILIZED CONSTRUCTION EXIT PAD (CONSTRUCTION ENTRANCE) SHALL BE CONSTRUCTED AT LOCATIONS SHOWN ON THE PLANS OR AS APPROVED BY THE ENGINEER BASED ON SAFETY, ECONOMY AND CONSTRUCTION SEQUENCE. THESE ENTRANCES ARE POINTS OF EGRESS FROM UNSTABILIZED AREAS OF THE PROJECT TO PUBLIC ROADS WHERE OFF SITE TRACKING OF MUD COULD OCCUR. TRAFFIC FROM UNSTABILIZED AREAS OF THE PROJECT SHALL BE DIRECTED THROUGH THE STABILIZED ENTRANCE. BARRIERS, FLAGGING, OR OTHER POSITIVE MEANS SHALL BE USED AS REQUIRED TO LIMIT AND DIRECT VEHICULAR EGRESS ACROSS THE STABILIZED ENTRANCE. 2. ALL MATERIALS SPILLED, DROPPED, OR TRACKED ONTO PUBLIC ROADS (INCLUDING THE STABILIZED CONSTRUCTION ENTRANCE AGGREGATE AND CONSTRUCTION MUD) SHALL BE REMOVED DAILY OR MORE FREQUENTLY IF SO DIRECTED BY THE ENGINEER. 3. AGGREGATES SHALL BE 2-3 INCH COARSE WASHED STONE. SIZES CONTAINING EXCESSIVE SMALL AGGREGATE WILL TRACK OFF THE PROJECT AND ARE UNSUITABLE. 4. THE STABILIZED CONSTRUCTION ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL ALLOW IT TO PERFORM ITS FUNCTION TO PREVENT OFF SITE TRACKING. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-3 INCH STONE. ADDITIONAL STABILIZATION OF THE VEHICULAR ROUTE LEADING TO THE STABILIZED ENTRANCE MAY BE REQUIRED TO LIMIT THE MUD TRACKED. 5. THE NOMINAL SIZE OF A STANDARD STABILIZED CONSTRUCTION ENTRANCE IS 12'x5O' UNLESS OTHERWISE SHOWN IN THE PLANS. CEP CONSTRUCTION NOT TO SCALE EXIT PAD DETAIL PLASTIC TIES WOVEN WIRE GEOTEXTILE FENCE PLASTIC TIES; FABRIC 3 IN UPPER 8" OF 1-10' 0/C MAX. FABRIC AND WIRE z iD r� z (V STEEL POSTS I ----------------- -----6" TRENCH -RENC T- H ----- SILT FENCE THE MANUFACTURER SHALL HAVE EITHER AN APPROVED COLOR MARK YARN IN THE FABRIC OR LABEL THE FABRICATED SILT FENCE WITH BOTH THE MANUFACTURER AND FABRIC NAME EVERY 100 FEET. THE TEMPORARY SILT FENCE SHALL BE INSTALLED ACCORDING TO THIS SPECIFICATION, AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. FOR INSTALLATION OF THE FABRIC, SEE DETAIL. USE THREE PLASTIC TIES PER POST (50 LB. TEST STRENGTH), LOCATED IN THE TOP 8" OF THE STEEL POST FABRIC, WITH EACH TIE HUNG ON A POST NIPPLE, � WOVEN WIRE FENCE PLACED DIAGONALLY TO ATTACH AS MANY VERTICAL AND HORIZONTAL THREADS OF THE ABRIC ��\/\\, GEOTEXTILE FABRIC AND WOVEN WIRE FENCE BACKING AS POSSIBLE. THE FABRIC SHALL ALSO BE FASTENED SECURELY TO THE WIRE BACKING WITH PLASTIC TIES SPACED EVERY 24 INCHES ALONG THE TOP. OW\��\ POST INSTALLATION SHALL START AT THE CENTER OF THE LOW POINT (IF APPLICABLE) WITH THE REMAINING POSTS SPACED MINIMUM 4 FEET, i MAXIMUM 10 FEET APART FOR TYPE "A" SILT FENCE. ONLY STEEL POSTS SHALL BE USED WITH TYPE "A" SILT FENCE. POSTS SHALL BE 4' IN LENGTH, 1.3 LBS/FT. MAINTENANCE SEDIMENT SHALL BE REMOVED ONCE IT HAS ACCUMULATED TO ONE-HALF THE ORIGINAL HEIGHT OF THE BARRIER. FILTER FABRIC SHALL BE REPLACED WHENEVER IT HAS DETERIORATED TO SUCH AN EXTENT THAT THE EFFECTIVENESS OF THE FABRIC IS REDUCED (APPROXIMATELY SIX MONTHS). TEMPORARY SEDIMENT BARRIERS SHALL REMAIN IN PLACE UNTIL DISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED. ALL SEDIMENT ACCUMULATED AT THE BARRIER SHALL BE REMOVED AND PROPERLY DISPOSED OF BEFORE THE BARRIER IS REMOVED. SB TYPE 'A' SILT FENCE NOT TO SCALE 12" DIAMETER SOCK STAKES AT ENDS, MIDSLOPE, AND TOE OF SLOPE THROUGH CENTER OF SOCK END POINTS "A" MUST BE HIGHER THAN FLOW LINE POINT "B" A STAKES B _I 18 MIN. SOCKS TO BE TRENCHED 4" DEEP TO PREVENT FLOW a I I n I BENEATH 0 of J L� O O O O PLACE DOWNSTREAM SOCKS SUCH THAT POINT "B" IS APPROXIMATELY LEVEL WITH THE LOWEST GROUND ELEVATION OF THE UPSTREAM SOCK =III—i SOCKS TO BE TRENCHED iIII I — - II 4" DEEP TO PREVENT FLOW BENEATH LATH AND FLAGGING ON 3 SIDES �10' MIN. n 0 �Ci SANDBAG L(� 10 MIL MIN. PLASTIC LINING 13 PLAN ❑ 1 ❑ SANDBAG 10 MIL MIN. PLASTIC LINING 3' BERM SECTION A -A' SIGN BERM (OR EQUIVALENT) 48"x24" PLYWOOD PAINTED WHITE BLACK LETTERS 6" HEIGHT LAG SCREWS (Y2 IN.) WOOD POST (4"x4", 8' LONG) NOTES 1. ACTUAL LAYOUT DETERMINED IN THE FIELD. 2. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30 FEET OF THE WASHOUT. 3. THE CONCRETE WASHOUT SHOULD NOT BE PLACED WITHIN 50 FEET OF STORM DRAINS, OPEN DITCHES, OR WATERBODIES. 4. APPROPRIATE GRAVEL OR ROCK SHOULD COVER THE APPROACH TO CONCRETE WASHOUT FACILITIES. 5. THE TEMPORARY CONCRETE WASHOUT MUST BE CLEANED OUT WHEN IT IS A MAXIMUM OF 75% FULL. WASHOUT REMOVAL 1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, THE HARDENED CONCRETE, SLURRIES AND LIQUIDS SHALL BE REMOVED AND PROPERLY DISPOSED OF. 2. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE REMOVED FROM THE SITE OF THE WORK AND DISPOSED OF OR RECYCLED. 3. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED, AND STABILIZED TO PREVENT EROSION. GK BELOW GRADE CONCRETE WASHOUT DETAIL NOT TO SCALE TEMPORARY SEDIMENT I.iLL/"�IV L/I\l111V I\Vl.if\. 2:1 GRAVEL SLOPE r-FINE WIRE MESH "E BLOCK Aml klillmlistm THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. AS SHOWN IN DETAIL ONE BLOCK IS PLACED ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. THE BOTTOM ROW OF BLOCKS ARE PLACED AGAINST THE EDGE OF THE STORM DRAIN FOR LATER SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, LATERAL SUPPORT MAY BE GIVEN TO SUBSEQUENT ROWS BY PLACING 2" X 4" WOOD STUDS THROUGH BLOCK OPENINGS. HARD WARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 INCH OPENINGS SHALL BE FITTED OVER ALL BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. CLEAN GRAVEL SHOULD BE PLACED 2 INCHES BELOW THE TOP OF THE BLOCKS ON A 2:1 SLOPE OR FLATTER AND SMOOTHED TO AN EVEN GRADE. DOT #57 WASHED STONE IS RECOMMENDED. 1 d T PIPE OUTLET TO FLAT AREA; NO WELL-DEFINED CHANNEL L� -TH)� D=1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" SECTION A -A 0 CLASS I GEOTEXTILE L TH) I— CLASS I SECTION A -A GEOTEXTILE CONSTRUCTION SPECIFICATIONS 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. GEOTEXTILE MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER FABRIC OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP A MINIMUM OF 1 FT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER FABRIC. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER FABRIC. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. 6. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFALL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT. 7. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION. 10. SELECT STONE FOR RIPRAP FROM FIELD STONE OR QUARRY STONE. THE STONE SHOULD BE HARD, ANGULAR, AND HIGHLY WEATHER -RESISTANT. THE SPECIFIC GRAVITY OF THE INDIVIDUAL STONES SHOULD BE AT LEAST 2.5. MAINTENANCE INSPECT RIPRAP OUTLET STRUCTURES AFTER HEAVY RAINS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. OP STORM DRAIN OUTLET PROTECTION NOT TO SCALE CD COMPOST SOCK CHECK DAM DETAIL NOT TO SCALE BLIP BLOCK & GRAVEL INLET PROTECTION DETAIL NOT TO SCALE STORMWATER MANAGEMENT REPORT FOR NEW RETAIL STORE U.S. HIGHWAY 64 / CASHIERS ROAD & CHERRYWOOD DR. HIGHLANDS, NC 01-10-2020 PREPARED FOR The Group Commercial Real Estate Development 216 Westsiae square • Huntsville, Al 35801 Phone:1256) 533-7287 • Fax:12561533-7236 CONTENTS I. PREDEVELOPMENT CONDITIONS ............................................ ...... I ............................. II. ANALYSIS METHODS.....................................................................................................I III. RAINFALL INFORMATION .....................................................................I IV. EROSION CONTROL IMPEMENTATION SCHEDULE................................................2 V. POSTDEVELOPMENT CONDITIONS.............................................................................3 APPENDIX A. PRECONSTRUCTION SITE CALCULATIONS......................................4 DRAINAGEAREA MAP...............................................................................................................5 DRAINAGE ROUTING DIAGRAM..............................................................................................6 2, 5, 10, 25, 50, 100-YEAR STORM EVENT CALCULATIONS ......................................... 7 - 30 APPENDIX B. POSTCONSTRUCTION SITE CALCULATIONS..................................31 DRAINAGEAREA MAP.................................................................................................... ........32 DRAINAGE ROUTING DIAGRAM.............................................................................................33 2, 5, 10, 25, 50, 100-YEAR STORM EVENT CALCULATIONS ..................................... 34 - 147 APPENDIX C. NRCS SOIL REPORT .................. PREPARED BY or p.la upf2f s a! Mom. qua aAfir.._ gqq 7-8 ii4llo_ 3��rir_i Flu / = ; ��_ [L�Yri� ury�iOu .......................... 148 - 152 I. PREDEVELOPMENT CONDITIONS The site is a 2.24 acre piece of property located on the southwest side of U.S. Highway 64 (Cashiers Road) and Cherrywood Drive, in Macon County North Carolina. It is a previously developed site with a gravel driveway. The remaining portions of the lot are covered with grass and trees. There are two streams and two wetland areas present onsite. There is an unnamed tributary to Big Creek that runs from south to north alongside Cherrywood Drive. There is another unnamed tributary to Big Creek that runs from west to east neara the northern property line that forms two wetland areas before it flows into the creek adjacent to Cherrywood Drive. Existing onsite soils are classified as Cullasaja-Tuckasegee complex, Hydrologic Soil Group A, and Udorthents, Hydrologic Soil Group C. The site generally slopes from south to north at about 4.7%. Surface runoff flows north to the wetland area before flowing into the unnamed tributary to Big Creek. II. ANALYSIS METHODS In order to determine the pre- and post -development peak discharges and hydrographs of the drainage basins, drainage area maps were developed based upon a topographic survey performed by King Engineering of Concord, Inc., the USGS quad map of the area for the off -site drainage areas, and the proposed site design. From these maps, the SCS curve numbers and times of concentration were determined and input into HydroCAD 10.0, which calculated peak flows and hydrographs for each runoff basin by the SCS TR-20 method. Reach and pond storages and capacities were calculated by the storage -indication routing methods. III. RAINFALL INFORMATION Total rainfall depths for the studied storm events were obtained from NOAA Atlas 14 Volume 9 Version 2, Precipitation -Frequency Atlas of the United States, Southeastern States, available from the Precipitation Frequency Data Server (http://hdsc.nws.noaa.gov/hdsc/pfds). The events and corresponding 24-hour rainfall events are summarized below. Event Rainfall Depth, inches 2 year 5.79 5 year 7.13 10 year 8.19 25 year 9.68 50 year 10.90 100 year 12.10 IV. EROSION CONTROL IMPLEMENTATION SCHEDULE See the Initial, Intermediate, and Final Phase Erosion and Sedimentation Control plans accompanied this document for locations of the practices described below. INITIAL PHASE 1. Install construction exit pad (CEP) and type "A" silt fence (SB), double row where indicated. 2. Clear trees as needed. 3. Strip and stockpile topsoil (TSG), and remove unsuitable material. 5. Temporary seeding to be installed on areas where grading and stabilization operations have ceased and will not resume for 5 working days, or 7 calendar days, whichever is shorter. If a qualifying rain event is expected, temporary stabilization shall be achieved prior to the rain event. INTERMEDIATE PHASE 1. Begin grading site in the building and parking areas. 2. Construction exit pad (CEP), double row of type "A" silt fence (SB), and temporary seeding (TS) to remain and maintained as needed as grading progresses. 3. Install compost sock check dams (CS) in channels where indicated. 4. Install utilities (storm, sanitary, and water). Storm pipe outlet to be stabilized with outlet protection (OP). 5. Protect grate inlets with block and gravel inlet protection (BIP) after installation. 6. Concrete washout (GK) to be established and maintained as necessary once concrete pouring begins. FINAL PHASE 1. Maintain construction exit pad (CEP), double row of type "A" silt fence (SB), check dams (CS), and temporary seeding (TS) as site grading progresses. 2. Grade parking lot and construct building pad. Base, paving and building are to be installed after utility construction is completed. 3. Install sod (SOD) on areas indicated as soon as practicable. Appropriate plant material shall be installed area by area as site work permits. 4. Clean storm structures. Install any other permanent BMP. 5. Demuck all structural BMP's and safely dispose of material. Maintain silt fence until vegetation has achieved 100% coverage across site with 85% density, then remove. V. POSTDEVELOPMENT CONDITIONS This project consists of constructing a 9100 sq.ft. retail store with a 28-space parking lot and truck delivery area. The remaining areas will be landscaped with sod. Drainage from the roof will be discharged on the surface and directed towards the curb line of the rear parking lot area. All parking lot areas will be sloped to drain to one of five grate inlets located in the parking lot. Those inlets will be connected to an 18" HDPE pipe network that will convey stormwater to an underground detention chamber system located east of the building, near the driveway. Proposed slopes of the parking lot range from 1.0% to 3.5%, while the remaining grassed areas will be graded to a maximum slope of 4:1 H:V (25%). A. WATER QUALITY AND QUANTITY CONTROL In order to treat the first inch of stormwater runoff generated from this development, the underground detention chamber system will include a separator row system which will remove 80% of the total suspended solids (TSS) from the stormwater. The separator row is wrapped in filter fabric, and the system is designed so that stormwater entering the chambers must flow through the separator row first, filtering 80% TSS before flowing downward and filling the gravel bed and then the adjoining chambers. To control the increased discharges due to this development, the on -site stormwater will be detained in an underground detention chamber system. The chamber system will consist of 89 Cultec R-150XLHD chambers embedded in a gravel bed. The outflow will be controlled by the use of a 6"x6" orifice and an 18"xl2" weir in the outlet control box located near the northeast end of the parking lot. The orifices will force storm water to back up and be stored in the chambers. Discharge from the outlet control box will be directed to the northeast, where it will be discharged on the surface, and flow to the wetland area adjacent to the unnamed tributary to Big Creek. SITE DISCHARGE COMPARISON Event Predevelo ment, cfs Postdevelo ment, cfs Decrease, cfs 2 year 5.82 5.81 0.01 5 year 10.04 9.14 0.90 10 year 13.73 12.14 1.59 25 year 19.30 17.58 1.72 50 year 24.12 22.83 1.29 100 year 29.03 28.16 0.87 APPENDIX A PRECONSTRUCTION SITE CALCULATIONS DRAWN BY: JAC DATE: 03-27-2019 / NEW RETAIL STORE REVISED: 11-22-2019 CASHIERS ROAD HIGHLANDS, NC PRECONSTRUCTION MACON COUNTY CONDITIONS DRAINAGE AREA MAP Broadway Civil Designs of NC,PIIC SCALE: 1' = 100' 5 216WestsideSonora - Huntsville, At35801 Phone: 12561533-7287 - Fax: 12561533-7236 2EX Offsite PRE Preconstruction Site 1 EX Discharge Site DRAWN BY: JAC DATE: 03-27-2019 / NEW RETAIL STORE REVISED: 11-22-2019 CASHIERS ROAD 00 HIGHLANDS, NC PRECONSTRUCTION MACON COUNTY CONDITIONS DRAINAGE ROUTING Broadway Civil Designs of NC,PIIC g DIAGRAM 216westsideSquare •Nuntsaiile.a135801 Phone: 12561533-7287 - Fax: 12561533-7236 PRECONSTRUCTION SITE CALCULATIONS 2-YEAR STORM EVENT Highlands Preconstruction Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 1 EX: Site Runoff = 5.45 cfs @ 12.03 hrs, Volume= 15,170 cf, Depth= 1.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 5 4 3 3 0 LL 2 1 t- -k- I --k I-4 �--I -k- Subcatchment 1 EX: Site Hydrograph Ifi 1 t-Ifi1-t 1 5.45 cfs iy�eJl`-�4 ih% -4 1-1 4-1 IR4npff-A, r"e =W� $61* IRM off VQlyme7151170, cf — Runoff DeT -4 8T' IFiow L�n�gtk12661' 1 I I Isjoj)�.6400 -1' I I I Tc�=11.61 mil) fiItl-t r-1 tIrt _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 8 Highlands Preconstruction Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 2EX: Offsite Runoff = 0.60 cfs @ 12.08 hrs, Volume= 3,568 cf, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph 0.6 T 0.55 T 0.5 fit T I� �I 0.45 0.4 3 -2 0.3 0.25 T I t 1 0.2 l 0.15 1-4 —1 0.1 0.05 ❑ Runoff S4 I--� F-I T I T 17T�er�Ii 241h� - I ---j �-- I -L12�yi -kal+n'fa`-E O. 9# -t 1-� �-Iftrhotff ArefaO71,24-71 sf I I IN��ffIVP*I���'01 Cf _eeIpr 0� Flow Len �th=2 0 - IT TI T I T it eL0.11076 11 1 1 1 1 1 IT62i11niui 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 9 Highlands Preconstruction Type 111 24-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 3 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 1.33" for 2-yr event Inflow = 5.82 cfs @ 12.03 hrs, Volume= 18,738 cf Primary = 5.82 cfs @ 12.03 hrs, Volume= 18,738 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph ❑ Inflow ❑ Primary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 10 PRECONSTRUCTION SITE CALCULATIONS 5-YEAR STORM EVENT Highlands Preconstruction Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 1 EX: Site Runoff = 8.43 cfs @ 12.03 hrs, Volume= 22,727 cf, Depth= 2.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 1 EX: Site Hydrograph _ LI 11 L I 9 8.43 cfs 8 L I I I-t I L A L I I I -�_Jrki illhllfi1164.1[3�' 7 I I I I I I I I I I 11R4noff A,rga�97�5�61 s1t 6 IRM off VQIyrne7�217?71 cf 5 I�unof Dep�h.SQ" LL 4 IFiow -L�n�ti1296' ISio�6=6.Wd '/I' 3 1 T� 11.51irn 2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff iv, Highlands Preconstruction Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 2EX: Offsite Runoff = 1.75 cfs @ 12.05 hrs, Volume= 6,716 cf, Depth= 1.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph ��I I � IIII � IIIIII 1.75 cfs I I I I ITYpeI II+ 24-'hi 5Ly% Rain6110.1I3'I' Rau noff Areat71,1247I sf RuggfflVollume=,6,7161 cf p l 13" 0 1 IIIIII �7'ovv 4�1 �7"I I,LL Length=200 �lope-- 0.1000 'i' 1 Td:�111 mirk CND '43 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 13 Highlands Preconstruction Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 2.09" for 5-yr event Inflow = 10.04 cfs @ 12.03 hrs, Volume= 29,443 cf Primary = 10.04 cfs @ 12.03 hrs, Volume= 29,443 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph T—I-7I 1 1 7-I -7I--1 11 T T I T T 10.04 cfs 10 9 — 8 LI L I L IL 11 7 w 6 3 2 5 LL _ M TIT IT 4 — f � � ❑Inflow ❑Primary 1 LI L I L I L 4 1 I�- 1 4-1 -� 1-4 I� -t h �I tlt l T 7 TI T I T IT 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 14 PRECONSTRUCTION SITE CALCULATIONS 10-YEAR STORM EVENT 15 Highlands Preconstruction Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1 EX: Site Runoff = 10.96 cfs @ 12.03 hrs, Volume= 29,181 cf, Depth= 3.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 0 Subcatchment 1 EX: Site Hydrograph 1 10.96 cfs I 11 I I 10 9 N7 3611111111 0 LL 511111111 3 filrt I� �i 2 l II0A,R, ■ Runoff 17 I F1 -TII 4Jh �-1 I $gnpff�r�-4 0�7�"6�sf �1 +"gff�V�I �n el �9��11 cl IB noff-Depth -3.59" F�wl i n; gt� 266 1 I -Si0�6 b.wdiv V �-I 4 4 I- �-Tc I:I d �I filrt I� �I �Irt � 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) `[: Highlands Preconstruction Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 2EX: Offsite Runoff = 2.90 cfs @ 12.05 hrs, Volume= 9,691 cf, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps LO 3 0 LL 3 2 1 Subcatchment 2EX: Offsite Hydrograph 2.90 cfs I I I I I I ITYpeI II+ 24-1hi I � " '� 0 y� Rainfall 8�.19 I I I I 1 1 1 I RluiholffiAreat71,1247I sf RUggff volurnp�%,6�1 I Cf Runoff ulnoff Dep�h�11. 3'I Flow Len th=2 0' p T�C�2 � 11 rri i r� DN'43 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 17 Highlands Preconstruction Type 111 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 9 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 2.76" for 10-yr event Inflow = 13.73 cfs @ 12.03 hrs, Volume= 38,872 cf Primary = 13.73 cfs @ 12.03 hrs, Volume= 38,872 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph 15 14 / 13.73 cfs 12 11 + 19 L I -L I- N 0 7 / 3 2 1= } - Inflow Area=168,783 sf 17 4 I 4-1 I4 I� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Inflow ❑ Primary 18 PRECONSTRUCTION SITE CALCULATIONS 25-YEAR STORM EVENT 19 Highlands Preconstruction Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 1 EX: Site Runoff = 14.71 cfs @ 12.02 hrs, Volume= 38,777 cf, Depth= 4.77" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 1 EX: Site Hydrograph 16 15 LII --I L 14.71 cfs 14 13 12 11 10 w 9 o $ T T 7' LL ' 6 5 4-14 1-4 �-- 14-1 -I 4 3111illllil 4 �—I + �--i -L I —L I--] L1 iy��Ikl 4 h% r1 7 11 12--t-jr: IR-Jjh-fij llA.C& �-1--I �$ E-1 L' uIT9R !� del 1s��rl TI T I T . I IF I -U t�261 �I t I -t 1-� tsio-�6 -b.w"v 1 I 1 1 1 1 1 1 -� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 20 Highlands Preconstruction Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 2EX: Offsite Runoff = 4.77 cfs @ 12.04 hrs, Volume= 14,461 cf, Depth= 2.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph IIIIIIIIIII' I III III 5 4.77 cfs I 1 ley 1pe III �4 h% 4 -t L -t L I I I2$_yr]R�Wall=d.68-�' R4npff 4rpa�=71 j2471 sf -4 H 4R1un�off�VQl�rn�e7-�4�4�11 cl w 3 Runoff Depth=2.44" o f IIII 1 1 1 IFiow L�nJ tkl266' 2 l fi l rt l IS14-6.1Odd 11' 1 1 1 Tc7g-1 mirk 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 21 Highlands Preconstruction Type/1/ 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 12 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 3.79" for 25-yr event Inflow = 19.30 cfs @ 12.03 hrs, Volume= 53,237 cf Primary = 19.30 cfs @ 12.03 hrs, Volume= 53,237 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph SIT %I ►�I ICI j% fi �� �� � fi � �� � i ❑Inflow ❑Primary I �VW ���6�831sf 4-14 1-4 1 I 1 4-1 + 14 I� tIrt I� 1 I �I tIt Irt I-1 � -E I I C 0 E:I I I I I-T Il E: 1-14 1-4 1 I 4-1 + 14 I� I- It I� 1 I �I tIt I- � 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) `lr: PRECONSTRUCTION SITE CALCULATIONS 50-YEAR STORM EVENT 23 Highlands Preconstruction Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 1 EX: Site Runoff = 17.87 cfs @ 12.02 hrs, Volume= 46,982 cf, Depth= 5.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 1E 1E 17 1E 1E 14 12 12 11 3 1C o LL ii Subcatchment 1 EX: Site Hydrograph I I I L I -1 I--� L— I -L I - L I - 1 1-1 1 ■Runoff 17.87 cfs - �-1 4-1 -I �-14-I-I � 1 4 I-4k-- 1 4-1 -I 14 I--� H fi �I � I � I� L-1 ty�b 11Ir-�41h% � I °Ifu � � Runoff -Depth -5.78" �I I�F�o-w)L�n�t�266' � 14- 14 I � � I +ToO H 4- 14 I � �-1 + 14 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 24 Highlands Preconstruction Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 2EX: Offsite Runoff = 6.46 cfs @ 12.04 hrs, Volume= 18,786 cf, Depth= 3.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph k-I �I ' '- �I � i� � I-4 ' 6.46 cfs Type III 4h- 6 1 1 1 1 1 1 1 1 1 1 1 5O�yi Rainfall=110.0& 5 -1 -F I -g4 off#r�-aFTl;2471 sf � �Rlun+off-Y77okim�e��8 7$6 c 3 4 1 1 1 1 (Runoff Depth=3.16" �ioW1 te; gtk-�26 LL 3 1 1 1 1 1 1 Slop6=0.100011' 2 T i i Tc7g-1 min 77 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 25 Highlands Preconstruction Type 111 24-hr 50-yr Rainfall= 10. 90" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 15 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 4.68" for 50-yr event Inflow = 24.12 cfs @ 12.03 hrs, Volume= 65,768 cf Primary = 24.12 cfs @ 12.03 hrs, Volume= 65,768 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph ❑ Inflow ❑ Primary Time (hours) 26 PRECONSTRUCTION SITE CALCULATIONS 100-YEAR STORM EVENT 27 Highlands Preconstruction Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 1 EX: Site Runoff = 21.03 cfs @ 12.02 hrs, Volume= 55,290 cf, Depth= 6.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 1 EX: Site Hydrograph 23 22 2; 1.03 cfsI ICI 1114-h% 20 I 14 1� H -/� 4-1 -t� H 4- 1d�y�-#aaWh:41 1& � 18 17 l- -1 fil - - -$ 1415 —l— I�� 1� - � I —l— — — — — "°I��V i� 1 5 1 u 13 Runoff-Depth=6.89" .2 10 I � --Ifi = -I — - 1-Fiew �n jt 2J6' 9 T I-T 1-7 F71 T7 I F71 7 1-T 17 SII16�6:�b.UWV' s 7 +- I-+ I� 1--I J- I H i- I-+ 1� �-I +Tc�:II-I 6 4 � I � 1-1 CI � I E1 _ L I � I:] �I 112 �71 2 4 I� 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 28 Highlands Preconstruction Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 2EX: Offsite Runoff = 8.23 cfs @ 12.04 hrs, Volume= 23,347 cf, Depth= 3.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite -k-I+ I—t H �- I --k I-4 �-I -k- 7 5 _o 1 LI1 I-1 L u. 4 Hydrograph ■ Runoff 8.23 cfs I +- I + I -4 h II`�4-h% -4 1 I I -O&y� Raintail='lill-& IR 4npff#re-aF-T1 j2471-sf Runoff Depth=3.93" 1 -Fiow-L�� t�26d' I I 11 1 U SAoia6.1 Q0-9v 1 1 11 1 Tc�=�-11 r0h) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 29 Highlands Preconstruction Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 18 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 5.59" for 100-yr event Inflow = 29.03 cfs @ 12.03 hrs, Volume= 78,636 cf Primary = 29.03 cfs @ 12.03 hrs, Volume= 78,636 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph T I T I 1 7- 32 30 29.03 cfs 28 I L I A I A 26 24 I T I T I T I T1-1 22 20 1 t T I-t I-t �16 � T1� 1-4 3 16 0 M14 L CIA IA 12 10 1 TI T I T IT 6 T I� 4 I �- ❑Inflow ❑ Primary ���b�, ��e�1���sl�s� LIT 1A U LI LIT 1A I� L TIT IT 17 TI TIT IT IT T TIC ItI-fI� II �-i �, — IA L-1 L 17 IT 17 TI T I T IT IT T ti-t 1� H �� fi1T I-f I� 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 30 APPENDIX B POSTCONSTRUCTION SITE CALCULATIONS 31 DRAWN BY: JAC DATE: 03-27-2019 / NEW RETAIL STORE REVISED: 11-22-2019 CASHIERS ROAD HIGHLANDS, NC POSTCONSTRUCTION MACON COUNTY CONDITIONS DRAINAGE AREA MAP Broadway Civil Designs of NC,PIIC SCALE: 1 ' = 10 0' 32 216 Westside Sonora • Huntsville, At 35801 Phone: 12561533-7287 - Fax: 12561533-7236 (2EX) Offsite 1 S North Parking/Driveway 8S JV We land Area Roof V I�7 \ Postcon ruction 2S Di charge Delivery/Dumpster Area 150XLH Cultec eten i system (i� 7S Front Parking Area to G12 Front Parking Area to G11 Septic Area East Driveway Aisle Cherrywood Dr/Driveway Cashiers Rd. R.O.W. DRAWN BY: JAC DATE: 03-27-2019 / NEW RETAIL STORE REVISED: 11-22-2019 CASHIERS ROAD 00 HIGHLANDS, NC POSTCONSTRUCTION MACON COUNTY CONDITIONS DRAINAGE ROUTING Broadway Civil Designs of NC,PIIC 33 DIAGRAM 216westsideSquare •Nuntsaiile.a135801 Phone: 12561533-7287 - Fax: 12561533-7236 POSTCONSTRUCTION SITE CALCULATIONS 2-YEAR STORM EVENT 34 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 1 S: Roof Runoff = 1.44 cfs @ 12.02 hrs, Volume= 4,327 cf, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 0.5 U 0p 0 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 1S: Roof Hydrograph ��ilii�lll li 1.44 cfs Tyi�el III 24-hi 121y% I6iri 11�=09'I' RO nbff AOeOiO9,13521 sf RuggfflVlollumn 74,13?71cf Rulnpff Delp�h�5�. 51I� Flow Len h �b�e bb � I I I I I T�C�1 �21 r>riir� 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 35 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 2EX: Offsite Runoff = 0.60 cfs @ 12.08 hrs, Volume= 3,568 cf, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph 0.6 T 0.55 T 0.5 fit T I� �I 0.45 0.4 3 -2 0.3 0.25 T I t 1 0.2 l 0.15 1-4 —1 0.1 0.05 ❑ Runoff S4 I--� F-I T I T 17T�er�Ii 241h� - I ---j �-- I -L12�yi -kal+n'fa`-E O. 9# -t 1-� �-Iftrhotff ArefaO71,24-71 sf I I IN��ffIVP*I���'01 Cf _eeIpr 0� Flow Len �th=2 0 - IT TI T I T it eL0.11076 11 1 1 1 1 1 IT62i11niui 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 36 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 0.48 cfs @ 12.02 hrs, Volume= 1,454 cf, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN Description 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph ❑ Runoff 0.5 0.48 cfs T�ielfli 24=h� 0.45 2-�%�au�fa`-I-I 5171� 0 4 L I-L I� U -i L-1 L I ft nbfff-Arle�li 13,11421 sf 0.351-4 �Ryqqff�vP"44 0 025 t-I + ��u Q _qe 5� - FI w L n �h=124 LL 0.2 fi l fi l t 1- �1 -r l t eL0.d1 0.15 F-I - T 17 FT-6=�—j 12Trr i6 0.1 Q114-VO 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 37 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 0.88 cfs @ 12.02 hrs, Volume= 2,640 cf, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min Subcatchment 3S: North Parking/Driveway Hydrograph -1 I 1-4 1-4 0.95 0.9 0.85 0.88 cfs rye �Te�fl-h 0.8 4-1 �- 14 1 W 4 � W12�yi• a faFtf� 719' 0.75 0.7 � I + 14 1 �- - 4 P ftnbfff-Aisle 1=5,70-51 Sf 0.65 0.6 � I + 14 1 H 4 FRY irffY071P rp-P �27,W10 w 0.55 0045 I+14 H 4 I� 11 Q Ip r"'54 - a 0.4 0.35 �1+14 1�1 H4-I4 v� L =a 2� O �n L d 0.3 -H + 1 � H H H + I 16il 12ffiil rii 0.25 0.2 + 0.15 0.1 4 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 38 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 0.47 cfs @ 12.02 hrs, Volume= 1,424 cf, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph 0.5 L I L L o.47 cfs l -1 L I L L 1 LT e�11 241 h% 0.45 ' I I I I I � I� �I � 12�yi•�ta�falH�5�719'k 0.4 0.35 4 4 H RLinbfff-AOe�1=la,I0T71 S# 0.3 L I + 1 � 1�1� ��p� u rpe �1��41 ".57 cf c 0.25 L I t 1—t Lu r�� .2 Flow Len th=1 8 0.2 eLa .;0 0.15 1 1 1T6=614nii6 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 39 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 0.56 cfs @ 12.02 hrs, Volume= 1,673 cf, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN Description 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph o.s � � � � � � � � � ❑Runoff 0.55 0.56 cfs - �1 t t 1� � T e I I 41h-� 0.5F I I I I I_ I I I 121 % Ikali llli611:6090 0.45 Li � Id - I LI Rl.MnWA"e=116151 0.4 - 1+ 14 H 4 P Y "ffY1o1 u T-� +W31 Cf 0 00.3 l--�l 7 - .2aCTnoo 0.25 h= 0 2 pieL(�-01-�0 0.15 fi l fi �- 1 t t I I I NF=19 0.1 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 40 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 0.78 cfs @ 12.03 hrs, Volume= 2,197 cf, Depth= 4.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total Subcatchment 6S: Front Parking Area to Gil Hydrograph T I— T- 0.78 cfs --4 0.75 0.7 I L I I I -i 0.65 0.6 ITITI�II 0.55 1-I t Irt 1 t-I 0.5 - 0.45 0 + 0.4 _ LL 0.35 I�I�I�II 0.3 0.25 L I I I -L 0.2 0.15 - - -0.1 �I 1-4T�e�i �4!h% L I L 12�y%-F60N 0. 9J F-1 ft nTOFArie T , I68-11 s-f Pq"Tv1°tprp— O FI O u Q �,pT74.-14vv -IowLeng th=7T L-I L I I -i U Lth= 9d F-1 7IT17 F F1T1-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff Ell Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 7S: Septic Area Runoff = 0.25 cfs @ 12.05 hrs, Volume= 1,150 cf, Depth= 0.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min 0.26 0.24 0.22 02 I �14-1- I 0.18 0.16 a TIT 17 3 0.14 L I I —L I —I LL 0.12 0.1 n ns Subcatchment 7S: Septic Area Hydrograph .-L- I--L I I I I -i- I I I I L---I L-- 0.211 I__j �I 1_jTe 12+41h IRtt hoff 'AreIzO1 ,I1951 sf T I� I�N��PIu� ����I Cf I� L_IuQIn r72" o e� 3� Is6=iI 121 rr ii -T T' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 42 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 8S: NW Wetland Area Runoff = 0.87 cfs @ 12.05 hrs, Volume= 2,560 cf, Depth= 1.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 8S: NW Wetland Area Hydrograph 0.95 -4 — 1-4 — ❑Runoff 0 9 0.85 ---- 8 0 .7 cfs 1 4 H I H 4 1 JT�e-fl i it h-� 0-8 k I H 14 H H H H H 12 y%-kaki f":65j" 0.75 0`7 1 H 1 1 — H HR-tOoff IAre00--*,1401 sf 0.65 0.6 H I H 14 1 H I H IH PW�PTVP�UT��Z,5-1740I Cf w 0.55 0 H 1 H 1 H 1 H I - I H H I _ Q Ip T H 4 00.5 LL 0.4 0.35 H H Hi H H ova Lin =2W HL Od 0.3 I H H t6:63iOir ri# 0.25 0.2 - H H H I H I H H 0.15 — 0.1 i I H - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 43 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 2.15 cfs @ 12.03 hrs, Volume= 5,806 cf, Depth= 3.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph ■ Runoff 2.15 cfs Tyl � 2 1 1 1 121y% Rai rllfall�=09'1' Rluihdffl Area#118,13621 sf Ruggffl Vlollume�5,8Q61 cf Runpfl Pe,pth-=3.7I9'1, .2 -Flow Length=256 1 1 1 1 1 1 1 1 �1b�eL0.026d'i' T6:46niirIll 1 1 CND=182 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 44 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 1.01 cfs @ 12.03 hrs, Volume= 2,751 cf, Depth= 2.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph i III�� 1.01 cfsl I � � � � 1 Thy e II+�24-hir 121y% lkt iinfa ll�=09'I' Rluihdffl AlrOa�--112,19481 sf Ruggffl Vlollugnp=2,7�1 i cf 3 Rulnpfl Pe,p�h=2 ' 55Flow Len th=83' �1b�eL�.a�4�d T641 ni i 6 CN=169 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 45 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 12 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 5.38" for 2-yr event Inflow = 4.59 cfs @ 12.02 hrs, Volume= 13,714 cf Outflow = 1.29 cfs @ 12.30 hrs, Volume= 13,713 cf, Atten= 72%, Lag= 16.5 min Primary = 1.29 cfs @ 12.30 hrs, Volume= 13,713 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,023.40' @ 12.30 hrs Surf.Area= 3,890 sf Storage= 3,229 cf Plug -Flow detention time= 34.5 min calculated for 13,713 cf (100% of inflow) Center -of -Mass det. time= 34.5 min ( 782.3 - 747.8 ) Volume Invert Avail.Storage Storage Description #1A 4,022.00' 576 cf 8.00'W x 95.00'L x 2.54'H Field A 1,932 cf Overall - 493 cf Embedded = 1,439 cf x 40.0% Voids #2A 4,022.50' 493 cf Cultec R-150XLHD x 18 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows #313 4,022.00' 1,614 cf 17.75'W x 125.75'L x 2.54'H Field B 5,673 cf Overall - 1,639 cf Embedded = 4,034 cf x 40.0% Voids #413 4,022.50' 1,639 cf Cultec R-150XLHD x 60 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #5C 4,022.00' 438 cf 4.75'W x 115.50'L x 2.54'H Field C 1,394 cf Overall - 301 cf Embedded = 1,094 cf x 40.0% Voids #6C 4,022.50' 301 cf Cultec R-150XLHD x 11 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows #7 4,022.50' 8 cf 12.0" Round 37 LF 12" HDPE L= 10.0' S= 0.0050 T #8 4,022.53' 47 cf 4.00'D x 3.76'H J131 #9 4,022.63' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0050 T #10 4,022.86' 42 cf 4.00'D x 3.34'H G12 #11 4,022.96' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0050 T #12 4,023.37' 35 cf 4.00'D x 2.75'H G11 #13 4,022.69' 33 cf 4.00'D x 2.63'H G14 #14 4,022.79' 70 cf 15.0" Round 57 LF 15" HDPE L= 57.0' S= 0.0050 T #15 4,023.10' 33 cf 4.00'D x 2.59'H G13 #16 4,022.56' 32 cf 4.00'D x 2.58'H J132 #17 4,022.56' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0050 T #18 4,022.75' 33 cf 4.00'D x 2.62'H G15 5,646 cf Total Available Storage Storage Group A created with Chamber Wizard 46 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 13 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.90' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.90' / 4,021.75' S= 0.0375 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,022.00' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,023.50' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,024.50' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=1.29 cfs @ 12.30 hrs HW=4,023.40' (Free Discharge) L =Culvert (Passes 1.29 cfs of 6.63 cfs potential flow) 2=Orifice (Orifice Controls 1.29 cfs @ 5.15 fps) 3=Weir ( Controls 0.00 cfs) 4=Top of Wall ( Controls 0.00 cfs) 47 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 14 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 9 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 93.00' Row Length +12.0" End Stone x 2 = 95.00' Base Length 2 Rows x 33.0" Wide + 6.0" Spacing x 1 + 12.0" Side Stone x 2 = 8.00' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 18 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 2 Rows = 492.7 cf Chamber Storage 1,931.7 cf Field - 492.7 cf Chambers = 1,439.0 cf Stone x 40.0% Voids = 575.6 cf Stone Storage Chamber Storage + Stone Storage = 1,068.3 cf = 0.025 of Overall Storage Efficiency = 55.3% Overall System Size = 95.00' x 8.00' x 2.54' 18 Chambers 71.5 cy Field 53.3 cy Stone 48 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 15 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 12 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 123.75' Row Length +12.0" End Stone x 2 = 125.75' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 60 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 1,639.1 cf Chamber Storage 5,673.2 cf Field - 1,639.1 cf Chambers = 4,034.1 cf Stone x 40.0% Voids = 1,613.6 cf Stone Storage Chamber Storage + Stone Storage = 3,252.7 cf = 0.075 of Overall Storage Efficiency = 57.3% Overall System Size = 125.75' x 17.75' x 2.54' 60 Chambers 210.1 cy Field 149.4 cy Stone 00000 49 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 16 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.00'L with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows 11 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 113.50' Row Length +12.0" End Stone x 2 = 115.50' Base Length 1 Rows x 33.0" Wide + 12.0" Side Stone x 2 = 4.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 11 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 1 Rows = 300.7 cf Chamber Storage 1,394.4 cf Field - 300.7 cf Chambers = 1,093.8 cf Stone x 40.0% Voids = 437.5 cf Stone Storage Chamber Storage + Stone Storage = 738.2 cf = 0.017 of Overall Storage Efficiency = 52.9% Overall System Size = 115.50' x 4.75' x 2.54' 11 Chambers 51.6 cy Field 40.5 cy Stone 1-1 50 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 17 Pond 150XLHD: Cultec detention system Hydrograph �I 14 IH H fi I+ I H H H + I4 S Inflow 5 1 1 1 1 1 1 1 1 1 4 59 cfs lE Primary `inlfl� ww Area=30,572 sf I H+ITI 4 IIIIIIIIIII a 3 3 0 LI 1 0 0 1 2 3 4 5 6 7 -TP"kr-b d—V= 4, b2 31. 4 W HMIMMM 0 Time (hours) 51 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 18 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 2.10" for 2-yr event Inflow = 5.81 cfs @ 12.04 hrs, Volume= 29,548 cf Primary = 5.81 cfs @ 12.04 hrs, Volume= 29,548 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link POST: Postconstruction Site Discharge Hydrograph ❑ Inflow ❑ Primary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 52 POSTCONSTRUCTION SITE CALCULATIONS 5-YEAR STORM EVENT 53 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 1 S: Roof Runoff = 1.78 cfs @ 12.02 hrs, Volume= 5,370 cf, Depth= 6.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 0.5 3 1 0 LL 0p 0 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 1S: Roof Hydrograph ��ilii�lll li 1.78 cfs Tyi�e1Ili 24-hi 51y% Iaiirifai11�7�.113'I' RO nbff Arte0109,13521 sf Ruggffl VIollugn�75,13701 cf . IIII 1 �mr 4E1h�' � Flow Len h . ' � I I I I I T�C�1 �21 r>riir� 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 54 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 2EX: Offsite Runoff = 1.75 cfs @ 12.05 hrs, Volume= 6,716 cf, Depth= 1.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph ��I I � IIII � IIIIII 1.75 cfs I I I I ITYpeI II+ 24-'hi 5Ly% Rain6110.1I3'I' Rau noff Areat71,1247I sf RuggfflVollume=,6,7161 cf p l 13" 0 1 IIIIII �7'ovv 4�1 �7"I I,LL Length=200 �lope-- 0.1000 'i' 1 Td:�111 mirk CND '43 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 55 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 0.60 cfs @ 12.02 hrs, Volume= 1,804 cf, Depth= 6.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fDs 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph 0.65 + 14 I + ❑Runoff 0.60 cfs 0.6 TITIT IT � TI TITIT — T eA 24-h� 0.55 L I+� L I 5 yi•�ta fa�N� 1 0.5 0.45 + + + H + ftnbfff AOe�i=la,114-2I sf 0.4 �f rmq lVp Mr"=I �j1� 4ICf 3 0.35 T + u Q ep�17 � ° 0.3 FI w L n �h=14 LL 0.25 T l rt l rt lI �I fi l rt eL0.d1d 0.2 II I16=� 12lri{hi 0.15 T I T 1-4 4 I H�--QN=00 0.1 0.05 17 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 56 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 1.09 cfs @ 12.02 hrs, Volume= 3,276 cf, Depth= 6.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min Subcatchment 3S: North Parking/Driveway Hydrograph 1.09 cfs 51y% 06infa 11�=�.1131I' ROnbff Me0105,17051 sf Ruggffl Vlolpkne73,12761 cf eL.b2bb9'Runpff Delp�h�6. � LL Fowen=11' � I I I I I T�C�1 �21 r>riir� 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 57 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 0.59 cfs @ 12.02 hrs, Volume= 1,767 cf, Depth= 6.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos w 0 LL 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph TTIT 1 1 1 1 T1T 1 1 0.59 cfs �1 ITI T IA TIT IT IT T T �— I T 14 I AtA T I� 0.25 T I T 17 0.2 0.15 0.1 T11 I T T IT�elIi 14 h� �I � 15�yi•�a�faFtf��11� T I RO nTDfff ArFe-;� 1a OT71 s-f IRqgq�VP�Mr"p=11 1�f71 __1 _, up Q ep�h7 97 ow Len th=1 8 TI TI T L Od L-I T I T I-i I-T6==j J2rriuj 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 58 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 0.69 cfs @ 12.02 hrs, Volume= 2,076 cf, Depth= 6.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN Description 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph 1— +I -+ I --I �—I L I + 0.75 0.7 Li L I LI _ 0.69 cfs L I L I L I L Tied I- 0.65 I L I t 1 rt l I— I� f-1 L 15ti•-ka �f 11�7fi.113� 0.s 0.55 1 4- 1 �- 1l, 3, Io6y1551 Sf R nbff(f� �I""I��II---n,I- �A08 45 4-1 + I — u�Y �~T �j� r� 0.35 U. 0.3 I I Ti I I I I - I �_ I I I I � 1 / �nr erigt � I I I �pieL(�-01�0 0.25 L 1 t 11 �-1 L -t I -i 1file jztf�-A 0.2 0.15 L 1 L L 1 L 1 IL LI L I L I L LI LCN7-9-8 0.1 n nr _ + 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 59 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 0.98 cfs @ 12.03 hrs, Volume= 2,817 cf, Depth= 5.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total 3 0 LL Subcatchment 6S: Front Parking Area to Gil Hydrograph 0.98 cfs Type1Ili 24-h% 151y% Rainfa ll�=�.113'I' ROnbff AlllteA05,1661 I sf Ruggffl Volluln��2,18171 cf RulnOff Qeip�h7�.95" Flow Length=72' Tc1 1.2� nA6 ,N=06 Illlllli 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 60 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 7S: Septic Area Runoff = 0.61 cfs @ 12.03 hrs, Volume= 2,077 cf, Depth= 1.30" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min Subcatchment 7S: Septic Area Hydrograph 0.65 0.61 cfs 0.6 I t I t 1� l I I-1 �I t t 1 --T�e IIi 2-4!h4 0.55 I I II 1 �1y�al; fu�11 05 I4 4 1--� HRU hoof IAre01--010,119-51 sf 0.45 0.4 T T 7 INN1°`fFa5 p71 Cf 0 0.35 Li I 1� - I-1 LI u Q Ip r__L .2 0.3 Flow Len th=2 0 0.25 fi l fi l l I� �1 t l t -eLa .d7-id _ P 0.15 14 + I 1— N= 0.1 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 61 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 8S: NW Wetland Area Runoff = 1.35 cfs @ 12.05 hrs, Volume= 3,835 cf, Depth= 2.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 8S: NW Wetland Area Hydrograph 1.35 cfs l��I I I I I ITYpeI II+ 24!hir 51y% l�aiirifaill�7�.113'I' 1 1 -4 1110 66ff l-Arda�- % 7460 IV 1 Ruggffl Vollugnp=3,8�5 cf RuInpfl Pe,p�h=2 ' 80U-Flow Len th=26' I III I I I I I I I �1b�eL�.a�o�d'�' 1 1T6C 314n{16 CN=161 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 62 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 2.83 cfs @ 12.03 hrs, Volume= 7,709 cf, Depth= 5.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph 1- 1 -Li�I� 3 F 2.83 cfs Type ' I 1124-h r 151yll- RairlfaI14.113'I' Rluihdffl Alrea$118,13621 sf 2 RuggfflVlolluTn 77,17Q91cf Rulnoff Depth=5. 4'1, LL Flow Length=2 6 o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 63 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 1.45 cfs @ 12.03 hrs, Volume= 3,907 cf, Depth= 3.62" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph 1.45 cfs l��I I I I I ITYpeI II+ 24!hir 151y % l�aiirifaill=7�.1I3'I' Rluihdffl AlrOa�--112,1948I sf RuggfflNlolluTp=3,9Q7i cf RuInpfl Pep�h=3.16.2" LL Flow Len th=383' III III I I I I I I I �lb�eL�.a�4�d '�' T6=21.1 n{ i 6 CN=I69 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 64 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 30 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 6.72" for 5-yr event Inflow = 5.69 cfs @ 12.02 hrs, Volume= 17,110 cf Outflow = 1.83 cfs @ 12.24 hrs, Volume= 17,110 cf, Atten= 68%, Lag= 13.3 min Primary = 1.83 cfs @ 12.24 hrs, Volume= 17,110 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,023.69' @ 12.24 hrs Surf.Area= 3,900 sf Storage= 3,991 cf Plug -Flow detention time= 34.2 min calculated for 17,110 cf (100% of inflow) Center -of -Mass det. time= 34.1 min ( 778.5 - 744.4 ) Volume Invert Avail.Storage Storage Description #1A 4,022.00' 576 cf 8.00'W x 95.00'L x 2.54'H Field A 1,932 cf Overall - 493 cf Embedded = 1,439 cf x 40.0% Voids #2A 4,022.50' 493 cf Cultec R-150XLHD x 18 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows #313 4,022.00' 1,614 cf 17.75'W x 125.75'L x 2.54'H Field B 5,673 cf Overall - 1,639 cf Embedded = 4,034 cf x 40.0% Voids #413 4,022.50' 1,639 cf Cultec R-150XLHD x 60 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #5C 4,022.00' 438 cf 4.75'W x 115.50'L x 2.54'H Field C 1,394 cf Overall - 301 cf Embedded = 1,094 cf x 40.0% Voids #6C 4,022.50' 301 cf Cultec R-150XLHD x 11 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows #7 4,022.50' 8 cf 12.0" Round 37 LF 12" HDPE L= 10.0' S= 0.0050 T #8 4,022.53' 47 cf 4.00'D x 3.76'H J131 #9 4,022.63' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0050 T #10 4,022.86' 42 cf 4.00'D x 3.34'H G12 #11 4,022.96' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0050 T #12 4,023.37' 35 cf 4.00'D x 2.75'H G11 #13 4,022.69' 33 cf 4.00'D x 2.63'H G14 #14 4,022.79' 70 cf 15.0" Round 57 LF 15" HDPE L= 57.0' S= 0.0050 T #15 4,023.10' 33 cf 4.00'D x 2.59'H G13 #16 4,022.56' 32 cf 4.00'D x 2.58'H J132 #17 4,022.56' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0050 T #18 4,022.75' 33 cf 4.00'D x 2.62'H G15 5,646 cf Total Available Storage Storage Group A created with Chamber Wizard 65 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 31 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.90' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.90' / 4,021.75' S= 0.0375 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,022.00' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,023.50' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,024.50' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=1.83 cfs @ 12.24 hrs HW=4,023.69' (Free Discharge) L =Culvert (Passes 1.83 cfs of 8.29 cfs potential flow) 2=Orifice (Orifice Controls 1.44 cfs @ 5.76 fps) 3=Weir (Weir Controls 0.39 cfs @ 1.44 fps) 4=Top of Wall ( Controls 0.00 cfs) 66 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 32 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 9 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 93.00' Row Length +12.0" End Stone x 2 = 95.00' Base Length 2 Rows x 33.0" Wide + 6.0" Spacing x 1 + 12.0" Side Stone x 2 = 8.00' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 18 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 2 Rows = 492.7 cf Chamber Storage 1,931.7 cf Field - 492.7 cf Chambers = 1,439.0 cf Stone x 40.0% Voids = 575.6 cf Stone Storage Chamber Storage + Stone Storage = 1,068.3 cf = 0.025 of Overall Storage Efficiency = 55.3% Overall System Size = 95.00' x 8.00' x 2.54' 18 Chambers 71.5 cy Field 53.3 cy Stone 67 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 33 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 12 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 123.75' Row Length +12.0" End Stone x 2 = 125.75' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 60 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 1,639.1 cf Chamber Storage 5,673.2 cf Field - 1,639.1 cf Chambers = 4,034.1 cf Stone x 40.0% Voids = 1,613.6 cf Stone Storage Chamber Storage + Stone Storage = 3,252.7 cf = 0.075 of Overall Storage Efficiency = 57.3% Overall System Size = 125.75' x 17.75' x 2.54' 60 Chambers 210.1 cy Field 149.4 cy Stone 00000 68 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 34 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows 11 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 113.50' Row Length +12.0" End Stone x 2 = 115.50' Base Length 1 Rows x 33.0" Wide + 12.0" Side Stone x 2 = 4.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 11 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 1 Rows = 300.7 cf Chamber Storage 1,394.4 cf Field - 300.7 cf Chambers = 1,093.8 cf Stone x 40.0% Voids = 437.5 cf Stone Storage Chamber Storage + Stone Storage = 738.2 cf = 0.017 of Overall Storage Efficiency = 52.9% Overall System Size = 115.50' x 4.75' x 2.54' 11 Chambers 51.6 cy Field 40.5 cy Stone 1-1 69 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 35 Pond 150XLHD: Cultec detention system Hydrograph 5.69 cfs TI T IT IT T 5 ILITI III 4 3 3 0 2 1.83 cfs 1 I l i t 0 1 2 3 4 5 6 10 11 12 13 14 15 16 17 18 Time (hours) 21 22 23 24 25 26 27 28 29 30 Inflow ❑ Primary 70 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 36 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 2.94" for 5-yr event Inflow = 9.14 cfs @ 12.04 hrs, Volume= 41,354 cf Primary = 9.14 cfs @ 12.04 hrs, Volume= 41,354 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link POST: Postconstruction Site Discharge Hydrograph 1 o —t 9.14 cfs 9 TI T I T IT 7 IIIIII w 6 3 5 0 LL 3 LIII I 2 ILA 1 ` �1� ❑ Inflow 6W Aee�y168' / �4 sf El Primary 1111 � IT 17 TI T IT IT IT T IIIIIIIIIIII IIIIIIIIIIII IIIIIIIIIIII IIIIIIIIIII 1 U LI LIT 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 71 POSTCONSTRUCTION SITE CALCULATIONS 10-YEAR STORM EVENT 72 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 1 S: Roof Runoff = 2.04 cfs @ 12.02 hrs, Volume= 6,196 cf, Depth= 7.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 0.5 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 1S: Roof Hydrograph I I 2.04 cfs 2 + I� 1 I I I IT�e-li 24-hi joLyi• Oza 1411�41191h ROnbff AOeOiO9,3521 sf Ruggffl Vlollugn�76,11 P61 cf L I _L 1 _�n?j 4elp�hT7I_ 5,1� Flow een h= 11 1 1 1 1 fib eL�g�4�17I II � � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 73 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 2EX: Offsite Runoff = 2.90 cfs @ 12.05 hrs, Volume= 9,691 cf, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps LO 3 0 LL 3 2 1 Subcatchment 2EX: Offsite Hydrograph 2.90 cfs I I I I I I ITYpeI II+ 24-1hi I � " '� 0 y� Rainfall 8�.19 I I I I 1 1 1 I RluiholffiAreat71,1247I sf RUggff volurnp�%,6�1 I Cf Runoff ulnoff Dep�h�11. 3'I Flow Len th=2 0' p T�C�2 � 11 rri i r� DN'43 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 74 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 0.69 cfs @ 12.02 hrs, Volume= 2,082 cf, Depth= 7.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN Description 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph 0.75 0.7 L I � _ 0.69 cfs L -L-L -[ Tied I- 0.65 t 1 t 1--t l I— fi110�% a �f 11� 119 06 0.55 1 � �- 1 Ri nbbffAJrie4 Z.11421 sf T � - � PI"l, I'�I-- - ((fj-�'-- rrt� - ,,9#21cf 45 —u Sul R,pT7�� 0.35 .2 - LI w O 1 t I t- -t I 1 file jZ4� 16 0.2 .2 0.15 L 1 I Li 1 L1 U L_1 L I I I-L L_I LCN7-9-8 0.1 n nr 1—� + _ + 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 75 Highlands Postconstruction w smaller Chambers2 Type /// 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 1.25 cfs @ 12.02 hrs, Volume= 3,780 cf, Depth= 7.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min Subcatchment 3S: North Parking/Driveway Hydrograph 1.25 cfs T��e II+ 24-hi i oLyi• lka 1411�4119'h 1 I ROnbff AOeOiO5j051 sf Ruggffl Vlollugn�73,17g01 cf RI u�IowLen npf 4elp h77.9j5'I� h=127 �.b2bb � 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 76 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 0.67 cfs @ 12.02 hrs, Volume= 2,039 cf, Depth= 7.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph ❑Runoff 0.7 o.6cfs 0.65 7 �T�p e� 0.55 �- 1 14 1 1 4 1 � H ft "fff-Aillei�-Ia,107-71 sf 0.4- qep�h77 5 LL 0.35 — — NOW Lenqth: 1%� 8! 0.25 0.2 fi I T I rt fi rt 1 rt fT6� 1z�ir� 0.2 0.1 '7 I __I r r--I n nx 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 77 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 0.79 cfs @ 12.02 hrs, Volume= 2,395 cf, Depth= 7.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fDs 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph + + 1--4 + 1 —4 ❑Runoff 0.85 0.8 L I I I 0.79 I cfs L1 L-L 1�T 24Ih> 0.7 T 1 T 17 1 1 F I -T T I elh� T110Ty%:kaillrllf":61k11!Y� 0.65 t 1 t 1 rt 1 1 t-1 1 �- 1 RO nbfff-p►Out 161-51 sf 0.6 0.55 + I P9rh PTVPIMrpf =1z1�1'0,51 Cf w 0.5 a 0.45 — �Ypj� 0.4 U. 0.35 1 /���� Q / A Wr -LVngW 1-IIIJJJ tid j j� f 0.3 0.25 V VVV ����777 VVVV IT6=� 12-1rril ui 0.2 0.15 T I T 1-T 1 1-1 fi 11 r-I T T 1 I r1 1c Nr-" 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 78 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 1.14 cfs @ 12.03 hrs, Volume= 3,310 cf, Depth= 6.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total N 3 LL Subcatchment 6S: Front Parking Area to Gil 1 [�-1 t l t l--� h t Hydrograph 2� 1 Typel Ili 24-h% t I tiOOLyr Rai nfal1�4.119'I' ROnbff Ate&�5,16611 sf Ruggffl Viol,um�73,13101 cf Rulnoff Qeip�h7f-9;9' Flow Length=72' Tc-12 ni i 6 t'N=19b Illlllli 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 79 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 7S: Septic Area Runoff = 0.95 cfs @ 12.03 hrs, Volume= 2,939 cf, Depth= 1.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min Subcatchment 7S: Septic Area Hydrograph 0.95 cfs l��I 'TYpeI II+ 24!hi• JOLyr Rain6ll- 8.119'I' RIu hdff Area=19,1951 sf RuggfflVollume72,19�91 cf Ruln? j Pe,p�h7l,. 4'I� LL Flow Length=2 0 Slope=0.0730 T "T'c�1 L21 mirk 1 I I CN=145 Time (hours) ❑ Runoff 80 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment 8S: NW Wetland Area Runoff = 1.76 cfs @ 12.05 hrs, Volume= 4,925 cf, Depth= 3.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 8S: NW Wetland Area Hydrograph 1.76 cfs l��I I I I I ITYpeI II+ 24!hir I JOLyi• 061411�41I9111 RluhdfflAlrOa�--116,I460I sf Ruggffl Vollugnp=4,9?51 cf 0RT1r �e,plh= ' YI, - Flow Len th=2�6 LL �1b�eL0.00�d T6=631.01 nil16 I CN=I61 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 81 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 3.37 cfs @ 12.03 hrs, Volume= 9,243 cf, Depth= 6.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph 3 3 2 LL IIIIIIIII TT T T T i i I I � Runoff 3.37 cfs ITY eI II+ 241hi T M T I T -OLyi• h"i fill1�= 9'1' Rluihdffl AlrOa$118,13621 sf Ruggffl VlolluT�79,I2431 cf Rulnoff Delpth=C.04'I Flow Length=256' §160eL0.0260 'i' + T 1 - T640tn irk 1 1 CND=182 o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 82 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 1.81 cfs @ 12.03 hrs, Volume= 4,868 cf, Depth= 4.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph 2 T— I t 1.81 cfs l��I I I I I ITYpeI II+ 24!hir 1 1 1 I I 'COLy i• 061411�41I9111 RluhdfflAlrOa�--112,1948I sf l l Ruggffl Vollugnp=4,8g81 cf 0R7?j 1 �elpth=4. 'I,.2 ow Length=3 3 �1b�eL0.041d'�' T6=621.1 ni i 6 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 83 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 48 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 7.77" for 10-yr event Inflow = 6.55 cfs @ 12.02 hrs, Volume= 19,801 cf Outflow = 2.56 cfs @ 12.15 hrs, Volume= 19,800 cf, Atten= 61 %, Lag= 8.0 min Primary = 2.56 cfs @ 12.15 hrs, Volume= 19,800 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,023.86' @ 12.15 hrs Surf.Area= 3,873 sf Storage= 4,382 cf Plug -Flow detention time= 32.8 min calculated for 19,800 cf (100% of inflow) Center -of -Mass det. time= 32.7 min ( 775.1 - 742.4 ) Volume Invert Avail.Storage Storage Description #1A 4,022.00' 576 cf 8.00'W x 95.00'L x 2.54'H Field A 1,932 cf Overall - 493 cf Embedded = 1,439 cf x 40.0% Voids #2A 4,022.50' 493 cf Cultec R-150XLHD x 18 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows #313 4,022.00' 1,614 cf 17.75'W x 125.75'L x 2.54'H Field B 5,673 cf Overall - 1,639 cf Embedded = 4,034 cf x 40.0% Voids #413 4,022.50' 1,639 cf Cultec R-150XLHD x 60 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #5C 4,022.00' 438 cf 4.75'W x 115.50'L x 2.54'H Field C 1,394 cf Overall - 301 cf Embedded = 1,094 cf x 40.0% Voids #6C 4,022.50' 301 cf Cultec R-150XLHD x 11 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows #7 4,022.50' 8 cf 12.0" Round 37 LF 12" HDPE L= 10.0' S= 0.0050 T #8 4,022.53' 47 cf 4.00'D x 3.76'H J131 #9 4,022.63' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0050 T #10 4,022.86' 42 cf 4.00'D x 3.34'H G12 #11 4,022.96' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0050 T #12 4,023.37' 35 cf 4.00'D x 2.75'H G11 #13 4,022.69' 33 cf 4.00'D x 2.63'H G14 #14 4,022.79' 70 cf 15.0" Round 57 LF 15" HDPE L= 57.0' S= 0.0050 T #15 4,023.10' 33 cf 4.00'D x 2.59'H G13 #16 4,022.56' 32 cf 4.00'D x 2.58'H J132 #17 4,022.56' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0050 T #18 4,022.75' 33 cf 4.00'D x 2.62'H G15 5,646 cf Total Available Storage Storage Group A created with Chamber Wizard 84 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 49 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.90' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.90' / 4,021.75' S= 0.0375 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,022.00' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,023.50' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,024.50' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=2.56 cfs @ 12.15 hrs HW=4,023.86' (Free Discharge) L =Culvert (Passes 2.56 cfs of 9.04 cfs potential flow) 2=Orifice (Orifice Controls 1.52 cfs @ 6.10 fps) 3=Weir (Weir Controls 1.04 cfs @ 2.04 fps) 4=Top of Wall ( Controls 0.00 cfs) 85 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 50 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 9 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 93.00' Row Length +12.0" End Stone x 2 = 95.00' Base Length 2 Rows x 33.0" Wide + 6.0" Spacing x 1 + 12.0" Side Stone x 2 = 8.00' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 18 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 2 Rows = 492.7 cf Chamber Storage 1,931.7 cf Field - 492.7 cf Chambers = 1,439.0 cf Stone x 40.0% Voids = 575.6 cf Stone Storage Chamber Storage + Stone Storage = 1,068.3 cf = 0.025 of Overall Storage Efficiency = 55.3% Overall System Size = 95.00' x 8.00' x 2.54' 18 Chambers 71.5 cy Field 53.3 cy Stone 86 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 51 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 12 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 123.75' Row Length +12.0" End Stone x 2 = 125.75' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 60 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 1,639.1 cf Chamber Storage 5,673.2 cf Field - 1,639.1 cf Chambers = 4,034.1 cf Stone x 40.0% Voids = 1,613.6 cf Stone Storage Chamber Storage + Stone Storage = 3,252.7 cf = 0.075 of Overall Storage Efficiency = 57.3% Overall System Size = 125.75' x 17.75' x 2.54' 60 Chambers 210.1 cy Field 149.4 cy Stone 00000 87 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 52 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows 11 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 113.50' Row Length +12.0" End Stone x 2 = 115.50' Base Length 1 Rows x 33.0" Wide + 12.0" Side Stone x 2 = 4.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 11 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 1 Rows = 300.7 cf Chamber Storage 1,394.4 cf Field - 300.7 cf Chambers = 1,093.8 cf Stone x 40.0% Voids = 437.5 cf Stone Storage Chamber Storage + Stone Storage = 738.2 cf = 0.017 of Overall Storage Efficiency = 52.9% Overall System Size = 115.50' x 4.75' x 2.54' 11 Chambers 51.6 cy Field 40.5 cy Stone 1-1 88 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 53 Pond 150XLHD: Cultec detention system Hydrograph 6.55 cfs L 7 �a�fl�o-�ry Q►re�a-�,�-71--s� 6 I I I I I I I IPie k1 bi6v=0, 3.66� 5 Sf oir ge 08j2 6t I- 4 1L I.ILILLILILILILI_ 3 0 3 2.56 cfs 2 IIIIIIIII IIIIIIIIIIIII -I_7 F-I T-ILILI7 I- 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Time (hours) 23 24 25 26 27 28 29 30 Inflow ❑ Primary 89 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 54 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 3.66" for 10-yr event Inflow = 12.14 cfs @ 12.04 hrs, Volume= 51,466 cf Primary = 12.14 cfs @ 12.04 hrs, Volume= 51,466 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs a U 3 0 LL Link POST: Postconstruction Site Discharge Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) Inflow ❑ Primary s: POSTCONSTRUCTION SITE CALCULATIONS 25-YEAR STORM EVENT 91 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment 1 S: Roof Runoff = 2.42 cfs @ 12.02 hrs, Volume= 7,356 cf, Depth= 9.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 0.5 0 70 Total, Increased to minimum Tc = 1.2 min t I I—t I-- Subcatchment 1S: Roof Hydrograph 2.42 cfs 1 Tyi�e1 III 24-hi 110 nbff AOeOiO9,13521 sf Ruggffl Vlolluln�77,13�61 cf IIII I I Ri ulnp �.e,p�h7�- 4'FI ogth 0, fit rt I� w en �Ib eL'64 '1' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 92 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 56 Summary for Subcatchment 2EX: Offsite Runoff = 4.77 cfs @ 12.04 hrs, Volume= 14,461 cf, Depth= 2.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph IIIIIIIIIII' I III III 5 4.77 cfs I 1 ley 1pe III �4 h% 4 -t L -t L I I I2$_yr]R�Wall=d.68-�' R4npff 4rpa�=71 j2471 sf -4 H 4R1un�off�VQl�rn�e7-�4�4�11 cl w 3 Runoff Depth=2.44" o f IIII 1 1 1 IFiow L�nJ tkl266' 2 l fi l rt l IS14-6.1Odd 11' 1 1 1 Tc7g-1 mirk 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 93 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 57 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 0.81 cfs @ 12.02 hrs, Volume= 2,472 cf, Depth= 9.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN Description 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph 0.9 fiITI 1111 1111 111 1�-1T 0.85 os tITI� 0.81 cfs �I t tI� T e�Ii iA 1h °o7 I� �I — 0.65 - 1 + 14 4 I--] H�Jffnf bbfff-Aille�=-a,{1�421 Sf 0.6 0.55 1 T 1 �l �P-�- -�TP 'I -" 0.5 0 045 Li T 1- � I� LI L Ip r_'� - LL 0.35 T 1 T 1 I 1 TI 1- w L n h=124 T T eL, 0.3 0.25 T I I I— -I - — - ��� 12 r�j6 02 1 fi 1 T I� 1-1 r- 1 -r T 1 rt r1 �N--" 0.15 0.1 / 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 94 Highlands Postconstruction w smaller Chambers2 Type /// 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 58 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 1.48 cfs @ 12.02 hrs, Volume= 4,488 cf, Depth= 9.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min Subcatchment 3S: North Parking/Driveway Hydrograph 1.48 cfs Tyi�e1Ili 24-hi �5Lyi• 110nbff A te�iO5,17Q51 sf 1Iu�QVl�lue7-4,181C IIII 1 Ri uln?j 4e,p�h7�.4'I; Flow Len h=1�7 IIII 1 I I I �Ib eL�.b2bb'�' � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 95 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 59 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 0.80 cfs @ 12.02 hrs, Volume= 2,420 cf, Depth= 9.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph 0.85 0.80 cfs °.75 o; fi l rt l 11 rt I� �I5y%afa�ll�6� 0.65 t 1 t 1--� l 1 1 �- 1R-0 nbff -AOe--a,107-71 sf 0.6 0.55 - 1 + 14 H 1 4 PW1 PTVOUTJ° ?WOO Cf 0.45 14- 0.35 L I I-i L L 1 L 1 I 0.3 0.25 IT6:�-1 ii rril ui 0.2 0.15 fi 1 T -r rt I I I 1�-c Nf-" 0.1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 96 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 60 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 0.93 cfs @ 12.02 hrs, Volume= 2,844 cf, Depth= 9.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN Description 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph — �- 1 0.93 cfs I I I I I Tyi�e1Ili 24-hi I �5Lyi• 110 nbff Me0103,16151 sf R u gaff l Vlollu ln�72,18441 c f IIII 1 Ri uln?j �.e,p�h7�4'LL FI w en h� , �b�edd d� � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 97 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 61 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 1.37 cfs @ 12.03 hrs, Volume= 4,007 cf, Depth= 8.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total Subcatchment 6S: Front Parking Area to Gil Hydrograph 1.37 cfs Type1 III 24-hr l l l l �5Lyr Rainfall=9.68" —I I -ROnbff Ate&�5,16-81IV u Iff Volum 4 0 7 II III I I I I�mQ I � � ����IQI c f Runoff Qeip�h�A,6'i, LL Flow Length=72 t'N=19b I' Illlllli 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 98 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 62 Summary for Subcatchment 7S: Septic Area Runoff = 1.51 cfs @ 12.02 hrs, Volume= 4,304 cf, Depth= 2.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min 1 in LL Subcatchment 7S: Septic Area Hydrograph 1.51 cfs 'TeeIlli 241hi• �5Lyr Rain611§.68'I' RluhdfflArea=19,195, sf �upgffj Vloilume74,1394j cf l l Ruln? j Pe,p�h7?. 9'I' Flow Length=2 0 Slope=0.0730 T Time (hours) ❑ Runoff 99 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 63 Summary for Subcatchment 8S: NW Wetland Area Runoff = 2.35 cfs @ 12.05 hrs, Volume= 6,544 cf, Depth= 4.77" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 8S: NW Wetland Area Hydrograph 1 � I- 3 0 LL 1 IT I_ T ❑ Runoff ITYpeI II+ 24!hir 1 �5�y% litaii-rif�]1l 461-wv RluhdfflAlrOa�116,14601 sf RuggfflVolium p=6,5441 cf Runoff Depth=4.7I7'I Flow Length=226' T T IT �loeLo.od � T6=6314 nil16 I I CN=161 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 100 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 64 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 4.12 cfs @ 12.03 hrs, Volume= 11,426 cf, Depth= 7.47" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph 4.12 cfs 4 Type III 24-hr 12$-err Rainfall=9.68" - I -Rpnpff Area��t8,3621-Sf 3 RMni Q� off V I m- 1 4 c I IIe�� ��6I Runoff Depth=7.47" 3 Flow ength=256' 2 �I Slope=6.0200 T o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 101 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 65 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 2.33 cfs @ 12.03 hrs, Volume= 6,268 cf, Depth= 5.81" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph 2.33 cfs l��I ITYpeI Ili 24=hir �I 2 -4 H 7 RluhdfflAlrOa�112,1948I sf RuggfflVolium p=6,2g8i cf 1 Run off Depth=5.81" LL Length=3831' 1 -t �1o�eL0.041d')' T6=621.1 ni i 6 CPI=I69 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 102 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 66 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 9.26" for 25-yr event Inflow = 7.76 cfs @ 12.02 hrs, Volume= 23,586 cf Outflow = 4.10 cfs @ 12.10 hrs, Volume= 23,585 cf, Atten= 47%, Lag= 5.1 min Primary = 4.10 cfs @ 12.10 hrs, Volume= 23,585 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,024.14' @ 12.10 hrs Surf.Area= 3,792 sf Storage= 4,883 cf Plug -Flow detention time= 30.9 min calculated for 23,585 cf (100% of inflow) Center -of -Mass det. time= 30.9 min ( 770.9 - 740.1 ) Volume Invert Avail.Storage Storage Description #1A 4,022.00' 576 cf 8.00'W x 95.00'L x 2.54'H Field A 1,932 cf Overall - 493 cf Embedded = 1,439 cf x 40.0% Voids #2A 4,022.50' 493 cf Cultec R-150XLHD x 18 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows #313 4,022.00' 1,614 cf 17.75'W x 125.75'L x 2.54'H Field B 5,673 cf Overall - 1,639 cf Embedded = 4,034 cf x 40.0% Voids #413 4,022.50' 1,639 cf Cultec R-150XLHD x 60 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #5C 4,022.00' 438 cf 4.75'W x 115.50'L x 2.54'H Field C 1,394 cf Overall - 301 cf Embedded = 1,094 cf x 40.0% Voids #6C 4,022.50' 301 cf Cultec R-150XLHD x 11 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows #7 4,022.50' 8 cf 12.0" Round 37 LF 12" HDPE L= 10.0' S= 0.0050 T #8 4,022.53' 47 cf 4.00'D x 3.76'H J131 #9 4,022.63' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0050 T #10 4,022.86' 42 cf 4.00'D x 3.34'H G12 #11 4,022.96' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0050 T #12 4,023.37' 35 cf 4.00'D x 2.75'H G11 #13 4,022.69' 33 cf 4.00'D x 2.63'H G14 #14 4,022.79' 70 cf 15.0" Round 57 LF 15" HDPE L= 57.0' S= 0.0050 T #15 4,023.10' 33 cf 4.00'D x 2.59'H G13 #16 4,022.56' 32 cf 4.00'D x 2.58'H J132 #17 4,022.56' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0050 T #18 4,022.75' 33 cf 4.00'D x 2.62'H G15 5,646 cf Total Available Storage Storage Group A created with Chamber Wizard 103 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 67 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.90' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.90' / 4,021.75' S= 0.0375 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,022.00' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,023.50' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,024.50' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=4.10 cfs @ 12.10 hrs HW=4,024.13' (Free Discharge) L =Culvert (Passes 4.10 cfs of 10.37 cfs potential flow) 2=Orifice (Orifice Controls 1.65 cfs @ 6.60 fps) 3=Weir (Weir Controls 2.44 cfs @ 2.81 fps) 4=Top of Wall ( Controls 0.00 cfs) 104 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 68 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 9 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 93.00' Row Length +12.0" End Stone x 2 = 95.00' Base Length 2 Rows x 33.0" Wide + 6.0" Spacing x 1 + 12.0" Side Stone x 2 = 8.00' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 18 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 2 Rows = 492.7 cf Chamber Storage 1,931.7 cf Field - 492.7 cf Chambers = 1,439.0 cf Stone x 40.0% Voids = 575.6 cf Stone Storage Chamber Storage + Stone Storage = 1,068.3 cf = 0.025 of Overall Storage Efficiency = 55.3% Overall System Size = 95.00' x 8.00' x 2.54' 18 Chambers 71.5 cy Field 53.3 cy Stone 105 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 69 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 12 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 123.75' Row Length +12.0" End Stone x 2 = 125.75' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 60 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 1,639.1 cf Chamber Storage 5,673.2 cf Field - 1,639.1 cf Chambers = 4,034.1 cf Stone x 40.0% Voids = 1,613.6 cf Stone Storage Chamber Storage + Stone Storage = 3,252.7 cf = 0.075 of Overall Storage Efficiency = 57.3% Overall System Size = 125.75' x 17.75' x 2.54' 60 Chambers 210.1 cy Field 149.4 cy Stone 00000 106 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 70 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows 11 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 113.50' Row Length +12.0" End Stone x 2 = 115.50' Base Length 1 Rows x 33.0" Wide + 12.0" Side Stone x 2 = 4.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 11 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 1 Rows = 300.7 cf Chamber Storage 1,394.4 cf Field - 300.7 cf Chambers = 1,093.8 cf Stone x 40.0% Voids = 437.5 cf Stone Storage Chamber Storage + Stone Storage = 738.2 cf = 0.017 of Overall Storage Efficiency = 52.9% Overall System Size = 115.50' x 4.75' x 2.54' 11 Chambers 51.6 cy Field 40.5 cy Stone 1-1 107 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 71 Pond 150XLHD: Cultec detention system Hydrograph I I I I I I I I I I I I I I I I I I I I I I I I I I 7.76 cfs 1 7 IIIIIIIIIII IIIIIIIIII� 6 IIIIIIII 5 I TITIT 174.10cfs 0 4- 3 v.I fil�lrtl 6 0 1 2 3 4 5 I Itift W1 IA%6aL30,672Isf IPie kl bi6v=4,b�4.44� I I Sfoir g6:�4,W 6t IIIIIIIIIIIIIII I7F-ITITITI7 �It1- --1 ---1 tIt -I + I-+ I-i --I -1--I +I + 10 11 12 13 14 15 16 17 18 Time (hours) 21 22 23 24 25 26 27 28 29 30 Inflow ❑ Primary 108 Highlands Postconstruction w smaller Chambers2 Type/1/ 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 72 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 4.73" for 25-yr event Inflow = 17.58 cfs @ 12.05 hrs, Volume= 66,588 cf Primary = 17.58 cfs @ 12.05 hrs, Volume= 66,588 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link POST: Postconstruction Site Discharge Hydrograph j ❑ Inflow [1 Primary 14 `n�li� �e�1���81�s� I-f I I �I J- I+ I-f H �I t I t I� I� �Irt I� II �I filrt I� I� � Z I 1 0 1 I D ZII 1� ❑ L LI -1 1 I L1 L1 IA L 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 109 POSTCONSTRUCTION SITE CALCULATIONS 50-YEAR STORM EVENT i`n Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 73 Summary for Subcatchment 1 S: Roof Runoff = 2.72 cfs @ 12.02 hrs, Volume= 8,307 cf, Depth=10.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 3 0 LL 0.5 3 0 0& 0 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 1S: Roof Hydrograph 1 t I t —F I—T I fi l --r I--� 1 t I t I� I I I I I I I I 2.72 cfs I I I I I I I I I �� T e II+ 24-hir �6-�r IR�Ik6h=i O.9& l -4 -4 1-RUnbff-4ife0i=9,1521-sf Ruggffl Vlollugne78,13Q71 cf Lq.�js'I Flowen h=7 1 1 1 t L g��0;, I T�C�1 �21 r>riir� 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff liiffil Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 74 Summary for Subcatchment 2EX: Offsite Runoff = 6.46 cfs @ 12.04 hrs, Volume= 18,786 cf, Depth= 3.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph k-I �I ' '- �I � i� � I-4 ' 6.46 cfs Type III 4h- 6 1 1 1 1 1 1 1 1 1 1 1 5O�yi Rainfall=110.0& 5 -1 -F I -g4 off#r�-aFTl;2471 sf � �Rlun+off-Y77okim�e��8 7$6 c 3 4 1 1 1 1 (Runoff Depth=3.16" �iow te; gtk-�26 LL 3 1 1 1 1 1 1 Slop6=0.100011' 2 T i i Tc7g-1 min 77 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff `sm Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 75 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 0.92 cfs @ 12.02 hrs, Volume= 2,791 cf, Depth=10.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN Description 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph 1 0.92 cfs Type' III 24-hi• 1 6-yr IR�Ik6h=i O.9& RO nbff AOeOiO30 421 sf Ruggffl Vlollugne72j1 lj cf o I I IIII 1 �� °f� Pgpt�=� q. s�1, low Len h=124 I I I � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 113 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 76 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 1.66 cfs @ 12.02 hrs, Volume= 5,067 cf, Depth=10.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min Subcatchment 3S: North Parking/Driveway Hydrograph 1 1 1 I l 1.66 cfs Ty el III24-hi• l l l l l l l l �6-�r IR�Ik6h=i 0.9& ROnbff McOiO5,17051 sf L --t L I L � LRUTQf tVO1UInn��5,U? c 0 °f� Pg�t'1=1 q.�js'I; low Len h=127 I C I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff ISE] Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 77 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 0.90 cfs @ 12.02 hrs, Volume= 2,733 cf, Depth=10.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph 0.90 cfs Type' III 24-hi• 1 6-yr IR�Ik6h=i O.9& ROnbff Me0103,10771 sf Ruggffl Vlollugne72J1 31 cf o low Len th=1 8 IIII 1 I I I �Ib eL�.do�d ��� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 115 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 78 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 1.05 cfs @ 12.02 hrs, Volume= 3,211 cf, Depth=10.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN Description 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fos 3 0 LL 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph 1.05 cfs 1 15(�_�►r IR�iinfal�=�1 d.9�0�' RO nbff Me0103,16151 sf Ruggffl Vlolluln�73,1?J 11 cf Pgpt�=j q. 6'I, Flow Len h=7 �b�edd d� � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 116 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 79 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 1.55 cfs @ 12.03 hrs, Volume= 4,579 cf, Depth= 9.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total 3 LL Subcatchment 6S: Front Parking Area to Gil Hydrograph 1.55 cfs Type III 24-h% 16-�r Rai nfialkl0.9& Rtnbff Ate&�5,16611 sf t-R�u qf# Violpme74,1-5791-ef RI ulnOff Qeip�h7�.6,7.. Flow Length=72' Tc1 1.2' nA 6 t'N=19b Illlllli 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff IMN Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 80 Summary for Subcatchment 7S: Septic Area Runoff = 2.00 cfs @ 12.02 hrs, Volume= 5,531 cf, Depth= 3.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min Subcatchment 7S: Septic Area '�illll U- 1 Hydrograph 2.00 cfs T��e lli 41hi 1 6-_ r Rainfall=16.9'& RluhdfflArea=19,195, sf RuggfflVollume75,15�1 I cf � I lung elp h7 619 Flow Length=2 0' Slope=0.0730 T CN=145 Time (hours) ■ Runoff 118 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 81 Summary for Subcatchment 8S: NW Wetland Area Runoff = 2.86 cfs @ 12.05 hrs, Volume= 7,929 cf, Depth= 5.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 3 0 LL 3 2 1 Subcatchment 8S: NW Wetland Area Hydrograph 1 _I 1 2.86 cfs T��e Ili 24-hir '' i l i i' i l l I I I I I 15�_�►r IR�iinfal�=�1 �.9�0�' RluhdfflAlrOa�--116,14601 sf RUggfflVOW m p77,929i Cf Runoff Depth=5.78'I Flow Length=226' T6=6314 nil16 I CN=161 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff Iim Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 82 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 4.73 cfs @ 12.03 hrs, Volume= 13,231 cf, Depth= 8.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph 4.73 cfs 4 w 3 3 0 LL 2- 0 ❑ Runoff Type III 24-hr Rainfall=11-0.90-1' Rgnpff Area�=18�3621 sf �Rl-noff�VQlyme713,2�11 cl (Runoff Depth=8.65" Flow Length=256' 1 17 T I T I Slopd=6.0200 '/I' I T0�=�-6 min =P o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 120 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 83 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 2.76 cfs @ 12.03 hrs, Volume= 7,447 cf, Depth= 6.90" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph 3- 2 N I�� III II 3 LL 1 ❑ Runoff ITYpeI Ili 24=hir � I Rul holffl-Arda�-- 2,19481- f RuggfflVolium p77,447i cf Runoff Depth=6.90'I Flow Length=383' T621,E nii6 CPI=169 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 121 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 50-yr Rainfall= 10. 90" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 84 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 10.48" for 50-yr event Inflow = 8.75 cfs @ 12.02 hrs, Volume= 26,688 cf Outflow = 5.45 cfs @ 12.09 hrs, Volume= 26,687 cf, Atten= 38%, Lag= 4.2 min Primary = 5.45 cfs @ 12.09 hrs, Volume= 26,687 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,024.34' @ 12.09 hrs Surf.Area= 3,721 sf Storage= 5,219 cf Plug -Flow detention time= 29.6 min calculated for 26,678 cf (100% of inflow) Center -of -Mass det. time= 29.6 min ( 768.2 - 738.5 ) Volume Invert Avail.Storage Storage Description #1A 4,022.00' 576 cf 8.00'W x 95.00'L x 2.54'H Field A 1,932 cf Overall - 493 cf Embedded = 1,439 cf x 40.0% Voids #2A 4,022.50' 493 cf Cultec R-150XLHD x 18 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows #313 4,022.00' 1,614 cf 17.75'W x 125.75'L x 2.54'H Field B 5,673 cf Overall - 1,639 cf Embedded = 4,034 cf x 40.0% Voids #413 4,022.50' 1,639 cf Cultec R-150XLHD x 60 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #5C 4,022.00' 438 cf 4.75'W x 115.50'L x 2.54'H Field C 1,394 cf Overall - 301 cf Embedded = 1,094 cf x 40.0% Voids #6C 4,022.50' 301 cf Cultec R-150XLHD x 11 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows #7 4,022.50' 8 cf 12.0" Round 37 LF 12" HDPE L= 10.0' S= 0.0050 T #8 4,022.53' 47 cf 4.00'D x 3.76'H J131 #9 4,022.63' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0050 T #10 4,022.86' 42 cf 4.00'D x 3.34'H G12 #11 4,022.96' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0050 T #12 4,023.37' 35 cf 4.00'D x 2.75'H G11 #13 4,022.69' 33 cf 4.00'D x 2.63'H G14 #14 4,022.79' 70 cf 15.0" Round 57 LF 15" HDPE L= 57.0' S= 0.0050 T #15 4,023.10' 33 cf 4.00'D x 2.59'H G13 #16 4,022.56' 32 cf 4.00'D x 2.58'H J132 #17 4,022.56' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0050 T #18 4,022.75' 33 cf 4.00'D x 2.62'H G15 5,646 cf Total Available Storage Storage Group A created with Chamber Wizard `FIN Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 50-yr Rainfall= 10. 90" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 85 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.90' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.90' / 4,021.75' S= 0.0375 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,022.00' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,023.50' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,024.50' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=5.45 cfs @ 12.09 hrs HW=4,024.34' (Free Discharge) L =Culvert (Passes 5.45 cfs of 11.07 cfs potential flow) 2=Orifice (Orifice Controls 1.74 cfs @ 6.96 fps) 3=Weir (Weir Controls 3.71 cfs @ 3.31 fps) 4=Top of Wall ( Controls 0.00 cfs) 123 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 86 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 9 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 93.00' Row Length +12.0" End Stone x 2 = 95.00' Base Length 2 Rows x 33.0" Wide + 6.0" Spacing x 1 + 12.0" Side Stone x 2 = 8.00' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 18 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 2 Rows = 492.7 cf Chamber Storage 1,931.7 cf Field - 492.7 cf Chambers = 1,439.0 cf Stone x 40.0% Voids = 575.6 cf Stone Storage Chamber Storage + Stone Storage = 1,068.3 cf = 0.025 of Overall Storage Efficiency = 55.3% Overall System Size = 95.00' x 8.00' x 2.54' 18 Chambers 71.5 cy Field 53.3 cy Stone IPZII Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 87 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 12 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 123.75' Row Length +12.0" End Stone x 2 = 125.75' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 60 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 1,639.1 cf Chamber Storage 5,673.2 cf Field - 1,639.1 cf Chambers = 4,034.1 cf Stone x 40.0% Voids = 1,613.6 cf Stone Storage Chamber Storage + Stone Storage = 3,252.7 cf = 0.075 of Overall Storage Efficiency = 57.3% Overall System Size = 125.75' x 17.75' x 2.54' 60 Chambers 210.1 cy Field 149.4 cy Stone 00000 125 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 88 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows 11 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 113.50' Row Length +12.0" End Stone x 2 = 115.50' Base Length 1 Rows x 33.0" Wide + 12.0" Side Stone x 2 = 4.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 11 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 1 Rows = 300.7 cf Chamber Storage 1,394.4 cf Field - 300.7 cf Chambers = 1,093.8 cf Stone x 40.0% Voids = 437.5 cf Stone Storage Chamber Storage + Stone Storage = 738.2 cf = 0.017 of Overall Storage Efficiency = 52.9% Overall System Size = 115.50' x 4.75' x 2.54' 11 Chambers 51.6 cy Field 40.5 cy Stone 1-1 126 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 89 Pond 150XLHD: Cultec detention system Hydrograph I I I I I I I Inflow 8.75 cfS L ❑ Primary 9 - W111 aary Q►re�a— 71 s 6 5.45 cfS N 5 3 — — 4 I LILILL L 1L IL LI LILILIL 3 L L L LL11 2 -� I--� I �-I L I 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) MA Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 50-yr Rainfall= 10. 90" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 90 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 5.66" for 50-yr event Inflow = 22.83 cfs @ 12.04 hrs, Volume= 79,610 cf Primary = 22.83 cfs @ 12.04 hrs, Volume= 79,610 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link POST: Postconstruction Site Discharge Hydrograph 24 22 22.83 cfs T I T I T T 20 L I-L I-1 1_ 18� 0 12 LL 10L7'7;�'�j + 6-4. 2. J Inflov`r �4rea=168,784 isf IT 17 TI T I i r T T 1LLILIII-1L-1 L I t-IfilT11 I-1 t- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Inflow ❑ Primary 128 POSTCONSTRUCTION SITE CALCULATIONS 400-YEAR STORM EVENT 129 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 91 Summary for Subcatchment 1 S: Roof Runoff = 3.02 cfs @ 12.02 hrs, Volume= 9,242 cf, Depth=11.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 0.5 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 1S: Roof Hydrograph I I ❑Runoff 3.02 cfs -IT�e Ili 24-hi I I I 1 1 11 bU-�rr IR�ai%fal�=�12�.110�' RO nbff AOeOiO9,13521 sf 17 TRIQVloilu"�12421 2 LL lR�IlnlO7 P�ptf1=l1.86'I1 Flow Length=70 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 130 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 92 Summary for Subcatchment 2EX: Offsite Runoff = 8.23 cfs @ 12.04 hrs, Volume= 23,347 cf, Depth= 3.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite -k-I+ I—t H �- I --k I-4 �-I -k- 7 5 _o 1 LI1 I-1 L u. 4 Hydrograph ■ Runoff 8.23 cfs I +- I + I -4 h II`�4-h% -4 1 I I -O&y� Raintail='lill-& IR 4npff#re-aF-T1 j2471-sf Runoff Depth=3.93" 1 -Fiow-L�� t�26d' I I 11 1 U SAoia6.1 Q0-9v 1 1 11 1 Tc�=�-11 r0h) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 131 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 93 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 1.02 cfs @ 12.02 hrs, Volume= 3,105 cf, Depth=11.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN Description 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph I I 1.02 cfs I� �I IT�etl1 24-hi• I I I 1 1 11 bU-�rr IR�ai%fal�=�12�.110�' RO nbff Me01030 421 sf Ruggffl Vlollugne73,11 Q51 cf 6 o 'I� low Len h=1 4 IIII 1 I I I �Ib eL�.d1 � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 132 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 94 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 1.85 cfs @ 12.02 hrs, Volume= 5,638 cf, Depth=11.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min 2 0 1 LL Subcatchment 3S: North Parking/Driveway Hydrograph low-my, %m �— I � I —� I- Ty�el II+ 241hi 1 bU-�rr IR�ai%fal�=�12�.110�' ROnbff McOiO5,17051 sf Ruggffl Vlollulne75,16�81 cf T I -��!Olf- "t�'= .': Flow Len dh=; 7 eL�.2bb'�' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 133 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 95 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 1.00 cfs @ 12.02 hrs, Volume= 3,041 cf, Depth=11.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph 1.00 cfs 1 l ❑ Runoff T �e II+ 24-hi 1 bb-�r IRS i%fah=ii11& 1110nbff Me0103,10771 sf Ruggffl Vlollulne73,10411 cf L ow Len th=1 8 I I I �Ib eL�.do�d'i' I I I � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 134 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 96 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 1.17 cfs @ 12.02 hrs, Volume= 3,572 cf, Depth=11.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN Description 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph 1.17 cfs 1 0 LL � IIIII Ty aI II+ 241hi RO nbff Me0103,16151 sf Ruggffl Vlolluln�73,15721 cf lR�Ilrllo7 P�ptf1=l 1 86 91 Flow Length=70 � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 135 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 97 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 1.73 cfs @ 12.03 hrs, Volume= 5,142 cf, Depth=10.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total Subcatchment 6S: Front Parking Area to Gil Hydrograph 1.73 cfs Type1 III 24-h% 1 1 11 bb-�r'Rainfali=12.1 & Rtnbff Ate&II15,16611 sf Ruggffl Violpm�75,11421 cf LL Flow Length=72 tN=19b 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 136 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 98 Summary for Subcatchment 7S: Septic Area Runoff = 2.52 cfs @ 12.02 hrs, Volume= 6,816 cf, Depth= 4.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min MO Subcatchment 7S: Septic Area Hydrograph 2.52 cfs 1 1 1 1 1 1 'T��eI II+ 24!hr 1 bb-�r IRai%fali=li11& RluhdfflAlrea#1'9,1951 sf RuggfflVollume=16,8161 cf I Pep�hj. 1 uFlow Len th 9=2 01' �I Slope' = �I� 0.0730 '%' � � T'c�1 L21 mirk CN=145 Time (hours) ❑ Runoff 137 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 99 Summary for Subcatchment 8S: NW Wetland Area Runoff = 3.36 cfs @ 12.05 hrs, Volume= 9,331 cf, Depth= 6.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 8S: NW Wetland Area Hydrograph 3.36 cfs 3I 2 3 0 LL 1 It ITYpeI II+ 24!hir 1 b�-�►r IR�i%fal�=�12�.1I0�' RluhdfflAlrOa�116,I460I sf Ruggffl Vollugnp79,13�1 I cf Ruln?" i Pep�h7 . 0'I Flow Len th=2 6, �lb�eL�.a�o�d'�' 1 I fiT631.0fini i r� I CN=161 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 138 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 100 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 5.33 cfs @ 12.03 hrs, Volume= 15,016 cf, Depth= 9.81" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph i I I Runoff 5.33 cfs Type 1114�hi• 5 I 1 d0�yi Rainfall=l1 i11& �I —I 1 RgnpffArea$�3¢21-sf 4 �R off V I me- 5,016 c Mn Q I �� I l w Runoff -Depth=9.8V " 3'I Flow Length=256' LL L- L- I -t LL L -t I I L_ I L- I -1 $Iop=0.0200 't' 2 " I I I I I T0�=�•8 Min fi I T I-t I fi l rt�-18� o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 139 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 101 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 3.18 cfs @ 12.03 hrs, Volume= 8,626 cf, Depth= 7.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph III Ills �� III 3.1 s cfs 3 I I I I 1 1 1 1 11 b�-�►r IR�i%fal�=�12�.110�' Runoff l AlrOa�-- 112,19481 sf N 2 , -4 +RupgTVo1iump=8,g61zf 3 Runoff Depth=7. 91 LL Flow Length=3 3' �1b�eL0.041d '/' 1 1 1 1 +-t 1 1 T6k21A n{ i 6 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 140 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 102 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 11.67" for 100-yr event Inflow = 9.73 cfs @ 12.02 hrs, Volume= 29,740 cf Outflow = 6.78 cfs @ 12.08 hrs, Volume= 29,739 cf, Atten= 30%, Lag= 3.5 min Primary = 6.78 cfs @ 12.08 hrs, Volume= 29,739 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,024.52' @ 12.08 hrs Surf.Area= 3,686 sf Storage= 5,501 cf Plug -Flow detention time= 28.5 min calculated for 29,729 cf (100% of inflow) Center -of -Mass det. time= 28.6 min ( 765.9 - 737.3 ) Volume Invert Avail.Storage Storage Description #1A 4,022.00' 576 cf 8.00'W x 95.00'L x 2.54'H Field A 1,932 cf Overall - 493 cf Embedded = 1,439 cf x 40.0% Voids #2A 4,022.50' 493 cf Cultec R-150XLHD x 18 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows #313 4,022.00' 1,614 cf 17.75'W x 125.75'L x 2.54'H Field B 5,673 cf Overall - 1,639 cf Embedded = 4,034 cf x 40.0% Voids #413 4,022.50' 1,639 cf Cultec R-150XLHD x 60 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #5C 4,022.00' 438 cf 4.75'W x 115.50'L x 2.54'H Field C 1,394 cf Overall - 301 cf Embedded = 1,094 cf x 40.0% Voids #6C 4,022.50' 301 cf Cultec R-150XLHD x 11 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows #7 4,022.50' 8 cf 12.0" Round 37 LF 12" HDPE L= 10.0' S= 0.0050 T #8 4,022.53' 47 cf 4.00'D x 3.76'H J131 #9 4,022.63' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0050 T #10 4,022.86' 42 cf 4.00'D x 3.34'H G12 #11 4,022.96' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0050 T #12 4,023.37' 35 cf 4.00'D x 2.75'H G11 #13 4,022.69' 33 cf 4.00'D x 2.63'H G14 #14 4,022.79' 70 cf 15.0" Round 57 LF 15" HDPE L= 57.0' S= 0.0050 T #15 4,023.10' 33 cf 4.00'D x 2.59'H G13 #16 4,022.56' 32 cf 4.00'D x 2.58'H J132 #17 4,022.56' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0050 T #18 4,022.75' 33 cf 4.00'D x 2.62'H G15 5,646 cf Total Available Storage Storage Group A created with Chamber Wizard `«i Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 103 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.90' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.90' / 4,021.75' S= 0.0375 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,022.00' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,023.50' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,024.50' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=6.76 cfs @ 12.08 hrs HW=4,024.52' (Free Discharge) L =Culvert (Passes 6.76 cfs of 11.63 cfs potential flow) 2=Orifice (Orifice Controls 1.81 cfs @ 7.25 fps) 3=Weir (Weir Controls 4.90 cfs @ 3.71 fps) 4=Top of Wall (Weir Controls 0.04 cfs @ 0.45 fps) 142 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 104 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 2 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 9 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 93.00' Row Length +12.0" End Stone x 2 = 95.00' Base Length 2 Rows x 33.0" Wide + 6.0" Spacing x 1 + 12.0" Side Stone x 2 = 8.00' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 18 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 2 Rows = 492.7 cf Chamber Storage 1,931.7 cf Field - 492.7 cf Chambers = 1,439.0 cf Stone x 40.0% Voids = 575.6 cf Stone Storage Chamber Storage + Stone Storage = 1,068.3 cf = 0.025 of Overall Storage Efficiency = 55.3% Overall System Size = 95.00' x 8.00' x 2.54' 18 Chambers 71.5 cy Field 53.3 cy Stone 143 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 105 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 12 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 123.75' Row Length +12.0" End Stone x 2 = 125.75' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 60 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 1,639.1 cf Chamber Storage 5,673.2 cf Field - 1,639.1 cf Chambers = 4,034.1 cf Stone x 40.0% Voids = 1,613.6 cf Stone Storage Chamber Storage + Stone Storage = 3,252.7 cf = 0.075 of Overall Storage Efficiency = 57.3% Overall System Size = 125.75' x 17.75' x 2.54' 60 Chambers 210.1 cy Field 149.4 cy Stone 00000 `«1 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 106 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 1 rows 11 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 113.50' Row Length +12.0" End Stone x 2 = 115.50' Base Length 1 Rows x 33.0" Wide + 12.0" Side Stone x 2 = 4.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 11 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 1 Rows = 300.7 cf Chamber Storage 1,394.4 cf Field - 300.7 cf Chambers = 1,093.8 cf Stone x 40.0% Voids = 437.5 cf Stone Storage Chamber Storage + Stone Storage = 738.2 cf = 0.017 of Overall Storage Efficiency = 52.9% Overall System Size = 115.50' x 4.75' x 2.54' 11 Chambers 51.6 cy Field 40.5 cy Stone 1-1 145 Highlands Postconstruction w smaller Chambers2 Type 11124-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 107 Pond 150XLHD: Cultec detention system Hydrograph I I I I I I I I I I I I I I I I I I I I I I I I I I 9.73 cfs 10 I_ 9 L I—L 1-1 1 I 8 14 1-4 II 6.78 cfs 0 5 v. IIIIIIIIII 4 3 IIIIIIIII 2 f 1 2 3 4 5 6 IifIbW I Irea=30, 72-Is 4 4 Into lr g ez�g,-60 f-ci� J rt I- I� � �— TI-TI-I Ir -TI-1F 0 11 12 13 14 15 16 ' Time (hours) 19 20 21 22 23 24 25 26 27 28 29 30 Inflow ❑ Primary 146 Highlands Postconstruction w smaller Chambers2 Type 111 24-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 1/10/2020 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 108 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 6.60" for 100-yr event Inflow = 28.16 cfs @ 12.04 hrs, Volume= 92,875 cf Primary = 28.16 cfs @ 12.04 hrs, Volume= 92,875 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link POST: Postconstruction Site Discharge Hydrograph T T i —t — I ❑ Inflow 28 T T I T 1 T 28. % CfsP — lnflov`r Area=168,784 sf ❑ Pnmary 26r, I T T T T T H I T 24 22 20 1 T-I T I T 17 n 18 `16 1T TIC IT TI -ihTItITIT io 14 � 14 1-4- � � 1-4 1 1 4-1 � 12 10 8 6 T —t 1T 4- 2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) IEW APPENDIX C NRCS SOIL REPORT 148 b 301610 301640 301670 301700 35° S 17" N —� •fir.. ~ � -� ,f Z ~ 1f IL ■ As lob 35° 510"N 301610 301640 301670 301700 301730 301760 301790 3 o Map Scale: 1:1,480 if printed on A landscape (11" x 8.5") sheet. Meters N 0 20 40 80 120 Feet 0 50 100 200 300 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 G}DA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Macon County, North Carolina 301730 301760 301790 1 1 1 301820 112 3 a 301850 301880 301910 35° S 17" N 301820 301850 301880 35° S 10" N 301910 3 0 2/28/2019 Page 1 of 4 Hydrologic Soil Group —Macon County, North Carolina MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D Not rated or not available Soil Rating Lines r r A r r A/D r B B/D r r C 0 C/D r r D r r Not rated or not available Soil Rating Points 0 A 0 A/D ■ B ■ B/D MAP INFORMATION p C The soil surveys that comprise your AOI were mapped at 1:12,000. 0 C/D 0 D Warning: Soil Map may not be valid at this scale. p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Water Features line placement. The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed scale. Transportation §_§_+ Rails Please rely on the bar scale on each map sheet for map rJ Interstate Highways measurements. US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Major Roads Coordinate System: Web Mercator (EPSG:3857) Local Roads Maps from the Web Soil Survey are based on the Web Mercator Background projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the ® Aerial Photography Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Macon County, North Carolina Survey Area Data: Version 15, Sep 11, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 6, 2016—Oct 26, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. UU� Natural Resources Web St9C6urvey 2/28/2019 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Macon County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CuD Cullasaja-Tuckasegee complex, 15 to 30 percent slopes, stony A 2.3 58.3% EdC Edneyville-Chestnut complex, 8 to 15 percent slopes, stony A 0.0 0.2% Ud Udorthents, loamy C 1.6 41.5% Totals for Area of Interest 3.9 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. usDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/28/2019 Page 3 of 4 151 Hydrologic Soil Group —Macon County, North Carolina Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher uSDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/28/2019 Page 4 of 4 152