HomeMy WebLinkAbout20191305 Ver 1_More Info Received_20191024Moore, Andrew W
From: Jeremy Cobb <jeremy.cobb@broadwaygroup.net>
Sent: Thursday, October 24, 2019 12:47 PM
To: Moore, Andrew W
Subject: [External] Highlands Retail Development Project, Macon County
Attachments: Highlands, NC Site Plan rev10 24 19.pdf
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Andrew,
I've attached the revised site plan where I have added a detail with a typical cross section where the culvert is being
installed in the existing stream bed. The invert elevations shown on the plan are such that they are 20% below the
existing flowline. Please review and let me know if this will satisfy your comment about Condition 11.11 of 4139 being
satisfied.
We still haven't been able to get in touch with Macon County about if they are doing the stormwater review or not. I
will let you know when we hear from them.
Thanks,
Jeremy A. Cobb, P.E.
Civil Engineer
Broadway Management, LLC
216 Westside Square
Huntsville, AL 35801
(P) 256-533-7287
(F) 256-533-7236
1