Loading...
HomeMy WebLinkAbout20191305 Ver 1_SW Report_20191202STORMWATER MANAGEMENT REPORT FOR NEW RETAIL STORE U.S. HIGHWAY 64 / CASHIERS ROAD & CHERRYWOOD DR. HIGHLANDS, NC 11-22-2019 PREPARED FOR The Group Commercial Real Estate Development 216 Westsiae square • Huntsville, Al 35801 Phone:1256) 533-7287 • Fax:12561533-7236 CONTENTS I. PREDEVELOPMENT CONDITIONS............................................................................... I II. ANALYSIS METHODS .................................................... ................................................. I III. RAINFALL INFORMATION.............................................................................................I IV. EROSION CONTROL IMPEMENTATION SCHEDULE................................................2 V. POSTDEVELOPMENT CONDITIONS.............................................................................3 APPENDIX A. PRECONSTRUCTION SITE CALCULATIONS......................................4 DRAINAGEAREA MAP...............................................................................................................5 DRAINAGE ROUTING DIAGRAM..............................................................................................6 2, 5, 10, 25, 50, 100-YEAR STORM EVENT CALCULATIONS ......................................... 7 - 30 APPENDIX B. POSTCONSTRUCTION SITE CALCULATIONS..................................31 DRAINAGEAREA MAP.............................................................................................................32 DRAINAGE ROUTING DIAGRAM............................................................................................33 2, 5, 10, 25, 50, 100-YEAR STORM EVENT CALCULATIONS ..................................... 34 - 147 APPENDIX C. NRCS SOIL REPORT.................................................................... 148 - 152 PREPARED BY Bfoadway Civil Designs of NC,11C 218 Wesiside Sauare • fiunisYlle, ILL 35801 Phone':12561533-1287 • Fax:12561533-7230 H CAI? �f �446d►3Y v ,•4� .F,P , '•f. £4iY A. ,•. •to's I I It 1001, I. PREDEVELOPMENT CONDITIONS The site is a 2.24 acre piece of property located on the southwest side of U.S. Highway 64 (Cashiers Road) and Cherrywood Drive, in Macon County North Carolina. It is a previously developed site with a gravel driveway. The remaining portions of the lot are covered with grass and trees. There are two streams and two wetland areas present onsite. There is an unnamed tributary to Big Creek that runs from south to north alongside Cherrywood Drive. There is another unnamed tributary to Big Creek that runs from west to east neara the northern property line that forms two wetland areas before it flows into the creek adjacent to Cherrywood Drive. Existing onsite soils are classified as Cullasaja-Tuckasegee complex, Hydrologic Soil Group A, and Udorthents, Hydrologic Soil Group C. The site generally slopes from south to north at about 4.7%. Surface runoff flows north to the wetland area before flowing into the unnamed tributary to Big Creek. II. ANALYSIS METHODS In order to determine the pre- and post -development peak discharges and hydrographs of the drainage basins, drainage area maps were developed based upon a topographic survey performed by King Engineering of Concord, Inc., the USGS quad map of the area for the off -site drainage areas, and the proposed site design. From these maps, the SCS curve numbers and times of concentration were determined and input into HydroCAD 10.0, which calculated peak flows and hydrographs for each runoff basin by the SCS TR-20 method. Reach and pond storages and capacities were calculated by the storage -indication routing methods. III. RAINFALL INFORMATION Total rainfall depths for the studied storm events were obtained from NOAA Atlas 14 Volume 9 Version 2, Precipitation -Frequency Atlas of the United States, Southeastern States, available from the Precipitation Frequency Data Server (http://hdsc.nws.noaa.gov/hdsc/pfds). The events and corresponding 24-hour rainfall events are summarized below. Event Rainfall Depth, inches 2 year 5.79 5 year 7.13 10 year 8.19 25 year 9.68 50 year 10.90 100 year 12.10 IV. EROSION CONTROL IMPLEMENTATION SCHEDULE See the Initial, Intermediate, and Final Phase Erosion and Sedimentation Control plans accompanied this document for locations of the practices described below. INITIAL PHASE 1. Install construction exit pad (CEP) and type "A" silt fence (SB), double row where indicated. 2. Clear trees as needed. 3. Strip and stockpile topsoil (TSG), and remove unsuitable material. 5. Temporary seeding to be installed on areas where grading and stabilization operations have ceased and will not resume for 5 working days, or 7 calendar days, whichever is shorter. If a qualifying rain event is expected, temporary stabilization shall be achieved prior to the rain event. INTERMEDIATE PHASE 1. Begin grading site in the building and parking areas. 2. Construction exit pad (CEP), double row of type "A" silt fence (SB), and temporary seeding (TS) to remain and maintained as needed as grading progresses. 3. Install compost sock check dams (CS) in channels where indicated. 4. Install utilities (storm, sanitary, and water). Storm pipe outlet to be stabilized with outlet protection (OP). 5. Protect grate inlets with block and gravel inlet protection (BIP) after installation. 6. Concrete washout (GK) to be established and maintained as necessary once concrete pouring begins. FINAL PHASE 1. Maintain construction exit pad (CEP), double row of type "A" silt fence (SB), check dams (CS), and temporary seeding (TS) as site grading progresses. 2. Grade parking lot and construct building pad. Base, paving and building are to be installed after utility construction is completed. 3. Install sod (SOD) on areas indicated as soon as practicable. Appropriate plant material shall be installed area by area as site work permits. 4. Clean storm structures. Install any other permanent BMP. 5. Demuck all structural BMP's and safely dispose of material. Maintain silt fence until vegetation has achieved 100% coverage across site with 85% density, then remove. V. POSTDEVELOPMENT CONDITIONS This project consists of constructing a 9100 sq.ft. retail store with a 28-space parking lot and truck delivery area. The remaining areas will be landscaped with sod. Drainage from the roof will be discharged on the surface and directed towards the curb line of the rear parking lot area. All parking lot areas will be sloped to drain to one of five grate inlets located in the parking lot. Those inlets will be connected to an 18" HDPE pipe network that will convey stormwater to an underground detention chamber system located east of the building, near the driveway. Proposed slopes of the parking lot range from 1.0% to 3.5%, while the remaining grassed areas will be graded to a maximum slope of 4:1 H:V (25%). A. WATER QUALITY AND QUANTITY CONTROL In order to treat the first inch of stormwater runoff generated from this development, the underground detention chamber system will include a separator row system which will remove 80% of the total suspended solids (TSS) from the stormwater. The separator row is wrapped in filter fabric, and the system is designed so that stormwater entering the chambers must flow through the separator row first, filtering 80% TSS before flowing downward and filling the gravel bed and then the adjoining chambers. To control the increased discharges due to this development, the on -site stormwater will be detained in an underground detention chamber system. The chamber system will consist of 90 Cultec R-150XLHD chambers embedded in a gravel bed. The outflow will be controlled by the use of a 6"x6" orifice and an 18"xl2" weir in the outlet control box located near the northeast end of the parking lot. The orifices will force storm water to back up and be stored in the chambers. Discharge from the outlet control box will be directed to the northeast, where it will be discharged on the surface, and flow to the wetland area adjacent to the unnamed tributary to Big Creek. SITE DISCHARGE COMPARISON Event Predevelo ment, cfs Postdevelo ment, cfs Decrease, cfs 2 year 5.82 5.82 0.00 5 year 10.04 9.15 0.89 10 year 13.73 12.22 1.51 25 year 19.30 17.80 1.50 50 year 24.12 23.05 1.07 100 year 29.03 28.32 0.71 APPENDIX A PRECONSTRUCTION SITE CALCULATIONS DRAWN BY: JAC DATE: 03-27-2019 / NEW RETAIL STORE REVISED: 11-22-2019 CASHIERS ROAD HIGHLANDS, NC PRECONSTRUCTION MACON COUNTY CONDITIONS DRAINAGE AREA MAP Broadway Civil Designs of NC,PIIC SCALE: 1' = 100' 5 216WestsideSonora - Huntsville, At35801 Phone: 12561533-7287 - Fax: 12561533-7236 2EX Offsite PRE Preconstruction Site 1 EX Discharge Site DRAWN BY: JAC DATE: 03-27-2019 / NEW RETAIL STORE REVISED: 11-22-2019 CASHIERS ROAD 00 HIGHLANDS, NC PRECONSTRUCTION MACON COUNTY CONDITIONS DRAINAGE ROUTING Broadway Civil Designs of NC,PIIC g DIAGRAM 216westsideSquare •Nuntsaiile.a135801 Phone: 12561533-7287 - Fax: 12561533-7236 PRECONSTRUCTION SITE CALCULATIONS 2-YEAR STORM EVENT Highlands Preconstruction Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 1 EX: Site Runoff = 5.45 cfs @ 12.03 hrs, Volume= 15,170 cf, Depth= 1.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 5 4 3 3 0 LL 2 1 t- -k- I --k I-4 �--I -k- Subcatchment 1 EX: Site Hydrograph Ifi 1 t-Ifi1-t 1 5.45 cfs iy�eJl`-�4 ih% -4 1-1 4-1 IR4npff-A, r"e =W� $61* IRM off VQlyme7151170, cf — Runoff DeT -4 8T' IFiow L�n�gtk12661' 1 I I Isjoj)�.6400 -1' I I I Tc�=11.61 mil) fiItl-t r-1 tIrt _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 8 Highlands Preconstruction Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 2EX: Offsite Runoff = 0.60 cfs @ 12.08 hrs, Volume= 3,568 cf, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph 0.6 T 0.55 T 0.5 fit T I� �I 0.45 0.4 3 -22 0.3 0.25 T I t 1 0.2 l 0.15 1-4 —1 0.1 0.05 ❑ Runoff S4 I--� F-I T I T 17T�er�Ii 241h� - I ---j �-- I -L12�yi -kal+n'fa`-E O. 9# -t 1-� �-Iftrhotff ArefaO71,24-71 sf I I IN��ffIVP*I���'01 Cf _eeIpr 0� Flow Len �th=2 0 - IT TI T I T it eL0.11076 11 1 1 1 1 1 IT62i11niui 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 9 Highlands Preconstruction Type 111 24-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 3 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 1.33" for 2-yr event Inflow = 5.82 cfs @ 12.03 hrs, Volume= 18,738 cf Primary = 5.82 cfs @ 12.03 hrs, Volume= 18,738 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph ❑ Inflow ❑ Primary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 10 PRECONSTRUCTION SITE CALCULATIONS 5-YEAR STORM EVENT Highlands Preconstruction Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 1 EX: Site Runoff = 8.43 cfs @ 12.03 hrs, Volume= 22,727 cf, Depth= 2.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 1 EX: Site Hydrograph _ LI 11 L I 9 8.43 cfs 8 L I I I-t I L A L I I I -�_Jrki illhllfi1164.1[3�' 7 I I I I I I I I I I 11R4noff A,rga�97�5�61 s1t 6 IRM off VQIyrne7�217?71 cf 5 I�unof Dep�h.SQ" LL 4 IFiow -L�n�ti1296' ISio�6=6.Wd '/I' 3 1 T� 11.51irn 2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff iv, Highlands Preconstruction Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 2EX: Offsite Runoff = 1.75 cfs @ 12.05 hrs, Volume= 6,716 cf, Depth= 1.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph ��I I � IIII � IIIIII 1.75 cfs I I I I ITYpeI II+ 24-'hi 5Ly% Rain6110.1I3'I' Rau noff Areat71,1247I sf RuggfflVollume=,6,7161 cf p l 13" 0 1 IIIIII �7'ovv 4�1 �7"I I,LL Length=200 �lope-- 0.1000 'i' 1 Td:�111 mirk CND '43 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 13 Highlands Preconstruction Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 2.09" for 5-yr event Inflow = 10.04 cfs @ 12.03 hrs, Volume= 29,443 cf Primary = 10.04 cfs @ 12.03 hrs, Volume= 29,443 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph T—I-7I 1 1 7-I -7I--1 11 T T I T T 10.04 cfs 10 9 — 8 LI L I L IL 11 7 w 6 3 2 5 LL _ M TIT IT 4 — f � � ❑Inflow ❑Primary 1 LI L I L I L 4 1 I�- 1 4-1 -� 1-4 I� -t h �I tlt l T 7 TI T I T IT 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 14 PRECONSTRUCTION SITE CALCULATIONS 10-YEAR STORM EVENT 15 Highlands Preconstruction Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1 EX: Site Runoff = 10.96 cfs @ 12.03 hrs, Volume= 29,181 cf, Depth= 3.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 0 Subcatchment 1 EX: Site Hydrograph 1 10.96 cfs I 11 I I 10 9 N7 3611111111 0 LL 511111111 3 filrt I� �i 2 l II0A,R, ■ Runoff 17 I F1 -TII 4Jh �-1 I $gnpff�r�-4 0�7�"6�sf �1 +"gff�V�I �n el �9��11 cl IB noff-Depth -3.59" F�wl i n; gt� 266 1 I -Si0�6 b.wdiv V �-I 4 4 I- �-Tc I:I d �I filrt I� �I �Irt � 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) `[: Highlands Preconstruction Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 2EX: Offsite Runoff = 2.90 cfs @ 12.05 hrs, Volume= 9,691 cf, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps LO 3 0 LL 3 2 1 Subcatchment 2EX: Offsite Hydrograph 2.90 cfs I I I I I I ITYpeI II+ 24-1hi I � " '� 0 y� Rainfall 8�.19 I I I I 1 1 1 I RluiholffiAreat71,1247I sf RUggff volurnp�%,6�1 I Cf Runoff ulnoff Dep�h�11. 3'I Flow Len th=2 0' p T�C�2 � 11 rri i r� DN'43 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 17 Highlands Preconstruction Type 111 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 9 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 2.76" for 10-yr event Inflow = 13.73 cfs @ 12.03 hrs, Volume= 38,872 cf Primary = 13.73 cfs @ 12.03 hrs, Volume= 38,872 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph 15 14 / 13.73 cfs 12 11 + 19 L I -L I- N 0 7 / 3 2 1= } - Inflow Area=168,783 sf 17 4 I 4-1 I4 I� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Inflow ❑ Primary 18 PRECONSTRUCTION SITE CALCULATIONS 25-YEAR STORM EVENT 19 Highlands Preconstruction Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 1 EX: Site Runoff = 14.71 cfs @ 12.02 hrs, Volume= 38,777 cf, Depth= 4.77" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 1 EX: Site Hydrograph 16 15 LII --I L 14.71 cfs 14 13 12 11 10 w 9 o $ T T 7' LL ' 6 5 4-14 1-4 �-- 14-1 -I 4 3111illllil 4 �—I + �--i -L I —L I--] L1 iy��Ikl 4 h% r1 7 11 12--t-jr: IR-Jjh-fij llA.C& �-1--I �$ E-1 L' uIT9R !� del 1s��rl TI T I T . I IF I -U t�261 �I t I -t 1-� tsio-�6 -b.w"v 1 I 1 1 1 1 1 1 -� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 20 Highlands Preconstruction Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 2EX: Offsite Runoff = 4.77 cfs @ 12.04 hrs, Volume= 14,461 cf, Depth= 2.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph IIIIIIIIIII' I III III 5 4.77 cfs I 1 ley 1pe III �4 h% 4 -t L -t L I I I2$_yr]R�Wall=d.68-�' R4npff 4rpa�=71 j2471 sf -4 H 4R1un�off�VQl�rn�e7-�4�4�11 cl w 3 Runoff Depth=2.44" o f IIII 1 1 1 IFiow L�nJ tkl266' 2 l fi l rt l IS14-6.1Odd 11' 1 1 1 Tc7g-1 mirk 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 21 Highlands Preconstruction Type/1/ 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 12 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 3.79" for 25-yr event Inflow = 19.30 cfs @ 12.03 hrs, Volume= 53,237 cf Primary = 19.30 cfs @ 12.03 hrs, Volume= 53,237 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph SIT %I ►�I ICI j% fi �� �� � fi � �� � i ❑Inflow ❑Primary I �VW ���6�831sf 4-14 1-4 1 I 1 4-1 + 14 I� tIrt I� 1 I �I tIt Irt I-1 � -E I I C 0 E:I I I I I-T Il E: 1-14 1-4 1 I 4-1 + 14 I� I- It I� 1 I �I tIt I- � 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) `lr: PRECONSTRUCTION SITE CALCULATIONS 50-YEAR STORM EVENT 23 Highlands Preconstruction Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 1 EX: Site Runoff = 17.87 cfs @ 12.02 hrs, Volume= 46,982 cf, Depth= 5.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 1E 1E 17 1E 1E 14 12 12 11 3 1C o LL ii Subcatchment 1 EX: Site Hydrograph I I I L I -1 I--� L— I -L I - L I - 1 1-1 1 ■Runoff 17.87 cfs - �-1 4-1 -I �-14-I-I � 1 4 I-4k-- 1 4-1 -I 14 I--� H fi �I � I � I� L-1 ty�b 11Ir-�41h% � I °Ifu � � Runoff -Depth -5.78" �I I�F�o-w)L�n�t�266' � 14- 14 I � � I +ToO H 4- 14 I � �-1 + 14 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 24 Highlands Preconstruction Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 2EX: Offsite Runoff = 6.46 cfs @ 12.04 hrs, Volume= 18,786 cf, Depth= 3.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph k-I �I ' '- �I � i� � I-4 ' 6.46 cfs Type III 4h- 6 1 1 1 1 1 1 1 1 1 1 1 5O�yi Rainfall=110.0& 5 -1 -F I -g4 off#r�-aFTl;2471 sf � �Rlun+off-Y77okim�e��8 7$6 c 3 4 1 1 1 1 (Runoff Depth=3.16" �ioW1 te; gtk-�26 LL 3 1 1 1 1 1 1 Slop6=0.100011' 2 T i i Tc7g-1 min 77 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 25 Highlands Preconstruction Type 111 24-hr 50-yr Rainfall= 10. 90" Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 15 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 4.68" for 50-yr event Inflow = 24.12 cfs @ 12.03 hrs, Volume= 65,768 cf Primary = 24.12 cfs @ 12.03 hrs, Volume= 65,768 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph ❑ Inflow ❑ Primary Time (hours) 26 PRECONSTRUCTION SITE CALCULATIONS 100-YEAR STORM EVENT 27 Highlands Preconstruction Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 1 EX: Site Runoff = 21.03 cfs @ 12.02 hrs, Volume= 55,290 cf, Depth= 6.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 42,492 76 Woods/grass comb., Fair, HSG C 6,800 98 Ex. Road 48,244 43 Woods/grass comb., Fair, HSG A 97,536 61 Weighted Average 90,736 93.03% Pervious Area 6,800 6.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 296 0.0470 3.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 1 EX: Site Hydrograph 23 22 2; 1.03 cfsI ICI 1114-h% 20 I 14 1� H -/� 4-1 -t� H 4- 1d�y�-#aaWh:41 1& � 18 17 l- -1 fil - - -$ 1415 —l— I�� 1� - � I —l— — — — — "°I��V i� 1 5 1 u 13 Runoff-Depth=6.89" .2 10 I � --Ifi = -I — - 1-Fiew �n jt 2J6' 9 T I-T 1-7 F71 T7 I F71 7 1-T 17 SII16�6:�b.UWV' s 7 +- I-+ I� 1--I J- I H i- I-+ 1� �-I +Tc�:II-I 6 4 � I � 1-1 CI � I E1 _ L I � I:] �I 112 �71 2 4 I� 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 28 Highlands Preconstruction Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 2EX: Offsite Runoff = 8.23 cfs @ 12.04 hrs, Volume= 23,347 cf, Depth= 3.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite -k-I+ I—t H �- I --k I-4 �-I -k- 7 5 _o 1 LI1 I-1 L u. 4 Hydrograph ■ Runoff 8.23 cfs I +- I + I -4 h II`�4-h% -4 1 I I -O&y� Raintail='lill-& IR 4npff#re-aF-T1 j2471-sf Runoff Depth=3.93" 1 -Fiow-L�� t�26d' I I 11 1 U SAoia6.1 Q0-9v 1 1 11 1 Tc�=�-11 r0h) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 29 Highlands Preconstruction Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 9/25/2019 HydroCADO 10.00-24 s/n 05474 © 2018 HydroCAD Software Solutions LLC Page 18 Summary for Link PRE: Preconstruction Site Discharge Inflow Area = 168,783 sf, 8.82% Impervious, Inflow Depth = 5.59" for 100-yr event Inflow = 29.03 cfs @ 12.03 hrs, Volume= 78,636 cf Primary = 29.03 cfs @ 12.03 hrs, Volume= 78,636 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link PRE: Preconstruction Site Discharge Hydrograph T I T I 1 7- 32 30 29.03 cfs 28 I L I A I A 26 24 I T I T I T I T1-1 22 20 1 t T I-t I-t �16 � T1� 1-4 3 16 0 M14 L CIA IA 12 10 1 TI T I T IT 6 T I� 4 I �- ❑Inflow ❑ Primary ���b�, ��e�1���sl�s� LIT 1A U LI LIT 1A I� L TIT IT 17 TI TIT IT IT T TIC ItI-fI� II �-i �, — IA L-1 L 17 IT 17 TI T I T IT IT T ti-t 1� H �� fi1T I-f I� 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 30 APPENDIX B POSTCONSTRUCTION SITE CALCULATIONS 31 DRAWN BY: JAC DATE: 03-27-2019 / NEW RETAIL STORE REVISED: 11-22-2019 CASHIERS ROAD HIGHLANDS, NC POSTCONSTRUCTION MACON COUNTY CONDITIONS DRAINAGE AREA MAP Broadway Civil Designs of NC,PIIC SCALE: 1 ' = 10 0' 32 216 Westside Sonora • Huntsville, At 35801 Phone: 12561533-7287 - Fax: 12561533-7236 (2EX) Offsite 1 S North Parking/Driveway 8S JV We land Area Roof V I�7 \ Postcon ruction 2S Di charge Delivery/Dumpster Area 150XLH Cultec eten i system (i� 7S Front Parking Area to G12 Front Parking Area to G11 Septic Area East Driveway Aisle Cherrywood Dr/Driveway Cashiers Rd. R.O.W. DRAWN BY: JAC DATE: 03-27-2019 / NEW RETAIL STORE REVISED: 11-22-2019 CASHIERS ROAD 00 HIGHLANDS, NC POSTCONSTRUCTION MACON COUNTY CONDITIONS DRAINAGE ROUTING Broadway Civil Designs of NC,PIIC 33 DIAGRAM 216westsideSquare •Nuntsaiile.a135801 Phone: 12561533-7287 - Fax: 12561533-7236 POSTCONSTRUCTION SITE CALCULATIONS 2-YEAR STORM EVENT 34 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 1 S: Roof Runoff = 1.44 cfs @ 12.02 hrs, Volume= 4,327 cf, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 0.5 U 0p 0 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 1S: Roof Hydrograph ��ilii�lll li 1.44 cfs Tyi�el III 24-hi 121y% I6iri 11�=09'I' RO nbff AOeOiO9,13521 sf RuggfflVlollumn 74,13?71cf Rulnpff Delp�h�5�. 51I� Flow Len h �b�e bb � I I I I I T�C�1 �21 r>riir� 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 35 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 2EX: Offsite Runoff = 0.60 cfs @ 12.08 hrs, Volume= 3,568 cf, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph 0.6 T 0.55 T 0.5 fit T I� �I 0.45 0.4 3 -2 0.3 0.25 T I t 1 0.2 l 0.15 1-4 —1 0.1 0.05 ❑ Runoff S4 I--� F-I T I T 17T�er�Ii 241h� - I ---j �-- I -L12�yi -kal+n'fa`-E O. 9# -t 1-� �-Iftrhotff ArefaO71,24-71 sf I I IN��ffIVP*I���'01 Cf _eeIpr 0� Flow Len �th=2 0 - IT TI T I T it eL0.11076 11 1 1 1 1 1 IT62i11niui 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 36 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 0.48 cfs @ 12.02 hrs, Volume= 1,454 cf, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN Description 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph ❑ Runoff 0.5 0.48 cfs T�ielfli 24=h� 0.45 2-�%�au�fa`-I-I 5171� 0 4 L I-L I� U -i L-1 L I ft nbfff-Arle�li 13,11421 sf 0.351-4 �Ryqqff�vP"44 0 025 t-I + ��u Q _qe 5� - FI w L n �h=124 LL 0.2 fi l fi l t 1- �1 -r l t eL0.d1 0.15 F-I - T 17 FT-6=�—j 12Trr i6 0.1 Q114-VO 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 37 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 0.88 cfs @ 12.02 hrs, Volume= 2,640 cf, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min Subcatchment 3S: North Parking/Driveway Hydrograph -1 I 1-4 1-4 0.95 0.9 0.85 0.88 cfs rye �Te�fl-h 0.8 4-1 �- 14 1 W 4 � W12�yi• a faFtf� 719' 0.75 0.7 � I + 14 1 �- - 4 P ftnbfff-Aisle 1=5,70-51 Sf 0.65 0.6 � I + 14 1 H 4 FRY irffY071P rp-P �27,W10 w 0.55 0045 I+14 H 4 I� 11 Q Ip r"'54 - a 0.4 0.35 �1+14 1�1 H4-I4 v� L =a 2� O �n L d 0.3 -H + 1 � H H H + I 16il 12ffiil rii 0.25 0.2 + 0.15 0.1 4 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 38 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 0.47 cfs @ 12.02 hrs, Volume= 1,424 cf, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph 0.5 L I L L o.47 cfs l -1 L I L L 1 LT e�11 241 h% 0.45 ' I I I I I � I� �I � 12�yi•�ta�falH�5�719'k 0.4 0.35 4 4 H RLinbfff-AOe�1=la,I0T71 S# 0.3 L I + 1 � 1�1� ��p� u rpe �1��41 ".57 cf c 0.25 L I t 1—t Lu r�� .2 Flow Len th=1 8 0.2 eLa .;0 0.15 1 1 1T6=614nii6 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 39 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 0.56 cfs @ 12.02 hrs, Volume= 1,673 cf, Depth= 5.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN Description 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph 0.6 � � � � � � � � � ❑Runoff 0.55 fit l 0.56 cfs fi � T e II 241h 0.5 I_ I I I 121 i Italirif�11:6090 0.45 Li me d - I L I RO n-Off-A"e -' L,16151 0.4 - 1 + 14 I y"ff+Vo1urp-� +t16T31 cf Zia 0 00 3 F 1 T 17 Coll �Ip� 5f` To-� - LL 0.25 T� V n� h= 0 2 I- I� 0.15 fi fi I t t I NF=9 0.1 0.05 I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 40 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 0.78 cfs @ 12.03 hrs, Volume= 2,197 cf, Depth= 4.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total Subcatchment 6S: Front Parking Area to Gil Hydrograph T I— T- 0.78 cfs --4 0.75 0.7 I L I I I -i 0.65 0.6 ITITI�II 0.55 1-I t Irt 1 t-I 0.5 - 0.45 0 + 0.4 _ LL 0.35 I�I�I�II 0.3 0.25 L I I I -L 0.2 0.15 - - -0.1 �I 1-4T�e�i �4!h% L I L 12�y%-F60N 0. 9J F-1 ft nTOFArie T , I68-11 s-f Pq"Tv1°tprp— O FI O u Q �,pT74.-14vv -IowLeng th=7T L-I L I I -i U Lth= 9d F-1 7IT17 F F1T1-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff Ell Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 7S: Septic Area Runoff = 0.25 cfs @ 12.05 hrs, Volume= 1,150 cf, Depth= 0.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min 0.26 0.24 0.22 02 I �14-1- I 0.18 0.16 a TIT 17 3 0.14 L I I —L I —I LL 0.12 0.1 n ns Subcatchment 7S: Septic Area Hydrograph .-L- I--L I I I I -i- I I I I L---I L-- 0.211 I__j �I 1_jTe 12+41h IRtt hoff 'AreIzO1 ,I1951 sf T I� I�N��PIu� ����I Cf I� L_IuQIn r7I2" o e� 3� Is6=iI 121 rr ii -T T' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 42 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 8S: NW Wetland Area Runoff = 0.87 cfs @ 12.05 hrs, Volume= 2,560 cf, Depth= 1.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 8S: NW Wetland Area Hydrograph 0.95 -4 — 1-4 — ❑Runoff 0 9 0.85 ---- 8 0 .7 cfs 1 4 H I H 4 1 JT�e-fl i it h-� 0-8 k I H 14 H H H H H 12 y%-kaki f":65j" 0.75 0`7 1 H 1 1 — H HR-tOoff IAre00--*,1401 sf 0.65 0.6 H I H 14 1 H I H IH PW�PTVP�UT��Z,5-1740I Cf w 0.55 0 H 1 H 1 H 1 H I - I H H I _ Q Ip T H 4 00.5 LL 0.4 0.35 H H Hi H H ova Lin =2W HL Od 0.3 I H H t6:63iOir ri# 0.25 0.2 - H H H I H I H H 0.15 — 0.1 i I H - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 43 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 2.15 cfs @ 12.03 hrs, Volume= 5,806 cf, Depth= 3.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph ■ Runoff 2.15 cfs Tyl � 2 1 1 1 121y% Rai rllfall�=09'1' Rluihdffl Area#118,13621 sf Ruggffl Vlollume�5,8Q61 cf Runpfl Pe,pth-=3.7I9'1, .2 -Flow Length=256 1 1 1 1 1 1 1 1 �1b�eL0.026d'i' T6:46niirIll 1 1 CND=182 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 44 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 1.01 cfs @ 12.03 hrs, Volume= 2,751 cf, Depth= 2.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=5.79" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph i III�� 1.01 cfsl I � � � � 1 Thy e II+�24-hir 121y% lkt iinfa ll�=09'I' Rluihdffl AlrOa�--112,19481 sf Ruggffl Vlollugnp=2,7�1 i cf 3 Rulnpfl Pe,p�h=2 ' 55Flow Len th=83' �1b�eL�.a�4�d T641 ni i 6 CN=169 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 45 Highlands Postconstruction w smaller Chambers Type 111 24-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 12 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 5.38" for 2-yr event Inflow = 4.59 cfs @ 12.02 hrs, Volume= 13,714 cf Outflow = 1.30 cfs @ 12.29 hrs, Volume= 13,713 cf, Atten= 72%, Lag= 16.3 min Primary = 1.30 cfs @ 12.29 hrs, Volume= 13,713 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,022.67' @ 12.29 hrs Surf.Area= 3,680 sf Storage= 3,194 cf Plug -Flow detention time= 33.5 min calculated for 13,713 cf (100% of inflow) Center -of -Mass det. time= 33.4 min ( 781.2 - 747.8 ) Volume Invert Avail.Storage Storage Description #1A 4,021.25' 687 cf 40.50'W x 23.25'L x 2.54'H Field A 2,393 cf Overall - 675 cf Embedded = 1,718 cf x 40.0% Voids #2A 4,021.75' 675 cf Cultec R-150XLHD x 24 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows #313 4,021.25' 1,476 cf 24.25'W x 84.75'L x 2.54'H Field B 5,224 cf Overall - 1,534 cf Embedded = 3,689 cf x 40.0% Voids #413 4,021.75' 1,534 cf Cultec R-150XLHD x 56 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows #5C 4,021.25' 307 cf 17.75'W x 23.25'L x 2.54'H Field C 1,049 cf Overall - 281 cf Embedded = 767 cf x 40.0% Voids #6C 4,021.75' 281 cf Cultec R-150XLHD x 10 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #7 4,021.65' 8 cf 12.0" Round 10 LF 12" HDPE L= 10.0' S= 0.0083 T #8 4,021.80' 56 cf 4.00'D x 4.49'H J131 #9 4,021.90' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0100 T #10 4,022.37' 48 cf 4.00'D x 3.83'H G11 #11 4,022.47' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0100 '/' #12 4,023.29' 36 cf 4.00'D x 2.83'H G11 #13 4,021.80' 44 cf 4.00'D x 3.49'H G14 #14 4,021.90' 102 cf 18.0" Round 58 LF 18" HDPE L= 58.0' S= 0.0100 T #15 4,022.51' 40 cf 4.00'D x 3.18'H G13 #16 4,021.94' 40 cf 4.00'D x 3.20'H J132 #17 4,022.04' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0100 T #18 4,022.41' 37 cf 4.00'D x 2.96'H G15 5,627 cf Total Available Storage Storage Group A created with Chamber Wizard 46 Highlands Postconstruction w smaller Chambers Type 111 24-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 13 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.15' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.15' / 4,021.10' S= 0.0125 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,021.25' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,022.75' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,023.75' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=1.30 cfs @ 12.29 hrs HW=4,022.67' (Free Discharge) L =Culvert (Passes 1.30 cfs of 6.08 cfs potential flow) 2=Orifice (Orifice Controls 1.30 cfs @ 5.19 fps) 3=Weir ( Controls 0.00 cfs) 4=Top of Wall ( Controls 0.00 cfs) 47 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 14 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 12 Rows x 33.0" Wide + 6.0" Spacing x 11 + 12.0" Side Stone x 2 = 40.50' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 24 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 12 Rows = 675.5 cf Chamber Storage 2,393.3 cf Field - 675.5 cf Chambers = 1,717.8 cf Stone x 40.0% Voids = 687.1 cf Stone Storage Chamber Storage + Stone Storage = 1,362.6 cf = 0.031 of Overall Storage Efficiency = 56.9% Overall System Size = 23.25' x 40.50' x 2.54' 24 Chambers 88.6 cy Field 63.6 cy Stone 48 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 15 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 8 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 82.75' Row Length +12.0" End Stone x 2 = 84.75' Base Length 7 Rows x 33.0" Wide + 6.0" Spacing x 6 + 12.0" Side Stone x 2 = 24.25' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 56 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 7 Rows = 1,534.4 cf Chamber Storage 5,223.6 cf Field - 1,534.4 cf Chambers = 3,689.2 cf Stone x 40.0% Voids = 1,475.7 cf Stone Storage Chamber Storage + Stone Storage = 3,010.1 cf = 0.069 of Overall Storage Efficiency = 57.6% Overall System Size = 84.75' x 24.25' x 2.54' 56 Chambers 193.5 cy Field 136.6 cy Stone 49 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 16 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 10 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 281.5 cf Chamber Storage 1,048.9 cf Field - 281.5 cf Chambers = 767.5 cf Stone x 40.0% Voids = 307.0 cf Stone Storage Chamber Storage + Stone Storage = 588.4 cf = 0.014 of Overall Storage Efficiency = 56.1 % Overall System Size = 23.25' x 17.75' x 2.54' 10 Chambers 38.8 cy Field 28.4 cy Stone 50 Highlands Postconstruction w smaller Chambers Type 11124-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 17 Pond 150XLHD: Cultec detention system Hydrograph HI IH IH H fi I H I H H H t— IH I I I I I I I I 14.59 cfs IHHITI 4 IIIIIIIIIII a 3 3 0 1 0 0 1 2 3 4 5 6 7 1.30 cfs I Wi6W1 IAii6a=30,�71Ist I I Sfoir g6=6J,1194 6t I IIHIIIIIIIHI IIHIIIIIIIHI IIIIIIIIIIII H L-I L I L I I I H I- I I I H I I 1 1 1 1 1 1 1 1 10 11 12 13 14 15 16 17 18 Time (hours) 23 24 25 26 27 28 29 30 S Inflow ❑ Primary 51 Highlands Postconstruction w smaller Chambers Type 111 24-hr 2-yr Rainfall=5.79" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 18 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 2.10" for 2-yr event Inflow = 5.82 cfs @ 12.04 hrs, Volume= 29,549 cf Primary = 5.82 cfs @ 12.04 hrs, Volume= 29,549 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link POST: Postconstruction Site Discharge Hydrograph ❑ Inflow ❑ Primary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 52 POSTCONSTRUCTION SITE CALCULATIONS 5-YEAR STORM EVENT 53 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 1 S: Roof Runoff = 1.78 cfs @ 12.02 hrs, Volume= 5,370 cf, Depth= 6.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 0.5 3 1 0 LL 0p 0 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 1S: Roof Hydrograph ��ilii�lll li 1.78 cfs Tyi�e1Ili 24-hi 51y% Iaiirifai11�7�.113'I' RO nbff Arte0109,13521 sf Ruggffl VIollugn�75,13701 cf . IIII 1 �mr 4E1h�' � Flow Len h . ' � I I I I I T�C�1 �21 r>riir� 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 54 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 2EX: Offsite Runoff = 1.75 cfs @ 12.05 hrs, Volume= 6,716 cf, Depth= 1.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph ��I I � IIII � IIIIII 1.75 cfs I I I I ITYpeI II+ 24-'hi 5Ly% Rain6110.1I3'I' Rau noff Areat71,1247I sf RuggfflVollume=,6,7161 cf p l 13" 0 1 IIIIII �7'ovv 4�1 �7"I I,LL Length=200 �lope-- 0.1000 'i' 1 Td:�111 mirk CND '43 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 55 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 0.60 cfs @ 12.02 hrs, Volume= 1,804 cf, Depth= 6.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fDs 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph 0.65 + 14 I + ❑Runoff 0.60 cfs 0.6 TITIT IT � TI TITIT — T eA 24-h� 0.55 L I+� L I 5 yi•�ta fa�N� 1 0.5 0.45 + + + H + ftnbfff AOe�i=la,114-2I sf 0.4 �f rmq lVp Mr"=I �j1� 4ICf 3 0.35 T + u Q ep�17 � ° 0.3 FI w L n �h=14 LL 0.25 T l rt l rt lI �I fi l rt eL0.d1d 0.2 II I16=� 12lri{hi 0.15 T I T 1-4 4 I H�--QN=00 0.1 0.05 17 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 56 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 1.09 cfs @ 12.02 hrs, Volume= 3,276 cf, Depth= 6.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min Subcatchment 3S: North Parking/Driveway Hydrograph 1.09 cfs 51y% 06infa 11�=�.1131I' ROnbff Me0105,17051 sf Ruggffl Vlolpkne73,12761 cf eL.b2bb9'Runpff Delp�h�6. � LL Fowen=11' � I I I I I T�C�1 �21 r>riir� 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 57 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 0.59 cfs @ 12.02 hrs, Volume= 1,767 cf, Depth= 6.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos w 0 LL 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph TTIT 1 1 1 1 T1T 1 1 0.59 cfs �1 ITI T IA TIT IT IT T T �— I T 14 I AtA T I� 0.25 T I T 17 0.2 0.15 0.1 T11 I T T IT�elIi 14 h� �I � 15�yi•�a�faFtf��11� T I RO nTDfff ArFe-;� 1a OT71 s-f IRqgq�VP�Mr"p=11 1�f71 __1 _, up Q ep�h7 97 ow Len th=1 8 TI TI T L Od L-I T I T I-i I-T6==j J2rriuj 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 58 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 0.69 cfs @ 12.02 hrs, Volume= 2,076 cf, Depth= 6.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN Description 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph 1— +I -+ I --I �—I L I + 0.75 0.7 Li L I LI _ 0.69 cfs L I L I L I L Tied I- 0.65 I L I t 1 rt l I— I� f-1 L 15ti•-ka �f 11�7fi.113� 0.s 0.55 1 4- 1 �- 1l, 3, Io6y1551 Sf R nbff(f� �I""I��II---n,I- �A08 45 4-1 + I — u�Y �~T �j� r� 0.35 U. 0.3 I I Ti I I I I - I �_ I I I I � 1 / �nr erigt � I I I �pieL(�-01�0 0.25 L 1 t 11 �-1 L -t I -i 1file jztf�-A 0.2 0.15 L 1 L L 1 L 1 IL LI L I L I L LI LCN7-9-8 0.1 n nr _ + 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 59 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 0.98 cfs @ 12.03 hrs, Volume= 2,817 cf, Depth= 5.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total 3 0 LL Subcatchment 6S: Front Parking Area to Gil Hydrograph 0.98 cfs Type1Ili 24-h% 151y% Rainfa ll�=�.113'I' ROnbff AlllteA05,1661 I sf Ruggffl Volluln��2,18171 cf RulnOff Qeip�h7�.95" Flow Length=72' Tc1 1.2� nA6 ,N=06 Illlllli 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 60 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 7S: Septic Area Runoff = 0.61 cfs @ 12.03 hrs, Volume= 2,077 cf, Depth= 1.30" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min Subcatchment 7S: Septic Area Hydrograph 0.65 0.61 cfs 0.6 I t I t 1� l I I-1 �I t t 1 --T�e IIi 2-4!h4 0.55 I I II 1 �1y�al; fu�11 05 I4 4 1--� HRU hoof IAre01--010,119-51 sf 0.45 0.4 T T 7 INN1°`fFa5 p71 Cf 0 0.35 Li I 1� - I-1 LI u Q Ip r__L .2 0.3 Flow Len th=2 0 0.25 fi l fi l l I� �1 t l t -eLa .d7-id _ P 0.15 14 + I 1— N= 0.1 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 61 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 8S: NW Wetland Area Runoff = 1.35 cfs @ 12.05 hrs, Volume= 3,835 cf, Depth= 2.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 8S: NW Wetland Area Hydrograph 1.35 cfs l��I I I I I ITYpeI II+ 24!hir 51y% l�aiirifaill�7�.113'I' 1 1 -4 1110 66ff l-Arda�- % 7460 IV 1 Ruggffl Vollugnp=3,8�5 cf RuInpfl Pe,p�h=2 ' 80U-Flow Len th=26' I III I I I I I I I �1b�eL�.a�o�d'�' 1 1T6C 314n{16 CN=161 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 62 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 2.83 cfs @ 12.03 hrs, Volume= 7,709 cf, Depth= 5.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph 1- 1 -Li�I� 3 F 2.83 cfs Type ' I 1124-h r 151yll- RairlfaI14.113'I' Rluihdffl Alrea$118,13621 sf 2 RuggfflVlolluTn 77,17Q91cf Rulnoff Depth=5. 4'1, LL Flow Length=2 6 o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 63 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 1.45 cfs @ 12.03 hrs, Volume= 3,907 cf, Depth= 3.62" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 5-yr Rainfall=7.13" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph 1.45 cfs l��I I I I I ITYpeI II+ 24!hir 151y % l�aiirifaill=7�.1I3'I' Rluihdffl AlrOa�--112,1948I sf RuggfflNlolluTp=3,9Q7i cf RuInpfl Pep�h=3.16.2" LL Flow Len th=383' III III I I I I I I I �lb�eL�.a�4�d '�' T6=21.1 n{ i 6 CN=I69 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 64 Highlands Postconstruction w smaller Chambers Type 111 24-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 30 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 6.72" for 5-yr event Inflow = 5.69 cfs @ 12.02 hrs, Volume= 17,110 cf Outflow = 1.90 cfs @ 12.23 hrs, Volume= 17,110 cf, Atten= 67%, Lag= 12.4 min Primary = 1.90 cfs @ 12.23 hrs, Volume= 17,110 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,022.95' @ 12.23 hrs Surf.Area= 3,722 sf Storage= 3,914 cf Plug -Flow detention time= 32.9 min calculated for 17,110 cf (100% of inflow) Center -of -Mass det. time= 32.9 min ( 777.3 - 744.4 ) Volume Invert Avail.Storage Storage Description #1A 4,021.25' 687 cf 40.50'W x 23.25'L x 2.54'H Field A 2,393 cf Overall - 675 cf Embedded = 1,718 cf x 40.0% Voids #2A 4,021.75' 675 cf Cultec R-150XLHD x 24 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows #313 4,021.25' 1,476 cf 24.25'W x 84.75'L x 2.54'H Field B 5,224 cf Overall - 1,534 cf Embedded = 3,689 cf x 40.0% Voids #413 4,021.75' 1,534 cf Cultec R-150XLHD x 56 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows #5C 4,021.25' 307 cf 17.75'W x 23.25'L x 2.54'H Field C 1,049 cf Overall - 281 cf Embedded = 767 cf x 40.0% Voids #6C 4,021.75' 281 cf Cultec R-150XLHD x 10 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #7 4,021.65' 8 cf 12.0" Round 10 LF 12" HDPE L= 10.0' S= 0.0083 T #8 4,021.80' 56 cf 4.00'D x 4.49'H J131 #9 4,021.90' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0100 T #10 4,022.37' 48 cf 4.00'D x 3.83'H G11 #11 4,022.47' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0100 '/' #12 4,023.29' 36 cf 4.00'D x 2.83'H G11 #13 4,021.80' 44 cf 4.00'D x 3.49'H G14 #14 4,021.90' 102 cf 18.0" Round 58 LF 18" HDPE L= 58.0' S= 0.0100 T #15 4,022.51' 40 cf 4.00'D x 3.18'H G13 #16 4,021.94' 40 cf 4.00'D x 3.20'H J132 #17 4,022.04' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0100 T #18 4,022.41' 37 cf 4.00'D x 2.96'H G15 5,627 cf Total Available Storage Storage Group A created with Chamber Wizard 65 Highlands Postconstruction w smaller Chambers Type 111 24-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 31 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.15' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.15' / 4,021.10' S= 0.0125 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,021.25' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,022.75' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,023.75' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=1.89 cfs @ 12.23 hrs HW=4,022.95' (Free Discharge) L =Culvert (Passes 1.89 cfs of 7.65 cfs potential flow) 2=Orifice (Orifice Controls 1.45 cfs @ 5.80 fps) 3=Weir (Weir Controls 0.44 cfs @ 1.51 fps) 4=Top of Wall ( Controls 0.00 cfs) 66 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 32 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 12 Rows x 33.0" Wide + 6.0" Spacing x 11 + 12.0" Side Stone x 2 = 40.50' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 24 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 12 Rows = 675.5 cf Chamber Storage 2,393.3 cf Field - 675.5 cf Chambers = 1,717.8 cf Stone x 40.0% Voids = 687.1 cf Stone Storage Chamber Storage + Stone Storage = 1,362.6 cf = 0.031 of Overall Storage Efficiency = 56.9% Overall System Size = 23.25' x 40.50' x 2.54' 24 Chambers 88.6 cy Field 63.6 cy Stone 67 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 33 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 8 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 82.75' Row Length +12.0" End Stone x 2 = 84.75' Base Length 7 Rows x 33.0" Wide + 6.0" Spacing x 6 + 12.0" Side Stone x 2 = 24.25' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 56 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 7 Rows = 1,534.4 cf Chamber Storage 5,223.6 cf Field - 1,534.4 cf Chambers = 3,689.2 cf Stone x 40.0% Voids = 1,475.7 cf Stone Storage Chamber Storage + Stone Storage = 3,010.1 cf = 0.069 of Overall Storage Efficiency = 57.6% Overall System Size = 84.75' x 24.25' x 2.54' 56 Chambers 193.5 cy Field 136.6 cy Stone 68 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 34 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 10 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 281.5 cf Chamber Storage 1,048.9 cf Field - 281.5 cf Chambers = 767.5 cf Stone x 40.0% Voids = 307.0 cf Stone Storage Chamber Storage + Stone Storage = 588.4 cf = 0.014 of Overall Storage Efficiency = 56.1 % Overall System Size = 23.25' x 17.75' x 2.54' 10 Chambers 38.8 cy Field 28.4 cy Stone 69 Highlands Postconstruction w smaller Chambers Type 111 24-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 35 Pond 150XLHD: Cultec detention system Hydrograph 5.69 cfs TITIT - T LILT 4 N 3 3 0 LL 2 III' 1 0 1 2 3 4 5 6 ❑ Inflow ❑ Primary Inflow Area=30,572 sf T I Peak Elev=4,022.95' Storage=3,914 cf I- 1.90 cfs -� at �IIIIIIIIIIIIIII 10 11 12 13 14 15 16 17 18 Time (hours) 23 24 25 26 27 28 29 30 70 Highlands Postconstruction w smaller Chambers Type 11124-hr 5-yr Rainfall= 7.13 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 36 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 2.94" for 5-yr event Inflow = 9.15 cfs @ 12.04 hrs, Volume= 41,354 cf Primary = 9.15 cfs @ 12.04 hrs, Volume= 41,354 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs 0 a U 3 0 LL Link POST: Postconstruction Site Discharge Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) Inflow ❑ Primary 71 POSTCONSTRUCTION SITE CALCULATIONS 10-YEAR STORM EVENT 72 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 1 S: Roof Runoff = 2.04 cfs @ 12.02 hrs, Volume= 6,196 cf, Depth= 7.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 0.5 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 1S: Roof Hydrograph I I 2.04 cfs 2 + I� 1 I I I IT�e-li 24-hi joLyi• Oza 1411�41191h ROnbff AOeOiO9,3521 sf Ruggffl Vlollugn�76,11 P61 cf L I _L 1 _�n?j 4elp�hT7I_ 5,1� Flow een h= 11 1 1 1 1 fib eL�g�4�17I II � � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 73 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 2EX: Offsite Runoff = 2.90 cfs @ 12.05 hrs, Volume= 9,691 cf, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps LO 3 0 LL 3 2 1 Subcatchment 2EX: Offsite Hydrograph 2.90 cfs I I I I I I ITYpeI II+ 24-1hi I � " '� 0 y� Rainfall 8�.19 I I I I 1 1 1 I RluiholffiAreat71,1247I sf RUggff volurnp�%,6�1 I Cf Runoff ulnoff Dep�h�11. 3'I Flow Len th=2 0' p T�C�2 � 11 rri i r� DN'43 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 74 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 0.69 cfs @ 12.02 hrs, Volume= 2,082 cf, Depth= 7.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN Description 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph 0.75 0.7 L I � _ 0.69 cfs L -L-L -[ Tied I- 0.65 t 1 t 1--t l I— fi110�% a �f 11� 119 06 0.55 1 � �- 1 Ri nbbffAJrie4 Z.11421 sf T � - � PI"l, I'�I-- - ((fj-�'-- rrt� - ,,9#21cf 45 —u Sul R,pT7�� 0.35 .2 - LI w O 1 t I t- -t I 1 file jZ4� 16 0.2 .2 0.15 L 1 I Li 1 L1 U L_1 L I I I-L L_I LCN7-9-8 0.1 n nr 1—� + _ + 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 75 Highlands Postconstruction w smaller Chambers Type /// 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 1.25 cfs @ 12.02 hrs, Volume= 3,780 cf, Depth= 7.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min Subcatchment 3S: North Parking/Driveway Hydrograph 1.25 cfs T��e II+ 24-hi i oLyi• lka 1411�4119'h 1 I ROnbff AOeOiO5j051 sf Ruggffl Vlollugn�73,17g01 cf RI u�IowLen npf 4elp h77.9j5'I� h=127 �.b2bb � 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 76 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 0.67 cfs @ 12.02 hrs, Volume= 2,039 cf, Depth= 7.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph ❑Runoff 0.7 0.65 o.67 cfs -�T�p e� 0.55 �- 1 14 1 1 4 1 � H ft "fff-Aillei�-Ia,107-71 sf 0.4- qep�h77 5 LL 0.35 — — NOW Lenqth: 1%� 8! 0.25 0.2 fi I T I rt fi rt 1 rt fT6� 1z�ir� 0.2 0.1 '7 I __I r r--I n nx 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 77 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 0.79 cfs @ 12.02 hrs, Volume= 2,395 cf, Depth= 7.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fDs 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph + + 1--4 + 1 —4 ❑Runoff 0.85 0.8 L I I I 0.79 I cfs L1 L-L 1�T 24Ih> 0.7 T 1 T 17 1 1 F I -T T I elh� T110Ty%:kaillrllf":61k11!Y� 0.65 t 1 t 1 rt 1 1 t-1 1 �- 1 RO nbfff-p►Out 161-51 sf 0.6 0.55 + I P9rh PTVPIMrpf =1z1�1'0,51 Cf w 0.5 a 0.45 — �Ypj� 0.4 U. 0.35 1 /���� Q / A Wr -LVngW 1-IIIJJJ tid j j� f 0.3 0.25 V VVV ����777 VVVV IT6=� 12-1rril ui 0.2 0.15 T I T 1-T 1 1-1 fi 11 r-I T T 1 I r1 1c Nr-" 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 78 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 1.14 cfs @ 12.03 hrs, Volume= 3,310 cf, Depth= 6.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total N 3 LL Subcatchment 6S: Front Parking Area to Gil 1 [�-1 t l t l--� h t Hydrograph 2� 1 Typel Ili 24-h% t I tiOOLyr Rai nfal1�4.119'I' ROnbff Ate&�5,16611 sf Ruggffl Viol,um�73,13101 cf Rulnoff Qeip�h7f-9;9' Flow Length=72' Tc-12 ni i 6 t'N=19b Illlllli 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 79 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 7S: Septic Area Runoff = 0.95 cfs @ 12.03 hrs, Volume= 2,939 cf, Depth= 1.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min Subcatchment 7S: Septic Area Hydrograph 0.95 cfs l��I 'TYpeI II+ 24!hi• JOLyr Rain6ll- 8.119'I' RIu hdff Area=19,1951 sf RuggfflVollume72,19�91 cf Ruln? j Pe,p�h7l,. 4'I� LL Flow Length=2 0 Slope=0.0730 T "T'c�1 L21 mirk 1 I I CN=145 Time (hours) ❑ Runoff 80 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment 8S: NW Wetland Area Runoff = 1.76 cfs @ 12.05 hrs, Volume= 4,925 cf, Depth= 3.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 8S: NW Wetland Area Hydrograph 1.76 cfs l��I I I I I ITYpeI II+ 24!hir I JOLyi• 061411�41I9111 RluhdfflAlrOa�--116,I460I sf Ruggffl Vollugnp=4,9?51 cf 0RT1r �e,plh= ' YI, - Flow Len th=2�6 LL �1b�eL0.00�d T6=631.01 nil16 I CN=I61 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 81 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 3.37 cfs @ 12.03 hrs, Volume= 9,243 cf, Depth= 6.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph 3 3 2 LL IIIIIIIII TT T T T i i I I � Runoff 3.37 cfs ITY eI II+ 241hi T M T I T -OLyi• h"i fill1�= 9'1' Rluihdffl AlrOa$118,13621 sf Ruggffl VlolluT�79,I2431 cf Rulnoff Delpth=C.04'I Flow Length=256' §160eL0.0260 'i' + T 1 - T640tn irk 1 1 CND=182 o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 82 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 1.81 cfs @ 12.03 hrs, Volume= 4,868 cf, Depth= 4.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=8.19" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph 2 T— I t 1.81 cfs l��I I I I I ITYpeI II+ 24!hir 1 1 1 I I 'COLy i• 061411�41I9111 RluhdfflAlrOa�--112,1948I sf l l Ruggffl Vollugnp=4,8g81 cf 0R7?j 1 �elpth=4. 'I,.2 ow Length=3 3 �1b�eL0.041d'�' T6=621.1 ni i 6 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 83 Highlands Postconstruction w smaller Chambers Type 111 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 48 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 7.77" for 10-yr event Inflow = 6.55 cfs @ 12.02 hrs, Volume= 19,801 cf Outflow = 2.68 cfs @ 12.14 hrs, Volume= 19,800 cf, Atten= 59%, Lag= 7.1 min Primary = 2.68 cfs @ 12.14 hrs, Volume= 19,800 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,023.13' @ 12.14 hrs Surf.Area= 3,736 sf Storage= 4,299 cf Plug -Flow detention time= 31.5 min calculated for 19,800 cf (100% of inflow) Center -of -Mass det. time= 31.5 min ( 773.9 - 742.4 ) Volume Invert Avail.Storage Storage Description #1A 4,021.25' 687 cf 40.50'W x 23.25'L x 2.54'H Field A 2,393 cf Overall - 675 cf Embedded = 1,718 cf x 40.0% Voids #2A 4,021.75' 675 cf Cultec R-150XLHD x 24 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows #313 4,021.25' 1,476 cf 24.25'W x 84.75'L x 2.54'H Field B 5,224 cf Overall - 1,534 cf Embedded = 3,689 cf x 40.0% Voids #413 4,021.75' 1,534 cf Cultec R-150XLHD x 56 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows #5C 4,021.25' 307 cf 17.75'W x 23.25'L x 2.54'H Field C 1,049 cf Overall - 281 cf Embedded = 767 cf x 40.0% Voids #6C 4,021.75' 281 cf Cultec R-150XLHD x 10 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #7 4,021.65' 8 cf 12.0" Round 10 LF 12" HDPE L= 10.0' S= 0.0083 T #8 4,021.80' 56 cf 4.00'D x 4.49'H J131 #9 4,021.90' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0100 T #10 4,022.37' 48 cf 4.00'D x 3.83'H G11 #11 4,022.47' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0100 '/' #12 4,023.29' 36 cf 4.00'D x 2.83'H G11 #13 4,021.80' 44 cf 4.00'D x 3.49'H G14 #14 4,021.90' 102 cf 18.0" Round 58 LF 18" HDPE L= 58.0' S= 0.0100 T #15 4,022.51' 40 cf 4.00'D x 3.18'H G13 #16 4,021.94' 40 cf 4.00'D x 3.20'H J132 #17 4,022.04' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0100 T #18 4,022.41' 37 cf 4.00'D x 2.96'H G15 5,627 cf Total Available Storage Storage Group A created with Chamber Wizard 84 Highlands Postconstruction w smaller Chambers Type 111 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 49 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.15' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.15' / 4,021.10' S= 0.0125 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,021.25' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,022.75' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,023.75' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=2.68 cfs @ 12.14 hrs HW=4,023.13' (Free Discharge) L =Culvert (Passes 2.68 cfs of 8.38 cfs potential flow) 2=Orifice (Orifice Controls 1.54 cfs @ 6.14 fps) 3=Weir (Weir Controls 1.14 cfs @ 2.11 fps) 4=Top of Wall ( Controls 0.00 cfs) 85 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 50 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 12 Rows x 33.0" Wide + 6.0" Spacing x 11 + 12.0" Side Stone x 2 = 40.50' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 24 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 12 Rows = 675.5 cf Chamber Storage 2,393.3 cf Field - 675.5 cf Chambers = 1,717.8 cf Stone x 40.0% Voids = 687.1 cf Stone Storage Chamber Storage + Stone Storage = 1,362.6 cf = 0.031 of Overall Storage Efficiency = 56.9% Overall System Size = 23.25' x 40.50' x 2.54' 24 Chambers 88.6 cy Field 63.6 cy Stone 09, Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 51 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 8 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 82.75' Row Length +12.0" End Stone x 2 = 84.75' Base Length 7 Rows x 33.0" Wide + 6.0" Spacing x 6 + 12.0" Side Stone x 2 = 24.25' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 56 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 7 Rows = 1,534.4 cf Chamber Storage 5,223.6 cf Field - 1,534.4 cf Chambers = 3,689.2 cf Stone x 40.0% Voids = 1,475.7 cf Stone Storage Chamber Storage + Stone Storage = 3,010.1 cf = 0.069 of Overall Storage Efficiency = 57.6% Overall System Size = 84.75' x 24.25' x 2.54' 56 Chambers 193.5 cy Field 136.6 cy Stone 87 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 52 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 10 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 281.5 cf Chamber Storage 1,048.9 cf Field - 281.5 cf Chambers = 767.5 cf Stone x 40.0% Voids = 307.0 cf Stone Storage Chamber Storage + Stone Storage = 588.4 cf = 0.014 of Overall Storage Efficiency = 56.1 % Overall System Size = 23.25' x 17.75' x 2.54' 10 Chambers 38.8 cy Field 28.4 cy Stone 88 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 53 Pond 150XLHD: Cultec detention system Hydrograph 6.55 cfs L 7 �a�fl�o-�ry Q►re�a-�,�-71--s� 6 I I I I I I I IP�k1 bi6v=�,�0�31.43� 5 Sfoir ge 4,290 6t 14 I--4 HLO I� 4 �I I-1 L_I LI 3 0 LL 3 2.68 cfs 2 L �IIIIIIIIIIIIII J I7 F-I T-ITITI7 I- 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Time (hours) 21 22 23 24 25 26 27 28 29 30 Inflow ❑ Primary 89 Highlands Postconstruction w smaller Chambers Type 111 24-hr 10-yr Rainfall=8.19" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 54 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 3.66" for 10-yr event Inflow = 12.22 cfs @ 12.04 hrs, Volume= 51,466 cf Primary = 12.22 cfs @ 12.04 hrs, Volume= 51,466 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link POST: Postconstruction Site Discharge Hydrograph ❑ Inflow ❑ Primary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 90 POSTCONSTRUCTION SITE CALCULATIONS 25-YEAR STORM EVENT 91 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment 1 S: Roof Runoff = 2.42 cfs @ 12.02 hrs, Volume= 7,356 cf, Depth= 9.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 0.5 0 70 Total, Increased to minimum Tc = 1.2 min t I I—t I-- Subcatchment 1S: Roof Hydrograph 2.42 cfs 1 Tyi�e1 III 24-hi 110 nbff AOeOiO9,13521 sf Ruggffl Vlolluln�77,13�61 cf IIII I I Ri ulnp �.e,p�h7�- 4'FI ogth 0, fit rt I� w en �Ib eL'64 '1' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 92 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 56 Summary for Subcatchment 2EX: Offsite Runoff = 4.77 cfs @ 12.04 hrs, Volume= 14,461 cf, Depth= 2.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph IIIIIIIIIII' I III III 5 4.77 cfs I 1 ley 1pe III �4 h% 4 -t L -t L I I I2$_yr]R�Wall=d.68-�' R4npff 4rpa�=71 j2471 sf -4 H 4R1un�off�VQl�rn�e7-�4�4�11 cl w 3 Runoff Depth=2.44" o f IIII 1 1 1 IFiow L�nJ tkl266' 2 l fi l rt l IS14-6.1Odd 11' 1 1 1 Tc7g-1 mirk 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 93 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 57 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 0.81 cfs @ 12.02 hrs, Volume= 2,472 cf, Depth= 9.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN Description 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph 0.9 fiITI 1111 1111 111 1�-1T 0.85 os tITI� 0.81 cfs �I t tI� T e�Ii iA 1h °o7 I� �I — 0.65 - 1 + 14 4 I--] H�Jffnf bbfff-Aille�=-a,{1�421 Sf 0.6 0.55 1 T 1 �l �P-�- -�TP 'I -" 0.5 0 045 Li T 1- � I� LI L Ip r_'� - LL 0.35 T 1 T 1 I 1 TI 1- w L n h=124 T T eL, 0.3 0.25 T I I I— -I - — - ��� 12 r�j6 02 1 fi 1 T I� 1-1 r- 1 -r T 1 rt r1 �N--" 0.15 0.1 / 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 94 Highlands Postconstruction w smaller Chambers Type /// 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 58 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 1.48 cfs @ 12.02 hrs, Volume= 4,488 cf, Depth= 9.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min Subcatchment 3S: North Parking/Driveway Hydrograph 1.48 cfs Tyi�e1Ili 24-hi �5Lyi• 110nbff A te�iO5,17Q51 sf 1Iu�QVl�lue7-4,181C IIII 1 Ri uln?j 4e,p�h7�.4'I; Flow Len h=1�7 IIII 1 I I I �Ib eL�.b2bb'�' � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 95 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 59 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 0.80 cfs @ 12.02 hrs, Volume= 2,420 cf, Depth= 9.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph 0.85 0.80 cfs °.75 o; fi l rt l 11 rt I� �I5y%afa�ll�6� 0.65 t 1 t 1--� l 1 1 �- 1R-0 nbff -AOe--a,107-71 sf 0.6 0.55 - 1 + 14 H 1 4 PW1 PTVOUTJ° ?WOO Cf 0.45 14- 0.35 L I I-i L L 1 L 1 I 0.3 0.25 IT6:�-1 ii rril ui 0.2 0.15 fi 1 T -r rt I I I 1�-c Nf-" 0.1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 96 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 60 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 0.93 cfs @ 12.02 hrs, Volume= 2,844 cf, Depth= 9.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN Description 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph — �- 1 0.93 cfs I I I I I Tyi�e1Ili 24-hi I �5Lyi• 110 nbff Me0103,16151 sf R u gaff l Vlollu ln�72,18441 c f IIII 1 Ri uln?j �.e,p�h7�4'LL FI w en h� , �b�edd d� � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 97 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 61 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 1.37 cfs @ 12.03 hrs, Volume= 4,007 cf, Depth= 8.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total Subcatchment 6S: Front Parking Area to Gil Hydrograph 1.37 cfs Type1 III 24-hr l l l l �5Lyr Rainfall=9.68" —I I -ROnbff Ate&�5,16-81IV u Iff Volum 4 0 7 II III I I I I�mQ I � � ����IQI c f Runoff Qeip�h�A,6'i, LL Flow Length=72 t'N=19b I' Illlllli 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 98 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 62 Summary for Subcatchment 7S: Septic Area Runoff = 1.51 cfs @ 12.02 hrs, Volume= 4,304 cf, Depth= 2.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min 1 in LL Subcatchment 7S: Septic Area Hydrograph 1.51 cfs 'TeeIlli 241hi• �5Lyr Rain611§.68'I' RluhdfflArea=19,195, sf �upgffj Vloilume74,1394j cf l l Ruln? j Pe,p�h7?. 9'I' Flow Length=2 0 Slope=0.0730 T Time (hours) ❑ Runoff 99 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 63 Summary for Subcatchment 8S: NW Wetland Area Runoff = 2.35 cfs @ 12.05 hrs, Volume= 6,544 cf, Depth= 4.77" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 8S: NW Wetland Area Hydrograph 1 � I- 3 0 LL 1 IT I_ T ❑ Runoff ITYpeI II+ 24!hir 1 �5�y% litaii-rif�]1l 461-wv RluhdfflAlrOa�116,14601 sf RuggfflVolium p=6,5441 cf Runoff Depth=4.7I7'I Flow Length=226' T T IT �loeLo.od � T6=6314 nil16 I I CN=161 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 100 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 64 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 4.12 cfs @ 12.03 hrs, Volume= 11,426 cf, Depth= 7.47" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph 4.12 cfs 4 Type III 24-hr 12$-err Rainfall=9.68" - I -Rpnpff Area��t8,3621-Sf 3 RMni Q� off V I m- 1 4 c I IIe�� ��6I Runoff Depth=7.47" 3 Flow ength=256' 2 �I Slope=6.0200 T o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 101 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 65 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 2.33 cfs @ 12.03 hrs, Volume= 6,268 cf, Depth= 5.81" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=9.68" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph 2.33 cfs l��I ITYpeI Ili 24=hir �I 2 -4 H 7 RluhdfflAlrOa�112,1948I sf RuggfflVolium p=6,2g8i cf 1 Run off Depth=5.81" LL Length=3831' 1 -t �1o�eL0.041d')' T6=621.1 ni i 6 CPI=I69 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 102 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 66 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 9.26" for 25-yr event Inflow = 7.76 cfs @ 12.02 hrs, Volume= 23,586 cf Outflow = 4.25 cfs @ 12.10 hrs, Volume= 23,586 cf, Atten= 45%, Lag= 4.9 min Primary = 4.25 cfs @ 12.10 hrs, Volume= 23,586 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,023.41' @ 12.10 hrs Surf.Area= 3,720 sf Storage= 4,787 cf Plug -Flow detention time= 29.8 min calculated for 23,586 cf (100% of inflow) Center -of -Mass det. time= 29.7 min ( 769.8 - 740.1 ) Volume Invert Avail.Storage Storage Description #1A 4,021.25' 687 cf 40.50'W x 23.25'L x 2.54'H Field A 2,393 cf Overall - 675 cf Embedded = 1,718 cf x 40.0% Voids #2A 4,021.75' 675 cf Cultec R-150XLHD x 24 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows #313 4,021.25' 1,476 cf 24.25'W x 84.75'L x 2.54'H Field B 5,224 cf Overall - 1,534 cf Embedded = 3,689 cf x 40.0% Voids #413 4,021.75' 1,534 cf Cultec R-150XLHD x 56 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows #5C 4,021.25' 307 cf 17.75'W x 23.25'L x 2.54'H Field C 1,049 cf Overall - 281 cf Embedded = 767 cf x 40.0% Voids #6C 4,021.75' 281 cf Cultec R-150XLHD x 10 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #7 4,021.65' 8 cf 12.0" Round 10 LF 12" HDPE L= 10.0' S= 0.0083 T #8 4,021.80' 56 cf 4.00'D x 4.49'H J131 #9 4,021.90' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0100 T #10 4,022.37' 48 cf 4.00'D x 3.83'H G11 #11 4,022.47' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0100 '/' #12 4,023.29' 36 cf 4.00'D x 2.83'H G11 #13 4,021.80' 44 cf 4.00'D x 3.49'H G14 #14 4,021.90' 102 cf 18.0" Round 58 LF 18" HDPE L= 58.0' S= 0.0100 T #15 4,022.51' 40 cf 4.00'D x 3.18'H G13 #16 4,021.94' 40 cf 4.00'D x 3.20'H J132 #17 4,022.04' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0100 T #18 4,022.41' 37 cf 4.00'D x 2.96'H G15 5,627 cf Total Available Storage Storage Group A created with Chamber Wizard 103 Highlands Postconstruction w smaller Chambers Type/1/ 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 67 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.15' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.15' / 4,021.10' S= 0.0125 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,021.25' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,022.75' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,023.75' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=4.25 cfs @ 12.10 hrs HW=4,023.41' (Free Discharge) L =Culvert (Passes 4.25 cfs of 10.20 cfs potential flow) 2=Orifice (Orifice Controls 1.66 cfs @ 6.65 fps) 3=Weir (Weir Controls 2.58 cfs @ 2.87 fps) 4=Top of Wall ( Controls 0.00 cfs) 104 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 68 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 12 Rows x 33.0" Wide + 6.0" Spacing x 11 + 12.0" Side Stone x 2 = 40.50' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 24 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 12 Rows = 675.5 cf Chamber Storage 2,393.3 cf Field - 675.5 cf Chambers = 1,717.8 cf Stone x 40.0% Voids = 687.1 cf Stone Storage Chamber Storage + Stone Storage = 1,362.6 cf = 0.031 of Overall Storage Efficiency = 56.9% Overall System Size = 23.25' x 40.50' x 2.54' 24 Chambers 88.6 cy Field 63.6 cy Stone 105 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 69 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 8 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 82.75' Row Length +12.0" End Stone x 2 = 84.75' Base Length 7 Rows x 33.0" Wide + 6.0" Spacing x 6 + 12.0" Side Stone x 2 = 24.25' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 56 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 7 Rows = 1,534.4 cf Chamber Storage 5,223.6 cf Field - 1,534.4 cf Chambers = 3,689.2 cf Stone x 40.0% Voids = 1,475.7 cf Stone Storage Chamber Storage + Stone Storage = 3,010.1 cf = 0.069 of Overall Storage Efficiency = 57.6% Overall System Size = 84.75' x 24.25' x 2.54' 56 Chambers 193.5 cy Field 136.6 cy Stone 106 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 70 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 10 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 281.5 cf Chamber Storage 1,048.9 cf Field - 281.5 cf Chambers = 767.5 cf Stone x 40.0% Voids = 307.0 cf Stone Storage Chamber Storage + Stone Storage = 588.4 cf = 0.014 of Overall Storage Efficiency = 56.1 % Overall System Size = 23.25' x 17.75' x 2.54' 10 Chambers 38.8 cy Field 28.4 cy Stone 107 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 71 Pond 150XLHD: Cultec detention system Hydrograph I I I I I I I I I I I I I I I I I I I I I I I I I I 7.76 cfs 7 IIIIIIIIIII IIIIIIIIII� 6 IIIIIIII 5 I TITIT17 4.25cfS 0 4- 3 v.I fi l� l rt ti t I 2 n 0 1 2 3 4 5 I Itift W1 IA%6aL30,672Isf IPie k1 EI�v1= ,b�3L�1 I I Sfo%alg6:�4,1816t IIIIIIIIIIIIIII I7F-ITITITI7 Irtlrt I� r-I fil _­Irt I__� ItIt I- +I-+ I—i _I ­_I +I+ I- 10 11 12 13 14 15 16 17 18 Time (hours) 23 24 25 26 27 28 29 30 Inflow ❑ Primary 108 Highlands Postconstruction w smaller Chambers Type 111 24-hr 25-yr Rainfall=9.68" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 72 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 4.73" for 25-yr event Inflow = 17.80 cfs @ 12.05 hrs, Volume= 66,588 cf Primary = 17.80 cfs @ 12.05 hrs, Volume= 66,588 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link POST: Postconstruction Site Discharge Hydrograph 19 18 4- 14 1 17.80 _ cfs 16 15 14 13 12 U 11 10 + 3 9 LL 8 - - - 7 6 XLI -L I A 5 4 3 f _ � � � ❑Inflow El Primary 4-14 1-4 1 I � 14-1 4- 1 � I� � H +- I + 14 I� 7 17 17 T-I TIT I-1 I7 F -1 U LI A -1 L-1 L 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 109 POSTCONSTRUCTION SITE CALCULATIONS 50-YEAR STORM EVENT i`n Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 73 Summary for Subcatchment 1 S: Roof Runoff = 2.72 cfs @ 12.02 hrs, Volume= 8,307 cf, Depth=10.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 3 0 LL 0.5 3 0 0& 0 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 1S: Roof Hydrograph 1 t I t —F I—T I fi l --r I--� 1 t I t I� I I I I I I I I 2.72 cfs I I I I I I I I I �� T e II+ 24-hir �6-�r IR�Ik6h=i O.9& l -4 -4 1-RUnbff-4ife0i=9,1521-sf Ruggffl Vlollugne78,13Q71 cf Lq.�js'I Flowen h=7 1 1 1 t L g��0;, I T�C�1 �21 r>riir� 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff liiffil Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 74 Summary for Subcatchment 2EX: Offsite Runoff = 6.46 cfs @ 12.04 hrs, Volume= 18,786 cf, Depth= 3.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite Hydrograph k-I �I ' '- �I � i� � I-4 ' 6.46 cfs Type III 4h- 6 1 1 1 1 1 1 1 1 1 1 1 5O�yi Rainfall=110.0& 5 -1 -F I -g4 off#r�-aFTl;2471 sf � �Rlun+off-Y77okim�e��8 7$6 c 3 4 1 1 1 1 (Runoff Depth=3.16" �iow te; gtk-�26 LL 3 1 1 1 1 1 1 Slop6=0.100011' 2 T i i Tc7g-1 min 77 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff `sm Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 75 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 0.92 cfs @ 12.02 hrs, Volume= 2,791 cf, Depth=10.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN Description 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph 1 0.92 cfs Type' III 24-hi• 1 6-yr IR�Ik6h=i O.9& RO nbff AOeOiO30 421 sf Ruggffl Vlollugne72j1 lj cf o I I IIII 1 �� °f� Pgpt�=� q. s�1, low Len h=124 I I I � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 113 Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 76 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 1.66 cfs @ 12.02 hrs, Volume= 5,067 cf, Depth=10.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min Subcatchment 3S: North Parking/Driveway Hydrograph 1 1 1 I l 1.66 cfs Ty el III24-hi• l l l l l l l l �6-�r IR�Ik6h=i 0.9& ROnbff McOiO5,17051 sf L --t L I L � LRUTQf tVO1UInn��5,U? c 0 °f� Pg�t'1=1 q.�js'I; low Len h=127 I C I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff ISE] Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 77 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 0.90 cfs @ 12.02 hrs, Volume= 2,733 cf, Depth=10.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph 0.90 cfs Type' III 24-hi• 1 6-yr IR�Ik6h=i O.9& ROnbff Me0103,10771 sf Ruggffl Vlollugne72J1 31 cf o low Len th=1 8 IIII 1 I I I �Ib eL�.do�d ��� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 115 Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 78 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 1.05 cfs @ 12.02 hrs, Volume= 3,211 cf, Depth=10.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN Description 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fos 3 0 LL 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph 1.05 cfs 1 15(�_�►r IR�iinfal�=�1 d.9�0�' RO nbff Me0103,16151 sf Ruggffl Vlolluln�73,1?J 11 cf Pgpt�=j q. 6'I, Flow Len h=7 �b�edd d� � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 116 Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 79 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 1.55 cfs @ 12.03 hrs, Volume= 4,579 cf, Depth= 9.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total 3 LL Subcatchment 6S: Front Parking Area to Gil Hydrograph 1.55 cfs Type III 24-h% 16-�r Rai nfialkl0.9& Rtnbff Ate&�5,16611 sf t-R�u qf# Violpme74,1-5791-ef RI ulnOff Qeip�h7�.6,7.. Flow Length=72' Tc1 1.2' nA 6 t'N=19b Illlllli 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff IMN Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 80 Summary for Subcatchment 7S: Septic Area Runoff = 2.00 cfs @ 12.02 hrs, Volume= 5,531 cf, Depth= 3.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min Subcatchment 7S: Septic Area '�illll U- 1 Hydrograph 2.00 cfs T��e lli 41hi 1 6-_ r Rainfall=16.9'& RluhdfflArea=19,195, sf RuggfflVollume75,15�1 I cf � I lung elp h7 619 Flow Length=2 0' Slope=0.0730 T CN=145 Time (hours) ■ Runoff 118 Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 81 Summary for Subcatchment 8S: NW Wetland Area Runoff = 2.86 cfs @ 12.05 hrs, Volume= 7,929 cf, Depth= 5.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 3 0 LL 3 2 1 Subcatchment 8S: NW Wetland Area Hydrograph 1 _I 1 2.86 cfs T��e Ili 24-hir '' i l i i' i l l I I I I I 15�_�►r IR�iinfal�=�1 �.9�0�' RluhdfflAlrOa�--116,14601 sf RUggfflVOW m p77,929i Cf Runoff Depth=5.78'I Flow Length=226' T6=6314 nil16 I CN=161 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff Iim Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 82 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 4.73 cfs @ 12.03 hrs, Volume= 13,231 cf, Depth= 8.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph 4.73 cfs 4 w 3 3 0 LL 2- 0 ❑ Runoff Type III 24-hr Rainfall=11-0.90-1' Rgnpff Area�=18�3621 sf �Rl-noff�VQlyme713,2�11 cl (Runoff Depth=8.65" Flow Length=256' 1 17 T I T I Slopd=6.0200 '/I' I T0�=�-6 min =P o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 120 Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 83 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 2.76 cfs @ 12.03 hrs, Volume= 7,447 cf, Depth= 6.90" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 50-yr Rainfall=10.90" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph 3- 2 N I�� III II 3 LL 1 ❑ Runoff ITYpeI Ili 24=hir � I Rul holffl-Arda�-- 2,19481- f RuggfflVolium p77,447i cf Runoff Depth=6.90'I Flow Length=383' T621,E nii6 CPI=169 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 121 Highlands Postconstruction w smaller Chambers Type 111 24-hr 50-yr Rainfall= 10. 90" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 84 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 10.48" for 50-yr event Inflow = 8.75 cfs @ 12.02 hrs, Volume= 26,688 cf Outflow = 5.57 cfs @ 12.09 hrs, Volume= 26,687 cf, Atten= 36%, Lag= 4.1 min Primary = 5.57 cfs @ 12.09 hrs, Volume= 26,687 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,023.61' @ 12.09 hrs Surf.Area= 3,659 sf Storage= 5,115 cf Plug -Flow detention time= 28.6 min calculated for 26,687 cf (100% of inflow) Center -of -Mass det. time= 28.5 min ( 767.1 - 738.5 ) Volume Invert Avail.Storage Storage Description #1A 4,021.25' 687 cf 40.50'W x 23.25'L x 2.54'H Field A 2,393 cf Overall - 675 cf Embedded = 1,718 cf x 40.0% Voids #2A 4,021.75' 675 cf Cultec R-150XLHD x 24 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows #313 4,021.25' 1,476 cf 24.25'W x 84.75'L x 2.54'H Field B 5,224 cf Overall - 1,534 cf Embedded = 3,689 cf x 40.0% Voids #413 4,021.75' 1,534 cf Cultec R-150XLHD x 56 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows #5C 4,021.25' 307 cf 17.75'W x 23.25'L x 2.54'H Field C 1,049 cf Overall - 281 cf Embedded = 767 cf x 40.0% Voids #6C 4,021.75' 281 cf Cultec R-150XLHD x 10 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #7 4,021.65' 8 cf 12.0" Round 10 LF 12" HDPE L= 10.0' S= 0.0083 T #8 4,021.80' 56 cf 4.00'D x 4.49'H J131 #9 4,021.90' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0100 T #10 4,022.37' 48 cf 4.00'D x 3.83'H G11 #11 4,022.47' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0100 '/' #12 4,023.29' 36 cf 4.00'D x 2.83'H G11 #13 4,021.80' 44 cf 4.00'D x 3.49'H G14 #14 4,021.90' 102 cf 18.0" Round 58 LF 18" HDPE L= 58.0' S= 0.0100 T #15 4,022.51' 40 cf 4.00'D x 3.18'H G13 #16 4,021.94' 40 cf 4.00'D x 3.20'H J132 #17 4,022.04' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0100 T #18 4,022.41' 37 cf 4.00'D x 2.96'H G15 5,627 cf Total Available Storage Storage Group A created with Chamber Wizard `FIN Highlands Postconstruction w smaller Chambers Type 111 24-hr 50-yr Rainfall= 10. 90" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 85 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.15' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.15' / 4,021.10' S= 0.0125 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,021.25' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,022.75' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,023.75' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=5.56 cfs @ 12.09 hrs HW=4,023.61' (Free Discharge) L =Culvert (Passes 5.56 cfs of 11.12 cfs potential flow) 2=Orifice (Orifice Controls 1.75 cfs @ 6.99 fps) 3=Weir (Weir Controls 3.81 cfs @ 3.35 fps) 4=Top of Wall ( Controls 0.00 cfs) 123 Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 86 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 12 Rows x 33.0" Wide + 6.0" Spacing x 11 + 12.0" Side Stone x 2 = 40.50' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 24 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 12 Rows = 675.5 cf Chamber Storage 2,393.3 cf Field - 675.5 cf Chambers = 1,717.8 cf Stone x 40.0% Voids = 687.1 cf Stone Storage Chamber Storage + Stone Storage = 1,362.6 cf = 0.031 of Overall Storage Efficiency = 56.9% Overall System Size = 23.25' x 40.50' x 2.54' 24 Chambers 88.6 cy Field 63.6 cy Stone 124 Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 87 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 8 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 82.75' Row Length +12.0" End Stone x 2 = 84.75' Base Length 7 Rows x 33.0" Wide + 6.0" Spacing x 6 + 12.0" Side Stone x 2 = 24.25' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 56 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 7 Rows = 1,534.4 cf Chamber Storage 5,223.6 cf Field - 1,534.4 cf Chambers = 3,689.2 cf Stone x 40.0% Voids = 1,475.7 cf Stone Storage Chamber Storage + Stone Storage = 3,010.1 cf = 0.069 of Overall Storage Efficiency = 57.6% Overall System Size = 84.75' x 24.25' x 2.54' 56 Chambers 193.5 cy Field 136.6 cy Stone 125 Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 88 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 10 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 281.5 cf Chamber Storage 1,048.9 cf Field - 281.5 cf Chambers = 767.5 cf Stone x 40.0% Voids = 307.0 cf Stone Storage Chamber Storage + Stone Storage = 588.4 cf = 0.014 of Overall Storage Efficiency = 56.1 % Overall System Size = 23.25' x 17.75' x 2.54' 10 Chambers 38.8 cy Field 28.4 cy Stone 126 Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 89 Pond 150XLHD: Cultec detention system Hydrograph I I I I I I I Inflow 8.75 cfs L ❑ Primary 9 - W111 aary Q►re�a— 71 s 6 5.57 cfs N 5 (IIIIIIIII 3 — 4 I LILI-L L IL IL LI LILILIL 3 L L L LLI 2 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) MA Highlands Postconstruction w smaller Chambers Type 11124-hr 50-yr Rainfall= 10. 90 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 90 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 5.66" for 50-yr event Inflow = 23.05 cfs @ 12.04 hrs, Volume= 79,610 cf Primary = 23.05 cfs @ 12.04 hrs, Volume= 79,610 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link POST: Postconstruction Site Discharge Hydrograph 24 22 T� 14 1 A 23.05 cfs 20 IIIIII 18 16 �I 14 1-4 1 a _14 TI T IT IT 0 12 LL LI T I A IA 10 8 1 tI t I t 1--1 1- 6 I�IIII 4 I ❑Inflow El Primary I� �I fi 1 T Irt I-1 r- I �I IIIIIIIIIIIII 1 4-1T 14 I� 1 1 T IT 17 71 T IT IT IT T LIT IA U LI TIT IA L 1 It I� I t I t I� I� 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 128 POSTCONSTRUCTION SITE CALCULATIONS 400-YEAR STORM EVENT 129 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 91 Summary for Subcatchment 1 S: Roof Runoff = 3.02 cfs @ 12.02 hrs, Volume= 9,242 cf, Depth=11.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN Description 9,352 98 9,352 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.5 70 0.0417 2.31 Sheet Flow, Smooth surfaces n= 0.011 P2= 5.79" 0.5 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 1S: Roof Hydrograph I I ❑Runoff 3.02 cfs -IT�e Ili 24-hi I I I 1 1 11 bU-�rr IR�ai%fal�=�12�.110�' RO nbff AOeOiO9,13521 sf 17 TRIQVloilu"�12421 2 LL lR�IlnlO7 P�ptf1=l1.86'I1 Flow Length=70 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 130 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 92 Summary for Subcatchment 2EX: Offsite Runoff = 8.23 cfs @ 12.04 hrs, Volume= 23,347 cf, Depth= 3.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 8,084 98 road 63,163 36 Woods, Fair, HSG A 71,247 43 Weighted Average 63,163 88.65% Pervious Area 8,084 11.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 200 0.1000 1.58 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 2EX: Offsite -k-I+ I—t H �- I --k I-4 �-I -k- 7 5 _o 1 LI1 I-1 L u. 4 Hydrograph ■ Runoff 8.23 cfs I +- I + I -4 h II`�4-h% -4 1 I I -O&y� Raintail='lill-& IR 4npff#re-aF-T1 j2471-sf Runoff Depth=3.93" 1 -Fiow-L�� t�26d' I I 11 1 U SAoia6.1 Q0-9v 1 1 11 1 Tc�=�-11 r0h) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 131 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 93 Summary for Subcatchment 2S: Delivery/Dumpster Area Runoff = 1.02 cfs @ 12.02 hrs, Volume= 3,105 cf, Depth=11.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN Description 3,142 98 3,142 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 124 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.8 124 Total, Increased to minimum Tc = 1.2 min Subcatchment 2S: Delivery/Dumpster Area Hydrograph I I 1.02 cfs I� �I IT�etl1 24-hi• I I I 1 1 11 bU-�rr IR�ai%fal�=�12�.110�' RO nbff Me01030 421 sf Ruggffl Vlollugne73,11 Q51 cf 6 o 'I� low Len h=1 4 IIII 1 I I I �Ib eL�.d1 � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 132 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 94 Summary for Subcatchment 3S: North Parking/Driveway Runoff = 1.85 cfs @ 12.02 hrs, Volume= 5,638 cf, Depth=11.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN Description 5,705 98 5,705 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 127 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.7 127 Total, Increased to minimum Tc = 1.2 min 2 0 1 LL Subcatchment 3S: North Parking/Driveway Hydrograph low-my, %m �— I � I —� I- Ty�el II+ 241hi 1 bU-�rr IR�ai%fal�=�12�.110�' ROnbff McOiO5,17051 sf Ruggffl Vlollulne75,16�81 cf T I -��!Olf- "t�'= .': Flow Len dh=; 7 eL�.2bb'�' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 133 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 95 Summary for Subcatchment 4S: East Driveway Aisle Runoff = 1.00 cfs @ 12.02 hrs, Volume= 3,041 cf, Depth=11.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN Description 3,077 98 3,077 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 108 0.0090 1.93 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.9 108 Total, Increased to minimum Tc = 1.2 min Subcatchment 4S: East Driveway Aisle Hydrograph 1.00 cfs 1 l ❑ Runoff T �e II+ 24-hi 1 bb-�r IRS i%fah=ii11& 1110nbff Me0103,10771 sf Ruggffl Vlollulne73,10411 cf L ow Len th=1 8 I I I �Ib eL�.do�d'i' I I I � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 134 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 96 Summary for Subcatchment 5S: Front Parking Area to G12 Runoff = 1.17 cfs @ 12.02 hrs, Volume= 3,572 cf, Depth=11.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN Description 3,615 98 3,615 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.4 70 0.0170 2.65 Shallow Concentrated Flow, Paved Kv= 20.3 fos 0.4 70 Total, Increased to minimum Tc = 1.2 min Subcatchment 5S: Front Parking Area to G12 Hydrograph 1.17 cfs 1 0 LL � IIIII Ty aI II+ 241hi RO nbff Me0103,16151 sf Ruggffl Vlolluln�73,15721 cf lR�Ilrllo7 P�ptf1=l 1 86 91 Flow Length=70 � I I I I I T�C�1 �21 r>riir� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 135 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 97 Summary for Subcatchment 6S: Front Parking Area to Gil Runoff = 1.73 cfs @ 12.03 hrs, Volume= 5,142 cf, Depth=10.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 1,138 60 Avg. of Woods/grass & Newly graded, HSG A 4,543 98 5,681 90 Weighted Average 1,138 20.03% Pervious Area 4,543 79.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 21 0.2500 0.21 Sheet Flow, Grass: Bermuda n= 0.410 P2= 5.79" 0.5 51 0.0080 1.82 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.2 72 Total Subcatchment 6S: Front Parking Area to Gil Hydrograph 1.73 cfs Type1 III 24-h% 1 1 11 bb-�r'Rainfali=12.1 & Rtnbff Ate&II15,16611 sf Ruggffl Violpm�75,11421 cf LL Flow Length=72 tN=19b 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 136 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 98 Summary for Subcatchment 7S: Septic Area Runoff = 2.52 cfs @ 12.02 hrs, Volume= 6,816 cf, Depth= 4.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 2,401 60 Avg. of Woods/Grass & Newly graded, HSG A 16,794 43 Woods/grass comb., Fair, HSG A 19,195 45 Weighted Average 19,195 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 230 0.0730 4.05 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 0.9 230 Total, Increased to minimum Tc = 1.2 min MO Subcatchment 7S: Septic Area Hydrograph 2.52 cfs 1 1 1 1 1 1 'T��eI II+ 24!hr 1 bb-�r IRai%fali=li11& RluhdfflAlrea#1'9,1951 sf RuggfflVollume=16,8161 cf I Pep�hj. 1 uFlow Len th 9=2 01' �I Slope' = �I� 0.0730 '%' � � T'c�1 L21 mirk CN=145 Time (hours) ❑ Runoff 137 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 99 Summary for Subcatchment 8S: NW Wetland Area Runoff = 3.36 cfs @ 12.05 hrs, Volume= 9,331 cf, Depth= 6.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 331 60 Avg. of Woods/Grass & Newly Graded, HSG A 2,664 83 Avg. of Woods/Grass & Newly Graded, HSG C 8,086 43 Woods/grass comb., Fair, HSG A 5,379 76 Woods/grass comb., Fair, HSG C 16,460 61 Weighted Average 16,460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 226 0.0070 1.25 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 8S: NW Wetland Area Hydrograph 3.36 cfs 3I 2 3 0 LL 1 It ITYpeI II+ 24!hir 1 b�-�►r IR�i%fal�=�12�.1I0�' RluhdfflAlrOa�116,I460I sf Ruggffl Vollugnp79,13�1 I cf Ruln?" i Pep�h7 . 0'I Flow Len th=2 6, �lb�eL�.a�o�d'�' 1 I fiT631.0fini i r� I CN=161 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ❑ Runoff 138 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 100 Summary for Subcatchment 9S: Cherrywood Dr/Driveway Runoff = 5.33 cfs @ 12.03 hrs, Volume= 15,016 cf, Depth= 9.81" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 2,293 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,911 83 Avg. of Woods/Grass & Newly Graded, HSG C 4,885 98 6,273 76 Woods/grass comb., Fair, HSG C 18,362 82 Weighted Average 13,477 73.40% Pervious Area 4,885 26.60% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 256 0.0200 2.12 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 9S: Cherrywood Dr/Driveway Hydrograph i I I Runoff 5.33 cfs Type 1114�hi• 5 I 1 d0�yi Rainfall=l1 i11& �I —I 1 RgnpffArea$�3¢21-sf 4 �R off V I me- 5,016 c Mn Q I �� I l w Runoff -Depth=9.8V " 3'I Flow Length=256' LL L- L- I -t LL L -t I I L_ I L- I -1 $Iop=0.0200 't' 2 " I I I I I T0�=�•8 Min fi I T I-t I fi l rt�-18� o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 139 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 101 Summary for Subcatchment 10S: Cashiers Rd. R.O.W. Runoff = 3.18 cfs @ 12.03 hrs, Volume= 8,626 cf, Depth= 7.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=12.10" Area (sf) CN DescriDtion 5,907 60 Avg. of Woods/Grass & Newly Graded, HSG A 4,208 98 2,833 43 Woods/grass comb., Fair, HSG A 12,948 69 Weighted Average 8,740 67.50% Pervious Area 4,208 32.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.1 383 0.0430 3.11 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps Subcatchment 10S: Cashiers Rd. R.O.W. Hydrograph III Ills �� III 3.1 s cfs 3 I I I I 1 1 1 1 11 b�-�►r IR�i%fal�=�12�.110�' Runoff l AlrOa�-- 112,19481 sf N 2 , -4 +RupgTVo1iump=8,g61zf 3 Runoff Depth=7. 91 LL Flow Length=3 3' �1b�eL0.041d '/' 1 1 1 1 +-t 1 1 T6k21A n{ i 6 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) ■ Runoff 140 Highlands Postconstruction w smaller Chambers Type 111 24-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 102 Summary for Pond 150XLHD: Cultec detention system Inflow Area = 30,572 sf, 96.28% Impervious, Inflow Depth = 11.67" for 100-yr event Inflow = 9.73 cfs @ 12.02 hrs, Volume= 29,740 cf Outflow = 6.90 cfs @ 12.08 hrs, Volume= 29,739 cf, Atten= 29%, Lag= 3.4 min Primary = 6.90 cfs @ 12.08 hrs, Volume= 29,739 cf Routing by Stor-Ind method, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Peak Elev= 4,023.78' @ 12.08 hrs Surf.Area= 3,621 sf Storage= 5,390 cf Plug -Flow detention time= 27.5 min calculated for 29,729 cf (100% of inflow) Center -of -Mass det. time= 27.6 min ( 764.8 - 737.3 ) Volume Invert Avail.Storage Storage Description #1A 4,021.25' 687 cf 40.50'W x 23.25'L x 2.54'H Field A 2,393 cf Overall - 675 cf Embedded = 1,718 cf x 40.0% Voids #2A 4,021.75' 675 cf Cultec R-150XLHD x 24 Inside #1 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows #313 4,021.25' 1,476 cf 24.25'W x 84.75'L x 2.54'H Field B 5,224 cf Overall - 1,534 cf Embedded = 3,689 cf x 40.0% Voids #413 4,021.75' 1,534 cf Cultec R-150XLHD x 56 Inside #3 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows #5C 4,021.25' 307 cf 17.75'W x 23.25'L x 2.54'H Field C 1,049 cf Overall - 281 cf Embedded = 767 cf x 40.0% Voids #6C 4,021.75' 281 cf Cultec R-150XLHD x 10 Inside #5 Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows #7 4,021.65' 8 cf 12.0" Round 10 LF 12" HDPE L= 10.0' S= 0.0083 T #8 4,021.80' 56 cf 4.00'D x 4.49'H J131 #9 4,021.90' 76 cf 18.0" Round 43 LF 18" HDPE L= 43.0' S= 0.0100 T #10 4,022.37' 48 cf 4.00'D x 3.83'H G11 #11 4,022.47' 138 cf 18.0" Round 78 LF 18" HDPE L= 78.0' S= 0.0100 '/' #12 4,023.29' 36 cf 4.00'D x 2.83'H G11 #13 4,021.80' 44 cf 4.00'D x 3.49'H G14 #14 4,021.90' 102 cf 18.0" Round 58 LF 18" HDPE L= 58.0' S= 0.0100 T #15 4,022.51' 40 cf 4.00'D x 3.18'H G13 #16 4,021.94' 40 cf 4.00'D x 3.20'H J132 #17 4,022.04' 40 cf 15.0" Round 33 LF 15" HDPE L= 33.0' S= 0.0100 T #18 4,022.41' 37 cf 4.00'D x 2.96'H G15 5,627 cf Total Available Storage Storage Group A created with Chamber Wizard `«i Highlands Postconstruction w smaller Chambers Type 111 24-hr 100-yr Rainfall=12.10" Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD® 10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 103 Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 4,021.15' 18.0" Round Culvert L= 4.0' Ke= 0.500 Inlet / Outlet Invert= 4,021.15' / 4,021.10' S= 0.0125 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 4,021.25' 6.0" W x 6.0" H Vert. Orifice C= 0.600 #3 Device 1 4,022.75' 1.5' long Weir 2 End Contraction(s) 1.0' Crest Height #4 Device 1 4,023.75' 5.0' long Top of Wall 2 End Contraction(s) Primary OutFlow Max=6.88 cfs @ 12.08 hrs HW=4,023.78' (Free Discharge) L =Culvert (Passes 6.88 cfs of 11.66 cfs potential flow) 2=Orifice (Orifice Controls 1.82 cfs @ 7.27 fps) 3=Weir (Weir Controls 4.98 cfs @ 3.74 fps) 4=Top of Wall (Weir Controls 0.08 cfs @ 0.56 fps) `IN Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 104 Pond 150XLHD: Cultec detention system - Chamber Wizard Field A Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 12 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 12 Rows x 33.0" Wide + 6.0" Spacing x 11 + 12.0" Side Stone x 2 = 40.50' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 24 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 12 Rows = 675.5 cf Chamber Storage 2,393.3 cf Field - 675.5 cf Chambers = 1,717.8 cf Stone x 40.0% Voids = 687.1 cf Stone Storage Chamber Storage + Stone Storage = 1,362.6 cf = 0.031 of Overall Storage Efficiency = 56.9% Overall System Size = 23.25' x 40.50' x 2.54' 24 Chambers 88.6 cy Field 63.6 cy Stone 143 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 105 Pond 150XLHD: Cultec detention system - Chamber Wizard Field B Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 7 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 8 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 82.75' Row Length +12.0" End Stone x 2 = 84.75' Base Length 7 Rows x 33.0" Wide + 6.0" Spacing x 6 + 12.0" Side Stone x 2 = 24.25' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 56 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 7 Rows = 1,534.4 cf Chamber Storage 5,223.6 cf Field - 1,534.4 cf Chambers = 3,689.2 cf Stone x 40.0% Voids = 1,475.7 cf Stone Storage Chamber Storage + Stone Storage = 3,010.1 cf = 0.069 of Overall Storage Efficiency = 57.6% Overall System Size = 84.75' x 24.25' x 2.54' 56 Chambers 193.5 cy Field 136.6 cy Stone 144 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 106 Pond 150XLHD: Cultec detention system - Chamber Wizard Field C Chamber Model = Cultec R-150XLHD (Cultec Recharger®150XLHD) Effective Size= 29.8"W x 18.0"H => 2.65 sf x 10.251 = 27.2 cf Overall Size= 33.0"W x 18.5"H x 11.001 with 0.75' Overlap Row Length Adjustment= +0.75' x 2.65 sf x 5 rows 33.0" Wide + 6.0" Spacing = 39.0" C-C Row Spacing 2 Chambers/Row x 10.25' Long +0.75' Row Adjustment = 21.25' Row Length +12.0" End Stone x 2 = 23.25' Base Length 5 Rows x 33.0" Wide + 6.0" Spacing x 4 + 12.0" Side Stone x 2 = 17.75' Base Width 6.0" Base + 18.5" Chamber Height + 6.0" Cover = 2.54' Field Height 10 Chambers x 27.2 cf +0.75' Row Adjustment x 2.65 sf x 5 Rows = 281.5 cf Chamber Storage 1,048.9 cf Field - 281.5 cf Chambers = 767.5 cf Stone x 40.0% Voids = 307.0 cf Stone Storage Chamber Storage + Stone Storage = 588.4 cf = 0.014 of Overall Storage Efficiency = 56.1 % Overall System Size = 23.25' x 17.75' x 2.54' 10 Chambers 38.8 cy Field 28.4 cy Stone 145 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 107 Pond 150XLHD: Cultec detention system Hydrograph 10 I I I IIIIIIIII I I I I I 19.73 cfs I IIIIIIII�IIIII I I I I I+� 1"Area=30, 7�-sf- 9 L L I L I L I I 8 L 14 1 L I—Sto'rag e=5,-196-cf-- 6.90 cfs 7 ILILI�I� LEI LILL �6 LLLL F LLI LLL 0 5 LL 4 IIIIIIIII IIII IIIIIIIIIII 3 II II 2 -1 LIL IL IL L 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 ' Time (hours) 19 20 21 22 23 24 25 26 27 28 29 30 0 Inflow ❑ Primary 146 Highlands Postconstruction w smaller Chambers Type 11124-hr 100-yr Rainfall= 12. 10 " Prepared by Broadway Management, LLC Printed 11/22/2019 HydroCAD®10.00-24 s/n 05474 ©2018 HydroCAD Software Solutions LLC Page 108 Summary for Link POST: Postconstruction Site Discharge Inflow Area = 168,784 sf, 27.62% Impervious, Inflow Depth = 6.60" for 100-yr event Inflow = 28.32 cfs @ 12.04 hrs, Volume= 92,876 cf Primary = 28.32 cfs @ 12.04 hrs, Volume= 92,876 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.01 hrs Link POST: Postconstruction Site Discharge Hydrograph 30 28.32 CfS T 1 IA El Primary 28�5� 26 1-+ 1-4 1- T 1I T 1 T T IT 24 1 T I-L I T 22 20 I T I T I T FT w 18 16 L L L IUL-14� T 1 12 10 6 T T T I t I T T T 4 1 i i i 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours) 147 APPENDIX C NRCS SOIL REPORT 148 Hydrologic Soil Group —Macon County, North Carolina N M O] W 301610 301640 301670 301700 301730 301760 301790 301820 301850 301880 301910 35° 5 17" N !- 35° 5 17" N a W-I r - I '' C a • Y .Oje% lob 35° 5' 10" N 35° 510" N 301610 301640 301670 301700 301730 301760 301790 301820 301850 301880 301910 3 3 o Map Scale: 1:1,480 Y printed on A landscape (11" x 8.5") sheet. 0 Meters N 0 20 40 80 120 Feet 0 50 100 200 300 Map projection: Web Mercator Comer coordinates: WGS84 Edge bcs: UTM Zone 17N WGS84 G}DA Natural Resources Web Sbgl Survey 2/28/2019 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group —Macon County, North Carolina MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D Not rated or not available Soil Rating Lines r r A r r A/D r B B/D r r C 0 C/D r r D r r Not rated or not available Soil Rating Points 0 A 0 A/D ■ B ■ B/D MAP INFORMATION p C The soil surveys that comprise your AOI were mapped at 1:12,000. 0 C/D 0 D Warning: Soil Map may not be valid at this scale. p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Water Features line placement. The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed scale. Transportation §_§_+ Rails Please rely on the bar scale on each map sheet for map rJ Interstate Highways measurements. US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Major Roads Coordinate System: Web Mercator (EPSG:3857) Local Roads Maps from the Web Soil Survey are based on the Web Mercator Background projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the ® Aerial Photography Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Macon County, North Carolina Survey Area Data: Version 15, Sep 11, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 6, 2016—Oct 26, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. UU� Natural Resources Web St9C6urvey 2/28/2019 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Macon County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CuD Cullasaja-Tuckasegee complex, 15 to 30 percent slopes, stony A 2.3 58.3% EdC Edneyville-Chestnut complex, 8 to 15 percent slopes, stony A 0.0 0.2% Ud Udorthents, loamy C 1.6 41.5% Totals for Area of Interest 3.9 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. usDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/28/2019 Page 3 of 4 151 Hydrologic Soil Group —Macon County, North Carolina Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher uSDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/28/2019 Page 4 of 4 152