Loading...
HomeMy WebLinkAbout20191702 Ver 1_More Info Requested_20200113Strickland, Bev From: Homewood, Sue Sent: Monday, January 13, 2020 3:23 PM To: George Junkin; Mike Vietor Cc: Bailey, David E CIV USARMY CESAW (USA) Subject: RE: [External] Request for Additional Information: Cardinal Pipeline Stabilization of UT to Haw River, Rockingham Co., NC; SAW-2020-00087 Gentlemen, Per threshold item d) of 401 General Water Quality Certification #4139' this project will be required to receive written authorization from the Division of Water Resources and therefore will require an application review fee. You will receive an email with payment requirement/details. In addition, this project is subject to the Jordan Lake Riparian Buffer regulations and therefore will require a buffer authorization, please update the PCN form and plan sheets accordingly. In order to review the buffer impacts please provide plan sheets which clearly show the existing Jordan Lake Riparian Buffer (50 feet from the top of bank) that is outside of the maintenance corridor, and the proposed 50 foot buffer for the new stream alignment. Please provide a permanent buffer restoration plan, including a monitoring plan, for any areas outside of the ROW. Please note that the relocation of the stream will create new buffers which will impact the adjacent landowner. The adjacent landowner should be made aware of future restrictions within the new protected buffer. Please copy me on your response to David's request below. Thank you, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Sent: Monday, January 13, 2020 2:39 PM To: George Junkin<george@americanlandconcepts.com>; Mike Vietor <Mike.Vietor@williams.com> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: [External] Request for Additional Information: Cardinal Pipeline Stabilization of UT to Haw River, Rockingham Co., NC; SAW-2020-00087 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Messrs. Junkin and Vietor, Thank you for your PCN and attached information, dated and received 12/11/2019, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permit 13 (http://saw-reg.usace.army.mil/NWP2017/2017NWP13.pdf). Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1) The purpose of the project as proposed is to protect/maintain an existing pipeline, rather than to control or prevent erosion. Otherwise, avoidance and minimization would point toward stabilizing the stream channel in place rather than relocation. As such the project is not a good fit for NWP 13. Rather, the project is a better fit to use NWP 39; 2) Please provide a profile view along the centerline of the proposed channel relocation; 3) Please note that, at such point that the a NWP verification is processed, Special Conditions would be included requiring photo monitoring for at least 3 years post construction. Please let me know if you have any questions. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey.