Loading...
HomeMy WebLinkAbout310469_Report_20191018ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Jack Alphin Jack Alphin Farm 1-9 519 Bethel Church Rd Mount Olive, NC 28365 Dear Jack Alphin: NORTH CAROLINA Environmental Quality October 18, 2019 EC;IE 3f CtJG�LR�$:JO�atE'" OCT 2 3 2019 VJater Quality Re-ional operations section `lei! Tlinstor,, Re°ion?I Qffics Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS310469 Jack Alphin Farm 1-9 Animal Waste Management System Duplin County The Division of Water Resources (Division) received your sludge survey information on September 20, 2019. With the survey results, you requested an extension of the sludge survey requirement for lagoon structure "Back" at the Jack Alphin Farm 1-9 facility. Due to the amount of treatment volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed until December 31, 2024. The next sludge survey for lagoon structure "Back" at Jack Alphin Farm 1-9 should be performed before December 31, 2024. Please retain this letter and keep it with your farm records for reference. Please call me at (919) 707-3705 if you have any questions. Sincerely, !!!Heath C. Robinson Animal Feeding Operations Program cc: ilxniigtci Itegi,oiial�'fc Water Quality Regional Operations Section Permit File AWS310469 ®�� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11636 Mail Service Center I Raleigh, North Carolina 27699-1636 rmrrrti canoe wn 919.707.9000 Lagbpn,ID Back.'.. ff S'U dge SU Fa Owne Existing Treatment Depth (Row P.): (ft) 5.00- SI Facility age at time of surve'y:(yr) 36 Average Sludge Accumulation. (ft/yr): 0.04 Requested Extension: -(yr) 5 Treatment Depth Available after Extension: (fi) 4.82 Sludge level.OK.. Ratio Estimates Based on Depth EXISTING EkEMPTION Ratio of Sludge layer to total trmt depth. Ratio of -Sludge depth 0K9 Average Sludge layer thickness (T) 1.3 1.48 Depth of the lagoon from top of bank to bottom soil surface (D) 9.9 9.9 Length at the top of inside bank (L) 370 370 Width at the top inside slope (VV) 1110 110 Length at midpoint of sludge layer (Lm)=L-2S(D-(T/2)) 323.35 324.20 Width at midpoint of sludge layer (Wm)=W-2S(D-(T/2)) 63.75 64.20 Thickness of total treatment zone (Z)=T+Y 6.30 6.30 Length at midpoint.6f . total treatment zone (Lz)=L-2(S)(D-(Z/2)) 336.25 33625 Width at midpoint -of total treatment zone (Wz)=W-2(S)(D-(D2)) 76.25 76.25 10 pe Le g th at t at es th kn th Width at mjdp Ratio(R) of sludge layer volume to total trmt volume 0.166 0391.. Sludge Volume Ratio OK? Maximum extension until end of permit cycle Next survey to be done: (calendar yr)- 12/31/2024 Notification letter mailed:. 10/18/2019 OCT �� ?0i� --��°^... water Qun|ih, Pedonal upemwv OCT �� ?0i� --��°^... water Qun|ih, Pedonal upemwv