Loading...
HomeMy WebLinkAbout20181195 Ver 2_Design/Maps/Site Plans Revised_20200109 Wanucha, Dave From:Euliss, Amy Sent:Thursday, January 9, 2020 1:44 PM To:Wanucha, Dave; Braspennickx, Nicholle M CIV USARMY CESAW (US) Cc:trantham, darren k; Suggs, Phillip H; Shaver, Larry B; Braquet, Stephanie Subject:Bridge 410 Greensboro Street plan revision Attachments:17BP.9.R.61 Bridge no. 410 Davidson revision.pdf Dave and Nicholle, We are going to extend the rip rap on the NW bank on Bridge 410 in Davidson (Greensboro St Ext). The opposite bank previously had impacts approved. Since its already covered in the impacts, we won’t be modifying the permits. I’ve attached a markup of the plan sheet showing the additional rip rap. We had a bank failure during a recent storm event, and it’ll be best long term if we get it armored. Let me know if you have any questions or need additional information. For reference: USACE Action ID SAW-2018-01709 DWR no 20181195 v2 Amy Euliss Division 9 Environmental Officer North Carolina Department of Transportation 336 747 7802 office aeuliss@ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1