HomeMy WebLinkAbout20181195 Ver 2_Design/Maps/Site Plans Revised_20200109
Wanucha, Dave
From:Euliss, Amy
Sent:Thursday, January 9, 2020 1:44 PM
To:Wanucha, Dave; Braspennickx, Nicholle M CIV USARMY CESAW (US)
Cc:trantham, darren k; Suggs, Phillip H; Shaver, Larry B; Braquet, Stephanie
Subject:Bridge 410 Greensboro Street plan revision
Attachments:17BP.9.R.61 Bridge no. 410 Davidson revision.pdf
Dave and Nicholle,
We are going to extend the rip rap on the NW bank on Bridge 410 in Davidson (Greensboro St Ext). The opposite bank
previously had impacts approved. Since its already covered in the impacts, we won’t be modifying the permits. I’ve
attached a markup of the plan sheet showing the additional rip rap. We had a bank failure during a recent storm event,
and it’ll be best long term if we get it armored. Let me know if you have any questions or need additional information.
For reference: USACE Action ID SAW-2018-01709
DWR no 20181195 v2
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1