Loading...
HomeMy WebLinkAboutR-2828 Bank letters_Stone Creek_Stone Creek Task 2 Credit Release 082119DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 August 21, 2019 Regulatory Division/1200A Action ID No. SAW-2016-01990 Re: Second Credit Release (As -Built Implementation) associated with Neu -Con Umbrella Mitigation Bank, Stone Creek Mitigation Site Mr. Brad Breslow EBX-Neuse I, LLC 302 Jefferson Street, Suite 110 Raleigh, North Carolina 27605 Dear Mr. Breslow: This correspondence is in reference to the Neu -Con Umbrella Mitigation Bank, Stone Creek Mitigation Site, located southwest of the intersection of Joyner Bridge Road and Rhodes Pond Road, near Four Oaks, in Johnston County, North Carolina; within the Mill Creek watershed in the Upper Neuse Cataloging Unit (03020201). The purpose of this letter is to confirm the second release of credits (As -Built Implementation) for this mitigation site. Pursuant to the Mitigation Banking Instrument (UMBI) entitled, Neu -Con Umbrella Wetland Mitigation and Stream Restoration Bank, approved April 2, 2001, and amended April 10, 2009; the site -specific Stone Creek Final Mitigation Plan (Plan) dated October 2018 and approved November 9, 2018; and the Stone Creek Mitigation Site As -Built Baseline Monitoring Report dated July 2019, 15 percent of the mitigation site's total restoration and enhancement stream credits shall be available for sale immediately upon completion of all of the following: a. Successful completion of all stream restoration and enhancement activities (As -Built Construction) as described in the Plan dated October 2018; b. Successful completion of all planting activities as described in the Plan dated October 2018; and c. Successful completion of easement fencing suitable for livestock exclusion as outlined in the Plan dated October 2018. Please note that all conditions of the Plan have been fully met, and the construction and planting activities have been completed; therefore, the Construction Performance Bond for the Stone Creek Mitigation Site is hereby released. The monitoring and maintenance bond, letter of credit, or casualty insurance must be received by November 12, 2019. Failure to comply may lead to a suspension in credit sales. In addition, please relocate the flow gauge in UT2 and install a flow gauge in UT (at the locations discussed during the July loth IRT site visit). By copy of this correspondence, we confirm that you have satisfied the above requirements for the initial credit release; and 669.3 stream mitigation units (SMU's), constituting 15 percent of the mitigation site's total restoration and enhancement stream credits (4,462 SMUs), are now available for sale. To date, 30 percent of the total stream restoration and enhancement credits (1,338.6 SMUs) and 100 percent of the total preservation credits (176 SMUs) have been released. Our records indicate that zero SMUs associated with this mitigation site have been debited as of August 21, 2019. Therefore, the current total amount of credits available for sale are 1,514.6 SMUs. Thank you for your interest in restoring and protecting waters of the United States. If you have questions regarding this letter, please contact Samantha Dailey, Raleigh Regulatory Field Office at Samantha.J.Dailey(c,usace.army.mil or telephone (919) 554-4884, Extension 22. Sincerely, by GIBBY.JEAN.B GIBBYJEAN.B.1229783633 .1229783633 04,00'019.08.2108:46:13 Jean B. Gibby Chief, Raleigh Field Office Regulatory Division Electronic Copies Furnished: NCIRT Distribution List