Loading...
HomeMy WebLinkAboutR-2828 Bank letters_Cedar Grove_Cedar Grove MY3 Credit Release 120817DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 December 8, 2017 Regulatory Division/1200A Action ID: SAW-2012-00294 Re: Year 2 Monitoring Credit Release (remaining 3%) and Year 3 Monitoring Credit Release associated with Neu -Con Umbrella Mitigation Bank, Cedar Grove Mitigation Site Mr. Daniel Ingram Resource Environmental Solutions, LLC 302 Jefferson Street, Suite 110 Raleigh, North Carolina 27605 Dear Mr. Ingram: This correspondence is in reference to the Neu -Con Umbrella Mitigation Bank, Cedar Grove Mitigation Site, located northwest of the intersection of Dade Store Road and Rick Road, north of Hillsborough, in Orange County, North Carolina. The mitigation site is adjacent to the East Fork of the Eno River within the Neuse River Basin, Hydrologic Unit Code (HUC) 03020201, The purpose of this letter is to confirm the release of stream restoration credits associated with Year 2 adaptive management report and Year 3 Monitoring activities for this project. Pursuant to the Umbrella Mitigation Banking Instrument entitled, Neu -Con Umbrella Wetland Mitigation and Stream Restoration Bank, approved April 2, 2001 and amended April 10, 2009 and February 2, 2017; and the site -specific Cedar Grove Mitigation Site Final Mitigation Plan dated December 2013, ten percent (10%) of the mitigation site's total restoration credits shall be available for sale provided the third year monitoring report demonstrates interim performance standards are being met. The Cedar Grove Mitigation Site Year 2 Monitoring Report was received in our office on October 6, 2016. A review of the monitoring report and a site visit conducted on February 2, 2017 indicated low stem densities in vegetation plots 6, 8, 9, and 12; two small areas of sparse vegetation adjacent to the East Fork Eno River (EFER) and UT 2-A; minor areas of bank erosion along the EFER at its confluence with UT-1, minor bed erosion on UT-2A associated with a grade control structure; and two areas of bed erosion on UT-1. Therefore, 3% of the anticipated 10% credit release for Year 2 constituting 205.86 SMUs was withheld in abeyance until the sponsor submitted an adaptive management report demonstrating that all stream repairs are complete and stable, and all areas of sparse/low density vegetation had been replanted. On April 24, 2017, the sponsor provided an adaptive management plan to our office indicating the work had been completed. The Cedar Grove Mitigation Site Year 3 Monitoring Report was received in our office on October 10, 2017. A review of the monitoring report and a site visit conducted on November 14, 2017 indicated the upper 2 ponds of UT2-A (-614 SMUs) were not achieving or trending towards their success criteria; this reach was observe to have more of a braided system rather than a single thread. In addition, beaver activity was observed in the upper reach of UT3. Therefore, 0.895% (or 61.4 SMUs) of the anticipated 10% (or 686.2 SMUs) credit release for Year 3 will be held in abeyance until the sponsor submits an adaptive management report demonstrating that all stream repairs are complete and stable. By copy of this correspondence, we confirm that 3% (or 205.86 SMUs) from Year 2 and 624.8 SMUs (or 9.105%) from Year 3 are now available for sale; totaling 830.66 SMUs. To date, 59.105% of the total credits (4055.8 SMUs) have been released. Our records indicate that 2,744.8 SMUs associated with this mitigation site have been debited as of December 8, 2017. Therefore, the current total amount of credits available for sale is 1,311 SMUs. Please confirm these totals on your mitigation bank ledger. Thank you for your interest in restoring and protecting waters of the United States. If you have any questions, please contact Samantha Dailey at (919) 554-4884 extension 22. Sincerely, Jean B. Gibby Chief, Raleigh Field Office Regulatory Division Electronic Copies Furnished: NCIRT Distribution List