Loading...
HomeMy WebLinkAbout20200041 Ver 1_Shoreline Stabilization_20200107VL LA bA0 MY/ State of North Carolina DWR Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sen to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information ; j 1 - Name: i 1e�YN, 5 1JQC Illy Mailing Address: t Telephone Number: A5..) 610 USA\ Fax Number: E-mail Address: & 20\a3C4D QMG%to1M 2. Agent/Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.odf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number E-mail Address: Person to receive the Certification Approval II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 a. etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: ,�)G3L C.6y-, Nearest Town: 0QC1%\e 5. Subdivision name or site address (include phase/lot number): \r�k 0)n0,\a 5V,00-c5 Directions to siV - please include road names and numbers, landmarks, etc.: Latitude (in decimal degrees) 3S. o N S a Longitude (decimal degrees) -'93 • Wk TS16 5. Describe the existing land use or condition of the site The time of this application (residential, undeveloped, etc.): uLf\&_VtI09C 6. Property size (acres): 7. Lake/ river/ ocean adjacent to property: \-kV-4— 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 35 4 �C , to WQ k\ 15 �-k ! V y 9. Will work be conducted from land? ❑ From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level nd 50 feet landward to be impacted (number of trees, for instance):�� 0.►1� �� VPL4iQ or', , - 6 - Z� %z/L<,1/9 Owner/Agent's Signature* [15A NCAC 02H .0502(f)] Date -Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 FullPond/ Normal Water Level rri�a� Shoreline Lake (At Full Pond/Normal Water Lever 35 tk \dear kX*A 3kk be.\*%-0 3�-t <<QYaQ Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSG 10-2013 Page 3 of 3 Peoa 1 of 1 hn nio l I r_rs z TnD1EM s. men wv®miy, u�a ewnw io. �-.ue mrtnr m w: w la¢ OP M I6ta1DB a DNC lCe Tr6 • i • Ow nar nee war a m A eiwreT v A ueom� ao tWD rmmi M Aea w M RMIT T1aT 11„ W ORWI� 11aT IFA4Ti4 Fam6 OP WT. [7Ls TM,T nas ruT n v a awrir TwT a ,nrnn n era rwrmi or a mwir w aernrm mr a wmurm As m W er0aa¢ TYT enrums rAgeas a urm. C TNa M LreT a DI W OROfDo ram w raazi � WD aT ovs er OE 1! i Id efl@r WYW A 041¢ W FASfDC eil@r aWMm. 17C Tar Tor R1i a De A e1,0S1 O AlDlia tllaalT. COI W M f�aflar=n of M=W raml • alwl a®m eUiYlT w DO61 EI®r=T6 m M O6LOT=q W atoframi. Oe nor rx Twmrrtax ArATsaas m nor �nrpeA a emr nor , W uwne m Moa A D,�araa,a m M m OP Nr wunaoar. AraTY u ro wonTOaB maATep 1r a fwmuNr a mre --m z are.nr e. Fmren o'rrvr nar T08 war Na orow iT a na W Acme nr0tr ex ere ®r®mm n smc._ ER—r ris Tar M armim rm swre,Ta a! usAv mm�rm a; LTaw Fla emo eraarin rwr M wm0 or rwana u wmarm u f : r.5oq_ Twr naa war a wvam n Amroaos en es, nbo As Aae®. ones Nr aGeDUL BIWa1rC IfTITIaTmr IT. rlT @a. 3Z ... swvao ro. A.ere ■TiN MY EX I9TIN6 ifirkm2onam orraai mRYT 1WT M W w waT m aaa. Tor raa a arT® ems em orrrml IDXI>HlIIt 012�D8: IgTM fi1lYLll JOtICSOfI mwrr Tor varwrort m wmnm roe eramuTw m wsa®n war c roaT afa m rsc w caor= m 19.T_ �N- semnfn u � JOE NA O.Tca GRAPHIC SCALE 1-30' 0 30 GO 90 mia DUOS ENER r �nc PAPAXEL ra•'E K'rTe D7.17 O6'M a. ee• 567?3'51-E' 21.33 um• m sf-N J�0 hTN 3A.2: LOT 2 WILLIIAiw S. WAIAE D.B. lg6 PS. 6f3) P.C. S SL. 976 PARCEL • 1-9?a9 r6 1aFIN Wip.rNA COai101. MaNF]IT lOCaIED MITMn a.am FEET W E rioo0 ITT AMM HMM n r6i LOCATED WMN ANT DFSIOtuTED / Fwome IS U6ECf m All. AlGW m MAT EASBi M Aa) n69T=Tj0W S N30'f9•a6-N ,ryap O.TB' m-eDme n0sroo DOr en -V -tome far Da m aR a'ef mi. �w..-mores uoEre ■i..aNr �.•-Door® urafn of N9-E 13.52* ar-mmu YTG ern 5o LLC L932 eNn-mmc eAmWr eaoi NWT�e eow-mDio aaw aun sDeue a0 � m ®--mega utw imx N•-D901Es m61 as�a Dur o'-mmss maunra ern vae TAHIILLOATSHOIF.S 'P> SEMISE*. QVJqM ILL D.B. 2051�gP�6, r71 LOT 3 O.S. TAP% Pg. 739 P.C. 1 SL. 32 PANCFL,f •��p7p765 1 ml 0.45 siaeE$ i � �A.t-T 1 Tie ane T i L. E 5D.04' iE �. � �• /�21.2 / MOWS�IIOIM�TALIFTAIIIL / (BO' PAIYATE R/ q / r.Ts eeame ru0 m n a,.a• sTe oe•N a. w.m• SURVEY FOR: QUINN ISLAND, LLC. "TmmCWVMT2W.*M.L A NORTH CAROLINA i ot"-.rL�1�rRoby�rnMeraw6 LIMITED LIABILITY COMPANYeI'visNis°fjew. _ ... cuwo T owat weft TNfi orODT'1T J. foe.Tie .,wn . rmae ester LISA DAW.% TRUSTEE .wr r nrmawe. TrreTeiaenc reaa,0lfm. rr sa01r. _ LtIT 3. _ TAHALA S 01M - THE POINT - e0Tl QTI1TLE AfFTfTr NAS rmYaEa Fes TQS weG�.z50eIFLWFAT9MLNpil�flt2�tTpnfFm A/Om969�CE "r�FMM w 8 S =16fALLTTIO[f �0'a1 SoDf: 23 Page: S65 Seq:• F• I i<< 1 r , 1 FULI. POND NCIi'i IAL SUMMERTIME fq T] 0 END OF LACE 13ED zw C7 � xU3 2a ace mw 5' }�lune�'�hp,raf+v.e. TOE OF BANK 1K HEIGHT DETERMINATION - FM SHOREf.1HE STAB UT TIA ON TMg MAY, Im e 5'tw- i NORMAL SUMMERTIME ,�� J TOP F-RODED ESCARPMENT qr-" w EW OF LAKE aEo-, pIo TOE OF BANK A NK NEIGHT iiETER�i1td�►� olt MR SHOREUNE ST ASIUTAT1®M ACT- M nn MAY, 1999 Jackson County, NC - GoMaps `' Select Map General r"10, k%Sf#}y7 i ff,bl eteyet TrlxPam(*I quv.e HrCII)t t` F ¢ 1C .� • _ F• _ 4, z w UN 3 4 Lx low a0-a6K IE I • w r. L3 ', 14 t jy