Loading...
HomeMy WebLinkAbout20200042 Ver 1_Shoreline Stabilization_20200107State of North Carolina DWR Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10-2013 Shoreline Stabilization Application Form One copy of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Mailing Address: • • Telephone Number: g04.928-005 Fax Number: E-mail Address: neal- oIcV%a-r+e.r. ne.-i- Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/dots/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.adf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: 70z1 - Lhut) - 51 II__ Fax Number: _10L1- ULOO-^ 5g1o9 E-mail Address:'Irl1�nhi)r1,rsknnpar.dree,lr_1%nn-r^vv- Person to receive the Certification Approval: Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, FORM: SSGP 10-2013 Page 1 of 3 and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: _ �u 0 Nearest Town: ' `k(" , a SdI�L Subdivision name or site address (include phase/lot number): ? 5 Q _6adoer Coop (In -MreS%XJIke , N 9111 Lod 4 1141 0 g: 5� C YID LLyke1 i-TLM 6erCC>r�. Directions to site - please include road names and numbers, landmarks, etc.: See V lac h d Latitude (in decimal degrees)_35_,5Ar] Xi0 Longitude (decimal degrees)— Q4L70110 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): I�P<< h,rntj,L� 6. Property size (acres): . & �1 7. Lake/ river/ ocean adjacent to property: LAC iNLo r M 1n 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 1ng}n I I y R E e.U4on wall +-o a F[Q 11 Zr,c�n(l 600lder r' o mn around \ From water? ❑ u{v)derynl ned all excavation, backfill, rip rap, retaininjo g walls, etc.)Z� below the normal pool lake level/ Normal Water Level in square feet or acres: 1.5' Inelei�� / 153 s� o�'imo�� 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: ( , a:60%je— ( 102 51; Okz' ; rrf loaf 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): QC0.5� 60fye r- no. "TC-eP r yno r ,m• n1 ma.l di"\r)Dancr 1y lnUVhGr" l CY�99C1/VI Li l�L 4�C� 1'd �G j�; Owner/Agent's Signature' [15A NCAC 02H .0502(f)] Date 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 0 Full Pond/ Normal Water Level Shoreline IS Wow T Wail lOZ' -Fofo.. house le-"g'k L �'a6ov ro-P OL free. 10� W i DIG A cct-�b Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 12dEr(dne 610Eat Cermr A9 MW tNlle,NCb2`e 4vls lap.Moxmulle.NC RH]-(a¢yb Maq Google Maps 610 East Center Avenue, Mooresville, NC to 259 Barber Loop, Mooresville, NC 28117 Drive 9.8 miles, 20 min 610 E Center Ave Mooresville, NC 28115 t 1. Head south on Evergreen St toward E CenterAve 17 s (197 fit) Take NC-1100to Chuckwood Rd In Davidson 18 mb (83 mQ r' 2. Turn right onto E Center Ave 05mi -1 3. Turn left onto S Church St 0.s mi r' 4. Turn right onto E Wilson Ave L5mi t 5. Continue onto NG1100/Brawle/ School Rd 56 mi t 6. Continue straight onto NG1100 0.3 m1 Continue on Chuckwood Rd. Drive to Barber Loop 3 min (1.4 m9 r• 7. Turn right onto Chuckwood Rd 0.8m1 -1 8. lltrn left onto Barber Loop 40 Destination will be on the left 06mi 259 Barber Loop Mooresville, NC 28117 fors/MwxgwglacwNrrepslUrAlOaFataCeta*Awxe,aMaraNbaNCI�tBVUn+laogaMarccYlb.aNLamH]I�355T11WI.-66frIp108,Molar/arE4'CaS13n IaA,iMmlWNn1311rr&1mi11r... IQ 1Y =19 610 Fat Carbrs Mpm 0% NC b 26g Barber Lap, MaraaA1% NC M117-ample Maps These d.ttbns are far plan., Wrposes only you may find that construction projects, traac, weather. a Mher events may cause oorldabm to dater from the map results, and y should pldn W rare accadingy You must obey al sign a rwibes regarding your route. Nqs/iWw.9m91e.mringNnfrStMEanCctaaawrve,aMo,re411e,aNCfEbr2a'Oaalwp,aMwrarlbaNCa291171@%MW,-8191@106,1WM6rMrF22 LaT 1.1 i1 e1v-uu xx.ve B° fi06-t{Y IB.IG lD aaf-[.M Ba. 16 li 619-11Y H.a] lx Hr-]]Y rD.96 L0r ls0 l a!6-IH fa.H l8 eDT-.IY IB..• >j a29-OO. [1.. BY -]BM r1 .. L0T I.[ B11 -!IY 6B.10 70 ° s.lUY 19H s0 sl.--aeY ..t °1 Nse-au tO.tD at xe.-uw xe.n rB xGeKOY a.ei LDT I.. Mll-HY °1.00 tl x°r-39Y «s0-.w Er.Oe ay an SO.-0a sC .Is vD -.eu Iv.DO LOT I.T 01 Nl]-pEY to.IP xsa-v(Y u.ae .eo °6 97 Ba..-01M i0.0Y ]B LOT 1., 91 eu-aTY u.n 9B 1�I09 cu- 1 HN s.[.. 00° a.-ve . B0D0 1$a.-aew 1tA 1I.-33Y a Y8.00 LDT ua 10 aY6-]PL L1 .11 aH-D lO.H 10O 10al6-aX ]G.l. NO B.a Q -!X INO aB6-!0E :1.00 ;IH9-BX a.01 11 HI-O.E ]l.te 800_D00 CRESCENT LAND I TIMBER CORP. IW- R. BARNETTj U. M. I. - 2 CRESCENT LRNO x TIMBER CORP. IL. O. BROTNERTON. ET RLI U. M. I. 819 \ I_ pe N 0 T E S . . . L•Q RG �• ♦N/ WB[ POISON CONrPYT TO CRESCENT LAND L TIRBEa CHr- ay.... .BI .. °I. HTED PPT 1. IH( S01LOIND XTSPEN uan a-1 ee FCCT FN. 0000RIHT OFWY. 90 FrEY na CHToINELE'S ON T9D. a$.a LEVEL MY. ao 10 reel FROM SIDE LDT LINE. RLL!i([hCMK(aR011 K tDKCT.FRORaT- T LIRE DIaTMab M[ ED of O TO (DTIOR °T a.aetl It..".. 6MHx YXION Fnn TX aX W LAKE' NLIKESN. axrarlM uF Laxc RHMPN rMR LEVEL ORI M0. 1 D.9.0.8. XP L(v[L afa I CO. RD. NO. i4� Ne6-Gr[ nmu . Lrlx Y LOT UB 1 �''°.. O.nR 0 L] i'a \ LOT UB o.w "at \ HTwx Ia 1 L R K E La..9 \I.P IM I LOT 1(6 0.9a Pa[ .rin I Lrq[. MRlat[ w 9b Lla.9] \ I.r16 LOT 18.. BEE Mo. No. C. F. T-M 3I KC ONO. NO. C. F. T -N p T '� \\�/ ' LOT IeE POMI. YaM. E.I. N 0 R M R N CRESCENT LAND C TIMBER CORP. 1J. R. BROWN. ET RLI U. M. 1. - 202 CRESCENT LRMO E TIM9ER CORP. LAKE NORMAN RAN OF RECREATION LOTS SECTION 7 LOTS 145-151 DAVIDSON loNR6RIP IREDELL COUNTY. N. C. SCALE t•• = f00' ••e �RFRIL °. IRTB R@C. C.D. .0. °OE 1 10, D.C. CO. C. "GAIN 12t27/2019 Iredell.ConneotGIS SCONNECTGIS WEB HOSTING IredellCouhty N m n 262 1: Feet It4*JArec1W1 a rmcWfs.cm MspAW 1/1 12/27/2019 2%Barber Loop- Goog le Maps Go gle Maps 259 Barber Loop Imagery 412019 Google,Imagery@2019 Maxar Technologies,Orbis Inc, Map data@2019 50ft htlps:IAw.google.cmyn' s/place/259+Barber+Loop,+MooraN!Ie,+NC+281171@35.548409,-80.9470913,22&Ndata=!3m1!tea!4m513m4!1s0)0856ad1e9410ca19:W1d8M15351e1118m2!3d35.5486784!4d-80.94... 1/2 12127/2019 2% Barber Loop- GoN le Maps Go gle Maps 259 Barber Loop 90ro0 (0-0 LOoC B+rbO 84 Barber L00y earo0`,oO9 o°a 359 Bmbty loop 0 w �n F 4 x �7 t Go gle Map data 02019 50ftr htp JAwm...googie.corr✓mWp!aca259+Barber+Loop,+MooresHlle,+NC+28117/@35.5484961; 80.9474364,lWdata=!4m5l3m4!1s0i®856Bd1e9410ca19:0jQ1dBM15351elll8ff !3d35.5486784!4d-00.9470597N=en 12 *-DARY CATAWBA ajim LINCOLN co 12/27/2019 Ireddl.ConnectGIS ,OCONNECTGIS WEB aOSt140 1 1:,:50 m n 4; A °�1 V ilya https:/iredelI.connectgis.coT Map.aspx Feet sl. c l ,,gyp+ e ♦ J �.a.' '! _ a{.iF�. �.., -r- '=. '�G •-} !�r '��r f �' �'•.�',. rid' y� ''y _ � f rl� � _ .. i• . r- ! .m i. 1-7 rip- - FCynthia ♦ ;;.r. Flehan/Cassandra Stone ' 259 Barber Loop Mooresville, NC 28117 sti d �• / a :r" r % CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: '� �J G/ e ( I _!» /� Cau w: yP Owner: Of,«nk,<l.t� Print Signature Contractor/agent: Print 0 ISignature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and SSA NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)) Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [35A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 028.0243(5), (6)] Acknowledgement of Notification I, u—rl—h' :. c011U2,11ereby state that I have been informed of the Catawba Rip ia�} n Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. �! irF(Z'u CLZCi^f��C� Signature (owner): ("^- ,� 1'4 • (k, l , ( ,/yam Date: