Loading...
HomeMy WebLinkAboutNCC200093_ESC Approval Submitted_20200110ROY COOPER Governor , MICHAEL S. REGAN Secretaryr S. DANIEL SMITH " Director NORTH CAF OLINA Environwntal Quality October 31, 2019 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS MJ Silmser Corporation ATTN: Matt Silmser, Registered Agent PO Box 428 King, NC 27021 RE: Project Name: Maple Leaf Farm Acres Approved: 14.4 Project ID: STOKE-2019-009 County: Stokes City: King Address: Spainhour Rd. River Basin: Yadkin - Pee Dee Stream Classification: C Submitted By: CPT Engineering & Surveying, Inc. Date Received by LQS: October 24, 2019 Plan Type: Revised Dear Mr. Silmser: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1) (b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. North Carolina Department of Environmental QualItq i Division of Energy, Mttneral and Land Resources w. Winston Salem Regional Office 1 450 Hanes Mill Road, Suite 300 7 Winston-Salem, North Carolina 27193 336.776.9800 Letter of Approval MJ Silmser Corporation October 31, 2019 Page 3 of 6 Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, achar Len , EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet Modifications Required for Approval cc: CPT Engineering & Surveying, Inc. ATTN: John Butler 4400 Tyning St. High Point, NC 27265 WSRO File Letter of Approval MJ Silmser Corporation October 31, 2019 Page 5 of 6 MODIFICATIONS and PERFORMANCE RESERVATIONS Project Name: Maple Leaf Farm Project ID: STOKE-2019-009 County: Stokes Modifications: 1. Silt fencing below fill slopes should be installed a minimum of 10 feet off the proposed toe of the slope. This will allow room for sediment storage and maintenance access, as well as minimize the potential for damage to the silt fence during fill slope construction. [G.S. 113A-57(3)] 2. Silt fence alone is not adequate below fill slopes in excess of 10 feet in height (NC Erosion and Sediment Control Planning and Design Manual, Section 6.62). Please provide additional measures for these areas. Matting of the slopes is recommended. [G.S. 113A-57(3)] 3. Sediment traps, basins, ditches, and diversions need to be stabilized immediately after installation and any subsequent disturbance. This includes the basin walls. [15A NCAC 4B .0106(a)(3)] 4. Per Section 6.20 of the North Carolina Erosion and Sediment Control Planning and Design Manual, diversions that will stay in place longer than 30 working days should be seeded and mulched as soon as they are constructed to preserve dike height and reduce maintenance. This includes roadside ditchlines, even if future utility installation will occur in the area. [G.S. 113A-57(2), 15A NCAC 4B .0106(a)(3)] 4-0 -4..0 •� z . 0 [�] � eye � •^� �~ � � � U eeY