Loading...
HomeMy WebLinkAboutSW1191202_O&M_signed_1/10/2020&,Ma1nte_W ce Project Name: Project Location: Circle K Mills River (Jeffress Rd) NE corner NC 280 (Boylston Hwy) and Jeffress Rd Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & ci Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity. - Level Spreader/VFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity-, Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: ding O&M tables wi. Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s).- Location(s): Location(s): oe aaoeo auto I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. Signature: Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Ha tham Kasem Construction Manager, Circle K Stores Inc. 2560 W. T ►rota Road, Suite 200 Charlotte, NC 28217 (704) 776-6444 hkaseml circlek.com NDA Date: f:n& County of _ do hearby certify that i_ Hely �15err personally appeared before me this Z3� day of Vaember-' and , a Notary Public for the State of acknowledge the due execution of the 9P erations and Maintena ce Agreement. Witness my hggV and official seal, i pJARY a PUB00 2; 6ov����,. ST08WZ NlFFN My commission expires ' I r �l �v 12/12/2019 Version 1.4 Page 1 of 3 STORM-EZ 12/1212019 Version 1.4 O&M Manual Page 2 of 3 Section I Important operation and maintenance procedures: -'Inspect isolator row for out isolator row using jetvac process Replace all covers, grates, filters, and lids; record observations and actions Inspect and clean basins and manholes upstream of the underground detention system The system will be visually inspected by the owner/operator at least quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Section 2 Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BNIP element: Potentialproblem: How to remediate theproblem: Isolator row Sediment Remove/open lid on nyoplast inline drain on inspection port Remove and clean flexstorm filter if Installed Using a flashlight and stadia rod, measure depth of sediment Record depth of sediment on maintenance to If sediment is 3" or higher, clean isolator row with 'etvac Use fixed culvert cleaning nozzle with rear facing spread of 45"+ Apply multiple passes of jetvac until backfiush is clean Vaccum structure sump as required Replace all covers, grates, filters, and lid; record observations Inspect and clean basins and manholes upstream of system STORM-EZ 1211212019 Version 1.4 O&M Manual Page 3 of 3