Loading...
HomeMy WebLinkAbout20200046 Ver 1_17BP10C6_Permit Package Wetland_20190607_20200108Hi North Carolina Department of Transportation Highway Stormwater Program .r�. STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) 11 1 FOR NCDOT PROJECTS JIL- WBS Element: 17BP.10.C.6 TIP No.: SF-120301 County(ies): Cabarrus Page 1 of 1 General Project Information WBS Element: 17BP.10.C.6 ITIP Number: SF-120301 Project Type: Bridge Replacement Date: 6/3/2019 NCDOT Contact: Shawn Harris, PE Contractor / Desi ner: Sun ate Design Group Address: NCDOT Hydraulics Unit 1590 Mail Service Center Raleigh, NC 27699 Address: 905 Jones Franklin Rd Raleigh, NC 27606 Phone: 919-707-6725 Phone: 919-710-8333 Email: shawnharris ncdot. ov Email: idaIton sun atedesi n.com City/Town: N/A Count ies : Cabarrus River Basin(s): Yadkin -Pee Dee CAMA Count ? I No Wetlands within Project Limits? No Project Descri tion Project Length (lin. miles or feet): .11 miles Surrounding Land Use: lRural Residential, Agricultural Proposed Project Existing Site Project Built -Upon Area ac. 0.3 ac. 0.2 ac. Typical Cross Section Description: 2 - 10ft lanes with Eft shoulders (3ft Paved) 2 - 9ft lanes with grass shoulder Annual Avg Daily Traffic (veh/hr/day): Design/Future: 160 Year: 2040 Existing: 160 Year: 2017 General Project Narrative: (Description of Minimization of Water Quality Impacts) 17BP.10.C.6 is a culvert replacement project that involves removing existing Cabarrus County Pipe #301 on SR 2608 (Hahn Road) over Unnamed Tributaryto Little Bear Creek. The existing pipes are 2 @ 112" x 75" Arch CMPs and will be replaced with 2 @ 10' x 8' RCBC. The proposed culvert inverts will be buried 1' below the stream channel bed and will have a low flow and high flow barrel. Sills will be constructed in each end of the proposed box culvert with floodplain benches installed up and downstream. Another jurisdication stream flows parallel to the roadway and fill slopes will avoid impacts to this stream. 2:1 fill slopes have been used to minimize the proposed culvert length and associated stream impacts. Waterbody Information Surface Water Body (1): Little Bear Creek NCDWR Stream Index No.: 13-17-31-5-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? JNo (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) W O W See Sheet I -A For Index of Sheets See Sheet 1-B For Conventlonal Symbols STATIC OF NORTH CAROL INA DIVISION OF HIGHWAYS ('"BARRUS COUNTY LOCATION: REPLACE PIPE NO.301 OVER UT TO LITTLE BEAR CREEK ON SR 2608 (HAHN RD.) TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT �NC 73 -SR — — — BEGIN STATE PROJECT I7BP.10.C.6 L STAoI5f00.00 THIS PROJECT IS NOT WITHIN MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. END STATE PROJECT 17BP.10.Ca6 —L— STAe l9-�42.44 BEGIN CULVERT —1 — CT- A 17-tCF / PDND STATE STAIR PROlP.CI REPERENC6 NQ 89EET NO. TOTAL RRRTB 1713P.10.C.6 I STATE PROl.N0. .APROl. NO. OESCRIPT[ON 17BP.10.C.6 PE RW UTIL CON PERMIT DRAWING SHEET 1 OF 7 RIGHT OF WAY PLAINS C B VE T V/ / END CULVERT �P —L— STA,I7f85,90 �po DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Pre ored In the Office of: Plons Pre red For: HYDRAULICS ENGINEER xclAssooiatesofN.C.,P.A. NCDOT DIVISION 10 GRAPHIC SCALES DESIGN DATA PROJECT LENGTH 4505 Falls ofN.. Road, Suite 400 $0 25 0 50 100 ADT 2017 = 160 R.16gh,NC 27609 KCI Ph—(919)783-9214 716 W. Main S:. Albemarle, NC 28001 V = 45 MPH LENGTH OF ROADWAY STATE PROJECT 17BP.10.C.b = 080 MILES _ Fax (919) 783-9266 ®* gJ 2018 STANDARD SPECIFICATIONS DEWAYNE L. SYKES, P.E. PLANS RIGHT OF WAY DATE: P.E. a KCI ROADWAY PRACTTCE LEAD RONALD D. ALLEN, P.E. 50 25 0 50 100 FUNC CLASS = LOCAL LENGTH OF STRUCTURE STATE PROJECT 17BP.10.C.6 = 004 MILES MAY 15, 2019 SIGNATURE: ROADWAY DESIGN ENGINEER LETTING DATE: PROFILE (HORIZONTAL) KCI ROADWAY PROJECT MNA AGER SUB - REGIONAL TIER DECEMBER 4, 2019 O � 8wA,� 10 5 0 10 20 TOTAL LENGTH OF STATE PROJECT 17BP.10.C.6 = .084 MILES RE. 1VCDOT CONTACT: GARLAND HAYWOOD, PE DIVISION 10 BRIDGE PROGRAM MANAGER PROFILE (VERTICAL) SIGNATURE. Z 0 o DENOTES IMPACTS IN � SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER ' FREDRICK DOTGER III INLET CHANNEL W/FLOODPLAIN BENCH SEE DETAIL 2 EST. 45 TONS CLASS I RIP RAP 50' 25' 0 50' 100' SCALE: 1" =100' SALLIE DOTGER OUTLET CHANNEL W/FLOODPLAIN BENCH SEE DETAIL 2 EST. 35 TONS CLASS I RIP RAP DETAIL 2 INLET/OUTLET CHANNEL DETAIL NOT TO SCALE MG FLOODPIAIN BENCHNG CL 'I' RIPRAP ON -� .ANNELL--*NS CHANNEL RANKS CL T RIPRAP vd PLACED ON TOP 10' TO FILL VOIDS 8, 2, STA. 17+76 -L- LT STA. 17+76 -L- RT PROJECT REFERENCE NO. SHEET NO. 178P.10.C.6 4 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPL1EIF E PLANS I DO NOT USE FOR R6W ACOUISITTON DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED KC, Fug aee . PI mes . wliem . �e eeR� RA0 i FallsC 27NI Rued, Soite J00 Rely (919) 2'3-92 om pyoue 1919)'IB}9210• Pmc (919)]83-9]66 PERMIT DRAWING SHEET 3 OF 7 � O3 \ MARTHA CORINNE DOTGER SMITH 0 RUTH DOTGER ESTATE DETAIL 1 TOE PROTECTION (Nol to Swle) 1w�aR NaNlal 1.1 �;\cJ\oQe Ground b =F. b =2.2.0 F. Geotextile Type of Liner= Class B Rip-Rop FROM STA. 16+75 TO STA. 17+53 -L RT 0 0 0 Q 3 E DENOTES IMPACTS IN SURFACE WATER I J DENOTES TEMPORARY I IMPACTS IN SURFACE WATER O 0 TO �I o49' POND T D E ;yT -JI X W PROJECT REFERENCE NO. SHEET NO. 17BP.10.C.6 RW SHEET NO. BYO ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT USB POR / W ACQUISITION 12.5' 6.25' 0 25' 50' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SCALE:1"=25' PERMIT DRAWING SHEET 4 OF 7 I C) 0 0 o, PROJECT REFERENCE NO. SHEET NO. 17BP.10.C.6 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE —NOT USE FOR rE PLANS lfW ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED "MIME lm�� C ST 1 + 6 — — 20 10'.x8' RCBC WSILLS CL P 55 .77 21 N ZMAL AN 3 S (EVVED A D KE ED EXISIING 2 11 "X7 " RC C P B _ B T T LT INS N S N S 1. ILL ' S OP=0.75D I c m a 0 U N !n V (9 L it 4' N 3 E it U T oN OU I N� �0] tD�.' BM #2 - RR SPIKE IN 36" OAK L- STA. 17+75.84, 67.75' RT EL = 546.15' I J —=- r� - - L - O + + Q PROJECT REFERENCE NO. SHEET NO. 17BFJO.C.6 5 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOM PLE rE ]PLANS W NOT USE FOR If W ACQUISITION BM #1 - "X-MARK" IN SW CORNER OF CULVERT HEADWALL -L- STA. 19+16.74, 34.74' RT EL = 547.68' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ,=gin :rr.sw,.oa KC I DESIGN EXCEPT/ON FOR VERTICAL CURVE K-„mP gryx 9,P1,8.3"-9m]s I 0m. Far (919)]e1-9266 PERMIT D RAW I N G SHEET 6 OF 7 + M Q � W O CD co a + 2 T 10 W J � v W cc W w T 2 W to - m W 9 ' W 561;.K P1= E 16 =E 00.0 53.3 s D = 5MH _ 548.9 W CULVERT HYDRAULIC DATA DESIGN DISCHARGE = 1200 DESIGN FREQUENCY = 25 DESIGN HW ELEVATION = 549.2 BASE DISCHARGE = 1600 BASE FREQUENCY = l00 BASE HW ELEVATION = 550.0 OVERTOPPING DISCHARGE = 1200 OVERTOPPING FREQUENCY= 25 OVERTOPPING ELEVATION = 549J CFS YRS FT CFS YRS FT CFS YRS FT Dt>H 555 — —(+)O. E ISTING 2@712" X 75" ARCH EM 45% Cmp I - PROP. 2 0 10 X 8' R EIC FO -L ALl NME T, S E S EE 4 13 14 15 16 17 18 19 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 16+68 to 16+96-L-LT TEMPORARY CHANNEL < 0.01 34 BANK STABILIZATION 37 16+50 to 16+92-L-RT TEMPORARY CHANNEL 0.01 47 BANK STABILIZATION 30 TOTALS*: 0.02 67 81 0 *Rounded totals are sum of actual impacts NOTES: Bank Stabilization Includes Floodplain Bench 2018 Feb