Loading...
HomeMy WebLinkAbout20200046 Ver 1_PCN Form Submission_20200108DWR Dlrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20200046 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Donna Hood:eads\drhood Information for Initial Review 1a. Name of project: Replacement of pipe #301 with Culvert over unnamed tributary to Little Bear Creek 1a. Who is the Primary Contact?* Larry Thompson 1b. Primary Contact Email:* Thompson@ncdot.gov Date Submitted 1/8/2020 Nearest Body of Water Little Bear Creek Basin Yadkin-PeeDee Water Classification C (13-17-31-5-1) Site Coordinates Latitude: Longitude: 35.3968271-80.3857081 A. Processing Information County (or Counties) where the project is located: Cabarrus Is this project a public transportation project?* IT Yes r No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: SF-120301 WBS # (?) 17BP.10.C.6 1a. Type (a) of approval sought from the Corps: Version#* 1 Reviewing Office* Mooresville Regional Office - (704) 663-1699 1c. Primary Contact Phone:* (704)301-4881 V W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: North Carolina Department of Transportation 2b. Deed book and page no.: not applicable 2c. Responsible party: not applicable 2d.Address Street Address 716 W. Main Street Address Line 2 City Albemarle Rostal / Zip Code 28001 2e. Telephone Number: (704)301-4881 2g. Email Address:* State / Province / Rion North Carolina Country USA 2f. Fax Number r Yes r No r Yes r No Ithompson@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: Larry Thompson 3b. Business Name: not applicable 3c.Address Street Address 716 W. Main Street Address Line 2 city Albemarle Postal / Zip Code 28001 3d. Telephone Number: (704)301-4881 3f. Email Address:* Ithompson@ncdot.gov State / Rovince / Region NC Country USA 3e. Fax Number: C. Project Information and Prior Project History O [Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality/town: Mt Pleasant (Concord) 2. Project Identification 2a. Property Identification Number: not applicable 2c. Project Address Street Address not applicable Address Line 2 not applicable city not applicable Postal / Zip Code not applicable 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Little Bear Creek 3b. Water Resources Classification of nearest receiving water:* C (13-17-31-5-1) 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050404 4. Project Description and History 2b. Property size: not applicable State / Province / legion not applicable (buntry not applicable 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* 6dsting structure is described as 2@112" x 75" Arch CMP. Cover is soil and rip rap. Project area is out of frame in the Cabarrus County future land use plan but is in the vicinity of areas and presumed to be zoned as single family agricultural or single family residential. Land cover can be observed in the natural resources technical report (figure 4. terrestrial communities map). 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) NC_Mou nt_Pleasant_20190727_17 BP.10. C.6. pdf 93.03MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Cabarrus_NRCS_C6.pdf 161.9KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 319 4h. Explain the purpose of the proposed project:* The existing pipes and associated materials have reached the end of their usable life. Taking no action would result in eventual road closure. Due to the soil cement and pipe construction, rehabilitation of existing structure is essentially equivalent to replacing the structure. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* 17BP.10.C.6 is a culvert replacement project that involves removing existing Cabarrus County Pipe #301 on SR 2608 (Hahn Road) over Unnamed Tributary to Little Bear Creek. The existing pipes are 2 @ 112" x 75" Arch CMPs and will be replaced with 2 @ 10' x 8' RCBC. The proposed culvert inverts Wil be buried 1' belowtheh stream channel bed and will have a lowflowand high flow barrel. Sills will be constructed in each end of the proposed box culvert with floodplain benches installed up and downstream. Another jurisdiction stream flows parallel to the roadway and fill slopes will avoid impacts to this stream. 2:1 fill slopes have been used to minimize the proposed culvert length and associated stream impacts. 4j. Please upload project drawings for the proposed project. 17BP10C6_Permit Package Wetland_20190607.pdf 1.14MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No C Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* C Preliminary r Approved C Not Verified r Unknown C N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Joseph Sullivan Agency/Consultant Company: KCI associates of NC. Other: Per Natural Resources Technical Report 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* C Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries r Open Waters r Pond Construction 3. Stream Impacts r Buffers U 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type* Type of 3gSwidth * 3h. ImpactM ❑ �[3f. urisdiction* length* S1 Temporary Channel Temporary Other Jnnamed Stream Perennial Both 6 34 Average (feet) (linearfeet) S2 Bank Stabilization Permanent Bank Stabilization Unnamed Stream Perennial Both 6 37 Average (feet) (liriearfeet) S3 Temporary Channel Temporary Other Unnamed Stream Perennial Both 12 47 Average (feet) (lin�rfeet) Sq Bank Stabilization Permanent Bank Stabilization Unnamed Stream Perennial Both 12 30 Average(feet) i (lirearfeet) 31. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 67 81 3i. Total stream and ditch impacts: 148 3j. Comments: E. Impact Justification and Mitigation n) 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: 2:1 roadway side slopes were utilized to minimize culvert length. Slopes also chosen to avoid impacting stream that runs parallel to roadway (-L- RT 17+85 to 19+21). Sills utilized in proposed overflow culvert to minimize change to existing floodplain bench. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Erosion Control BMP's utilized during construction to minimize sediment introduced into stream. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: Project is not within a watershed that requires Riparian Buffer Protection. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No Comments: A minimum criteria determination checklist was prepared 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes f• No 3b. If you answered "no," provide a short narrative description. According to "cumulative impacts and teh 401 Water Quality Certification and Isolated Wetland Permit Programs - Division of water Quality Internal Policy NC Division of Water Quality" Policy I., Section A. "Generic description of water quality impacts", bridge replacement projects typically don't add much impervious area to the watershed. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r Yes r No If you answered "Yes" to 5g(1), did you discover any signs of bat use? r Yes r No r Unknown 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No r Unknown 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 17BP.10.C.6 Natural resources technical report. Consultation Documentation Upload CabarrusPipe301_NRTR_Final_Submittal_20191220.pdf 2.1 MB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* 1713P.10.C.6 Natural Resources Technical Report 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* No National Register of Historic Places Eligible or Listed Archaeological Sites Present of Affected Form for Project (Project Tracking No. 18-09-0095) 7c. Historic or Prehistoric Information Upload AR18-09-0095NoSitesPresent.pdf 6.43MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* 176P.10.C.6 approved CSR, NCFRIS (no floodway shown within DFIRM panel 5680 at project site). Miscellaneous Comments Miscellaneous attachments not previously requested. CabarrusPipe30l _NRTR_Final_Submittal_20191220. pdf 17BP.10.C.6_MCDC_Pipe _301_Cabarrus_FINAL (signed). pdf 2.1 MB 1.13MB Signature U ® By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Larry Thompson Signature Date