Loading...
HomeMy WebLinkAbout20200045 Ver 1_Riparian Buffer Authorization Request_20200107Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 1/7/2020 5:06:24 PM (Start) Approve by Carpenter, Kristi 1/10/2020 9:37:03 AM (DOT - Initial Review) • The task was assigned to Carpenter, Kristi 1/7/2020 5:11 PM Water ResourcesENTAL QUALITY Original Submittal 1/7/2020 A. Owner/Applicant Information General Information ....................................................................................... Primary Contact Email:* Who is submitting the application?* 1. Property Owner Information: la. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1d. Telephone:* 919-435-9512 3. Agent Information: 3a. Name: 3b. Company Affiliation: 3c. Mailing Address: dcooper@vhb.com Please list the contact persons erreil for questions or payment on this project if needed. m Owner r- Applicant other than Owner rJ Agent Town of Wake Forest Suzette Morales, Transportation Division Mgr. (for Corporations) Street Address 301 S. Brooks St. Address Line 2 City State / Ftovince / Pbegion Wake Forest NC Postal / Zip Code Country 27587 United States le. Email Address:* smorales@wakeforestnc.gov Street Address Address Line 2 aty State / Ftovince / Region Fbstal / Zip Code Country 3d. Telephone: 3e. Email Address: 3f. Attach a signed and dated copy of the agent aickthe upload button or drag and drop files hereto attach docurrent authorization form. PDFQnly B. Project Information and Prior Project History 1. Project Information ^ la. Name of Project:* Smith Creek Greenway, Phase 3 (Subdivision, facility, or establishrrent narre) 1b. Is this a publicly -funded transportation project?* r Yes r No 1 c. TIP# NIA - Town of Wake Forest Project 1d. Subdivision Name: le. Nearest Wake Forest Municipality: 1f. Property Size: acres 1g. County (or Counties) where the project is located:* Wake 1h. Property ID# Date of Purchase Tax RN or Parcel id 1 i. Deed Information Deed Map 1j. Attach a copyof the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach docurrent RDF only 1k. How would you like to provide the Latitude and Longitude information?* r Address Lookup t= Manually Latitude * 35.934266 Longitude *-78.522033 11. Is the project located in any of North Carolina's twenty coastal counties? r Yes r No 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Smith Creek 2b. Water Quality Classification of nearest receiving water:* C; NSW 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 6,333 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project vicinity consists of a sewer line right of way and forested corridor adjacent to Smith Creek. Surrounding land use is primarily residential and light industrial. 3b. Attach an 81/. x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. (lick the upload button or drag and drop files hereto attach docurrent Fig 1 _USGS. pdf 6.37MB FDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. pick the upload button or drag and drop files here to attach docurrent SoilSurvey_LetterSizePortrait_2019.pdf 3.02MB FDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* Phase 3 of the Smith Creek Greenway project proposes to construct a greenway from the terminus of Phase 2 at Ligon Mill Road north along the west side of Smith Creek to connect to existing greenway trails in the vicinity of Heritage High School. Phase 3 of the greenway trail will begin at the Phase 2 terminus at Ligon Mill Rd. as a paved 10-foot multi -use path, and will proceed north on the west side of Smith Creek to connect to existing trails in the vicinity of Heritage High School. Boardwalks and bridges will be used to cross streams and wetlands. The path will be constructed using the "top -down" method, which minimizes disturbance. Typical construction equipment will be used. Erosion and sedimentation will be controlled according to the erosion control plan. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach docurrent A16008.03_Planset_Full-NoRise.pdf 27.98MB A16008.03_SmithCreek_Phase3_Structure_Plans. p... 2.99MB A16800_BufferPermitDrawings_20200107.pdf 2.36MB FUF only 5. Jurisdictional Determinations ^ 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* f• Yes f No 5b. Who did the determination on the jurisdictional areas? Who did the determination? List name if known Date Attach Agent/Consultant D. Cooper, H. Smith - VHB 11/21/2016 (Formerly Ecological Eng.) (Nave if known) Sm. 1 Pdf only *** Please include the date of the determination and upload a copy of the determination. Comments: James Lastinger/USAGE and Rick Trone/NCDWR met on -site with David CooperNHB/Ecological Engineering on Feb. 21, 2017 to verify the delineation. SAW-2017-00380 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No 6b. List any permits/approvals that have been requested or obtained for this project in the past. Application Date Date Issued Permit Type 6c. Please explain and detail according to "help file" instructions.* Unknown dates of application/issuance for Phase 1 of this greenway. 7. Future Project Plans ^ ............................................ -..... 7a. Is this project a phased project?* r Yes r No 7b. If yes, explain* The greenway is set up due to funding sources as a phased project. Phase 1 has been constructed. Phase 2 (recently submitted) connects Phase 1 south of Burlington Mills Rd. to Ligon Mill Rd. Phase 3 (this submittal) will connect from the end of Phase 2 at Ligon Mill Rd. to e)asting trails in the vicinity of Heritage High School. C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* r Neuse River Basin (15A NCAC 02B.0233) f Catawba River Basin (15A NCAC 02B.0243) r Randleman Lake Watershed (15A NCAC 02B.0250) r Tar -Pamlico River Basin (15A NCAC 02B.0259) f Jordan Lake Watershed (15A NCAC 02B.0267) r Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type * Zone 1 Zone 2 Site 1 - Trail Smith Creek Permanent Allowable 300.00 2,640. Footprint (P) Square 00 Nbp label (e.g. Road Perm or Terrp Feet Square Crossing 1) Feet Site 1 - Clearing Smith Creek Permanent Allowable 9,260. 8,147. rVbp label (e.g. Road (P) 00 00 Crossing 1) Perm orTerrp Square Square Feet Feet ^ Site 2 - Trail Stream M Permanent Allowable 601.00 414.00 Footprint (P) Square Square Nbp label (e.g. Fbad Fbrmor Tenp Feet Feet Crossing 1) Site 2 - Clearing Stream M Permanent Allowable 1,175. 805.00 Ift label (e.g. Fbad (P) 00 Square Grossing 1) FL-rmorTenp Square Feet Feet Site 3 - Trail Stream K Permanent Allowable 602.00 398.00 Footprint (P) Square Square Nbp label (e.g. Fbad Fbrmor Tenp Feet Feet Crossing 1) Site 3 - Clearing Stream K Permanent Allowable 952.00 620.00 Nbp label (e.g. Fbad (P) Square Square Grossing 1) FbrmorTenp Feet Feet Site 4 - Trail Stream J Permanent Allowable 27.00 0.00 Footprint (P) Square Square Ivbp label (e.g. Fbad Fbrmor Terrp Feet Feet Crossing 1) Site 4 - Clearing Stream J Permanent Allowable 1.00 283.00 Ivbp label (e.g. RDad (P) Square Square Crossing 1) FbrmorTenp Feet Feet Total Zone 1 Impacts: 12,918.00 Total Zone 2 Impacts: 13,307.00 Total Buffer Impacts: 26,225.00 Comments: The majority of the project is located within an existing cleared and maintained sanitary sewer easement. Impacts were assessed as follows: The area within the proposed limits of disturbance within the buffer and outside the existing maintained easement is included as impact in the table above. The area within the proposed limits of disturbance within the buffer and also within the existing maintained easement was excluded from impacts. D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* The route of the proposed greenway was chosen to avoid wetland and stream impacts. Boardwalks and bridges will be used to cross wetlands and streams, avoiding impacts in those areas. The existing piped stream crossing at Stream J was evaluated and the project was designed to avoid an extension of this pipe, thereby avoiding a stream impact in this area. The existing pipe will remain in place. The limits of disturbance for erosion control measures were adjusted to avoid all wetland impacts. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. * The "top -down" method will be used to construct the path, which minimizes soil disturbance. E. Diffuse Flow Plan 1a. What type of SCM are you providing?* F Level Spreader W Vegetated Conveyance (lower SHWT) r— Wetland Swale (higher SHWT) W Proposed project will not create concentrated stormwater flow through the buffer r— Other SCM that removed minimum of 30% nitrogen 1c. Diffuse Flow Documentation* click the upload button or drag and drop files here to attachdocurrent Diffuse Flow Statement.pdf 31.8KB FDF only F. Supplementary Information Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? C, 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? C Yes r No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? C �' Nu 2b. Is this an after -the -fact buffer authorization application? C Yes r No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach docurrent USFWS_ConcurrenceRequest _SmithCreekPh2- 15.82MB 3_20191213.pdf EmailConfirmation_GaryJordan_20191217.pdf 187.94KB ER 18-1632.pdf 100.25KB FDF only Additional Comments: H. Sign and Submit By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the application form." Print Name:* David G. Cooper Signature Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version:* Select Reviewer: Select Reviewing Office* Has payment been received?* O Yes O No O Yes C No 20200045 1 Rob Ridings:eads\rgridings Central Office - (919) 707-9000 t: No Payment Needed r Fee Received r Need Fee - send electronic notification