Loading...
HomeMy WebLinkAboutNC0024201_Pretreatment Compliance Inspection_20200107ROY COOPER Coveotur MICHAEL S. REGAN Secretary LINDA CULPEPPER Dirooc) Danieley Brown, CEO Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, North Carolina 27870 t r?TH CAre�'`r� £rlwtronmcntal Quality January 7, 2020 Subject: Pretreatment Compliance Inspection Roanoke Rapids Sanitary District (RRSD) NPDES Permit No. NCO02420I Halifax County Dear Mr. Brown: M.11i ^ i #, r On December 5, 2019, Cheng Zhang of the Raleigh Regional Office, Division of Water Resources conducted a Pretreatment Compliance Inspection of the Roanoke Rapids Sanitary District's Pretreatment Program. The assistance of Ms. Isabelle Wilcoxon, the Pretreatment Coordinator, was greatly appreciated as it facilitated the inspection process. The inspection report is attached. Findings during the inspection were as follows: 1. There are three Significant Industrial Users (SIUs), two of which are also Categorical Industrial Users (CIUs). It was noted that no SIUs were in Significant Non -Compliance (SNC) during the past two semi-annual periods. 2. A review of the files containing the pretreatment program elements was conducted. These files were available and well organized. Update of Headwork Analysis was approved by the Division on November 5, 2019. Update of Long Term Monitoring Plan (LTMP) was submitted on November 20, 2019. 3. The review of LTMP data indicated that all locations were sampled with required frequencies and detection limits since last inspection. 4. The pretreatment inspection file review included Rosemary Power Station (Permit No. 0007), Reser's Fine Food (Pen -nit No. 0009), and Kennametal (Pen -nit No. 0002). The files needed for review were available for inspection, contained the required elements and were in good condition. The POTW completed all required sampling. All SIUs completed their monitoring and submitted monitoring reports on time as required by the Industrial User Pretreatment Permits (IUDs). During the first semi-annual period of 2019, Rosemary Power Station and Kennametal were in compliance. Rcser's Fine Food had one TSS violation from POTW sampling in April 2019. The POTW took appropriate enforcement �\ V<rrth (:ar, 1'n,� I)r irm tn'rn1 q` Ensirttr ircnr.+l Qmikr � D v'•,inn of Wvty RcimirEcs ��� Ra1c;ylrRcrlicm4 Ofiia• ';d!}UEi•uIII tDriv¢ €olrr,4i,ht•rr1,C�I;Oin.r3rbgr) actions per Enforcement Response Plan (issuance of Notice of Violation and civil penalty assessment). The Roanoke Rapids Sanitary District's pretreatment program is well managed. Thank you for your continued support of the Pretreatment Program. If you have any questions or comments, please call Cheng Zhang at (919) 791-4200 (or email: cheng.zhang�' ncdenr.gov). Sincerely, Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources Enclosure: 2019 Roanoke Rapids Sanitary District PCI Inspection Form CC: Monti Hassan, DWR - PERCS Unit (Laserficlie) Central Files (Laserfiche) Cheng Zhang, RRO Isabelle Wilcoxon, RRSD (electronic copy only) NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFOILNIATION lComplete Prior To PCI: Review Program Info Database Sheet s I . Control Authority (POTW) Name: Roanoke Rapids Sanitary District 2. Control Authority Representative(s): Isabelle Wilcoxon 3. Title(s): Pretreatment Coordinator 4. Last Inspection Date: Mav_11, 2018 Inspection Type (Check One)- ❑ PCI ® Audit 5. Has Program Completed All Requirements from (lie Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6, Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ❑ ,NO Order Type, Number, Parameters: [CIS CODING Alain Program Pennit Number ,SUM DD yy N I C 1 O 10 121412 1 011 1 LU 05LI9! Are Milestone Dates Being Met? ❑ YES ElNO 7. Current Number Of Significant Industrial Users (SIUs)? 3 8. Number of SIUs With No [UP, or With an Expired IUP? C 9. Number of SIUs Not Inspected.By POTW in the Last Calendar Year'? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? C 11. Number of S1Us In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? C 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number ofSIUs in SNC with Pretreatment Schedule? C 14. Number of SIUs on Schedules? C 15. Current Number Of Categorical industrial Users (CIUs)? C 16. Number of CIUs in SNC? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? ❑ YES ®NO If Yes, What are the Parameters and How are these Problems Being Addressed`? I8. Since the Last PCI, has the POTW had any Problems Related to an Industrial ❑ YES ® NO Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed'? 19. Which Industries have been in SNC for Limits or Reporting during SIC for Limits: None either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Reporting: None Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Published: None 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? N A 21, Are Any Permits or Civil Penalties Currently Under Adjudication'? If Yes, Which Ones? ❑ YES ®NO LTi`IP/STiyIP FILE REVIEW: 22. Is LTMP.:STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP.'STNiP Monitoring? ®YES ❑ NO 24. Is LTMP:'STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25, All LTMP?'STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verifyyourselP 26. If NO to 23 - 26, list violations 27. Should any Pollutants of Concern'be Eliminated from or Added to LTMP/STNIP? ❑ YES ® NO If yes, which ones? Eliminated: Added: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 28. PRETREATMENT PROCKAi I ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files, complete with sueporting documents and copy of PERCS Approval Letter, and dates consistem with Program Info: Program Element Last Submittal Date In tile? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis IIWA) 5/112019 Z YesEl No 111512019 Yes No 7412025 Industrial Waste Surve • (IWS) 12/2012017 Yes No 1/18/2018 Yes No 2f1/2023 Sewer Use Ordinance (5U0) 10/2112011 Yes No 1[1/2112011 Yes Na Enforcement Response Plan (ERP) 1 101212012 Ye7EJ No 1015/2012 Zq Yes No Long Term Monitoring Plan (LTVIP) 1 11/2002019 Yes 0 No 2/23/2017 El Yes EFNo INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR I FILE REVIEW AND 1 IU INSPECTION) 29, User Name 1. Rosemary Power Station 2. Kennametal P. Reser's Fine Food 30. [UP Number 0007 1 00 1 0009 31. Does File Contain Current Permit? 0 Yes El No Yes 0 No 11 El Yes El No 32. Permit Ex iration Date 5/31/2022 53112022 5/31/2022 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N'A 423.17 471J NIA 34, Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ® Yes D No 0 Yes No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year'? G3 Yes 0 No I L<J Yes U No Yes No 36. a. Does the File Contain a Slug/Spill Control Plan'? a. ®Yes [IN o a. ®Yes ❑No 1b. a. ®Yes ❑No b. If No, is One Needed`? (See Inspection Form from POTW) b. ❑Yes ❑No ❑Ye.s ❑No b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑ti'es❑NoElN A A ❑Yes❑NoEN A Organic Mana ement Plan (TOMP)? 1[❑Ye5ONc!EI 11 38. a. Does File Contain Original Permit Review Letter from the Division? a. ®Yes ❑No a. ®Yes ❑No a. ®Yes ❑No b. All Issues Resolved? b ❑Yes❑No❑N A b.❑YLs❑No❑N A b ❑Yes❑No❑N A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete ® Yes ❑ Yes No Yes No its Sampling as Required b IUP, including flow? Hm 40, Does File Contain POTW Sampling Chain-Of-Custod Forms? 21 Yes El No UYes U No 11 U Yes INo 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its ®Ycs❑tio❑` A ®Ycs❑NoQN'A ®Yes❑tio❑N:A Sampling as Required by IUP, including flow? 4lb. During the Most Recent Semi -Annual Period, Did SIU submit all reports EYes❑No❑` A ®Yes❑No❑NIA EYcs❑No❑N'A an time? 42a. For categorical [Us with Combined Wastestream Formula (CWF), does ❑Yes❑`oEN A ❑Yes❑NOON A ❑Ycs❑No®N`A file include rocess,'dilution flows as Required by IUP? 42b. For categorical [Us with Production based limits, does File include ❑Y'cs❑NoEN-A OYesO'NoON ❑Ycs❑NoON.:A production rates and.:or flows as Required b [UP? A 43a, During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑NoEN A ❑Yes❑tioEN A Yes ElNo All Limits Non -Compliance from Both POTW and SIU Sampling? 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Ycs❑tio®ti A7�� oEN.A ❑Yes❑NoEN A All Re artin Non -Cam liance from SIU Sampling? 11 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑No®N' A a.❑Ycs❑NoMN` A a.❑Yes❑No®N A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days`? b.❑tesONopN A b ❑YoMoEN A b.MYcs❑tio❑N A c. If applicable, Did POTW resample within 30 days of becoming aware = of SIU limit violations in the POTW's sampling of the SIU? c ❑ti c5❑NoEN A c ❑Yes❑NOON A c ❑Yes®No❑N A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? I El Yes Z No Yes Z No 11 0 Yes El No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken ON es❑NoON A 1 ❑Yes❑No®N' A ®Ycs❑No❑N A as Specified in the POTW's ERP (NOVs, Penalties, timing,etc.)? 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑N,MN A ❑Ycs❑NoON-A 11 EYes❑No❑N-A 49. Does The File Contain Proof Of Penalty Collection? ❑Yes❑No®N A ❑Ycs❑NoEN A ®Ycs❑No❑N A 50. a. Does the File Contain Any Current Enforcement Orders? a.❑YesONomN A a.❑Yes❑ 'uON'A a.❑Yes❑NoGN A b. Is SIU in Com liance with Order? b ❑Yes❑Nom ''A b ❑Yes❑NoB14 A b.❑Yes❑No0N A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This Yes ® No El Yes ®No ❑ Yes Z No Requested Information For You? E __p I NC DWR Pretreatment Compliance Inspection (PC[) Form Updated December 2016 Page 2 FILE REVIEW COMMENTS: 43a — Reser's Fine Food had one TSS violation from POT«' samplinb in April 2019. 47 & 48 — POTW issued a NON' with civil penalty assessment ($325) on May 24, 2019. INDUSTRY INSPECTION [CIS CODING: Main Program Permit Number NIM DD. N'Y I. Industry Inspected: 2. Industry Address: 3. Type of Industry: -Product: 4. Industry Contact: Title: Phone: Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: The program was well managed Requirements: None Recommendations: None NOD: ❑ YES ® NO NOV: ❑ YES ® NO QNCR: ❑ YES ® NO POTW Rating: Satisfactory Z Marginal ❑ UnSatisfactory ❑ PCI COMPLETED BY: Cheng Zhang. DWR Raleigh Regional Office DATE: December 5. 2019 NC DWR Pretreatment Compliance Inspection (PCI) Form Updaied December 2016 Pag* 3