HomeMy WebLinkAboutNCC200099_ESC Approval Submitted_20200110ROY COOPER
Governor
MICHAEL S. REGAN
Secretory
S. DANIEL SMITH
interim Director
NORTH CAROLINA
Environmental Quality
June 20, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
Duke Energy Progress, LLC
Attn: Mr. Issa Zarzar, GM-CCP Central Projects
410 S. Wilmington Street
Raleigh, NC 27601
RE: Project Name: H.F. Lee 1982 Ash Basin Haul Road Improvements,
Pipe Removal, and Powerline Corridor
Project ID: Wayne-2019-032
Acres Approved: 6.64 County: Wayne
Address: 1677 Old Smithfield Road City: N/A
River Basin: Neuse
Date Received by LQS: May 30, 2019
Submitted By: Wood Environment & Infrastructure Solutions
Plan Type: New
Dear Sir,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval, The enclosed Certificate of Approval must
be posted at the job site. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC
413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO 10000 Construction Stormwater General Permit. This form MUST be submitted prior to the
commencement of any Iand disturbing activity on the above named project. The NOI form may be
accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.elark@ncdenr.gov. After you submit a complete
and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR
will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a
$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office
staff in Raleigh.
Title 15A NCAC 413.0118(a) and the NCGOI permit require that the following documentation be
kept on file at the job site:
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Washington Regional Office 1 943 Washington Square Mall } Washington, North Carolina 27889
r cnpautan
oewmneme�xon.epn� /"� 252.946.6481
1. The approved E&SC plan as well as any approved deviation.
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute it3A-51
through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended farm
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Please be advised that a rule to protect and maintain existing buffers along watercourses in the
Neuse River Basin became effective on July 22, 1997. The Neuse River Riparian Area Protection
and Maintenance Rule (15A NCAC 2B.0233) applies to the 50-foot wide zone directly adjacent to
surface waters (intermittent streams, perennial streams, lakes, ponds, and estuaries) in the Neuse
River Basin. For more information about this riparian area rule, please contact the Division of
Water Resources Wetland/401 Unit at 919-807-6300, or DWR in our regional office at 252-946-
6481.
Sincerely,
Samir Dumpor, P.E.
Regional Engineer
cc w/o enc: Issa Zarzar, Duke Energy Progress, LLC (email)
Dick Parks, P.E., Wood Environment & Infrastructure Solutions (email)
WaRO Division of Water Resources
The developer is responsible for the control of sediment on -site. If the approved erosion
and sedimentation control measures prove insufficient, the developer must take those
additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)).
Each sediment storage device must be inspected after each storm event (NCGS 113A-
54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity.
All sediment storage measures will remain on site and functional until all grading and final
landscaping of the project is complete (15A NCAC 04B .0113).
2. The developer is responsible for obtaining all permits and approvals necessary for the
development of this project prior to the commencement of this land disturbing activity.
This could include our agency's Stormwater regulations and the Division of Water
Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S.
Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division
of Coastal Management's CAMA requirements, the Division of Solid Waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S.
Army Corps of Engineers jurisdiction of the Clean Water Act, local County or
Municipalities' ordinances, or others that may be required. This approval cannot supersede
any other permit or approval.
3. Adequate and appropriate measures must be properly installed downstream, within
the limits of disturbance, of any land disturbing activity to prevent sediment from
leaving the limits of disturbance, entering existing drainage systems, impacting an on -
site natural watercourse or adjoining property. (NCGS 113A-S7)
PROJECT INFORMATION SHEET
APPROVAL DATE: June 20, 2019
RESPONSIBLE PARTY: Duke Energy Progress, LLC
H.F. Lee 1982 Ash Basin Haul Road Improvements,
PROJECT NAME: Pipe Removal, and Powerline Corridor
COUNTY: _Wayne NO.: Wayne-2019-032
OFF -SITE BORROW
AND/OR DISPOSAL SITE:
START-UP DATE:
CONTRACTOR:
ON -SITE CONTACT:
ON -SITE PHONE NO.:
OFFICE PHONE NO.:
I Us
COMPLETE & RETURN THIS FORM
PRIOR TO THE START OF CONSTRUCTION UCTION TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: James Edwards
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
james.edwards@ncdenr.gov