Loading...
HomeMy WebLinkAboutSW1191202_Circle K Mills River (Jeffress Rd)_12-23-19_1/9/2020c� z_ H J Cn Cn Z O U z O m 0 r m ¢ 0 w m cn J _ CD Z H J cn (n Z O U Z O m m m nof O w 0 0 z z 0 N 0 _ Q z w CD 0 z w CD cn z 0 w LLj Of Of Z Q J I O Of 0 z Q 0 U) Of 0 w Of LLj cn ¢ U O LIj U 0 z Q w cn 0 U U a_ cn w Elf w r J z 0 0 w 0 z w z cn U Of w 0 z w Of z z ¢ cn Of LIj z w 0 z LIj Of a_ cn CD cn 0 0 z Q cn LIj z 0 U w Elf _ CD 0 z w U O N _ H PROPOSED SITE DEVELOPMENT FOR: CIRCLE K STORE NE CORNER BOYLSTON HWY AND JEFFRESS RD. SITE AREA: DISTURBED AREA: +/-1.80 AC +/-2.14 AC PROJECT DESCRIPTION: THIS PROJECT CONSISTS OF THE CONSTRUCTION OF A NEW CONVENIENCE STORE/GAS STATION WITH ALL ASSOCIATED UTILITIES, DRAINAGE, AND INFRASTRUCTURE. THE PROPOSED SITE AREA IS +/-1.80 ACRES WITH FRONTAGES OF +/- 360 FEET ON BOYLSTON HIGHWAY. THIS PROJECT IS A PART OF A LARGER PARCEL. UTILITY PROVIDERS: WATER CITY OF HENDERSONVILLE 160 SIXTH AVENUE E HENDERSONVILLE, NC 28782 (828) 233-3237 SEWER CRANE CREEK SEWER DISTRICT 100 N KING ST. HENDERSONVILLE, NC 28782 (828) 694-6526 STORM WATER NORTH CAROLINA DEQ 217 W. JONES ST. RALEIGH, NC 27603 (828) 296-4698 BENCHMARK: ELECTRIC DUKE ENERGY CAROLINAS 957 SPARTANBURG HWY. HENDERSONVILLE, NC 28792 (866) 236-3749 GAS DOMINION ENERGY 15 OVERLAND INDUSTRIAL BLVD, ASHEVILLE, NC 28806 (877) 776-2427 COMMUNICATION AT&T (800) 288-2020 TEMPORARY BENCHMARK AT RIM OF SANITARY SEWER MANHOLE LOCATED AT SOUTHWEST CORNER OF SITE, ±71 FEET SOUTH FROM THE SOUTHWEST CORNER OF THE PROPERTY. RIM ELEVATION OF MANHOLE IS 2092.72'. TEMPORARY BENCHMARK AT RIM OF SANITARY SEWER MANHOLE LOCATED AT NORTH EAST CORNER OF SITE, ±29 FEET WEST FROM FROM THE NORTHWEST CORNER OF THE PROPERTY. RIM ELEVATION OF MANHOLE IS 2102.65'. VERTICAL DATUM FOR SITE BASED ON GPS OBSERVATION USING CORS STATIONS "HAYWOOD CORS", "HENDERCONVILLE CORS" AND "SWANNANOA CORS" (NGVD 88) FLOOD NOTE: THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA BASED ON THE FLOOD INSURANCE RATE MAP FOR THIS AREA. THE MAP NUMBER FOR THIS AREA IS 3700963200J, AND THE DATE OF SAID MAP IS OCTOBER 2, 2008. THIS DETERMINATION WAS MADE BY GRAPHICALLY DETERMINING THE POSITION OF THIS SITE ON SAID FIRM MAPS UNLESS OTHERWISE NOTED. MILLS RIVER, NC PARCEL I D# 39632-60-9234 SITE LOCATION MAP NOT TO SCALE DIRECTIONS TO PROJECT SITE: FOLLOW 1-26 W TO US-25 N IN HOPPERS CREEK. TAKE EXIT 44 FROM 1-26 W. TAKE BUTLER BRIDGE RD TO JEFFRESS ROAD IN MILLS RIVER. THE SITE WILL BE ON THE SOUTH EAST CORNER OF BOYLSTON HWY AND JEFFRESS RD. SURVEYOR: MSP & ASSOCIATES LAND SURVEYING, INC. LAND SURVEYOR: MICHAEL S. PERDUE 301 HILLCREST DR. GREENVILLE, SC 29609 PHONE: (864) 370-2232 MPERDUE@MSPSURVEYING.COM OWNER / DEVELOPER OWNER/DEVELOPER: CIRCLE K STORES INC TAYLOR SEELOFF 2550 W. TYVOLA ROAD SUITE 200 CHARLOTTE, NC 28217 PHONE: (478) 494-1828 EMAIL: TSEELOFF@CIRCLEK.COM CIVIL ENGINEER: BOWMAN CONSULTING ENGINEER OF RECORD: KAI BURK 950 NORTH POINT PARKWAY SUITE 200 ALPHARETTA, GA 30005 PHONE: (678) 374-6687 KBURK@BOWMANCONSULTING.COM TM LANDSCAPE ARCHITECT: MANLEY LAND DESIGN, INC. PROFESSIONAL LANDSCAPE ARCHITECT: STEVE MANLEY 51 OLD CANTON STREET ALPHARETTA, GA 30009 PHONE: (770) 442-8171 SMANLEY@MANLEYLANDDESIGN.COM Bowman C O N S U L T 1 N G Sheet List Table Sheet Number Sheet Title C0.0 COVER SHEET S1.0 SURVEY D1.0 DEMOLITION PLAN C1.0 EROSION CONTROL - INITIAL PHASE C1.1 EROSION CONTROL - FINAL PHASE C1.2 EROSION CONTROL DETAILS C1.3 EROSION CONTROL DETAILS C2.0 SITE PLAN C2.1 SITE DETAILS C2.2 TRUCK TURN C2.5 SIGHT DISTANCE PLAN C3.0 GRADING & DRAINAGE PLAN C3.1 GRADING PROFILES C3.2 GRADING PROFILES C3.4 GRADING & DRAINAGE DETAILS C3.4 DETENTION DETAILS C4.0 UTILITY PLAN C4.1 UTILITY DETAILS L1.0 LANDSCAPE PLAN L1.1 LANDSCAPE DETAILS A-2 BUILDING ELEVATIONS A-3 BUILDING ELEVATIONS A-4 BUILDING ELEVATIONS A-5 CANOPY ELEVATIONS North Carolina Ono -Gall Center = a rwr w. Nwa W ] sws s@Ow: a w www Nam GALL I-b=-652-4449 ,,,namaa CONTrACM SWIMUL ,arw,opa aW awa ,o us O w, urowe ro anon ,xwno"s. Gall BEFORE you Pis[ "It's The Law" U o 00 CU o O M O Q I CN U M O N 0000 .= Co I— U) (2) O Co N Z s sz O O Q L L Cn 0N ''ry VJ W w n/UH z H Oho Z Q LU w w � 0 LL � �e)z LU " O W O LU (n U J U()° J LU U O U LU z J E ci 0 0 0� C � = c C O c U O a U co E 3: E O O co KAI BURK LICENSE NO. 043463 Lal z w J J_ LL O 0�_i 1 PLAN STATUS 1 DATE DESCRIPTION PL BG KB DESIGN DRAWN CHKD SCALE 1 " = 20' JOB No. 120003-01-050 DATE 1 FILE C0.0 -COVER SHEET 1 SHEET CO.0 CAD file name: V:\120003 — Circle K\120003-01-050 — Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C0.0 COVER SHEET.DWG 1 0 TITLE EXCEPTIONS VICINITY MAP 2 n 0 I°b I mo^ I � I / I IE=2( ' I=2( ry I - / I Q) I i I I , i /I CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE TANGENT C1 2867.28' 303.71' 303.57' N 06-30-19" E 6°04'08" 152.00' LINE BEARING DISTANCE L1 S 06°35'47" W 3.97' Q ' JB=2101.37' `� I I E=2098.07' 18"RCP I G IE=2099.27' MHSi=2102.17' IE=2p91.21' N/F BEAVER CREEK INVESTMENTS OF NC LLC PIN# 9632605275 SLIDE 10341 (DB. 3030, PG. 169) ASPHALT PARKING c a � -CONC. m EIP 1/2" REBAR N ca (0 o N Co (p M O co �o zo co 00 0 DET. POND -2104 S 84 °28'51 " E _ TBM - - 200.92' 00 TOP OF IE 2098.49' sr W - - - - _ ROW OF 4" FIR TREES _ - 1C MHSS=2102.65' IN �\ N - - - - - -� LAN6SCTAPE BUFF - - - 8"PVC- - -- co S 84°28'51" E ER o OUT)% M - - ----� 22.01' I �i $ Z I 2102 - - - SEWER ESMT. N MHSS=2102.65' - - � L - _ er (DB. 1688, _!F=2093.89' Z" EXCEP TION #7 "' I 3021 - `t DB PG- aa1 I °' I _ EIP 112" 30. BUILDING SETBACK `° _ REBAR C I I I i Lot 8R PIN# 9632609234 (Slide 4578) ' RAVEL I 011 I EIP - p� �� Im IEi2098.70' --f WATER TOP I a O wZ II 1 24' APLE WELL I 1 ma sI$ I I vJ � :5I I 230"E 101 MAPL' I I I II \ I I I n% I 24'\MAPLE I I ^ l I I ONE-STORY I I ��° Lf� I I 1 HOUSE I& 1 �- _ 1 210 \\ /'� I I Q M' j 1 jMP APLE I 12"Bi H coI I 0ai I I� IIIs 01 I� N/F I - I 0 z WMAPLE JAMES A GOODE , TRUSTEE of the I MHSS=209 18' 1 m o G7 JAMES GOODE REVOCABLE TRUST 10"PIN I IE�2089.73' IN) c l "5m PIN# 9632609234 IIE=2089.65' OUT) 1 "n (DB. 1689, PG. 46) 12"Pi I n o;)� I i U I I E=2095.9 I 20"MAPLE 36"MAPLE S�ED I I I °°° o I o CD PROPOSED PARCEL o � o M I 78426.54 Sq. Feet I I i I IE=2094.94' II I\ I I 1.800 Acres z 11 I ' 1 M M1 r. I / i C) ' I r / $ I GRAVEL- i I1 CANOPY � � I -----_ 2 8- -- SHED I I ti I ;: - cI� I 'CANOPY 1 co/ ❑ I Z ❑ ,.I I 1 3 / / I IE IE MHSS=2093�.54' I E=2087.77'(I N ) I E=2087.73'(O U OVERHEAD SIGNAL / TOP OF MHSS=2092.72' MHSS=2092.72' IE=2086.71'(IN) IE=2086.61'(OUT) 0 �o r' Lot 9 PIN# 9632609234 (Slide 4578) 2100 N 86°11'16r E Schedule B Section II Title Exceptions Chicago Title Insurance Company Commitment 1119-17624RA ; Effective Date: Sept. 26, 2019 J. Any right, easement, setback, interest, claim, encroachment, encumbrance, violation, variations or other adverse circumstance affecting the Title disclosed by plot(s) recorded in Plat Slides 10341, 8350, 6004, 5484, 4578, 3714, 2768, 2653, 2492; and Book of Maps ------, Page ---------- [new recombination plot] (LOT LINES AS SHOWN) 4. Any discrepancy, conflict, matters regarding access, shortage in area or boundary lines, encroachment, encumbrance, violation, variation, overlap, setback, easement or claims of easement, riparian right, and title to land within roads, ways, railroads, watercourses, burial grounds, marshes, dredged or filled areas or land below the mean highwoter mark or within the bounds of any adjoining body of water, or other adverse circumstance affecting the Title that would be disclosed by a current inspection and accurate and complete land survey of the Land. 5. The correctness of the square footage/acreage computation contained in the description of the Land is not insured. 6. Title to any portion of the Land lying within the right of way of Boylston Hwy (NC Hwy 191 and NC Hwy 280). 7. Sewer Easement to Cane Creek Water and Sewer District of Henderson County recorded in Book 1688, page 654, Henderson County Registry. (AFFECTS SITE AS PLOTTED) 8. Easements for public/private utilities. 9. Rights of tenants in possession, as tenants only, under unrecorded leases. 10. Right(s) of way to Duke Power Company recorded in Book 541, page 17, and Book 573, page 943, Henderson County Registry. (BLANKET EASEMENT) 11. Eosement(s)/ Right(s) of Way to State Highway Commission recorded in Book 742, page 213; Book 742, page 211; Book 715, page 689; and Book 715, page 795. (R/W OF NC HWY 280 AS SHOWN) 12. Right(s) of way to Department of Transportation recorded in Book 716, page 290; and Book 716, page 287, Henderson County Registry. (R/W OF NC HWY 280 AS SHOWN) 13. Eosement(s) to Duke Power Company / Duke Energy Corp. recorded in Book 968, page 418. (DOES NOT AFFECT SITE) 14. Eosement(s) to Southern Bell Telephone and Telegraph Company recorded in Book 727, page 215. (DOES NOT AFFECT SITE) 15. Any statutory lien or claim of lien affecting Title to the Land that arises from labor, services, materials or rental equipment heretofore or hereafter furnished by, through, with, at the direction of, or under contracts with the Insured owner of the Land identified in Schedule A of this policy or its affiliates. LEGAL DESCRIPTION All that tract or parcel of land lying and being in Mills River, Henderson County, state of North Carolina and being more particularly described as follows: Commencing from the intersection of the northern right-of-way Jeffress Rood and the eastern right-of-way of Boylston Hwy; thence with said right-of-woy of Boylston Hwy. N 02°38'03" E a distance of 44.29' to a 1/2" rebar found, said pin being The True Point of Beginning; thence continuing with said right-of-way the following calls: thence with a curve turning to the right with an arc length of 303.71 ', with a radius of 2867.28, with a chord bearing of N 06°30'19" E, with a chord length of 303.57' to a 1/2" rebor found; thence N 12"1631 " E a distance of 39.26' to a point, thence leaving said right-of-way S 84'2851 " E a distance of 200.92' to a point; thence S 84"2851 " E a distance of 22.01 ' to a point; thence S 06°34'06" W a distance of 303.52' to a point; thence N 84'17'02" W a distance of 22.00' to a 1 " open top found, thence N 84"17'02" W a distance of 204.35' to a 1/2" rebar found, said pin being The True Point of Beginning. Said Parcel having an area of 78426.54 square feet, 1.800 acres O� �O N <S SITE R�VFR N. T. S LEGEND m JEFFRESS RD CB CATCH BASIN CPP CORRUGATED PLASTIC PIPE GUY WIRE CT CRIMPED TOP PIPE - G - GAS LINE DI DROP INLET -W- WATER LINE IE INVERT ELEVATION JB JUNCTION BOX -OHP- POWER LINE MH MANHOLE - E - UNDERGROUND POWER LINE OT OPEN TOP PIPE POB POINT OF BEGINNING - T - UNDERGROUND PHONE LINE POC POINT OF COMMENCEMENT - FO - FIBER OPTIC TBM TEMPORARY BENCHMARK RCP REINFORCED CONCRETE PIPE POWER POLE SS SANITARY SEWER ® SANITARY SEWER MANHOLE OHP OVERHEAD POWER EIP IRON PIN FOUND STORM SEWER MANHOLE NIP IRON PIN SET CATCH BASIN O WATER VALVE LP FH LIGHT POLE O WATER METER © GAS VALVE FIRE HYDRANT © GAS METER T❑ TRANSFORMER T TELEPHONE PEDESTAL SIG SIGNAL BOX GENERAL NOTES This property is in Zone X based on Flood Insurance Rate Map 3700963100J dated Oct. 2, 2008. This determination was made by graphically determining the position of said site on said FIRM Map. Vertical datum for site based on GPS observation using CORs Stations "HAYWOOD CORS", "HENDERSCONVILLE CORS" and 'SWANNANOA CORS" (NGVD 88) Contact proper Authorities Before building near utility lines, for easement width and restrictions. Underground Utilities are approximate and should be verified prior to any construction. Locations shown are approximate. This survey has been prepared for the exclusive use of the person or entities named hereon. No express or implies warranties with respect to the information shown hereon is to be extended to any persons or entities other than those shown hereon. Property Zoned Setbacks to be verified by Site Engineer I, Michael S. Perdue certify that this plat was drawn under my supervision from on actual survey made under my supervision and is a portion of DB. 1689 pg. 46; that the ratio of precision as calculated 1: 20,000 + and was not adjusted, that this plat was prepared in accordance with G.S. 47-30 as amended. Witness my original signature, registration # and seal this 4th day of Sept 2019. 00, That this survey h$ - i parcels of land, existing structures and buildings and does not Great r chan e existing streets. -WrI S. rdue, PLS# L-4322 The property shown hereon Parcel 119632609234 Survey references: DB. 1689, PG. 46 0 BUILDING SETBACK I I Lot 5 PIN# 9632609234 <� _ PO B - ' ��---� / � � I I (Slide 2492) -1 EIP1/2"- _ co I SURVEYORS CERTIFICATE J REBAR 2097 I SCAR EIP 1" I N 84°17-02" W 204.35' a°PEAR - 4"PEAR TQP- " To: Circle K Stores Inc., James A. Goode, Trustee of the James Goode \ W 4 PEAR "P12"MAPLE N 84°1702" Revocable Trust and Chicago Title Insurance Company I 4EAR M 2097 22.00' This is to certify that this mop or plot and the survey on which rn \ I� 2097 15" E it is based were mode in accordance with the 2016 Minimum N IN \' Standard Detail Requirements for ALTA/NSPS Land Title Surveys, 01 �O co established and adopted by ALTA and NSPS, and includes N/F N `\J items 1-4, 7o,b, 8, 9, 11, 13, 14, 16, 17, 19 and 20 of Table P O C A thereof . T k was completed on 914119. MARRY LEE KEITH o `* P �q 1 PIN# 9631694639 cn L (DB. 512, PG. 59) 914119 o 2 � \ G N O 0 Know what's below 0 ® Call before you dig. Q Dial 811 Or Call 800-282-7411 GRAPHIC SCALE 0 30 60 90 V-30' EIP 3/4" OPEN TOP EIP MON. E N � Lot 4 m Co PIN# 9632609234 o (Slide 2492) co �IN C = & ASSOCIATES LAND SURVEYING, INC. 301 E HILLCREST DR. GREENVILLE SC, 29609 864-370-2232 WWW MSPSURVEYING. COM MICHAEL S. PERDUE ,PLS # L-4322 Michael S. Perdue PLS #L-4322 Date ALTA/NSPS LAND TITLE SURVEY FOR CIRCLE K STORES INC. CITY. • MILLS RIVER COUNTY: HENDERSON STATE: NORTH CAROLINA DATE OF SURVEY. 914119 SCALE: 1:30 FIELD WORK: MSP DRAWN BY. MSP REVIEWED BY: MSP MSP FILE: CKROCK MSP JOB# : 191351 c� z_ H J z 0 U Q 0 m 0 r m Q J C) 0 w m J a _ c� z J C/) UU Z Q 0 m r m z O a 0 z Q z 0 Q N CD 0 Ld a z C) 0 _ z U LLj 0 z 0 w U LLj Of Q J CY w o Of Ld z 0 Ld Of 0 w Of a m w Q _ U_ _ C) 0 LLj z U 0 z Q w Of Of U L� U w C1 (/) LJ H Of CD Z 0 0 w 0 z w Li U LLj Of 0 z w Of z Q Q z w _ LLj 0 Of r z w Ld Of o- z cD U) 0 0 z Q w U Z O U w Ld Of w cD 0 z w U O I I I � \ 0 -m I—v , / RA,&I lS '8' 15"u CMP PIPE TU EJE REMOVED 00 7A1 ��� I H ANGLE 6°04'08*-, v t ",4-AN GENT 152.00' \ - S TO N H WY. ' \ \—30 RCP PIPE �15 MF,PIPE TO TO REMAIN BE REMOVED NC-280 \ \ 4. APH \ \ 75 R/W \ \ \2700 \ \ \2099\ \ \ \ M W i 096 \209" 0 \2098 \ \ \ \ 0 \ \ 0�� i i !v O 1' \ O MHSS=2093.54' IE=2087.77'(IN) _ IITI DEMOLITION NOTES 1 1. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATION APPROVED BY ALL GOVERNING AUTHORITIES) OF ALL MATERIALS, SUCH THAT THE IMPROVEMENTS SHOWN ON THE REMAINING PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE SPECIFICATIONS. 2. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING OF THE DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICES TO ANY NECESSARY UTILITIES DURING CONSTRUCTION. 4. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. 5. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN DETERMINED FROM INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START OF ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR ONSITE LOCATIONS OF EXISTING UTILITIES. 6. ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH THE WORK. 7. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN ANY ROAD RIGHT OF WAY DURING CONSTRUCTION. 8. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC., (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY CONSTRUCTION MANAGER. 9. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE EXISTING FACILITIES. 10. PRIOR TO DEMOLITION OCCURRING, THE INITIAL PHASE EROSION CONTROL DEVICES ARE TO BE INSTALLED. (SEE SWPPP SHT C1.0) 11. CONTRACTOR MUST LIMIT SAW -CUT & PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC,. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL AND REPAIR. 12. THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPT. AND THE TOWN/COUNTY UTILITY DEPARTMENT TO PLAN PROPOSED IMPROVEMENTS AND TO ENSURE ADEQUATE FIRE PROTECTION IS CONSTANTLY AVAILABLE TO THE STORE AND SITE THROUGHOUT THIS SPECIFIC WORKAND THROUGH ALL PHASES OF CONSTRUCTION. CONTRACTOR WILL BE RESPONSIBLE FOR ARRANGING/PROVIDING ANY REQUIRED WATER MAIN SHUT OFFS WITH THE CITY/COUNTY DURING CONSTRUCTION. ANY COSTS ASSOCIATED WITH WATER MAIN SHUT OFFS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND NO EXTRA COMPENSATION WILL BE PROVIDED. 13. DAMAGE TO ALL EXISTING FACILITIES AND IMPROVEMENTS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE. 14. FOR ALL ITEMS NOTED TO BE REMOVED, REMOVE NOT ONLY THE ABOVE GROUND ELEMENTS, BUT ALSO REMOVE ALL UNDERGROUND ELEMENTS AS WELL INCLUDING, BUT NOT LIMITED TO; FOUNDATIONS, GRAVEL FILLS, TREE ROOTS, PIPES, TANKS, ETC. 15. BACKFILL FOR ALL EXCAVATIONS RESULTING FROM THE DEMOLITION WORK MUST MEET THE REQUIREMENTS FOR FILL OUTLINED IN THE GEOTECHNICAL INVESTIGATION REPORT FOR THIS SITE. 16. ASBESTOS AND ANY OTHER HAZARDOUS MATERIAL SHALL BE PROPERLY PERMITTED AND REMOVED BY THE CONTRACTOR. CONTRACTOR SHALL SECURE ALL PERMITS FOR DEMOLITION AND REMOVAL OF MATERIALS FROM THE SITE. 17. SEPTIC TANKS MAY EXIST ON THE EXISTING PARCELS. CONTRACTOR TO REMOVE AND DISPOSE SEPTIC TANK AND ASSOCIATED MATERIAL IN A LAWFUL MANNER. D J 0 0 0) c c 0 U c Cu E 0 m 0 Z 0 r==j 0 u J Cu Cu Cu 0 CD O 04 0 LO CD CD o co Q U r— 00 1-t � co o E o a a .= a 0 0 C� Cn c y..� 0 z U) Cu Cu = s- c 0 Cu E 3:E C) m � � Q p m 0 N0N W w n/UH z H 0LU Z p LEGEND - EXISTING J z z U) 0 � I W w TBM TEMPORARY BENCHMARK RCP REINFORCED CONCRETE PIPE 7 Z (j � LL i O O InIRON PIN SET (5/8" REBAR) OS SSMH SANITARY SEWER MANHOLE u- = (n O IPF IRON PIN FOUND © GMH GREASE MANHOLE LLI Z i R/W RIGHT-OF-WAY ® CO CLEANOUT O rQi PP POWER POLE ElT-PED TELEPHONE PEDESTAL � 0 LLI El EM ELECTRIC METER —tT SIGN \ /— J 1 HEADLIGHT STANDARD OHE— OVERHEAD ELECTRIC LINE LLI Z 2 HEAD LIGHT STANDARD SS — SANITARY SEWER LINE O cv N GAS VALVE W — WATER LINE J m WATER VALVE J WATER METER — G — GAS LINE _ ui WM WHITE LINE � � �® yYW FIRE HYDRANT — — DASHED WHITE LINE z�/ L.I_ O MW MONITORING WELL DOUBLE YELLOW LINE O & IRRIGATION CONTROL VALVE --------- 5' CONTOUR U ® SDMH STORM DRAIN MANHOLE --------- 1' CONTOUR LL] ❑ CBDI CATCH BASIN DROP INLET STORM DRAIN PIPE z LEGEND - DEMOLITION .. :. : REMOVE ALL BUILDINGS, ASPHALT •�' '' PAVEMENT, CONCRETE PAVEMENT, ! CONCRETE PADS, CONCRETE SIDEWALKS, AND VEGETATION // -// -// -// -// -// - UTILITY REMOVAL X-X-X-X-X-X-X-X- REMOVAL OF SIDEWALK/CURB/ PAVEMENT MARKINGS NOTES 1. EXISTING TO BE REMOVED 2. EXISTING TO REMAIN 3. PROTECT EXISTING UTILITIES DURING CONSTRUCTION 4. PROTECT EXISTING SIGNAL EQUIPMENT AND POLES DURING CONSTRUCTION 5. SAWCUT LINE 6. EXISTING ROADWAY SIGNAGE TO REMAIN 7. EXISTING TO BE ABANDONED GRAPHIC SCALE 0 10' 20' 40' ( IN FEET ) SCALE: 1" = 20' North Carolina One -Gall Center s%N.r. "■w N.r oar 1 N omm GALL 1-600-652-4A44 LNnVem so Lnrwims W UNO N .. ", aoNncr A uNOFWS FM M UFO OM dar 10 aas ux m UP0111E 0 m unLm �arwnas Gall BEFORE you Olaf "It's The Law.. O s� `~•Q�olzt�3/I 4,9r SEALq 34663 _= s � e ` i '•.• GINEv.•' � it B KAI BURK LICENSE NO. 043463 PLAN STATUS ATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 FILE D1.0 DEMOLITION PLAN SHEET D 1.O CAD file name: V:\120003 — Circle K\120003-01-050 — Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\D1.0 DEMOLITION PLAN.dwg 1 iE EROSION CONTROL STANDARD NOTES c� z J Cn Cn 0 U Q 0 m O Cn CD Cn m ¢ J 0 _ w m J J ¢ _ z Cn z 0 U z 0 r m z 0 a 0 0 z 0 a Of 0 _ z w Of 0 _ z w 0 0 Cn _ z 0 w U Z J w Of Of Of 0 0 z ¢ w 0 w Cn w Of w Of a m w of Cn ¢ U Of O w z w J U Cl z Cn 0 U U Of cn _ Of 0 w r J Z O 0 w 0 z w Cn w U Of Cn z w Of Cn Q Cn ¢ z w Of _ 0 w z w Of Cn CD Cn 0 0 z Cn w U z 0 U _ Of _ w CD z w U O Cl Cn SOIL DATA TABLE SYMBOL SOIL NAME HYDROLOGIC SOIL GROUP BeB BRADSON GRAVELLY LOAM B DeB DELANCO (DILLARD) LOAM C MILLS RIVER -FRENCH BROAD WATERSHED N o/ ti I/ TBMI TOP OF MHSS=210 .65' I I I DUMPSTER N/F BEAVER CREEK INVESTMENTS OF NC LL PIN# 9632605275 SLIDE 10341 (DB. 3030, PG. II II II I 24.. RCP I _ JB,210 /. 37, 1 ,6 2098.07' IE=2099. f 7� I =2U98-9' I � \ I I \ -- II \\ I \\ I � I \ \ �2 101- IEf2094!�uvlk, IP2093.62'(OUT) I I i + DISTURBED AREA:: 2.14 ACRES 24 HR CONTACT: HAYTHAM KASEM 704-776-6444 EROSION CONTROL NOTES A. CONSTRUCTION ENTRANCE 6.06, SEE DETAIL ON SHEET C1.2 B. SILT FENCE 6.62, SEE DETAIL ON SHEET C1.3 C. CONCRETE WASHOUT, SEE DETAIL ON SHEET C1.2 D. TEMPORARY SEEDING 6.10, SEE DETAIL ON SHEET C1.2 E. HARDWARE CLOTH & GRAVEL INLET PROTECTION 6.51, SEE DETAIL ON SHEET C1.2 F. ROCK PIPE INLET PROTECTION 6.55, SEE DETAIL ON SHEET C1.2 G. TREE PROTECTION FENCE, SEE DETAIL ON SHEET L-1.1 i ANY OFF -SITE BORROWAND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCE RULES AND REGULATIONS [15A NCAC 4B .0110] Lot 4 PIN# 9632609234 I (Slide 2492) i "'bnvLSTON HWY A5-M PH \ \ 75 R/W \?p `?096 ?7Op 99\ \ I N/F MARR� LEE KEIT� I PIN#I9631694639 I (DB.I512, PG. 59) I I I I I I I I I o / co I \ I � I I I � I N No �I I �I I I II \ I\ I EHO - \ \ !0 \ W \ o \2096, \ \ �� o \, 1. ALL CLEARING OR LAND DISTURBANCE OUTSIDE OF THE LIMITS DEFINED BY THE PLANS IS PROHIBITED. 2. THE SSC'S SHOWN ON THESE PLANS REPRESENT THE ENGINEER'S OPINION OF REASONABLE MEASURES TO CONTROL STORMWATER AND TO PREVENT SEDIMENT FROM LEAVING THE SITE; HOWEVER, STORMWATER AND SEDIMENTATION CONTROL IS A DYNAMIC PROCESS THAT REQUIRES MONITORING, MAINTENANCE AND ADAPTATION TO CHANGING CONDITIONS. THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN ANY AND ALL MEASURES NECESSARY TO CONTROL STORMWATER AND TO PREVENT SEDIMENT FROM LEAVING THE SITE, WHETHER SHOWN ON THESE PLANS OR NOT, UNTIL FINAL ACCEPTANCE OF THE PROJECT BY THE ENGINEER. 3. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE. LO LO M 4. SOIL STABILZATION SHALL BE ACHIEVED ON ANY AREAS OF A SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED U ACCORDING TO THE FOLLOWING SCHEDULE AND SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS: • ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED o z TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST � LAND-DISTRUBING ACTIVITY. o • ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY fts Cu EVENT WITHIN 14 DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. L 0 5. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMIT -FEE MUST ADDRESS THE NECESSARY REPLACEMENT OR Q MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. SEE SELF -INSPECTION, RECORDKEEPING, AND REPORTING NOTES ON o SHEET C1.2 EROSION CONTROL DETAILS.Cu o U 6. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT o THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE SEDIMENT BEFORE U BEING PUMPED BACK INTO ANY WATERS OF THE STATE (WoS). 7. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION 0 ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTRO EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 8. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE In GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 9. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UP -SLOPE RUNOFF AND/OR TO DIVERT SEDIMENT -LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. -a -6 10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM J WATER DISCHARGES. SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. o= Cu O r- E o (0 o 0 11. WATER THAT IS BEING PUMPED FROM TRENCHES OR EXCAVATIONS SHALL BE FILTERED TO REMOVE SEDIMENT PRIOR TO BEING DISCHARGED OFFSITE OR INTO j Cu o 0 U ANY WoS. IN ADDITION, THE INTAKE OF SEDIMENT SHALL BE MINIMIZED BY EQUIPPING THE INTAKE WITH A FLOAT OR BY EMBEDDING IT IN FILTER ROCK. EROSION AT 0 oo Q - 0) THE PUMP OUTLET SHALL BE MINIMIZED THROUGH THE USE OF AN ENERGY DISSIPATER, SEDIMENT BASIN OR OTHER APPROPRIATE SSC'S. N Q9 N 12. A COPY OF THE SWPPP, INSPECTION RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE 2)ov o 0 U) o DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OR CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. o C a) co C) SEE SELF -INSPECTION, RECORDKEEPING, AND REPORTING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. z � E c CO E o CD Q 13. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND -DISTURBING ACTIVITIES HAVE PERMANENTLY OR d rn m TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF SEVEN (7) CALENDAR DAYS. SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON o O SHEET C1.2 EROSION CONTROL DETAILS. 00 14. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. 15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATER. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE. SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 16. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH W 0 APPROPRIATE BMP'S (SEDIMENT BASIN, FILTER BAG, ETC.). v J N Q 17. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED (SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 0 • WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; ^ • WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; L1 UJ w • FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND • SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. J G� U LL z 20. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE W CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. �� 0 Z � � 21. IF EXISTING BMPs NEED TO BE MODIFIED OR IF ADDITIONAL BMPs ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR STATE'S WATER 0 QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPs MUST BE IMPLEMENTED AS SOON AS z r Z REASONABLY POSSIBLE. J U) Q 22. A PRE -CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON -SITE SWPPP PRIOR TO THE IMPLEMENTATION OF O/ I LIJ W CONSTRUCTION ACTIVITIES. FOR NON -LINEAR PROJECTS THAT DISTURB TEN (10) ACRES OR MORE THIS CONFERENCE MUST BE HELD ON -SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE. O. I- O/ LL > 0� z ILL U) SEQUENCE OF CONSTRUCTION - INITIAL PHASE Lu O z J (SCHEDULE PROVIDED AS PART OF CONSTRUCTION SEQUENCE IS FOR INFORMATION ONLY.) U O LL 1. RECEIVE NPDES COVERAGE FROM NCDEQ. 7 ui w � 0 2. AT LEAST ONE WEEK PRIOR TO ANY LAND DISTURBANCE ACTIVITY, CONDUCT A SWPPP PRE -CONSTRUCTION CONFERENCE. SITE CONTRACTOR SHALL SCHEDULE AND CONDUCT SWPPP PRE MEETING WITH SWPPP PREPARING ENGINEER, TOWN OF MILLS RIVER, NCDEQ, OWNER AND ALL O -/� > J >Z -CONSTRUCTION LAND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. W O 0 O U) m 3. CONDUCT LIMITED CLEARING AND GRUBBING AS REQUIRED TO INSTALL CONSTRUCTION ENTRANCE AND PERIMETER BMPS. _j fl� J 4. INSTALL CONSTRUCTION ENTRANCE, SILT FENCE, INLET PROTECTION AND CONCRETE WASHOUT, AS SHOWN ON PLAN AND IN ACCORDANCE WITH DETAILS ui w ON SHEET C1.2AND C1.3. C G 5. INSTALL TEMPORARY SEED IN DISTURBED AREAS AND IN ACCORDANCE WITH DETAILS ON SHEET C1.2. 0z L.1- 6. MAINTAIN ALL BMPS THROUGHOUT CONSTRUCTION. O 7. COMPLETE INSPECTION REPORTS EVERY 7 DAYS IN ACCORDANCE WITH THE GENERAL PERMIT. Lu z EROSION CONTROL MAINTENANCE - INITAL PHASE SILT FENCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CONSTRUCTION ENTRANCE MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. HARDWARE CLOTH AND GRAVEL INLET PROTECTION INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT/ CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. ROCK PIPE INLET PROTECTION INSPECT AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY, REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUNDCOVER. TEMPORARY SEEDING RESEED AND MULCH AREA WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT AS MUCH AS POSSIBLE. EROSION CONTROL LEGEND - - - PROPERTY LINE - - - SOIL BOUNDARY - LOD LIMITS OF DISTURBANCE - SF SILT FENCE (DETAIL SHEET C1.3) - X TREE PROTECTION FENCE (DETAIL SHEET L-1.1) STABILIZED CONSTRUCTION ENTRANCE (DETAIL SHEET C1.2) HARDWARE CLOTH & GRAVEL INLET PROTECTION (DETAIL SHEET C1.2) ROCK PIPE INLET PROTECTION (DETAIL SHEET C1.2) GRAPHIC SCALE 0 10' 20' 40' ( IN FEET ) SCALE: 1" = 20' North Carolina Ono -Gall Center M •. • i w. ••r, •.•. m 0 '___M GALL 0I-WO-63Z-4449 mowna•a�. • rn mxm-era Swu miner n@ MOM" u�rwtoas MW 70 WS ran M MWE ro unm �nr%yua Call BEFORE you DI61 "It's The Law" SEALq - 34 3 GINS t, 41 BURS KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 A LE C1.0 EROSION CONTROL - INITIAL PHASE SHEET `'' • 0 CAD file name: V:\120003 - Circle K\120003-01-050 (ENG) - Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C1.0 EROSION CONTROL - INITIAL PHASE.dwg 12/23/2019 EROSION CONTROL STANDARD NOTES c� z H J Cn cn z O U z ¢ 0 m 0 Cn } r J m ¢ J r O _ m J J _ CD z J Cn N 0 U z 0 r m z O ¢ a 0 0 z ¢ z 0 N Of 0 _ r z w Of 0 _ z w U O 0 Cn z O w U z J w Of Of Of O 0 z ¢ C) 0 w Cn uj Of 0 w Of a m w 0- 0- Cn ¢ _ U Of 0 L_ z w J U Cl z ¢ Cn 0 Of c- U L� U w cn Of 0 r J z 0 0 w 0 z w Cn Lj Of Cn L_ 0 z Of Of Cn Q Cn z w Of _ 0 z w Of 0- Cn CD Cn 0 z Cn w U Z 0 _ Of w _ H w CD 0 z U O Cl Cn SOIL DATA TABLE SYMBOL SOIL NAME HYDROLOGIC SOIL GROUP BeB BRADSON GRAVELLY LOAM B DeB DELANCO (DILLARD) LOAM C MILLS RIVER -FRENCH BROAD WATERSHED I A-m /m TBMI m m - m A- r ,�m -� j TOP OF MHSS=210 .65' 2�oti' ^% T m m r� DUMPSTER I m m I A- m A- 1m T 1 m I m I m m m m m I m I m I 1 m mm1 m mlm� I m m I m m I m m l m m1 I m m m r \ U1� m I1 A- Im\I r 1 T L 1 m L CV 1 � 1 ml I m 1 A- m ml I 1 ml II m �m Im m m A- m T 0 II m km II m I I T i m l m m I I W I I m l 1 ml 0 14 Im IT m I I1 ml ml 1 m �m�lmm� m N/F -- �I I m BEAVER CREEK 1 I m \1T INVESTMENTS OF NC LLC 1 �\ "mI PIN# 9632605275 1 m m m m SLIDE 10341r 1 I 1m (DB. 3030, PG. 16�) 1 m 1 m1 m Im iI II Of I I� 24 „RCP I _ 4' lE `2101.37' 2098.07, o J I I I I I I I i I I II I\ I \ \ I \ N_ O a I V-2-09419- MI IP2093.62'(OU DISTURBED AREA- + 2.14 ACRES 24 HR CONTACT: HAYTHAM KASEM 704-776-6444 ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCE RULES AND REGULATIONS [15A NCAC 4B .0110] I I Lot 4 / PIN# 9632609234 I I(Slide 2492) m A'A' T m m m m m m A-m I m m m T m m m A-m A'm m m m A' A' / m I m A T A'm m m A -A- -It---A--m m A' A- T m A' A- A- A' A- T T T T T n' m A \ \ 1 I 1 I I I I I I I I I I N/F I MARRY LEE KEITA PIN# h631694639 I (DB.I512, PG. 59) I I I I I � � I I I k C J / II �1 I �I I �1 \ II \ I II \ II \ I I\ I I I I ONE. n 3 kA O _ O \ \ OZ \ w \ \ \ \ 2 \ \ \ O \ EHO - 1. ALL CLEARING OR LAND DISTURBANCE OUTSIDE OF THE LIMITS DEFINED BY THE PLANS IS PROHIBITED. 2. THE SSC'S SHOWN ON THESE PLANS REPRESENT THE ENGINEER'S OPINION OF REASONABLE MEASURES TO CONTROL STORMWATER AND TO PREVENT SEDIMENT FROM LEAVING THE SITE; HOWEVER, STORMWATER AND SEDIMENTATION CONTROL IS A DYNAMIC PROCESS THAT REQUIRES MONITORING, MAINTENANCE AND ADAPTATION TO CHANGING CONDITIONS. THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN ANY AND ALL MEASURES NECESSARY TO CONTROL STORMWATER AND TO PREVENT SEDIMENT FROM LEAVING THE SITE, WHETHER SHOWN ON THESE PLANS OR NOT, UNTIL FINAL ACCEPTANCE OF THE PROJECT BY THE ENGINEER. 3. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE. 4. SOIL STABILZATION SHALL BE ACHIEVED ON ANY AREAS OF A SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE AND SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS: • ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND-DISTRUBING ACTIVITY. • ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 5. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. SEE SELF -INSPECTION, RECORDKEEPING, AND REPORTING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 6. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE SEDIMENT BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE (WoS). 7. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 8. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 9. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UP -SLOPE RUNOFF AND/OR TO DIVERT SEDIMENT -LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 11. WATER THAT IS BEING PUMPED FROM TRENCHES OR EXCAVATIONS SHALL BE FILTERED TO REMOVE SEDIMENT PRIOR TO BEING DISCHARGED OFFSITE OR INTO ANY WoS. IN ADDITION, THE INTAKE OF SEDIMENT SHALL BE MINIMIZED BY EQUIPPING THE INTAKE WITH A FLOAT OR BY EMBEDDING IT IN FILTER ROCK. EROSION AT THE PUMP OUTLET SHALL BE MINIMIZED THROUGH THE USE OF AN ENERGY DISSIPATER, SEDIMENT BASIN OR OTHER APPROPRIATE SSC'S. 12. A COPY OF THE SWPPP, INSPECTION RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OR CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. SEE SELF -INSPECTION, RECORDKEEPING, AND REPORTING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 13. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND -DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF SEVEN (7) CALENDAR DAYS. SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 14. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. 15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATER. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE. SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 16. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMP'S (SEDIMENT BASIN, FILTER BAG, ETC.). 17. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED (SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. • WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; • WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; • FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND • SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 20. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. 21. IF EXISTING BMPs NEED TO BE MODIFIED OR IF ADDITIONAL BMPs ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR STATE'S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPs MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE. 22. A PRE -CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON -SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON -LINEAR PROJECTS THAT DISTURB TEN (10) ACRES OR MORE THIS CONFERENCE MUST BE HELD ON -SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE. SEQUENCE OF CONSTRUCTION - FINAL PHASE (SCHEDULE PROVIDED AS PART OF CONSTRUCTION SEQUENCE IS FOR INFORMATION ONLY.) 1. CONTINUE TO MAINTAIN ALL BMPS THROUGHOUT CONSTRUCTION (SEE EROSION CONTROL MAINTENANCE BELOW). 2. START STORM DRAIN SYSTEM INSTALLATION AS SHOWN ON PLAN AND ON C3.0. COMPLETE GRADING TO EXTENT POSSIBLE. 3. START BUILDING AND CANOPY CONSTRUCTION. 4. COMPLETE FINAL GRADING AND PAVING FOR THE SITE. 5. REMOVE CONCRETE WASHOUT AND CONSTRUCTION EXIT AS NECESSARY AS PAVING IS INSTALLED. 6. PERMANENTLY STABILIZE DISTURBED AREAS AS SHOWN ON PLAN AND IN ACCORDANCE WITH DETAILS ON SHEET C1.3. 7. REMOVE INLET PROTECTION SCMS AND SILT FENCE AFTER ENTIRE AREA IS STABILIZED. 8. PREPARE THE STORMWATER AS-BUILTS. SCHEDULE AN ONSITE INSPECTION WITH TOWN OF MILLS RIVER AND THE ENGINEER AFTER THE SITE IS FULLY STABILIZED. 9. CONTINUE WEEKLY INSPECTION REPORTS UNTIL THE SITE IS FULLY STABILIZED AND THE PERMIT MAY BE TERMINATED. EROSION CONTROL MAINTENANCE - FINAL PHASE SILT FENCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CONSTRUCTION ENTRANCE MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. HARDWARE CLOTH AND GRAVEL INLET PROTECTION INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT/ CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. ROCK PIPE INLET PROTECTION INSPECT AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY, REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUNDCOVER. TEMPORARY SEEDING RESEED AND MULCH AREA WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW �,OTECTAS AS POSSIBLE. PERMANENT SEEDING FERTILIZE, MOW, WATER, CONTINUE SOIL TESTING, REPAIR, AND MULCH AS NEEDED. EROSION CONTROL LEGEND - - PROPERTY LINE - - SOIL BOUNDARY LOD LIMITS OF DISTURBANCE SF SILT FENCE (DETAIL SHEET C1.3) STABILIZED CONSTRUCTION ENTRANCE (DETAIL SHEET C1.2) HARDWARE CLOTH & GRAVEL INLET PROTECTION (DETAIL SHEET C1.2) ROCK PIPE INLET PROTECTION (DETAIL SHEET C1.2) OPERMANENT SEEDING (DETAIL SHEET C1.3) GRAPHIC SCALE 0 10' 20' 40' ( IN FEET ) SCALE: 1" = 20' North Carolina Ono -Gall Cemter NIN a SNY.N. a" •.e. Ntf 0 9 �fNnl� GALL I-W0-63Z-4449 INDEPAPO N• LOCAMft ff IM MOM"InrwCON",oas MW 70 WS wn M MWE Call BEFORE you DI61 "It's The Law" 0 z O 0 �6� -a -6 J J Q C� .= y 0 U Cu E Cu Cu d • 0 d o z L.6Q0 O O N •- (n LO CDO CD O coCD Q +� Cu _� r- co 0 [-- (O `� 0 E 0 0 C 0 U s= E 3: si O Cn c O U E o m 0 00 0 0 ��W VJ ui Lu L.I_ L� LL z LL Z O w LL 0 z I J U) W Q U z 0 W 0� U LL. w > Z LL = cn W J J U p z W W (1)O LL O > >- 3:ov o 0 1 J JLu co W �z U O U W z SEALq - 34 3 'rq1 BU01- KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 A LE C1.1 EROSION CONTROL - FINAL PHAS SHEET `'' 1 ' 1 CAD file name: V:\120003 - Circle K\120003-01-050 (ENG) - Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C1.1 EROSION CONTROL - FINAL PHASE.dwg 12/23/2019 STRAW BALE BARRIER CONCRETE WASHOUT d z I- z O U < O m CD r m Q O = Li m Q = Cn CD z Cn 0 U = O } m z O .< 0- 0 a 0 Q = O Q Of O = I-- Of O = = LLJ Cn = = O w U = Of Of L 0- O Of 0- 12) = O Cn Of r� w Of Q 0- LLJ Cn = U = Of O z LLJ a = Cn O 0- Of 0- (-) i U w 0- cn w = Of O _L } = O Ln w 1= w z Cn L' U > Of W Cn CD I- Of U1 = Q Cn Z Of w = 0 z Cn Of 0- Cn z CD Cn w 1= 12) z Q Cn LJ U = O LJ = r = Of w = O H = w U O 0 Cn = I- Practice Standards and Specifications 6.06 •�' • • FolDefinition A graveled area or pad located at points where vehicles enter and leave a construction site. To provide a buffer area where vehicles can drop their mud and sediment to Purpose avoid transporting it onto public roads, to control erosion from surface runoff, and to help control dust. Conditions Where Wherever traffic will be leaving a construction site and moving directly onto a public road or other paved off -site area. Construction plans should limit traffic Practice Applies to properly constructed entrances. Design Criteria Aggregate Size -Use 2-3 inch washed stone. Dimensions of gravel pad - Thickness: 6 inches minimum Width: 12-feet minimum or full width at all points of the vehicular entrance and exit area, whichever is greater Length: 50-feet minimum Location -Locate construction entrances and exits to limit sediment from leaving the site and to provide for maximum utility by all construction vehicles (Figure 6.06a). Avoid steep grades, and entrances at curves in public roads. ; "' .._ ►i�i•1 j- 60 ...it .;..•. .� ,.. .....:•. �� �.�.s w-. i ; . 6.06.1 Practice Standards and Specifications 6.55 _• '• • A horseshoe shaped rock dam structure at a pipe inlet with a sediment storage Definition P PP g area around the outside perimeter of the structure. Purpose To prevent sediment from entering, accumulating in and being transferred by a culvert or storm drainage system prior to stabilization of the disturbed drainage area. This practice allows early use of the storm drainage system. Rock pipe inlet protection may be used at pipes with a maximum diameter Conditions Where PP P Y PP of 36 inches. This inlet protection may be used to supplement additional Practice Applies P Y PP sediment traps or basins at the pipe outlet, or used in combination with an excavated sediment storage area to serve as a temporary sediment trap. Pipe g P ry P P inlet protection should be provided to protect the storm drainage system and downstream areas from sedimentation until permanent stabilization of the disturbed drainage area. Do not install this measure in an intermittent or perennial stream. Planningproject stage When construction on a ro'ect reaches a a where culverts and other storm drainage structures are installed and many areas are brought to the desired Considerations grade, there is a need to protect the points where runoff can leave the site through culverts or storm drains. Similar to drop and curb inlets, culverts receiving runoff from disturbed areas can convey large amounts of sediment to lakes or streams. Even if the pipe discharges into a sediment trap or basin PPP the pipe or pipe system itself may clog with sediment. Design Criteria When used in combination with an excavated sediment storage area to serve as a temporary sediment trap, the design criteria for temporary sediment traps must be satisfied. The maximum drainage area should be 5 acres, and 3600 cubic feet of sediment storage per acre of disturbed drainage area should be provided. The minimum stone height should be 2 feet, with side slopes no steeper than 2:1. The stone "horseshoe" around the pipe inlet should be constructed of Class B or Class I riprap, with a minimum crest width of 3 feet. The outside face of the riprap should be coved with a 12-inch thick layer of #5 or #57 washed stone. In preparing plans for rock pipe inlet protection, it is important to protect the embankment over the pipe from overtopping. The top of the stone should be a minimum of 1 foot below the to of the fill over the pipe. The stone should tie P PP into the fill on both sides of the pipe. The inside toe of the stone should be no closer than 2 feet from the culvert opening to allow passage of high flows. The sediment storage area should be excavated upstream of the rock pipe inlet protection, with a minimum depth of 18 inches below grade. 0 WashingIf conditions at the site are such that most of the mud and sediment are not removed by vehicles traveling over the gravel, the tires should be washed. Washing should be done on an area stabilized with crushed stone that drains into a sediment trap or other suitable disposal area. A wash rack may also be used to make washing more convenient and effective. Construction 1, Clear the entrance and exit area of all vegetation, roots, and other objectionable material and properly grade it. Specifications 2. Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2- inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. References Runoff Conveyance Measures 6.30, Grass -lined Channels Sediment Traps and Barriers 6.60, Temporary Sediment Trap 6.06.2 Figure 6.55a Rock pipe inlet protection plan view and cross-section view Practice Standards and Specifications 6.51 a �• a • • ■ Definition A temporary measure of wire -mesh hardware cloth around steel posts supporting washed stone placed around the opening of a drop inlet. Purpose To prevent sediment from entering yard inlets, grated storm drains or drop inlets during construction. This practice allows early use of the storm drain system. Conditions Where To be placed around a catch basin or a drop inlet and where the flow is light to moderate. If heavy flow is anticipated, use the rock doughnut inlet protection Practice Applies method (Practice 6.54, Rock Doughnut Inlet Protection). it is also used where storm drain inlets are to be made operational before permanent stabilization of the disturbed drainage area. This method of inlet protection is effective where the inlet is expected to drain shallow sheet flow. The immediate [and area around the inlet should be relatively flat (less than 1 percent) and located so that accumulated sediment can be easily removed. This practice must not be used near the edge of fill material and must not divert water over cut or fill slopes. Design Criteria Ensure that drainage areas do not exceed 1 acre per inlet. For securing the wire mesh hardware cloth barriers, use steel T posts. The posts need to be 1.25 lb/linear ft steel with a minimum length of 5 feet. Make sure the posts have projections to facilitate fastening the hardware cloth. Securely drive each stake into the ground to a minimum depth of 2 feet. The maximum spacing for the posts is 4 feet. The wire mesh should be at least a 19-gauge hardware cloth with a '/4 inch mesh opening. The total height should be a minimum of 2 feet. Providing a flap of hardware cloth on the ground projecting away from the inlet can aid in removal of the stone at the project's completion. The sediment control stone, with a height of 16 inches, should have a outside slope of 2:1. The top elevation of the structure must be at least 12 inches lower than the ground elevation downslope from the inlet. It is important that all storm flows pass over the structure into the storm drain and not bypass the structure. Temporary dikes below the structure may be necessary to prevent bypass flow. Soil excavated when constructing the sediment pool may be used for this purpose (Figure 6.51a). Rev. 6/06 6.51.1 Practice Standards and Specifications Construction I. Clear the area of all debris that might hinder excavation and disposal of Specifications Spoil' 2. Install the Class B or Class I riprap in a semi -circle around the pipe inlet. The stone should be built up higher on each end where it ties into the embankment. The minimum crest width of the riprap should be 3 feet, with a minimum bottom width of I 1 feet. The minimum height should be 2 feet, but also 1 foot lower than the shoulder of the embankment or diversions. 3. A 1 foot thick layer of NC DOT #5 or #57 stone should be placed on the outside slope of the riprap. 4. The sediment storage area should be excavated around the outside of the stone horseshoe 18 inches below natural grade. 5. When the contributing drainage area has been stabilized, fill depression and establish final grading elevations, compact area properly, and stabilize with ground cover. Maintenance Inspect rock pipe inlet protection at least weekly and after each significant (%z inch or greater) rainfall event and repair immediately. Remove sediment and restore the sediment storage area to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage. Any riprap displaced from the stone horseshoe must be replaced immediately. After all the sediment -producing areas have been permanently stabilized P g P Y remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and provide permanent ground cover (Surface Stabilization). References Inletp-section 6.52 Block and Gravel Inlet Protection (Temporary) > ( P rY) Sediment Trap and Barriers 6.60, Temporary Sediment Trap Surface Stabilization 6.15> Ri ra P P North Carolina Department of Transportation Erosion & Sedimentation Guidelines for Division Maintenance Operation, P , 1993. Virginia Erosion and Sediment Control Handbook. 1992. STD & SPEC 3.08, Culvert Inlet Protection. pages III-46 - III-51 (Culvert Inlets Sediment Trap). Rc.. r,/or, 6.55.1 6.55.2 Re, 6/06 Re, 6/06 6.55.3 Practice Standards and Specifications 6.10 O Definition rapid -growing annual grasses, small Brains or legumes toprovide initial, temporary cover for erosion control on disturbed areas. Purpose To temporarily stabilize denuded areas that will not be brought to final grade P Y g b fora period s. of more than 21 calendar days. Y Temporary seeding controls runoff and erosion until permanent vegetation or other erosion control measures can be established. in addition, it provides residue for soil protection and seedbed preparation, and reduces problems of mud and dust production from bare soil surfaces during construction. Conditions Where On any cleared, unvegetated, or sparsely vegetated soil surface where Practice A Iles PP vegetative cover is needed for less than 1 year. Applications of this practice include diversions, dams, temporary sediment basins, temporary road banks, and topsoil stockpiles. P I a n n i n g Annual plants, which sprout and grow rapidly and survive for only one season, Considerations are suitable for establishing initial or temporary vegetative cover. Temporary seeding preserves the integrity of earthen sediment control structures such as dikes, diversions, and the banks of dams and sediment basins. It can also reduce the amount of maintenance associated with these devices. For example, the frequency of sediment basin cleanouts will be reduced if watershed areas, outside the active construction zone, are stabilized. Proper seedbed preparation, selection ofappropriate species, and use of quality seed are as important in this Practice as in Practice 6.11, Permanent Seeding. Failure to follow established guidelines and recommendations carefully may result in an inadequate or short-lived stand of vegetation that will not control erosion. Temporary seeding provides protection for no more than I year, during which time permanent stabilization should be initiated. Specifications Complete grading before preparing seedbeds, and install all necessary erosion control practices such as, dikes, waterways, and basins. Minimize steep slopes because they make seedbed preparation difficult and increase the erosion hazard. If soils become compacted during grading, loosen them to a depth of 6-8 inches using a ripper, harrow, or chisel plow. SEEDBED PREPARATION Good seedbed preparation is essential to successful plant establishment. A good seedbed is well -pulverized, loose, and uniform. Where hydroseeding methods are used, the surface may be left with a more irregular surface of large clods and stones. Liming -Apply lime according to soil test recommendations. Ifthe pH (acidity) of the soil is not known, an application of ground agricultural limestone at the Rc,.1, Ill, 6.10.1 6.10.2 B rate of 1 to 1 1/2 tons/acre on coarse -textured soils and 2-3 tons/acre on fine - textured soils is usually sufficient. Apply limestone uniformly and incorporate into the to 4-6 inches of soil. Soils with a H of 6 or higher need not be P P g limed. Fertilizer -Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-1,000 lb/acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used do not mix seed and fertilizer more than 30 minutes before application. Surface rots hening- If recent tillage operations erations have resulted in a loose g g surface, additional roughening may not be required, except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen it just prior to seeding b disking, raking, harrowing, or other suitable methods. J P g Y gm g, g, Groove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6.03, Surface Roughening). PLANT SELECTION Select an appropriate species or species mixture from Table 6.1OR for seeding in late winter and early spring, Table 6.1Ob for summer, and Table 6.1Oc for fall. In the Mountains, December and January seedings have poor chances of success. When it is necessary to plant at these times, use recommendations for fall and a securely tacked mulch. SEEDING Evenly apply seed using a cyclone seeder (broadcast), drill, cultipacker seeder, or hY droseeder. Use seedingrates given in Tables 6.10a-6.10c. Broadcast seeding and hydroseeding are appropriate for steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution. Small grains should be planted no more than 1 inch deep, and grasses and legumes no more than 1/2 inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or cultipacker. Hydroseeded mixtures should include a wood fiber (cellulose) mulch. MULCHING The use of an appropriate mulch will help ensure establishment under normal conditions, and is essential to seeding success under harsh site conditions (Practice 6.14, Mulching). Harsh site conditions include: • seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), • slopes steeper than 3:1, • excessively hot or dry weather, • adverse soils (shallow, rocky, or high in clay or sand), and • areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as in channels, anchor mulch with netting (Practice 6.14, Mulching). Practice Standards and Specifications Maintenance Reseed and mulch areas where seedling emergence is poor, or where erosion occurs, as soon as possible. Do not mow. Protect from traffic as much as Possible. References Site Preparation 6.03 Surface Roughening g g 6.04, Topsoiling Surface Stabilization 6.11 Permanent Seeding 6.14, Mulching Appendix 8.02, Vegetation Tables Table 6.10b Temporary Seeding Recommendations for Summer Table 6.10c Temporary Seeding Recommendations for Fall Seeding mixture Species Rate (Iblacre) German millet 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 Ib/acre. Seeding dates Mountains -May 15 -Aug. 15 Piedmont -May 1 -Aug. 15 Coastal Plain -Apr. 15 -Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Iblacre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. Adisk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Seeding mixture Species Rate (Iblacre) Rye (grain) 120 Seeding dates Mountains -Aug. 15 - Dec. 15 Coastal Plain and Piedmont Aug. 15 - Dec. 30 Soil amendments Follow soil tests or apply 2,000 Iblacre ground agricultural limestone and 1,0001b/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. Adisk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 Iblacre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespeden in late February or early March. 6.10.3 0 NCDOT #5 or #57 washed stone - 4' max 19-guage hardware cloth r - /- ($ mesh openings) ■ -!_ ---- ----T- i4;.7 16'm NCDOT #5 or #57 water washed stone �' W­ Figure 6.51a Hardware cloth and gravel inlet protection Construction I. Uniformly grade a shallow depression approaching the inlet. Specifications 2. Drive 5-foot steel posts 2 feet into the ground surrounding the inlet. Space posts evenly around the perimeter of the inlet, a maximum of 4 feet apart. 3. Surround the posts with wire mesh hardware cloth. Secure the wire mesh to the steel posts at the top, middle, and bottom. Placing a 2-foot flap of the wire mesh under the gravel for anchoring is recommended. 4. Place clean gravel (NC DOT #5 or #57 stone) on a 2:1 slope with a height of 16 inches around the wire, and smooth to an even grade. 5. Once the contributing drainage area has been stabilized, remove accumulated sediment, and establish final grading elevations. 6. Compact the area properly and stabilized it with groundcover. Maintenance Inspect inlets at least weekly and after each significant (%x inch or greater) rainfall event. Clear the mesh wire of any debris or other objects to provide adequate flow for subsequent rains. Take care not to damage or undercut the wire mesh during sediment removal. Replace stone as needed. References Inlet Protection 6.52, Block and Gravel Inlet Protection 6.54, Rock Doughnut Inlet Protection North Carolina Department of Transportation Standard Specifications for Roads and Structures 6.51.2 Rev. 6/06 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activitybeing considered compliant with the Ground Stabilization and Materials Handling 8 P g sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slo es 3:1 to 4:1 14 ditches perimeter slopes and H .P W P Q Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, e Areas with slopes ditches, perimeter slopes es and H W Zones flatter than 4:1 14 days for Falls Lake Watershed unless there is zero slope the Note: After the permanent cessation of construction activities an areas with temporary P Y P Y round stabilization shall be converted to permanent round stabilization as soon as 8 P g practicable but in no case longer than 90 calendar days after the last land disturbing P 8 Y g Ng activity. Temporary round stabilization shall be maintained in a manner to render the P surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the round sufficient) so that rain will not dislodge the soil. Use one of the g Y 8 techniques in the table below: Tarnponrystawlization I Permenentstablleration • Temporary grass seed covered with straw" • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackitiers • Hydroseedlrlg a Geowalle fabrics such as permanent soil • trolled erosion wntrol Products whh" reinforcement matting without temporary grass seed a Hydroseeding • Appropriawly applied straw OF other mukh . Shrubs of tither permanent plantings synced a Plastic sheeting with mulch •le ni rm d n n[ u U a eve y distributed ground cover suRkient to rintraln eroslon • Structural mtthmis such as concrete, asphalt or taming wall& . Railed erosion cura'trol products with grass seed POLYACRYLAMIDES PAMS AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction selecting from the NCDWR ListofAPProved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NCDWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide porting area for containment of treated Stormwater before discharging onsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. in' MIN STAKE (TYP.) STAPLES Jili• DIA. 4- STAPLE (2 PER BALE) NATIVE MATERIAL (OPTIONAL) STRAW BALE T1P. ( ) PLAN TYPE"ABOVE GRADE" WITH STRAW BALES NOTES: LETTERS A MINIMUM OF 5" 1. ACTUAL LAYOUT DETERMINED IN FIELD. IN HEIGHT 2. INSTALL CONCRETE WASHOUT SIGN (24"X24", MINIMUM) WITHIN 30' OF THE n n TEMPORARY CONCRETE WASHOUT II CONCRETE II FACILITY. WASHOUT H H 3. TEMPORARY WASHOUT AREA MUST BE AT LEAST 50' FROM A STORM DRAIN, CREEK BANK OR PERIMETER CONTROL. 4. CLEAN OUT CONCRETE WASHOUT AREA WHEN 50% FULL. CONCRETE WASHOUT SIGN DETAIL 5. THE KEY TO FUNCTIONAL CONCRETE WASHOUTS IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR CLEAN OUT. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). S. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide seconds containment. Repair or replace damaged waste containers. P secondary P p g 6. Anchor all lightweight items in waste containers during times of high winds. g 8 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site t an approved facilit . a ri P PPY 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint q aint and other liquid waste into storm drains streams or wetlands. 2. Locate away paint washouts at least 50 feet from storm drain inlets and surface P Y waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable provide relocation of portable toilet behind silt fence or lace .P P P on a s. ravel ad and surround with sand bags. g P g 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER .. i .m,. ,a T _ �,b( / l � ,'.,a.....,, uc m..., .,..... FaR.-,..,e=� eta a ea BE' OW GRA% 46MI IT STRI ICTURL R4ar�v CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storingdefective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easilyaccessible area on level round and install a stone g entrance may be required ad in front of the washout. Additional controls b the P Y 4 Y approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project g g P 1 limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75%capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary P g g P P fY products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply , I herbicides pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides pesticides and rodenticides in their original containers with the ,P label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers undercover or in secondary containment. ,'", NORTH CAROLI NA I 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. EnvironmentalQua�Pt�+ k NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. F,eq,r " lwpw Id.,bme normal In,""l morn%-0 Include: trimness hours) _ Dolly minrallanw- (I) Rain ga,.te Dairy re.M.lned In if tin dou, rain gauge e•teryaap are made d,Fftl ...ke•ll OF goodwmkFa holiday perw s, and as Imcmdual day rainlall wrowrtol Is eador available, record the wmula[Wp rain mnaturrment fw th[ne w attended days (anc this mu dete m m H a site inspection is eded). We .filch aghl II oohed .shall be rewded as " theocmgnee ayu rwthe• Mr -monitoring deie ppmytd by doINY4LtF. (2) EJ; At least ortpp par Y Idc-t '-do r the measuros insr m.d, ktraf! 7alpldar days 2 Dam and tlmc ofthe Mspectlpn, and within 24 3. Name of the p n perrormlog the inaaelkb hours of a rate A. lndw.wri of.t-Iref the mea.m were o,,erMing e a 1.0 inch in peperry, 24 hours S. oetenplion of .A.-nct nras ror the measure, G D.wrl tien,.vlde,rc., and da,. eF Corr-e rive -Ica, vk-. 13) smnmwa:er At lea t corn pro I Id tifiMo f he discharge ifam rmd R M mstha a rR 7cale.d ,O t r 2 oa and time rtn y n spot n wtalk SDC. 1 gf and wthnl4 3 fad Nto N F P Pe 8 P - numrt F ram a ewaenee of tie umes tit are at.r pnllutien wen at ail Brent a 1.0 IxA I. titr fWgPr tit solids W [rctwauo, 24 hours 5. 3ndKadtnofYtWcswlmCNM diefIM r1 6,Dear. .icon eWdrrrs. and date of wre4xtive actW.m taken. (4) Primer Or M Yeast nett per OF u1sW udlmemarkm N fats .urdde sr. fadtq then a rtrerd ssx 7ulted ,days Mthe rpllpenng hallb. male: and wit Mn.24 L Actions uk"to dwn up or mbNh4 tk• mdMlant that hat left hounafa Min the slit kmf[s events 1.0 inch In 2 Omflpfiw, nvwn.rn, and dam of _.,-milve actions taken, and 24 haws 3. Anexpbneti .,,pit.-, uk n.omnrmlfu.p releases. (s)sfreamam At lean wipe per Kthe stmam orwetbml has Increased Nseles 10menullon or wretladsomke 7calendar days stream has Wd4k leareased wrbldhy tram thecrostruakn or.fhltt and wRMn2a a� Wn tnen a re[pm of the fol w n that be made: Y. a (.Me hadsefarain L A ripten,evldenrtenddaleef_ elmaeVar-Y ..,'and arresshl.) eyent2 LD Irwh In 2. Rtenrdt oftheee4uirad reports m rhe.rppppkm Division 24 hq,rs - nrl Offi,. P. P.vr 111, 5e[ri-C, aem(IlAJA d.,.hi, --it (6)Gr.d After race phase 1. *a phase of wad-,(IreNallatiun of Perlmatcr MSC xa6R1ra on citgradWg rreawren, d-Irg and grubbing, installatb of storm eaaures drainagefacili ie4 compietion of all Mri" turesng ,rt.ay,tontuurdenoe�I.Pmen' Per r-1, e,eund.mer). 2. oer„m.rtate. th.11h. required gmurd rtahai.1t ors hart burn p,tvldod w4hi 10.,".Irtd timptr asturaPcothat they w.R by Pramyfdodas :r.n ossbk. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance P with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary permanent control needs. p Y or PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. hem to occurrent Da rnent.df Requfnemerox la) Each E&SC measure has been installed Initial and dace each E&SC measure on a copy and does not sWificamdy deviate From the of the approved E&5C plan or ram plem, date locations, dimensions and relative elewtions and sign an Inspection report chat lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC 51an.. This documentation is required upon the initial instalFatipn of the E&SC measures or if the E&SC measures are modified after initial Installation. b A hale of radf l has been completed. d) P g ng P Imiral and date a co of the a rowd E&SC w pp plan or complete, date and sign an Impecdon rep"t to indicate completion of the construction phase. (c) Ground rover is located and installed Initial and date a copy of the approved E9M in accordance with the approved E&5C plan or complete, date and sign an inspection plan report to Indicate compliance with apprrn,ed I ground corer Wecakatfons. d The maintenance and repair I 1 r» r m i date and an i ectlon rt. co k p w s3gn � moo requirements for all F&SC mea lures have been performed. e rsirrect,ve actions have been taken l) f Ini[Fal and dart a co a the approved E&SC copy PP to E&SC measures. plan or complete, date and nga an Inspection report to indicale the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following Items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-N01 and all inspection records shall be maintained for period P P of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawri down g for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) aid (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and If) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, . They cause sheen on surface waters (regardless of volume), or . They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act Ref: 40 CFR 110.3 and 40 CFR 117.3 or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. -frames and Other Requirements Reporting Time After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. rscwrrs tc Reporting Timeframes [After Discovery) and Other Requirements 1 (a) Vi sidle sedimen t . VIATENa24houn, a n oral of electronic notificoteon. deposition in a e WWNR7 colenddr'days, a report that contains a description of the stream or wetland sediment and actions taker to address the cause of the deposition.: OWision staff may waive the requirement fora wdeten report an a case-hy-rase basis- - If the stream is narcrad on no RC 3D3fdl list as impaired for sediment• related causes, the permitt_e nwy be required to perform additional rrtonitoring, Inspecticns or apply enure stringent pmctire.s it staff determine that add ilional requirements are needed to assure compliance with the lederat bra state impaired -water to ditions- (b) oil spills and ` WUNaW boon an 5ral"ereclfonic ootd cation. The floc+rKation release of shall include information about the dale, time, nature, volume and hazardous io-lion of the spill cc release. substances per Item lfliHO above IgAnticipamd a Arrponarleaserendays alirednedare atmebypadn,gpcuslbie. bypasses 140 Cf R The report sha11 imlude an evalua lion of the anticipated quality and 171.41(m}(9)] erect of the bypass. (dl Unanticipated . W Nn 24 houn, an}rat welectranic notification.. bypasses 140 CFR . Widdn7 rafendw days, a report that includes an evaluation of the 122.41 mJi3)] quality and effect of the bypass. (e) Noncompliance . WtNa 24 hours, a n,ral 0, eiettrome notification., with the conditions. . WfUdn7 calendar day,, a report that contains a description or to of this permit that noricarnpliance, and its causes; the period of nancompl'ianee, may endanger Including exact data and tines, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(gl7)) prevent reoccurrence of the noncompli-m [40 CFR 117.41(1116}. • DWlslon slag mmr waive the reeuiramem Ic, a wdtlen,amrt an a NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING J v ..l f 1 (;R' H G !iq ClV 'll'h tttI nma,r (Ii I •, ri0, EFFECTIVE: 04/01/19 BINDING WIRE STRAW BALE WOOD OR METAL STAKES (2 PER BALE) 6. SILT FENCE SHALL BE INSTALLED AROUND PERIMETER OF CONCRETE WASHOUT AREA EXCEPT FOR THE SIDE UTILIZED FOR ACCESSING THE WASHOUT. 7. A ROCK CONSTRUCTION ENTRANCE MAY BE NECESSARY ALONG ONE SIDE OF THE WASHOUT TO PROVIDE VEHICLE ACCESS. CONCRETE WASHOUT STRAW BALES OR ABOVE GROUND NOT TO SCALE co N .L M O Q O co UO It iv Z" �0 �6� -a -6 J J Iz 0) C N a O U E co .1O -O C O ll L V o Z Lin 0.) CV a)Doa •= fin L, C)Do0 CD M Q (� 4--� a) co CL r- CO I Nt M I 6 O 0- E OC.0 i) C = = O U a E 3: -0 ti O (D 0) 5 to c O c) m E Q m O C0 0 V/ 0 J_ 0 LU �/LL U I..1_ W L.L Z L.L 0 O ,-\ LI J O Iiiiiiiiiiiiii- 0/��/ .._ 0 wo Z Q 0 Z O ' U UJ �/ I..I_ ILLU . ILL = Z �eLU --) ` O - -Eli O r� V / 1 /� V J J N0 0. W U0�t/� />_/ 0. O "' W 1..` ()� J � - LJJ U O U LI J Z KAI BURK LICENSE NO. 043463 PLAN STATUS U NZ LL W >_ w J _JJ_ G LL 0 z 0 DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1 " = 20' JOB No. 120003-01-050 DATE December, 2019 FILE C1.2 EROSION CONTROL DETAILS SHEET `r' nAn eel_ name- %,.\4nnnnz nr__I_ v\•I nnnnz n4 nr=n /7A1n\ kc11_ o:..__ / I_C[____ MJ\ AIn\r__:____:__\r__:______ nI___\n4 n =nclnAl nnAlT�nl nrTAll � ­_ 4n /nz /nn4n U/'1U IIIC IIVIIIC. v. \ILVVUJ - UiCia r\\ILVUUJ-W-VJU `L1VVI - IHHS 1\Ivoi �Jviivi SS 1\VI, IVU \u1y111001 illy \L.11yolccl lily FlullJ\1,1.L LI\UJIUIV UUIIIROL LJLIr\ILJ.Vwy IL/LJ/LUIJ CD = J to = O U = O m O H M J O m J Cn = CD = J In = O U = O m r m 0 ¢ 0 n = = O a Of O = w r M O _ w U 0 to = 0 w U _ J w cof Of w O of n = 0 w to Of 0 w cof - w cof to = U_ = Of O = U n _ w rn O cof _i U w w = of O i } J = O n = z to L' U > cof i O = LLJ Elf to = = to z w of = 0 w to w Of rn = CD to w n n = U _ O U w = = w = CD 0 = w U O n In = Practice Standards and Specifications 6.62 Definition A temporary sediment control measure consisting of fabric buried at the bottom, stretched, and supported by posts. Purpose To retain sediment from small disturbed areas by reducing the velocity of sheet flows to allow sediment deposition. Conditions Where Below small -disturbed areas that are less then'/4 acre per 100 feet of fence. Practice Applies Where runoff can be stored behind the sediment fence without damaging the fence or the submerged area behind the fence. Do not install sediment fences across streams, ditches, or waterways, or other areas of concentrated flow. Sediment fence should be placed along topographic elevation contours, where it can intercept stormwater runoff that is in dispersed sheet flow. Sediment fence should not be used alone below graded slopes greater than 10 feet in height. Planning A sediment fence is a system to retain sediment on the construction site. The fence retains sedimentprimarily retardingfl w anri promoting depos ition. operation, generally the fence becomes clogged with fine particles, which reduce the flow rate. This causes a pond to develop behind the fence. The designer should anticipate ponding and provide sufficient storage areas and overflow outlets to prevent flows from overtopping the fence. Since sediment fences are not designed to withstand high water levels, locate them so that only shallow pools can form. Tie the ends of a sediment fence into higher ground to prevent flow around the end of the fence before the pool reaches design level. Curling each end of the fence uphill in a "J" pattern may be appropriate to prevent end flow. Provide stabilized outlets to protect the fence system and release storm flows that exceed the design stone. Deposition occurs as the storage pool forms behind the fence. The designer can direct flows to specified deposition areas through appropriate positioning of the fence or by providing an excavated area behind the fence. Plan deposition areas at accessible points to promote routine cleanout and maintenance. Show deposition areas in the erosion and sedimentation control plan. A sediment fence acts as a diversion if placed slightly off the contour. A maximum slope of 2 percent is recommended. This technique may be used to control shallow, uniform flows from small disturbed areas and to deliver sediment -laden water to deposition areas. The anchoring of the toe of the fence should be reinforced with 12 inches of NC DOT #5 or #57 washed stone when flow will run parallel to the toe of the fence. Sediment fences serve no function along ridges or near drainage divides where there is little movement of water. Confining or diverting runoff unnecessarily with a sediment fence may create erosion and sedimentation problems that would not otherwise occur. atmHal a The Slicing Method Pending height POST SPACING: mix 24" 6.' max. on open runs 4' max . on pooling areas Aft- h fabrlc to uPrneam side of Post FLOW Drive over each side of silt pr1CT l fence 2 tc a times wlm device exerting 60 p. s.r. or 2 feet greater compacted soil 0 compacted soil 0 �� , , ,A-,/..X,- --,/ \ \ \ \ No more than 24" ofa 36" fabric is allowed above ground. .............. .................. Top of Fabric fie0 0P R" Vilk 14 16 Don al attachment cl tloubles strength. -11 ATIACHMENr DETAILS: • Gother fabric at posts, 0 needed. • Utilize three flea per post, all within top 8" of fabric. 0 Position each tie diagonally, puncturing holes vertically ❑ minimum of 1" apart. • Han each fie ono past nipple and tighten securely. 9 P PP 9 Y Use cable ties (50lbs1 a soft wire. toll of silt fence 6.62.1 Fl, _111P_ I I Pb!! / If Raul- after compaction Fabric Oabove ground Silt Fence ��ii %TiO�r�� ��i'C Oi G�iG " rO r �r�` � o', /,r t.,,\ �r/% ri r W";/ I/\�/�\//�%�i/�\/`/_ mil/ �r%�� ��.11 r Horizontal chisel point Sllclna blade 3" width 0,7• Completed Installation Vibratory plow is not acceptable because of horizontal compaction Figure 6.62b Schematics for using the slicing method to install a sediment fence. Adapted from Silt Fence that Works 6.62.6 a Rev. 5113 Areas to be Seeded: • Till or disc the areas to be seeded to a minimum depth of four prepared P (4) inches. Remove stones larger than three (3) inches on any side, sticks, roots and other extraneous materials that surface. If not incorporated during the soil preparation process, add pH modifier and fertilizers at the rate specified in the soil test report. • Re -compact the area utilizing a cultipacker roller. The finished grade shall be a smooth even soil surface with a loose uniformly fine texture. All ridges and depressions shah be removed and fined to provide the approved g P P PP surface drainage. Seeding of graded areas is to be done immediately after finished grades are obtained and seedbed preparation is completed. Areas to be Sprigged, Sodded, and/or Planted: • At the time of planting till or disc the prepared areas to a depth of four (4) to six (6) inches below the approved finished grade. Remove all stones larger than three (3) inches on any side, sticks, roots and other extraneous materials that surface. If not incorporated in the ripping process, add pH modifier, fertilizer, and other recommended soil amendments. • Re -compact the area utilizing a cultipacker roller and prepare final grades as described above. Install sprigs, sod and plants as directed immediately after fine grading is complete. Mulch, mat and/or tack as specified. VEGETATION Availability of seed and plant materials is an important consideration of any construction stabilization effort. Throughout North Carolina, climate, economics, construction schedule delays and accelerations, and other factors present difficult challenges in specifying the different vegetation needed for site stabilization. To help resolve this issue, vegetative stabilization requires consideration in three categories: is Immediate Stabilization -nurse crop varieties (Note: temporary mulching may be utilized for immediate stabilization if outlined on the approved my plans and construction sequence.) ■ Primary Stabilization - plant varieties providing cover up to 3 years with a specified maintenance program ■ Long Term Stabilization - plant varieties providing protective cover with maintenance levels selected by the owner An adequate job in one of these areas does not guarantee success in the later phases. Horticultural maintenance must be included in the plans. Immediate vegetative cover will always require additional fertilization, soil amendments, soil tests, overseeding and/or other horticultural maintenance until primary vegetative cover is established. a Straw barriers have only a 0-20% trapping efficiency and are inadequate. Straw bales may not be used in place of sediment fence. Prefabricated sediment fence with the fabric already stapled to thin wooden posts does not meet minimum standards specified later in this section. Anchoring of sediment fence is critical. The toe of the fabric must be anchored in a trench backfilled with compacted earth. Mechanical compaction must be provided in order for the fence to effectively pond runoff. Design Criteria Ensure that drainage area is no greater than'/4 acre per 100 feet offence. This is the maximum drainage area when the sloe is less than 2 percent. Where P all runoff is to be stored behind the fence, ensure that the maximum slope length behind a sediment fence does not exceed the specifications shown in Table 6.62a. The shorter slope length allowed for steeper slopes will greatly reduce the maximum drainage area. For example, a 10-20 % slope may have a maximum slope length of 25 feet. For a 100-foot length of sediment fence, the drainage area would be 25ft X 100ft = 2500sq.ft., or 0.06 acres. Table 6.62a Maximum Slope Slope Length (ft) Maximum Area ii Slope Length and Slope for <2% 100 10,000 which Sediment Fence is 2 to 5% 75 7,500 Applicable 5 to 10% 50 5,000 0 10 to 20 /0 25 2,500 >20% 15 1,500 Make the fence stable for the 10-year peak storm runoff. Ensure that the depth of impounded water does not exceed 1.5 feet at any point along the fence. If non -erosive outlets are provided, slope length may be increased beyond that shown in Table 6.62a, but runoff from the area should be determined and bypass capacity and erosion potential aloe the fence must be checked. The YP P tY P g velocity of the flow at the outlet or along the fence should be in keeping with Table 8.05d, Appendix 8.05. Provide a rira splash ad or other outlet protection device for an point riprap P P P Y where flow may overtop the sediment fence, such as natural depressions or swales. Ensure that the maximum height of the fence at a protected, reinforced outlet does not exceed 2 feet and that support post spacing does not exceed 4 feet. The design life of a synthetic sediment fence should be 6 months. Construction MATERIALS Specifications 1. Use a synthetic filter fabric of at least 95% by weight of polyolefins or Polyester, which is certified by the manufacturer or supplier as conforming to the requirements in ASTM D 6461, which is shown in part in Table 6.62b. Synthetic filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120' F. Practice Standards and Specifications 2. Ensure that posts for sediment fences are 1.25 lb/linear ft minimum steel with a minimum length of 5 feet. Make sure that steel posts have projections to facilitate fastening the fabric. 3. For reinforcement of standard strength filter fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. Table 6.62b Specifications For Sediment Fence Fabric Temporary Silt Fence Material Property Requirements Supported' PP Un-Su rted' PPo Type e of Test Material Units Silt Fence Silt Fence Value Grab Strength ASTM D 4632 N (Ibs) Machine Direction 400 550 MARV (90) (90) X-Machine Direction 400 450 MARV (90) (90) Permidivitys ASTM D 4491 sec-1 0.05 0.05 MARV Apparent Opening Sizes ASTM D 4751 min 0.60 0.60 Max. ARV' (US Sieve #) (30) (30) Ultraviolet StabilityASTM 70%after D 4355 Retained 70%after Typical YP Strength SOON of exposure SOON of exposure ' Silt Fence support shall consist of 14 gage steel wire with a mesh spacing of 150 min (6 inches), or prefabricated poylmer mesh of equivalent strength. q 9 z These default values are based on empirical evidence with a variety of sediment. For environmentally sensitive areas, a review of previous experience and/or site or regionally specific geotextile tests in accordance with Test Method D 5141 should be performed by the agency to confirm suitability of these requirements. a As measured in accordance with Test Method D 4632. CONSTRUCTION 1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2. Ensure that the height of the sediment fence does not exceed 24 inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3. Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post. 4. Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement then fabric on the upslope side of the fence post. Wire or plastic zip ties should have minimum 50 pound tensile strength. 5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Support posts should be driven securely into the ground a minimum of 24 inches. 6. Extra strength filter fabric with 6 feet post spacing does not require wire mesh support fence. Securely fasten the filter fabric directly to posts. Wire or plastic zip ties should have minimum 50 pound tensile strength. 0 7. Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of posts and upslope from the barrier (Figure 6.62a). 8. Place 12 inches of the fabric along the bottom and side of the trench. 9. Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance. 10. Do not attach filter fabric to existing trees. SEDIMENT FENCE INSTALLATION USING THE SLICING METHOD Instead of excavatinga trench placing fabric and then backfillin trench ,P g g , sediment fence may be installed using specially designed equipment that inserts the fabric into a cut sliced in the ground with a disc (Figure 6.62b). Installation 1. The base of both end posts should be at least one foot higher than the middle of the fence. Check with a level if necessary. Specifications 2. Install posts 4 feet apart in critical areas and 6 feet apart on standard applications. 3. Install posts 2 feet deep on the downstream side of the silt fence, and as close as possible to the fabric, enabling posts to support the fabric from upstream water pressure. 4. Install posts with the nipples facing away from the silt fabric. 5. Attach the fabric to each post with three ties, all spaced within the top 8 inches of the fabric. Attach each tie diagonally 45 degrees through the fabric with each puncture at least 1 inch vertically apart. Also, each tie should be positioned to hang on a post nipple when tightened to prevent sagging. 6. Wrap approximately 6 inches of fabric around the end posts and secure with 3 ties. 7. No more than 24 inches of a 36 inch fabric is allowed above ground level. 8. The installation should be checked and corrected for any deviations before compaction. 9. Compaction is vitally important for effective results. Compact the soil immediately next to the silt fence fabric with the front wheel of the tractor, skid steer, or roller exerting at least 60 pounds per square inch. Compact the upstream side first, and then each side twice for a total of 4 trips. 6.62.4 6.62.2 Re, 5113 Rec. 5/13 6.62.3 Rev. 5113 Practice Standards Specifications Practice Standards and Specifications a and 6.11 It is imperative thatclisturbed soilsbetotallyprotectedfromerosion and sediment Maintenance inspect sediment fences at least once a week and after each rainfall. Make any loss during construction and before a project is considered complete and required repairs immediately. acceptable.Installing appropriatevegetationinan immediate andtimelyfashion (�) is the optimal means of achieving this stabilization. Vegetative specifications Should the fabric of a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Definition Controlling runoff and erosion on disturbed areas by establishing perennial for most exposed soil conditions across North Carolina are provided in this vegetative cover with seed. section of the manual. It should be noted however, that no two sites in the State Remove sediment deposits as necessary to provide adequate storage volume are exactly alike; therefore the protective vegetative cover for individual sites for the next rain and to reduce pressure on the fence. Take care to avoid should be carefully selected. Each requires its own investigation, analysis, undermining the fence during cleanout. Purpose To reduce erosion and decrease sediment yield from disturbed areas, to design and vegetative prescription as set forth in this section of the manual. per manently stabilize such areas in a manner that is economical, adants to site Remove all fencing materials and unstable sediment deposits and bring the conditions, and allows selection of the most appropriate plant materials. This practice standard describes three stages of vegetative cover; immediate, area to grade and stabilize it after the contributing drainage area has been primary and long term. Effective and acceptable stabilization can be provided properly stabilized. only when the optimum combination of immediate, primary, and long term Conditions Where fine -graded areas on which permanent, long-lived vegetative cover is the vegetative practices are applied. References ASTM D 6461 - 99. "Standard Specification for Silt Fence Materials" ASTM Practice Applies most practical or most effective method of stabilizing the soil. Permanent The vegetative measures presented in this chapter include application of seed, International. For referenced ASTM standards, visit the ASTM website, seeding may also be used on rough -graded areas that will not be brought to www.astrn.org, or contact ASTM Customer Service at service@astm.org. For final grade for a year or more. sod and sprigs. Use of field and container grown plants are not addressed Annual Book ofASTM Standards volume information, refer to the standard's in this manual. Planting of these types of vegetation is typically at spacing Document Summary page on the ASTM website. Areas to be stabilized with permanent vegetation must be seeded or planted and intervals that will not provide the required protective cover. However, within 15 working days or 90 calendar days after final grade is reached, unless the design professional is encouraged to utilize these larger plants to ASTM D 6462 - 03. "Standard Practice for Silt Fence Installation" ASTM temporary stabilization is applied. compliment the required protective cover, particularly where these types of International. For referenced ASTM standards, visit the ASTM website, plants will provide seed for continued long team cover and wildlife habitat. www.astin.org, or contactASTM Customer Service at service@astm.org. For Annual Book ofASTM Standards volume information, refer to the standard's Introduction During the initial phase ofall land disturbing projects, the protective layer, either PLANNING CONSIDERATIONS Document Summary page on the ASTM website. natural or man-made, is removed from the earth's surface. As the protective layer is removed, the resulting bare areas are exposed to the natural forces SOILS C. Joel Sprague, PE, Silt Fence Performance Limits and Installation of rainfall, freezing, thawing, and wind. The result is soil erosion that leads Test and analyze the type(s) and quality of the existing soils on a site, their pH Requirements. Sprague and Sprague Consulting Engineers and TRU to sediment pollution of North Carolina streams, rivers, lakes, and estuaries. ranges, and their nutrient levels. Taking soil samples from the different areas Environmental Inc. This design manual presents many alternative ative strategies for preventing erosion the site and having P J g them tested at a state or independent project Pendent lab will Carpenter Erosion Control. http://www.tommy-sfm.com/ and reducing sediment loss during the construction process. Establishment provide a baseline for determining the pH modifiers and additional nutrients Kentucky Erosion Prevention and Sediment Control Field Manual, 2004. of protective vegetative cover during the construction project, however, is required for the selected plant varieties. the crucial step in achieving soil stabilization, controlling soil erosion, and Disturbed conditions on a site may produce a variety of soil communities. RunoffControl Measures preventing sedimentation ofwaterwa Withoutasufficientamountofrtwtmat P g Ys Nutrient and pH levels in deeply cut soils will be quite different from those 6.20, Temporary Diversions and leaf cover to protect and hold the soil in lace, large volumes of soil will be P P soils found on the original surface. When sites are highly disturbed through lost and waterways will be degraded long afterproiects are considered complete. Outlet Protection mechanical means such as grading, the soils become mixed together inmany 6.41, Outlet Stabilization Structure Sections of this practice standard address many of these various situations different ratios. These areas should be identified and tested. Appendix and set forth selection criteria for the appropriate cover based on purpose and Results from soil tests will usually include recommended application rates of 8.03, Estimating Runoff adaptability. Some sediment and erosion control practices recommended in earlier editions of manual may no longer be applicable. For example, many soil modifiers such as lime and fertilizer for the selected plant species in the o ular and common] used seed and lent varieties have been identified as PP Y P articular soils. Application rates will be itemized in the report. P PP eP invasive. Invasive plants are defined as species that aggressively compete P PThe texture of the soil on a site, which is the proportion of sand, silt, and clay with and displace, local] adapted native plant communities. In select cases P Y P P inthe soil, is an important physical indicator f the site's s ability to support where no practical alternative is available, these plants may be considered on vegetation. In heavy clay soils amendments may be necessary to provide an a limited basis for soil stabilization, understanding that the goal is to eliminate adequately drained planting medium. Conversely, in extremely sandy soils, the use of all invasive plants in favor of non-invasive native and/or introduced amendments may be required to provide for moisture and nutrient retention. species that will provide an equally acceptable vegetative cover. Where there is no alternative to the use of invasive species, measures need to be incorporated in the installation and maintenance of these plants to limit their impacts. Rev. 5/13 6.62.7 Rev. 5/68 6.11.1 6.11.2 Rev. 5/08 Practice Standards and Specifications a 0 Where provisions are made for regular maintenance, primary vegetative cover may be the end result. An example of rime vegetative cover being Y P primary g g acceptable as an end use would be lawns in residential and commercial developments that are established, monitored and complimented with regular and approved horticultural maintenance practices. (See Example 6.1 La.) In projects where continual maintenance will not be provided or scheduled following the primary stabilization of a project, long-term stabilization will be necessary. Maintenance of initial and long -tern stabilization can cease only after the long-term cover has established and hardened to local climatic conditions. Maintenance of long-term. vegetation must be included in the project construction sequence and on the approved plan. Examples of areas suitable for long term vegetation include roadsides, reforestation areas, restored flood plains, restored riparian areas, phased closing of landfills, and mining reclamation. Complete stabilization requires using at least two, and most times, all three vegetative phases. The design professional must clearly communicate this point in their specifications, construction sequence, and in direct communications to owners and installers. The charts in tables 6.1 La through 6.1 Ld provide information to assist the design professional in this task. The tables are not inclusive and are presented only as alternatives. The professional is expected and required to provide design and specifications that combine the information in the manual with knowledge of the particular sites and their constraints. pH AND NUTRIENT AMENDMENTS Determining the nutrients that enable seed and container plants to grow, flourish, and become established after planting are critical elements of the design and stabilization process. The soils tests previously described will provide a recipe for amendments based on particular plants and particular soils. The test results will recommend the amounts of base elements (nitrogen, phosphorous, potassium), pH modifiers and other trace elements that should to be added to the soil for selected species of seeds and plants. The acid/base characteristic of the soil is a primary component of soil fertility. If the soil acidity is not in the proper range, other nutrients will be ineffective, resulting in less productive plant growth. Most plants grow best in a pH range of 6.5 - 7.0 (slightly acidic to neutral). The soil tests will recommend the specific amendments and application rates required to achieve this range. These amendments must be incorporated into the soil (not applied on the surface) to be effective. (See the General Requirements for soil preparation specifications and timing for incorporation of soil amendments.) The base elements are easily found in bulk quantities. Lime can also be obtained in large quantities. They all must be thoroughly incorporated into the soil through appropriate mechanical means. Ground surface applications without proper soil mixing will result in poor results. In addition to the base fertilizers, other trace elements are needed to produce healthy and vigorous growth. These include but may not be limited to sulfur, manganese, zinc, boron, chlorine and molybdenum. If not already included with bulk mixes of the base elements, they can be obtained from commercial suppliers. Provisions for soils test during and/or after initial grading is complete shall be included on the approved plan, in the approved construction sequence, and on the bid item list utilized for the project. If you did not obtain a soil test: Follow these recommendations for all grasses except centipedegrass. 1. Apply 75 pounds of ground limestone per 1,000 sq. ft. 2. Apply a starter type fertilizer (one that is high in phosphorus) based on the e of grass and planting method. Fertilizer bags stem s have a three -numbers type g P g g Y indicating the primary nutrients, such as 8-8-8 or 5-10-10. These numbers denote the N-P-K ratio -the of each nutrient in a fertilizer. The percentage ,...t.................... H... a..n,....:......_a,.... perecntagcs ar� e.weyS ......... ...........n�w...s ,,.,.C.. N Nitrogen for green color and growth. P,O, Phosphorus for good establishment and rooting. K20 Potassium to enhance pest and environmental stress tolerance. Some common examples of starter type fertilizers required for a 1,000 sq. ft. area include 40 pounds of 5-10-10, 20 pounds of 10-20-20, or 16 pounds of 18-24-6. For sandy soils, typical to coastal plain and sandhills of North Carolina, fertilizer rates should be increased by 20 percent. Where available, it is recommended that the design professional specify organic compounds that meet the fertilization requirements, pH and other element requirements. Initial studies have indicated that these compounds have a more positive effect on the environment than some of the synthetic compounds used to manufacture inorganic fertilizers. These materials are readily available in the commercial trade as well as found in recycled yard waste debris, sewerage sludge, lime -stabilized sludge and animal manures. Materials proposed for use must be industry certified and/or privately tested and certified to be acceptable for proposed areas of use and application prior to approval. MULCHES AND TACKING AGENTS Mulches and tacking agents may be required or necessary to protect a seedbed's disturbed surface until the seed can germinate and provide the required protection from erosion. Selection of the materials used in this application should be based on their ability to hold moisture in the soil, as well as protect exposed soil from rainfall, stone water runoff, and wind. The availability of the selected material and the mean to apply it are critical factors to consider when planning for the stabilization of any disturbed area. The mulch must cover a minimum of eighty (80) percent of the soil surface and must be secured by a tacking agent, crimping, or protective biodegradable netting. Netting that incorporates plastic mesh and/or plastic twine should not be used in wetlands, riparian buffers or floodplains due to the potential of small animal mortality. See Section 6.14 for detailed specifications and product applications. SOIL BLANKETS Soil blankets can be an acceptable and effective method of temporary sediment and erosion control in lieu of nurse crops. See Section 6.17 of the manual for descriptions of this product and how it can be used in conjunction with this section. In absence of mulches and tracking agents other means of protection may be necessary and required. 6.11.4 Re, 5/08 Rey-. 5/08 6.11.5 6.11.6 Rev. 5/08 t /` An G:Ie \/. \ 1 nr%n112 /� --i- I/\ 9l11111112 ni nGl1 ur\U 11IG I IUI I IG. v. \I LVuuJ - Ui Giu r\ \I LUUUU-V I -VUU Permanent native seed species within the seed mixture should be selected based on natural occurrence of each species in the project site area. Climate, soils, topography, and aspect are major factors affecting the suitability of plants for a particular site and these factors vary widely across North Carolina, with the most significant contrasts occurring among the three major physiographic regions of the state - Mountains, Piedmont, and Coastal Plain. Sub -regions of the state should also be considered. For example, the Triassic Basin in the Piedmont region may have characteristics that call for special soil treatment, limited plant selection, and special maintenance. Even within the riparian area there may be need for different species depending on site conditions Y P P g i.e. sand alluvial flood lain with wet pockets). Therefore thoughtful ( , dii' Y P P ) g planning is required when selecting species for individual sites in order to maximize successful vegetation establishment. Native seed and plant species are included on the plant list in Appendix 8.02 of this manual. The design professional should note that regardless of the benefits and advantages of native seeds and plants, there are potential issues if proper planning, installation and maintenance do not occur. These may include: • Potential for erosion or washout during the establishment stage; • Seasonal limitation on suitable seeding dates and availability of seed and plants; • Adaptability of species at specific sites; • Availability of water and appropriate temperatures during germination and early growth; and • Lack of maintenance to control invasive plants and undesirable competition. PLANTING • Seed - Prepare the seed bed as described above in soil preparation. Apply seed at rates specified on the plans, and/or as recommended in Tables 6.11a-c of this manual, with a cyclone seeder, prop type spreader, drill, or hydroseeder on and/or into the prepared bed. Incorporate the seed into the seed bed as specified. Provide finished grades as specified on the approved plan and carefully culti-pack the seedbed as terrain allows. If terrain does not allow for the use of a cultipacker, the approved plans and construction sequence must provide an alternative method of lightly compacting the soil. Mulch immediately. • Sprigs and Sod -Install onto the prepared seedbed per the most current guidance in Carolina Lawns, NCSU Extension BulletinAG-69, or Practice 6.12 Sodding. Practice Standards and Specifications 8' max. standard strength fabric with wire fence 6' max. extra strength fabric without wire fence Steel post Plastic or wire ties 18-24" 1 8" down & 4" forward along 24 the trench Fi lter I Ifabric y Cross -Section View FilteCALr Steel fnhrir Rar4fill +.ronrh Natural post 4 and compact ground thoroughly "' T m.mrnins• Upsl� i 24" . - :: - _.. - i Figure 6.62a Installation detail of a sediment fence. Rev. 5113 Rev. 5108 Natural ground 6.62.5 Practice Standards and Specifications Soil tests will indicate the texture of the given soil but will not provide recommendations for amendments that will improve the soil texture. Generally, the addition of organic materials will improve the porosity of heavy clay soils and improve the water holding capacity of extremely sandy soils. On sites where these different soil conditions exist, it is recommended that a design professional with experience in soil modification be employed to recommend the proper amendments. For more information visit the NCDA Agronomic Services Soil Testing web page http://www.agr.state.nc.us/agronomic/sthome.htrn SOIL PREPARATION Proper soil preparation is necessary for successful seed germination and root establishment. It is also necessaryfor establishment of rooted sprigs, sod and woody plants. Heavily compacted soils prevent air, nutrients and moisture from reaching roots thereby retarding or preventing plant growth. The success of site stabilization and reduction of future maintenance are dependent on an adequately prepared soil bed. Following are the requirements for preparation of areas to be vegetated by 1sing, sprigging, sodding, and/or planting of woody plants: General Requirements: • Preparation for primary/permanent stabilization shall not begin until all construction and utilitywork within the preparation area is complete. P P P However, it may be necessary to prepare for nurse crops prior to completion of construction and installation of utilities. • A North Carolina Department of Agriculture Soils Test or equal) P g ( q ) shall be obtained for all areas to be seeded, sprigged, sodded or planted. Recommended fertilizer and pH adjusting products shall be incorporated into the prepared areas and backfill material per the test. • All areas to be seeded or planted shall be tilled or ripped to a depth specified on the approved plans, construction sequence and/or construction bid list Rinnina r cicfs of ire l fismrres in -ft- o P-Tthe entire surface area, utilizing an implement that will not glaze the side walls of the fissures. Site preparation that does not comply with these documents shall not be acceptable. The depth of soil preparation may be established as a range based on the approval of the reviewing state or local agency. Once tilled or ripped according to the approved plan, all areas are to be returned to the approved final grade. pH modifiers and/or other soil amendments specified in the soil tests can be added during the P g soil preparation procedure or as described below. • All stones larger than three (3) inches on any side, sticks, roots, and other extraneous materials that surface during the bed preparation shall be removed. Practice Standards and Specifications Seed Mixes for Native Species (lbsiac) When Mixed with 3, 4, or 5 Other Native Species (See Table 6.11.a for nurse crop species to be added to these mixes) 30ther total 4 species) 4Other total 5 species) 5Other total 6 s ecies Switch Grasses A 3.5 lbs. 3.0 lbs. 2.5 lbs. Indian Grasses B 7.0 lbs. 6.0 lbs. 5.0 Ibs. Deertongue (C) 6.0 lbs. 5.0 lbs. 4.0 Ibs. Big Bluestein D 7.0 Its. 6.0 lbs. 5.0 lbs. Little Bluestem E 7.0 lbs. 6.0lbs. 5.0lbs. SweetWoodreed F 2.5 lbs. 2.0lbs. 1.5 Its. Rice Cutgrass G 6.0 lbs. 5.0I1bs. 4.0 lbs. Indian Woodoats H 2.5 lbs. 2.016s. 1.5 lbs. Virginia Wild Rye I 6.0 Its. 5.0 lbs. 4.0 lbs. Eastern Bottlebrush Grass J 2.5 lbs. 2.0lbs. 1.5Ibs. Soft Rush K 2.5 lbs. 2.0lbs. 1.5 Ibs. Seri es L 2.5 lbs. 2.0lbs. 1.5 lbs. NOTE: With the native varieties, the seed mix should be in the range of 15 pounds per acre. Depending on availability of native seeds adaptable to North Carolina, the percentage of a particular variety used may be reduced or increased accordingly. Although diversity is desirable, it is imperative that the primary crop develop and become an effective protective cover. In addition to the native species mix, additional nurse crop species must be included to provide immediate stabilization and an adequate ground cover. 6.11.3 41 .w• �Ilol�»�e�u�l®�m10� ������������ea^� ��IOI�Q����lm�mlotaa��csi IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII loMQiMMMMlm=mlotsr�cc>e�1 • • 1IIIIIIIIIIIIIIIIIIIIIIIIIIIIII=t����������I o�Qi m�®mm0rr=te a 1�I�I�I�I�I�I�I�I�I�I�ra� -a -6 J J CL O N O U M E O M co li - d -t O z i 0.)m O N = (n to C:)o0 O C:)tI M Q .--� � CL Q li toPO � I­� M .-. ((O c O d E O 0) C N O U a E 3: -0 i iD _� M c O C) m E 0 m 0 V/ 0 J WN 0� 0 L.1_ W LL O ,-, UJ J � -) 0 /O 0J v ) Z O I U L�J I / L.1_ LL . U LL = Z �eLU __-) ` \J �O V) UJ '0 0 0 J T LL W U ��// L.1_ ''^) O vJ m KAI BURK LICENSE NO. 043463 PLAN STATUS ii Z W i (n J J_ LL 0 0 DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1 " = 20' JOB No. 120003-01-050 DATE December, 2019 FILE C1.2 EROSION CONTROL DETAILS 6.11.10 Rev. 5/08 (� SHEET `�' r I:II.- �:...... / I-sc-.-.-.- MAN kil"k r-- -:..-- -.-:- -\ c----.----:-- ni ---\ /,1 n r- lnhl / nki-1 OI rICTAII C' A—- 1 n /n2 /n 111 n lvinla nlvcl kuc;ilclaa nu/, llU \ulyul=l lily \ulyulccl lily rluila\�I.c L.nU. Ull UUllll\u ULIri1LJ.Uwy 1L/LU/LUlJ c� z J Cn Cn z 0 U z Q 0 m 0 r m Q J CD 0 w m Cn CD Cn Q _ z J Cn z 0 U z Q CD 0 m r m z 0 0 0 z Q z 0 N_ CD 0 _ a z CD 0 z w u 0 0 Cn _ z 0 w U Z Q J w Of Of 0 z Q 0 w Cn Of w Of Cn Q U C) 0 w z U 0 z Q w Cn Of Of 0- U L� U w Cn Cn 0 r J Z 0 0 w 0 z w z Cn Li Of w 0 z w Of z Q Cn Of z w 0 z Cn w Of 0- Cn z Cn 0 0 z Cn U z 0 U w _ Of _ H w CD 0 z w u U O Cn SETBACKS & BUFFERS SETBACKS REQ'D CIRCLE-K CANOPY LANDSCAPE FRONT YARD (W) 75' 146' 54' 10, I SIDE YARD (N) 30' 137' 73' 10, SIDE YARD (S) 30' 89' 65' 10, REAR YARD (E) 30' 35' 151' 10, 1 TBM TOP OF MHSS=2102.65' DUMPSTER tN N/F BEAVER CREEK INVESTMENTS OF NC LLC PIN# 9632605275 SLIDE 10341 (DB. 3030, PG. 169) LLI tT U-)� 6010 (NIC� 00 5 12016'31„ Vj 39.26' OHE Lot 9 PIN# 9632609234 (Slide 4578) - S 06034'06" W 1 . 1,11] ' gpYLSTON HWY. CHORD BEARING DELTA ANGLE 6004f08130'19" E NC 280 TANGENT 152.00' 4, APH 75 R/W Lot 4 PIN# 9632609234 (Slide 2492) 10' LANDSCAPE BUFFER I 10' LANDSCAPE BUFFER ONE ENE N/F MARRY LEE KEITH PIN# 9631694639 (DB. 512, PG. 59) ON� 3HO - 3HO - GENERAL SITE NOTES 1. ALL DIMENSIONS ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. 2. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL LOCAL REGULATIONS AND O.S.H.A. STANDARDS. 3. CONTRACTOR SHALL REFER TO ARCHITECT PLANS FOR EXACT BUILDING LOCATION AND DIMENSIONS AND UTILITY ENTRANCE LOCATIONS. 4. CONTRACTOR SHALL REFER TO SPECIFICATIONS AND GEOTECHNICAL REPORT DETAILS FOR PAVING DESIGN AND PROPER MATERIALS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE SITE UNTIL WORK IS ACCEPTED BY THE OWNER. 6. ALL SIGNS SHALL BE PER THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND NCDOT. 7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING ADEQUATE TRAFFIC CONTROL THROUGHOUT THE PROJECT, INCLUDING PROPER TRAFFIC CONTROL DEVICES AND/OR PERSONNEL AS REQUIRED. THIS INCLUDES BOTH VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) STANDARDS. 8. ALL MARKINGS WITHIN THE NCDOT R/W ON CONCRETE SHALL BE EPDXY WHILE THOSE ON ASPHALT SHALL BE THERMOPLASTIC. 9. ANY ROADWAY PAVEMENT MARKINGS DAMAGED DURING CONSTRUCTION SHALL BE REPLACED AT COMPLETION OF PROJECT BY CONTRACTOR. In SITE KEY NOTES 1. FUELING CANOPY, HEIGHT 20'6" (PER FUELING PLANS) 2. UNDERGROUND STORAGE TANKS (PER FUELING PLANS) 3. DUMPSTER ENCLOSURE (PER ARCH PLANS) 4. AIR AND VACUUM MACHINE 5. FUELING VENT PIPES (PER FUELING PLANS) 6. PROPANE STORAGE 7. BICYCLE PARKING 8. SITE SIGNAGE (PER SIGN PLANS) 9. BOLLARD, PER DETAIL ON SHEET C2.1 10. 36" X 36" STOP SIGN, PER NCDOT STANDARD INDEX AND MUTCD STANDARD R1.1 11. ADA SIGN, PER DETAIL ON SHEET C2.1 12. ADA PARKING STRIPING, PER DETAIL ON SHEET C2.1 13. 4"DOUBLE YELLOW LINE 14. 24" WIDE WHITE STOP BAR. EPDXY ON CONCRETE PAVEMENT AND THERMOPLASTIC ON ASPHALT. 15. 4" WHITE PARKING LOT STRIPING O16. HEAVY DUTY CONCRETE PAVEMENT, PER SECTION ON C2.1 17. STANDARD DUTY CONCRETE PAVEMENT, PER SECTION ON C2.1 18. PEDESTRIAN RAMP, PER DETAIL ON SHEET C2.2 19. CONCRETE SIDEWALK, PER DETAIL ON SHEET C2.1 20. NOT USED 21. INTEGRAL CURB, PER DETAIL ON SHEET C2.2 22. LANDSCAPE AREA (PER LANDSCAPE PLANS) 23. EXISTING PAVEMENT SAW CUT LINE 24. TRANSFORMER 25. PATIO 26. RAISED CONCRETE MEDIAN, PER SECTION ON C2.1 27. ASPHALT PAVEMENT, PER SECTION ON C2.1 28. LOADING ZONE, 12' X 40' 29. RIGHT ONLY SIGN, PER NCDOT INDEX AND MUTCD STANDARD R3-5R 30. PAVEMENT MARKINGS, PER NCDOT STANDARD DETAIL 1205.08 SITE SUMMARY ZONING MR -MU (MIXED USE DISTRICT) FUTURE LAND USE CONVENIENCE STORE/GAS STATION ZONING REQUIREMENTS PROVIDED PROJECT AREA DISTURBED AREA 78,426 SF (100%) (1.80 AC) 96,485 SF (2.14 AC) EXISTING: TOTAL IMPERVIOUS AREA TOTAL PERVIOUS AREA (OPEN SPACE) 20,320 SF (25.9%) (0.47 AC) 58,106 SF (74.1 %) (1.33 AC) PROPOSED: TOTAL IMPERVIOUS AREA PAVING / SIDEWALK AREA BUILDING AREA (INCLUDING CANOPY AREA) 52,437 (66.9%) (1.20 AC) 40,668 SF (77.6%) (0.93 AC) 11,769 SF (22.4%) (0.27 AC) TOTAL PERVIOUS AREA (GREEN SPACE) 25,989 SF (33.1 %) (0.60 AC) BUILDING SIZE 5,471 SF HEIGHT 23-8" CANOPY HEIGHT 20'-6" PARKING REQUIRED' 16' PROPOSED REG SPACES 27 HANDICAP SPACES 2 TOTAL SPACES 29 STALL SIZE 9' x 18' 'TWO SPACES PER PUMP EDGE OF PAVEMENT CURB AND GUTTER PROPERTY LINE fQ UTILITY POLE II �%- SIGN ❑E ELECTRIC BOX OO CURB DRAIN INLET (CDI)/DRAIN INLET (DI) @D STORM DRAIN MANHOLE (SDMH) SO SANITARY SEWER MANHOLE (SMH) STREET LIGHT/LAMP PROPOSED LEGEND ---------- PROPERTY LINE INTEGRAL CURB PARKING COUNT 24" CURB AND GUTTER / SAWCUT LINE GRAPHIC SCALE 0 10' 20' 40' ( IN FEET ) SCALE: 1" = 20' North Carolina One -Gall Center s%Nrl. "■.4 N.r Nn oar 1 omm N GALL 1-600-652-4A44 �NnVem so � c ms aDNIR/C10R SXNL aoNncr A uNOFWS FM M UFO dar 10 aas ux m UP0111E 0 m unm �arwnas Gall BEFORE you Olaf "It's The Law" O z 0 r==j 0 u J J Ci C� y O U Cu E 3: Cu Cu O d O z � rn O CN N •- U) LO CD O M OCD Q (� +� Cu Q co co 00 [-- (fl `� O E C O U Cu 3: ci o O a' O c O U E o m O 00 0 0 W w n/ULL zLL OLIJ 0 Q U iU)W W Q z LuI ULL Lu w B vJ Lu J z J O LLB Lu u) LL O O U U) ° J Lu U O U Lu z ` tj% 11111//11// CARO ��' s� `~•Q�olzt�3/I �9r - SEALq - 34 3iGINS KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 FILE C2.0 SITE PLAN SHEET C2.0 CAD file name: V:\120003 - Circle K\120003-01-050 (ENG) - Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C2.0 SITE PLAN.dwg 1 iE c� z H J Cn Cn Z 0 U Q 0 m O r m J 0 _ w m J J _ N CD z Cn Cn 0 U z CD 0 r m z 0 a 0 0 ¢ z 0 N Of 0 _ z w F- r Of 0 z 0 Cn _ z 0 w U Z J Of Of Of 0 0 z ¢ w 0 w Cn Of 0 w Of 0- Of 0- Cn ¢ U _ Of O w z U 0 z ¢ w Cn Of U L� U w d N LJ _ H Of O w } J z O w Z Cn U Of N w O Z Of Of F- Cn Q N ¢ z w Of w _ w r z w cn w Of 0- Cn z CD Cn w 0 12) Cn a w U Z O U _ H Of w CD 0 z w U O 0 Cn 1/4" WIDE BY 1" DEEP SAW CUT. FILL WITH PAVEMENT SEALANT. MAKE SAW CUT PCC JOINT DETAIL BLOW-UP PCC JOINT DETAIL BLOW-UP IMMEDIATELY PRIOR TO INSTALLING PAVEMENT SEALANT. (FIRST PLACEMENT) PLACEMENT) (SECOND ZU) a aP Z(AZ O W W U a- W U LLB Lu 3/4" DIAMETER DOWEL FOR 6" THICK PAVEMENTS �- APPLY CURING COMPOUND AND 1/2" DIAMETER DOWEL FOR 4" OR 5" THICK TO SLAB FACE AT A PAVEMENTS. DOWELS TO BE 10" LONG CENTERED COVERAGE RATE OF 300 SF WITH JOINT SPACED AT 18" ON CENTER. MAX PER GALLON TO ACT AS DOWEL TO BE INSTALLED IN FORM WITH A BOND BREAKER AT LEAST AN APPROVED DOWEL BASKET. 48 HOURS PRIOR TO PLACING LIGHTLY OIL FULL LENGTH OF DOWEL. NEW SLAB. NOTE: 1. PLACE CONSTRUCTION JOINTS AT END OF PLACEMENTS AND AT LOCATIONS WHERE PLACEMENT OPERATIONS ARE STOPPED FOR PERIOD OF MORE THAN 1/2 HOUR. CONSTRUCTION JOINT WAIT AS LONG AS FEASIBLE TO SEAL JOINTS TO ALLOW CONCRETE SHRINKAGE TO OCCUR. IF REQUIRED, RE -SAW JOINT IMMEDIATELY PRIOR TO INSTALLING SEALANT TO ACHIEVE A 1/4 " JOINT WIDTH. T ENSURE JOINT IS CLEAN, DRY AND SIDES PREPARED PER MANUFACTURER'S RECOMMENDATIONS. T/2 BUT NOT PAVEMENT SEALANT CLOSED CELL BACKER ROD. TYPICALLY 1/8" TO 1/4" LARGER THAN JOINT WIDTH. 1/8" FIRST SAWCUT 1/4" SECOND SAWCUT (IF REQUIRED) NOTES: 1. ENSURE JOINTS ARE CLEAN AND DRY PRIOR TO THE APPLICATION OF THE JOINT SEALANT. 2. INSTALL CLOSED CELL BACKER ROD AFTER JOINTS HAVE BEEN CLEANED AND DRIED IN ACCORDANCE WITH SEALANT MANUFACTURER'S REQUIREMENTS. 3. INSTALL BACKER TOD AT CONSISTENT AND UNIFORM DEPTH. 4. JOINT SEALANT APPLICATION SHALL BE IN STRICT COMPLIANCE WITH SEALANT MANUFACTURER'S REQUIREMENTS. PCC JOINT DETAIL BLOW-UP (TYP.) 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C TYPE 119.00 TYPE B25.00, IN EACH OF TWO LIFTS, FIRST LIFT EXTENDING 6" BEHIND CURB, SECOND LIFT EXTENDING 3" BEHIND CURB ASPHALT (FLEXIBLE) PAVEMENT - NCDOT R/W SCALE: NONE TROWELED, ROUNDED CONCRETE 6" fd STEEL PIPE (SCHEDULE 80) FILLED WITH CONCRETE ANCHOR STEEL PIPE IN CONCRETE FOOTING, 2'-0" DIAMETER x 2'-6" DEPTH ASPHALT PAVEMENT APPLICATIONS M 24" fd SIGN MOUNTING DETAIL WITH BOLLARD PROTECTION SCALE: NONE Lu LD of W H- O 0 W H O z U) U) W J Z D 0 u 11 11111111111 1 1 1 11 1- 2'-O" BOLLARD DETAIL SCALE: NONE 1" DEEP SAWED JOINT (TYP.) EXPANSION JOINT CONCRETE PAVEMENT/ SLAB APPLICATIONS NOTES: 1. PROVIDE 1/2" EXPANSION JOINT BETWEEN SIDEWALK AND ALL FIXED OBJECTS A 2. CONCRETE SHALL BE 3000 PSI. SEE SITE PLA 1/4" THICKNESS PREMOLDED EXPANSION JOINT FILLER SPACED @ 35' O.C. MAX.2 SLOPE 1/4" /FT. mD' mD' EXTEND JOINT FILLER FULL DEPTH OF SIDEWALK () MAX. 2" U U 5. 0' 1 5. 0' 5. 0' 5. 0' 5. 0' 5. 0' 5. 0'_ (TYP) 1/2"R (TYP) U U NOTE: GUTTER SLOPE TO MATCH NOTE: C111, 4, 6 I~ PC CONCRETE m < ADJACENT PAVEMENT, 3,000 PSI CONCRETE. (TYP) (�.P)TYP TRAVERSE AND LONGITUDINAL. 4" AGGREGATE BASE SECTION B-B 6„ 1 1/2" MIN. RADIUS SECTION A -A COURSE COMPACTED TO 1" MAX. RADIUS 90% STD. PROCTOR (TYP) io �12" CONCRETE SIDEWALK SCALE: NONE NOTE: SIDEWALK INSIDE NCDOT RIGHT-OF-WAY, REFER TO STANDARD DRAWING 848.01 P.C. CONCRETE PAVING SEE PAVING DETAILS FOR PAVEMENT SECTIONS, SUBBASE, SUBGRADE AND COMPACTION REQUIREMENTS. INTEGRAL CURB DETAIL STRAIGHT ARROW RIGHT OR LEFT COMBINATION STRAIGHT AND COMBINATION LEFT AND 2oln TURN ARROW LEFT OR RIGHT TURN ARROW RIGHT TURN ARROW 20" �_ r 20" ,f 6'_4" SAME DIMENSIONS APPLY AS FOR THE LEFT/RIGHT TURN ARROW Q Q 3 Q N Z 2 U 36" 38" H f.4 O lL J H 8" 00�2Z cc LuQZu- N m N O HLL o COMBINATION LEFT AND STRAIGHT z 4" AND RIGHT TURN ARROW p 0 m N z N V N j0" C 00 r La N _ SAME DIMENSIONS APPLY AS r v a FOR THE COMBINATION STRAIGHT AND LEFT/RIGHT TURN ARROW 12" 324" 12" 12" 6'-4" MERGE ARROW ELONGATED STRAIGHT ARROW WRONG -WAY RAMP ARROW 9 .0" 20" 70'_O„ Cr 0 CA CRYSTAL/RED MARKER 8' TYP. (� C'3 5,g" 0" �AVEMENT Q Z IQ \ " O \ on D1 2'-6' D1 on - OF RAMP g� Cr z 14" f 6n 0/ Z O � Q 5' O„ Z0 4'-4h„ 1� 16r 6 r 7 _1 < LLI Q 14'-1 Ot/4 W Cn roo* RAMP ARROW AT EXIT RAMP }>_j Q a m 0 IL 12" « Q O Cn GENERAL NOTES: 1- USE THE COLOR WHITE FOR ALL PAVEMENT MARKING SYMBOLS. r 2- DO NOT LOCATE PAVEMENT MARKING SYMBOLS AS TO ENCROACH INTO INTERSECTION AREAS. r 3- DO NOT PLACE SYMBOLS ACROSS TRANSVERSE EXPANSION JOINTS ON PORTLAND CEMENT CONCRETE PAVEMENTS, UNLESS APPROVED BY THE ENGINEER. RAMP ARROW 4- CONFORM ALL SYMBOLS TO THE FHWA "STANDARD HIGHWAY SIGNS" MANUAL WHICH INCLUDES AT EXIT RAMP PAVEMENT MARKINGS AND STANDARD ALPHABETS (REFER TO SHEETS 6 THRU 9)DIMENSIONS NOTE: rO0* CAN VARY AMONG MANUFACTURERS, THEREFORE SLIGHT VARIANCES ARE ACCEPTABLE. HOWEVER, ALL SYMBOLS ARE REQUIRED TO BE APPROVED BY THE DEPARTMENT. 1- WHEN INSTALLING COLD APPLIED PLASTIC ON CONCRETE, IT IS RECOMMENDED SHEET 1 OF 9 11205.08 TO USE COLD APPLIED PLASTIC WITH A BLACK CONTRASTING BOLDER. 1/2 VARIABLE z 1/8" RADIUS 40d SPIKE 9" �"� } > _ 0.02 SLOPE ¢ Q a Z 2 = U H O ' LL 2" RADIUS a z . �:::• :r::: :.:: J! O o x Cn Z •.seaa JOINT SEALER HU<OC=J JOINT FILLER BASE COURSE 13/4" RADIUS V. H = z Lu SURFACE COURSE cop J SHOWING EXPANSION JOINT ��, 5" MONOLITHIC CONCRETE ISLAND (SURFACE MOUNTED) zoco< RADIUS ON ASPHALT CONCRETE PAVEMENT > j (USE ON ISLAND 4' WIDE OR GREATER) Lu O VARIABLE 0.02 SLOPE 91, "e''.�' �'i>.i •:. s. i!,e':i a'..'s'::l°. e:s° �'i>.i'. . r ..:....:.:e:...:::e: •:;:;e:•...... •..... SEE TYPICAL SECTIONS N JOINT SEALER FOR PAVEMENT DEPTH. KEY IN ON THE LAST LAVER OF SHOWING GROOVED JOINT PAVEMENT SURFACE COURSE SURFACE COURSE 2" RADIUS PARTIAL LONGITUDINAL SECTIONS BASE COURSE BINDER COURSE 13/4" RADIUS o OF PAVED ISLANDS OR EXISTING PAVEMENT LL 5 MONOLITHIC CONCRETE ISLAND (KEYED IN) o y NOTE: ON ASPHALT CONCRETE PAVEMENT o Z WHEN MONOLITHIC CONCRETE ISLAND IS ON TOP OF SURFACE (USE ON ISLAND LESS THAN 4' WIDE) VARIABLE Cr J COURSE, DRIVE 40d SPIKES INTO SURFACE UNDER MONOLITHIC 1/2" x 6" LONG DIA. DEFORM - U y CONCRETE ISLAND. STAGGER SPIKES ON 2' CENTERS EACH WAY. BARS ON 24" C STAGGERED 9" o 0.02 SLOPE a Q W IN THE CONCRETE PAVEMENT (ISLAND) AND CONCRETE ISLAND ,:e.� W (MONOLITHIC) PLACE 1/2" EXPANSION JOINTS AT 30' INTERVALS. a .'•:e. •a:da.e:, Q AND GROOVED JOINTS 1" DEEP AT 10' INTERVALS BETWEEN . • 13/4". RADIUS ° v••2" RADIUS U EXPANSION JOINTS. 5" MONOLITHIC CONCRETE ISLAND Q o (SURFACE MOUNTED) ON CONCRETE PAVEMENT a v LINE UP THE JOINTS IN THE CONCRETE PAVEMENT (ISLAND) VARIABLE p WITH THE JOINTS IN THE CURB OR CURB AND GUTTER. JOINT SEALER FILL AND SEAL THE TOP 1,2JOINT FILLER" OF THE EXPANSION JOINTS AND 4" CONC. COVER CURB AND GUTTER 0.02 SLOPE THE ENTIRE DEPTH OF GROOVED JOINTS WITH JOINT SEALER. AS CALLED FOR ON PLANS. FOR JOINTS IN THE CURB AND/OR CURB AND GUTTER, SEE SURFACING nva os% y.a u;e:o v o,�:p vo 0 o vn;a�o o::ti:'? .4... BASE COURSE, STANDARD NO. 846.01 __ _ SHEET 1 OF 1 PAVED CONCRETE ISLAND $52.01 LO M Lo �6� -a -6 J J Q 0 C� O) p V) p O U = E � Co Cu • p O CL O z � O CN N •= (n LO O O O M Q (� +� v � CL Q r 00 co T co 00 I� O d E ov C O U o E � o O c O U m E o m O 00 0 0 W w n/ULL LL Z LL O�� J U) W Q Z Lu W 0 W w >_ Lu U0� LL_ LL_ Z� u) ��� V) LuZ � J J p W LL_ O Lu (n EE 0 0 Wco J Lu U O U z ``0t11IIII //////CAp / i .r! SEAL q 34 3 wGINEQ�. ' /////111111j1111 KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 FILE C2.1 SITE DETAILS SHEET C2.1 CAD file name: V:\120003 - Circle K\120003-01-050 (ENG) - Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C2.1 SITE DETAILS.dwg 12/23/2019 0 w m ¢ m w _ U C) O Z w J U 0 z ¢ O m LLJ m U Li U w m _ C) 0 w r J Z 0 0 w 0 z w z U m w W 0 Elf Of z z ¢ ¢ z w w 0 z LLJ Y) z c� 0 0 z U Z O U w w w 0 z w U O 0 Lot 9 Lot 9 N# 9632609234 PIN# 9632609234 (Slide 4578) Lot 5 (Slide 4578) Lot 5 Lot 4 PIN# 963260 Lot 4 PIN# (Slide 249 PIN# 9632609234 (Slide 249 PIN# 9632609234 (Slide 249 w (Slide 2492) w (Slide 2492) Ln S 06°34'06" V903.52' n S 06°34'06" V$03.52' TBM N �j 30"OAK o TBM O 30 OAK O - O TOP OF o N o TOP = Q MHSS=2102.65' uJ c� N LO LO MHSS=2102.65' cn v N M � N U DUMPSTER DUMPSTIM a. O 0 o z c O PROPOSED � Z 'PUA N PROPOSED L a 'PFJiR U STORE STORE o 5,471 SOFT T � 5,471 01.0 ®T FFE: 2101.00' c�Q • PEM Q FFE: 2101.00' � � PEAR O 1'1 PP o z� � N �� U w a 'PEAR w a 'PEAR .`� IN TITN/F o o N/F O Z" = o MARRY LEE KEITH z o MARRY LEE KEITH PIN# 9631694639 �` `� PIN# 9631694639 J W +PEAR (DB. 512, PG. 59) a W +PEAR (DB. 512, PG. 59) Oo w Z o Z o a oo •• ..' o� •• •• 0 00' p oO ." Lp2"MAPLE op p o0 ." [n2"MAPLE s. 0 v M a. a, b CM Q O o O p o d a N 04 N/F 9a a. p N/F o 9d• _ • � BEAVER CRE K J J BEAVER CRE K INVESTMENTS OF C LC o Q co L E ci INVESTMENTS OF C LC b w PIN# 9632605 5 CO o O PIN# 9632605 5 SLIDE 1034 Q° Q O Y o 00 U o Ur O i 0 SLIDE 1034 (DB. 3030, 9 v ' • r .. o Q = S (DB.3030, 9 � � � M � O N 1 I N(0 O 0 - = O C U)" U U O Cu= E z O 3: E ICU g g o � -It Q d 0 w g = In TBM '� g - TBM m �' o P OF MHSS=2092.72' TOP OF MHSS=2092.72' awsw A I T g03.71B0YLSTON HWY. A g03.7�0YLSTON HWY. A A G� 4'08^30'19" E N C 28O A '08^30'19" E NC 280 GENT62.00' ENfb2.2.00' 4� ,��, � _"mow •j IVIPH== 4i ivi�i-i us 75 R/WQ 75 R/WQ La so sa L.1_ W w Z U- TRUCK TURN - FUELING TRUCK TURN - TRASH Z 0 0 ui SCALE: 1" = 40' SCALE: 1" = 40' 0 U U) Q Z Lu w �UL U_ w Lot 9 PIN# 9632609234 w JL J (Slide 4578) Lot 5 z� Lot 4 PIN# 2O N PIN# 9632609234 (Slideide 24949 LJJ w w 0 (Slide 2492) Im in S 06°34'06" V903.52' � � J z _ 0 0 TBM N n 0"OAK O o o TOP OF p� N � O MHSS 2102.65' u) 00 N ' ♦ M V 0 DUMPSTER o � J � U Z Z U 0 PROPOSED 'PEAR STORE ® 0 5,471 SQFTVII U FFE: 2101.00' PEAR w� � a 'PEAR w � CV w m 0? m N/F x o MARRY LEE KEITH °a PIN# 9631694639 F W epuR (DB. 512, PG. 59) s � � x ac ciLD00 1111111111//�'e CID .� ,y.. a L(12"MAPLE — •® M SEALg9 _ di#434 3 _- N/F o BEAVER CRE K ob ® 'i IN ` eo�`e'�A i INVESTMENTS OF C LC • b ODBllR� III I PIN# 9632605 5 U) 11��`� SLIDE 1034 (DB. 3030, 69 • • KAI BURK 1. I LICENSE NO. 043463 PLAN STATUS = TBM TOP OF MHSS=2092.72' BOYLSTON HWY. DEL A G� 3.i 2.00' 4'08'30'19" E NC 280 � WWI chi 75 R/W S DATE DESCRIPTION PL BIG KB DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-050 TRUCK TURN - FIRE (48.8' LENGTH) DATE December,2019 FILE C2.0 SITE PLAN SCALE: 1" = 40' SHEET ` 2.2 CAD file name: V:\120003 — Circle K\120003-01-050 (ENG) — Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C2.0 SITE PLAN.dwg 12/23/2019 w [r ¢ w LLJ Ld Of _ U 0 w z U Z 0 U L� U w C1 (/) LJ CD w r J Z 0 0 w 0 z w z U U Lr w 0 z w z z a ¢ z w w LLJ LLJ 0 z w LZ z c� 0 LLJ z U z O U w w _ H LLJ z w U O dl��, BOYLSTON HWY (NC 280) FULL ACCESS SCALE- 1" = 40' IC7V 1 LV V1 V 1 1 V V 1 CLAW45 MPH 1. `1 YV LVv, SQF 5,471 01.0 FFE: 1 0' ocY I —--z----------- CT T""" fl I i I I Im 1 I I I I 1 Im I I ___ _-_-----�— T�___ od• o o" 1. - l I I I I b �m L. o� Q.I C� .41 1 Lij BOYLSTON HWY (NC 280) RIRO ACCESS SCALE- 1" = 40' C7 BOYLSTON HWY (NC 280) _ 45 MPH �G ,qp, \x EDGE OF PAVEMENT CURB AND GUTTER PROPERTY LINE fQ UTILITY POLE 111II� SIGN ❑E ELECTRIC BOX @ CURB DRAIN INLET (CDI)/DRAIN INLET (DI) @D STORM DRAIN MANHOLE (SDMH) SO SANITARY SEWER MANHOLE (SMH) STREET LIGHT/LAMP PROPOSED LEGEND PROPERTY LINE INTEGRAL CURB 24" CURB AND GUTTER North Carolina Ono -Gall Center ,. a NWww.W. of W our 1 DNS ENE OIOi113 N IONM fJYg1N GALL 12WO 632-4944 J@ uNom010d ND LRGfOR1 LxNRR/ = SH" LxRl W ILL1 UNDOMM OIINID L"ral eAR1' LD MYS FOR M Lro" m LRLLILr LnrwnDls Gall BEFORE you 0I61 "It's The Law" u -a -6 J J Ci N o U Cu o Cu Cu Cu 0 d o z CD ° CD O N •= (n CD0 CDO O co Q +� Cu 2- Q Co 00 [-- O 0 E OU 0) C +_ 0 U = Cu E � li O in T_ O c O U E m m o 0 ry W LuZ J �/U� z LL O �W LLJ U O Z �(nQ 1 ' Lu U) - U 0. LL IL 2 Lu z 2 W Lu (n 0U)0 J 0� �z Lu U ry O U Lu z Z W U) J J_ ILL 0 0 `0tI%I IIIII/I''' � '(N CARD s� O ' �Essio •.�ti `�•Q�°Ist�3/�q9� 9 SEAL - = 34 3 t i a ` GINS • KAI BURK LICENSE NO. 043463 1 PLAN STATUS 1 IDATE I DESCRIPTION I PL I BG I KB DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 1 FILE C2.5 SITE DISTANCE PLANT SHEET C2.5 CAD file name: V:\120003 — Circle K\120003-01-050 (ENG) — Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C2.5 SITE DISTANCE PLAN.dwg 1 9 GRADING GENERAL NOTES LEGEND - EXISTING c� z J Cn cn z 0 U z Q 0 m 0 Cn J_ m Q J 0 _ J J Q _ z J Cn z U U z Q CD 0 m r m z 0 a m 0 0 a z 0 a N Of O _ a z w Of 0 _ z w U 0 0 Cn _ z 0 w U z Q J W Of Of w m 0 Of m 0 z Q CD 0 w Cn Of 0 w Of a m w m Cn Q _ U Of 0 L, z w J U 0 z Q w 0 U L� U w m m w _ Of 0 r J z 0 0 w 0 z w Cn w U Of w Cn Of w _ z z Q Cn z w Of w 0 z w Cn Of z CD 0 z Q U z 0 w Of w 0 0 z w U O 0 Cn I I � J I I I I I / I I I I I I 2102.85 2102.14 TBMII i TOP s - � - ----------two ---- I I OF I S S S-� S� °---+--------------- 18�� W MHSS=210 .65' SI0 44'52" � I 6 I- - -/ /N -- / --- ��o - S S „ S S y I / 9.40' _0 7 / ' ' - - 57 LF 12" HDPE @ 1.00% _ - - 40 LF 12 HDPE @ 1.00%- S 06° '06" W I N w, - -- - 2101.20 - - - 2101.20°. 2102.51 2101.80 0 0 0 0 0 0 2100.94 43. 2100.99 2100.92 DUMPSTER I _ \ 2100.70 - - 2100.(1 2101.00 - I I I I o 2100.73 2100.70 - n' \ 2100.73 2100.73 • \ 2100.73 / . • 8" VC ° I 2100.78 \ \ 1 % ;:• I I o MHS = 1 2102.28 0' 2100.93 I 1 U A.4-GI 2101.00 � I E-20 3 \ RIM = 2100.34 \ 1 2100.94 INV IN (12") = 2095.40 1 PROP SED 2100.75 I INV OUT (15") = 2095.15 \ I STOR 1 r. / 5,471 SQ / I 2102.17 "`-� 2101.46 2100.87 2100.34 2100.34 2100.93 1 FFE: 2101.00 E - I I 1 21 1 4 1 06 21 I 00.87 I ND 1 0 2100.34 � U G. OCS 0 2100.34 0 0 ° 2.47 /0 1.16 I \ / ° I RIM = 2099.80 INV OUT (24") = 2090.75 2100.75 2100.60 o � 2101.00 2100.54 9 LF 24" HDPE @ 1.00% I I o \ --;;;,/- 2101.00 � � 2100.54 2099.88 I I N I I 2101.71 1 2100.93 2100.78 2100.78 o N / - - - - -v�� �- - - - 2101.00 2100.75 SD R1 / I III ui 2100.86 W 2100.73 II II I I \I 2100.85 yyN / 100.30210.87 0.1-MH100.82 \0 2100.807 ui O0I 2101.09 = _ _ N o I 2100.63 RIM = 2098.69 .66 2102.64 / , I LID / I INV O T (2 " 202090. I I I � �� I INV OUT (24") = 2090.66 \ 2102.29 2101.95 2101.82 -•� ( 2100.78 l I 2100.50 I I / '� /JI 2100.60 2100.60 \ 2100.50 2100.38 2100.38 ry- o 2099.55 2.73// I '2099.46 cv ?19 ACIO.2-MH 0% B.2-HCI 191 LF 15" HDPE @ 1.RIM = 2099.86 I1 I I I N ^ RIM = 2098.89 U I 2101.40 \ SD INV IN (15") = 2092.65 INV OUT (18") = 2094.3A I 2100.77 2100.50 INV OUT (18") = 2092.40 Ln II I I A.3-MH o\o \0 2100.25 2100.08 2100.01 SD 2098.98 0 I Q I N I00 I .q`� 2 2098.88 -4 CD RIM = 210116 `D INV IN (15") = 2094.56 o\1 moo° i N I II INV OUT 2094.56 �°'� pC� 60 LF 18" HDPE @ 1.00% co d II I I I 2101.62 - / - - 60 LF 18" HDPE @ 1.00% II I N I I _ 2101.09 H I • • / • ��\� • • 2100.56\� \ 2100.18 - - Q I I I 1) 0 � --0 - ^. • • co� • 1i - - •- - - -2099.80 I I \ 2103.30 I I 2101.80 2101.69 - - - I I I I I 2101.42 2101.15 - 2100.88 2100.74 2100.64 �o - - - - - o 2100.45- - - 2100.25 2100.06 2099.98 2099.25 I o \ I I - / 166 LF 24 HDPE @ 1.00 /- I U 2101.62 - - - - �� 2101.11 I 00.5721- -t - - - - 2099.80 1 / 2100.94 2100.50 2100.18UNDG.2 I I I \ N I I RIM = 2099.44 I -o / ( INV IN (18") = 2090.75 I I I \ \ I17 LF 18" HDPE @ 1.00% M SD I I I I I N o 2099 INV IN RIM = 2099.40 47 LF 18" HDPE @ 4.00% 2 \ �r' (18") = 2091.92 \ I o INV IN (18") = 2091.80 \ / p0 �6pa ) I I RI M H 21098.40 I I I I / I I I I 2102.30 2101.28'`L1 INV OUT (18") = 2090.82 �a / I INV IN (18") =)2093.79 \ 2102.93 I � L - - -2100.57 20gg J 2098.45 / INV OUT 18" - 2093.79 /b I I I I I v I 2103.08 I I _- 2099.92 2099.7 2099.84 0\0 2099.29 0° 2098.77 2p9a/ 2098.57 I� o_ MHS02.17' 2102.98 1 2102.52 - - --2- - - / ONE I E= 09 .21\ , / 2101.95 209 2098 I I I X.2-J B 2102.89 � I � 0",-- P /I 2101.92 - _ _ SS z _ _ I 2099.80 2099.90 2099.50 2098.88 / 10�� r SS 2102.01 I 01 OHE 2099.71 OH 2098.78 �4 RCP OH 2099 2099.22 2102.398 PVC 2099.56 2098.68 C.1-YI 2099.36 1391 -� /E, 37 _ n n n •• 2098 _ _ ss - _ RIM: 2097.00 209$ 07f cV - 2101.65 _ 2101.24 - - 1 +�� n n ss ss 2098.54 gs ss �s pgss - ss ss S P _ _ - - - - _ - 2099.13 2098.88 - - RCP @ 8.09% C.3-YI ' _ _ - - - - / W- 2098.00� _ _- RIM: 2101.52 -o- 2102 21\ rn RIM: 901.73 , c @ ° O --CrN � c O-H �I e E E M E �� �2 - - \ 3H0 MHO - EX. 117 LF 30 RCP 2.17 /o c I o 38 LF 30" RCP @ 8.46% 2100.52 - -� c c ` c c ° CB=209�r25' X.1-CB EX. 184 LF 30" RCP 2.17 /o MHSS=2099.18' \ @ RIM = 2093.00 I I CB 269 .55' CONVERT EXISTING - 11��� INV IN (24") = 2089.00 \ ME:2102.04 , RATE INLET TO � - 089.73' IN 2098.12 2098.19 J 2097.85 ` 2097.14 \ ( ) - IE=2 87.01' UT) INV IN (30") = 2087.10 \ IE 2094.26'(I ANHOLE TOP IE=20$ (}�T 2098.02 2097.70 \ �� INV OUT (30") = 2087.01 \ I 12093.62 (Ou) \ ME:2099.77 ) �� S m \ \2 \ \ME:\2100.92 � \\ ME:2098.09 .�os�\ME:2096.27 \ �MHSS=2093.54' O 0 1/0 ftOY�,STON HWY.•20ss, IE=2087.77'(IN) 70 0 ` NL 28 UT) 0\ \ w \ l \ 0 \ \ \ \ \ 75 R/W \ \ m\ \ \ \ �\ \\ \ _ \�\ \ \ \ 0�� \ \ i i 1. ALL ELEVATIONS ARE BASED ON NAVD88. 2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF ALL EXISTING UTILITIES (ABOVE AND BELOW GROUND) AS SHOWN ON THESE PLANS ARE APPROXIMATE AND WERE LOCATED BASED ON EITHER VISUAL OBSERVATIONS AT THE SITE, EXISTING SURVEYS, AND/OR FROM UTILITY OWNERS. THE OWNER DOES NOT GUARANTEE THAT EXISTING UTILITY LOCATIONS ARE EXACT. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATIONS OF EXISTING UTILITIES(ABOVE AND BELOW GROUND) BEFORE BEGINNING ANY CONSTRUCTION. THE CONTRACTOR SHALL CALL APPROPRIATE UTILITY COMPANIES AND THE UTILITIES PROTECTION CENTER AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY OWNER AND/OR ENGINEER OF ANY UTILITY CONFLICTS WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 3. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. 4. EXISTING DRAINAGE STRUCTURES TO BE INSPECTED AND REPAIRED AS NEEDED, AND EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILTS AND DEBRIS. 5. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 6. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING AND COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". 7. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDING AND FOR ALL NATURAL AND PAVED AREAS. 8. FOR PIPE BEDDING REFERENCE NCDOT STANDARDS 300 GRADING KEY NOTES 1. ADA PARKING AREA 2. UNDERGROUND DETENTION AREA UNDERGROUND STORMWATER MANAGEMENT SYSTEM MODEL INFORMATION: SC-740 STORMTECH CHAMBER SYSTEM WITH 6" UNDERDRAIN TOTAL VOLUME: 8,456 CF BOTTOM ELEV. OF STONE: 2090.75' BOTTOM ELEV. OF SYSTEM: 2091.25' TOP ELEV. OF SYSTEM: 2093.75' TOP ELEV. OF STONE: 2094.25' - 350- INDEX CONTOUR - - - 352- ' INTERMEDIATE CONTOUR rim EDGE OF PAVEMENT Z CURB AND GUTTER PROPERTY LINE - W WATER LINE to Q0 S SANITARY SEWER `n STORM SEWER IME M U OHE OVERHEAD ELECTRIC o C COMMUNICATION SERVICE z HANDICAP SYMBOL CC SIGN N ❑E ELECTRIC BOX ® O° CURB DRAIN INLET (CDI)/DRAIN INLET (DI) Q 0 SO SANITARY SEWER MANHOLE (SDMH) a? Co CONCRETE _ FLARED END SECTION � z0 PROPOSEDLEGEND 0 PROPERTY LINE O 350 f1 INDEX CONTOUR 352 11 INTERMEDIATE CONTOUR V CURB AND GUTTER XXX.XX' PROPOSED SPOT ELEVATION ME: XXX.XX' MATCH EXISTING SPOT ELEVATIO -a -6 J � J E ci TW: XXX.XX' TOP OF WALL ELEVATION o 00 o 0 BW: XXX.XX' BOTTOM OF WALL ELEVATION coCu C) a O 0 o Q 15- CN U Co .= O N 00 a U) Ena_ .- CC r- o c a .-- co U o o U) `� c U U o � E m co CD � z _CL o 3: E oQ � m 00 O° DRAINAGE STRUCTURE TABLE STRUCTURE STRUCTURE PIPE PIPE RIM ELEV. ID TYPE INVERTS INFORMATION IN (S) = 2091.92 47 LF 18" HDPE @ 4.00% A.1-MH 48" MANHOLE RIM = 2099.40 IN (E) = 2091.80 60 LF 18" HDPE @ 1.00% OUT (SE) = 2090.82 7 LF 18" HDPE @ 1.00% OUT (W) = 2092.40 60 LF 18" HDPE @ 1.00% A.2-MH 48" MANHOLE RIM = 2099.86 IN (N) = 2092.65 0 191 LF 15" HDPE @ 1.00% OUT (S) = 2094.56 191 LF 15" HDPE @ 1.00% A.3-MH 48" MANHOLE RIM = 2101.16 IN (E) = 2094.56 59 LF 15" HDPE @ 1.00% OUT (W) = 2095.15 59 LF 15" HDPE @ 1.00% A.4-GI GRATE INLET RIM = 2100.34 IN (SE) = 2095.40 57 LF 12" HDPE @ 1.00% IN (E) = 2093.79 60 LF 18" HDPE @ 1.00°% B.1-HCI HOODED CURB INLET RIM = 2098.40 OUT (N) = 2093.79 47 LF 18" HDPE @ 4.00 /o B.2-HCI HOODED CURB INLET RIM = 2098.89 OUT (W) = 2094.39 60 LF 18" HDPE @ 1.00% IN (N) = 2091.08 117 LF 30" RCP @ 2.17°% C.1-YI YARD INLET RIM = 2097.00 OUT (S) = 2091.08 184 LF 30" RCP @ 2.17% IN (N) = 2093.62 38 LF 30" RCP @ 8.46%OUT C.2-MH 48" MANHOLE TOP REPLACEMENT RIM = 2101.73 (S) = 2093.62 117 LF 30" RCP @ 2.17% IN (N) = 2097.35 37 LF 24" RCP @ 8.09% C.3-YI YARD INLET RIM = 2101.52 OUT (S) = 2096.85 38 LF 30" RCP @ 8.46% OUT (W) = 2090.66 166 LF 24" HDPE @ 1.00% 0.1-MH 48" MANHOLE RIM = 2098.69 IN (N) = 2090.66 9 LF 24" HDPE @ 1.00% UNDG.1 OCS UNDERGROUND SYSTEM OUTFALL RIM = 2099.80 OUT (S) = 2090.75 9 LF 24" HDPE @ 1.00% UNDG.2 UNDERGROUND SYSTEM INLET RIM = 2099.44 IN (NW) = 2090.75 7 LF 18" HDPE @ 1.00% IN (E) = 2089.00 166 LF 24" HDPE @ 1.00% X.1-CB EXISTING CATCH BASIN RIM = 2093.00 IN (N) = 2087.10 184 LF 30" RCP @ 2.17% OUT (S) = 2087.01 128 LF 30" HDPE @ 1.00% X.2-JB EXISTING JUNCTION BOX RIM = 2102.44 OUT (S) = 2100.37 37 LF 24" RCP @ 8.09% �0/ z J w LLJ � n/U� W ZLL 0 LLJ z 0 Q U) Cn Q v Z L LU w > 0 U O ILL LLI z J J z `- p 0 W Lu (1)0 LL �vWm O 0 J �z Lu U O U Lu ` `111111CJ4 111, /' , �V. ......ROB % 34 3 �/11111111111111 KAI BURK LICENSE NO. 043463 PLAN STATUS GRAPHIC SCALE 0 10' 20' 40' DATE DESCRIPTION ( IN FEET ) PL BIG KB SCALE: 1" = 20' DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 FILE C3.0 GRADING & DRAINAGE PLAN I SHEET C3.0 I CAD file name: V:\120003 - Circle K\120003-01-050 (ENG) - Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C3.0 GRADING & DRAINAGE PLAN.dwg 12/23/2019 z H J Cn Z Cn U Z O m O m ¢ J 0 _ m J Q Cn C, Cn J Cn Z O U z O m r m z O ¢ 0 0 z ¢ z 0 a N_ of O _ Z w H H of O _ w U O 0 Cn 0 w U Z ¢ J w of w O a_ z 0 w a Cn ¢ Cn U of 0 z U 0 z ¢ Cn 0 U u- U CL N W _ H of O Li r J Z 0 a w 0 z w z Cn w U m w O Z Cn Cn z z ¢ Cn z Of w z Cn w Of z CD Cn 0 0 z ¢ Cn z O U w w 0 z CD U O 0 Cn LO - 11 0 IM co co U 0 Z 0 0 Cu N �L O Q O 0 CO U N Z" 0 O095 J J Q CO �, E Ci 0 p O 00 O O OL Cu O O 0) U U' M � C 0 o Q _0) M N ^ N 7 N d C O c .� (0 U O O U) " U U o Cu Co m Cu CD 2- O � E Cu E LO Q 0 2090 o M In m 0 0 I..L -0+25 0+00 1+00 2+00 3+00 4+00 5+00 CIO CIO LJ w STRM A PROFILE VIEW U HORIZONTAL SCALE: 1"=20' w z u- VERTICAL SCALE: 1"=2' LL 0 0 O z ��Q z W w U > 4.z U ILL Q w J r CD ID Q ��z C� OrldI..L \J G LL CD w w cn 0 J > 0 J Lu �z U O U W z s� �� •oFEssio®ti9 SEALq - 34 3 a ` GINE� •' • 0 KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL BG KB DESIGN DRAWN CHKD SCALE -0+25 0+00 1 +00 2+00 3+00 4+00 JOB No. 120003-01-050 STRM X PROFILE VIEW DATE December,2019 HORIZONTAL SCALE: 1 "=20' FILE C3.0 GRADING& DRAINAGE PLAN VERTICAL SCALE: 1"=2' SHEET `�' M ^ °0 O � N `--' r � 00 00 `--' r r (V � O p� p � � O � Op0 O � N O O � � O O N II M O N O N II � O O O ON O N O O II N II II Z� r � = N O � N II Z Z \ � �_ i i O N � > > FUTURE GRADE NON C� � EXISTING GRADE 40 LF 12" HDPE @ 1.00% 21 LF 12" HDPE @ 1.00% 57 LF 12" HDPE @ 1.00% u Z I I I I � I I 59 LF 15" HDPE @ 1.00% I I _ LF 15" HDPE @ 1.00% 34 LF 8" HDPE @ 1.00% I I I I I I I I I I 191 I I I I I I 60 LF 18" HDPE @ 1.00% I 7 LF 18" HDPE @ 1.00% I I I I 105 � 210 C''> � ... C70 � (D � O N C,5 O �N LNG ON ti� � O� O O N O N O N � II �IIp }IIZO gIIZU FUTURE GRADE �II— X�? U�Z Z �j�Z Z U�— z 100 I � 21 0 o o o r o0 o O N N I I V N II Z Z p EX. 37 LF 24" RCP @ 8.09% � 095 38 LF 30" RCP @ 8.46% 10-YR HGL 209 090 EX.117LF 209 I I EX' 184 LF 3p--RCP I I LJ CAD file name: V:\120003 — Circle K\120003-01-050 (ENG) — Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C3.0 GRADING & DRAINAGE PLAN.dwg 12/23/2019 z J Cn Cn z O U Q O m O r J_ m Q 0 Cn Q CD z J Cn (n O U z Q O m r m O 0 0 z Q Z O N_ CD O _ H Q Z W 0 z w U O 0 Cn z 0 w U Z Q Of w Of 0 z Q 0 w Cn Of Q LLJ Cn Q U m O Cn U 0 z Q w 0 U U W Cn Cn w Elf U r J Z O 0 w 0 z w z Cn w U Cn w 0 z w Of Cn z Q Cn Of z w w 0 z w Cn a_ Cn CD Cn w 0 0 z Q Cn Elf LLJ LLJ CD U Z O U 0 z w U O Cn 105 210 o .N.i .M.. r 0 00 0) U°pN O II r N ~ z > _ CO Qc r 00 O ti O � O O N N II o � ON II o 21001 U II Z z 0 FUI LIRE GRADE II z 21 0 X Z Z Z EXISTING GRADE O z I I I I 771777T I I I I � � I � I I I I I I 095 I 1 209 I I I I I I I I 1 10-YR HGL =29 1 I I I I I IC xI I I ICISCICINCIC I I I I 1 090 209 I I I I I I I 166 LF 24" HDPE @ 1.00% I I I 9 LF 24" HDPE @ 1.00% I LJ -0+25 0+00 1+00 STRM O PROFILE VIEW HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 111=2' 2+00 105 EDGE OF TRAVEL NC 280 CENTER 210 PROPERTY LINE -INE FUTURE GRADE / EXISTING GRADE ° 51 2100 21 od EXISTING 30" STORMWATER PIPE 0+00 1+00 NC 280 FULL ACCESS PROFILE VIEW HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 111=2' 0+00 1 +00 CO d7N ��N 00 O qj M (D z 0 0 00 r r A CM O O N _O U =110 0 0 Z 5Q'z � 07 O O N 0)N N II O N II O 11 II = N II II Zz U = II z O N� >> > z z pNp�Z 2100 EXISTING GRADE r I I I I I I 1 10-YR HGL I I I I 095 I I 209 I I 1 I I I 60 LF 18" HDPE @ 1.00% P E I I P1 F 18" HDPE @ 1.007, I 090 I 209 I I I I I 0+00 1 +00 STRM B PROFILE VIEW HORIZONTAL SCALE: 111=20' VERTICAL SCALE: 111=2' NC 280 RIRO PROFILE VIEW HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 111=2' 0 z 0 rm 0 u J J Ci 0 U' 0)+_ N 0 U Cu Cu E C Cu '= 0 d o Z lO � N N •= U) LO o o O M o C +� Cu 2- Q r- °O o co M (O `� 0 E 0)C 0 U c Cu E � 2 0)CDQ T- 5 O c O U E p CO 0 00 0 0 w Lu LL W z IL J 0'--' Lu LL O w U) z U z Ww z O > z_U ILILLL LLJ z J J � CD wLu(~n LL o U U) J Lu UG z 0L O U Lu z KAI BURK LICENSE NO. 043463 1 PLAN STATUS 1 1 DATE I DESCRIPTION 1 PL I BG I KB DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 1 FILE C3.0 GRADING & DRAINAGE PLAN 1 SHEET C3.2 CAD file name: V:\120003 — Circle K\120003-01-050 (ENG) — Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C3.0 GRADING & DRAINAGE PLAN.dwg 12/23/2019 c� z F- J Cn Cn Z O U Z O m O r } m ¢ J F- O S W m J J S N CD Z H J Cn N Z O U z CD O } m z O a 0 0 ¢ Z 0 N Of O S F- ¢ Z W H F- Of O S z w 0 Cn S z O W U Z ¢ w Of Of w d O Of W 0 Z 0 W N Of W Of ¢ d W Of 0- d N S U S Of O z w J U z ¢ W Cn Of m 0- U U W m cn Of O LL } J Z O 0 W 0 Z W Cn w U Of LJ N LL O Of Cn w Of Z Q Cn Z Of S 0 W z Cn Of 0- Cn Z CD Cn 0 z Cn a W U Z O S S r Of LJ S F- W CD z w U O 0 Cn MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN(BASED ON MIN. HEIGHT, H, WITH NO RISER) * DIMENSIONS OF BOX AND PIPE COVER DIMENSION I CU.YDS. CONIC. IN BOXI DEDUCTIONS ONE PIPE PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT BARS-U BARS-V BARS-W TOTAL LBS. TOP SLAB BOTTOM SLAB TOT, CONC. EI MINIMUM HEIGHT H D A B C G H E F NO. LENGTH NO. LENGTH NO. LENGTH C.M. R.C. 12" 3'-0" 2'-2" -- -- 2'-9" -- -- -- -- -- -- -- -- -- -- 0.235 0.772 0.015 0.026 15" 3'-0" 2'-2" 3'-0" 0.235 0.829 0.023 0.036 18" 3'-0" 2'-2" 3'-3" 0.235 0.887 0.033 0.049 24" 3'-0" 2'-2" 3'-9" 0.235 1.001 0.059 0.085 30" 3' 0" 2'-2" 3'-4" 4'-3" 1' 2" 4' 0" 4 V-5" 2 3' 9" 3 3' 9" 39 0.123 0.321 1.433 0.092 0.127 36" 3'-0" 2'-2" 3'-10" 4'-9" V-8" 4' 0" 4 1' 11" 3 3' 9" 3 3' 9" 43 0.161 0.358 1.714 0.132 0.178 42" 3' 0" 2'-2" 4' 5" 5'-3° 1' S" 3' 2" 4 1'-8" 2 2'-11" 3 2'-11" 32 0.112 0.318 1.738 0.180 0.243 48" 3' 0" 2'-2" 5' 0" 5'-9" 2'-0" 3' 2" 4 2'-3" 3 2'-11" 3 2'-11" 35 0.145 0.352 2.052 0.235 0.317 54" 3'-0" 2'-2" 5'-7" 6'-3" 2'-7" 3'-2" 4 2'- 10 1 2'-11"1 41 1 0.180 10.386 1 2.387 1 0.297 0.401 A 43" B B f- PLAN FRAME,GRATE, & HOOD ASS'Y NOTE: USE TYPE "E", "F" AND "G" GRATE UNLESS OTHERWISE NOTED. lantAE A ALIGN FRAME WITH INSIDE EDGE OF WALL TO ALLOW FOR VERTICAL ADJUSTMENT WALL SECTION --- SECTION - BB 34 �� '� _� a 0 v > 3/2,r 3,_0„ �3�,, SECTION - KK DETAIL SHOWING TYPES OF GRATES USE ACCORDING TO WATER FLOW. 3'-0%8" R 11/2,r 6„ 2,_Or, ]:43, r, I 1Y6 rr 2'-111/2" R HOOD ELEVATION TYPE "G" TYPE "E" TYPE "F" c� WATER FLOW SAG WATER FLOW WATER FLOW SAG WATER FLOW -- TYPE "F" TYPE "E" TYPE "G" P RAISED FLOW ARROW 23/'� %s" HIGH � N\ 1 /8 rr Q O 1 rr 1 /2 1 /2 rr 13/ 1 t 1/B rr 2'- 1 13/4 " 11/2r' A 1 /2'� �-tI` �Brr 1344" SECTION A -A TYPE - F N 2 /9„ SECTION - LL T, II T-1 SECTION - PP 3W \ 2'-113/4" 13/4 rr 21/4 r, L 1 n 21/g„ SECTN ION - MM 13,/811 r�j SECTION- NN -N 4/41'N O O 13/q r' N � SECTION - JJ 55/8" 1/2 rr 3" R /2 „ 45/S" SECTION - RR Z O Cn H- Q Q rZ-I fr C='SU LL JHZ O O O = Lu LL = Q0000H H H-LLOJ N 0 a) = Z H � l- � H W 0 � G H LL Q = m (3 H 0 ¢ Q U 0 w � CC N Q Lu aa� H 0 U) QO W QLu a5 CC LL O LL HEET 1 OF 2 840.03 z DU) 23/4 1/2rr ~ Q Q HCC0v LL -1 8- H Z 1�QU�OH O O Cn = w< - H �x zw �H-0OJ U) 9T8r, 0 = z F> H r Ii 1 /2 rr 13/ w� r O SECTION B-B Z cc 0 H LL OCo C7 = z = TYPE - E Z Q RAISED FLOW ARROW cc Q U sr' HIGH 23� ►� O N Q Qrc Wz CTI z Q H <oC(n U) O z „ O Lr 1/$ \ < W w U) 1 /2"R ¢ 2'-113/4" 1/2 TYPE G "� 1/$ O 11/2r �srr HEET 2 OF 2 840.03 GENERAL NOTES USE 4000 PSI MINIMUM COMPRESSIVE STRENGTH CONCRETE. USE ASTM A615 GRADE 60 REINFORCING STEEL. USE ASTM A1064 WELDED WIRE FABRIC (WWF). FABRICATE, ASSEMBLE AND DESIGN PRECAST MANHOLE COMPONENTS ACCORDANCE WITH AASHTO M199. ASSEMBLE RISER AND GRADE RINGS WITH THE STEPS SPACED 12" FROM THE TOP TO THE BOTTOM OF THE MANHOLE. WHERE THE MANHOLE IS EXPOSED TO ROAD TRAFFIC, CONSTRUCT THE TOP OF THE MANHOLE FLUSH WITH THE GROUND AND A MINIMUM OF 9" ABOVE THE GROUND AT OTHER LOCATIONS. LIMIT DEPTH OF FILL TO 30'-0" FROM FINISH GRADE TO TOP OF BOTTOM SLAB. THE MIN. SLAB THICKNESS 'T' IS THE DIMENSION OF THE THINNEST PORTION OF THE TOP/BOTTOM SLAB. * TOP MAT OF REINFORCEMENT MAY BE NEGLECTED IF TOP SLAB HAS A DISTINGUISHABLE TOP AND BOTTOM. D W T As Z O Cn INTERNAL MIN. MIN. MIN. CIRCUMFERENTIAL I- Q DIAMETER WALL TOP/BOTTOM AREA OF STEEL Q < U (FT.) THICKNESS (IN.) SLAB THICKNESS (IN.) PER VERTICAL FT. (SD. IN.) w J HO-1 O O CL = Z W QQ LL= 4 4 6 0.12 QUm0H 5 5 i::� s 0.15 F-S~Zw s s s 0.18 V)owo�Q 1 Z H F � � H T 0 ALTERNATE CONE SECTION GRADE RING r v MIN. AREA OF STEEL °•p IS 0.07 in.' ECCENTRIC CONE W 6" MAX. SPACING W LOCATE WALL REINFORCEMENT OF CIRCUM. R/F IN MIDDLE THIRD OF WALL v Q FRAME AND GRATES STD. NO. TRAFFIC SEARING 840.37 1" MIN. ADDITIONAL CLR. #4 REBAR NONTRAFFIC BEARING: 840.22 840.24 .°.O°. 840.20 e4G.zs 1" MIN. USE MIN. AREA OF STEEL IN TOP s4a.aa� CLR. SLAB OF #4'S @ 8" CTS. EACHWAY/EACH FACE *. FLAT TOP SLAB ADDITIONAL #4 EACH ADDITIONAL #4 EACH CLEAR OF BOTTOM FACE SIDE OF OPENING SIDE OF OPENING (1" RISER PLACE BARS DIAGONAL CLEAR OF BOTTOM FACE) TO CORNERS (TYP.) ' FRAME & GRATE `` SEE STD. 840.54 _ . _-_. _ � � FOR MANHOLE - - 11 RING AND COVER ill 1 I / K 1tG. l - JL � I�----•l, 1 1 1 � 1 lid = - -I 1 \ \(l S Z✓`°, GRATED INLET OPTION MANHOLE OPTION A A N O LL STEP STD. L, w N0. 840.66 AS H Lu C (CIRCUMFERENTIAL 3: Cl Z H REINFORCEMENT) < o_ • LONGITUDINAL REINFORCEMENT p Ln 01) Z 'D' `W' < Cn W I- J _ O' } 2 r = BASE Z a o Q USE MIN. AREA OF STEEL IN BASE SLAB 0.12 inz PER OF LINEAR W FOOT EACH WAY cc IL TYPICAL MANHOLE SECTION SOLID COVER SHOWN PERFORATED. PERFORATED AVAILABLE IF SPECIFIED. STATE USE OF SYSTEM ON COVER (I.E.: SEWER, STORM DRAIN, ELECTRICAL) TOP OF COVER 4 4 BOTTOM OF COVER PLAN OF FRAME 2'-11/„ 1'- 1 1 3/4 ° 3/4 " 1'-10%8" N \ TYPE #1 n� � ~ � ALTERNATE N 43/8rr 2,_01/2rr A 2r_91/„ ly ) SECTION A -A TYPE #2 1" R. PLAN OF COVER 1'-111/2,r N (7\ N 33/ �I IlflI'~ %2 rl 1/2 " 1� 43/4 " 1r_105/arr SECTION B-B MINIMUM WEIGHTS - LBS. FRAME - 180 COVER - 120 TOTAL - 300 Z 0 Cn F } Q Q H 3CDU LL Jd~Z 00u)2 =Z Q0o� Hx�zw CAH LLOJ ooC/)Q Z •H= CL LuLu o 0 HEET 1 OF 1 840.54 HEET 1 OF 1 840.52 Ln M Lo 0 z 0 0 �6� J J Ci 0) N o U Cu Cu E Cu Cu d "- O 0_ o z Lin O04 N •= (n LO O O O co Q +� v Cu CL M O Co M I-- = o E OU 0) C O U E 3:E b ci O n c O U o m O 00 0 0 /^, v / Q W W W �zLL U LL p w 0 Lu w Q Q 0 z U) W Q U < I 0 I..L mowN/ L.1� > DULLILL_ W �e W z J J Lu Z W Lu � (1)O `� - 0vWm 0 J Lu U LLL O U Lu A � • �Essio••. ti `�•Q��Ist�3/1 �9< 9 - SEALq - �3- ` 141 BUR` KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL BG KB DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 FILE C3.3 GRADING DETAILS SHEET `'' 3.4 CAD file name: V:\120003 - Circle K\120003-01-050 (ENG) - Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C3.3 GRADING DETAILS.dwg 12/23/2019 z J (n Z O U Z Q O m O H r m Q J H CD O LLJ J J Q _ (n CD Z J O U z Q O m M m Z O Q fZ Cof 0 a z Q Z O Q O _ H Q Z W H H CD O H Z W U O r] (n _ Z 0 W U Z Q Of Cof w W W 0 D_ r] Z Q O LLJ r] Of w Q W Of IZ Q _ U_ _ O Z U Z Q W O Iz Of U Li U w Cr1 D- 0 w r J Z O 0 w 0 z w z Ld LLJ LLJ w 0 z D' Cn z z Q (n Q z w 0 Z (n a- Z U (n LLJ r] Z Q !n w U Z O U w W 0 CD z Elf U O Cn PROPOSED LAYOUT TORMTECH SC-740 CHAMI -PUTPCH cr_74n Pun c 8460 (COVER STONE INCLUDED) C H ISOLATOR ROW (SEE DETAIL) L CONCEPTUAL ELEVATIONS INNER TRADE (TOP OF PAVEMENT/UNPAVED): 11 00 ITEM ON PART TYPE DESCRIPTION RADE (UNPAVED WITH TRAFFIC). 5.00 LAYOUT RADE (UNPAVED NO TRAFFIC): 4.50 PREFABRICATED END CAP 24' B A OTTOM PREFABRICATED END CAPfTP OF ALL 24" BCTTOM CONNECTIONS AND PLACE MINIMUM 12.50' OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS BED LIMITS UNDERDIRAIN DETAIL NTS STORMTECH CHAMBER RMTECH END CAP 'LET MANIFOLD FOUNDATION, STONE BENEATH CHAMBERS ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE STORMTECH END CAP FOUNDATION STONE BENEATH CHAMBERS ADS GEOSYNTHETICS S601T NON -WOVEN GEOTEXTILE - _.ITE DESIGN ENGINEER 4" (100 mm) TYP FOR SC-310 & SC-16OLP SYSTEMS 6" (150 mm) TYP FOR SC-740, DC-780, MC-3500 & MC-4500 SYSTEMS SECTION B•B W CHAMBER w UJ > z J w J Y N W I J - U U m Z 3 rc O ¢_ z w o Y U = x G U p a i if o MAX FLOW 14.4 CFS IN I.0 CFS OUT ~ N d aN oN g ma b �O� s jpn z J R i NOTES • MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH SHEET#7 FOR MANIFOLD SIZING GUIDANCE. - DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. § • THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET. - • THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE -SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER SHEET IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED. OF 6 NOT FOR CONSTRUCTION lie SC-740 TECHNICAL SPECIFICATION NTS w W >De m z o Imo- 85.4" (2169 mm) INSTALLED LENGTH Z � Z Y 3 0 B <= BUILD ROW IN THIS DIRECTION J W p U Ix W J - 0 o START END V F U - W lii 3 F O - ¢ m O a p OVERLAPNEXTCHAMBER HERE (OVER SMALL CORRUGATION) g 29.3" 30.0" (744 mm) ® ® (762 mm) 12.2" _ 45.9' (1166 mm) 51.0' (310 MM) 0295 mm) NOMINAL CHAMBER SPECIFICATIONS SIZE(W X H X INSTALLED LENGTH) 51.0"X30.0"X85.4" (1295 mm X 762 mm X 2169 mm) CHAMBER STORAGE 45.9 CUBIC FEET (1.30 m') MINIMUM INSTALLED STORAGE' 74.9 CUBIC FEET (2.12 m') WEIGHT 75.0 Ibs. (33.6 kg) �1 'ASSUMES 6" (152 mm) STONE ABOVE, BELOW, AND BETWEEN CHAMBERS -I A A III e PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "i' C PRE -CORED END CAPS END WITH "PC" PART # STUB A B C SC740EPE06i / SC740EPE06TPC SC740EPE06B / SC740EPE06BPC 6" (150 mm) 10.9" (277 mm) 18.5" (470 -- 0.5" (13 mm) SC740EPE08T /SC740EPE08TPC SC740EPE08B / SC740EPE08BPC g" (200 mm) 12.2" (310 mm) 16.5" (419 ) mm -- -- 0.6" (15 mm) SC740EPE10T/SC740EPE10TPC SC740EPE10B /SC740EPE10BPC 10" (250 mm) 13.4" (340 mm) 14.5"(368 mm) -- -- 0.7"(18 mm) SC740EPE12T / SC740EPE12TPC SC740EPE12B/SC740EPE12BPC 12" (300 mm) - 148..7"373mm 12.6 (3--18 m) 12'(3--- 0 mm) SC740EPE15T/SC740EPE15TPC SC740EPE15B /SC740EPE15BPC (375 mm) 14"(46 . 90"(229mm)15" - -- 1.3"(33 mm) SC740EPE18T / SC740EPE18TPC SC740EPE1BB /SC740EPE18BPC 18" (450 mm) 19.7" (500 mm) 5.0" (127 mm) -- - 1.6'(41 mm) SC740EPE24B' 24" (600 mm) 18.5" (470 mm) 0.1" (3 mm) ALL STUBS, EXCEPT FOR THE SC740EPE24B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB 15 FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694. ' FOR THE SC740EPE24B THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. NOTE: ALL DIMENSIONS ARE NOMINAL o - g4 § oN g ma b 2 1 ° n - r^ _ �=m 6 3 SHEET 5OF6 ACCEPTABLE FILL MATERIALS: STORMTECH SC-740 CHAMBER SYSTEMS AASHTO MATERIAL MATERIAL LOCATION DESCRIPTION COMPACTION / DENSITY REQUIREMENT CLASSIFICATIONS FINAL FILL: FILL MATERIAL FOR LAYER'D':iTARTS FROM THE PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED D TOP OF THE'C' LAYER TO THE BOTTOM OF FLEXIBLE ANY SOIUROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. N/A INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PAVEMENT OR UNPAVED FINISHED GRADE: ABOVE. NOTE THAT CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. PREPARATION REQUIREMENTS. PAVEMENT SUBBASE MAY BE PART OF THE-'D' LAYER. AASHTO M145' BEGIN COMPACTIONS AFTER 12" 300 mm OF MATERIAL OVER ( ) INITIAL FILL: FILL MATERIAL FOR LAYER'C' STARTS FROM THE GRANULAR WELL -GRADED SOIUAGGREG <35%FINES OR A-1 A-2.4 A.3 THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) PROCESSED AGGREGATE. AGGREGATE. 6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR C ABOVE THE TOP OF THE CHAMBER. NOTE'iHAT PAVEMENT MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS OR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. ROLLER GROSS SUBBASE MAY BE A PART OF THE'C' LAYER. LAYER. AASHTO M43' VEHICLE WEIGHT NOT TO EXCEED 12,000 Ibs (53 I,N). DYNAMIC 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 FORCE NOT TO EXCEED 20,000 Ibs (89 kN). EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS AASHTO M43' B FROM THE FOUNDATION STONE ('A' LAYER) TO THE C' LAYER ABOVE. CLEAN, CRUSHED, ANGULAR STONE 3, 357, 4, 467, 5, 56, 57 NO COMPACTION REQUIRED. A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE CLEAN, CRUSHED, ANGULAR STONE AASHTO M43' PLATE COMPACTOR ROLL TO ACHIEVE A FLAT SURFACE.�3 SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. 3, 357, 4, 467, 5, 56, 57 a0 ¢ C W m z w > 2 z Z o Y U) 3 U J J_ W U Ir Y m LU p J - a U i U # o z a [C PLEASE NOTE: f°n 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". o 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FORA' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4. ONCE LAYER 'C' IS PLACED, ANY SOIUMATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. PERIMETER STONE (SEE NOTE 5) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) 12" (300 m ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS C 740 "' ""'�IIH IHIt=IIHIF ID CAP SUBGRADE SOILS (SEE NOTE 4) PAVEMENT LAVER (DESIGNED BY SITE DESIGN ENGINEER) D LLATI ° Exio E AY ooc a C lllo�i/IloOi�lll11RE111 I-leao mmis �� u.tllx 18" (2.4 m) (450 mm) MIN' MAX 6" (150 mm) MIN © 30„ 760 mm) WI=Amp LEI ICI I�III k=11 �IIIETIIIIETIIIII 11 III L�II III �I IIII L9111 �IIIL�IIIEHII IIII�I II� DEPTH OF STONE TO BE DETERMINED L L. °�Lilll-ul ul Ill�lil=uuTul-meliuilu�hi„ II�II BY SITE DESIGN ENGINEER 6" (150 ..)MIN 6 51" (1295 mm) (150 12" (300 mm) TYP mm) MIN NOTES: 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2. SC-740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787'STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE ALLOWABLE BEARING CAPACITYOF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO'THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5. REQUIREMENTS FOR HANDLING AND INSTALLATION: • TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. • TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 7. • TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, e) THE ARCH STIFFNESS CONSTANTAS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 550 LBSANAN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73" F 123- C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 0pp _. 4 & P U 3 8m '&o 3 � o� o� ma b W°� so .pw zr xx� =w R=iS �m a SHEET 3OF6 NYLOPLAST DRAIN BASIN NTS W m 3 U z w INTEGRATED DUCTILE IRON JLU FRAME & GRATE/SOLID TO MATCH BASIN O.D. > o U 18" (457 mm) W MIN WIDTH J D_ AASHTO CONCRETE SLAB 8' (203 mmmm) MIN THICKNESS U F w € w 12"(610 mm)MIN TRAFFIC LOADS: CONCRETE DIMENSIONS O a (FOR AASHTO H-20) ARE FOR GUIDELINE PUPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE DESIGNED GIVING CONSIDERATION FOR INVERT ACCORDING TO LOCAL SOIL CONDITIONS, TRAFFIC LOADING - PLANS/TAKE OFF & OTHER APPLICABLE DESIGN FACTORS ADAPTER ANGLES VARIABLE 0*- 360° z ° o ACCORDING TO PLANS rc y a VARIABLE SUMP DEPTH ACCORDING TO PLANS Y= [6" (152 mm) MIN ON 8-24" (200-600 '- 10" (254 mm) MIN ON 30" (750 mm)] r1f wF �g Y U I I N VARIOUS TYPES OF INLET AND 4" (102 mm) MIN ON 8-24" (200-600 mm) OUTLET ADAPTERS AVAILABLE: 6" (152 mm) MIN ON 30" (750 mm) 4-30" (100-750 mm) FOR w w CORRUGATED HDPE " s WATERTIGHT JOINT BACKFILL MATERIAL BELOW AND TO SIDES 0� 8 (CORRUGATED HDPE SHOWN) A OF STRUCTURE SHALL BE ASTM D2321 -: CLASS I OR II CRUSHED STONE OR GRAVEL W AND BE PLACED UNIFORMLY IN 12" (305 mm) a m N � � 2 u� zl�LIFTS AND COMPACTED TO MIN OF 90% a o. NH ?ooRR NOTES o0 1. 8-30" (200-750 mm) GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 �4 €H - 2. 12-30" (300-750 mm) FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 7050-05 O 3. DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS -4 p 4. DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TOASTM D3212 FOR CORRUGATED HDPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC XH c& 5. FOR COMPLETE DESIGN AND PRODUCT INFORMATION: W W W.NYLOPLAST-US.COM ow 6. TO ORDER CALL: 800-821.6710 m4 w ¢Z¢> WOn ?Q Bz �_ 4 0 a €� SHEET 6 OF 6 A PART # GRATE/SOLID COVER OPTIONS 8' PEDESTRIAN LIGHT STANDARD LIGHT (200 mm) 2808AG DUTY DUTY SOLID LIGHT DUTY PEDESTRIAN LIGHT STANDARD LIGHT (25100.m) 2810AG DUTY DUTY SOLID LIGHT DUTY 12" PEDESTRIAN STANDARD AASHTO SOLID (300 mm) 2812AG AASHTO H-10 H-20 AASHTO H-20 PEDESTRIAN STANDARD AASHTO SOLID (37155.m) 2815AG AASHTO H-10 H-20 AASHTO H-20 18" PEDESTRIAN STANDARD AASHTO SOLID (450 mm) 2818AG AASHTO H-10 H-20 AASHTO H-20 24" PEDESTRIAN STANDARD AASHTO SOLID (600 mm) 2824AG AASHTO H-10 H-20 AASHTO H-20 30" PEDESTRIAN STANDARD AASHTO SOLID (750 mm) y830AG AASHTO H-20 H-20 AASHTO H-20 MANHOLE COVER RIM I E = 2099.88' WEIR I E = 2094.25' 9" WEIR I E = 2092.50' 9" ORIFICE I E = 2090.75' I E = 2089.75' COVER ENTIRE ISOLATOR ROW WITH ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE 8' (2.4 m) MIN WIDE STORMTECH HIGHLY RECOMMENDS FLEXSTORM PURE INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES CATCH BASIN OR MANHOLE SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" 1600 mm] MIN RECOMMENDED) INSPECTION & MAINTENANCE STEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT SC-74C CHAMBER 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE -FABRICATED END CAP PART#: SC740EPE24B SC-740 ISOLATOR ROW DETAIL NTS A. INSPECTION PORTS (IF PRESENT) A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE. DRAIN A'2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B. ALL ISOLATOR ROWS B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW B.2. USING A FLASHLIGHT, INSPECT DOWN THE: ISOLATOR ROW THROUGH OUTLET PIPE 1) MIRRORS ON POLES OR CAMERAS MAYBE USED TO AVOID A CONFINED SPACE ENTRY iiI FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PR'.00ESS A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B. APPLY MULTIPLE PASSES OF JETAC UNTIL BACKFLUSH WATER IS CLEAN C. VACUUM STRUCTURE SUMP AS REQUIRED STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. 10.1' 24." OUTFALL PIPE I E = 2090.75' FRONT ELEVATION STRUCTURE UNDG.1-CS CONTROL STRUCTURE DETAIL SCALE: NONE OPTIONAL INSPECTIO14 PORT SC-740 END CAP TWO LAYERS OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 5' (1.5 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS 8 ,"p d E9 d rc 8m S 3 � ma �� MQy W ^ �m .g� n ym� B S SHEET 4 OF 6 Cu N N O Q 4- O uqCu U v- It a) U O V J J Q r0 VCu 0 .= y O U Cu E Cu Y • O D_ O z LO 0 O N O •= (n �, O O O M Q Q9 +� Cu CL Q 00 I M M I� (O O D_ OU 0 C O U c Cu � O c O U m E o m O m 0 '0 W v / W J U LL Z LL OUJI Q � W p U) U) < 7 Z LLI w\ ULL_ Z IL '�^ w uj Lu z J CJ_ UJ W Q W cn 0 UU° J Lij U G LLL O U Lu z ` `111111CI,►J4 O ze `~ Q�®Is413/I �9� 9 SS - SEALq - - U 3 - BURS 77//1111111j11`` KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 FILE C3.3 GRADING DETAILS SHEET `'' 3 ' I CAD file name: V:\120003 - Circle K\120003-01-050 (ENG) - Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C3.3 GRADING DETAILS.dwg 12/23/201; z J Cn Cn z 0 U Q 0 m O } m ¢ J H 0 _ m Cn J ¢ CD Cn J Cn 0 U z ¢ CD 0 r m z 0 0 a 0 z 0 N Of O _ H Q Z W H H Of 0 z w _ 0 0 Cn z 0 W U Z Q J W Of Of Of CD W O W z ¢ Cn Of 0 w Of m w m m N U Of O z U Cl Cn ¢ W 0 U L� U d N w _ Of 0 W r J Z O 0 w 0 z w Cn Of U w Cn z W Of z Q Cn ¢ z w Of w 0 w z w Cn 0- Cn CD Cn w 0 0 z Q Cn W U Z O U w _ Of w _ w 0 z w U O Cl Cn I I i I I I I I I 202 I INV: 2094.40' 201 Lot 9 PIN# 9632609234 (Slide 4578) INV: 2096.10' 112 30"OAK I I I I I I I I I I I I I I I 201 -Zra-i,w------- s s s s s s I S S S, Lik - - OHE OHE OHE OHE OHE _ - a 8 M �M PvC �95 J �G_OHE OHE i G G G G MHSS=2099.18' IE=2089.73'(IN) / IE=2089.65'(OUT) BOYLSTON HWY. NC 280 Lot 4 PIN# 9632609234 (Slide 2492) INV: 2096.86' INV: 2097GOT - - - - - 201 P 0 INV: 2097.43' O, „aE S 06027'06" W 43.24' N/F MARRY LEE KEITH PIN# 9631694639 (DB. 512, PG. 59) � APV GENERAL UTILITY NOTES 1. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND IS RESPONSIBLE TO REPAIR ANY DAMAGE TO EXISTING UTILITIES DURING CONSTRUCTION AT NO COST TO THE OWNER. 2. ALL UTILITIES ARE SHOWN FROM INFORMATION GATHERED AND SHOULD NOT BE USED AS EXACT. CONTRACTOR SHALL VERIFY EXACT DEPTHS AND LOCATIONS PRIOR TO UTILITY INSTALLATION. 3. CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY COMPANY FOR INSTALLATION AND SPECIFICATION REQUIREMENTS. 4. ALL PIPE MATERIALS SHALL COMPLY WITH LOCAL REGULATIONS. 5. ALL TRENCHING AND BEDDING SHALL BE PER THE UTILITY TRENCH AND BEDDING DETAIL. 6. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR ALL BUILDING UTILITY TIE INS. 7. ALL CERTIFICATES AND SHOP DRAWINGS MUST BE SUBMITTED, REVIEWED, AND APPROVED PRIOR TO STARTING CONSTRUCTION. 8. THE CONTRACTOR WILL COORDINATE THE WORK WITH THE UTILITY COMPANIES AND WILL VERIFY ALL EXISTING PIPE INVERTS AND EXISTING ROAD ELEVATIONS PRIOR TO CONSTRUCTION. UTILITY KEY NOTES 1. ELECTRIC TRANSFORMER 2. PROPOSED UNDERGROUND ELECTRIC LINE TO TRANSFORMER (BY OTHERS). WATER 100. PROPOSED 8" x 2" TAPPING SADDLE INSTALLED BY CONTRACTOR 101. PROPOSED 2" LINE FOR DOMESTIC SERVICE 102. PROPOSED 2" x 2" x 1" TEE 103. PROPOSED 2" VALVE 104. PROPOSED 2 METER FOR DOMESTIC SERVICE - - - 105. PROPOSED 2" RPZ FOR DOMESTIC SERVICE 106. PROPOSED 3/4" LINE FOR IRRIGATION SERVICE 107. PROPOSED 3/4" 90° BEND FOR IRRIGATION SERVICE 108. PROPOSED 3/4" VALVE 109. PROPOSED 3/4" METER TO BE USED FOR IRRIGATION SERVICE 110. PROPOSED 3/4" RPZ FOR IRRIGATION SERVICE 111. PROPOSED 2" 90° BEND FOR DOMESTIC SERVICE 112. PROPOSED 2" 45' BEND FOR DOMESTIC SERVICE 113. PROPOSED 2" WATER SERVICE BUILDING CONNECTION. SEE PLUMBING PLANS FOR EXACT LOCATION 3HO - AHO - SEWER 200. 4" SANITARY SEWER BUILDING CONNECTION. SEE PLUMBING PLANS FOR EXACT LOCATION. 201. 4" PVC PIPE @ MIN 1.00% 202. 4" CLEANOUT 203. 1000 GALLON GREASE INTERCEPTOR, SEE DETAIL SHEET C4.1 204. PROPOSED CONNECTION TO EXISTING SANITARY SEWER MANHOLE SCALE: 1" = 5' GRAPHIC SCALE 0 10' 20' 40' ( IN FEET ) SCALE: 1" = 20' North Carolina Ono -Gall Center M a r.i.n.. N" a.e. m O ow 9 - BBOAE OiO.O N mm GALL I-WO-63Z-4444 Iwo rnrwna. mxmNera SWU miner nc Iwo M U-Ms Ewn ru mny un y wah 0 ro anon �naioxs. Call BEFORE you DI61 "It's The Law" O z 0 0 \6J J J Ci 0 (� t� N O U Cu CO E Cu Cu Cu �_ O d O z CD Lo CD CN N •= U) LO o CD O coCD Q (� +� v CuE sz r- °O co co 00 [-- (0 O E 0) C O U 3:E b o O c O U o m O 00 0 0 W w n/ULL z LL z 0 '^ J � �^ � C// < U Z LU w JULL IL Lu w z J O W LL O Lu (n 0 U (/) ° J �z U O Lu z CApo i SEALq - 34 3 GINE� ' �q1 BUR` KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL BG KB DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 FILE C4.0 UTILITY PLAN SHEET ` 4.0 CAD file name: V:\120003 - Circle K\120003-01-050 (ENG) - Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C4.0 UTILITY PLAN.DWG 12/23/2019 U z J Cn Cn z O U O m O H m J H O _ W m Q _ N U Z H J Cn N U U z CD 0 m z O a 0 0 ¢ z 0 Of O _ I- Z W H H Of O _ z 0 0 Cn _ z O W U z J W Of Of w d O Of m 0 z 0 W Cn Of 0 Of W 0- 0- Cn U Of 0 z U 0 z ¢ W Cn O m Of m U L_ U W m cn _ 1-- Of O W } J Z 0 0 W 0 z w Cn Of U Cn w 0 Of w _ I- U1 z Q Cn ¢ z W Of W 0 W z W U W 0- Cn CD Cn W 0 0 z Cn W U Z O U W Of W CD 0 z w U O 0 Cn GENERAI 1. NOTES, WATER CONSTRUCTION ON THIS SITE IS AUTHORIZED BY PERMITS ISSUED BY THE NORM 20. MAINTAIN 18 INCHES VERTICAL SEPARATION BETWEEN STORM DRAIN AND WATER, OR CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) AND AUTHORIZED BY THE INSTALL FERROUS MATERIAL WATER LINE WTIHN 10 FEET EACH SIDE OF CROSSING. CITY OF HINDERS ONVNLE THE WORK IS SUBJECT TO INSPECTIONS AT ALL TIMES BY 21. TAPS GREATER THAN CIE -INCH IN DIAMETER N EXISTING ACTIVE WATER MAN ARE TO BE REPRESENTATIVES OF NCDEA THE CITY OF HENDERSONVILLE, THE OWNER OR THE PERFORMED BY THE CITY UNLESS OTHERWISE APPROVED IN WRITING BY THE CITY. TAPS IN ENGINEER. THE PERMITS REQUIRE CMMCATON OF COMPLETION OF THE WATER SYSTEMS NEW CONSTRUCTION ARE TO BE PERFORMED BY THE CONTRACTOR IN ACCORDANCE WITH BY THE ENGINEER AND THE APPLICANT PRIOR TO ISSUANCE OF FINAL OPERATION CITY REQUIREMENTS. APPROVAL 22. All. WATER METERS WILL BE SET BY CITY STAFF UNLESS THE CONTRACTOR IS GRANTED 2. MATERIALS AND INSTALLATION FOR WATER CONSTRUCTION SHALL CONFORM TO THE LATEST WAN PERMISSION BY THE CITY. VERSIONS OF CITY SPECIFICATION AND DETAILS AND AWWA STANDARDS AND REQUIREMENTS. 22.1. CONTRACTOR WILL PROVIDE THE CITY NOTICE OF 10 WORKING LAYS MINIMUM PRIOR 3. CONTRACTOR SHALL NOTIFY NCB11 & APPROPRIATE UTILITIES AGENCIES PRIOR TO T TO THE DATE OF METER INSTALLATION. PERFORMING ANY WORK. �'2' ME CONTRACTOR WILL PROVIDE A LICENSED PLUMBER DURING THE METER INSTALLATION 4. REGULAR WORKING HOURS SHALL BE FROM 7O0 AM TO 5:00 PM MONDAY THROUGH TO VERIFY LINE SERVICES N ALL MULTI -METER BOXES. FRIDAY. EXCEPT IN CASES OF EMERGENCY OR OTHERWISE APPROVED N WRITING BY THE CITY OR AUTHORIZED REPRESENTATIVES. THE CONTRACTOR SHALL ENSURE THE 23• ALL PUBLIC WATER MAIN CONSTRUCTION SHALL BE PERFORMED BY A NORM NA CAROLI CONSTRUCTION SITE S SAFE FOR ANY PERSONS WHO MAY BE ON SITE WRING UCENSED UTILITY CONTRACTOR. NON -WORKING HOURS. 24. ALL WATER APPURTENANCES ARE TO BE MADE USING LEAD FREE MATERIALS. PIPE 5. ALL PERSONS SHALL BE COURTEOUS AND RESPECTFUL TO THE PUBLIC. CURSING OUR FImNGE. VALVES, HYDRANTS. PIPE CLAMPS, RESTRAINTS, FIANCES, CASTING$ FEW. FOUL LANGUAGE S NOT PERMITTED AND WILL NOT BE TOLERATED. HATCHES, INLETS, METER BOXES AND ALL OTHER CAST IRON COMPONENTS SHALL BE MANUFACTRED IN THE USA 6. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING TRAFFIC CONTROL ON ALL ROADWAYS WRING THE PROJECT. THE CONTRACTOR SHALL NOTIFY LOCAL EMERGENCY. SCHOOL AND 25• RESTRAINED JOINTS BY AN APPROVED PIPE MANUFACTURER ARE TO BE USED FOR ALL OTHER NECESSARY AUTHORITIES PRIOR TO ANY STREET CLOSING OR TRAFFIC CHANGE. PUBLIC WATER LINES WERE THRUST RESTRAINING 15 REQUIRED IN ACCORDANCE WITH THE 7. THE CONTRACTOR AT HIS OWN EXPENSE SHALL KEEP THE CONSTRUCTION SITE AND PLANS AND MARLwACTURER's SPECIFlGTION. CONCRETE THRUST BLOCKS ARE PERMITTED ONLY MATERIEL CONNECTIONS ARE MADE TO EXISTING WATER LINES OR WHERE THE USE OF AWADFM PUBLIC AND PRIVATE ROADWAYS CLEAN DUIBNG THE PROJECT. THE CONTRACTOR IS AM RESPONSIBLE FOR CONTROLLING DUST DUST WITHIN THE PROJECT AREA MECRESTRAINT IS NOT FEASIBLE S. THE CONTRACTOR S RESPONSIBLE FOR ALL CONSTRUCTION IN ACCORDANCE WITH THE 26. AL FIRE HYDRANTS, VAULTS, BACKFLOW PRVE TIERS, HOT MAKES AND WATER METERS ARE TO BE INSTALLED ON RELATIVELY FIAT AREAS OUTSIDE OF PAVEMENT. UNES, GRADES AND ELEVATIONS SHOWN ON THE PLANS OR AS GIVEN BY THE ENGINEER IN THE FIEND. 27. TAMPERING WITH OR ILEGAL USE OF THE PUBLIC WATER SUPPLY WILL RESULT IN 9. CONTRACTOR SHALL VERIFY THE EXACT LOCATION AND THE ELEVATION FOR ALL UTILITIES, SUSPENSION OF WATER SERVICE. INCLUDING DOMESTIC AND COMMERCIAL, UNTIL FINAL APPROVAL BY THE CITY 15 ISSUED A PERSON FOUND TO BE USING WATER ILLEGALLY DRAINAGE ARID OTHER UNDERGROUND FACILITIES JTIES BOTH EXISTING AND PROPOSED. AND SHALL BE SUBJECT TO PENALTIES OR FINES, AS PRESCRIBED AND APPROVED BY CITY SHALL NOTIFY THE ENGINEER GE ANY DISCREPANCIES OR CONFLICTS PRIOR TO COUNCIL CONSTRUCTION. 10. CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING CONSTRUCTION. REPAIRS SHALL BE LADE N ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES AT THE TESTING & INSPEIMON� CONTRACTORS IXP.ESE 1. NOTIFY THE CITY OF HENDERSONVILLE AND ENGINEER AT (FAST 5 WORKING DAYS BEFORE 11. DURING CONSTRUCTION THE CONTRACTOR STALL MAINTAIN THE OPERATION OF EXISTING STARING CONSTRUCTION OF WATER FACILITIES TO SCHEDULE A PRE-CONSIRJCnON UTILITIES WITH THE LEAST AMOUNT SERVICE INTERRUPTION POSSIBLE IN COORDINATION CONFERENCE. THE ENGINEER SHALL PERIODICALLY INSPECT THE PROGRESS OF WITH THE CITY OF HENDERSONVILLE CONTINUOUS SOME. PUBIC HEALTH AND SAFETY INSTALLATION AT A MINIMUM AND STALL COMPLETE A FINAL WATER CERTIFICATION. CONSIDERATIONS SHILL EXCEED ALL OTHERS AND CONTRACTOR'S SCHEDULE, PLANS AND 2 ALL CHANGES TO THE APPROVED CONSTRUCTION PLANS AND SUBMITTALS MUST BE WORK SHALL AT ALL TIMES BE SUBJECT TO ALTERATION AND REVISION IF NECESSARY FOR APPROVED IN WRITING BY THE CITY PRIOR TO IMPLEMENTATION N THE FIELD. THESE CONSIDERATIONS. 3. THE CONTRACTOR SHALL FURNISH SECURE AND PROVIDE ALL NECESSARY TESTING 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TEMPORARY OR PERMANENT MATERAIIS, EQUIPMENT, LABOR. THE WNIRACTDR SHALL COORDINATE TESTING, FLUSHING, RELOCARON OF STRUCTURES AND UTILITIES, INCLUDING BUT NOT LIMITED TO POLES. SIGNS. DISINFECTION. AND BACTERIOLOGICAL SAMPLING WITH CRY INSPECTOR. FENCES, HYDRANTS, VALVES, PIPING, CONDUITS AND DRAINS THAT INTERFERE WITH THE 4. THE ENGINEER OR CONTRACTOR STALL NOTIFY THE CITY CONSTRUCTION INSPECTORS 72 POSITIONING OF THE WORK AS SHOWN ON THE DRAWINGS HOURS (MINIMUM) PRIOR TD ANY WATER MAN OR TESTING OPERATIONS. AT A MINIMUM 13. CONTRACTOR SCOWL BE REQUIRED TO CONFORM AND COMPLY WITH ALL RESTRICTIONS CITY STAFF SHALL BE NOTIFIED PRIOR TO TAPS, TESTING, FWSMNG, DISINFECTION. AND AND EASEMENT CONDITIONS AND IS RESPONSIBLE FOR ALL RELATED INCIDENTAL COSTS SAMPLING. INVOLVED. 5. PRESSURE TEST WATER MAINS TO 200 PSI MIN. FOR A MINMUM OF TWO HOURS IN 14, EXISTING WATER SERVICES SCOWL R REPLACED TO THE EXISTING METER UNLESS ACCORDANCE WITH CITY REQUIREMENTS AND AWWA COCO. OTHERWISE APPROVED N WRITING BY THE CITY. SPLICING OF THE WATER SERVICE ON THE 8 DIECT WATER LINES AND PROVIDE ACCEPTABLE BACTERIOLOGICAL TEST FROM A SMFCERTIFIED DOWNSTREAM SIDE OF THE METER 15 Nor PERMITTED. TESTING LABORATORY IN ACCORDANCE WITH CITY REQUIREMENTS AND AWWA 15. AL DISTURBED AREAS. INCLUDING BUT NOT UNITED TO ASPHALT. CONCRETE. DRIVEWAYS. 0551. THE CONTRACTOR MAY ELECT TO USE THE CIIYS CERTIFIED TESTING; LABORATORY. ROADS, LANDSCAPING. SHALL BE REPAIRED TO EQUAL OR BETTER CONDITION THAN THE ORIGINAL SITE. GRASS AND LANDSCAPED AREAS FILL MATERIAL MUST BE REPLACED IN 7. PRIVATELY OWNED FIRE SYSTEMS SHML B. APPROVED BY THE APPROPRIATE LOCH. TRENCH TO SOON AS CONSTRUCTION ALLOYS. SEEDING PERMITTING AUTHORITY. ME CITY ENGINEERING OR WATER PAID SEWER DEPARTMENTS ARE ADD SRAM OR C EN BE APPLIED TENCH MULCH BALL THEN BE MPLBE TO THE DISTURBED TRENCH AREA NOT RESPONSIBLE FOR ENSURING COMPLIANCE WITH APPROPRIATE FIRE PROTECTION IL ADDITIONAL FILL AND SITE RESTORATION MAY BE REQUIRED WITHIN THE WARRANTY PERIOD REGULATION THE CITY DOES NOT PROVIDE ANY GUA WATER SYSEM'S CI AT THE CnYS DISCRETION. T E E PRESSURE AUTHORITY TD DELIVER WATER FLOW AND RESIDUAL PRESAIRE THE FIRE PERMITTING AUTHORITY MAY REQUIRE 16. CONTRACTOR SHALL PROVIDE EROSION CONTROL DEVICES TO CONTROL RUNOFF AS REQUIRED. THE CONTRACTOR IS RESPONSIBLE FOR ANY FINES THAT MAY BE LEVIED WE & ALL DACKFIDW PREVENTION ASSEMBLIES SHALL BE USC APPROVED AND RENEWED BY TO RUNOFF FROM CONSTRUCTION. THE GEMS. PROTECTION OF THE PUBLIC WATER DISTRIBUTION SYSTEM SHALL BE 17. IT S THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO FOLLDW ALL APP Urea c ASSURED BY INSPECTION OF THE INSTALLATION AND TESTING OF BACKFL W/ PREVENTION DEVICES IN ACCORDANCE WITH APPROPRIATE LOCAL. STATE AND FEDERAL REGULATIONS. FEDERAL. STATE AND LOCAL HEALTH AND SAFETY REOULATIONS PERTAINING TO CONSTRUCTION OPEATIONS. 9. CONSTRUCTION WATER SOURCING MUST BE APPROVED IN WRITING BY THE CITY. 18. ALL. WATER AWNS SHINL HAVE 3 FEET MINIMUM COVER. CONSTRUCTION WATER CONNECTIONS BALL BE PAIRED WTIH AN IRRIGATION METER AND APPROVED &ACKFLOW PREVENTION ASSEMBLY. THIS ASSEMBLY INSTALLATION MUST BE 19. INSTAL FERROUS PIPING FOR BOTH WATER AND SEWER WITHIN 10 FT. OF A CROSSING TESTED BY A LICENSED PLUMBER AND TEST RESULTS SUBMITTED TO THE CITY BEFORE IF' USE OF CONSTRUCTION WATER. 10.1. SEWER LINE CROSSES OVER WATER, OR 10. SECURE FINAL WRITTEN ACCEPTANCE FROM THE CITY OF HENDERSONVILLE PRIOR TO 19.2. VERTICAL CLEARANCE BETWEEN WATER AND SEWER S LESS THAN 18 INCHES. ACTIVATION OF THE SYSTEM. WATER SERVICE WILL NOT BE PROVIDED UNTIL WRITTEN ACCEPTANCE OF THE SYSTEM IS ISSUED BY THE Cm. 19.3. MAINTAIN 10 FEET HORIZONTAL SEPARATION BETWEEN SEWER AND WATER MANS 11 THE ENGINEER SHALL. SUPPLY THE CITY WITH FINAL. AS -BUILT DRAWINGS AND COMPLETE UNLESS WAFT D IN SEPARATE TRENCHES WTHE BOTTOM OF THE WATER LINE AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER LINE OR USE FERROUS MATERIAL FOR BOTH ALL PROJECT CLOSE OUT REQUIREMENTS. WATER AND SEWER. 1' BRASS BALL VALVE (COMPRESSION FITTINGS) 42'x22-x3O" METAL METER BOX, 1" COPPER POWDER COATED W/ 2"x1" TEE IAMOND PLATED TOP (MALEWEMALE) (OPEN BOTTOM) 2'xi' TEE (MALEWEMALE) 2' P x _ ;(ACTUAL " P x L_ J 2" BRASS BALL VALVE W/ BOX _ _ _ (CUSTOMER CUT OFF) BALL VALVE W/ BOX POOL PIECE (COI SIDE) METER INSTALLED McDONALD 2" NON -LEAD TELESCOPING Y COI) BALL STYLE METER STOP (OR EQUIVALENT) 2" BRASS BALL VALVE (THREADEDxSLOTTED FLG) PLAN NOT TO SCALE OPENING FOR MXU 2" HARD TEMPERED. STRAIGHT TYPE "K' COPPER OR BRASS m EDT., ✓I I� _ I I I Tom, (ACTUAL METER TO BE INSTALLED MM ..- . 9Y..CQH1 .... _ -STONE BEDDING - ELEVATION NOT TO SCALE 2" METER BOX ICI► Pl I► Sm IFI&I11 will I L91 III PA, SEWER SERVICE SEWER SERVICE SEE VALVE DETAIL CONCRETE T NOTE 12" X 12" AND 16' X 16" TAPPING SLEEVES ARE NOT ALLOWED, CONCRETE DETAIL) I:1Fill LN1 N DETAIL) ELEVATION NOTE: 12" X 12" AND 16' X 16" TAPPING SLEEVES ARE NOT ALLOWED. TABLE A-1 TBD NOTED 1. CONCRETE SHALL BE 3000 PSI. 2. CONCRETE SHALL NOT CONTACT BOLTS OR ENDS OF MECHANICAL JOINT FITTINGS BY THE INSTALLATION OF POLYETHYLENE FILM PLACED BETWEEN THE FITTINGS AND POUREDCONCRETE. 3. SEE TABLE A-1 FOR AREA OF CONCRETE REQUIRED FOR MAIN SIZED 6-INCH THROUGH 16-INCH. DATE: 01/12/2019 WD DWG. NO. 6 1111CAll` NOT TO SCALE STANDARD TAPPING SLEEVE City of Hendersonville Engineering Department 305 Williams Street Hendersonville, NC 28792 (828) 697-3000 (office) www.cltvofhendersonville.org 8/21?019 9:40:28 AM, mpamraning AND VALVE ASSEMBLY Its LN 27' MIN. IN ROADS 7 3/4" MIN. 4"MIN.CLEARANCE FROM BOTTOM OF - COVER TO TOP OF CLEANOUT z COUNTERSUNK - PLUG 3"MIN. 4" SEWER CLEANOUT NOUT RISER PIPE Q� O 0" ti 6"MIN. WASHED STONE BASE ❑ ❑ ❑ 000 ❑ 111111 11 El El El El 11 El El El ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑❑❑ ❑❑❑ ❑❑❑❑❑❑❑❑❑ ❑❑❑❑❑❑❑ ❑❑❑❑❑ NOTE: 1. ALL SANITARY SEWER CLEANOUT BOXES AND COVERS SHALL BE MANUFACTURED FROM GRAY IRON (CAST IRON) MEETING THE REQUIREMENTS OF AWWA C110 AND ASTM A536. 2. ALL SANITARY SEWER CLEANOUT BOXES AND COVERS SHALL CONFORM TO PARAGRAPH 2.01(d) OF ITEM II, SECTION VI OF MSD's TECHNICAL SPECIFICATIONS (MADE IN THE U.S.A.) 3. NON -TRAFFIC LOCATIONS; SANITARY SEWER CLEANOUT BOXES AND COVERS SHALL BE AS MANUFACTURED IRON WORKS 1566(ORA PEQUAL)ROVED UAL) MODELSTANDARD DETAIL 4. TRAFFIC LOCATIONS; SANITARY SEWER CLEANOUT Metropolitan Sewerage District BOXES AND COVERS SHALL BE AS MANUFACTURED of Buncombe County, Not Carolina BY EAST JORDAN IRON WORKS MODEL 1574 (OR APPROVED EQUAL) CLEANOUT BOX DATE APPROVED: MARCH 28, 2019 2.07 - 05 SEE DETAILS FOR PAVEMENT REPLACEMENT IIREMENTS UNDER SUBGRADE, NOTE 4 BELOW. EA\ \� \, _ 10 12 /l 010 UNDISTURBED RTH__//1 ill _ \j ZS BACKFILL SHALL MEET REQUIREMENTS OF NOTE 3 BELOW. BACKFILL PLACED IN MAXIMUM 8" LOOSE LIFTS, AT 95% CONTINUOUS TRACER WIRE COMPACTION. AS SPECIFIED BELOW DUCTILE IRON WATER UNE 2!TRENCH 12" MIN. +OUTSIDE DIAMETER OF PIPE I� WIDTH 24" MAX. + OUTSIDE DIAMETER OF PIPE NOTES: v 1. THIS TRENCH BACKFILL DETAIL APPLIES TO AREAS UNDER PAVEMENT, CURB, GUTTER, SIDEWALK OR AREAS WHERE THE TRENCH IS WITHIN FIVE (5) FEET OF THE EDGE OF PAVEMENT. 2. COMPACTION OF THE BACKFILL SHALL BE ACHIEVED THROUGH THE USE OF AN APPROVED VIBRATORY PLATE TAMPER OR ROLLER. THE CONTRACTOR IS RESPONSIBLE FOR MEETING ALL COMPACTION REQUIREMENTS. 3. COMPACTION TESTING OF THE BACKFILL SHALL BE PROVIDED, DIRECTED AND COORDINATED BY THE OWNER. INTERVALS OF TESTING SHALL BE AT THE TOTAL DISCRETION OF THE OWNER AND MAY BE CHANGED AT ANY TIME. IF A TEST DOES NOT PASS, THE CONTRACTOR SHALL REMOVE THE DEFECTIVE BACKFILL, REDO THE WORK AND THE AREA WILL BE RETESTED. THE CONTRACTOR SHALL BE AWARE OF THE LEVEL OF COMPACTION REQUIRED. IF THE WORK IS SUSPECT TO BE DEFECTIVE BY THE OWNER, THE WORK SHALL BE RETESTED. THE WATER CONTENT OF THE BACKFILL MATERIAL SHALL ALSO BE TESTED AND RECORDED FOR EACH TEST COMPLETED. THE CONTRACTOR WILL BE ALLOWED TO ADD WATER TO THE BACKFILL MATERIAL IN ORDER TO OBTAIN THE OPTIMUM WATER CONTENT. HOWEVER, THE CONTRACTOR WILL NOT BE ALLOWED TO UTILIZE THE ADDITION OF WATER AS A MEANS OF COMPACTION. FURTHERMORE, SHOULD THE BACKFILL MATERIAL BE FOUND TO HAVE WATER CONTENT RATIOS WHICH IN THE OPINION OF THE ENGINEER OR THE OWNER PREVENTS THE APPROPRIATE COMPACTION OF THE TRENCH, THE CONTRACTOR SHALL REMOVE ALL DEFECTIVE MATERIAL AND UNDERTAKE THE NECESSARY CORRECTIVE WORK. 4. THE TOP TWELVE INCHES OF THE FINAL BACKFILL SHALL BE COMPACTED TO 98X STANDARD PROCTOR, 5. THE WATER LINE SHALL HAVE A MINIMUM OF 3' OF COVER AT FINISHED GRADE. 6. TRACER WIRE WILL BE A 19 GAUGE, TIN COATED, COPPER CONDUCTOR WITH POLYETHYLENE INSULATION. CORE MATERIAL COMPRISED OF HIGH -TENACITY, WOVEN POLYESTER WITH WATER BLOCKING YARNS ENCAPSULATED IN 30 MIL BLUE HDPE JACKET PROVIDING CORROSION RESISTANCE, FLEXIBILITY, IMPACT STRENGTH AND 1800 CBS. TENSILE STRENGTH. TRACER WIRE WILL NOT CONDUCT AN ELECTRICAL CURRENT WHEN STRUCK BY LIGHTNING AND IS DESIGNED FOR DIRECT BURY AND DIRECTIONAL BORING APPLICATIONS. WHEN SPUCES AND LATERAL CONNECTIONS ARE MADE, ONLY GEL FILLED CONNECTORS DESIGNED FOR WIRE WITH WOVEN POLYESTER FIBER CORE ARE TO BE USED. TRACER WIRE AND CONNECTORS SHALL BE TRACE -SAFE® WATER BLOCKING TRACER WIRE AND RELATED CONNECTORS, MANUFACTURED BY NEPTCO. INC., OR EQUIVALENT APPROVED BY ENGINEER, AND PRODUCED IN THE UNITED STATES OF AMERICA. TRACER WIRE SHALL BE EXTENDED ALONG ALL WATER UNES, FITTINGS, VALVES, SERVICES, AND HYDRANTS. LOCATING CUPS SHALL BE PROVIDED AT ALL VALVES, HYDRANT VALVES AND METER BOXES. THE CONTRACTOR SHALL DUCT TAPE TRACER WIRE ON CROWN OF WATER LINE EVERY FIVE FEET. DATE: 0IE/10/2010 WD DWG. NO.3 SNEERS WAI MT TO =All WATER TRENCH CONSTRUCTION City of Hendersonville Engineering Department 305Wnvam,8 UNDER PAVEMENT u - - m Hendersonville, INCNC 28792 � �,t� �- (828) 697-3000 (office) ti K 7 www.citvafhendersonville.orQ 1847 8/2/2019 9.40:22 AM, mpomraning EXISTING SOIL /\\ /\\ y/\ EXISTING SOIL 12" OF FINE LOOSE EARTH FREE FROM LARGE CLODS, STONES, yy DEBRIS, VEGETABLE MATTER, \/ OR OTHER OBJECTIONABLE MATERIALS. 'c DRY UNDISTURBED o TRENCH BACKFILL MATERIAL EARTH N COMPACTED TO 85% STANDARD PROCTOR IN 12" LIFTS. OD INITIAL BACKFILL SEE TRENCH DETAILS. TRENCH BACKFILL IN MSD RIGHTS OF WAY N.T.S. STANDARD DETAIL Metropolitan Sewerage District of Buncombe County, Not Carolina TRENCH BACKFILL DATE APPROVED: MARCH 2O17 1.16 - 01 VIEWING PORT (END REMAINS OPEN) GRADE BRICK WATER TIGHT SEAL NON -SHRINK GROUT (TYP.) /.. ' . INLET 3" AIR SPACE) ' WATER LEVEL 12 4" SCH. 40/ \yj\ PVC TEE NON- MSD MANHOLE COVER & RING VIEWING PORT (END REMAINS OPEN) OUT. CONC. i OUTLET----'o�/ \ /\ ORIFICE N /\ �j BAFFLE W/ 4"x12" SLOT / 12" CRUSHED STONE 8'-4" BEDDING SECTION THRU GREASETRAP PLAN (OVERHEAD) VIEW N. T. S. REVISED: 11/9/05 PER W. TIPTON DN REVISED: 9/25/03 PER W. TIPTON DIN REVISED: 4/23/03 PER W. TIPTON DIN EXAMPLE ONLY �6� -a -6 J J Q 0)= 0 N O U Cu Cu E Cu Cu • O d O z LLo CO O 04 N •= U) LO O O O M Q (D Cu +� v Cu Cz Q r- Do (0 co M O E OU 0) C C O U E 3:E O CO Cn c O C) m o m O 00 0 �0// V J W W n/ULL U) ZLL LL L 0 .-: W Lu 1 W Q z U) U0. W/�/ W LL J W = \J z O J W W (n LL O EE / 0 U(/)° J 0� �z Lu U O U W z �p.�N CAROB e `�•Q��Ist�3/1 4,9< 9 SEALq - 34 3 :� •.• GINE�.•' � / 41 BUR` KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL BIG KB DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-050 DATE December, 2019 FILE C4.1 UTILITY DETAILS SHEET ` 4.1 CAD file name: V:\120003 - Circle K\120003-01-050 (ENG) - Mills River (Jefferss Rd), NC\Engineering\Engineering Plans\C4.1 UTILITY DETAILS.dwg 12/23/2019 S 06033'18" W 118.56' TBM TOP OF - MHSS=2102_ 5' DUMPSTER 0 n Existing 4" Evergreen Trees planted as part of neighboring development requirements. N/F BEAVER CREEK INVESTMENTS OF NC LLC PIN# 9632605275 SLIDE 10341 (DB. 3030, PG. 169) II I ' I I Lot 9 PIN# 9632609234 I I I (Slide 4578) I I I I I I I T Lot 4 PIN# 9632609234 (Slide 2492) - - - - - - - - - - - - - - - - - - - Fs-od 1 EIP 1 2' I Sod s„ s OPEN s sod s s s s s •° s s- s s° S 0 44 52 - - 36° OAK _ _ o° OAK _FQP- -- -- -- -- - � / �- \ O 39.4 '° M y. \�L o 0 0 0 0 0 10" PINEI, /12" PINE - A � I 1-Black Gum \ j ) 10-Needlepoint Holly o 25-Adagio Grass ° ° ° ° Sod o PROPOSED , ° o STORE / I 5,471 SQFT Jin a \I �� Id o FFE: 2101.00' °° ° C Sod t Sod 0 36" MAPLE � I \ - �---_F Xo 0 0 --a-o 0 0 o 0 o o o o o o o o o o/ I i 123-Big Blue Lirio e 16-Rose Creek Abelia 3-Nuttall Oak 54-Big Blue Liriope t 2 I 3-Common Bald ypress S _ O 43-Needlepoint H Ily 24" MAPLE I � 30" MAPLE 24" MAPLE 18" MAPLE 8" MAPLE Sod /I w t\Xi \X� \X�. \X� \X� �\Xi I 20" MAPLE �1 Tree Protection m Fencing 0 0 -- �o a o 0 0 0 0 0- \ 0 � ) I X - \ � 12" BIRCH r- 12-Adagio Gras Additional Dri eway - I 12-Rose Creek belia 30-Rose Creek Abelia 12-Rose inoCre Zelkova Loading Zon Area 3-Musashino Zelkova 25-Needlepoint Holly - - o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 --- i EIP 1/2" - _ - _ _ - - _ - -� - 0 Z 0 10 20 FT i i 0 i 0 REBAR y'ii Sod all w: • • • Z BOYLSTON HWY. NC 280 DHO -I-i 3HO 121-Big Blue Liriope 1-Musashino Zelkova I I I I I I I I I I S 06027'06" W 43.24' L1 f Tree Protection Fencing MARRY LEE KEITF PIN# 96 16-Adagio Grass 21-Needlepoint Holly ON I12"MAPLE i dl 27-Adagio Grass 3-Okame Cherry I II 12-Needlepoint Holly 20-Pink Drift Rose 1-Musashino Zelkova 0 0 0 0 0 0 0 0 0 O S EIP 1/211 F REBAR - o ONE O� Sod ----------- _z::3HO HO DHO ONE �IE���O w O �o O= m 0 z� on o G) wZ =D C 0 Q 0 Z co LU � M LU aft)Z LANDSCAPE NOTES 1. Prior to installation, the Landscape Contractor shall inspect the sub grade, general site conditions, verify elevations, utility locations, irrigation, approve topsoil provided by General Contractor and observe the site conditions under which the work is to be done. Notify General Contractor of any unsatisfactory conditions. Work shall not proceed until such conditions have been corrected and are acceptable to the Landscape Contractor and/or Construction Manager. 2. Landscape Contractor shall locate and protect all underground utilities, prior to installation. 3. General and Landscape Contractor are responsible for protecting existing trees from damage during construction. General Contractor to install tree protection fencing prior to any site work as directed on the landscape plans. 4. All tree protection areas to be protected from sedimentation. 5. All tree protection fencing to be inspected daily, and repaired or replaced as needed. 6. All shrubs and groundcover beds (existing and new) to be mulched with a minimum 4 inches of mulch. Mulch type to be double shredded hardwood mulch. 7. All annual and perennial beds to be tilled to a minimum depth of 18 inches and amended with 4 inches of organic material. Mulch planted beds with 3 inch depth of pine bark mini nuggets. 8. Planting holes to be dug a minimum of twice the width of the root ball of both shrubs and tree. Amend backfill with planting mix. Backfill and tamp bottom of hole prior to planting so top of root ball does not settle below surrounding grade. 9. Planting Mix to be 4 parts screened topsoil and 1 part organic material (i.e. Nature's Helper or Pro Mix). 10. Existing grass in proposed planting areas is to be removed and area to be hand raked to remove all rocks and debris larger than 1 inch in diameter prior to planting shrubs. 11. Soil to be tested to determine fertilizer and lime requirements. Lime and fertilizer to be distributed prior to laying sod. 12. Sod to be delivered fresh (Cut less than 24 hours prior to arriving on site), laid immediately, rolled and watered thoroughly within one hour of installation. 13. All changes to design and/or plant substitutions are to be authorized by the Landscape Architect at Manley Land Design - 770.442.8171 14. All parking islands to be bermed 6" - 10" with clean friable topsoil prior to planting. 15. All landscaping shall be installed in conformance with ANSI Z60.1 the "American Standard for Nursery Stock", and the latest accepted standards of the American Association of Nurserymen. 16. Site to be 100% irrigated by an automatic underground irrigation system. 17. The Landscape Contractor shall guarantee all plants installed for one full year from date of acceptance by the owner. All plants shall be alive and at a vigorous rate of growth at the end of the guarantee period. The Landscape Contractor shall not be responsible for acts of God or vandalism. 18. Any plant that is determined dead, in an unhealthy or unsightly condition, lost its shape due to dead branches or other symptoms of poor, non -vigorous growth shall be replaced by the Landscape Contractor with the cost of the replacement included in the bid or proposal price. 19. Stake all evergreen and deciduous trees. 20. Remove all stakes and guying from all trees after one year from planting. 21. Water thoroughly twice in the first 24 hours and apply mulch immediately. 22. The plant quantities are for the contractor's convenience, all numbers must be verified. PLANT LIST Qty Botanical Name Common Name Scheduled Size Remarks Trees 1 Nyssa sylvatica Black Gum 2" Cal.; 10'-12' Hgt B & B; Single Straight Leader 3 Prunus'Okame' Okame Cherry 1. 5" Cal.; 8'-10' Hgt B & B 3 Quercus nuttallii Nuttall Oak 2" Cal.; 10'-12' Hgt B & B; Single Straight Leader 3 Taxodium distichum Common Bald Cypress 2" Cal.; 10'-12' Hgt B & B; Single Straight Leader 6 Zelkova serrata'Musashino' Musashino Zelkova 2" Cal.; 10'-12' Hgt B & B Shrubs 58 Abelia x'Rose Creek' Rose Creek Abelia 3 Gal. 111 Ilex cornuta'Needlepoint' Needlepoint Holly 3 Gal. 80 Miscanthus sinensis'Adagio' Adagio Grass 3 Gal. 20 Rosa'Meijocos' Pink Drift Rose 3 Gal. Groundcovers 298 Liriope muscari'Big Blue' Big Blue Liriope 1 Gal. Plant 18" O.C. Other LANDSCAPE REQUIREMENTS TOWN OF MILLS RIVER, INC A. STREETS OR PERIMETER PLANTING BEDS (LS STRIPS) REQUIRED 1. 10' wide landscape strip at all perimeter and street frontages 1 Large Tree per 40 LF of frontage Min spacing 30' oc; Max spacing 50' oc 3 Shrubs per 100 SF of frontage. 2. Boylston Hwy 343 LF less 98 LF (drives) 245 @ 1 tree/40 LF = 6 Trees 2450 @ 3 Shrubs/100 SF = 74 Shrubs PROVIDED 1. 10' wide planting area at Boylton Hwy 2. Boylston Hwy: 4 Zelkova, 2 Cherry = 6 Trees 37 Holly, 7 Adagio, 30 Abelia = 74 Shrubs B. INTERIOR PLANTING - PARKING REQUIRED 1. 29 parking spaces @ 1 Large Shade Tree per 10 spaces = 3 Trees 2. 4732 Additional Driveway/ loading area @ 1 Large Tree per 1500 SF = 3 Trees PROVIDED 1. Parking Trees: 3 Oak 2. Additional Driveway/loading area: 3 Bald Cypress LEGEND X EXISTING TREE TO BE REMOVED \ t I • j EXISTING TREE TO REMAIN TREE PROTECTION FENCING = 3 Trees = 3 Trees LAN D D E S I G N Landscape Architecture 770.442.8171 tel 770.442.1123 fax Manley Land Design, Inc. 51 Old Canton Street Alpharetta, Georgia 30009 manleylanddesign.com r J M CV 0aC,OUR �WZ; O Of U) ■ _ (n N Co Z >> L _ >_ o of U U) 0, 0 Manama o L N 0 LU U) „���+tenrrNr� CAHp''ti. �o �s )13 litt1�`` REVISION SCHEDULE NO. DATE DESCRIPTION MLD PROJECT # 2019162 DRAWN BY MB CHECKED BY SLM DATE 12.16.19 Landscape Plan Lml nO Guy above first branch with woven Set top of rootball so that trunk flarE is visible and above finished grade Place rootball on unexcavated subgrade Tamp soil around rootball, and watE in 6" layers to remove air pockets Topsoil and planting mix as defined the Landscape Notes Remove all twine, rope, burlap and cut vire basket from top 1/3 of rootball i" Hgt. earth saucer beyond edge of oot ball for water retention. Outer Age of saucer to be 6' diameter iardwood stakes 3 stakes, "' x 2", driven firmly into subgrade prior o backfilling Mulch depth as defined in the Landscape Dotes; mulch type as defined in the _andscape Notes or on the Landscape Plan. -Iold mulch 4" from tree trunk. NOTE 1. Hole to be twice the width of the rootball. 2. Do not heavily prune tree at planting. Prune only crossover limbs, broken or dead branches; Do not remove the terminal buds of branches that extend to the edge of the crown. 3. Each tree must be planted such that the trunk flare is visible at the top of the rootball. Trees where the trunk flare is not visible shall be rejected. Do not cover the top of the rootball with soil. Mulch to be held back 4" away from trunk. 4. Remove Guy Wires and Staking when warranty period has expired (after one year). TREE PLANTING & STAKING SCALE: NTS A = Row Spacing B = On Center Spacing Space plants in a triangular pattern as shown, spaced equally from each other at spacing indicated on the plant list PLANTSPACING'B' X ROWSPACING'A' PLANTS/10SF 8° O.C. 12" O.C. 151, O.C. 181, O.C. Mulch depth as define, Landscape Notes; mul defined in the Landsce on the Landscape Plai Topsoil as defined in tl Landscape SpecificaS Native soils subgrade 6.9" 26 10.4" 12 13.0" 7 15.7" 5 NOTE 1. Space groundcover plants in accordance with indicated spacing listed on the plant list, or as shown on the landscape plan. 2. Adjust spacing as necessary to evenly fill planting bed with indicated quantity of plants. 3. Plant to within 24" of the trunks of trees and shrubs within planting bed and to within 18" of edge of bed. GROUNDCOVER PLANTING DETAIL SCALE: NTS Varies L Varies As shown on L-100 Native soils subgrade) / "V" Trench Bed Edge Mulch depth as defined in the Landscape Notes; mulch type as defined in the Landscape Notes or on the Landscape Plan Planting pit to be twice the - width of the rootball SHRUB BED PLANTING DETAIL SCALE: NTS 8.5" x 11" sign laminated in plastic spaced every 50' along the fence. Topsoil as defined in the Landscape Specifications Backfill planting pits with topsoil and native excavated soil Shrubs; type and size as defined on the plant list TURF SIDE PLANTING BED SIDE Mulch as defined in the Landscape Notes. Hold Mulch 4" from tree trunk and shrub stems Shovel Cut Bed Edge at 45 degree angle, 6" deep Finished grade at bedline Topsoil as defined in the Landscape Notes. Native soils subgrade "V" TRENCH BED EDGING SCALE: NTS Crown drip line or other limit of Tree Protection area. See landscape plan for fence alignment TREE PROTECTION FENCING DETAIL SCALE: NTS SECTION VIEW Notes: 1. See landscape notes for additional tree protection requirements. 2. No pruning shall be performed except by approved arborist. 3. No equipment shall operate inside the protective fencing including during fence installation and removal. 4. See site preparation plan for any modifications with the Tree Protection area. Tree Protection fence: High density polyethylene fencing with 3.5" x 1.5" openings; Color- orange. Steel posts installed at 8' o.c. 2" x 6' steel postsor approved equal. 5" thick layer of mulch. Maintain existing grade with the tree protection fence unless otherwise indicated on the plans. URBAN TREE FOUNDATION © 2014 OPEN SOURCE FREE TO USE Mound islands 6"-8" height above island curbing. Mulch depth as defined in the Landscape Notes; mulch type as defined in the Landscape Notes or on the Landscape Plan Pavement Typ. Curb &Gutter Typ.p. Compacted Subgrade Uncompact subgrade to a minimum depth of 24" from top of curb Topsoil as defined in the Landscape Specifications; minimum 4" depth Width Varies IIII 6 -8 Hgt IIIIIII IIII� IIII IIII II IL�III IIII IIII � _� NOTE 1. Clean construction debris from within landscape island areas (ie. concrete, rocks, rubble, building materials, ect), prior to installing topsoil and plant material. 2. Island plant material as per the Landscape Plan. 3. Install plant material as per tree, shrub and ground cover planting details, and as defined in the Landsacpe Notes. 4. Install mulch or sod as specified on the Landscape Plan, and as defined in the Landscape Notes. 5. Fracture/loosen existing subgrade to a minimum 24" depth. Remove and replace any subgrade unsuitable for planting. Once subgrade is clean of debris and loosened, add topsoil to a minimum bermed 6"-8" height above island curbing. PARKING ISLAND DETAIL SCALE: NTS 24" Depth ^IA,116 Mq0W M le 47111 LAN D DESIGN Landscape Architecture 770.442.8171 tel 770.442.1123 fax Manley Land Design, Inc. 51 Old Canton Street Alpharetta, Georgia 30009 manleylanddesign.com r J CV 00 0RdC)� �WZ ca La [R] I co o I� ■ cn N N Co Z L 2 >_// O LL �� _U) a O r- O L L U LU U) „%11900 1 1f llI ���/I r� �H CANO �o yFN.L lt►�`'r`r REVISION SCHEDULE NO. DATE DESCRIPTION MLD PROJECT # 2019162 DRAWN BY SLM CHECKED BY SLM DATE 12.16.19 Landscape Details Lml ol +23'-8" T.O. +21'-8" PARAPET T.O. PARAPET +12'-0" T.O. STONE CAP B.O. SOFFIT +4'-4" T.O. CMU CAP +23'-8" T.O. OIL +21'-8" PARAPET T.O. PARAPET +10'-0" SOFFIT +4'-4" T.O. CMU CAP 0'-011 A.F.F. E F E A-5 A-5 A-5 RIGHT SIDE ELEVATION SCALE: 1/4" = 1'-0" PERMANENT APPROVED MEANS OF EGRESS (ROOF LADDER). MINIMUM 6" DEEP TOE SPACING. RUNG SPACING NOT TO EXCEED 14" ON CENTER. MINIMUM 18" BETWEEN RAILS AND RUNGS SHALL HAVE A MINIMUM 3/4" 0 AND CAPABLE OF WITHSTANDING A 300 LB LOAD. SEE DETAIL THIS SHEET +23'-8" T.O. PARAPET +21'-8" T.O. PARAPET +12'-4 1 /2" TRUSS BEARING +4'-4" T.O. CMU CAP ALL EIFS TO BE DRAINABLE SYSTEM (TYPICAL). INSTALLER TO PROVIDE CONTROL JOINTS SO THAT "PANELS" DO NOT EXCEED 120 SQUARE FEET. "PANELS" SHALL BE 18' MAXIMUM; ONE DIMENSION SHALL NOT EXCEED OTHER BY 22 TIMES KEY NOTES I STEEL COLUMN WRAP WITH BREAK METAL TO MATCH STOREFRONT FRAME 2 LINE OF CANOPY/SOFFIT 3 DARK BRONZE WITH CLEAR GLASS STOREFRONT SYSTEM 4 INTERNALLY ILLUMINATED SIGN TO BE PERMITTED SEPARATELY 5 DARK BRONZE METAL AWNING 6 PAIR OF 3'X7'-6' STOREFRONT DOORS WITH DARK BRONZE FRAME 7 EIFS CORNICE MOULDING WITH METAL CAP FLASHING 8 D12AINABLE EIFS SYSTEM WITH ACRYLIC FINISH ON RIGID FOAM INSULATION 9 WALL MOUNTED FULL CUT OFF TYPE LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS. 10 4X8XI6 SPLIT FACE CMU VENEER, GROUTED TO MATCH CMU I I ROOF LINE AND HVAC UNITS 12 EIFS EXPANSION JOINT WITH FRY 12EGLET PCS-375-50 13 PAINTED METAL SCUPPERS AND DOWNSPOUTS 14 PAINTED METAL TRIM AT EMERGENCY OVERFLOW DRAIN OPENINGS 15 ADDRESSING LOCATION: 8' TALL BLACK NUMBERS. FINAL AREA LOCATION TO BE DETERMINED BY FIRE DEPARTMENT. 16 4X4X8 SOLID CMU CAP BLOCK 17 PAINTED ROOF ACCESS LADDER 18 PARAPET WALL BEYOND 19 (KNOX) KEY -BOX AT 6'-0' AFF (IF REQUIRED BY FIRE DEPARTMENT) 20 3'X7' STOREFRONT DOOR WITH DARK BRONZE FRAME 21 STONE VENEER, INSTALL PER MANUFACTURER SPECIFICATIONS. INSTALL GROUT TO MATCH STONE COLOR 22 EXTERIOR FINISH TO EXTEND ABOVE SIDEWALK/GRADE 23 EIFS ACCENT BAND ON RIGID FOAM INSULATION 24 STONE VENEER CAP, INSTALL PER MANUFACTURER SPECIFICATIONS. 25 EIFS SCORE LINE WITH FRY REGLET 26 ACM (ALUMINUM COMPOSITE MATERIAL) PANEL SECURED WITH HIDDEN FASTENERS 27 PAINTED HOLLOW METAL DOOR AND FRAME NOTES I. ALL MATERIALS AND FINISHES TO BE INSTALLED PER THE MANUFACTURER'S WRITTEN INSTRUCTIONS. 2. GENERAL CONTRACTOR TO VERIFY ALL EXTERIOR COLORS AND FINISHES WITH THE OWNER PRIOR TO CONSTRUCTION. 3. REFER TO WOOD ROOF TRUSS SEALED DRAWINGS. 4. REFER TO SHOP DRAWINGS BY CANOPY MANUFACTURER'S ENGINEER. 5. REFER TO STRUCTURAL ENGINEERING DRAWINGS. EXTERIOR FINISH SCHEDULE A *SHERWIN WILLIAMS USW6095 'TOASTY" B *SHERWIN WILLIAMS USW6115 "TOTALLY TAN" C CLEAR, INSULATED GLASS - U - 0.24 / SHGC - 0.41 MINIMUM D *SHERWIN WILLIAMS HI -SOLIDS POLYURETHANE "SAFETY RED' CIRCLE K RED E *SHERWIN WILLIAMS USW7005 CIRCLE K WHITE F WESTERN BLOCK SPLIT FACE CMU -""BOOT BROWN' - OR SIMILAR G CULTURED STONE CSV 20006 - CHAl2DONNAY COUNTRY LEDGESTONE H *SHERWIN WILLIAMS ttSW6090 "JAVA" <> CIRCLE K ORANGE ttPMS 144 *USE SHE12WIN WILLIAMS MANUFACTURER ONLY AG__H J K L K J H AG__� A-5 A-5 A-6 A-6 A-6 A-6 A-6 A-5 A-5 +23'-8" T.O. PARAPET +21'-8" T.O. PARAPET +12'-0" T.O. STONE CAP B.O. SOFFIT +4'-4" T.O. CMU CAP V N a 4� O Zo 0 o ° a I -I N U w c � o (sL 0 IL Lu 0 Lu U W z Lu z 0 0 i N 00 00 a a x U mCf) Lu Lu z z �c � O � Lu 0 z � N � z W z 0 W Q � J U 0z z Q o W z � � o � W I 1)z O 0 �W N--I Revisions O Scale AS NOTED Drawn By CTC Checked By TR13 Date 12/11/2019 Job No ???20 FRONT ELEVATION V) ►0-01 SCALE: 1/4" = 1'-0" P4 OF 6 u Agk+23'-8" T.O. Agk+21'-8" PARAPET T.O. PARAPET +12'-0" T.O. STONE CAP B.O. SOFFIT +4'-4" T.O. CMU CAP A -4 H 7 <13 I +23'-8" T.O. PARAPET +21'-8" ISIM0001 Jill 0' - 011 A.F.F. E F E A-5 A-5 y \���■ice\� LEFT SIDE ELEVATION SCALE: 1/4" = 1'-0" PERMANENT APPROVED MEANS OF EGRr-`'`' (ROOF LADDER). MINIMUM 6" DEEP TOE SPACING. RUNG SPACING NOT TO EXCE 14" ON CENTER. MINIMUM 18" BETWEEf RAILS AND RUNGS SHALL HAVE A MINIMUM 3/4" 0 AND CAPABLE OF WITHSTANDING A 300 LB LOAD. SEE DETAIL THIS SHEET +23'-8" T.O. PARAPET +21'-8" LADDER T.O. PARAPET EXTEND REAR PARA +12'-4 1 /2" TRUSS BEARING +4'-4" T.O. CMU CAP ROOF LADDER DETAIL SCALE: 1/4" = 1'-0" ALL EIFS TO BE DRAINABLE SYSTEM (TYPICAL). INSTALLER TO PROVIDE CONTROL JOINTS SO THAT "PANELS" DO NOT EXCEED 120 SQUARE FEET. "PANELS" SHALL BE 18' MAXIMUM; ONE DIMENSION SHALL NOT EXCEED OTHER BY 22 TIMES KEY NOTES I STEEL COLUMN WRAP WITH BREAK METAL TO MATCH STOREFRONT FRAME 2 LINE OF CANOPY/SOFFIT 3 DARK BRONZE WITH CLEAR GLASS STOREFRONT SYSTEM 4 INTERNALLY ILLUMINATED SIGN TO BE PERMITTED SEPARATELY 5 DARK BRONZE METAL AWNING 6 PAIR OF 3'X7'-6' STOREFRONT DOORS WITH DARK BRONZE FRAME 7 EIFS CORNICE MOULDING WITH METAL CAP FLASHING 8 D12AINABLE EIFS SYSTEM WITH ACRYLIC FINISH ON RIGID FOAM INSULATION 9 WALL MOUNTED FULL CUT OFF TYPE LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS. 10 4X8XI6 SPLIT FACE CMU VENEER, GROUTED TO MATCH CMU I I ROOF LINE AND HVAC UNITS 12 EIFS EXPANSION JOINT WITH FRY 12EGLET PCS-375-50 13 PAINTED METAL SCUPPERS AND DOWNSPOUTS 14 PAINTED METAL TRIM AT EMERGENCY OVERFLOW DRAIN OPENINGS 15 ADDRESSING LOCATION: 8' TALL BLACK NUMBERS. FINAL AREA LOCATION TO BE DETERMINED BY FIRE DEPARTMENT. 16 4X4X8 SOLID CMU CAP BLOCK 17 PAINTED ROOF ACCESS LADDER 18 PARAPET WALL BEYOND 19 (KNOX) KEY -BOX AT 6'-0' AFF (IF REQUIRED BY FIRE DEPARTMENT) 20 3'X7STOREFRONT DOOR WITH DARK BRONZE FRAME 21 STONE VENEER, INSTALL PER MANUFACTURER SPECIFICATIONS. INSTALL GROUT TO MATCH STONE COLOR 22 EXTERIOR FINISH TO EXTEND ABOVE SIDEWALK/GRADE 23 EIFS ACCENT BAND ON RIGID FOAM INSULATION 24 STONE VENEER CAP, INSTALL PER MANUFACTURER SPECIFICATIONS. 25 EIFS SCORE LINE WITH FRY REGLET 26 ACM (ALUMINUM COMPOSITE MATERIAL) PANEL SECURED WITH HIDDEN FASTENERS 27 PAINTED HOLLOW METAL D0012 AND FRAME NOTES I. ALL MATERIALS AND FINISHES TO BE INSTALLED PER THE MANUFACTURER'S WRITTEN INSTRUCTIONS. 2. GENERAL CONTRACTOR TO VERIFY ALL EXTERIOR COLORS AND FINISHES WITH THE OWNER PRIOR TO CONSTRUCTION. 3. REFER TO WOOD ROOF TRUSS SEALED DRAWINGS. 4. REFER TO SHOP DRAWINGS BY CANOPY MANUFACTURER'S ENGINEER. 5. REFER TO STRUCTURAL ENGINEERING DRAWINGS. EXTERIOR FINISH SCHEDULE A *SHERWIN WILLIAMS USW6095 'TOASTY" B *SHERWIN WILLIAMS USW6115 "TOTALLY TAN" C CLEAR, INSULATED GLASS - U - 0.24 / SHGC - 0.41 MINIMUM D *SHERWIN WILLIAMS HI -SOLIDS POLYURETHANE "SAFETY RED' CIRCLE K RED E > *SHERWIN WILLIAMS ttSW7005 CIRCLE K WHITE F WESTERN BLOCK SPLIT FACE CMU -""BOOT BROWN' - OR SIMILAR G CULTURED STONE CSV 20006 - CHAl2DONNAY COUNTRY LEDGESTONE H *SHERWIN WILLIAMS ttSW6090 "JAVA" <> CIRCLE K ORANGE ttPMS 144 *USE SHE12WIN WILLIAMS MANUFACTURER ONLY B D C B A T A-4 A-4 A-4 A-4 18 9 A 7 H A 8 13 A 14 A A A 8 A 9 12 11 A 14 A 13 8 A 25 H 7 A 8 A 9 18 14 A 13 H 7 8 B T.O. PARAPET +21'-8" T.O. PARAPET 13XA'> (16) (10KF> ( 8 K B > (16) (10KF> (10KF> (16) (22) ( 8 K B > ( 2 ) <A)(27) (16) <A)(13) (10KF> (8KBi <A)(13) <G)(21) <G)(24 REAR ELEVATION SCALE. 1/4" = I'-O" +15-6" T.O. DECK +12'-4 1 /2" TRUSS BEARING +4'-4" T.O. CMU CAP +0' 0" A� 0 O N 00 00 O O 00 N U W O o � Z W O@Z< �Q ILLWz W N nN o � W � z Lu O I—�1 Z > O 111 Q U mcf) z Z o� z o x N z o w 0z z � z � W � o Z IL o O W w Revisions O Scale AS NOTED Drawn By CTC\ Checked By TRB �n � I-�-I Dare 12/II/2019 O Job No ?QQ20 x OF 6 x U +23'-8" T.O. PARAPET +21'-8" T.O. PARAPET +15'-6" T.O. DECK +12'-4 1 2" TRUSS BEARII +4'-4" T.O. CMU )'-0" A.F.F. ,gk+23'-8" T.O. PA ,gk+21'-8" T.O. PAI +12'-0' TOP OF STONE CAP ,gk+O'—O' A.F.F. FRONT ELEVATION SCALE: 3/16" - 1'-0' 3'-8" 4PET >1'-8" APET -0„ CAP DFFIT E4'-4" CAP +o'—o" ih A.F.F. +23'-8" T.O. PARAPET +21'-8" T.O. PARAPET oL +12'-0" T.O. STONE CAP B.O. SOFFIT +4'-4" T.O. CMU CAP +0'-0" A.F.F. LEFT SIDE ELEVATION RIGHT SIDE ELEVATION SCALE, 3/16' - C-O" SCALE: 3/16" - 1'-0' REAR ELEVATION SCALE: 3/16' - 1'-0' +23'-8" PARAPET +21'-8" ). PARAPET f10'-0' SOFFIT +4'-4" ). CMU CAP +0'-0" ih A.F.F. IV +23'-8" T.O. PARAPET +21'-8" T.O. PARAPET +15-6" T.O. DECK +12'-4 1 /2" TRUSS BEARING +23'-8' dk PARAPET +21'-8' PARAPET +15'-6" 0. DECK —4 1 2" BEARING +4'-4' CMU CAP +0'-0' ih A.F.F. NV +4'-4" T.O. CMU CAP NOTES I. ALL MATERIALS AND FINISHES TO BE INSTALLED PER THE MANUFACTURER'S WRITTEN INSTRUCTIONS. 2. GENERAL CONTRACTOR TO VERIFY ALL EXTERIOR COLORS AND FINISHES WITH THE OWNER PRIOR TO CONSTRUCTION. 3. REFER TO WOOD ROOF TRUSS SEALED DRAWINGS. 4. REFER TO SHOP DRAWINGS BY CANOPY MANUFACTURER'S ENGINEER. 5. REFER TO STRUCTURAL ENGINEERING DRAWINGS. EXTERIOR FINISH SCHEDULE A *SHERWIN WILLIAMS ttSW6095 'TOASTY' B *SHERWIN WILLIAMS ttSW6115 'TOTALLY TAN" C CLEAR, INSULATED GLASS - U - 0.24 / SHGC - 0.41 MINIMUM D *SHERWIN WILLIAMS HI -SOLIDS POLYURETHANE 'SAFETY RED" CIRCLE K RED E *SHERWIN WILLIAMS ttSW7005 CIRCLE K WHITE F WESTERN BLOCK SPLIT FACE CMU - "BOOT BROWN" - OR SIMILAR G CULTURED STONE CSV 20006 - CHAl2DONNAY COUNTRY LEDGESTONE H *SHERWIN WILLIAMS ttSW6090 'JAVA' I CIRCLE K ORANGE UPMS 144 *USE SHE12WIN WILLIAMS MANUFACTURER ONLY KEY NOTES I STEEL COLUMN WRAP WITH BREAK METAL TO MATCH STOREFRONT FRAME 2 LINE OF CANOPY/SOFFIT 3 CLEAR ANODIZED ALUMINIM WITH CLEAR GLASS STOREFRONT SYSTEM 4 INTERNALLY ILLUMINATED SIGN TO BE PERMITTED SEPARATELY 5 DARK BRONZE METAL AWNING 6 PAIR OF 3'X7-6' STOREFRONT DOORS WITH DARK BRONZE FRAME 7 EIFS CORNICE MOULDING WITH METAL CAP FLASHING 8 DRAINABLE EIFS SYSTEM WITH ACRYLIC FINISH ON RIGID FOAM INSULATION 9 WALL MOUNTED FULL CUT OFF TYPE LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS. 10 4X8XI6 SPLIT FACE CMU VENEER, GROUTED TO MATCH CMU I I ROOF LINE AND HVAC UNITS 12 EIFS EXPANSION JOINT WITH FRY 12EGLET PCS-375-50 13 PAINTED METAL SCUPPE2S AND DOWNSPOUTS 14 PAINTED METAL TRIM AT EMERGENCY OVERFLOW DRAIN OPENINGS 15 ADDRESSING LOCATION: 8' TALL BLACK NUMBERS. FINAL AREA LOCATION TO BE DETERMINED BY FIRE DEPARTMENT. 16 4X4X8 SOLID CMU CAP BLOCK 17 PAINTED ROOF ACCESS LADDER 18 PARAPET WALL BEYOND 19 (KNOX) KEY -BOX AT 6'-0" AFF (IF REQUIRED BY FIRE DEPARTMENT) 20 3'X7STOREFRONT DOOR WITH DARK BRONZE FRAME 21 STONE VENEER, INSTALL PER MANUFACTURER SPECIFICATIONS. INSTALL GROUT TO MATCH STONE COLOR 22 EXTERIOR FINISH TO EXTEND ABOVE SIDEWALK/GRADE 23 EIFS ACCENT BAND ON RIGID FOAM INSULATION 24 STONE VENEER CAP, INSTALL PER MANUFACTURER SPECIFICATIONS. 25 EIFS SCORE LINE WITH FRY 12EGLET 26 ACM (ALUMINUM COMPOSITE MATERIAL) PANEL SECURED WITH HIDDEN FASTENERS 27 PAINTED HOLLOW METAL DOOR AND FRAME ALL EIFS TO BE DRAINABLE SYSTEM (TYPICAL). INSTALLER TO PROVIDE CONTROL JOINTS SO THAT "PANELS" DO NOT EXCEED 120 SQUARE FEET. "PANELS" SHALL BE 18' MAXIMUM; ONE DIMENSION SHALL NOT EXCEED OTHER BY 22 TIMES 0 O N 00 00 O O 00 N U W O o � Z W IL W J w O C) ry Q� � Lu W � z° � z 1 U m� 3: z z oc OC) � z � N z o w Q Z J 0 � Z z 0 w � o Z IL o O W w Revisions O Scale AS NOTED Drams, By CTC \ Checked By TRB �n � I+I Dare 12/II/2019 O Job No Q??20 x A-4 OF 6 x U CANOPY FONT/�)EA�) COLON �)ENDE�)ING SCALE: 3/16" = 1'-0" CANOPY LEFT/QIGNT SIDE COLOQ QENDEQING SCALE: 3/16" = 1'-0" INTERNALLY ILLUMINATED SIGNAGE TO BE PERMITTED SEPARATELY 24'-0" METAL FASCIA PANEL INTEGRALLY COLORED CM PRECAST CONCRETE SILL III1xella, 1_11WtKl]Ito] :111Zykl 12"X18" ACCESS PANEL COORDINATE WITH CANOPY DRAWINGS G.C. VERIFY EXACT SIZE AND LOCATION PRIOR TO CONSTRUCTION MOUNT FIRE EXTINGUISHERS) TO MASONRY COLUMN WRAP. G.C. VERIFY NUMBER AND LOCATION PRIOR TO CONSTRUCTION CANOPY FQONT/QEAQ ELEVATION SCALE: 3/16" = 1'-0" CONCRETE BASE d I INTERNALLY ILLUMINATED SIGNAGE TO BE PERMITTED SEPARATELY VERIFY EXACT LOCATIONS NOT ALL ALL ELEVATIONS Q w J U CANOPY LEFT/QIGNT SIDE ELEVATION SCALE: 3/16" = 1'-0" CC I EXTERIOR MATERIAL SPECIFICATIONS CMU: WESTERN BLOCK SPLIT -FACE CMU "BOOT BROWN" CANOPY PANELS: INTERNALLY ILLUMINATED METAL FASCIA PANELS NOTES I. ALL MATERIALS AND FINISHES TO BE INSTALLED PER THE MANUFACTURER'S WRITTEN INSTRUCTIONS, 2. GENERAL CONTRACTOR TO VERIFY ALL EXTERIOR COLORS AND FINISHES WITH THE OWNER PRIOR TO CONSTRUCTION. 3. REFER TO SHOP DRAWINGS BY CANOPY MANUFACTURER'S ENGINEER. 4. REFER TO STRUCTURAL ENGINEERING DRAWINGS. CANOPY DECK GAP TO BE CAULK ON COLOR TO INTEGRAL C( SOLID CMU II11I11el:7_l1WAII CON CANOPY COLUMN ELEVATION SCALE: 3/4" = 1'-0" 1" MINIMUN BETWEEN MAE AND CANOPY CC (TYPICAL AT ALL `. STEEL CANOPY C01 (MAY BE ROUND OR SQU VERIFY WITH CANOPY SUP[ 8" SPLIT -FACE INTE( COLORED CMU BLOCK CANOPY COLUMN PLAN SCALE: 3/4" = 1'-0" 61 O LL Lu CL O Cl� Lu U Lu z z O (1� W lL Q lL W� O oCv QU nn n a: hi zo z OW Cv o O 0 O V I I N 00 00 a a x U m(f) 1__IL W Lu z Z O U i--� w 0 z � � z W Q � U � D I —I � z � Q o W z � � o � W LL � O 101 F+-I Revisions O Scale AS NOTED Drawn By CTC Checked By TRB Date 12/11/2019 Job No ???20 A-510-01 OF 6 x U