Loading...
HomeMy WebLinkAboutNCC200084_ESC Approval Submitted_20200109ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality 12 December 2019 LETTER OF APPROVAL WITH MODIFICATIONS Greater Asheville Regional Airport Authority ATTN: Mr. Lew Bleiweis 61 Terminal Drive, Suite 1 Fletcher, NC 28732 RE: Project Name: Asheville Regional Airports - Parking Lots Acres Approved: 3.3 acres Project ID: BUNCO-2020-005 County: Buncombe City: Asheville Address: Terminal Drive River Basin: French Broad Stream Classification: B Submitted By: Mr. Dave Skurky, P.E. Date Originally Received by LQS: 6 September 2019 Date Revision Received by LQS: 6 December 2019 Plan Type: Commercial Dear Mr. Bleiweis, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NO[) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The N01 form may be accessed at dea.nc.gov./NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucasPncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. E��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NORTH CAROLINA ^� oec�nmeTofEnviro�mVmiau:nr 828.296.4500 Letter of Approval with Modifications Mr. Lew Bleiwies 12 December 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: The approved USC plan as well as any approved deviation. The NCG01 permit and the COC, once it is received. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval.. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, �_ 14 - Michael Smith Assistant Regional Engineer Land Quality Section Letter of Approval with Modifications Mr. Lew Bleiwies 12 December 2019 Page 3 of 3 Enclosures: Modifications Required for Approval NPDES NCG01 Fact Sheet ec: Mr. Dave Skurky, P.E. dskui•ky@aulickengineering.com cc: Regional Office file MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Asheville Regional Airport - Parking Lots Project ID: BUNCO-2020-005 County: Buncombe Until the pipe is removed and to prevent sediment from entering the existing stormwater sewer, please show on plan sheet ES-03A inlet protection around the inlet to the 12" CPP at the outlet of temporary diversion #1. {G.S. 113A-57 (3)1. 2. Please provide on the plans the overflow weir length for each of the temporary sediment traps. {G.S. 113A-57 (3)). 3. Please show on the plans the dimensional information for each of the temporary sediment traps (length vs. width). {G.S. 113A-57 (3)). 4. For inclusion in the submitted erosion control plan set, please send to this office a copy of stormwater plan sheets SW-01 - SW-07. {G.S. 113A-57 (3)). S. In the erosion control sequence on plan sheets ES-03A and ES-03B please add a note after Note 12 to maintain all erosion control measures in the final phase until after the permanent pipes are installed and the area is permanently stabilized. {G.S. 4113A-57 (3)}. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities