Loading...
HomeMy WebLinkAbout20160980 Ver 2_Credit Release Task 3_1-2020_20200108ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality January 8, 2020 Brad Breslow DWR Project #: 2016-0980v2 EBX Neuse 1, LLC Johnston County 302 Jefferson Street, Suite 110 Raleigh, NC 27605 Re: RES Neuse Buffer & Nutrient Offset Umbrella Mitigation Banking Instrument (UMBI) Meadow Spring Bank Parcel Credit Release — Task 3 Dear Mr. Breslow: On October 29, 2019, the Division of Water Resources (DWR) received an As -Built Report from EBX Neuse I, LLC (EBX) for the Meadow Spring site. According to the As -Built survey submitted with the As -Built Report, there are slight adjustments in the total amounts of buffer mitigation and nutrient offset credits as compared to the approved Bank Parcel Development Package. The subject site has generated 192,368 ft2 of buffer restoration credits, 26,805 ft2 of buffer enhancement credits and 4,271 lbs-Nitrogen nutrient offset credits. The credits being released have been modified to reflect any changes to the creditable acreage as proposed in the BPDP. DWR received a performance bond (#9332404) in the amount of $100,000 issued to EBX from Fidelity and Deposit Company of Maryland, to cover monitoring and maintenance at the subject site. The term of this bond applies beginning October 17, 2019 and ends October 17, 2020. Future credit releases will be dependent on both the renewal of this performance bond and the annual monitoring reports. In accordance with the UMBI, signed on January 31, 2018, the following Project Milestones have been met and the corresponding credits shall be released: Task/Milestones Credit 3) Monitoring Financial Assurance Posted and DWR Approval of As -Built Report 10% TOTAL: 10% By copy of this correspondence, DWR confirms that you have satisfied the above requirements for the above -referenced tract and 10% of your Nitrogen nutrient offset credits (0.10 x 4,271 lb-N = 427.1 lb-N) plus 70.65 lbs-N yields 497.75 lbs-N that are now available to sell. Additionally, 10% of your Neuse buffer Restoration credits (0.10 x 192,368 ft2 = 19,236.80 ft2) plus 1,296.90 ft2 yields 20,533.70 ft2 that are now available to sell. Lastly, 10% of your Neuse buffer Enhancement credits from cattle exclusion (0.10 x 26,805 ft2 = 2,680.50 ft2) minus 1,269.90 ft2 yields 19410.60 ft2 that are now available to sell. North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 Meadow Spring Site EBX January 8, 2020 Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020201 of the Neuse River Basin excluding the Falls Lake Watershed pursuant to 15A NCAC 02B .0240. Additionally, the riparian buffer credits must be used for impacts in the Neuse River Basin in accordance with guidelines in the Consolidated Buffer Mitigation Rule, 15A NCAC 02B .0295, which became effective on November 1, 2015. Please feel free to call (919) 707-3637 if you have any questions regarding this correspondence. Sincerely, Katie Merritt 401 & Buffer Permitting Branch cc:File Copy (Katie Merritt) Caitlan Parker (EBX) — via electronic mail I'a,c 212