Loading...
HomeMy WebLinkAbout20190888 Ver 1_No Written Concurrence NW3_20200107Mitchell, Robert K From: Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil> Sent: Tuesday, January 7, 2020 1:03 PM To: Mitchell, Robert K; Breedlove, Patrick J Cc: McHenry, David G Subject: [External] RE: Macon County - Turtle Pond Creek - Culvert Structure Change External email. Do not click links or open attachments unless you verify. Send all suspicious email as an atta ort.s am nc. ov I agree that as long as you follow the trout moratorium this would qualify under NWP 3 as a non -notifying project. As such, the activity is authorized to proceed under non -notifying NWP-3 without further correspondence from this office. No need to do anything with the permits already issued. This email will be filed in our record to document that the impacts authorized by the NWP 3 verification letter dated 9/16/2019 will no longer be conducted and instead the impacts described below in this email will. Sincerely, Crystal C. Amschler Project Manager Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28403 (828)-271-7980 Ext 4231 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 From: Mitchell, Robert K [mailto:kevin.mitchell@ncdenr.gov] Sent: Friday, December 20, 2019 12:13 PM To: Breedlove, Patrick J <pjbreedlove@ncdot.gov>; Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil> Cc: McHenry, David G <dgmchenry@ncdot.gov> Subject: [Non-DoD Source] RE: Macon County - Turtle Pond Creek - Culvert Structure Change Patrick, It wouldn't require written approval from our office, so I am okay with what is being proposed (non -notification route) as long as that works with Crystal. Kevin Mitchell Environmental Specialist II Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 828-296-4650 Office 828-231-1580 Mobile Email Kevin.mitchelI@ncdenr.gov NC DEQ Asheville Regional Office 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 N-C -Z>*IMhft Qqmm %.. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Breedlove, Patrick J Sent: Thursday, December 19, 2019 9:25 AM To: Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil>; Mitchell, Robert K <kevin.mitchell@ncdenr.gov> Cc: McHenry, David G <dgmchenry@ncdot.gov> Subject: Macon County - Turtle Pond Creek - Culvert Structure Change Good Morning Crystal/Kevin, Originally our project maintenance crews were going to replace the existing deteriorated 75' pipe with a 75' x 60" corrugated metal pipe, without any wetland impacts or the need to remove any trees, which would have qualified for non -notification permitting. However, this would have involved closing Hwy. 106 for a 24 hour period to replace existing culvert. At that point NCDOT had funding to contract a directional bore of 2 - 48" pipes to fix the deteriorating culvert and our office applied for permitting due to the boring operations would need to temporary impact wetlands and we would need to remove several trees. Our office was notified Monday that NCDOT does not have the funds to complete the bore and the existing culvert will need to be replaced much sooner that budget issues will be resolved. Mr. Mark Hill with Macon County Maintenance would like to replace the existing 75' CMP with a 75' x 60" CMP as originally determined, prior to permitting, and HWY. 106 will be closed for a 24 hour period while replacement takes place. We understand there will be a full trout moratorium and replacement work cannot commence until April 16, but there will be no temporary wetland impacts nor any trees removed and the pipe will be embedded 1 ft. What are your thoughts as far as permitting, since going with the initial plan to replace would have met the non -notification requirements? Maintenance crews plan to replace pipe on or around April 16t", 2020. 1 have attached the 404 and 401 permits we received and I have attached the hydro report showing a 54" CMP would be sufficient, however, due to the 1ft. embedment a 60" CMP will be needed. Do we need to complete a permit modification? Or cancel the current permits and adhere to the non -notification guidance? Your thoughts please. Sincerely, Patrick J. Breedlove Environmental Specialist II N.C. Dept. of Transportation Divison 14 (828) 631 - 1145 Office pibreedlove@ncdot.gov 253 Webster Road Sylva, N.C. 28779 A0. -oz0>"'NctHnqCcmpares,-%.^ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Facebook Twitter YouTube Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.