Loading...
HomeMy WebLinkAboutWQ0021912_Sewer Extension Permit Status Update_20191217 Request for Engineering Certification Date of Letter: December 17,2019 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return this form and supporting documents_by January 20, 2020 to the attention of Nyle Hothem at the Division's PERCS Unit by the delivery method below: 13M-- a � � NCDEQ/DWR Vv WQPS—PERCS UNIT DEC 2 6 2019 By U.S.Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem By Raleigh, NC 27699-1617 Raleigh, NC 27604 Nyle.Hothem@ncdenr.gov Permit No.:WQ0021912 Permittee: Zaremba Group LLC Project Name:Sterling Autobody Center Project Status (Check appropriate box to indicate Permittee's response and complete&sign below) SEWER NOT CONSTRUCTED ❑ The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. NOTE:If sewer will never be built,please complete Permit Rescission Request section below. SEWER HAS BEEN CONSTRUCTED [Check one] Permittee's Certification:The Permitted project has been constructed and the required Engineer's Certification and supporting documents are not available. However,the undersigned agent for the Permittee hereby states that to the best of[his/her] knowledge,this project has been constructed pursuant to the applicable standards&requirements of the Permit issued for the above named project and the Permittee is presently operating and maintaining the w stewater collection system in accordance with the conditions of the Permit. The permitted system was placed into service in ,� 2033 [insert month&year]. ❑ Engineer's Certification: The Permitted project has been constructed and the required Engineer's Certification and supporting documents are being submitted to the Division with this form. OWNERSHIP/NAME CHANGE XThe Permittee requests information to apply for ownership or name change. Please provide email and phone number below for follow-up. Name&Title(prin "TOAD mNmpi Signature: �_ " Date: `Z'Zb'`� Comments: ?L ` 81+1410 ehro01`IESpriv t.$ 1`w t te-ocv+.2, ep,37. ('7 wita ?. Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational.We understand that,in the future,should we wish to operate a ntgn-dbspb i e sewer system,we shall apply for and receive a new Wastewater Collection System Permit. E J t�J Name&Title(Print): JAN 06 2020 Signature: Date: NCDFO/IWVR/NPDFS Comments: Contact Information Updates for Current Owner Updated Contact Person&Title(Print): Updated Mailing Address: Updated Email: Updated Phone: .„ SfATE9 ` f ROY COOPER �' {]4rj,.elb ��ef' n" Governor ',;�` MICHAEL S.REGAN • Secretary ``& LINDA CULPEPPER NORTH CAROLINA Director Environmental Quality December 17,2019 Todd Hamula Zaremba Group LLC 14600 Detroit Ave,Ste 1500 Lakewood,OH 44107 Subject: Engineering Certification Zaremba Group LLC Mecklenburg County Dear Permittee: Based on a review of our records for permits issued during the period of 2002 through 2006,it appears that the Division of Water Resources (Division) has not yet received a final engineering certification in accordance with 15A NCAC 02T.0116,as well as the standard conditions of the permit,for the Wastewater Collection System Extension Permits) listed below. . • Permit No.WQ0021912:Sterling Autobody Center issued on 11/18/2002 If the permitted'facility,or arty portion of the facility,has been constructed and is in operation,a complete and final engineering certification is required to be submitted prior to placing the system into service. It should be noted that failure to certify a non-discharge sewer extension permit appropriately in accordance with the provisions of 15A NCAC 02T.0116 may result in enforcement action. Recognizing that the required certification documents may not be readily available for the permits issued , between 2002 and 2006(i.e., lost,destroyed,etc.),the Division will accept a statement from the Permittee, in lieu of the Engineer's Certification,attesting to the,construction,operation and maintenance of the permitted system. (See'Status Update form on back for response•options.) If the'permitted facility has not been con'struoted and will not be constructed,the Permittee may request to have the permit rescinded by returning the,attached Status Update form, If the Permittee no longer owns the facility or the Permittee's name has changed, please return the attached Status Updateiegtiesting informatiorr'fo'r ownership/name change. Please note that Permits are not automatically transferable in the event the project site is now owned by others. The Division requests a response from the Permittee by January 20,2020. The Status Update form on the back of this letter should be completed and included with all submittals. If you have any questions regarding this outreach program, please contact Nyle Hothem via e-mail at Nyle.Hothem@ncdenr.gov. Alternatively,voice mail messages can be left at(919)707-9130. Sincerely, C Christyn L. Fertenbaugh, P.E., Environmental Engineer PERCS Unit, Division of Water Resources cc: Mooresville Regional Office,Water Quality Section Regional Operations [electronic] PERCS [electronic copy]/157 D E�.,- North Carolina Department of Environmental Quality I Division of Water Resources l��J/� 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 1‘,0RTH CAROL NA u putzmntm Enviroannatal Wamr� 919.707.9000