Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
_Cliffside Unit 5 CBE - Appendix C3_20200107
Duke Energy Coal Combustion Residuals Management Program December 18, 2019 Cliffside Steam Station— Inactive Unit 5 Ash Basin CAMA Closure Plan (Closure by Excavation) Revision 0 Wood E&IS Project No. 7812190194 APPENDIX C3: SOIL QUANTITIES wood. SOIL QUANTITIES ASH BASIN ESTIMATED QUANTITIES DESCRIPTION UNITS ESTIMATED QUANTITY UNIT 5 INACTIVE ASH BASIN ASH BASIN BOUNDARY AREA ACRES 60.5 EARTH WORK (ASH) CUT VOLUME CU. YARDS 1,960,000 EARTH WORK (ASH) FILL VOLUME CU. YARDS 0 SOIL CUT (DIKE BREACH AREA) VOLUME CU. YARDS 483,823 SOIL FILL (GRADE BASINS TO DRAIN) VOLUME CU. YARDS 75,226