Loading...
HomeMy WebLinkAboutCliffside AAB CBE - Appendix C3_20200107Duke Energy Coal Combustion Residuals Management Program December 18, 2019 Cliffside Steam Station — Active Ash Basin CAMA Closure Plan (Closure by Excavation) Revision 0 Wood E&IS Project No. 7812190194 APPENDIX C3: SOIL QUANTITIES wood. SOIL QUANTITIES ASH BASIN ESTIMATED QUANTITIES DESCRIPTION UNITS ESTIMATED QUANTITY ACTIVE ASH BASIN ASH BASIN BOUNDARY AREA ACRES 92.0 EARTH WORK (ASH) CUT VOLUME CU. YARDS 5,040,000 EARTH WORK (ASH) FILL VOLUME CU. YARDS 0 SOIL CUT (DIKE BREACH AREA) VOLUME CU. YARDS 516,527 SOIL FILL (GRADE BASINS TO DRAIN) VOLUME CU. YARDS 106,231