HomeMy WebLinkAboutMarshall CBE - Closure Plan - Appendix A_20200107APPENDIX A ESTIMATED VOLUME OF CCR IN IMPOUNDMENT AECOM Job Duke Energy — Marshall Closure Description Estimated Volume of CCR in Impoundment Project No. 60432116 / Sheet 1 of 3 60603377 Computed by MSR Date 9/20/19 Checked by RJB Date 9/20/19 The purpose of these calculations is to estimate the quantity of the coal combustion residual (CCR) located within the Ash Basin at the Duke Energy Marshall Steam Station (MSS), located in Catawba County, North Carolina. These calculations have been developed independent of past calculations/estimates prepared by others, and the actual volume of CCR within the Ash Basin will vary from that presented previously. This variability is primarily due to the differences in data sources/references used in the calculations. These volume estimates will be refined if more accurate data is collected throughout the design process. APPROACH CCR Quantity within the Ash Basin The approximate pre -development topography (see Figure A-1), which is based on the Duke Energy drawing No. M-1 entitled "Plant Marshall -Unit 1&2 Site Plan", was compared to existing topography (see Figure A-2) using AutoCAD Civil 3D version 2018 (AutoCAD). The quantity of CCR within the Ash Basin was subsequently calculated, using AutoCAD Civil 3D, as the volume differential between the pre -development topographic contours and the existing topographic contours, within the Ash Basin Waste Boundary (see Figure A-3). The quantity of CCR within the Ash Basin Waste Boundary was calculated to be approximately 14,320,000 cubic yards (CY). However, this initial estimated quantity of CCR within the Ash Basin does not account for areas within the Ash Basin Waste Boundary that are not comprised of CCR (i.e., free water areas and fill used to construct the FGD Constructed Wetlands Treatment Area). Currently, there is no bathymetry data for these free water areas, as the bathymetry data referenced above (and used in the CCR quantity calculation) is only representative of the bathymetry contours within the Active Ash Basin area. The free water areas and volumes within the Ash Basin Waste Boundary, outside of the Active Ash Basin area, are estimated as follows: I_a141•7►i Job Duke Energy — Marshall Closure Description Estimated Volume of CCR in Impoundment 60432116 / Project No. 60603377 Computed by MSR Checked by RJB Sheet 2 of 3 Date 9/20/19 Date 9/20/19 Free Water Area Surface Area (SF) Volume (CY) Pond adjacent to Coal Pile 75,000 20,000 Nursery Pond 60,000 20,000 Pond west of Asbestos Landfill 25,000 10,000 Pond north of 1804 Landfill (Phase II) 140,000 40,000 Total Free Water Volume 90,000 1. The free water areas provided were calculated using AutoCAD and are approximate. 2. Due to the lack of bathymetry data in each of the specified free water areas, an average water depth of eight feet was assumed. In addition, borrow soil fill was placed within the Ash Basin Waste Boundary in order to construct the FGD Constructed Wetlands Treatment Area. Based on soil boring data, AECOM assumed an average depth of 18 feet of borrow soil fill is present above the CCR in this area. Utilizing AutoCAD, the portions of the FGD Constructed Wetlands Treatment Area, located within the Ash Basin Waste Boundary, were estimated to occupy an area of approximately 480,000 SF. This equates to a borrow soil fill volume within the Ash Basin Waste Boundary of approximately 320,000 CY. The free water volume (90,000 CY) and clean fill volume (320,000 CY) within the Ash Basin Waste Boundary were subtracted from the initial estimated quantity of CCR within the Ash Basin (14,320,000 CY), equating to a final estimated volume of CCR within the Ash Basin of approximately 13,910,000 CY, or 16,692,000 tons (using an assumed conversion rate of 1.2 tons/CY). I 4M01141Lill ML1I Based on the calculations described above, the total quantity of CCR within the Ash Basin at the MSS is estimated to be approximately 13,910,000 CY, or 16,692,000 tons. It is noted that based on estimates of net CCR disposal rates into the Ash Basin since the dates of the above mentioned surveys, Duke Energy has reported an in -place CCR tonnage of 16,840,000 tons (14,033,000 CY), as of July 31, 2019, with no additional CCR being disposed of in the Ash Basin. AECOM Job Duke Energy — Marshall Closure Project No. 60432116 / Sheet 3 of 3 60603377 Description Estimated Volume of CCR Computed by MSR Date 9/20/19 in Impoundment Checked by RJB Date 9/20/19 III. ATTACHMENTS Attachment A: Figures - Figure A-1— Pre -Development Topography - Figure A-2 — Existing Topography - Figure A-3 — In -Place CCR Isopach Map ATTACHMENT A Figures FIGURE A-1 LEGEND REV. A E F fill I If \ �0� l /1 I / / % It'0I I I \1 /'' % \If I It / If It / ; It 1 11 I I ► / III ��-/ / / /♦\ III' I \ / // / I I // / / I If/ / 1\ , I 1 1 `� ♦ / j j Ip , \ �/ /'��/ ! / ,If If If Vo tv If\\ \\ /j �` U.) if 1 / / ► I / / \ 1 1 1 . \ \ `. — / / / r �� / ; -----' ,// I`, `— 0 i i i \\ \\ \\ I \\ ` \ `\ \\\\ i oo I / / /'- III I //00 / 1\--� \$5 / 1 I o, \ 1 \ \ 1 \ \ \\ `\ � � I 1`II i/i it \ y..� ,II / /► // / ; \ I\\ ��\\\ /// 1/ l,l I 1 , \ / � \ \ I \ \ I \\ \ l I \ \ / ,/ / / / / / ♦ \ ` `_ I I I ! , l\ - ,/ / I I i I `\ /' / l /i / / I \ 1 I 1f /\ I I 1 / , �/ \ ♦ , // /, l r / , ///�1 ,// �,/// // \\♦\ \ \ \ 1 i I I I � � / l f ,', If ' I if I if 1 I� \ \\ , / I 1 r-�.. , I ♦\\\\ \\ \� / // �/ �.i/'/' -\_. 8rjo If / ,� ♦ c`♦ /If/ \ 00/1 / � � / I III 1 �-_ �// /. / � — —_�/ \- 1 ► \ \ , / I / / \ \ ♦ \ 1Io I I \ I _ 01 it 1\`. 11\ \ / \ / 1 If \\ r !/ ,1 ifif moo If If / / / \ / \ 1 \ \• 77 jp \If Ile '--� / / / /� //�(►//// // ��-' �\ \ `--� \ \ \\1 it / / / '/' /� \`I``♦ /' / / V- �/ / �Ak / / /i / // // // // /—__—'� \ \ \ `� �- ♦ \ I I11 \ \ \ I I \ If / _ 1 \ \ I \ I 1 Iit 'ell If I if '' \ If If / / I \ I1 I / I / '/ /__ ^'� \�\ /-\�lllllll'/ ��\ \ I I I ` ♦ ,/1 I / / III! 11 / / / I O r / 1\\ 1 1 ♦ \ I 1 1 I l I // % � �� \ / — -. \ 11 1 11 ` / /'�\`--� � I I j / / I \ \ � I `--' �_// / I I � `"' / /' ,' / / f / ♦ \ 1 \ \ I j / (_� _ _ `` //�� I I„f I I 1 j 1 I\ 1 r 1 l \\ \� / \ / \ 1 \ 1 /' / / 1 \ \ \ ♦ ♦ \ \ \ ,'/' % \\ \\ I I I \ \ \ I 1 1 \ I / \ / (�/ / //r 11 // / / / \ \ \ \ / I \ \ \�.. / / / ` / -. I \ I \p I I 1 �— / / / I O / \ f I 1 \ \\ \ \ 1 �� \ \ / it / O 7 750-- It I it) \ / % � Vol ♦\ � Imo`'\ � // -\`/1 I \ \ l ! I I \ \\_ / I I -� // ///'/ /'_ /' % %If /,/// �\ \ \\\\\ \\ \ \ � \I \� `� _/' � /' \\ \ �♦ `\\ \ \\ I / '•. i 111 I(1 \ \ / � /r i / / / \-mil I , I I\II \\ 1 \ I / / \ \ 8CO _ \_/ / //' � ♦ __�, / III \__ 1 \ 00 / -' ,/ / 1 I O ♦ \ \ I / / 1 I / I / \ `�\ /A _� // ,,/L//'////' /-'' \ I 1 I I / /,�\ \ 1 ► I I / 1 ' / - tl/1� ,/ / I I \ I I 1 I / 000, ,T I i!!• �r I 1 .// I\ /If k If If If If If 1\� / /I ' \.00 DSO If U If If 1 If � k It � I If 0, /,/ til 1♦ \\ i j/ ; 1\ I I I I)If /.. jj( — 800 - PRE -DEVELOPMENT MAJOR TOPOGRAPHIC CONTOUR PRE -DEVELOPMENT MINOR TOPOGRAPHIC CONTOUR ASH BASIN WASTE BOUNDARY (APPROXIMATE) NOTES BASIS OF BEARINGS: NC GRID NAD83/2011. ELEVATIONS ARE BASED ON NAVD88. 2. (10-FOOT) CONTOURS WERE DIGITIZED BY AMEC FOSTER WHEELER FROM HISTORICAL TOPOGRAPHY (REFERENCE 1). 3. A DATUM SHIFT OF -0.72 FEET WAS APPLIED TO CONVERT ELEVATIONS FROM NGVD 29 TO NAVD88. 4. THIS IS AN ACCURATE REPRESENTATION OF THE CONTOURS SHOWN IN REFERENCE 1 AND IS AN APPROXIMATION OF THE BOTTOM OF ASH POND CONTOURS (I.E., PRE -DEVELOPMENT TOPOGRAPHY) BASED ON THE INFORMATION AVAILABLE TO AECOM. REFERENCES DRAWING NO. M-1 ENTITLED "PLANT MARSHALL-UNIT 1&2 SITE PLAN" PREPARED BY DUKE POWER COMPANY, REV. 14, DATED FEBRUARY 3, 1988. VERTICAL DATUM CONVERTED FROM NGVD29 TO NAVD88. 2. THE CURRENT ASH BASIN WASTE BOUNDARY PRESENTED IN THIS FIGURE IS BASED ON THE "2018 COMPREHENSIVE SITE ASSESSMENT UPDATE" PREPARED BY SYNTERRA FOR DUKE ENERGY AND SUBMITTED TO NCDEQ (NPDES PERMIT NO. NC0004987) ON JANUARY 31, 2018. IN \7 TITLE L=com PRE -DEVELOPMENT TOPOGRAPHY MARSHALL STEAM STATION CLOSURE BY EXCAVATION CLOSURE PLAN CATAWBA COUNTY. NORTH CAROLINA FOR ISSUED FOR APPROVAL � DUKE ENERGYC SCALE: 1 "=500' DES: MSR DWG TYPE:.DWG DFTR: MSR JOB O 819 DATE: 09-20 ENGR: JB B FILENAME: FIGURE A-1 PRE -DEVELOPMENT TOPOGRAPHY. DWG APPD: JB C H C m ZJ m o 6INCHES j 2 3 ITENTHS 1'0 20 30 0 500 1000 1500 GRAPHIC SCALE (IN FEET) DWG SIZE I DRAWING NO. I REVISION ANSI I 22.0"x34.0" FIGURE A-1 A 10 Existing Topography FIGURE A- REV. A wo -F ', ISLAND POINT ROAD i � - ■. 'r4J' J'' l.' - r ■r INDUSTRIAL LANDFILL PERMIT NO. 1812 ■ .~�ri' 6N.� • rc `-' .-",• ILF PHASE I ASBESTOS LANDFILL ' �' fi Z r '�♦ PERMIT NO. 1804 ., - Z MAR-145 TEMPORARY ILF PHASE II f - DEMOLITION LANDFILL r STORMWATER POND - �.� {' PERMIT NO. 1804 r -A y■.. ILF PHASE III '♦♦ ■ i �' �' + - i� +r;w,.'".ti"`,,• N _ ■ ■ • �� � fj A '' '*Y�. ay . , S y: +e � • _ rf.•. `+. 3t� i` ►1Y - • ■ •3' . i -'�_ i i �"�{'}-'tip f %��y-�' - Q R ■ ■ ■ `_ 7S .yy`' �° :r 4" `4' 'r{ 1 + 'r'; _ y• dy ♦♦ � - I�Lkl-,00 ■ ■ � • • � �. � -r f_s { ~ . ��.I F �• �' .. +'"-T ` � '�, •.fit-i" ,y�" • AL ,' .•• ILF PHASE IV i ♦ l :c •' _ {1 .t" ■ ■ h ■ `4Fti '-• r F + M i, ,' �. . .. r r„' ' Mom, 4';- ' 16 do di rN :•�� 1 , ILF PHASE V �/,� .�•�:�� ' `{- {'.:►`3*; _ \��V k VAx ','� :4'F�i' :k. ' - • ' • ; L 1804 LANDFILL `-ilf '��.,r.* (PHASE 11) 1 ■ if" *� #* 17- 116 `'' • ' �. "�,` "' PERMIT NO. 1804.:"'='' AV L ■ ■ -} . - .i ■, ti' rig - ■ / STRUCTURAL FILL f �• ` "' • ;. • i PERMIT NO. CCB0031 i '; �4� �, Yr� Y } � r -• � r:K momma Ip ■ iw 3.� r _ - # .. `R,•r � ♦♦ ter• �. ; . �,.'.� � �.- .��fi � . # a� - t �' .. t . , �. � _ � AMD ��P� PLAN/ SOLAR 1 .� A'�. •� :� It FARM j ■' `� '� `. ' ..-r pf,,. •~ -{xi ��. ■ • I It , y �/ r+ e ♦ L - .fir `PI NJ 1804 LANDFILL R �!�� • �-�i� (PHASE 1) ♦♦ ,� 1 ..'}_ ti `{. _�♦- ,.. PERMIT NO. 1804 STRUCTURAL FILL ■ �' f " �` .� ACCESS ROAD +.•"„�, '-`; - .; ,• • -♦ PERMIT NO. CCB0030 '+' / • *';,;.� ~ 4 i . # ♦ ♦ + ..' ■ Miami =000 of T lit a-milt 0 'yt • ' r ,fir/ r '`"'-! _ �/ ..�► �� ■`• WTS AREA y► vim. + u s } ACTIVE i. � �- yM- �': 1: Lt< '�Y�� `�� •'��*"" - '� ASH BASIN , f v+• „ .. - FGD CONSTRUCTED ' -E-1 ltv WETLANDS ; W, LAKE NORMAN } mi,'*,. ►"4.-►„ �� TREATMENT AREA r ...'IL aa 70 i FGD ♦♦ � � •ti�. , • ''r ,. %pftZ TTED LANDFILL ♦♦ +',r,' .-; OUTFACE 002 ♦� PERMIT ♦♦♦ '.' �; :; ASH BASIN DAM ' ■ ♦♦♦ w1♦♦� � ` . x •�'Y -yam '� ` 0, � ♦ ♦ � • _ , ■ ♦ ♦ • ♦ DRY BOTTOM ' ■ ♦ �., • ASH SYSTEM 5' ' ^►-€" ! - • ■ # e' hJ r #iti LINED F. T' % i +*• #r -,' RETENTION ®� _ • �/ 1+ *, • BASINS ♦♦♦ f. '. COAL i i `~ 0 Ik . • ■ +i -+oe ir s : GYPSUM "i '} 'x' #• *' ♦♦ AREA � +�' � it �' �+.� r• MARSHALL STEAM STATIONIlL f . `" �� S. }`- fhT T,. �d. y 4 0 IN 1 2 3 TENTHS 10 20 30 4 5 1 1 LEGEND ASH BASIN WASTE BOUNDARY (APPROXIMATE) ------------- EXISTING SITE FEATURE (APPROXIMATE) PROPERTY BOUNDARY INDUSTRIAL LANDFILL (ILF) PHASE BOUNDARY (APPROXIMATE) IN -PLACE CCR MATERIAL THICKNESS NUMBER MINIMUM DEPTH (FT) MAXIMUM DEPTH (FT) AREA (SF) COLOR 1 0.00 10.00 2432684.65 2 10.00 20.00 2751742.64 0 3 20.00 30.00 2701533.60 4 30.00 40.00 2678238.70 5 40.00 50.00 1596709.72 6 50.00 60.00 741432.37 7 60.00 70.00 555413.54 8 70.00 80.00 230378.43 9 80.00 90.00 47654.70 NOTES 1. IN -PLACE CCR MATERIAL DEPTHS ARE BASED ON A COMPARISON BETWEEN PRE -DEVELOPMENT TOPOGRAPHY AND EXISTING TOPOGRAPHY WITHIN THE ASH BASIN WASTE BOUNDARY AND THE STRUCTURAL FILL ACCESS ROAD, UTILIZING AUTOCAD CIVIL 3D VERSION 2018. REFERENCES 1. THE ASH BASIN WASTE BOUNDARY; THE PERIMETERS OF THE 1804 LANDFILL (PHASES I AND II), STRUCTURAL FILL, FGD LANDFILL, ASBESTOS LANDFILL, AND DEMOLITION LANDFILL; PRESENTED IN THIS FIGURE ARE BASED ON THE "2018 COMPREHENSIVE SITE ASSESSMENT UPDATE" PREPARED BY SYNTERRA FOR DUKE ENERGY AND SUBMITTED TO NCDEQ (NPDES PERMIT NO. NC0004987) ON JANUARY 31, 2018. 2. THE PERIMETER OF THE STRUCTURAL FILL ACCESS ROAD PRESENTED IN THIS FIGURE IS BASED ON THE "MARSHALL STEAM STATION STRUCTURAL FILL CLOSURE REQUIREMENT AND RECORDATION (RECORD NUMBER: 006021 MS)" LETTER SUBMITTED TO THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES BY DUKE POWER ON JULY 8, 1998. 3. THE PERIMETER OF THE INDUSTRIAL LANDFILL PRESENTED IN THIS FIGURE WAS PROVIDED BY DUKE ENERGY. 4. THE PROPERTY BOUNDARIES PRESENTED IN THIS FIGURE ARE BASED ON THE CATAWBA COUNTY GIS, THE TOPOGRAPHIC SURVEY PERFORMED BY WSP IN APRIL 2014 AND SUBMITTED TO DUKE ENERGY IN JULY 2015, AND THE "BOUNDARY SURVEY OF PROPERTY TO BE ACQUIRED FROM DELMAR SHERRILL AND GEORGE C. SHERRILL" DATED JANUARY 27, 2016. 5. THE AERIAL PHOTOGRAPH WAS OBTAINED FROM BING (MICROSOFT CORPORATION, 2018). 0 500 1000 1500 GRAPHIC SCALE (IN FEET) AECOM TITLE IN -PLACE CCR MATERIAL ISOPACH MAP MARSHALL STEAM STATION CLOSURE BY EXCAVATION CLOSURE PLAN CATAWBA COUNTY, NORTH CAROLINA FOR ISSUED FOR APPROVAL rftDUKE � ENERGY® SCALE: 1 : =500' DES: MSR DWG TYPE:.DWG DFTR: MSR JOB NO: 60572849 CHKD: RJB DATE: 09-20-19 ENGR: JB FILENAME: APPD: JB DWG SIZE DRAWING NO. REVISION ANSID 22.0"x34.0" FIGURE A- 3 A 9 I 10 I H C M GJ M