Loading...
HomeMy WebLinkAbout20180307 Ver 4_Site Plan_20191209LEGEND INDEX OF SHEETS ASPHALT (PROFILE) BOTTOM OF BANK (TOE) nnlnnr LOIN V UL nI 111 r% LIn YUI LYII\U CHECK DAM STD. 6.83 CONCRETE (PROFILE) EXISTING CREEK PROPOSED CREEK CURB & GUTTER EDGE OF ROADWAY EXISTING q SANITARY SEWER EXIST. SAN. SEWER MANHOLE STRUCTURE EXISTING GAS MAIN EXISTING GAS SERVICE FENCE (LABEL TYPE) GAS VALVE GRAVEL (PROFILE) GROUND PROFILE nl IAnn nAII UUnI\V 1\nIL MARSH, POND, WETLAND OR LAKE OVERHEAD ELECTRIC nll- r 1 ILI\J POWER POLE/GUY WIRE PROPERTY LINE nnnr 11n1 r NVI\L 11%/" PROPOSED q SANITARY SEWER PROP. SAN. SEWER MANHOLE STRUCTURE n1n non IN — IN I ROAD/STREET R/W SEDIMENT FENCE (SILT FENCE) STD. 6.62 [ nruu l U JIVLttnL % STREET SIGN (LABEL TYPE) STORM DRAIN/CATCH BASIN, YARD AND DROP INLET TEMPORARY SEDIMENT TRAP STD. 6.60 TEMPORARY ROCK SEDIMENT DAM ROCK SILT CHECK SILT BASIN STONE CHECK DAM TEMPORARY DIVERSION STD. 6.20 TEMPORARY SILT DITCH TEMPORARY STREAM CROSSING STD. 6.70 PROPOSED TOP OF BANK (TOB) T^ 1rn 1 11,11- IVttLI% LII\L TREE & BUSH TREE LINE UNDERGROUND CABLE UNDERGROUND ELECTRIC UNDERGROUND TELEPHONE PROPOSED SANITARY SEWER (BY OTHERS) WATER METER 100 YEAR FLOOD PLAIN 50' WETLAND BUFFER 100' BUFFER MAJOR CONTOUR MINOR CONTOUR PROP. PERM. SEWER EASEMENT TEMPORARY CONSTRUCTION EASEMENT STAGING AREA TEMPORARY CONSTRUCTION ENTRANCE TD TD TD TSD TSD �T� OE 0 uc UE SS SS EROSION CONTROL MATTING NOTE: LINE WEIGHTS ARE NOT DELINEATED HERE. THEY ARE CONTROLLED THROUGH CLTWater PLOTSTYLE. DESIGN COMPANY: GHD CONSULTING SERVICES INC. ADDRESS: 222 S. CHURCH STREET, SUITE 400, CHARLOTTE, NC 28202 PHONE: (704) 342-4910 DATE DESIGN COMPLETED: - SURVEY COMPANY: LAWRENCE ASSOCIATES ADDRESS: 106 W. JEFFERSON STREET, MONROE, NC 28112 PHONE: (704) 289-1013 DATE SURVEY COMPLETED: NOVEMBER 20, 2018 GEOTECHNICAL COMPANY: JOEL E. WOOD & ASSOCIATES ADDRESS: P.O. BOX 296, CLOVER, SC 29710 PHONE: (803) 684-3390 DATE COMPLETED: OCTOBER 20, 2018 CONTRACTOR: ADDRESS: - PHONE: - INSPECTOR: - INSIDE CHARLOTTE: ( ) YES (0 NO: TOPO NO: 138 CHARLOTTE WTER CHARLOTTE, NORTH CAROLINA SANdTARX SEWERA(CT'E SYSTEM IMPROVEMENTS S FEVENS v,..,REEK FRUNK SEWER Z 2 . '' � � m " � E+CLE coal FARMIS PROPOSED SEWER 0a k or PSI Ae r� EXISTING SEWER eo TARAWOODS 41 FOX' HOLLOW LFIEVA L C� ��• r�El� �raF�l"Lb � 14- 6- I M EA AT ION � �� rrcas � � Sall !�„+��� PROPOSED SEWER VIA PHASE 1 SEWERS 1 FPO, � �} � � �y�}yam • lSOURCE: ESRI, DELORME, USGS, INTERMAP, NRCAN, NGCC, © OPENSTREETMAP CONTRIBUTORS LOCATION MAP (NTS) GHD PROJECT NO.: 111-44299 GHD Consulting Services Inc. 222 South Church Street, Suite 400 Charlotte NC 28202 USA T 1 704 342 4910 W www.ghd.com SHEET NO. 1 COVER SHEET SHEET NO. 2 GENERAL NOTES AND MANHOLE SCHEDULE SHEET NO. 3 KEY MAP SHEET NO. 4 PLAN AND PROFILE STA AO+00 TO STA A9+00 SHEET NO. 5 PLAN AND PROFILE STA A9+00 TO STA A18+00 SHEET NO. 6 PLAN AND PROFILE STA A18+00 TO STA A27+00 SHEET NO. 7 PLAN AND PROFILE STA A27+00 TO STA A36+00 SHEET NO. 8 PLAN AND PROFILE STA A36+00 TO STA A44+00 SHEET NO. 9 PLAN AND PROFILE STA BO+00 TO STA 138+00 SHEET NO. 10 PLAN AND PROFILE STA B8+00 TO STA B17+00 SHEET NO. 11 PLAN AND PROFILE STA B17+00 TO STA B25+07.90 SHEET NO. 12 PLAN AND PROFILE STA CO+00 TO STA C5+73.04 SHEET NO. 13 CHEVAL PUMP STATION DEMOLITION PLAN SHEET NO. 14 MINT HILL PUMP STATION DEMOLITION PLAN SHEET NO. 15 MANHOLE DETAILS (SHEET 1 OF 2) SHEET NO. 16 MANHOLE DETAILS (SHEET 2 OF 2) SHEET NO. 17 24 IN. MANHOLE FRAME AND COVER DETAILS SHEET NO. 18 SEWER DETAILS (SHEET 1 OF 2) SHEET NO. 19 SEWER DETAILS (SHEET 2 OF 2) SHEET NO. 20 EROSION CONTROL NOTES SHEET NO. 21 EROSION CONTROL DETAILS (SHEET 1 OF 4) SHEET NO. 22 EROSION CONTROL DETAILS (SHEET 2 OF 4) SHEET NO. 23 EROSION CONTROL DETAILS (SHEET 3 OF 4) SHEET NO. 24 EROSION CONTROL DETAILS (SHEET 4 OF 4) SHEET NO. 25 FENCE DETAILS SHEET NO. 26 PLANTING PLAN SHEET NO. 27 PLANTING PLAN SHEET NO. 28 PLANTING PLAN 100% DESIGN CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. APPROVAL SEAL N.C.P.E. SUMMARY OF SEWER MAINS & MANHOLES SIZE LENGTH MATERIAL 811 571' PVC 811 57' D I P 1211 4317' PVC TOTAL NO. OF MANHOLES: 24 TOTAL NO. LOTS SERVED: XX PROJECT NAME: SANITARY SEWER SYSTEM IMPROVEMENTS STEVENS CREEK TRUNK SEWER - PHASE 2 JOB NO: 7030700047-17-503 DATE OF ACTIVATION: DATE AS BUILT: BY: A CITY OF CHARLOTTE DEPARTMENT GENERAL NOTES: 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARDS, SPECIFICATIONS, AND CONTRACT DOCUMENTS. 2. ALL ELEVATIONS REFER TO DATUM NAVD88. 3. THE CONTRACTOR SHALL OBTAIN ALL ADDITIONAL PERMITS NECESSARY NOT PROVIDED IN CONTRACT DOCUMENTS AND FURNISH COPIES TO THE ENGINEER PRIOR TO COMMENCING WORK. 4. THE CONTRACTORS WORK AREA SHALL BE CONFINED TO THE LIMITS OF THE RIGHT-OF-WAYS AND EASEMENTS. THE CONTRACTOR SHALL OBTAIN ANY ADDITIONAL EASEMENTS OR WORK RELEASES SHOULD THE CONTRACTOR REQUIRE ADDITIONAL AREA TO ACCOMMODATE HIS OPERATIONS. A COPY OF WRITTEN AGREEMENTS SHALL BE FURNISHED TO CHARLOTTE WATER. 5. THE CONTRACTOR SHALL PROVIDE MAINTENANCE AND PROTECTION OF TRAFFIC IN ACCORDANCE WITH MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND NCDOT STANDARDS AND DRAWINGS FOR WORK ZONE TRAFFIC CONTROL. 6. THE LOCATIONS AND DEPTHS OF EXISTING UNDERGROUND UTILITIES AS SHOWN ON THE PLANS AND PROFILES ARE APPROXIMATE. OTHER UNDERGROUND UTILITIES NOT SHOWN MAY BE ENCOUNTERED. THE CONTRACTOR SHALL PERFORM SOFT -DIGS TO VERIFY THE LOCATION AND ELEVATION OF UTILITIES AT INTERCONNECTIONS AND CROSSINGS AS SHOWN, DIRECTED OR REQUIRED. THE CONTRACTOR SHALL EXCAVATE IN ADVANCE OF THE PIPE LAYING OPERATION AND EXPOSE ALL EXISTING UNDERGROUND UTILITIES TO PREVENT DAMAGE DURING CONSTRUCTION AND TO DETERMINE REQUIRED CHANGES IN GRADE NECESSARY TO INSTALL THE SEWERMAIN TO AVOID CONFLICTS. 7. THE CONTRACTOR SHALL INSTALL THOSE MEASURES REQUIRED TO LIMIT EROSION OF AREAS DISTURBED BY THE WORK. CLEARING SHALL BE PERFORMED TO THE EXTENT SHOWN OR ON AN AS NEEDED BASIS, WHICHEVER IS LESS, PHASED TO REDUCE EROSION POTENTIAL AND VISUAL IMPACT. 8. BLASTING WILL ONLY BE PERMITTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 9. ONLY CHARLOTTE WATER SHALL OPERATE EXISTING VALVES AND FIRE HYDRANTS. 10. ALL SEWER PIPING LESS THAN 3'-0" OF COVER SHALL BE DUCTILE IRON. CONTRACTOR SHALL NOTIFY ENGINEER AND OWNER OF ANY CHANGES TO DESIGN. 11. MINIMUM PIPE SEPARATION: 10' HORIZONTAL SEPARATION OR 18" VERTICAL SEPARATION SHALL BE MAINTAINED BETWEEN WATER MAINS OVER SEWER MAINS. WHEN WATER MAINS ARE BELOW SEWER MAINS OR THE ABOVE MINIMUM SEPARATION CANNOT BE MAINTAINED, DUCTILE IRON PIPE SHALL BE USED FOR BOTH MAINS TO 10' EITHER SIDE OF CROSSING, AND ALL ALONG THE LENGTH OF MAINS WHERE MINIMUM SEPARATION CANNOT BE MAINTAINED. 12. IF THE MATERIAL AT THE DESIGN GRADE IS UNSUITABLE AS DETERMINED BY THE ENGINEER, THE CONTRACTOR, WHEN ORDERED IN WRITING, SHALL EXCAVATE ADDITIONAL MATERIAL TO THE DEPTH NECESSARY AND SHALL BACKFILL TO THE PROPOSED GRADE WITH SELECT GRANULAR BACKFILL MATERIAL. 13. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY UTILITY POLE IN ADVANCE OF ANY EXCAVATION WORK THAT WILL TAKE PLACE WITHIN 5'-0" OF THE UTILITY POLE. THE CONTRACTOR SHALL INCLUDE THE COST OF TEMPORARY POLE SUPPORT IN THE APPROPRIATE BID ITEM. WHERE UTILITY POLES ARE REQUIRED TO BE SUPPORTED DURING CONSTRUCTION, THE CONTRACTOR SHALL MAKE ALL NECESSARY ARRANGEMENTS WITH THE UTILITY COMPANY (DUKE POWER). 14. IF MATERIALS ARE ENCOUNTERED DURING THE CONSTRUCTION THAT ARE SUSPECTED OF BEING CONTAMINATED, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE NCDEQ FOR DIRECTION REGARDING TESTING, SEPARATION, CONTAINMENT AND DISPOSAL PROCEDURES. 15. IF A PROPOSED SEWER CONFLICTS WITH A SUBSURFACE OBSTRUCTION AND WHEN THE MINIMUM COVER CANNOT BE MAINTAINED BY GOING ABOVE THE OBSTRUCTION, THE CONTRACTOR SHALL INSTALL THE SANITARY SEWER BELOW THE OBSTRUCTION MAINTAINING THE APPROPRIATE SEPARATION AND GRADE. 16. CONTRACTOR SHALL REPAIR ALL TRENCH EXCAVATIONS IN TRAVELED AREAS INCLUDING ROADS, DRIVEWAYS, SIDEWALKS AND PARKING AREAS TO MEET OWNER'S REQUIREMENTS. 17. THE USE OF EXISTING FIRE HYDRANTS FOR ANY REASON IS PROHIBITED WITHOUT PRIOR APPROVAL AND PERMITTING OF CHARLOTTE WATER. 18. THE CONTRACTOR SHALL SUBMIT IN ACCORDANCE WITH CONTRACT DOCUMENTS PROCEDURES FOR TESTING OF THE SEWER TO THE ENGINEER FOR APPROVAL. 19. THE CONTRACTOR SHALL BE PRESENT AND ASSIST IN THE FINAL WALK INSPECTION. THE CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT TO DEMONSTRATE TO THE ENGINEER THAT ALL EQUIPMENT OPERATES AS REQUIRED. 20. TO FACILITATE INSTALLATION OF THE NEW SEWER AND APPURTENANCES, THE CONTRACTOR SHALL REMOVE AND REINSTALL, OR RELOCATE EXISTING MAILBOXES, SIGNS, GUIDE RAILS, OR OTHER STRUCTURES AND OBSTACLES ENCOUNTERED DURING THE WORK. NO SEPARATE PAYMENT SHALL BE PAID FOR THIS WORK. 21. ALL OPEN EXCAVATED AREAS SHALL BE ADEQUATELY MARKED, SECURED WITH TEMPORARY FENCING WITH A MINIMUM HEIGHT OF 6 FEET, AND/OR COVERED WITH STEEL PLATE AT THE END OF EACH WORK DAY. 22. CONTRACTOR SHALL REMOVE AND REPLACE CURBS, SIDEWALKS, DRIVEWAYS, MAILBOXES, ETC. TO LIKE KIND CONDITION OR BETTER AS NECESSARY TO ACCOMMODATE CONSTRUCTION OF THE PROPOSED UTILITIES HERE IN. 23. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND FIELD MEASUREMENTS. THE CONTRACTOR MUST CONTACT ALL APPROPRIATE UTILITY COMPANIES AT LEAST A 3 WORKING DAY NOTICE PRIOR TO ANY EXCAVATION TO REQUEST DETAILED FIELD LOCATION OF EACH UTILITY. THE CONTRACTOR IS RESPONSIBLE TO CONTACT NORTH CAROLINA 811 AT 1-800-632-4949 OR 811 FOR UTILITY MARK OUT PRIOR TO THE START OF ANY EXCAVATION WORK ON THIS PROJECT. 24. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PERTINENT TO THE WORK OF THE CONTRACT. NO ALLOWANCE SHALL BE MADE ON BEHALF OF THE CONTRACTOR FOR ANY ERROR OR NEGLECT ON HIS PART. 25. ALL SURFACES DISTURBED BY THE CONTRACTOR WHICH ARE OUTSIDE THE WORK LIMITS OR WORK SCOPE, OR ARE SURFACES DISTURBED WITHOUT PRIOR AUTHORIZATION BY THE ENGINEER, SHALL BE RESTORED TO ORIGINAL CONDITIONS OR BETTER, AT THE CONTRACTOR'S EXPENSE. 26. CONTRACTOR SHALL FIELD LOCATE ALL SEWER LATERALS, WATER SERVICES, AND OTHER SERVICES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REPAIR ANY DAMAGED SEWER LATERALS, WATER SERVICES, AND OTHER SERVICES AS A RESULT OF CONSTRUCTION AT HIS OWN EXPENSE. 27. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY, WITHOUT INTERRUPTION TO EXISTING SANITARY SERVICES. THE CONTRACTOR SHALL UTILIZE APPROVED BYPASSING TECHNIQUES IN ORDER TO PERFORM SAID WORK UNDER SAID CONDITIONS. ALL PROPOSED BYPASSING TECHNIQUES AND EQUIPMENT SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO THE START OF THIS WORK. THE COST FOR THIS WORK SHALL BE INCLUDED IN THE UNIT PRICES BID FOR THIS PROJECT. NO ADDITIONAL COMPENSATION WILL BE PROVIDED FOR THIS WORK. 28. IN THE EVENT THAT A SERVICE MUST BE INTERRUPTED, THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO NOTIFY THE RESIDENT OF SAID INTERRUPTION. IN NO CASE SHALL ANY SERVICE BE INTERRUPTED FOR MORE THAN 6-HOURS, AND IN NO CASE SHALL THE INTERRUPTION EXTEND BEYOND THE END OF THE WORKING DAY. IN THE EVENT THAT ANY INTERRUPTION CONTINUES FOR MORE THAN 6-HOURS, THE CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES. NO ADDITIONAL COMPENSATION WILL BE PROVIDED FOR WORK ASSOCIATED WITH ALL SUCH TEMPORARY SERVICES. 29. WHEN WORK INCLUDED UNDER THIS PROJECT, AS INDICATED BY THE PROJECT CONTRACT DOCUMENTS, REQUIRES THE REMOVAL OF EXISTING PAVED SURFACES, TO INCLUDE BUT NOT BE LIMITED TO, ROADWAYS, DRIVEWAYS, SIDEWALKS, AND PARKING LOTS, THE CONTRACTOR SHALL BE REQUIRED TO SAW -CUT THE LIMITS OF THE PROPOSED EXCAVATION PRIOR TO EXCAVATION OF SAID AREA. THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE AND MAINTAIN TEMPORARY RESTORATION OF ALL SUCH AREAS, UNTIL PERMANENT RESTORATION IS PROVIDED. NO ADDITIONAL COMPENSATION SHALL BE PROVIDED FOR ALL SUCH SAW CUTTING AND TEMPORARY RESTORATION. 30. SUBSURFACE INVESTIGATIONS HAVE BEEN PERFORMED IN THE AREAS IN WHICH WORK IS PROPOSED. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE IF ANY ADDITIONAL SUBSURFACE INVESTIGATIONS ARE NECESSARY. NO ADDITIONAL COMPENSATION WILL BE PROVIDED FOR ANY SUCH WORK. IN THE EVENT THAT TRENCH EXCAVATION BECOMES DIFFICULT DUE TO THE MATERIAL ENCOUNTERED, THE ENGINEER SHALL DETERMINE WHETHER ADDITIONAL COMPENSATION SHALL BE PROVIDED FOR ALL SUCH EXCAVATING. THE CONTRACTOR SHALL REFER TO THE PROJECT SPECIFICATIONS FOR FURTHER INTERPRETATION OF WHEN SUCH ADDITIONAL ALLOWANCES WILL BE MADE, AND WHAT IS CONSIDERED "ROCK" EXCAVATION. 31. UNDER THIS PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE TO RESTORE, ACCORDING TO THE PLANS AND SPECIFICATIONS, ALL AREAS DISTURBED AS A RESULT OF HIS WORK. 32. IN ALL CASES WHERE THE PLANS AND SPECIFICATIONS VARY, THE SPECIFICATIONS SHALL PREVAIL, UNLESS OTHERWISE ORDERED BY THE ENGINEER. 33. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR, TO THE EXTENT SPECIFIED BY THE ENGINEER, ALL DAMAGED PAVEMENT AREAS, (OUTSIDE THE LIMITS OF EXCAVATION) DAMAGED AS A RESULT OF HIS (OR ANY OF HIS REPRESENTATIVES) OPERATIONS. NO ADDITIONAL COMPENSATION WILL BE PROVIDED FOR ALL SUCH WORK. 34. CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS FOR STATE, COUNTY AND CITY. 35. ALL SEWER MAINS SHALL MAINTAIN THE MINIMUM SEPARATION REQUIREMENTS AS SET FORTH BY THE NCDEQ STANDARDS, CHARLOTTE WATER AND SEWER POLICIES, PROCEDURES, STANDARDS AND SPECIFICATIONS MANUAL, MOST RECENT EDITION. 36. ALL PAVEMENT MARKINGS SHALL BE RECORDED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION AND REPLACED TO PRE CONSTRUCTION LAYOUT AS APPROVED BY THE ENGINEER AND OWNER. (IF NECESSARY) 37. THE CONTRACTOR SHALL MAINTAIN TRAFFIC THROUGHOUT THE LENGTH OF THE CONTRACT IN ACCORDANCE WITH THE REQUIREMENTS OF DIVISION 11 - WORK ZONE TRAFFIC CONTROL OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES AND TOWN OF MINT HILL STANDARDS AS THEY APPLY. 38. PRIOR TO THE START OF ANY CONSTRUCTION PHASE, ALL PROPOSED MAINTENANCE AND PROTECTION OF TRAFFIC RELATED WORK SHALL BE COMPLETE. THIS INCLUDES, WHERE APPLICABLE, ALL SIGNS, PAVEMENT MARKINGS, BARRIERS, DELINEATION (CONES, DRUMS, ETC.), PAVEMENT MODIFICATION AND OTHER RELATED WORK. 39. THE CONTRACTOR SHALL POST WARNING SIGNS AT ALL APPROACHES TO THE PROJECT AND AT CONSTRUCTION ENTRANCES. THE CONTRACTOR SHALL PROVIDE FLAG MEN WHEN AND WHERE NECESSARY. 40. CONSTRUCTION INGRESS AND EGRESS - THE CONTRACTOR SHALL KEEP TO A MINIMUM THE MOVEMENT OF CONSTRUCTION VEHICLES AND EQUIPMENT IN AND OUT OF DESIGNATED TRAVEL LANES. ONLY NECESSARY OR AUTHORIZED VEHICLES, AS DETERMINED BY THE ENGINEER, SHALL BE ALLOWED TO ENTER THE WORK AREA. 41. PUBLIC INGRESS AND EGRESS A. THE CONTRACTOR SHALL MAINTAIN ACCESS TO EXISTING PARKING LOTS AND DRIVEWAY ENTRIES AT ALL TIMES. B. THE CONTRACTOR SHALL PROVIDE PROPERTY OWNERS WITH PROPER ACCESS AND MINIMUM WIDTHS FOR THEIR DRIVEWAYS ACCORDING TO THE POLICY AND STANDARDS FOR ENTRANCES TO STATE HIGHWAYS AND SHALL MAINTAIN THEM THROUGH ALL PHASES OF WORK AND SHALL DELINEATE THESE BY MEANS OF SIGNS, CONES, AND/OR DRUMS. C. WHERE DIRECT ACCESS TO DRIVEWAYS IS NOT POSSIBLE DUE TO NECESSARY CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL PLAN ALTERNATE MEANS OF ACCESS AND SUBMIT SUCH PLANS TO THE ENGINEER AND CITY DPW FOR REVIEW BEFORE OPERATIONS COMMENCE. 42. PORTIONS OF THIS ALIGNMENT PASS THROUGH EXISTING ACTIVE HORSE PASTURES. WHEN WORK IS PERFORMED IN THIS AREA LIMITS OF CONSTRUCTION SHOULD BE ADEQUATELY FENCED AND PROTECTED TO PREVENT THE ENTRY OF ANIMALS ON ALL SIDES OF THE WORK, THIS INCLUDES ANY TRAVERSING ACROSS EASEMENTS. 43. CONTRACTOR SHALL RESTORE EXISTING FENCES, UNLESS SHOWN OTHERWISE, WITH EQUAL OR BETTER MATERIALS WHEN TEMPORARY FENCING IS REMOVED. STEVENS CREEK PHASE 2 MANHOLE SCHEDULE MH NAME STATION MH TYPE SIZE & MATERIAL RIM COVER TYPE FRAME mn-VI Au-rvv.VV rRGli/iJI It UUNLOMLIC VVI.VV 6vG1YIL✓f I IrG D MH-02 A4+12.24 PRECAST 4'0 CONCRETE 666.24 (WATERTIGHT) TYPE B MH-03 A8+45.95 PRECAST 4'0 CONCRETE 666.68 (WATERTIGHT) TYPE B MH-04 All 1+87.72 PRECAST 4'0 CONCRETE 672.34 (VENTED) TYPE B MH-05 A13+74.80 PRECAST 4'0 CONCRETE 674.49 (WATERTIGHT) TYPE B MH-06 A17+84.19 PRECAST 4'0 CONCRETE 673.61 (WATERTIGHT) TYPE B MH-07 A20+19.63 PRECAST 4'0 CONCRETE 676.95 (WATERTIGHT) TYPE B MH-08 A22+62.94 PRECAST 4'0 CONCRETE 682.38 (VENTED) TYPE B MH-09 A24+69.41 PRECAST 4'0 CONCRETE 680.69 (WATERTIGHT) TYPE B MH-10 A27+47.88 PRECAST 4'0 CONCRETE 691.22 (WATERTIGHT) TYPE B MH-11 A29+62.39 PRECAST 4'0 CONCRETE 685.55 (WATERTIGHT) TYPE B MH-12 A31+98.18 PRECAST 4'0 CONCRETE 684.12 (WATERTIGHT) TYPE B MH-13 A33+69.19 PRECAST 4'0 CONCRETE 686.28 (VENTED) TYPE B MH-14 A36+60.14 PRECAST 4'0 CONCRETE 688.71 (WATERTIGHT) TYPE B MH-15 A38+49.57 PRECAST 4'0 CONCRETE 690.13 (WATERTIGHT) TYPE B MH-16 A41+31.69 PRECAST 4'0 CONCRETE 693.59 (WATERTIGHT) TYPE B MH-17 A43+17.48 DOGHOUSE 4'0 CONCRETE 694.53 (VENTED) TYPE B MH-18 A43+52.36 PRECAST 4'0 CONCRETE 695.19 (WATERTIGHT) TYPE B MH-19 A43+72.49 DOGHOUSE 4'0 CONCRETE 696.47 (WATERTIGHT) TYPE B MH-20 C1+10.12 PRECAST 4'0 CONCRETE 732.32 (WATERTIGHT) TYPE B MH-21 C1+78.12 PRECAST 4'0 CONCRETE 727.52 (WATERTIGHT) TYPE B MH-22 C2+35.12 PRECAST 4'0 CONCRETE 726.76 (WATERTIGHT) TYPE B MH-23 C2+78.95 PRECAST 4'0 CONCRETE 731.04 (WATERTIGHT) TYPE B MH-24 C3+41.45 PRECAST 4'0 CONCRETE 735.96 (WATERTIGHT) TYPE B MH-25 C5+33.25 PRECAST 4'0 CONCRETE 745.35 (VENTED) TYPE B ABBREVIATIONS ABD = ABANDONED APPROX = APPROXIMATELY DIA = DIAMETER EL = ELEVATION MIN = MINIMUM MH = MANHOLE SS = SANITARY SEWER TYP = TYPICAL W/ = WITH YR = YEAR GHD Consulting Services Inc. 222 South Church Street, Suite 400 Charlotte NC 28202 USA T 1 704 302 4910 W www.ghd.com A CITY OF CHARLOTTE DEPARTMENT EXISTING MINT HILL COMMONS rl O Q oZ✓ > �- - PUMP STATION PROPOSED 8" SS SHEET 12 ED LLo OAK DRI I I ° ° Q � �� �' / o \ / SHEET 11�I► / o 0 0 \,\�\ '' �%\ � rl �IQ Y \ \ \ � _ \ —` \ EXISTING 8 SS \/' /p EXISTING \ \ A MANHOLE (TYP) F. \ \ N -n SHEET 9\�- o ✓� / EXISTING CHEVAL r — \ �_ P STATION - PUMP _ON O ` a i �° ° �i — � � � 1 �� EFPROPOSED 12 SS L] AVENUEell °o ro 017 —3I \ PROPOSED —� - ❑ - 1 ' I MANHOLE (TYP)\� '� ► I o _ `j \ , . - _ - [�° ❑ I - - — \ / / \ i CS L, I- d_ _ _ L � a / d \gyp I 407 <5> . . ... \ v \y / i <n\ i \ ✓ C� \ S{�` i ' / / / //)�\� COY \ ' < � O 0 q� V �\ �/ \ ` STEVENS CREEK 'O /\\� \10 o PHASE 1 12" SS / ✓ �\ ./ \ C _ ? \ i \ \ _' /C \ �\ \ / \ i ��\ \ / i it 1 -- / �. \ / /\ \ \ / \ / KEY MAP i / 1 Know what's below. Call before you dig. I 1 ' I I I I I I I , I I I I / I I GHD Consulting Services Inc. 0 400' 800' , 222 South Church Street, Suite 400 Charlotte NC 28202 USA T 1 704 302 4910 W www.ghd.com B ID7 /191 JAM 100% DESIGN A CITY OF CHARLOTTE DEPARTMENT Q PCQ �C4 > N ' * CN N M 00 O �OOco co Q�Q. O �Zco +to Q. Z mk 7 7 01 of La V) Ilk z 0O 0 2 0 + Q Q U to o co Z 1-- c0 w EXISTING GRADE Q i- w II Q N \= 2 AT CENTERLINE (APPROX.) ((n Uj of 100 YR FLOODPLAIN HAZARD AREA (TYP) ' LJ EXISTING TRIBUTARY STEVENS CREEK BOTTOM (APPROX.) _ MIN. COVER 3.0' - -_ .- - -- - PVC SANITARY SEWER PROP. 1 2" PROP. /N 5 ®0.80% 11 I� OUT I= 1.1 = 651.86 1350 PROP. PROP. 12" PVC SANITARY SEWER FFTT PROP. PROP. I IN OUT I = , 648.139 = 648. i 9 ®0.73% PROP, IN - 645.19 PROP. OUT = 644.99 1 Op I A0-- T _+4_3 - 0 7 - - C TBM #1 NAIL IN 20" HICKORY EL = 662.07 / 662.07 _ NLS-TBM _..._. _ i / / ExistiAg ��\- LOT 223 I� THE MEADOWS AT CHE%// AL Stevens Or Trib 100 YR FLOODPLAIN f ,. _ __ \\ �, - _ _ -.. I - _ - - / MB. 60vPG 518 _ ��. HAZARD AREA (TYP)0000, r 670 l�- \ REINFORCE STABI ZAl10N\ \ 4d' OUTLET (TYP) SEE DETAIL SHEETL PID 19508131 �J \ � -,� � j/ \ � � �- � , �� �1i 1 / � � 1 `� J \. i ��i �\ \ � � \ '- 0 / .. // _� _ �\ _ \ \ \ Q ~' ASSOCIATES, LLC _ _� \ ` DETAILSTONE SHEET22 )// \. \ _ . /... _. ,•y SS CIATE CHEVALPG C� X PROPOSED 424 / \ \ I / %/� `) - 1 //� \ \ f y�.4� v � I / `\ _SEE J - STA. A8+45.95;, -{Lo , 5MB 44, P\ 425 r i ,...,. \ %�/f / l DIA. MANHOLE MH-02 'T v TEMP. DIVERSION DITCH (TYP) \ ) l �'. \\ / / PROPOSED 4 \' \ O) TEMPORARY ROCK -� SEDIMENT DAM W/WATERTIGHT SEE DETAIL SHEET ✓� �. A ^- DIA. MANHOLE MH-03 STA AO+00.. �.\ \ \ , / / - `\\ //l \ . ..\ /f y/ / \�` =�.� _.. / / / f WEIR = 4 FRAME & COVER / / \� L1 BEECH MINT PLANTATI ♦ PERMANENT SEWER L W/WATER TIGHT 7 �..$ . ;�\�- �i� TYPE B EXISTING 4 r�/, / ��_ - = SEE DETAIL SHEET (TYP) / k 1 DIA. MANHOLE MH-01 ` 10069 , '� _ / I J EASEMENT (TYP) THE MEADOWS AT CH AL L �= PID 19507114 FRAME &COVER `— \. ✓i ' Y — � 659.75 \ i / JN�-TBM �` I k 1 • W/VENTED I TCE— IN OMHICKORY l • ICE .—r- TCE . • TCE• MB. 60, P 896 \ 1 �� %' NAIL i EL=659.75 \ ZCE•.'--^7p;�;• FRAME & CO VER - L l �� ?�� ; . ' .. -- RS-OC .. . TCE .. TCE CE T ° - CE T•:' :' r[� :_'::;:.:;::• �'• 7CE— E T °T TCE' y 'J W f ^� Ljj / L 1 .TCE • T -� I -� ZGE..; :; :� :; :; : - / `` :'•_.�►::� TtX— • T :' ::' :' :' :' :' :' :' _. P�SUE FD'. :' T '— jA'4+00 PSUE� .'-' D T TCE. x I I ( J 7 x L TCE•. �:. �. W Tc r :j.• .; .• TCE A5+00'- PsUE -- - � _ 7CEDow. • : /. ; : ; . °. : ; :: ' SCE .' SSE,-� TG i., :: •: •:' .' �: :' : ' �r TCE..' �.. ,..;;�;:;;:: :: :• i:;: ; �, :• :. �.• .• .RIU S10.28134" Ai+o NOTES: :%:'•::;.:;.:;..;'.:ICE 7 TC kp3+00 � • • • • • • ; • : • : ; • • • • PsuE. 43.3.71, o As+oo ps U BH- 1. PRIOR TO CONSTRUCTION CONTRACTOR SHALL T. _. (: • :: PsuE .,: ; ° :/.: • T :._ .. •. •.�EPROPOSED_ cE • • k J10E = 12" S I - --AN TARY SEW t ��. WORK WITH PROPERTY OWNERS TO PROVIDE . • . • • .:� • :.: , , E S 55 59 T E: _ FcE ::. --ER X -. —.—r—. o � TEMPORARY FENCE AND FENCE RELOCATIONS �:: ; :' • . • :� : ' : � 412.2 SEINED uE x � � � � / ` � E E Tce - � . k TEE' . ' : ': ; ; : ; ; ::. ; AS SPECIFIED AND IN ACCORDANCE WITH PSUE . • 12'a SANITARY _ \ PSUE �- �x x X x CE IC7 :: -�'' r '' •- T�" fD' CONTRACT DOCUMENTS. "•�FENCE \�\ �` - -('SUE REPLACEMLOCATION ENT i I - -f - -� -% ° / -x L�� x - > ` \ \ ° SILT FENCE EE DETAIL S EET \' `� - / + - - TEMPORAL ONSTRUCTION ®' _ _ EASEMENT (TYP) eS BHI STEVENS CREEK TRUNK - -CONTRACTOR SHALL CONFIRMSEWER - PHASE 1 PLANS ��AS-BUILT ELEVATIONS ONFOR x\100' 91- BUFFER LINESEE DOWNSTREAM SEWER, MH-01 AND NOTIFY ENGINEER ' J - \ / ° -/ \ CHARLOTTE WATER JOB OF ANY GRADE CHANGES \ - - \ - NUMBER 7030700047-17-503 REQUIRED. .- - - -� - - - \ \ I \ _ / / x ~ /�\ 1\ I _ _ -670 �� x \ x / PARTS FA ILY LLC \ / X. ° -// / / GHD Consulting Services Inc. 222 South Church Street, Suite 400 , Charlotte NC 28202 USA PID# 19507103 / / T 1 704 302 4910 W x \ \ DB PG 724 x \ \ / www.ghd.com MB443-5737 \ —x \\`\\ CHARLOTTE CHARLOTTE WATER /,/x'- `\ �� \ ` `� � / x � // / /,' / ``\ - `` ` \ \ x \ W TER � x � � \ _ _ -� / \ I / � / / / 6j5, \ \ \ \ / , � ' /'' � � �' CHARLOTTE NORTH CAROLING _� _ _ x �a A x �x — r -675, \ 11144299 STEVENS CREEK x UNPAVEDx x \ \ �x— fix— ° I\\\-/� / I J / ` \ \ \ Job No. File No. x — \ / / / x 7 Scales CANo PLAN 1" = 40' TRUNK SEWER PHASE 2 a x x � \\ ,\\ I ��� Know what's below. PROFILE _ xl I �- x x \ 1" = 40' Call before you dig. PLAN AND PROFILE x - x Vert 1" = 4' STA AO+00 TO STA A9+00 \ As Built Dote \\ B 7 1 JAM 100% DESIGN L. ASSOC JEM Sheet CJS BMG 11 19 4 Of 2 No. Dote By Revision Surveyed By Designed By Drown By Project-Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT O 00 00 ����' BOA 8 + W'jLQ �' �t==C)� 8 00 N y JWco Q�=Q� II Q �Q\�� + O�FZZI� y J�Q�o Q�O�3LIJ II Cp 0 EXISTING AT CENTERLINE GRADE (APPROX.) E170 I I I I ir 7 I EXISTING STEVENS CREEK co TRIBUTARY BOTTOM (APPROX.) MIN. COVER 3.0' i- - - -- -- - -- -- - -- -- - - -- -- - 100 HAZARD YR FLOODPLAIN AREA -- -- - -- -- - -- -- - -- __ _ 6 12 DIP SANITARY SEWE 6 PROP. 00.80X PROP. t IN = 660.17 12" DIP SANITARY SEWER PROP. OUT = 659.97 PROP. 12" PVC SANITARY SEWER ®0.80�' PROP.I �I IN 656.69 PROP. PROP. IN = 654.99 PROP. OUT = 656.49 _ PROP. OUT = 654.79 -- 10 1 1 12 13 14 15 16 17 18 00" 0 0 -675" \✓ `e LOT 223 �i/%�i�—;=�� _/ _1 / THE EADO S AT CHEVAL �\ \ \\ _g% ���� \ ��--_ MB. 60 PG 518/// / • �\ \ _ - - - _ _ _ /i ri / STA. A 17+84.19 - ° _ __� - -- - -__-- PROPOSED 4 _ IA MANHOLE M - , ° �� \\�\ \ t^)- \ TEMP. DIVERSION DITCH TYP - _-�`\�\ \� \ _ _ — �\ __\ \ _/\�f i%/ / W WATERTIGHT 6js� / , SEE DETAIL SHEET Z \ REINFOR6iE STABILIZATION�i .� -...� \ \ / \ \� _ \ _ —\ / \/ // i/ // \, , \ \I i FAME &COVER � `� OUTLET TYP 665- • ( ) > �— CF \ \ ` l \ 87 / I 11 I i C • SEE DETAIL SHEET 2� tcF STONE CHECK O \ SEE DETAIL SHEET Tc� -�.T O / \ In �� _ _ �.. `�� \ ; . NAIL IN CEDAR ` / s1 • . • t; • . .rC EL 670.89 / m / \ �G�' A18♦00 .34 �� E` xp'0 c \ 8' 0 :.: ; ; i�rj�R : ' h \ \ TEMPORARY EROSION \ 7Q ' ' 2� CONTROL MATTING (T1fP.) 8 �� f'; r"' \� I — - ` 1 SEE DETAIL SHEET . ' p: ti� O :. \\�`' / R // } \ • : '\. 10071 r 670.89 �\\ GE' s : 10• yo`� ) NLS TBM //\ `�� I �� 11 P`�`� • ' (/ / 1: . /\ j O O I ; / 1 / qr / 1: / _ / /y /j; / / / `� \x // 0 _ _ — �% \ _ /...' rl1J �cE: :':X'' '' / `— (n W NOTES: 1. PRIOR TO CONSTRUCTION CONTRACTOR SHALL /� h.;: x.• x GV �/ \ /l 0 ` �2�k ^ F• �.. �� i SILT FENCE (TYP) SEE DETAIL SHEET 21 \ — �i/% 1 \ :: �s�. ; • . ; • \ , /� I� WORK WITH PROPERTY OWNERS TO PROVIDE \ ROSION MATTING (TYP) :' : SUE• • : • . �!% \ `t �// SHEET 23 '' '• :;;•: \ 0S 1 \ Mba ARY ROCK^• k I ;'SEDIMENT�DAM ccF :;• �.' ':� / ' \ (n TEMPORARY FENCE AND FENCE RELOCATIONS AS SPECIFIED AND IN ACCORDANCE WITH — �EE�ETAIL _ r _\ _/ \ \ - - S ;:..;'' :•rc ' • : ; : �\ �2� 9+ WEIR - 4 ''`6k 5 9.3 \ \ —TYPE B / z _ CONTRACT DOCUMENTS. _ ` / , , _ �� _ — \\ \\ \\ \ \ _ �' • ' �. ?QUO rcF (TYPE P� q �c�./ �� \ f // / LLJ k \ \ \ STA. A 11 87.72 �.♦.�• : •.. \ .; 0 67 \ � PROPOSED 4 _ kI— -DIA. _ / / 1. .._... �� U ,,� MANHOLE MH-04Al W/VENTEDa�o��,4 Ar 0 40' 80' \� \\� \\\ -�� �� \��, FRAME & COVER _ . x�� xoo 0 :�\ ;:.ON _ —�\ - _ x �.. ::; ;•.• — // -717 1 �\ Consulting Services Inc. PARIS FAMILY LLC pq \ \ \ \ \ PID#/ 19507103 • } .� \ \ C, !;'.•;•'P1kX �' ,! \ / / _ \ — DB 25497 PG 724 j l \ \ \ \ MB 43-573 _ , 222 South Church Street, Suite 400 Charlotte NC 28202 USA T 1 704 302 4910 W www.ghd.com \ �\ ARMORFLEX 30—S S 1= DETAIL SHEET 24 x—��� ' EXISTING 60' LEVEL SP ADER -®'� _ — \ \ — — — -_ _ / — _ CHARLOTTE CHARLOTTE WATER \ >� k \ \� �\ \ �— k _ _FENCE REPLACEMENT- _ _ - LOCATION WJ)T E R �\k STA. A 13+74.80 \I /�� �-�T �- - - - _ _ - - - ° - / • CHARLOTTE, NORTH CAROLINA PROPOSED 4 k DIA. MANHOLE MH-05 ,BSA' _- _ - _ , \ / i 100' BUFFER LINE ° \ \ ® 11144299 Job No. File No. STEVENS CREEK k W/WATER TIGHT FRAME & COVER Ic soles 1" 40' TRUNK SEWER PHASE 2 k\ PLAN = a a Know what's bellow. PROFILE 1" = 40' / Call before you H or. dig. g PLAN AND PROF/LE / \ Vert. 1.. = 4' / \ STA A9+00 TO STA A 18+00 As Built Dote / B 12 18 JAM 90% DESIGN L. ASSOC JEM sheet Of CJS BMG 11 19 5 28 No. Date y Revision DBR Surveyed By Designed P By Drown By Project-Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT 9 1390 ep OOj O0 O iZV0) Zts O_4Lai Ilk � II w I 00 ��OcMV• N WWWt Q�ODZ II ti ���� �Vto � Q - N L JacQto Q OD~� II Q �Q\Q� ���� to 0� 8 8 y 101C 3 GRADE • JOLI CHEVAL LANE EXISTING AT CENTERLINE (APPROX.) - O LLJ EXISTING TRIBUTARY MIN. COVER 3.0' �- im STEVENS BOTTOM CREEK (APPROX.) _ -- - PVC SANITARY SEWER -- - -- -- 12" - - __,--- PRO --------- SANITARY SEWS ®0.809' 12" PVC PROP. 12 " PVC SANITARY SEWER ®0.80�b PROP � IN 666.25 PROP. PROP. OUT = 666.05 VC SANITARY SEWER ®0.80 0 ---PROP. PROP. E FL IN OUT I = 1664. = 664.20 40 PROP. 12 PROP � IN � 662.25 - ®0.80�b 6 PROP. OUT '662.05 6 18 19 O 1 2 3+ 4+ 5+ 6+ 7Ln — / 0 /��—//-- = 680—� c� -�- —+ — \\ /— \ / _-'°/� //�—gip,/� — /—� �_\ /�--\-- --. �/ / / CHEVAL PROPERTY \��-_—_—,�_=_=gg0_ _=�____ / /uNPAVE� / 66-5 - _ -/ / - / // OWNERS AeOCIATES INC -_--__-_-_-_ PID# A3S'J395 �, _ ° CHEVAL PROPERTY V / / // ° / - - _ ar� lr DB 32382 PG 643 OWNERS ASSOCIATES INC- / / / _ / / -- - �� _ / e�0 MB 56-164 PID# 19507395 - -` / -'--------- - / \ \ \ ���-_---6__-- -_ _ _- - - - - - - - - - - STA. A24+69.41. / -_ = _ ) q11 /DB 32382 PG 643(0 KAB 56-164 ` \ PROPOSED 4 DIA. MANHOLE MH-09 _r STA. A20+19.63=; —=- �\ � ,�� \\ \ W/WATER TIGHT / / -PROPOSED 4 �✓\ \ \ 1 \ REINFORCED STABILIZATION / MANHOLE MH-07 ti FRAME & COVER 10072 /'DIA. \\ . I ` _ _ OUTLET (TYP) \\.� 1� —6� " \ SEE DETAIL HEFT Z s7s.o9 1--\ NLS-\M _ \ ;I\\ — �'W/WA TERTIGHT Tce �1� — (\ ` I / — \ M AMP. DIVERSION DITCH (lYP) \` - / ,,FRAME & COVER �� ; ', \ ,\` �_ NAIL IN 29"GUM EL=678.09 i >_ / )r ,/l/ ) •: ; : ; : • . • T \ \ �� -r ._ \\ \\ �i r /� / �Sf` ' . Cl ; : ; :: • • : ;' : F': ; \ \\ \� - = \\ %I I ' � •• :•: � � SEE DETAIL SHEET ?A / / — — ERI C & JENNIFER LAZO ve / S # 19507365 _ - _.. PID • �- �. / Cyr - \ / �1.- DB 29005 PG 277 'rib \ O / \\ / : �. � • • ���- —/� � —. � \ _ ��... � � � \ � _ MB 53-484 O —\\ .`: ; . ; ,,fix F MPORARY EROSION \ / pry .:�� CONTROL MATTING TYP. \/ INSTALLED -� )TEMPORARY ?a 0 BE \\\VIA OPEN CUT UNDER � ` • . p 9 :: ; :: • .. SEE DETAIL SHEET \ ?��21�SEDIMENT �`� / ROCK ,Jr\\.. i r �� HEV NE . • ?? ) _ \ \. �DAM WEIR = 4 / //l SILT FENCE (T�) • T T \\ — \I : ; .: :: ' . • N/p — � `�:;•::•::•::•• TCF• S � J f TYPE B _.. _ SEE DETAIL SHE SEE DETAIL SHEET � (TYP) •. ..CF �- � � � � • \ \ \ �. . • / \ p T ° \ fj _ — / _— 1c� •--.1eElit 1111 •q22 `/ � I II I �\ \ _ \ � O. � �j cF: • .k• o 0--:675� � — *v �•, � F.\ i ' � — \gyp � � ``. \\ \ — / v/ ' NOTES: :.. •.r _ / / \\\\.��\ I �V p24+00 q2S' - Ooi' ss i / \ �` 4 1. PRIOR TO CONSTRUCTION CONTRACTOR SHALL +00 E '4f"E TC — \\ ��\ �/� \ \ �� �`�\\`'���� S09 04 E• f '' :;,� X. • \..,_... WORK WITH PROPERTY OWNERS TO PROVIDE TEMPORARY FENCE AND FENCE RELOCATIONS �� 1 \ \ *6 56 ' ( Tcf :! : ; .• .• �y \ \\ \ 6 ) /�' pc '' y •. 206.47 EWER • : � •�• • �• � : • • `— — - — � � � SANITARY � /•:••�•j.��-:-: • � (� SED_12.-: ..•.•• �' `•�:••.r•:;•.•• ''�I����''• ' � �_- oeo • ... : • .::. • ' Sys. . ; : — -- , , P Ye ?s�&P P 4ps? i '•....� :., y� r ` — ^ �/ cE / / — \ �.TEF :. ';•— . . oSE� ?�8 /y %42sxp : ✓ _ / ' ' AS SPECIFIED AND IN ACCORDANCE WITH CONTRACT DOCUMENTS. O % �Q 3d 100' BUFFER LINE / / /4- / / cF ``._ •TCE'.� Tc '� \ _ �� — / — � \ _ _ _ :. • :. .5 ty -. ; . T (/� 0 40 80 \ - _ W� \ f STA. A22+62.94 — PROPOSED 4' 1• — DIA. MANHOLE MH 08 -c•� — — I / GHD Consulting Services Inc. f %� / / c�\ W VENTED / — -- , _ — _ - / / / _ — — \ / / / / , 222 South Church Street, Suite 400 /� _ Know what's below. Charlotte NC 28202 USA FRAME & COVER Call before you dig. T 1 704 302 4910 W www.ghd.com \ STEVENS CREEK ASSOC LLC \ CHARLOTTE PID#19505131 CHARLOTTE WATER \ DB 18751 PG 36 MB 43-903 W TER PARIS FAMILY LLC PID 19507368 & 19507399 DB 17710-978 & MB 56-160 & ° �// x / CHARLOTTE, NORTH CAROLING MB 63, PG 931 I �^" {, — 11144299 I Job No. File No. STEVENS CREEK PLAN Scales 1" = IPROFILE 40' TRUNK SEWER PHASE 2 Hor. 1" = 40' 1" = 4' PLAN AND PROF/LE Vert. STA A 18+00 TO STA A27+00 ' As Built Date B D7/19 JAM 100% DESIGN L. ASSOC JEM Sheet Of CJS BMG 11 19 6 28 No. Date By Revision Surveyed By Designed By Drawn By Project-Engr Approved By Date A CITY OF CHARLOTTE DEPARTMENT Op- Q O w ap eF :t N JO LQ QW cIoN y "iW Q�p � to �:x p2Q ' + Q W pN�O eF=CjN to �'� Q Q00 CO 4 ~Zu0 N y J�Q�o op" =VN °' ��2Oef M NW.W �I�=W 9 Q�QL II + II , 9 M JQCQco � W ����� QIpZ�Q FT I GRADE EXISTNG AT CENTERLINE (APPROX.) MIN. COVER 3.0' 8LiJ STEVENS CREEK �� 8 EXISTING �_ _ - -- -- - - -- - -- -- - -- -� TRIBUTARY BOTTOM (APPROX.) �� 12" PVC SANITARY SEWE II I- '- - -- -` PROP. PVC SANITARY SEwE 00, 8ox Cn 12 PROP. 12" PVC SANITARY SEwE ®0.80 o PROP. -IN = 674.26 PROP. PROP. OUT - 674.06 PROP. 12 PVC SANITARY SEWER ®0.80 o PROP. FL IN = 672.69 7 PROP. f IN __ I 670.61 PROP. FL OUT .= 672.49 7 PROP. I FL I OUT = 670.40 ®0•80�° FL IN = 668.68 PROP. I FL I OUT = 1668.148 PROP. 7 8 9 O 1 2 3 4 5 6 10073 / 683.76 NLS-TBM TBM #4 NAIL IN 30"GUM EL = 683.76 \ \ \ _ BAINS FARM INC. DB 28946 PG 867 1 \ \ MB 58-407 ERK Lg8O2EN REDDING __-STA. A31 +98.18 \ _ _ PID# 19507364 _ DB 28954 PG 670 _ _ _ PROPOSED 4 MB 53-484 ; = DIA. MANHOLE MH-12 �- --- - -'%._- �_✓_ _ 111. W WATERTIGHT / ) /J/� iIJI I f \ — — 11�� \ \ PAUL & MEREDITH / / I < LEDFORD & COVER 1 lc� I I \_ \ \ \, PID 19507361 _FRAME \l I ;rrF SILT FENCE TYP) SEE DETAIL SHE • \ EINFORCED STABILIZATIONOUTLET / � •q`i2� •' • . . �cF \\V. � \ \ � \ � / -- — � � ` — � � � � � � � •' 0 / � / SEE DETAIL�SHEET �... ' _` �/ \ �• :: • • :::'::::: P� :: •• _- TEMP. DIVERSION DITCH (lYP) _ —SEE DETAIL SHEET � //� _ STA. A29+62.39 /� '- // asv �\ \ STONE CHECK DAM TYP / PROPOSED 4 ' �j / / ^ �c� 0 'TcF \� _"' SEE DETAIL SHEET / ( O V `C J / P D/A. MANHOLE MH-1101 Z.Z 9, \ \� iJ \��\� �� ' ` 6- _ r i ': :::':: 55 — �� _— `_ ��.. • 235• F '\ - �- / ,. �\ Q' �\ -W/WATERTIGHT r ,� i� , j �.� FRAME &COVER - �� / cc �� E �. ::: • .:. Os, :::. \.. �-. CO 00 / c3�:: P c . �O, ' ':::::: r MPORARY ROCK ::::'. • >> �pq3 cF. SEDIMENT DAM /:. F'%; NOTES: .:: __. �c� 'BOO, h-`;xOp' WEIR = 4. - Q O �,.- _ / �. •� — _ cF : • : ; TYPE B / qa _ F SEE DETAIL SHEET (TYP) I z �_ _�?cE ,_. Q \G� '' c� _ `�'' 7c 1. PRIOR TO CONSTRUCTION CONTRACTOR SHALL WORK WITH PROPERTY OWNERS TO PROVIDE TEMPORARY FENCE AND FENCE RELOCATIONS po / ` - - /' - - �' ?cE -- L ' ' '�(� T�=�.:::r Tce.— AS SPECIFIED AND IN ACCORDANCE WITH G lI .\ _ / - T_ \\ — •TAG E.. ox , .. • EE _ _ :::. • is ?fir ; : ' �_ .6W �_ ` A34+00 Tc� .-- -T CONTRACT DOCUMENTS. �/ \ \ i �� T E �� TC :: — — i = _ _ — — \ F P� — \ \ -• rcE �r xcE"• psU��� 4 _ / _ — — — \ \ \ cF S21.19'32 Psu� yF '. -` A29+00 — / _ — — — — \\ V 290.95' A36+00 7 \\\\ \TcF: :�.T �: SEQ 1?.�N1T!QY S 4 *49 c ii —_-- __/—_�----- \ • : • A28+00— —j F 214.51 Ens --:=.. E / / / / --� L \�\\ \�—�,_ 'zi /: 0 ��--�_�_—� �� ��—\_ �==' cE\ Tce'— r'::::••--•.'••'asuE _ _ Yce I I r / -690 - - - \ \ - I TeE _. 7cE :' L J , 0 40 80 • :' •;�• :' • Tc -� / / _ _ _ - \\ - - �� -�U � • ////' �. :�•::.:�:'••i !fCE.,�.fCE' \ \`- // / / /�-' /� /J-- STA. A33+69.19 \!► --,_^\ \\ �� ��------'� / —�' s /' / /// - // �- __ PROPOSED 4 \����� -/� -��-� �� Q .690 0 / /// , E' . \ -' / ��► i // / �'-69g DIA. MANHOLE MH-13 \ �_'-___-- \ / mar \ \ \— / / /—y�� \\ �\ �Mown•�� �'' \\ \e �� _ _\ _ \ STEVENS CREEK / /� J/--' \� — �— ��100' BUFFER LINE --�` \ ^�—' W/VENTED _ — _ _ \ ASS950513PID# / I / /— \ ^ GHD ConsultingServices Inc. �,� \ \ _ __`__ -_- \_ �� \ _ - ,/ / I / FRAME &COVER — _g \ �- — — _ / \ DB 18751 PG 36 / -�\ 95-__ — — ' /� \�— �� - 222 South Church Street, Suite 400 Know what°s be ow \ \� I / / / / ----- - \� / / `,_\ ___ �� __- �� _-,__,-- . Charlotte NC 28202 USA Call before OU dl T 1 704 302 4910 W www.ghd.com Y g• STA. A27+47.88 I� �/ // // // /� ' PROPOSED 4-_- D/A. MANHOLE MH-10 des \\'_-\ CHARLOTTE CHARLOTTE WATER W/WATER TIGHT -�, /-- �� \� \�-__-,_� �---'-�� FRAME &COVER ��-\ ^\ �\� \� �` ----�� W TER CHARLOTTE, NORTH CAROLINA 11144299 1 Job No. File No. STEVENS CREEK \ Scales 1" 40' TRUNK SEWER PHASE 2 PLAN = \/ PROFILE Hor. 1" = 40' 1.. = 4' PLAN AND PROFILE Vert. STA A27+00 TO STA A36+00 As Built Dote B 7 1 JAM 100% DESIGN Sheet L. ASSOC JEM CJS BMG 11 19 7 Of 28 No. Dote By Revision Surveyed By Designed By Drown By Project-Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT O� � + Q~ZW -LQW NQ� �ZQQ=_ O "- N:t ~�iTyj0=ph+ Q y _Q•���Jp=Q\WQ�II ���OLn Q �Q O Q 00 Z�� w + _Q Q y� Q��=W �II Q-Op�W� O� , �:7Z�VM + _ _ ^ Q Z 00 y J W (ZII Z Q W II °o Q W W p O Q W I I p Z 3 � RE SEE SHEET 13 REGARDING LIFT STATION DEMOLITION, DOGHOUSE MANHOLES, MANHOLE ABANDONMENT AND TYING INTO EXISTING SEWER O M Q EXISTING GRADE Lr La.QC AT CENTERLINE (APPROX.) Q 9 Ld 9 01 171 EXISTING STEVENS BOTTOM CREEK (APPROX.) TRIBUTARY _ — MIN. COVER 3.0' — -- -- - ---------- ----- SANITARY PROP. OUT = 683.69 PROP. 12 PVC SEW - _ - -- - - - - - -- -' - PROP. 12" PVC SANITARY SEWER 00.60N 12 PVC SANITARY SEWER PROP. IN = 680.97 ®0.80� 8 PROP. 8 12 PVC SANITARY SEWER ®0.80 o PROP. OUT 680.77 EXIST. FL /N = 684.05i (8") PROP. FL IN = 683.57 PROP. PROP. AFL IN _ 683.�16 PROP. FL OUT = 682.46 PROP. FL OUT = 683.37 PROP. 12" PVC SANITARY 00.60N SEWER ®0.80 0 PROP. � IN = 678.51 PROP. OUT = 678.31 PROP IN 676.79 PROP. OUT = 676.59 FF 6 7 8 9 O 1 2 3 4 \705, - S16°54'37"W 34.89 PROPOSED 12" SANITARY SEWER= J STA. A43+ 17.48 A43+52.36 ° , / _ , � TBM #5 - — — / PROPOSED 4 �. � •./ PROPOSED 4 ° -, �/ \ NAIL IN 25" HACKBERRY i EL=691.58 _ _ _ _ = 1 DIA. DOGHOUSE MANHOLE \ 1 DIA. MANHOLE MH-18 _ -,STA. A36+60.14 / _ `\ _ — — _ — -- STA. A38+49.57 \ — _ W WATERTIGHT ° / 10WI+ MH-17 W/VENTED — — I _ ' / � — ��% 0 C PROPOSED 4 ` PROPOSED 4 \ _ _ _ _ — _ — — NLS-TBM FRAME &COVER p_ _ l ME & COVER / \ FRAD _ ° _\`3 � , i ° ��- s - "W _ � DIA. MANHOLE MH-14 'I DIA. MANHOLE MH-15 _ — S59°58'31 ' \ W WATERTIGHT _ / I W/WATERTIGHT MPORARY ROCK \ \ TEMPORARY EROSION _ -_ CONTROL MATTING (TYP.) _ / j �� / /� / ° / l 20. 13' _ \ \ �� —FRAME & COVER = _ A OVER ,FR ME & C _��� \� SEDIMENT DAM WEIR=4' , SEE DETAIL SHEET — / ° _ J���/ PROP SA TARY SEWER I �� �f OSED 12 ° SANITARY ° I Q _ _ � ram__. /—3_-_.— 3.. _ 85PROPOSED --- TYPE B SE DETAIL SHEET E E EET 2$ _\ _ •=%/ ^\ /� STA A43 72 49 4' / i� �= �_ — ��� �_./��i �.._ .. ..%/ �2EINF CED STABWZAl1aN; J L �� TEMP. \ SEE DIVERSION DITCH (TYP , DETAIL SHEET �... i //// ` \ a \ \ �° ° • \ • :'��X �� V DIA. DOGHOUSE MANHOLE ✓ UUTLEr (TYP) / V) O SEE DETAIL SHEET I `� �` = ` �.,�.., -; — : �.:- -. r / \ / — ,. Q ,' NOTES: _ L- _ -_ , . ! / ��E •� , • �,::' : MH 19 W/WATERY/GHT �,� 1. PRIOR TO CONSTRUCTION CONTRACTOR SHALL — — r\ L _ STONE CHECK DAM (TYP) � � / \ SEE DETAIL SHEET C — ° ��,—__ � � _ — _ ° _� ` ��-. :;:.. \° ...... / ��E• .. • .. • +11 I (D FRAME & COVER \ ER •' • ' ' • • • •• •• � �.: x� \� �, � WORK WITH PROPERTY OWNERS TO PROVIDE FENCE AND FENCE RELOCATIO9 NS '�• 5: :�; ? ;r_ / �� / \ SILT FENCE TYP SEE DETAIL SHEET 21 /° / 5��.51 fig' 'TEMPORARY ° O� 0 1 ++ �/ ek„AS SPECIFIED AND IN ACCORDANCE WITH \ \ :';!;'' 2 1 � z pVC CONTRACT DOCUMENTS. ;•:f R. ..�:: 0? • ; /h9 j I TGE j2SQ —�7�E• . • TC€ TT Fc T CE . • 7CE. • TGE • T (G T -r:'•:'•:13 :'.'Tlj :; p: :; :: iD; :; :;TCi T�: T 7 TCE• TCE .TCE . 7 . • •: ' . •TG T� T E • . ° • T E. --r zCE — OT�E . • : . ; . / �' I SS / •+0-- /� q4 • . r+sUE -- Ps— iE PSUE ' A39+00 PSUE .o A40+00 A41 01 Noma _ A38+00 A37+00 S02'00'03"W S02 00 03 W r ^ ' 189.43' 282.12'L Q \ \ l . Sdd + + PRO�SED 12" $AN/TARY SEDER PRO SED 2" N/TA SE R o- ' t�E / ° PSUE, . , :. , :. ' • . . • . , .. PSUE •9 .. • . • . • .. • . • . ° woo ` 1 / / % Q / O 40 $0 - ' \ :''• i C�' T = fE CFI TCE 7CE TC T E TCf ' ' TEE' ' ' ' TCE ' ' \ 7CE 7CE TC • •TC j TEE' '' ' TCE 7CE �/ / �f dd�� Q / f / x � \ � \. � �>� GHD Consulting Services Inc. EXISTING CHEVAL LIFT , 222 South Church Street, Suite 400 / 13 \ ' — �8�— _ ',' / �. ni FORD DEMOON PLANKnow what's below. Charlotte INC 28202 USA — _ � , — — — _ 100' BUFFER LINE — - - STA. A41+31.69 r i Call before you dig. T 1 704 302 4910 W www.ghd.com Y g• PROPOSED 4 CHEVAL PROPERTY / OWNERS ASSOCIATION INC \ PID# 19505188 DIA. MANHOLE MH-16 DB 32382 PG 639 MB 59-976 CITY O 1CHARLOTTE CHARLOTTE DB 30613 PG 431 CHARLOTTE WATER W/WATER TIGHT WJ)TER -) — - STEVENS CREEK ASSOC LLC PID// FRAME & COVER pp L CHARLOTTE NORTH CAROLINA 9 / � _ — \ �� 19505131 DB 18751 PG 36 ' I MB 43-903 0 TIMOTHY & SONYA \ 11144299 STEVENS CREEK Job No. File No. TURNER DIB 287630PG1171 Scales 1" = 40' TRUNK SEWER PHASE 2 \ / -' MB 17-296 PLAN \ PROFILE Hor. 1.. = 40' \ 0 1.. = 4' PLAN AND PROFILE Vert. STA A36+00 TO STA A44+00 1 As Built Dote0 \ B 7 1 JAM 100% DESIGN L. ASSOC JEM CJS BMG 11 19 Sh8 eet Of 28 No. Dote By Revision Surveyed By Designed By Drown By Project—Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT —0 ^ m��0 fnlui�i� W J I= QOQ 0 0 II V)0 Ld N 0 + m�p-0 N J W O=w N_M Z>MD— QO�p� Urn porno= Ilw mw X��O� w?i��.. Uj w 2w Z>r- QOUco rn Zorn V) II X\� W 3 N u7 ± m�ZJ N w w O� Z>Ir QO ^ M� � ppco f~� II w � + m7z� Q N O� 2Wc Qpl� U� ppco HO II WN� w�� + m N o + m-IZ� N J p�\� Z>� QOW c��n ppc�p II X \M W�i� w 7 0 LL 0 EXISTING GRADE AT CENTERLINE (APPROX.) n 0 FL F� i IN OUT i i 69 = 3 693.73 i 9 7 EXISTING STEVENS CREEK TRIBUTARY BOTTOM (APPROX.) EX ,------- g" PVC -- _ -- 6 0 -- - g i EX. 8" PVC r � � EX• a,. Pvc F� IN OUT = 686.66 686.45 F� I F� N OUT = 687.55 687.31 - Ex. s" Pvc - IN OUT = 684.1�5 684.00 N = 683.76 IN = 684.61 F� Ii OUT = 683.49 6801 8 t 0-i-51D PPT(C? __00 r�_" (? _B13+00 \--------- ----_ —_ \/� —='-J \� \� /-- \\-•lO� —_-- \_ —\\ ` —\mil \_ -STA. BO+00 --_ EXIS_TIN_G MANHOLE - - / / — — — — _0 Lggj '0 ° l �-' —� \`__^�—\ \\_�_ ;���..- �� � �� ° II 00 Q _ TA _ r f ° w \\ XISTING MANHOLE) _ �.. — \' ANDONED \ T STA. B4+07.15 \ - \ TA.-B7+46.39 ..� X STING MANHOLE ° XISTING M H L -/ ° ° . AD 0 0 � r) XISTING MANHOLE �m TO Ill ABANDONED ° 00 / w\ Lc �: IDS °° ` 0 ob � — x x 0° 0 0� . 0 ' 0 °_ 0 _ - _0 0 _ _ - 0 - - ,. .. 87+00 � - - B5+00 1 ,86+00 C EX, 8" PVC / S '-S _SS— t>i / M \ S l � 0 0 \ EXISTING FORCEMAIN \ ,yx ��TO BE ABANDQNED EXISTING CHEVAL LIFT STATION SEE SHEET 13 FOR DEMO PLAN STA. B2+95.14 EXISTINGI MANHOLE i I / / \ / MOM 100' BUFFE LINE - Long Stirrup Lane I 601 Know what's below. Call before you dig. 7 1 JAM 100% DESIGN Date By Revision THIS SHEET IS PROVIDED FOR INFORIVIATIONAL PURPOSES ONLY GHD Consulting Services Inc. 222 South Church Street, Suite 400 Charlotte NC 28202 USA T 1 704 302 4910 W www.ghd.com CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE, NORTH CAROLINA 11144299 Job No. File No. Scales PLAN 1" = 40' PROFILE Hor. 1' = 40' Vert. 1" = 4' L. ASSOC I JEM I CJS Surveyed By I Designed By I Drawn By STEVENS CREEK TRUNK SEWER PHASE 2 PLAN AND PROFILE STA BO+00 TO STA B8+00 Sheet Of _ BMG 11 19 g 28 Project-Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT CO 0 + m�zJ w J O Z>� a 0 MOO Uml� II w N ^ + J Z> QOT UQ cV p + _ w 2W a O U Do 00 � N + co m�NO O� Z�� a 0 C'�I� Ld J O r- 2w Cj Z>p�j QOQ w VN X\� Lj u7 Om Z>� QO� + C�m� m��� II m�Z01- _Goo �O II \m ml-0 Q V) (n II V) X\� w ?i (/� II X\m w� L�� N Uj m�-0 11 cn 1 iD N w 3 EXISTING GRADE AT CENTERLINE (APPROX.) 1.1 O J LT EX. 8" PVC LJ EXISTING TRIBUTARY STEVENS BOTTOM CREEK (APPROX.) EX. 8" PVC - - -- -- - -- -- - - -- - - __'EX. 8" _ PVC __ N — - 699.�49 I N = 700.32 -_ -- , Ex. 8" PVC FL II OUT i i = 699.43 OUT = 699.99 IN = 698.26 - FL IN 1 _ 697.65 FL SIN _� 699 .92� -- -- --- -- -- OUT = 698.08 8" PVC FL OUT = 697.43 FL OUT = 699.65 - FL FL IN OUT _� 696.�08� = 695.73 -' 9 9 10 11 12 13 14 15 16 17 —�V Q NC6 _—/� 0 � ��\\ --' —� \ �I s`�J ��--710-, — �\lam' I/ - � 0 0 =�—STA►. 16+26.79- _�XISTI_NG MANHOLE r / '♦ / / 5 ''a / / / —STA. 16+09.21 STA. 14+02.71 — / z I ,l_ \— y \\` I `EXISTING MANHOLE EXISTING MANHO ^ ,� �— ` — / \ / I dos l \ 1 \ / \� I \ \ , /... �: ✓ — , � < Op ° \ / --RD 0 \� _ — / II\ �_ A. Q 13+k. 1 \ — V� 9� +oo�,�\� 00 m ° 5 �II11 I .. XSTING MANHOL THIS SHEET S PROVIDED o Q z e9 °o \�\� )�� i'I _ Ir�l /' /°`, '° l '� e,\ Qj FOR NFORMAT ONAL l� _ _ _ � =� --� —S 'Fk• p. ' � -7pp_�p0 �� _0-,/ /' / \ ' / /'\\ a �\ \ \ � O. �l \_ `, //�I —'--_-- S �= I IIII\� =' , - ► \ ,- -5-� �/ �' _ ,'�/ I ohm ,`� Z PURPOSES ONLY PURPOSES _�/ \ _ +oos � — — — — — `\\ 11 \\ I \ -' I I I\ e12+0°— � M� �- -- _° A. 15+9. ' + EXISTING NHOLE/ // � � � 4 : � _ _— — .. � d / /l Og _=\��'� ��- I � Pvc I) , _ _ / / � / ) — __� �\ �� — \ _/ // a 00 S -�' ♦ �) \ ^> / �a ~� / \ / / r r _j MEMO 1 _ OF STA. I mass +1��4 goo' BUFFER LINE ° 0 ♦ \\ \ — �� R EX I TING MANHOLE \ ` GHD Consulting Services Inc. 222 South Church Street, Suite 400 Charlotte NC 28202 USA \ \ T 1 704 302 4910 W www.ghd.com 0 ICHARLOTTE CHARLOTTE WATER Shady WJ)TER � Oak CHARLOTTE NORTH CAROLINA , 3 ,�,�, C t • / , \ ® 11144299 STEVENS CREEK Job No. File No. Ma ` � Scales 1" = 40' TRUNK SEWER PHASE 2 Lo r2e PROFILE RW Know what's below. o LE Stir rup Call before you dig. 11 �� = 4� PLAN AND PROF/LE L an 3 Vert. Rw a STA B8+00 TO STA B 17+00 As Built Dote RW RW B 7 1 JAM 100% DESIGN L. ASSOC JEM Sheet Of CJS BMG 11 19 10 28 No. Dote By Revision Surveyed By Designed By Drown By Project-Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT w J O 0 rn I� =w Z > N O + Q0—: U m1� M 0 II X �m N W3riE 7 0 730 w O w 2W w J 0 x z>a) Ell• O 0o C" co . 0 I� Z>� a0T m 0 W + <0 Uco + N m 0 Z0 II W �i N- co --O II N N W 7 0 7 0 N W J V) 0_' (0 O w 00 = LJ Q > 0 p EXISTING AT CENTERLINE GRADE (APPROX.) = 717.76 � " FL 0 U T 00 N Ld ^ , 8n PVC Pvc EXISTING STEVENS CREEK — Ex. a " IN = 712.67 7 0 TRIBUTARY BOTTOM (APPROX.) OUT I 71 2.47 710 PVC FL IN, — 710.27 1-1100, ,_ EX• FL OUT = 710.07 Pvc F� IN OUT = = 705.73 705.53 25+ 117 1 8 1 9 O 1 2 3 4 5 I �II _ /III\� C-11\ D I\ \\ I _ 30-- . o -7,\� /- \ -',� 013 I ICU uc 1 I IN 1 N \ I 1 ,�\/ \ �\ ° — O ��1L�Ir -- - _ I F - 3S. \ II STA _ _ _ 61_ � �F IDIA -\ I \SS00 A. 20+70.98 / / _ ------ \ II � ,4WD \ \\\\\/ �_`\ - \ \ \\ EXITING MANHOLE\ -; -� \ �- I \ 4\ FRS \ STA. XISTING 18+10.8 _-- --- MANHOLE ��- ��\�\-_----- / STA. 22+7y. \ - \ \`\ \ - , ° ° y A 7-17 \ \ O — EX STING MA OLE 826+00 \ B19+00_ C \ \ \ �B21+p0- fi,----._ __ 1 °j� l --------- B — X ''`\ � LA `—�EX. 8"P �/ vc B22- 41-0 \ \ \x ° � o \ \ \ \ � I 0 0 \ \ \ ST 25+6.�0 m o 00 ___EX -`_ _ _ - _ __ \_ _ \ l \ \ ��F�XIS�TING MAN�IQ4 ►� II THIS SHEET S PROVIDED � z -^ S 1 B \ 23+ o �20? FOR FOR AT A N 0 N ,..-- — � / L 1-0 , - \ � 1 —�� ,__J /��� \ IB24+00\ N \ �\ \ \ \ II III �T X Ss \ EX: `, I PURPOSES ONLY II nn \ i. — -- — - / ,15— _ — _ ._ CC J ` _ \ \ _ ° \ \ van �' �7'�7�� J _ `� / ' — r "— — _—�i--- ----- _ -- -- �——_ JJ _—_---_-- _ _ �\NB25+08 �_ J �..._. _..._..._....— — -- Z/ / ��—y -- l > II \ / \ /� _ \_ _ yy _ --_— _ __—/� �� i 1� 0 40' 80' -� ^ / 7 — �� — / — — / / II , GHD Consulting Services Inc. Know what's below. — — ' � — _ — \ J I I I I I \ / \� \ / I l 1 1 O 222 South Church Street, Suite 400 Call before you dig. Charlotte NC28202 USA _ I I y ° / / \l / �V II, �° ^�` � x / I I ' ( \ r I \ T 1 704 302 4910 W www.ghd.com 0 . 100' BUFFER LINE ( �" � ° ` �� `% , O G I / 1 \ \ \� v ` � /� � � � ` � � I 1 � \ 1 I CHARLOTTE CHARLOTTE WATER AW mum_ � m ' WJ)TER M� / � CHARLOTTE NORTH CAROLINA 9 Sh a d y Oak C t Mcy — R 11144299 STEVENS CREEK Job No. File No. Scales PLAN 1" = 40' TRUNK SEWER PHASE 2 RW RW RW RW d � PROFILE 1" = 40' Hor. Vert. 1" = 4' PLAN AND PROFILE Rw STA B 17+00 TO STA B25+07.90 As Built Date B 7 1 JAM 100% DESIGN I Sheet Of L. ASSOC JEM CJS BMG 11 19 11 28 No. Date By Revision Surveyed By Designed By Drawn By Project-Engr Approved By Date A CITY OF CHARLOTTE DEPARTMENT J � = W W J w ki VM o Zv� ' Qet j Q N p _ = V VI�NW Q Q I LO � N zw I X \� w?iE2 EXISTING AT CENTERLINE GRADE (APPROX.) V • 1V W ct 7 0 N Q CN .., zz:z Q�~2� Q QN F,Q :t Q (Z) Lm II Q� �� 740 Q`� Y QN�pN 0 00 FL IFL IN = FULL OF WATER Q:z> ()M Q)-4 •�Q Z:x II p N op �'��Q� Q�~ZM N V) JWLo-Q.. OUT 738.54 at N m o N� II x �� w�E2 Q Q W�\�� + W W Q^ `�� Q l p= Q W I I 3� ti ��Q4eZN g N QN N w I V co __ (n J �Q^ Q IIlk = 3 11 Q C11 ti Q: Q I= Q W II 02 Q Q to ���LZ� VJ E ER , ' PROP. 8" PVC SANITARY 05.00X SEZp WER • $+� P`PROP. •f Ri 4i5-100,14 5 — FL OUT = 736.35 7 0 ROP 7 0 PROP � IN � 726.76 PROP. OUT = 726.5 , EXISTING TRIBUTARY STEVENS BOTTOM CREEK (APPROX.) PROP. 8" PVC SANITARY SEWER PROP. -- -- - 8" -- PVC -- - SANITARY -- -- - -- SEWER - PROP. 8" SANITARY SEWER ®0.40X ®O. 00x ®5. 00% PVC - PROP. E IN = 723.44 7 0 PROP. OUT' = 723.24 7 0 PROP. 8" PVC SANITARY SEWER ®8.72% I LFEL I I FL 0 U T = 717.7 6 PROP. IN = 719.42 PRO P. IN = 717.88 PROP. OUT = 718.52 PROP. FL IN = 718.52 PROP. IFLOUT '718.32 C N R TE NT L JINS SEDTALSET 9 PROP. FL IN = 718.52 I PROP. 8" DIP SANITARY SEWER - PROP. OUT = 718.52 0-0.00N + 5 C O n '- — � /' I' / x / �\ / / /(I�-'6- ,.--735------ 08506 STA. C5+33.25 `, 1 ��\ / � \ PROPOSED 4 \ coMMUNITYIASSOCIA oN INC — Tim / o / / / / / / / / / / / / \ / PID# 19518212 / / D/A. MANHOLE MH-25 � DB 32183 PG 76 ` I C 1 +78.12�'�/l/ / +� � � � / / / i i' / 1-1 __ _ // � j W/VENTED PROPOSED 4' - /' / /'� .FRAME & COVER \ \ /^�// z / -, / I > I I � \ , l . D/A. MANHOLE MH-21 — �� \ \ W/WATERTIGHT / / \ > \ 1 - / / / / NAIL IN 14" POPLAR FRAME&COVER / EL = 728.22 \ ` \ ✓ \ \ � TEMPORARY ERb ION STA. C 1 + 10.12 - \ _ - Y� ' CONTROL MATTING (TYP.)/ PROPOSED 4' / / _ _ SEE DETAIL SHEET Z 43.82 - D/A. MANHOLE MH-20 / / / / / //� 10075 PROPOSED 8" SANITARY SEWER - , �-► \W/WATER TIGHT / / / / FRAME & COVER �/ / / / ,/ ��- .� I 1 ,'STA. C2+78 95 - - - / ' ► / // / // �/ / _ / PROPOSED 4' - _ - - ' - / 1 AP e „ S72 28 10 W , \ \ \ hl l \� MANHOLE MH-23 , LEGATE W/WATERTIGHT / 'CHARLOTTE / ' 39.79 -rf-� �� \ \ \ � -_- xoo SIP- 18'42~w . /' / 'A1h •�\ G PID 19618615 FRAME & COVER DB 32183 PG63 PROPOSED 8" SANIT, ° \ \ \ `\ \ / PROPOSED 868 SANITARY SEWER `?x0 i ' / � �\1 O - \` , SILT FENCE (TYP) \\ SEES DETAIL SHEET 21 // // _ _ _ _ _ ` - \\� Rr _ " ' STA. 25+07.90 �� d \ �� y � _ , • - \�1 iR� , j I XISIING EASEMENT s + / STA. 5 7�04 XISTING. MANI-I ' ,EX NG MANHO 5° \ \ TEMPORARY CREE�� / \� \ 5 � \ I ` ► / _ \� _F �\\\ _� \ ��°5P� REFRENCE BRIDGE MAT— ` ` ° SEE D TAIL SHEET 22 \\ $ r ;/ _ / p r dx \ \ / k ,01E o • �\ J 2C ER Os /ii/ 1`l�� x j/, i/i `7�I ,�;a~ 'i /��- r� r\\\\\\ i NOTES: 1. CONTRACTOR SHALL CORE NEW CONNECTION Q5� I \ ;�` COFICRETE ENCASEMENT` / / - \ \ \ B25+oo \ pQ '�/ } . , / / N ) / SSE DETAIL SHEET 19• Xp0 \5 g1.80 �tA Y . /, �f•/ 1)� S �T\l�^,11>/(//( C� \�1, SpN �� ^� \ . \ 1 I / ��� \ \��'i / 8 / / ` J u` SEA Q 1 FOR PROPOSED INVERT OUT AND PLUG EXISTING CONNECTION OUT TO PUMP -B24+00 \ \ \ n 1 . I:� -` / \ E X. 8 PVC _ l )(, ; s ss / / / / �s �'�1\l 11� $59 10 39 W / \ NO OSED i / /YP/ PR OP /! o �l \� I I ��III����^; ,\� STATION. EXISTING PIPE OUT SHALL BE / ` co+oo / !� / \ ,/ Q / \ �_ ; �1 / \ ll� DISCONNECTED FROM MANHOLE PRIOR TO ��B25+08 57.00 / / / I / / , /��' / / No ° 'EXISTING ` I PLUG AND REBUILDING INVERTS. SEE \ _ r MINI' / / PROPOSED 8" SANITARY SEWER / / l / / ,�% ,HILL COMMONS \ 1 SHEET 14 CONNECTION DETAILS ON SHEET 18 /SEE STA. C2+35.12 , / / JA � \ fOR DEMO PLAN �fiAIL SEE 1_N SHEET 18 PROPOSED 4' FOR CONNECTION TO / XI \ \ MANHOLE DIA. MANHOLE MH-22 / / 0 4o So ' `;p \ ° W/WA TER TIGHT FRAME & COVER P 100' BUFFER LINE ° ��� ` \ \ II 141 i STA. C3+41.45 f GHD ConsultingServices Inc. \ I/ i ► II PROPOSED 4 D/A. MANHOLE MH-24 222 South Church street, Suite 400 , Charlotte NC 28202 USA S72°58'S3"W W/WATER TIGHT � T 1 704 302 4910 W www.ghd.com aI \ 1 62.50' FRAME & COVER _ \ PROPOSED 8" SANITARY SEWER \ CHARLOTTE CHARLOTTE WATER �� 0000 woo W�TER woosow CHARLOTTE, NORTH CAROLINA \ o;c ® 11144299 Job No. File No. STEVENS CREEK R Scales PLAN 1" = 40' TRUNK SEWER PHASE 2 Know what's below . PROFILE g Call before you dig. 11" = 4' PLAN AND PROFILE Vert STA CO+00 TO STA C5+73.04 � As Built Dote B 7 1 JAM 100% DESIGN Sheet Of L. ASSOC JEM CJS BMG 11 19 2 28 i No. Dote By Revision Surveyed By Designed By Drown By Project-Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT PROPOSED 4' DIA. DOGHOUSE MANHOLE MH-17 EXISTING 8" PVC PROPOSED 8" SANITARY SEWER PROPOSED 4' DIA. MANHOLE MH-18 PROPOSED 8" SANITARY SEWER SEE NOTE EXISTING MANHOLE EXISTING 8" PVC TO BE ABANDONED PROPOSED 8" SANITARY SEWER PROPOSED 4' DIA. DOGHOUSE MANHOLE MH-19 EXISTING 8" PVC WATERTIGHT MASONRY PLUG EXISTING 8" PVC TO BE ABANDONED ABANDONED CHEVAL LIFT STATION WATERTIGHT MASONRY J PLUG CHEVAL LIFT STATION MANHOLE CONFIGURATION ISOMETRIC PLAN SCALE: N TS PLUG PIPE WITH WATERTIGHT MASONRY PLUG (TYP OF 2) ` P Jv STA. \ 1 +30:27 S20•5 1'9 OfTA. SEER EXISTING MANHOLE 1S5SpN1t SEp 8 \ SEE NOTE PROPo STA. 1 +59.24 1 BELOW EXISTING MANHOLE EXISTING CONCRETE EQUIPMENT PAD EXISTING VALVE VAULT EXISTING GENERATOR i / I / I i I I II J PROPOSED 4' DIA. DOGHOUSE MANHOLE STA. A43+52.36 MH-17 W/WA TERT/GHT PROPOSED 4' FRAME & COVER DIA. MANHOLE MH-18 \ W/WA TER TIGHT FRAME & COVER o PROP S'\3j•H, / O OSED 114 89 qRY S \ - � 8 Sgiyjr S59'58'31 "W 120.13' ' SEE NOTER\ PROPOSED 8" SANITARY SEWER 1 BELOW STA. A43+72.49 Ek g„ PROPOSED 4' pVC \ DIA. DOGHOUSE MANHOLE MH-19 W/WATERTIGHT 'FRAME & COVER NG 'EL D C) �CO �� \ Y 1 •�S 82+00 EXISTING WETWELL s 1 >K I EXISTING VALVE VAULT _ I CHEVAL LIFT STATION PUMP STATION M54-233 PID 19505176 CITY 01 CHARLOTTE r� CHEVAL LIFT STATION DEMOLITION PLAN SCALE: 1 " = 10' EXISTING SEWER DEMOLITION/ABANDONMENT NOTES 1. REMOVE TOP 3-FEET OF MANHOLE STRUCTURE. PLUG PIPE WITHIN REMAINING STRUCTURE WITH WATERTIGHT MASONRY PLUG. FILL REMAINING STRUCTURE WITH FLOWABLE FILL AND BACKFILL MANHOLE STRUCTURE. EXISTING MANHOLES SHALL REMAIN ACTIVE UNTIL APPROVED BY OWNER/ENGINEER FOR ABANDONMENT. 2. MANHOLES TO BE ABANDONED WILL FIRST HAVE BOTH INVERT AND EFFLUENT LINES PLUGGED INSIDE THE MANHOLE WITH WATERTIGHT MASONRY. THE MANHOLE WILL THEN BE FILLED WITH NON -COMPRESSIBLE MATERIAL (#57 STONE OR AN APPROVED EQUAL) TO A POINT THREE FEET BELOW FINISHED GRADE. THE REMAINDER OF THE MANHOLE SHALL BE BROKEN DOWN AND REMOVED, THEN THE EXCAVATION SHALL BE FILLED TO FINISHED GRADE WITH SUITABLE SOIL AND COMPACTED IN PLACE. DISTURBED AREAS SHALL BE LANDSCAPED. 3. EXPOSED PIPE OF ABANDONED MAINS SHALL BE REMOVED TO A POINT NOT LESS THAN 10-FEET INTO ADJACENT BANKS. THE REMAINING ENDS SHALL BE PLUGGED WITH WATERTIGHT MASONRY. PIPE REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND PROPERLY DISPOSED. 4. CONCRETE PIERS OR COLLARS LOCATED IN THE CREEK CHANNEL SHALL BE REMOVED COMPLETELY. CONCRETE PIERS OR COLLARDS NOT LOCATED IN THE CREEK CHANNEL SHALL BE REMOVED TO A POINT 3-FEET BELOW GRADE. THE EXCAVATION SHALL BE FILLED WITH SUITABLE SOIL AND COMPACTED. I I / EXISTING BFP L� x �x WOODEN FENCE TO REMAIN IN PLACE TOP 697 M EL 6S FLOWABLE FILL PUMP STATION DEMOLITION -SECTION NOT TO SCALE TOP EL f 697.23 SEE NOTES EXISTING CHEVAL LIFT STATION CONSTRUCTION SEQUENCE 1. IF SALVAGED EQUIPMENT AND MATERIALS ARE DAMAGED DURING REMOVAL OR TRANSPORT, THE CONTRACTOR SHALL REPLACE DAMAGED ITEMS WITH NEW ITEM OF IDENTICAL MAKE. 2. CONTRACTOR IS ADVISED TO MAKE A SITE VISIT TO THE PROJECT PRIOR TO SUBMITTING HIS BID PACKAGE. THIS MAY BE COORDINATED BY CONTACTING CHARLOTTE WATER. 3. PRIOR TO ANY DEMOLITION WORK ON THE CHEVAL LIFT STATION, EXISTING SEWER MAINS, AND MANHOLES, THE CONTRACTOR MUST HAVE STEVENS CREEK PHASE II SANITARY SEWER INSTALLED, TESTED, CERTIFIED AND ACCEPTED BY THE ENGINEER, OWNER, AND REGULATORY AGENCIES FOR OPERATION. 4. PROVIDE BYPASS PUMPING OR PIPING AS REQUIRED TO REMOVE THE EXISTING SEWER AND CONSTRUCT NEW CONNECTION TO PROPOSED SEWER TRUNK. 5. ANY WATER USED TO CLEAN THE WET WELL THAT IS CONNECTED TO A PUBLIC, POTABLE WATER SYSTEM, THE CONTRACTOR SHALL UTILIZE BACK FLOW PREVENTION PROCEDURES AND REDUCED PRESSURE PRINCIPLE BACKFLOW DEVICES APPROVED BY THE ENGINEER. ALL CLEANING WATER SHALL BE PUMPED TO DISCHARGE TO THE NEW SANITARY SEWER TRUNK LINE. CONTRACTOR TO PROVIDE CERTIFICATION THAT THE BACKFLOW DEVICE HAS BEEN TESTED. 6. REMOVE THE EXISTING WATER SERVICE AT THE WATER MAIN. INSTALL CAP ON CORPORATION STOP, PLUG SERVICE LINE AND TRANSPORT METER AND FITTINGS TO CHARLOTTE WATER. EXISTING CHEVAL LIFT STATION DEMOLITION NOTES 1. CONTRACTOR SHALL MEET WITH THE OWNER AT THE PUMPING STATION SITE ONE -WEEK BEFORE SCHEDULED DEMOLITION TO DISCUSS EQUIPMENT TO BE SALVAGED. OWNER WILL SALVAGE SEWAGE PUMPS, GENERATOR, AND CONTROL PANEL. 2. SITE DEMOLITION: REFER TO SPECIFICATIONS FOR ALL MATERIALS TO BE SALVAGED. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND PROPER OFF -SITE DISPOSAL OF ALL REMAINING EQUIPMENT, CONDUIT AND CONCRETE STRUCTURES AS SHOWN ON THE DEMOLITION DETAIL. ON -SITE BURIAL OF REMOVED MATERIALS IS PROHIBITED. 3. ALL MATERIALS AND EQUIPMENT SALVAGED TO CHARLOTTE WATER SHALL BE DELIVERED TO THE SEWER MAINTENANCE YARD AT 4100 WEST TYVOLA ROAD. SCHEDULE DELIVERY TIME WITH LIFT STATION SUPERVISOR (STUART ROSENBERGER 704-432-4376). ALL MATERIALS REMOVED AND NOT SALVAGED TO CHARLOTTE WATER SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE. 4. MATERIALS AND EQUIPMENT TO BE SALVAGED TO CHARLOTTE WATER INCLUDE THE FOLLOWING: * GENERATOR * BACKFLOW VALVE * SCRUBBER UNIT * GENERATOR TRANSFER SWITCH * MAIN DISCONNECTS 5. ALL PIPING, WIRING AND CONDUIT THAT IS LOCATED LESS THAN 3-FEET BELOW EXISTING GRADE AND/OR PRE=EXISTING CONTOURS SHALL BE EXCAVATED AND REMOVED. PIPING, WIRING AND CONDUIT LOCATED 3-FEET OR MORE BELOW EXISTING GRADE AND/OR PRE-EXISTING CONTOURS SHALL BE ABANDONED IN PLACE. THE ENDS OF ALL ABANDONED IN PLACE PIPING AND CONDUIT SHALL BE PLUGGED AND SEALED ACCORDING TO CHARLOTTE WATER SPECIFICATIONS. 6. ALL WIRING SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND BE REMOVED FROM THE SITE. 7. THE EXISTING POWER POLE, METERS, AND SWITCHES ARE THE PROPERTY OF THE ELECTRICAL UTILITY. THE CONTRACTOR UNDER THIS CONTRACT WILL COORDINATE THE REMOVAL OF THE ELECTRIC METER, AND ELECTRIC SERVICE REMAIN IN PLACE. 8. CONTRACTOR SHALL CONTACT DUKE ENERGY CAROLINAS DIVISION LINE FOR DUKE ENERGY'S BUILDERS, DEVELOPERS AND CONTRACTORS AND PROVIDE INFORMATION REGARDING THE POWER SUPPLY TO THE PUMP STATIONS. CONTRACTOR SHALL INCLUDE THE ACCOUNT NUMBER ADDRESS FOR THE POWER SUPPLY AND/OR METER NUMBERS. CONTRACTOR SHALL CONTACT DUKE ENERGY 14 DAYS IN ADVANCE PRIOR TO REMOVING POWER. 9. EXISTING ELEVATIONS SHOWN ARE BASED ON AVAILABLE RECORD DRAWINGS. THEREFORE ELEVATIONS ARE CONSIDERED APPROXIMATE. 10. CONTRACTOR SHALL DEMOLISH FIRST THREE FEET BELOW GRADE OF EXISTING VALVE VAULT AND WET WELL. FLOWABLE FILL SHALL BE UTILIZED TO FILL REMAINING EXISTING STRUCTURES. WET WELL AND DRY CHAMBER 1. REMOVE ALL EQUIPMENT, CONTROLS, WIRING, PIPING, AND ACCESSORY ITEMS FROM INSIDE THE EXISTING WET WELL AND SALVAGE MATERIALS AS INDICATED ABOVE. 2. REMOVE UNDERGROUND STEEL DRY PUMP CHAMBER & WET WELL SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND REMOVED FROM SITE AND PROPERLY DISPOSED. 3. EXCAVATE AND REMOVE EXISTING CONCRETE WET WELL INCLUDING TOP SLAB AND WALLS EXCLUDING EXISTING 24" THICK BASE FOUNDATION THAT IS TO REMAIN IN PLACE. 4. BACKFILL AND COMPACT EXCAVATION ACCORDING TO CHARLOTTE WATER SPECIFICATIONS. 5. REMOVE YARD HYDRANT, BACKFLOW PREVENTER, VALVES, PIPING, AND ENCLOSURE. SALVAGE ITEMS SPECIFIED ABOVE TO CHARLOTTE WATER. 6. REMOVE CONCRETE PADS. 7. REMOVE RISER PIPING TO DEPTH SPECIFIED ABOVE AND CAP PIPES TO BE ABANDONED IN PLACE. EROSION CONTROL NOTES 1. THE CONTRACTOR SHALL INSTALL AND MAINTAIN EROSION CONTROL MEASURES AT THE PUMP STATION SITE AS SHOWN OR REQUIRED FOR THE DEMOLITION WORK. 2. CONTRACTOR SHALL INSTALL SILT FENCE AND INLET PROTECTION PRIOR TO LAND DISTURBANCE. 3. CONTRACTOR SHALL MULCH, SEED AND FERTILIZE ALL DISTURBED AREA PER SPECIFICATIONS. 4. THE CONTRACTOR SHALL REMOVE ALL EROSION CONTROL MEASURES AFTER THE WORK IS COMPLETE, GRASS IS ESTABLISHED, AND REMOVAL IS AUTHORIZED. Know what's below. Call before you dig. 100% DESIGN Revision GHD Consulting Services Inc. 222 South Church Street, Suite 400 Charlotte NC 28202 USA T 1 704 302 4910 W www.ghd.com CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE, NORTH CAROLINA Job No. File No. Scales PLAN AS NOTED PROFILE Hor. Vert. STEVENS CREEK TRUNK SEWER PHASE 2 CHEVAL PUMP STATION DEMOLITION PLAN I Sheet Of CJS BMG BMG 11 19 13 28 Drown By Project-Engr Approved By Dote L. ASSOC JEM Surveyed By I Designed By A CITY OF CHARLOTTE DEPARTMENT \1 I l lI Iln IIIIIIII\ \ \�(1\1 /�/ 11 / ` l �� -� _ _ O \ CAP AND ABD i CONTROL PANEL WET \ O UO \ \ WELL \ O \ CONCRETE o \ PAD I \ - \ VAULT \ \ \ VALVE VAU LT \\ \ SEE NOTE 6 EMERGENCY PUMP 8"SS CONNECTION VAULT I / I I / I EXISTING OVERFLOW I. I MANHOLE I (SEE WET WELL AND DRY II I CHAMBER NOTE 9) I I I I ► _ - �/ I I I I I I I I I I I I I I I I I I I TOP E GRADE EL f 750.39 3' / MINT HILL PUMP STATION 8134 BRETTON WOODS DR j PUMP STATION LOT M63-598 PID 19518472 CITY OF CHARLOTTE CAP AND ABD EXISTING OVERFLOW MANHOLE EXISTING OVERFLOW MANHOLE (SEE WET WELL AND DRY CHAMBER NOTE 9) 17 V �7 CAP AND ABD MINT HILL COMMONS DEMOLITION PLAN SCALE: 1 " = 10' r- L 17.. V. • PUMP STATION SPILL CONTAINMENT BASIN TO BE FILLED TO GRADE f 751.54 \\- GRADE EL f 750.65 SEE NOTES 5 EXISTING MINT HILL PUMP STATION CONSTRUCTION SEQUENCE 1. IF SALVAGED EQUIPMENT AND MATERIALS ARE DAMAGED DURING REMOVAL OR TRANSPORT, THE CONTRACTOR SHALL REPLACE DAMAGED ITEMS WITH NEW ITEM OF IDENTICAL MAKE. 2. CONTRACTOR IS ADVISED TO MAKE A SITE VISIT TO THE PROJECT PRIOR TO SUBMITTING HIS BID PACKAGE. THIS MAY BE COORDINATED BY CONTACTING CHARLOTTE WATER. 3. PRIOR TO ANY DEMOLITION WORK ON THE MINT HILL PUMP STATION AND EXISTING SEWER MAINS AND MANHOLES, THE CONTRACTOR MUST HAVE STEVENS CREEK PHASE II SANITARY SEWER INSTALLED, TESTED, CERTIFIED AND ACCEPTED BY THE ENGINEER, OWNER, AND REGULATORY AGENCIES FOR OPERATION. 4. PROVIDE BYPASS PUMPING OR PIPING AS REQUIRED TO REMOVE THE EXISTING SEWER AND CONSTRUCT NEW CONNECTION TO PROPOSED SEWER TRUNK. 5. ANY WATER USED TO CLEAN THE WET WELL THAT IS CONNECTED TO A PUBLIC, POTABLE WATER SYSTEM, THE CONTRACTOR SHALL UTILIZE BACK FLOW PREVENTION PROCEDURES AND REDUCED PRESSURE PRINCIPLE BACKFLOW DEVICES APPROVED BY THE ENGINEER. ALL CLEANING WATER SHALL BE PUMPED TO DISCHARGE TO THE NEW SANITARY SEWER TRUNK LINE. CONTRACTOR TO PROVIDE CERTIFICATION THAT THE BACKFLOW DEVICE HAS BEEN TESTED. 6. REMOVE THE EXISTING WATER SERVICE AT THE WATER MAIN. INSTALL CAP ON CORPORATION STOP, PLUG SERVICE LINE AND TRANSPORT METER AND FITTINGS TO CHARLOTTE WATER. EXISTING MINT HILL PUMP STATION DEMOLITION NOTES 1. CONTRACTOR SHALL MEET WITH THE OWNER AT THE PUMPING STATION SITE ONE -WEEK BEFORE SCHEDULED DEMOLITION TO DISCUSS EQUIPMENT TO BE SALVAGED. OWNER WILLS SALVAGE SEWAGE PUMPS, GENERATOR, AND CONTROL PANEL. 2. SITE DEMOLITION: REFER TO SPECIFICATIONS FOR ALL MATERIALS TO BE SALVAGED. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND PROPER OFF -SITE DISPOSAL OF ALL REMAINING EQUIPMENT, CONDUIT AND CONCRETE STRUCTURES AS SHOWN ON THE DEMOLITION DETAIL. ON -SITE BURIAL OF REMOVED MATERIALS IS PROHIBITED. 3. ALL MATERIALS AND EQUIPMENT SALVAGED TO CHARLOTTE WATER SHALL BE DELIVERED TO THE SEWER MAINTENANCE YARD AT 4100 WEST TYVOLA ROAD. SCHEDULE DELIVERY TIME WITH LIFT STATION SUPERVISOR (STUART ROSENBERGER 704-432-4376). ALL MATERIALS REMOVED AND NOT SALVAGED TO CHARLOTTE WATER SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE. 4. MATERIALS AND EQUIPMENT TO BE SALVAGED TO CHARLOTTE WATER INCLUDE THE FOLLOWING: * MAGMETER * CHECK VALVES * PLUG VALVES * SUMP PUMP * PUMP AROUND VALVE * INSTRUMENT FLOATS * CAPACITOR PROBES * LIFTING CABLES * OVERHEAD PANELS 5. ALL PIPING, WIRING AND CONDUIT THAT IS LOCATED LESS THAN 3-FEET BELOW EXISTING GRADE AND/OR PRE=EXISTING CONTOURS SHALL BE EXCAVATED AND REMOVED. PIPING, WIRING AND CONDUIT LOCATED 3-FEET OR MORE BELOW EXISTING GRADE AND/OR PRE-EXISTING CONTOURS SHALL BE ABANDONED IN PLACE. THE ENDS OF ALL ABANDONED IN PLACE PIPING AND CONDUIT SHALL BE PLUGGED AND SEALED ACCORDING TO CHARLOTTE WATER SPECIFICATIONS. 6. ALL WIRING SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND BE REMOVED FROM THE SITE. 7. THE EXISTING POWER POLE, METERS, AND SWITCHES ARE THE PROPERTY OF THE ELECTRICAL UTILITY. THE CONTRACTOR UNDER THIS CONTRACT WILL COORDINATE THE REMOVAL OF THE ELECTRIC METER, AND ELECTRIC SERVICE REMAIN IN PLACE. 8. CONTRACTOR SHALL CONTACT DUKE ENERGY CAROLINAS DIVISION LINE FOR DUKE ENERGY'S BUILDERS, DEVELOPERS AND CONTRACTORS AND PROVIDE INFORMATION REGARDING THE POWER SUPPLY TO THE PUMP STATIONS. CONTRACTOR SHALL INCLUDE THE ACCOUNT NUMBER ADDRESS FOR THE POWER SUPPLY AND/OR METER NUMBERS. CONTRACTOR SHALL CONTACT DUKE ENERGY 14 DAYS IN ADVANCE PRIOR TO REMOVING POWER. 9. EXISTING ELEVATIONS SHOWN ARE BASED ON AVAILABLE RECORD DRAWINGS. THEREFORE ELEVATIONS ARE CONSIDERED APPROXIMATE. 10. CONTRACTOR SHALL DEMOLISH FIRST THREE FEET BELOW GRADE OF EXISTING VALVE VAULT AND WET WELL. FLOWABLE FILL SHALL BE UTILIZED TO FILL REMAINING EXISTING STRUCTURES. WET WELL AND DRY CHAMBER 1. REMOVE ALL EQUIPMENT, CONTROLS, WIRING, PIPING, AND ACCESSORY ITEMS FROM INSIDE THE EXISTING WET WELL AND SALVAGE MATERIALS AS INDICATED ABOVE. 2. REMOVE UNDERGROUND STEEL DRY PUMP CHAMBER & WET WELL SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND REMOVED FROM SITE AND PROPERLY DISPOSED. 3. EXCAVATE AND REMOVE EXISTING CONCRETE WET WELL INCLUDING TOP SLAB AND WALLS EXCLUDING EXISTING 24" THICK BASE FOUNDATION THAT IS TO REMAIN IN PLACE. 4. BACKFILL AND COMPACT EXCAVATION ACCORDING TO CHARLOTTE WATER SPECIFICATIONS. 5. REMOVE YARD HYDRANT, BACKFLOW PREVENTER, VALVES, PIPING, AND ENCLOSURE. SALVAGE ITEMS SPECIFIED ABOVE TO CHARLOTTE WATER. 6. REMOVE CONCRETE PADS. 7. REMOVE RISER PIPING TO DEPTH SPECIFIED ABOVE AND CAP PIPES TO BE ABANDONED IN PLACE. 8. ENTIRE 2'X3' EMERGANCY PUMP COLLECTION VAULT TO BE REMOVED AND SALVAGED. 9. OVERFLOW MANHOLES SHALL BE DEMOLISHED PER THE DEMOLITION PUMP STATION SECTION. EROSION CONTROL NOTES 1. THE CONTRACTOR SHALL INSTALL AND MAINTAIN EROSION CONTROL MEASURES AT THE PUMP STATION SITE AS SHOWN OR REQUIRED FOR THE DEMOLITION WORK. 2. CONTRACTOR SHALL INSTALL SILT FENCE AND INLET PROTECTION PRIOR TO LAND DISTURBANCE. 3. CONTRACTOR SHALL MULCH, SEED AND FERTILIZE ALL DISTURBED AREA PER SPECIFICATIONS. 4. THE CONTRACTOR SHALL REMOVE ALL EROSION CONTROL MEASURES AFTER THE WORK IS COMPLETE, GRASS IS ESTABLISHED, AND REMOVAL IS AUTHORIZED. Know what's below. Call before you dig. 0 10' 20' GHD Consulting Services Inc. IIP222 South Church Street, Suite 400 Charlotte NC 28202 USA T 1 704 302 4910 W www.ghd.com PUMP STATION DEMOLITION -SECTION NOT TO SCALE A CITY OF CHARLOTTE DEPARTMENT CITY OF CHARLOTTE STANDARD CITY OF CHARLOTTE STANDARD CAST IRON FRAME AND COVER. CAST IRON FRAME AND COVER 4" MIN. CLEAR FROM R CONC. GRADE (BOLT DOWN -WATER TIGHT) JOINT (ABOVE OR BELOW) DJUSTMENT OF I i FINISHED GRADEOLES. CUT TO FIT I 9 LF• i D.I.P. 1%2 PIPE IID. g. N kF a} * " MIN. 21" MAX r 5/8" COPPER GROUND ROD 5/8" COPPER GROUND ROD:;;;�j I 16' O.C.Eiid 1/4"x2" STAINLESS (SEE NOTES 14 AND 15)is (SEE NOTES 14 AND 15) STEEL STRAP WITH =� ; HEIGHT OF RISER EXISTING M.H.2 ANCHOR BOLTS AND CONEP.V.C. SECTION VARIES m 4' STEPS (SEE DETAIL SHEET 16) m ENLARGED DETAIL co NOTES: 00 CORE HOLE FOR INFLUENT D.I.P. 1. MANHOLE TO CONFORM WITH ASTM C478 EXCEPT AS WITH CORING MACHINE AND Z 5" MODIFIED BELOW. 5'-0" MIN. INSTALL FLEXIBLE RUBBER COUPLING. (SEE NOTE #5) rw 2. MANHOLE BASE TO BE REINFORCED WITH A MINIMUM AREA OF177 R-1/2 STRAIGHT WALL OF M.H. TO BE LOCATED 0.20 SQ. IN. PER LINEAL FOOT EACH WAY. WALL REINFORCING O.D. PIPE BARRELL TO BE MINIMUM OF 0.12 SQ. IN. PER LINEAL FOOT. EITHER OVER INFLUENT PIPE TONGUE OR GROOVE SHALL HAVE REINFORCING EQUAL IN STANDARD (4'0 M.H.) AREA TO MINIMUM OF WALL SECTION. #12 COPPER zo , A A TRACER WIRE ? 3 F 4'-0" OR 5'-0" w 3. ALL JOINTS SHALL CONFORM WITH ASTM C443. �I f� � W Zn SEE NOTE 13 w 4. STEPS TO BE PLASTIC PER CITY STANDARDS. ��II fN m 5. ALL PIPE OPENINGS TO BE NO GREATER THAN 3" LARGER THAN OUTSIDE DIAMETER OF PIPE AND ADDITIONALLY REINFORCED WITH A MINIMUM OF 0.20 SQ. IN. OF STEEL AT 1/4"x2" STAINLESS 90 DEGREES (ADDITIONAL REINFORCING NOT REQUIRED FOR CORED OPENINGS) STEEL STRAP WITH 2 ANCHOR BOLTS io 6. ALL SURFACES SHALL BE SMOOTH EVEN TEXTURED WITH A B F B MINIMUM OF HONEYCOMB, FINS AND OTHER IMPERFECTIONS. w 7. PENETRATING LIFTING HOLES SHALL BE PLUGGED WITH (N W RESHAPE INVERT /FLEXIBLE COUPLING CAST IN BASE OR STALLED IN CORED HOLE WITH EXPANSION GROUT. m SECTION B-B AINLESS STEEL COMPRESSION DEVICE. 8. INVERTS MAY BE 3600 PSI READY MIX CONCRETE IN LIEU OF AND 10" PIPE, INVERTS ARE TO BE BRICK. PRECAST INVERTS ARE ACCEPTABLE. 3/4" PIPE OD AT TROUGH, FOR 12" AND 9. STEPS IN 5' DIAMETER MANHOLES TO BE OVER WIDEST SHELF. SECTION A -A LARGER PIPE, PROVIDE FULL INVERT AS SHOWN. THE SHELF SHALL SLOPE 2" FROM 10. 4'0 CONE SECTIONS MAYBE USED WITH 5'0 MANHOLES WITH A THE MANHOLE WALL TO THE TROUGH. 4' OR 5' TRANSITION SECTION PLACED DIRECTLY BENEATH THE 4'0 CONE. NOTES: 11. ALL MANHOLE SECTIONS SHALL BE DESIGNED FOR H-20 1. PIPE FOR INSIDE DROP SHALL BE SDR 35 PVC CONFORMING TO ASTM LOADING. SPECIFICATION D3034. 12. MINIMUM HEIGHT FOR CONCENTRIC CONES ON MANHOLES WITH 2. BOTTOM BEND TO BE 90' SHORT BEND, BELL SPIGOT, OF SDR 35 BOLT DOWN F&C IS 32". PVC. SPIGOT OF BEND TO REST DIRECTLY ON EXISTING SHELF. CONSTRUCT MASONRY THROUGH FROM DROP EFFLUENT TO MAIN 13. COPPER TRACER WIRE TO BE WRAPPED AROUND OUTSIDE OF CHANNEL. MANHOLE AND UP TO CONNECT WITH GROUND ROD. 14. 5/8" COPPER GROUND ROD CAST IN MANHOLE 1" BELOW TOP 3. NOTCH BELL OF PVC DROP TO ACCEPT D.I.P. SPIGOT AS SHOWN. STEP IN CENTERLINE OF STEP, GROUND ROD NOT TO 4. LOCATE STRAPS AT PIPE BELL AND ABOVE BELL OF 90' BEND AS PROTRUDE PAST INSIDE EDGE OF STEP. SHOWN. ADD EXTRA STRAPS AS NECESSARY TO MAINTAIN MAXIMUM 2" FALL 15. CONNECT TRACER WIRE TO GROUND ROD WITH GROUND ROD SPACING OF TEN FEET. CLAMP WITH SS SCREWS. WRAP ALL EXPOSED METAL WITH 5. HOLE IN MANHOLE WALL TO BE MADE WITH A CORING MACHINE. RUBBER ELECTRICAL SPLICING TAPE. INSTALL FLEXIBLE RUBBER COUPLING. INSIDE DROP DETAIL 16. TRACER WIRE IN 1/2" PVC CONDUIT ATTACHED TO MANHOLE. 6. CORE HOLE SHALL NOT ENTER CONE SECTION. 7. STEPS SHALL BE RELOCATED IF THEY CONFLICT WITH INSIDE DROP. PRECAST POLYMER MANHOLES 4' & 5' DIAMETER A A NOTES: 1. MANHOLE BASE SHALL BE 4000 PSI CONCRETE PLACED ON M UNDISTURBED EARTH AND MAY BE PLACED AGAINST SHAPED r7 BANKS IN LIEU OF FORMS. 2. CONTRACTOR SHALL NOT CUT THE EXISTING SEWER PIPE UNTIL PERMISSION IS GRANTED BY THE ENGINEER OR SRU INSPECTOR - AFTER FINAL PROJECT APPROVAL 3. WRAP OUTSIDE MANHOLE SEAMS (JOINTS) WITH WIDE BUTYL O j 1-1/4" TAPE. rn O O 4. MANHOLE TO CONFORM TO CITY STANDARDS AND SPECIFICATIONS FOR PRECAST MANHOLES. O O PLAN STAINLESS NU&BOLTSSTEEL 5. ALL MANHOLES ARE REQUIRED TO BE VACUUM TESTED. O O BUTYL MASTIC BETWEEN 6. 4' INSIDE DIAMETER MANHOLES SHALL HAVE 5" THICK WALLS A MANHOLE AND FRAME & COVER 5' INSIDE DIAMETER MANHOLES SHALL HAVE 6" THICK WALLS PRE -CAST RINGS (WHEN NEEDED) 7. MANHOLES MUST NOT HAVE ANY LARGE CHIPPED AREAS, MAXIMUM OF 11 1/2" BROKEN AREAS, CRACKS, OR EXPOSED REINFORCEMENT, OR INCLUDING BUTYL MASTIC OTHER DEFECTS. DEFECTIVE MANHOLES WILL NOT BE A ACCEPTED. BUTYL RUBBER SEALS IN JOINTS 10-3/4" 12" 5" MIN 6" MIN CONCRETE BLOCK COPOLYMER POLYPROPYLENE PLASTIC TT__ PIPE DIA. CONCRETE MONOLITHIC POURED 1/2" GRADE 60 STEEL REINFORCEMENT 8" MIN MMOUR GHD Consulting Services Inc. III-1i , 222 South Church Street, Suite 400 ���_���_���_���_I _F_Fii_Fii_Fii Il���lll��iliiFi�iii--���-���-���_ Charlotte NC 28202 USA T 1 704 302 4910 W www.ghd.com UNDISTURBED SOIL OR COMPACTED SECTION AA WASHED STONE WHERE POOR SOIL 5-3/4" SECTION A -A CONDITIONS EXIST CHARLOTTE CHARLOTTE WATER DOGHOUSE MANHOLE 4' & 5' DIAMETER WJ)TER 1. THIS STEP TO BE DRIVEN CHARLOTTE, NORTH CAROLING INTO TAPERED HOLES IN PRECAST MANHOLE SECTIONS. DO NOT USE AS 1000 LB. PULL OUT TEST REPORT A GROUTED -IN STEP. 11144299 STEVENS CREEK REQUIRED ON EACH STEP. Job No. File No. Scales TRUNK SEWER PHASE 2 PLAN NTS PROFILEr PLASTIC STEP CORED HOLE NTS MANHOLE DETAILS Vert. Ve DRIVEN IN PLACE (SHEET 1 OF 2) As Built Date Sheet Of B 7 1 JAM 100% DESIGN 119 L. ASSOC JEM CJS BMG 1 15 28 No. Dote By Revision Surveyed By Designed By Drown By Project-Engr Approved By Date :j A CITY OF CHARLOTTE DEPARTMENT GROUND LEVEL H z w W m W 0 M 4" TOP VIEW 4" L A B E L TYPE "A" GROUNI TOP VIEW 2.956" TYPE "B" NOTE: 1. ALL MARKER POSTS SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. MANHOLE MARKER DETAIL C P A S I U E P T W E I E L 0 R I N N E IB Know what's below. Call before you dig. LABEL DETAILS 4' 2' 12" HOLE FILLFI WITH CONCRETE 5/8" COPPER GROUND ROD. CAST IN OR CORE IN MANHOLE 1" BELOW STEP IN CENTERLINE OF STEP. DO NOT PROTRUDE PAST INSIDE EDGE OF STEP. FLOW PLASTIC GREEN MANHOLE MARKER LABELED SEWER MH (SEE NOTES) SEWER ' LATERAL S - - - - —I I ------------ (SEE TRACER SCREWS (TYP.) GROUND ROD CLAMP SECTION VIEW 112" MIN. -CONNECT EACH TRACER WIRE TO GROUND ROD WITH GROUND ROD CLAMP WITH STAINLESS STEEL SCREWS (SEE DETAIL ABOVE). WRAP ALL EXPOSED METAL WITH RUBBER ELECTRICAL SPLICING TAPE NO. 12 GAUGE SOLID COPPER TRACER WIRES (TYP.) -) ALL VERTICAL WARE SHALL BE PLACED �IN 1" ID PVC CONDUIT N0. 12 GAUGE SOLID COPPER TRACER WIRE (TYP.) SEE NOTES I( )1� SEWER SADDLE TAP FLOW SEWER MAIN '-WRAP EACH TRACER WARE AROUND OUTSIDE OF MANHOLE AND CONNECT TO GROUND ROD GRAVITY SEWER MAIN & MANHOLE MARKER SECTION VIEW MAIN TRACER WIRE FOR NEW SEWER NEW SERVICE ON EXISTING MAIN MAGNESIUM ANODE 1 LB. MIN. REWIRED WHERE NO TRACER WARE IS LOCATED ON SEWER MAIN NOTES: 1. TRACER WIRE SHALL BE AWG NO. 12 GAUGE SOLID COPPER WITH 30 MILS GREEN HDPE INSULATION. 2. FOR GRAVITY MAIN AND OR LATERAL INSTALLATIONS LESS THAN 8 FEET, THE TRACING WIRE SHALL BE ATTACHED TO THE PIPE. TRACER WIRE SHALL BE LAID FLAT AND SECURELY AFFIXED TO THE PIPE AT 10 FOOT INTERVALS USING ZIP TIES. FOR GRAVITY MAIN AND OR LATERAL INSTALLATION DEEPER THAN 8 FEET, THE TRACING WIRE SHALL BE ATTACHED TO THE PIPE AND PLACED AT A DEPTH OF 4 TO 5 FEET DIRECTLY ABOVE THE SEWER PIPE. THE WIRE SHALL BE PROTECTED FROM DAMAGE DURING THE EXECUTION OF THE WORK. NO BREAKS OR CUTS IN THE TRACER WIRE OR INSULATION SHALL BE PERMITTED. 3. WHERE LATERAL TAPS ARE MADE BY SERVICE SADDLES, THE TRACER WIRE SHALL NOT BE ALLOWED TO TO BE PLACED BETWEEN THE SADDLE AND MAIN. 4. SPLICES IN THE PRIMARY TRACER WIRE ALONG THE SEWER MAIN SHALL INCLUDE 3 FEET OF SLACK WIRE ON EACH SIDE OF EACH SPLICE. 5. FOR INSTALLING A NEW LATERAL ON AN EXISTING MAIN WITH TRACER WIRE, ONLY SPLICE TO EXISTING WIRE WITH 3 FEET OF SLACK ON NEW LATERAL. 6. MANHOLE MARKERS SHALL BE PLACED ADJACENT TO MANHOLES AT THE DISCRETION OF ENGINEER OR ENGINEER'S REPRESENTATIVE. I— z w W N Q W W z_ VALVE BOX ASSEMBLY CLTWATER STD. W a.a. [(SEE PER REHAB DETAIL) DETAIL a. FINISHED GRA[ 1 •STEEL REM SIZE #3 OR #4 EXTEND TRACER WIRE 1 1 CONCRETE PAD JUST ABOVE CLEANOUT PLUG. 1 (SEE CLTWATER STD. PROVIDE 24" NEATLY COILED DETAIL) WARE IN BOX. 1 ALL VERTICAL WIRE SHALL BE PLA 1 IN 1/4" OR 3/8" ID CONDUIT SDR 9 PEX TUBING - ASTM F376 (TYP.) 1 1 1 GAUGE SOLID COPPER 1 fNO.112 TRACER WIRE (TYP.) A. FASTEN TRACER WARE TO PIPE WITH ZIP TIES AROUND THE EXISTING CIRCUMFERENCE OF PIPE AT 10' INTERVALS (TYP.) GRAVITY i MAIN SERVICE CONNECTION SECTION VIEW NOTES: 1. THE TRACER WIRE SHALL BE CONTINUOUS TO THE GREATEST EXTENT POSSIBLE. WHERE SPLICES ARE NECESSITATED IN THE WIRE, THE SPLICES SHALL BE SECURELY BONDED TOGETHER WITH AN APPROVED INDUSTRIAL CONNECTOR TO PROVIDE ELECTRICAL CONTINUITY. CONNECTOR SHALL BE COPPER AND INSULATION SHALL BE REPAIRED TO SEAL OUT MOISTURE AND CORROSION AND SHALL BE INSTALLED IN A MANNER SO AS TO PREVENT ANY UNINSULATED WIRE EXPOSURE. (SEE CLTWATER STD. DETAIL TS1) 2. THE CLEANOUT AT THE RIGHT OF WAY AND OR EASEMENT SHALL SERVE AS THE TEST PORT. 3. SPLICED CONNECTIONS SHALL BE ALLOWED BETWEEN THE MAIN LINE TRACER WIRE AND THE LATERAL TRACER WIRE. 4. FOR NEW SEWER TAPS ON EXISTING MAINS VOID OF ANY TRACER WIRE, PROVIDE A 1 LB. MAGNESIUM ANODE FOR THE TRACING WIRE TERMINATION AT THE POINT OF THE NEW TAP ON THE EXISTING SEWER MAIN. PLACE ANODE AT BOTTOM EDGE OF TRENCH AWAY FROM MAIN & LATERAL. 5. PRIOR TO ACCEPTANCE (POST PUNCH LIST) EACH WIRE SEGMENT SHALL PASS A CONDUCTIVITY TEST, WITNESSED BY THE ENGINEER OR ENGINEER'S REPRESENTATIVE. CURB SEWER LATERAL WRAP TRACER WIRE CURB AROUND OUTSIDE OF — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 0. 12 GAUGE SOLID COPPER MANHOLE AND CONNECT NO SPLICE — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — NO. 12 GAUGE SOLID COPPER TRACER WIRE (TYP.) TO GROUND ROD TRACER WIRE (TYP.) GRAVITY SEWER MAIN WRAP TRACER WIRE AROUND NEW SERVICE ON EXISTING MAIN OUTSIDE OF MANHOLE AND CONNECT 2 GAUGE SOLID MAGNESIUM ANODE (1 I.B. MIN.) EACH WIRE TO GROUND ROD CUR SEWER FLOW FLOW REWIRED WHERE NO TRACER ( CLTWATER STD. DETAIL) LVARE(TYP.) MANHOLE WARE IS LOCATED ON SEWER MAIN (TYP.) FLOW FLOW ~ "-SPLICE TAPE TRACER WIRE TO PIPE WITH Y WIDE PVC NO. 12 GAUGE SOLID COPPER ALL VERTICAL WIRE SHALL BE PLACED TRACER WARE (TYP.) EXIST. SEWER MAIN LINE SEWER MANHOLE NO SPLICE SEWER MAIN NO SPLICE SEWER MAIN NEW SERVICE ON EXISTING MAIN TAPE AROUND THE CIRCUMFERENCE OF PIPE AT 10' INTERVALS (TYP.) IN 1" ID PVC CONDUIT WITHOUT TRACER WARE LINE STREET ROADWAY WRAP TRACER WARE AROUND LINE MAGNESIUM ANODE (1 I.B. MIN.) GROUND ROD CURB SEWER SERVICE OUTSIDE OF MANHOLE AND CONNECT STREET / ROADWAY REWIRED WHERE NO TRACER GRAVITY SEWER MAIN SEWER MANHOLE LATERAL EACH WIRE TO GROUND ROD (SEE CLTWATER STD. DETAIL) CURB WIRE IS LOCATED ON SEWER MAIN PLAN VIEW — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - - — — — — — — — — — - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — SEWER TRUNK — — — — — — — — — — — — — — — — — — - — — — PLANTING STRIP LINE PLANTING STRIP SEWER SERVICE SEWER SERVICE LATERAL SIDEWALK LATERAL 0 SIDEWALK NO. 12 GAUGE SOLID COPPER TRACER NO. 12 GAUGE SOLID COPPER NO. 12 GAUGE SOLID COPPER TRACER WARE (TYP.) TRACER WARE (TYP.) WARE (TYP.) -T--- RIGHT OF -WAY CLEANOUT EASEMENT LINE VALVE BOX CLEANOUT CLEANOUT VALVE BOX ASSEMBLY VALVE BOX ASSEMBLY CONCRETE PAD ASSEMBLY I ( SEE (SEE CLTWATER STD. DETAIL) I (SEE CLTWATER STD. DETAIL) (SEE CLTWATER STD. DETAIL) STD. DETAIR PROPERTY / CONCRETE PAD (SEE CLTWATER STD. DETAIL) PROPERTY / CONCRETE PAD (SEE CLTWATER STD. DETAIL) EASEMENT LINE EASEMENT LINE SEWER TRUNK NOTES: N0. 12 o))1 LINE GATRRACE'R COPPER-, 1. TRACER WIRE SHOWN AWAY FROM PIPE FOR CLARITY. TRACER WIRE SHALL BE INSTALLED IMMEDIATELY ADJACENT TO THE SEWER PIPE. TRACER WIRE SHALL BE FASTENED TO THE PIPE WITH ZIP TIES AT 10 FOOT INTERVALS. 2. TRACER WIRE SHALL BE SOLID COPPER NO. 12 GAUGE WITH 30 MILS GREEN HDPE INSULATION. FLOW - - -RIGHT--OF-WAY / 8 No. 12 GAUGE SOLID COPPER EASEMENT LINE o o A TRACER WARE (TYP.) A— WRAP TRACER WIRE AROUND 6 //�OUTSIDE OF MANHOLE AND CONNECT EACH WARE TO GROUND ROD TOP VIEW (SEE CLTWATER STD. DETAIL) rTRACER WIREE(TYPD COPPER FLOW SEWER OUTFALL-' SEWER MANHOLES N.SEWER OUTFALL NO SPLICE / STREAM � STREAM / STREET VIEW - GRAVITY SEWER TRACER WIRE PLAN VIEW HED GRADE SECTION VIEW SEWER MANHOLE FINISHED GRADE FINISHED GRADE SEWER MANHOLE 24 4' TO 5' WARNING TAPE NO SPLICE MANHOLE NNECTION DETAIL TRACER WARE WARNING TAPE TRACER WARE NO. 12 GAUGE SOLID LV�A COPPER TRACER SEWER 12" SEWER WIRE (�•) PIPE T PIPE GAUGE SOLID GRAVITY SEWER MAIN R TRACER LESS THAN 8' DEPTH TYP.) TRACING WARE SHALL GRAVITY SEWER MAIN GREATER THAN 8' DEPTH BE ATTACHED TO PIPE TRACER WIRE SHALL BE ATTACHED TO PIPE SERVICE AND PLACED AT A DEPTH OF 4 TO 5 FEET LATERAL DIRECTLY ABOVE SEWER PIPE TRENCH DETAIL PROFILE VIEW TRACER WIRE FOR GRAVITY SEWER DEEPER THAN 8 ET NOTES: 1. LADDERS AVAILABLE IN 2 RUNG THROUGH 25 RUNG. 2. POLYPROPYLENE CONFORMS TO ASTM D-4104. LADDERS MEET ALL ASTM C-497 LOAD REQUIREMENTS AND OSHA 1910.26 AND 1910.27 SPECIFICATIONS. 3. FASTEN LADDER TO FLOOR AND WALL WITH 1/2" x 1-1/2" ANCHORS. ANCHORS TO BE INSTALLED PER MANUFACTURERS INSTRUCTIONS. 4. STANDARD ADJUSTABLE MOUNTING BRACKET — 8" O.D. 5. ALUMINUM REINFORCED COPOLYMER POLYPROPYLENE RAIL 1-3/4" x 1-3/4" DIA. 6. STEEL REINFORCED COPOLYMER POLYPROPYLENE RUNG 1'-5/8" x 1-1/4" DIA WITH MOLDED FINGER GRIPS, 12" C.C. 7. INSTALL LADDER ANCHOR EVERY 4' FROM TOP. FRONT VIEW SIDE VIEW POLYMER MANHOLE LADDER DETAIL Em mmm CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE, NORTH CAROLINA 11144299 Scales PLAN NTS PROFILE Hor NTS STEVENS CREEK TRUNK SEWER PHASE 2 Vert. NTS MANHOLE DETAILS (SHEET 2 OF 2) As Built Date 100% DESIGN L. ASSOC JEM CJS BMSheet Of G 11 19 Revision Surveyed By Designed By Drawn By Project—Engr Approved By Dote 1 6 28 A CITY OF CHARLOTTE DEPARTMENT 3/4" LETTERS 1" LETTERS (RECESSED FLUSH) ` INI(��• 0 1" VENT HOLE (RECESSED FLUSH) 3/4" LETTERS IIRpN 1" ARIAL TEXT ®�� A0� �• ® 5/8" ARIAL STYLE TEXT (2)PICON PENETRATING JORDAN I RpN WpR�S ®pD�l1®�� 1 5/8"°� T E®d� JORDAN wp (RECESSED FLUSH) `BPS E Res �•�®��OT T E ePs� 01 T E - 1" LETTERS 0T wq 1" ARIAL TEXT T (2) NON PENETRATING �'O - G�TF CAM LOCK PIICKBARSD .9 (RECESSED FLUSH) 5/8" ARIAL STYLE TEXT PICK HOLES 0 ARN I NG SEE ASSEMBLY DETAIL _Z_P CAM LOCK V WARNING 2 CORED AN ITARY PICKBARS DO NOT ENTER SEE SANITAR 1 1/2" DETAIL SEWER SEWER DO NOT ENTE (2) - LIFTING BARS SEWER (2) - NON PENETRATING PICK HOLES O (2) - NON PENETRATING PICK HOLES 1 1/2-1 lz 1 1/2" T HEX S8"- TYPE 304 S 11 x4" LETTERS 1 1 /2" 1 1 2" / li�' USF CAMLOCK WASHER / (REC 5/8" HEX HEAD BOLT 1/16"x5/8"x1 1/2" WASHER 1 1 2» (RECESSED FLUSH) ALL GRADE S.S. RUBBER ? 3/4" LETTERS /� (2) - LIFTING BARS s �� q E� TYPE 304 5/8" ID 1.50 OD TYPE 304 S.S. NET A Y S '� (RECESSED FLUSH) Oi D O NO A R Y s I D O N I R ®E IN U.S. MADE 1 N USP 1" VENT HOLE `�De IN U.S.�° — = 2 3/8" LOCK LUG MADE IN USA 1 1/8" BOSS 26" 6 1 /4" 1 1/2- 0 26" 1 1/2- 26" 22„ =_ 3/8" 0 26" NUT HEX 5/8"-11 1 13/16" TYPE 304 S.S. NYLK 15/16" 1 13/16" 6 1 /4" 15/16" 3 1 /4" 0 - 0 3 13/16" _ 0 p _ 3 1 /4" 2 1 /8" NUT HEX JAM 5/8"-11 TYPE 304 S.S. 1/2" 0 22 13/16" 1 1 15/16" 5 3/16"� 1 5/8" 3 1 /8" 1 /2" 1 3/8 0 22 13/16 » » 1 15/16" 5 3/16» 3/16 NEOPRENE 1 GASKET 2 /8 » 1 1 /2" � � " 0 25» O.D. OF GKT GROOVE 01 VENT HOLE 15/16" 9/16" 1— 15/16" 3 13/16 1 5/8" T i I I 011/16" 1 3/8" 6 1/2" 1/2" •, 9/16" 1/2" 5/8" TYPE 304 5/8" TYPE 304 1/2" 5/8" TYPE 304 MACHINED S.S. ROD SURFACE S.S. ROD MACHINED SURFACE EAST IRONWORKS S.S. ROD 3 16 DOVETAIL / GROOVE MACHINED " 1 2" „ •1800 / 5/8 TYPE 304 EAST JORDAN IRON WORKS USF NR USF NIL SURFACE .2400" MACHINED S.S. ROD SURFACE DATE 5/8" 3/4" 1 1/4" 1040C 2 1 /4" � » 7 16 PROD. NO. DATE 5/8" 3/4" 1 1 /4" 3/16" 1040AGS 2 1 /4" 7/16" � 1 3/8» " PROD. RX 1 PROD. NO. CLASS 35 8» 1 3 ASTM A48 CL35B / 1" 0 7/8" CAM LOCK CLASS 35 ASTM A48 CL35B -- -- -- -- /'' 1" VENT HOLE HOLE ®22" » 3/8 5/8" 5/16" — �-- /4» 3/8„ 3/16" DOVETAIL .180" [—�.240" 1 1/8" 3 4 /" GROOVE PICK HOLE DETAIL PICK HOLE DETAIL PICK HOLE DETAIL PICK HOLE DETAIL TYPE 1 24—INCH MANHOLE COVER (VENTED) TYPE 3 24—INCH MANHOLE COVER WATERTIGHT GASKET CAMLOCK (SOLID)- HLES n AANCHOR 9 � S S d I D O �S� b S .0 H/ Ob�Y dORDAN I RON S (4) - 0 1" ANCHOR PS1 WORk S 0 33 3/4" B.C.D. �� �� 0031 B.C.D. 0 0 s b'S.n (4)-0 1" ANCHOR HOLES ON A --3 0 I. b4 0 32 3/4" B.C.D. �g Y o 0 r— Z D n N O N LL w v, V) Cr � o O �O MACHINED r D MACHINED SURFACE 0 0 Lf) Lo SURFACE 0 0 1 1 /2" 01 w J 1 1 /2" EAST JORDAN IRON WORKS Oq %E MADE I N U S A MADE IN USA MACHINED FRAME SURFACE MACHINED 0 SURFACE 1 5/8" 0 1 1/2- q Te � 27 1 /4" FRAMEJ 1 1 /2" 34" 1" 26 1 /4" 1 1/2" 1 1/2- 26 1 /4" 1 1 /2" MACHINED 27 7/16" SURFACE 26 1 /4" FRAME 24" 4" 24" 1 /2» 27 15/16" » 36 " 26 1/4" 4" 1-424" ^ GHD Consulting Services Inc. 26 1 /4" 222 South Church Street, Suite 400 Charlotte NC 28202 USA 5/8" I 1 1/2" 36 " 24 1 1/2" 27 1/4" , T 1 704 302 4910 W www.ghd.com I 4" _F 27" 4" i i �5/8" CHARLOTTE CHARLOTTE WATER W�TER " 11/2" CHARLOTTE, NORTH CAROLINA 36 26 1/4» MACHINED SURFACE 11144299 Job No. File No. STEVENS CREEK TYPE B 24—INCH MANHOLE FRAME 4 INCHES TALL TYPE C 24—INCH MANHOLE FRAME 4—INCH Scales PLAN AS NOTED TRUNK SEWER PHASE 2 TALL INVERTED — REVERSIBLE (CAST IN) PROFILE Hor. NITS NITS 24 /N. MANHOLE FRAME Vert. AND COVER DETAILS As Built Date B 7 1 JAM 100% DESIGN Sheet Of L. ASSOC JEM CJS BMG 11 19 17 28 No. Dote By Revision Surveyed By Designed By Drown By Project-Engr Approved By Date A CITY OF CHARLOTTE DEPARTMENT FINAL BACKFlLL// I 1 1-1 1 1_ �/ III=III=III=III=III=III=III / INITIAL BACKFlLL I II�II ! W PIPE OD / — I I a PIPE SPRINGLINE co MUNCHING BEDDING / ...... FOUNDATION 24"/ // /�/�/ / //� 24" SUBGRADE NOTES: 1. FOUNDATION MATERIAL ONLY REQUIRED WHEN UNSUITABLE SUBGRADE MATERIALS ENCOUNTERED. 2. SEE SPECIFICATION 02223 (BACKFILLING) FOR MATERIALS REQUIRED. TYPICAL TRENCH DETAIL STRAIGHT THROUGH 4-WAY JUNCTION FORM BENCH WITH 4000 PSI CONCRETE NHOLE WALL 4ANHOLE Wi RIGHT ANGLE 3-WAY JUNC11ON CONCRETE BASE SECTION \PRON SLOPE BENCH TO CHANNEL ® 1% PROPOSED MANHOLE NOTES: 1. FINISH ALL CHANNELS AT PROPER GRADE AS TO ALLOW SMOOTH AND UN -OBSTRUCTED FLOW ALL INVERTS TO BE FLUSH WITH THE INSIDES. MINIMUM CHANNEL SLOPE = 0.2% FLOW CHANNEL AND BENCH DETAIL CONDITION SCHEMATIC REQUIREMENTS WL I A. WATERLINE AND SEWER LINE PIPE LENGTHS TO BE CENTERED AT CROSSING. EACH LENGTH OF PIPE WATERLINE MORE THAN IS TO BE 10' MINIMUM. ABOVE 18 INCHES SEWER LINE SL A. WATERLINE AND SEWER LINE PIPE SL LENGTHS TO BE CENTERED AT CROSSING. EACH LENGTH OF PIPE. B. COMPACTED SELECT FILL OR WASHED SAND TO THE CENTERLINE OF SEWER LINE MORE THAN EXISTING UTILITY PIPE. ABOVE 18 INCHES WATERLINE BACKFlLL WL - WATERLINE SL - SEWER LINE, SANITARY OR STORM D PIPE BEDDING D - OUTSIDE DIAMETER OF PIPE IN NO CASE SHALL PIPES BE CLOSER THAN 18" APART. DISTANCES ARE MEASURED BETWEEN OUTSIDES OF PIPE. D PLUS 2' END CLOSURE SEE DETAIL BELOW DRAINAGE GRAVEL (10 CIF OF STONE) WATERMAINZSEWER CROSSING SPIDER SUPPORTS OR APPROVED EQUAL SLOPE TO DRAIN PROVIDE" WEEP HOLE AT LOW POINT OF CASING :ARRIER PIPE ENCLOSE ENDS WITH 8" BRICK MASONRY (SEAL WITH NON -SHRINK GROUT AS V NECESSARY) END CLOSURE SECTION SECTION STEEL ENCASEMENT PIPE PROPOSED SEWER MAIN RESTRAINED JOINT DIP CARRIER PIPE A INIMUM SIZE AND THICKNESS STD. FOR ENCASEMEN PIPE LOCATION CARRIER PIPE CASING PIPE NCDOT THICKNESS (INCHES) (INCHES) (INCHES) THOMPSON RD 16 30 0.312 THOMPSON RD 12 24 0.250 SPIDER SUPPORTS ENCASEMENT PIPE NOTES: 1. REFER TO APPLICABLE PERMIT FOR MINIMUM REQUIREMENTS GOVERNING HIGHWAY UNDERCROSSINGS. 2. STEEL "SPIDERS" SHALL BE USED FOR SUPPORT OF THE CARRIER PIPE WITHIN THE ENCASEMENT (CASING) PIPE. 3. A MINIMUM REQUIREMENT OF 2 SPIDERS PER JOINT OF CARRIER PIPE SHALL BE REQUIRED. 4. SPACING OF SPIDERS WILL BE DICTATED BY THE LENGTH OF CASING PIPE AND NUMBER OF JOINTS OF CARRIER PIPE. 5. THERE SHALL BE NO WELDING OF CASING UNDER PAVEMENT. CASING PIPE WITH SPACERS STAINLESS STEEL TAKE-UP CLAMP 1 FOR PIPE 14.3" OD OR SMALLER 2 FOR PIPE 14.3" OD OR LARGER SLOPE TO CHANNEL STAINLESS STEEL POWER SLEEVE RING OR APPROVED EQUAL f� 1..17HIV IV GL EXISTING BENCH NOTES: 1. CORE DRILL ENTRANCE HOLE IN MANHOLE BARREL, BASE AND/OR BENCH FOR REQUIRED PIPE CLEARANCE. PER MANUFACTURERS RECOMMENDATIONS. 2. WATERTIGHT PIPE TO MANHOLE BOOT SEAL REQUIRED FOR ALL CORE DRILLED ENTRANCE HOLES IN MANHOLE BARREL AS SHOWN. CONNECTION TO EXISTING MANHOLE EXISTING PIPE CROSSING (SEE 1'-O" 1'-0" WATER MAIN CROSSING DETAIL FOR CONCRETE ENCASEMENT) cn Q J E: U Q m w I 0 N w n a 1 0 W 1 W / 0' w m TRENCH BOTTOM PIPE GASKET VARIES WITH / SLOPE z------- EXIST. OR FINISHED GRADE 4' MIN. COVER AT I� 1% MINIMUM 22-1/2' BEND (PVC, DIP OR CISP.) —COMPRESSION JOINT SEALER SEWER TAP SADDLE EPDXY SEALANT AS RECOMMENDED BY TAP SADDLE MANUFACTURER VITRIFIED CLAY, PVC OR DUCTILE IRON PIPE. NOTES: 1. THE OPENING PIPE SHALL BE CUT WITH A TAP MACHINE ONLY. 2. THE TAP SHALL BE MADE IN THE UPPER HALF OF THE PIPE AT 45' FROM THE HORIZONTAL 3. MAXIMUM SIZE TAP SHALL BE FOUR INCHES. 4. TEE & BEND TO BE FULLY ENCASED WITH #67 CRUSHED STONE. 5. SDR 35 PVC LATERAL PIPE REQUIRE TYPE III GRANULAR BEDDING. 6. MIN. CLEAR TO PIPE JOINT ON MAIN SHALL BE 1'-0". 7. THE LATERAL MUST BE INSTALLED PERPENDICULAR TO THE MAIN. 8. IF THE LATERAL HAS LESS THAN 3' OF COVER, THE LATERAL MUST BE D.I.P. 4" LATERAL(TAPI SURFACE FLOW DIVERTED BY SWALE SEED AND MULCH W/— SURFACE BINDER m _j AGGREGATE BED OVER SELECT FILL LL_ GEOTDMLE FILTER CLOTH J AGGREGATE APPROCH am Fr 1:5 (V. H) MAXIMUM SLOPE ON ROAD IR 0 UQ } a SURFACE FLOW DIVERTED BY SWALE PIPE BEDDING PIPE CROSSING SUPPORT DETAIL PROPOSED SEWER — NEW ROAD GEOTEXTILE FILTER CLOTH ORIGINAL STREAM BED AGGREGATE BED OVER GEOTEXTILE FILTER CLOTH SURFACE FLOW DIVERTED BY SWALE SURFACE FLOW DIVERTED BY SWALE TEMPORARY FORD CROSSING GHD Consulting Services Inc. 222 South Church Street, Suite 400 Charlotte NC 28202 USA T 1 704 302 4910 W www.ghd.com CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE, NORTH CAROLINA 11144299 Scales PLAN NTS PROFILE Hor, NTS Vert. NTS STEVENS CREEK TRUNK SEWER PHASE 2 SEWER DETAILS (SHEET 1 OF 2) 100% DESIGN Revision L. ASSOC JEM CJS Surveyed By I Designed By I Drown By Sheet Of BMG 11 19 118 28 Project-Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT NOTES: 1. EXISTING TOPSOIL SHALL BE REMOVED STOCKPILED AND PROTECTED FROM UTILITY TRENCH CONTAMINATION AND SHALL BE (SEE NOTE 8) TRENCH WIDTH REPLACED AS TOPSOIL AFTER UTILITY 5' MILL &OVERLAY 4" NATIVE TOPSOIL RESTORED INSTALLATION. EX.PAVEMEN �TACK TO ORIGINAL GRADE AND SEEDED COAT 2. ANTI -SEEP COLLAR SHALL BE PLACED AT THE '~ ' ::::::.a1lIITH WETLAND SEED MIXTURE. DOWNSTREAM WETLAND BOUNDARY AND A EX. BAS �; ........ "" "............... ..'` MIN. SPACING OF 150' UP THE GRADIENT UNTIL 3' IN UNDEVELOPED AREAS BACKFILL THE UTILITY EXITS THE WETLAND BOUNDARY EX. SUB-GRA MIN. REMAINING PORTION OF UNLESS INDICATED OTHERWISE ON THE DRAWINGS. TO/BURY TRENCH95% IF MAX DENSITY.3. ANTI -SEEP COLLARS MAY BE CONSTRUCTED WITH \//\///�/D EPTH\ i" COMPACTED CLAY, CLASS B CONCRETE, PVCOR COLLAS. WE -THAT 6" AREMETAL DIRECTIONALLY DRILL DN AND PERIPEND CULAR *MINIMUM BURY DEPTH NOTICE: WETLAND CROSSINGS THAT ARE OPEN CUT AND CONTRACTOR IS RESPONSIBLE FOR \//\ _III i BACKFILL TO 18" ABOVE PIPE LESS THAN 150' IN LENGTH DO NOT REQUIRE DETERMINING ACTUAL BURY DEPTH -' FOR A LENGTH OF 12" WITH ANTI -SEEP COLLARS. TO AVOID ADVERSE IMPACTS TO \\ \\ \\ \\ \ 18" MI �:.. CLASS B CONCRETE SPECIFIED ROADWAY STRUCTURE. 3' MINIMUM -I I BELOW OR WITH WITH IMPERMEABLE 4. CONTRACTOR SHALL PROVIDE EXISTING PAVEMENT 2 ASPHALT CONCRETE SURFACE COURSE BURY DEPTH; SOME INSTALLATIONS CLAY HAVING A SPECIFIC DISCHARGE OF TYPE S9.5C AT AN AVERAGE RATE OF 112 I I SUITABLE FORMING (TO BE REMOVED) SYSTEM LBS. PER SQ. YD. PER INCH. WIDTH VARIES. MAY REQUIRE MORE DEPTH. UNDISTURBED =I I 1 X 10-5 CM/SEC OR LESS. TO CONTAIN CONCRETE FOR PROPER SAW -CUT SHAPE AND DIMENSIONS. PROVIDE#4 ,, ANTI SEEP COLLAR SHALL EXTEND BARS ®12"OC EACH WAY. NOTES: CID) A MIN. OF 18" ABOVE THE PIPE, 6" 5. ANTI -SEEP COLLAR MATERIAL AND 1. ALL WORK SHALL HAVE PRIOR APPROVAL FROM TOWN ENGINEER 12" MIN -I I �' INTO UNDISTURBED TRENCH WALLS INSTALLATION SHALL BE APPROVED BY THE I-_- i irri i EACH SIDE AND 12" INTO UNDISTURBED ENGINEER PRIOR TO PLACING AND PRIOR TO BEFORE BEGINNING (EXCEPT FOR EMERGENCY REPAIRS; SEE NOTE 2). -III--,-�-� TRENCH BOTTOM. BACKFILLING. I 2. EMERGENCY REPAIRS ARE PERMITTED WITHOUT PRIOR APPROVAL; 6. CONSTRUCTION AND SEEDING IN WETLAND NOTIFICATION MUST BE SENT TO TOWN ENGINEER WITHIN 48 HOURS AREAS SHALL BE IN ACCORDANCE WITH I� II PH I I I I I 1 I 2" ASPHALT CONCRETE INTERMEDIATE OF BEGINNING EMERGENCY REPAIR. 1� BEDDING MATERIAL SHALL NOT BE INSTALLED STATE AND FEDERAL REGULATIONS AND SUB GRADE COURSE TYPE 119.06 AT AN AVERAGE WHERE ANTI -SEEP COLLAR IS LOCATED. THE OWNER'S PERMIT REQUIREMENTS. RATE OF 114 LBS. PER SQ. YD. PER INCH. 3. ALL WORK SHALL ADHERE TO THIS STANDARD (BOTH PLANNED AND 5" ASPHALT CONCRETE BASE COURSE EMERGENCY). CLASS B CONCRETE SPECIFICATIONS TYPE B25.OB AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER INCH 4. CONTRACTOR SHALL KEEP ROAD OPEN TO TRAFFIC DURING UTILITY A MINIMUM CEMENT CONTENT, SACKS PER SPECIAL CONDITIONS FOR WETLAND AREAS WORK. NO ROAD CLOSURES PERMITTED WITHOUT PRIOR APPROVAL SUITABLE" - " FROM TOWN ENGINEER. TEMPORARY LANE CLOSURES ARE PERMITTED CUBIC YARD WITH ROUNDED COURSE AGGREGATE 5.0 1. THE CONSTRUCTION CORRIDOR IS LIMITED TO COMPACTED MATERIAL TO WITH PROPER TRAFFIC CONTROL B MINIMUM CEMENT CONTENT, SACKS PER 40' IN WIDTH AND MUST BE MINIMIZED TO THE MINIMUM 959b OF MAX. DENSITY CUBIC YARD WITH ANGULAR COURSE AGGREGATE 5.5 MAXIMUM EXTENT POSSIBLE 5. FILL MATERIAL AND BASE COURSE COMPACTION SHALL BE VERIFIED C) MAXIMUM WATER -CEMENT RATIO GALLONS 2. PRECONSTRUCTION CONTOURS TO BE RESTORED BY A THIRD PARTY TESTING FIRM (AT CONTRACTOR'S/UTILITY'S PER SACK 6.8 3. STABILIZATION IS REQUIRED IMMEDIATELY ON EXPENSE). TESTS SHALL BE MINIMUM ONE(1) PER 100' OF TRENCH COMPLETION OF EACH INDIVIDUAL CROSSING. D) SLUMP RANGE 2" TO 4" 4. RESTORATION TO INCLUDE SEEDING WITH ANNUAL 6. WET MATERIAL IS PROHIBITED FROM BEING USED FOR FILL MATERIAL. E) MINIMUM STRENGTH - 28 DAY PSI 2,500 SUCHIES ASFE SCUE PROHIBIITED)�PERENNIALS 7. SURFACE COURSE ASPHALT SHALL BE SMOOTH AND CONTIGUOUS WITH SURROUNDING ROADWAY SURFACE. 5. THE TOP 6" TO 12" OF THE TRENCH SHOULD GENERALLY BE BACKFILLED WITH TOPSOIL FROM 8. UTILITY TRENCH WIDTH SHALL BE WIDE ENOUGH TO ALLOW THE TRENCH MECHANICAL COMPACTION AND PROOF ROLL INSPECTION. 6. EXCESS MATERIAL SHALL BE REMOVED TO UPLAND AREAS UPON COMPLETION OF 9. DAMAGE TO SURROUNDING PAVEMENT SURFACE SHALL BE THE UTILITY LINE. RESPONSIBILITY OF THE CONTRACTOR TO REPAIR, PER CURRENT TOWN OF MINT HILL PAVEMENT SURFACE COURSE REPAIR STANDARD. ANTI -SEEP COLLAR DETAIL PIPE DIAMETER (INCHES) WIDTH (MINIMUM) (INCHES) HEIGHT (H) (MINIMUM (INCHES) CONCRETE VOLUME APPROX. PER L.F. FT -ILF CYILF 4 31 25 4.26 0.16 6 33 27 4.93 0.18 8 36 30 6.05 0.22 10 38 32 6.77 0.25 12 40 34 7.49 0.28 16 44 38 8.96 0.33 20 49 43 11.09 0.41 24 53 47 12.67 0.47 30 60 54 15.91 0.59 36 66 60 18.50 0.69 42 74 68 23.14 0.86 48 80 74 26.04 0.96 54 88 82 31.04 1.15 60 92 86 33.24 1.23 64 96 90 35.48 1.31 DETAIL ELEVATION VIEW CONCRETE ENCASEMENT DETAIL PAVEMENT REPAIR DETAIL NO. DESCRIPTION c 1 DUCTILE IRON PIPE J 2 HDPE ADHESIVE TAPE OR HDPE ZIPLOCK TIE Q z CCv m Y 3 CONCRETE ENCASEMENT (f'c = 3600 PSI MIN.) N p 4 STONE STABILIZATION MATERIAL - AS REQUIRED 0 z 5 HIGH DENSITY CROSS LAMINATED POLYETHYLENE FILM (HDCLPE) - Z h 4 MILS - TUBE - AWWA C105 6 HIGH DENSITY CROSS - LAMINATED POLYETHYLENE FILM (HDCLPE) - 4 MILS - TUBE - AWWA C105 7 1-INCH DIA. SCH. 40 PVC ELECTRICAL CONDUIT -SOLVENT WELD JOINTS 8 AWG #12 GAUGE COPPER TRACER WIRE WITH BLUE INSULATION - (30 MIL HDPE) NOTES: A. CONCRETE ENCASEMENT SHALL ONLY BE INSTALLED WHERE SHOWN ON APPROVED PLANS OR WITH PRIOR APPROVAL BY CMUD ENGINEER. B. THIS RESTRICTION IS IN PLACE DUE TO THE INABILITY TO EASILY MAINTAIN I REPAIR OR TAP A MAIN ENCASED IN CONCRETE. m, bL ;IIUN VI LW H MIN) r- Q CZ C Wv �z UCD Z = W 0 W Z) ~O w� Z~ OV UZ (6 MILL & OVERLAY UTILITY LINE SEAL ALL ASPHALT -TO ASPHALT JOINTS WITH HOT -APPLIED JOINT SEALER (ASTM D6690) `SURFACE COURSE (SEE TABLE) INTERMEDIATE COURSE (SEE TABLE) BASE COURSE (SEE TABLE) COMPACTED CLEAN FILL MATERIAL NOT TO SCALE ROAD TYPE BASE COURSE INT, COURSE SURFACE COURSE ALL RESIDENTIAL 8" COMPACTED ABC 1!" S9.5B 1J" SF9.5A MINOR ARTERIAL 8" B25.OB (2x LIFTS) 2j" 119.0131 3" S9.5B(2x1i" LIFTS) MAJOR ARTERIAL 10" B25.00 (2x LIFTS) 24" 119.00 3" S9.5C(2x1i" LIFTS) ALL COMMWECIAL 8" COMPACTED ABC 4" 119.OB 3" S9.5B(2x1j" LIFTS) NOTE: CONTRACTOR SHALL VERIFY ROAD TYPE WITH TOWN ENGINEER UTILITY STREET CUT REPAIR GHD Consulting Services Inc. 222 South Church Street, Suite 400 Charlotte NC 28202 USA T 1 704 302 4910 W www.ghd.com CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE, NORTH CAROLINA Scales PLAN NTS PROFILE Hor• NTS Vert. NTS STEVENS CREEK TRUNK SEWER PHASE 2 SEWER DETAILS (SHEET 2 OF 2) B 7/191 JAM 1 100% DESIGN No. Date By Revision L. ASSOC I JEM Surveyed By I Designed By I Drawn By I Project-Engr I Approved B Sheet Of 11 19 19 28 Dote A CITY OF CHARLOTTE DEPARTMENT NPDES Stormwater Discharge Permit for Construction Activities (NCG01) NCDENR/Division of Energy, Mineral and Land Resources STABILIZATION TIMEFRAMES (Effective Aug. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS Perimeter dikes, swales, ditches, slopes 7 days None -F High Quality Water (HQW) Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less in length and are than 2:1, 14 days not steeper are allowed. Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length. All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW Zones. ENVIRONMENTAL PROTECTION SEDIMENTATION AND EROSION CONTROL ALL EXISTING SENSITIVE LAND FEATURES AND STRUCTURES SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION. ITEMS TO BE PROTECTED SHALL INCLUDE, BUT ARE NOT LIMITED TO, ALL DOWNSTREAM PROPERTY, NATURAL WATERWAYS, STREAMS, WETLANDS, YARDS, LAKES AND PONDS, CATCH BASINS, DRAINAGE DITCHES, ROADS, GUTTERS, AND NATURAL AREAS. SOIL EROSION AND SEDIMENTATION CONTROL SHALL BE PROVIDED AND MAINTAINED BY THE CONTRACTOR, AT HIS EXPENSE, THROUGHOUT THE LIFE OF THE CONTRACT AND DURING THE CONTRACT WARRANTY PERIOD, FOR ALL AREAS THAT ARE GRADED OR DISTURBED AS A RESULT OF THE CONTRACTOR'S WORK ACTIVITY. CONTROL MEASURES SHALL CONSIST OF APPROVED PRACTICES FOUND IN THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND AS SHOWN ON THE CONSTRUCTION DRAWINGS AS APPROVED BY THE N.C. DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES AND INSTALLED AS SUCH. IN THE EVENT THAT LOCAL CONDITIONS CHANGE TO RENDER DESIGNED SEDIMENTATION AND EROSION CONTROL INEFFECTIVE, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE NCDEQ INSPECTOR FOR A FIELD CHANGE DISPOSITION. AFTER DISTURBED AREAS ARE STABILIZED AND ALL TEMPORARY MEASURES REMOVED, THE SEDIMENT SHALL BE SPREAD IN A MANNER NOT TO ADVERSELY AFFECT PROTECTION PROCEDURES AND THEN THE AREA SHALL BE SEEDED AND MULCHED. OTHERWISE, SEDIMENT IS TO BE DISPOSED OF BY HAULING AND SPREADING AS DETAILED ON THE DIVISION OF LAND RESOURCES' APPROVED SEDIMENTATION AND EROSION CONTROL DRAWINGS. PROTECTION OF WETLANDS ALL AREAS SHOWN AS WETLANDS ON THE CONSTRUCTION DRAWINGS SHALL BE PROTECTED BY DIRECTIONS GIVEN ON THE PLANS AND ALL WORK WITHIN THESE AREAS SHALL BE IN ACCORDANCE WITH PROVISIONS AS SET FORTH IN THE ARMY CORPS OF ENGINEERS 404 PERMIT, THE N.C. DEPARTMENT OF ENVIRONMENTAL QUALITY AND NATURAL RESOURCES 401 PERMIT/CERTIFICATION, AND THE DIVISION OF ENERGY, MINERAL AND LAND RESOURCES LETTER OF APPROVAL SEEDING, GROUND COVERS, AND MULCHING AREAS DAMAGED BY CONSTRUCTION WORK SHALL BE RESTORED TO A CONDITION APPROVED BY CHARLOTTE WATER BY WORKING, FERTILIZING, SEEDING, AND MULCHING. SEEDING SHALL BE DONE WITHIN FIFTEEN (15) DAYS AFTER THE INITIAL GROUND DISTURBANCE. THE BED SHALL BE PREPARED BY PULVERIZING THE SOIL TO A DEPTH OF THREE INCHES. TILLAGE SHALL CONTINUE UNTIL A WELL —PULVERIZED, FIRM, AND UNIFORM SITE IS PREPARED CONFORMING TO ADJACENT PROPERTY. THE SOIL MUST BE LOOSE ENOUGH FOR WATER INFILTRATION AND ROOT PENETRATION. GOOD DRAINAGE MUST BE PROVIDED AND VISIBLE PONDING WILL NOT BE ALLOWED. ALL STONES, ROCKS, STICKS, RUBBISH, AND OTHER OBJECTIONABLE MATERIAL SHALL BE REMOVED PRIOR TO FERTILIZATION. THE pH OF THE SOIL SHALL BE NON —TOXIC TO THE SEED MIXTURE. PLANT SMALL GRAINS NO DEEPER THAN 1 INCH AND GRASSES/LEGUMES NO DEEPER THAN 1/2 INCH. PLANTING IS TO BE UNIFORM. CONSTRUCTION SEQUENCE - EROSION & SEDIMENT CONTROL TEMPORARY SEEDING SCHEDULE 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM NCDEQ. SEEDING SCHEDULE FOR STABILIZATION GRASS 2. SET UP A ON —SITE PRECONSTRUCTION CONFERENCE WITH THE INSPECTOR FROM THE NCDEQ TO DISCUSS EROSION CONTROL DATE TYPE PLANTING RATE MEASURES. MAR. 15 — MAY 15 PERRENNIAL SEED MIX N.C. WILDLIFE RESOURCES COMMISSION 10 LBS/ACRE 3. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT TRAPS, MAR. 1 — JUN. 1 TALL FESCUE 120 LBS/ACRE DIVERSION DITCHES, TREE PROTECTION, AND OTHER MEASURES AS JUN. 1 — SEP 1 TALL FESCUE 120 LBS/ACRE SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL SEP. 1 — MAR. 1 RYE (GRAIN) 120 LBS/ACRE THESE DEVICES. 4. CALL FOR ON —SITE INSPECTION BY NCDEQ INSPECTOR. NOTES: 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN 1. SEE SPECIFICATIONS FOR PERMANENT SEEDING SCHEDULES. ALL EROSION CONTROL DEVICES AND STRUCTURES. 2. SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND 6. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER MEET WITH NCDENR INSPECTOR PRIOR TO COMMENCING WITH 3. MULCH; APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A EACH PHASE OF EROSION CONTROL MEASURES. 7. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. 8. COORDINATE WITH NCDEQ INSPECTOR PRIOR TO REMOVAL OF 4. MAINTENANCE; REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH EROSION CONTROL MEASURES. MEASURES WILL NOT BE REMOVED UNTIL AREAS ARE PERMANENTLY STABILIZED. IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. 9. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, AND DETAILS SHOWN IN THESE PLANS. 10. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE NCDENR INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. A CITY OF CHARLOTTE DEPARTMENT 6' MAX. STEEL POST STEEL POST SURFACE FLOW DIVERSION NOTES: 1. REMOVE THE STRUCTURE WHEN NO LONGER NEEDED. (NOT TO EXCEED 1 FILTER FABRIC 2 SURFACE FLOW DIVERSION =1 —III— — 6' WASHED STONE —III=1 I I=1 I I=1 I I YEAR). 2. AS A MINIMUM, DESIGN THE STRUCTURE TO PASS 2 YEAR PEAK WOVEN FILTER FABRIC Ri J Q. � Q I � I —I � I —I � I —III- —III—III—III—I I I - p FLOW WITHOUT OVERTOPPING. •N � FLOW g\.° Fey=IIE-1 111—III—III—III=' �' -III=III=III=III- II —III —III —I' 3. ENSURE THAT DESIGN FLOW VELOCITY AT THE OUTLET OF THE CROSSING -III=III-111 STRUCTURE IS NON -EROSIVE FOR o=111=111=111=111 ao it l 11 l 11 l 11 l 11 l 11 l 11 l l l„111- =_ _ THE RECEIVING STREAM CHANNEL. =111=111=111=111=�111=�111=�111=�111=�111=�111=�111=�111=�111=�111=�111=�111=�111=111=111= 11=�111=�111=�111': I I it I -III -III -III- 1-1IE-1lI-1IEdIEdIEdIEdIEdIEdIEdIEdIEdIEdIEdIEdIEdIEdIEdIEdII 111-1 I L-1 I L-1 11 -111-1 I L-1 I L-1 I IJ I IJ I IJ I IJ I IJ I IJ I IJ I IJ I IJ I IJ I IJ I IJ I IJ I IJ -1IEdIEdIEd -1I1-III-111- I IJ I E I IJ I IJ I IJ I[ 4. ADDITIONAL MEASURES MAY BE =1 11=1 11=1 11= 1=1 11=1 11=1 I Ed I Ed I Ed I Ed I Ed I Ed I Ed I Ed I Ed I Ed I Ed I Ed I II-III=III=III-111-III-1I1=1IEdIEdIEdIEdI1=1IEdIEdIEdIEdIEdIEdIEdIEdIEdIEdIE Ed I Ed I Ed I Ed I El I Ed I Ed I L=' 'I: IIEdIEd " 4 _ REQUIRED BY THE EROSION CONTROL -"' "'= I -I I I=I I I=I I Ed I Ed I Ed I I- 111 I ''=1 I Ed I Ed I Ed I Ed I Ed I Ed I Ed 11=1 I F- II 1=111=1 I 1 / / COORDINATOR OR CITY ENGINEER -"'=1 i 1=1I 1=1 I I-1 �'- "' -1 i 1=I I1=1 I1=1 I1=1 I1=1 I I-1 " i'- '' _ "'-"' ANCHOR SKIRT; / BASED ON SITE SPECIFIC CONDITIONS. I-1 EXCAVATE TRENCH AND COMPACT / BACKFlLL STREAM BANK _-1 I I- 6" WASHED STONE 111-1 I I F: / 111—I I I —I I I —I —111=1 I I I F: / / LINE CREEK BOTTOM NTH I11-111-111-111-1 / FILTER FABRIC 111-1 I I I I I- II1=1I1=1I1=1I1=1I1=1II- II TOP BANK TOP BANK GENERAL NOTES: 11=1 11=1 11=1 I I —I I I—III=11' I I I I I I I I 111111111 RIP RAP I I I I I I I I I 11=III=III=III=III= 1. WOVEN FILTER FABRIC SHALL BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF ..I=III—III—III=III= 1/2 PIPE DIAMETER OR 12" MORE THAN 30 DAYS. MAINTENANCE NOTES: 1=III=III=III=III=III WICHEVER IS GREATER 2. STEEL POSTS SHALL BE 5 -0 IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL =1 1=1 I I=1 1 11—I I=1 _ RING FILTER AS REQUIRED BY INSPECTOR. TYPE. 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING RIP RAP 3. TURN SILT FENCE UP SLOPE ENDS. PROLONGED RAINFALL ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 4. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS ADJACENT 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE SHALL BE REPLACED PROMPTLY. AREAS. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF 5. DRAINAGE AREA CANNOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE ENGINEER TO SIZE PIPE (SEE NOTE 2) 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EXISTING GRADE, PREPARED AND SEEDED. PROVIDE PIPE SIZE, INVERTS, SLOPE AND MATERIAL EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL FOR EACH CROSSING. 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. TEMPORARY SILT FENCE TEMPORARY STREAM CROSSING #467 COARSE AGGREGATE 6" DEEP. NOTES: EXTEND 25' EACH SIDE OF BANKS. 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE DESIGNED BY THE ENGINEER. 2 \\\ 2. REFER TO THE CHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR RIPRAP APRON DESIGN STANDARDS. L---`—`� .: 3. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END J_ OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF FILL WITH CMUD 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR �f STANDARD RIP RAP CULVERT HEIGHT. ROCK 4. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE 1 ft. min. SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL THE PIPE SIZED TO CARRY NORMAL FLOW WHEN APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. FLOWING HALF FULL 5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM USE DUCTILE IRON CMP OR RCP ONLY. WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1 6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 8. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 6" #467 STONE I I NATURAL GRADE RIP RAP STD. DET. #29 I I w RIP RAP �I I H GHD Consulting Services Inc. 222 South Church Street, Suite 400 -- -- Charlotte NC 28202 USA \-4" #5 WASHED STONE T 1 704 302 4910 W www.ghd.com NOTES: NOTE: MINIMUM H=2/3 PIPE DIAMETER LAYER OF FILTER FABRIC 1. SLOPE APPROACHES TO CROSSING 2:1 OR FLATTER. 2. SPILLWAY LENGTH = BANK TO BANK WIDTH OF STREAM CHARLOTTE CHARLOTTE WATER OR AS SHOWN ON PLANS. 3. RIGHT TO EXTEND ANDO�1PftEBE ONDRLIIMITS OF RIP RAP. SECTION B-B WJ)T E R CHARLOTTE, NORTH CAROLINA (NOT TO SCALE) 11STEVENS CREEK Jobb NNo. File No. o Scales TRUNK SEWER PHASE 2 PLAN NTS PERMANENT STREAM CROSSING PROFILE Hor. NTS EROSION CONTROL DETAILS Vert. NTS (SHEET 1 OF 4) As Built Date Sheet Of B 7 1 JAM 100% DESIGN L. ASSOC JEM CJS BMG 1 20 1 2 � 28 No. Dote By Revision Surveyed By Designed By Drown By Project-Engr Approved By Date A CITY OF CHARLOTTE DEPARTMENT L = THE DISTANCE SUCH THAT POINTS A A AND B ARE OF EQUAL ELEVATION 9" MIN. 1.5' MIN.1 I A L B TYP. ILL SLOPE NOTES: SPACE CHECK DAM IN A CHANNEL SO THAT THE CREST FILTER FABRIC OF DOWNSTREAM DAM IS AT ELEVATION OF THE TOE OF UPSTREAM DAM A ' MIN MI OMPACTED BERM CHECK DAM SPACING FINIS NA7 Al A (SEE FENCE O EE 2) UND —1T-1 T 1' 11-1 r CLASS B RIPRAP /yq NOTES. 12- OF WASHEDNCDOT STONE#5 OR #57 DEPTH WRAC cROUHp D D TCH AND 1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A 0 0 BE DESIGNED FILTER FABRIC FOUNDATION. BY ENGINEER (18" MIN) 24" MAX. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL AT CENTER GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO KEEP WATER FILTER CLOTH NOTES: FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. �4' TO 6' � - I 1. DITCH SHOULD HAVE LONGITUDINAL SLOPE OF 1X 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP 2. SILT FENCE MAY BE REQUIRED BEHIND BERM OF THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. SECTION VIEW A -A 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM HEAVY FLOW STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER THAT COULD CAUSE EROSION. FROM CUTTING AROUND THE DAM. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES. STONE CHECK DAM TEMPORARY SILT DITCH BRIDGE MAT (HEAVY WOOD OR STEEL) 1 /4 SUPPORTE 1 /4 SUPPORTED NOTES • \\ /\\ 1. A STABILIZED ENTRANCE PAD OF 2-3" OF WASHED STONE AND/OR RAILROAD BALLAST SHALL BE LOCATED WHERE !� WATER DIVERSION �� STREAM �� /� STREAM BANK WATER DIVERSION TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. \\�//`\�j�`� 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL SECTION A -A STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. ANY AGGREGATE TRACKED INTO THE ROADWAY MUST BE SWEPT BACK ONSITE ON A NIGHTLY BASIS. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS STREAM-- INTO AN APPROVED SEDIMENT BASIN SEE STD. NO. 30.11B. 1 /4 SUPPORTED-- 6. CDOT MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY (STD. 10.24 & 10.25) TO ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THOROUGHFARE, OR ON ANY STREET WITH AN EXISTING SIDEWALK TO REMAIN OPEN DURING CONSTRUCTION. 7. FOLLOW WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH) FOR SIDEWALK CLOSURE OR DETOUR/DIVERSION. BRIDGE MAT SEGMENTS A , , A 100' MIN. PUBLIC STREET EXISTING GROUND SOIL�STABILUC NOTES: UNDER 2-3 OF WASHED STONE EX. CONC. 1. WHEN SITE CONDITIONS ALLOW, SELECT A STREAM CROSSING LOCATION THAT HAS THESE STREAM BANK(TYP.) 100' MIN. DRIVEWAY APRON CHARACTERISTICS -NARROW CHANNEL WIDTH PLAN WITH SIDEWALK AT BACK OF -FIRM STABLE STREAM BANKS — CURB -SOLID FOOTING ON EITHER SIDE TO SUPPORT BRIDGE MATS AND EQUIPMENT. w (IF RETAINED 2. CREATE A SOLID SURFACE CROSSING THAT PROVIDES A BARRIER OVER THE CHANNEL TO MINIMIZE ^ GHD Consulting Services Inc. z DURING CONSTRUCTION.) DEBRIS, SOIL, AND OTHER MATERIALS FROM FALLING INTO THE WATER. , 222 South Church Street, Suite 400 �, BRIDGE MAT Charlotte NC 28202 USA co 0 3. KEEP EQUIPMENT OUT OF CHANNEL DURING INSTALLATION AND REMOVAL OF THE CROSSING UNLESS � T 1 704 302 4910 W www.ghd.com i DOING SO IS NECESSARY FOR HANDLING THE BRIDGE MATS. MINIMIZE THE AMOUNT OF OVER -HANG a FROM LOGS, TREES, OR TRUCKS/TRAILERS THAT MAY DISTURB THE CHANNEL OR APPROACHWAYS. 4. CONTROL RUNOFF AND/OR CAPTURE SEDIMENT ON THE APPROACHWAYS. CHARLOTTE CHARLOTTE WATER 5. AS NEEDED, PERIODICALLY INSPECT THE CROSSING AND TAKE ACTION TO PROVIDE FOR SAFETY WHILE PROTECTING WATER QUALITY FROM RUNOFF, DEBRIS, SOIL, OR OTHER POTENTIAL POLLUTION FACTORS. W�T E R CHARLOTTE, NORTH C A R O L I N A 6. STABILIZE THE APPROCHWAYS AND CROSSING LOCATION IN ACCORDANCE WITH CONTRACT DOCUMENTS. 11144299 STEVENS CREEK Job No. File No. Scales TRUNK SEWER PHASE 2 PLAN NTS STABILIZED CONSTRUCTION ENTRANCE PROFILE Hor, NTS EROSION CONTROL DETAILS Vert. NTS (SHEET 2 OF 4) As Built Dote Sheet Of B 7 1 JAM 100% DESIGN L. ASSOC JEM CJS BMG 11 19 22 28 No. Date By Revision Surveyed By Designed By Drown By Project-Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT TEMP. STONE DITCH CHECK SN�p. P PMEN� NOTES: 1. USE CLASS 'B' EROSION CONTROL STONE FOR STRUCTURAL STONE. 2. THE ENGINEER MAY DIRECT THE OPTION OF CLASS "A" STONE FOR SITES HAVING LESS 4' MAX. 8' MAX. PLACE POST AT LOW POINTS THAN ONE (1) ACRE DRAINAGE AREA AND A EDGE OF STRUCTURAL STONE PAVEMENT DITCH GRADE LESS THAN 39a 5' MIN. 18" G� 3. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT 1'7,`^. 1 . 5'5 SEDIMENT ��� OQ�' CONTROL. PLACE SEDIMENT CONTROL STONE CONTROL STONE 5v AS DIRECTED BY THE ENGINEER. , 5 MIN. 2'7 5' MAX. 2' STRUCTURAL STONE BACK ELEVATION COARSE AGGREGATE �,OQ� 21 S S�OpF SLOPE 3 8 n� LINE OF POST Mqx 18" 2•� pW�_l2" ISOMETRIC VIEW II BEYOND SUPPORT WIRE FILTER FABRIC — =1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I=1 1= —III=1 I I=1 I I=1 I I=1 11=1 1= PROFILE SECTION 1 MIN. NATURAL GROUND SLOPE 18"COMPACTED MIN. LASS A STONE f6IDEO�SPT IN STRUCTURAL STONE OVERFILL 6" SOIL FOR SETTLEMENT DESIGN TEMPORARY GRAVEL DIVERSION DITCH FOR VEHICLE CROSSINGSETTLED ,:r::X TOP2 MIN.MIN. 2. 1 ti i991D MIN. Z "' CROSS SECTION 5' MAX. FILL EMERGENCY VEE DITCH BY-PASS 4" BELOW SETTLED WEIR LENGTH TOP OF DAM SECTION A - A PLUS 5 FEET NATURAL GROUND NATURAL GROUND 1' MIN. FOR POOR DEFINED CHANNELS CROSS SECTION A� NOTES: 5' MIN COMPACTED SOIL II I 2' MINI 1. USE CLASS 'B' EROSION CONTROL STONE FOR STRUCTURAL STONE. CROSS SECTION TRAPEZOIDAL DITCH II I X P 2. USE N0. 5 OR N0. 57 STONE FOR SEDIMENT CONTROL OW 18 MIN �- 3. DIKE MAY EXTEND ALONG MORE THAN ONE SIDE OF THE TRAP AREA. PROVIDETOTAL BASE OF DITCH SEDIMENT STORAGE VOLUME OF 1800f CUBIC FEET PER ACRE OF DISTURBED AREA. SOME OF THE REQUIRED VOLUME MAY BE PROVIDED BY OTHER UP OR DOWNSTREAM CONTROLS. 12" 12" MIN. 4' MAX. SEDIMENT 4. AN UNDERLAY OF STRUCTURAL STONE WITH FILTER FABRIC MAY BE REQUIRED BY THE ---- - - _ TRAP - ----- - - - - - - - - - - - - - - A ENGINEER. PLAN 6' TYPICAL W FL O REINFORCED STABILIZATION OUTLET TEMPORARY EARTHEN DIVERSION DITCH DRAINAGE AREA WEIR LENGTH (ACRES) (FT) OPTIONAL �'"i I L 4'-6" " "B"N '------- 1 4.0 SILT BASIN 12 THICK SEDIMENT 2 6.0 CONTROL STONE 4 0 0 ELEVATION VIEW 5 12.0 TEMPORARY ROCK SEDIMENT DAM TYPE 'B' TEMPORARY ROCK SILT CHECK TYP 'B' 3'-0" BACKFlLL TOP OF BANK SECTION TOP OF DITCH SLOPE 4 FT OF MATTING WITH MIN 6" TOPSOIL TOP OF BANK EXPOSE NO MORE THAN 12 IN 2 IN OF STAKE (TYP.) 30 IN HERBACEOUS BASE OF DITCH FOR -V- DITCH STAKE ALONG TOE OF PLANTS (SWITCH GRASS) SEED AND MULCH WITH Z SLOPE AT 1 FT SPACINGS COIR NET OVERLAY SECURE EROSION CONTROL MATTING ROLANKA BioD-MAT 70 OR APPROVED EQUAL N WITH 2 IN X 2 IN X 30 IN NOTCHED WOOD DEAD STAKES INSTALL ANCHORS IN ACCORDANCE WITH MANUFACTURES �G SPECIFICATIONS � BASE OF DITCH FOR FLAT TOE OF SLOPE EROSION CONTROL MATTING SCOUR LINE BOTTOM DITCH STONE RIP -RAP O OF DITCH SLOPE TOP PLAN KEY IN EROSION CONTROL MATTING FILTER FABRIC, MIRAFI 160N OR EQUAL FOR A DEPTH OF 1 FT TOP OF DITCH SLOPE PER MANUFACTURER'S RECOMMENDATIONS NOTES: NOTES: 24" MIN O 1. DETAIL #2 IS FOR MINOR STREAMS OR DRAINAGE . FEATURES OUTSIDE MECKLENBURG COUNTY S.W.I.M. 1. BEGIN AT TOP OF SLOPE AND ANCHOR FIBER MATTING IN A 12 IN DEEP INITIAL ANCHOR TRENCH. BACKFlLL TRENCH AND TAMP EARTH FIRMLY. 2 BUFFERS. OTHERWISE NOTED ON PLANS. SHALL ONLY BE USED REQUEST AND LENGTH IN FEET EQUALS TWICE THE �\� BASE OF DITCH FLOW LINE WIDTH MINIMUM BASE OF DITCH FLOW LINE DIRECDETAIL TION OF OWNER/ENGINEERNDER GHD Consulting Services Inc. 2. UNROLL FIBER MATTING DOWNSLOPE IN THE DIRECTION OF WATER FLOW. 222 South Church Street, Suite 400 , o z 3. OVERLAP EDGES OF ADJACENT PARALLEL ROLLS BY 6 IN AND ANCHOR AT 12 IN Charlotte NC 28202 USA N CENTERS. CREEK BED CLASS 1 RIPRAP MINIMUM OF 24" THICKNESS T 1 704 302 4910 W www.ghd.com 4. WHEN FIBER MAT MUST BE SPLICED, PLACE END OVER END (SHINGLE STYLE) WITH 12 IN FOR STONE SIZE SEE SPECIFICATIONS. OVERLAP AND ANCHOR USING TWO STAGGERED ROWS OF STAKES AT 6 IN CENTERS. 5. LAY FIBER MAT LOOSELY AND ANCHOR SUFFICIENTLY TO MAINTAIN DIRECT CONTACT CHARLOTTE CHARLOTTE WATER WITH THE SOIL - DO NOT STRETCH. WJ)T E R 6. FOR SLOPES 2:1 AND STEEPER USE A MINIMUM OF 3 STAKES PER SQUARE YARD AND CHARLOTTE, NORTH C A R O L I N A ELEVATION FOR SLOPES FLATTER THAN 2:1 USE A MINIMUM OF 2 STAKES PER SQUARE YARD. S TR E A M B A N K STABILIZATION DETAIL2 7. ANCHOR, FILL, AND COMPACT END OF FIBER MATTING IN 12 IN X 6 IN TERMINAL SILT BASIN TYPE 'B' ANCHOR TRENCH (MIRROR IMAGE OF INITIAL TRENCH). 11144299 STEVENS CREEK Job No. File No. Scales TRUNK SEWER PHASE 2 PLAN NTS PROFILE EROSION CONTROL MATTING DETAIL Hor, NTS EROSION CONTROL DETAILS Vert. NTS (SHEET 3 OF 4) As Built Dote Sheet Of B 7 1 JAM 100% DESIGN L. ASSOC JEM CJS BMG 11 19 23 28 No. Date By Revision Surveyed By Designed By Drown By Project-Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT CABLE CABLE I - CI L L11� /z TOP PLAN =1 SIDE TYP. 30S BLOCK 4,000 PSI CONCRETE, GROUT, OR OTHER (AS SPECIFIED BY EOR) ARMORFLEX CONCRETE MATTRESS APPROVED SUBGRADE SITE SPECIFIC GEOTEXTILE (TURN ENDS UP) TOP TERMINATION SITE SPECIFIC GEOTEXTILE (TURN ENDS UP) ARMORFLEX CONCRETE MATTRESS 4,000 PSI CONCRETE, GROUT, OR OTHER (AS SPECIFIED BY EOR) APPROVED SUBGRADE TOE TERMINATION 4,000 PSI CONCRETE, GROUT, OR OTHER (AS SPECIFIED BY EOR) SITE SPECIFIC — GEOTEXTILE (TURN ENDS UP) ARMORFLEX CONCRETE MATTRESS APPROVED SUBGRADE FLANK TERMINATION a REVETMENT REVETMENT CABLE SLEEVE TYP. 30S MAT R. 4,000 PSI CONCRETE, GROUT, OR OTHER (AS SPECIFIED BY EOR) w w fy Q ARMOR FLEX EROSION CONTROL AT 4,000 PSI CONCRETE, GROUT, OR OTHER ANGLE MAT (AS SPECIFIED BY EOR) NOTE: 1. ANGLE MATS WILL BE CONSTRUCTED BY OMITTING THE REQUIRED UNITS SO THE REQUIRED MAT DIMENSIONS CAN BE OBTAINED. TYP. ANGLE MAT 4,000 PSI CONCRETE, GROUT, OR OTHER (AS SPECIFIED BY REVIE �t� CAB[ TYP. MAT TO MAT GHD Consulting Services Inc. 222 South Church Street, Suite 400 Charlotte NC 28202 USA ' T 1 704 302 4910 W www.ghd.com A CITY OF CHARLOTTE DEPARTMENT 8" 5/8" LAG BOLTS 8" x 8" x 8' PRESSURE - TREATED POST INSTALLED 3' IN GROUND (TYP.) 5/8" LAG BOLTS 14'— 5 PANEL STEEL FARM• GATE, W/ 2" TUBING, 16GA, #57 STONE (TYP.) 28" LONG 5/16" LINK CHAIN SEE FENCE DETAILS x Ix- x x NOTES: 1. NO PADLOCK REQUIRED. GATE SHALL BE PROVIDED WITH CHAIN LATCH. 2. ALL HARDWARE SHALL BE GALVANIZED STEEL. FARM GATE DETAIL c� 9" 9" _ ip 9" VARIES i EXISTING NATURAL GRADE F7 F-1 IF- I I I I 10'-12' 4-RAIL PVC FENCE 0 .09" P GHD Consulting Services Inc. 222 South Church Street, Suite 400 Charlotte NC 28202 USA T 1 704 302 4910 W www.ghd.com CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE, NORTH CAROLINA Scales PLAN NTS PROFILE Hor, NTS Vert. NTS STEVENS CREEK TRUNK SEWER PHASE 2 FENCE DETAILS Em mmm 100% DESIGN Revision L. ASSOC I JEM I CJS Surveyed By I Designed By I Drawn By Sheet Of BMG 11 19 25 28 Project -Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT — TBM #1 NAIL IN 20" HICKORY \V - EL - 662.07 toe 10070 / + / /�\ _ _ - - - - 662.07.. LOT 223 \ /(( \ `\ ` - - THE MEADOWS AT NLS-TBM i \ II i / \ Existin 6tevens GCr _..._. \ \\_ _ �'�. CHEVAL 100 YR FLOODPLAIN HAZARD AREA (TYP) MB. 60 PG 518 rib REINFORCE STABI IZA110 OUTLET (TYP) - - - SEE DETAIL SHEET L - ` \ /� \ PID 19508131 CHEVAL � � / STA. A4+ 12.24 � � // % STONE CHECK DAM TYP ASSOCIATES, LLC - \ ✓/// / SEE DETAIL SHEET Z� DB. 19418 PG 1 /i�;—'�..._ \ %� /I I > / PROPOSED 4 \ I ; / , _ / ti — /r \ + — _ \\ /// � \ i TEMP. DIVERSION DITCH (TYP) \) / / / PROPOSED 495`\ ~ \ \ ^ + `— \ / MB 44, PG 425 ; r /r �\ %�r� �'i I l D/A. MANHOLE MH-02 ' — '� \ ' . 1 / TEMPORARY ROCK % SEE DETAIL SHEET 2 ✓� - \ / WIWATERTIGHT �. 0 ` DIA. MANHOLE MH-03 SEDIMENT DAM \ / LOT 11 / _ \ / S y . `. J _ STA. AO+00.. �';.� _ �,F� y,// \�� �...� j/ // r WEIR = 4 FRAME & COVER / BEECH MINT PLANTATI PERMANENT SEWER / W/WATERTIGHT EXISTING 4' // / �i- _ TYPE B / EASEMENT (TYP) J - / \ J THE MEADON/S AT CH AL 10 9 = / SEE DETAIL SHEET 23- (TYP) / 1, k - \ - / .._ /\ _ - FRAME & COVER ail /� Q / PID 19507114 ` \ // ,DIA. MANHOLE MH-01 659.75 \ — DB 17769- 8 \\ \� j / W W VENTED NLS-TBM TBM #1 / / ^ k MB. 60, P 896 1 \ r n N / / NAIL IN 20" HICKORY / / / �` —�.Napate- •.. , I III \ J \ V ! LL FRAME & COVER = �� EL = 659.75 / \ �� ° ` / 1w x x W C� :'::�'::;::;:. \ �r-• : ;: : �A3 L.4.Ld Sf02 34Ex - /' ' I 00' t O ; . • :. - ' A2+, P POE 1 " SAN B H =1 A9+00 U W 1.5,59ME k_' • ' — :' . TARY S W R o x A7 +00 412.24 — WER SANITXRY SE •X / / / / x Q AO+00' PROPOSED 1 : _ x \ x - X - x -� • •- C FENCE EPLACEMENT/ / � I \ `J '� \/ \ �-- - -�\ \\ � LOCATION- / I \� ILT FENCE (TYP) \ \ � � - - - 1gMPORA� ONSTRUCTION x - _ SEE DETAIL SHEET + \ - - _ - EASEMENT (TYPE \ \ N now wool ISM 0�11 \ - SEE STEVENS CREEK TRUNK - - CONTRACTOSHALL CONFIRM/ / \ \ \ ' I / ° x X \ _ _ - - - \ \ \ 1 �0' BUFFER LINE \ - SEWER - PHASE 1 PLANS ' ��AS-BUILT ELEVATIONS ON I _ �� FOR DOWNSTREAM SEWER, MH-01 AND NOTIFY ENGINEER \ x \ \ / - / / / x• e - - - \ \ \ \ \ \ \ \ / //// / / / / _ ,C CHARLOTTE WATER JOB OF ANY GRADE CHANGES \ - - _ - _ \ _ - NUMBER �7030700047-17-503 REQUIRED. I \ \ ° PARIS FA ILY LLC 4NOPY I / / PID# 19507103 DB 25497 PG 724 MB 43-573 01, 0 LOT 223 THE EADO S AT CHEVAL 60 PG 518 STA. A 17+84.19 ,PROPOSED 4' , — , _— — — — — — — _ \t DIA. MANHOLE MH-06. _..._ 0 ° \ ' TEMP. DIVERSION DITCH (TYP) - \� \ / \ - _ _ \ \ \ \ \ - - - ` ///// i/ // l \\� \ )/ W/WATER TIGHT \ s SEE DETAIL SHEET FRAME &COVER J J / \ - 0 REINFORCiE STABILIZATIONlr�' / • OUTLET (TYP) �.i _ _ \ \ \\ / > \ - \ / SEE DETAIL SHEET 2 // \ \ \ \ \ �\ / / ///� i/ l I III i C \ v /�... - ..:..'. / ONE CHECK DAM (lYP) •\ SEE DETAIL SHEET • 1 °�-\ \\\ ��\\/— 111� 'l/ / \ � \ •�\✓�i — I � \`� _ _...�..� �...�\ \ \ NAIL IN 15" CEDAR- \ ^ 1 • • . • .' • '`�•`. / \ V.... =... a EL = 670.89 \ \ \ \ / � / - \ 1 �• • • •A18+00• •,r .. .3¢I F xp0 � _ ^ \ TEMPORARY EROSION / \ \ .\I CONTROL MATTING (TYR)' O 0) r T • / \ / \\ \� 1 \ SEE DETAIL SHEET 21 \\\\\ III / 10071 / /`C x \ ` % 670.89 NLS TBM 0 \ x\ RE W CY- 'n / \ � tq • :. ; . , SILT FENCE (TYP) i 4� �� : ; ^ ° \ SEE DETAIL SHEET 21 \ / -%1�51/� I x / - /�( ROSION MATTING (TYP) ` `' . , \ \ ,SEMba ARY ROCK^ ° I� v J _ I DIMENT DAM SEE DETAIL SHEET 23 � � � ��• • : ;• : •- •'.k0 •5 3 / 7 \\ ° \ ... - / WEIR = 4' TYPE B \'STA. A11+87.72 � LV� }� / —; _ \\ ; �\��� _ —PROPOSED 4' �* 't \ `�� v-��'ti �:' ' ' y� \ _ / / I I— (� � / k \ \ \ \\\ \\\ - ' / \>� DIA. MANHOLE MH-04 _ _ , — — _`� �Po,�o so3• .\ Ilr� \ :.: �5xo /l i + / // Q W/VENTED \-FRAME & COVER /\ t — x _� / / PARIS FAMILY LLC \ • � 1 '; •. ... . • • :: • :, '00 ., • :•. � � � ` — �/ / I PID/ 19507103 f e j �� \ \ .r k • ' P1kX ��� -DB 25497 PG 724, \ `ti i \ \ \• �� — + — �- — — -- o r \ \ \ \\ MB 43-573— \ARMORFLEX 30-S 10 xAl— — — — — F — x \ \ \ \ \ \\ \ DETAIL SHEET 24 I J X �- _ _ _ _ _ — —Al \\ \\\ \\ I I x _ �_- EXIS7\ ? 60' LEVEL SP ADER I -� \ / / \ - - _ - _FENCE \ \\ \ / / - ` - - - - REPLACEMENT- `� je _ - _ _ -LOCATION---- I STA. A 13+74.80 PROPOSED 4 \ / / / / / — — — — / 00 \\VV DIA. MANHOLE MH 05 / / , — 100' BUFFER LINE0 \ x W/WA TER TIGHT 0 FRAME & COVER a k� a / G No. Dote By Revision LEGEND: ZONE 2A - PIEDMONT ALLUVIAL FOREST ® ZONE 2B - PIEDMONT SEEDING ONLY ZONE 3 - WETLAND FOREST CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE, NORTH CAROLINA 11144299 Job No. File No. Scales PLAN 1" = 40' PROFILE H or. Vert. L. ASSOC I JEM Surveyed By I Designed By STEVENS CREEK TRUNK SEWER PHASE 2 PLANTING PLAN FIGURE 1 Sheet Of CJS BMG 11 19 26 28 Drawn By Project-Engr Approved By Dote A CITY OF CHARLOTTE DEPARTMENT Ln q0 / I UNPAVED CHEVAL PROPERTY OWNERS ASSOCIATES 19507395 INC--- \ \\ \ \ \---1�_—_=_ _ /--- — — — — —— -- _ I' — \ CHEVAL PROPERTY \ \ \ —\ \ =_ __ — _— — — %� DB 32382 PG 643 0 OWNERS ASSOCIATES INC- - ll - C// / — _ / = ��� /;. \ MB 56-164 PID# 19507395 STA. A24+69.41, ._—_ ;_ r� / I/ // / / /� ��---1= ///i�� ..\l ) `I` l DB 3B386—P6 643 PROPOSED 4 _ / \ M 1 4 D/A. MANHOLE MH-09 / \ s T R -- \ "STA. A20+19.63 W/WATERTIGHT FRAME & COVER r' PROPOSED 4' _ _ � — �`V�;�\ \\\ \ \ \ REINFORCED STABILIZATION I \ - '7 I 1II(I\\ ; D/A. MANHOLE MH-07 / �� \� `\ ' i 1l ` _ _ OUTLET (TYP) 6708.09�— �i�� W/WATERTIGHT \ \\ \ _ / SEE DETAIL SHEET Z NLS-TBM `� \,(\ I / - \ TBM #3 \ TEMP. DIVERSION DITCH (TYP) / / \ \ \ O //%' FRAME & COVER :' \�\� / — \ f /� •' • .: \ \\ NAIL IN 29"GUM SEE DETAIL SHEET � / _ - — — — _ \\ 11 �/r ��'i .✓ \ _ —\\ �� `�._ii�.��\�\ EL=678.09 1 \� \� — ERI • •:'�•' • \ J,. \\ St �` �\ \� C & JENNIFER LAZO PID# 19607366 DB 29005 PG 277 / � \ \ /�I I '• '••'••.••.••••' —� — \ �.�/ 1 � \\ \� —' / jam' �.. _� ^�i �\ MB 63-484 A` PORARY EROSION CONTROL MATTING TYP. // .•%� = �.� / / l \ \ \ Q O \ P 0 BE NSTALLED \. r S� .: ' =\; (TYP.) i\C \ - ,, r%-- _ ��� \ \ 'v''91 \ '� SEE DETAIL SHEET 2$ / SEDIMENT D VIA OPEN CUT UNDER p,- . • P ? \ }� �/ ...\.,� '- \ 1• ,JO HEV NE • • � ? ?`3`!y'421x : ; • : ; ' •• \ � q /SEDIMENT DAM ./ A �,53,3 , Op Z III \ - 1 / /� WEIR = A \�:. \\__ Q .:••';•.:••: .•••• �.•• .•••' /' / SILT FENCE (TYP) � -.. ,.._� I� 1 , , / '/ \I\ :•: SgN�q j\ \ /, _ J /i.'� TYPE B \ �V SEE DETAIL SHE / \ \ • . �\ �\�� - /� - Y ) SEE DETAIL SHEET 2A (TYP) 01 q25 ' / \ . ^ :. • ' - S09'04'41 x00 O 1 / R B H X \ — — 206.47 \ 5 5• S_ ANItARY '�>-._ _ — — �V 0 \ \ \ � .06\ , ' } ♦ ` ) / /-� PROP 12 .• 1 � _ ' • ` . • . • p Q S�s'4ps?; ' • •yam _ _ ^ \ \ \\ZL... � :• 4 100' BUFFER LINE / / /+ / /' `�_ •: '� ' �- \ \ \ % / _� \ _ _ \ \ .Y LI K3 — WOO \ 0 f STA. A22+62.94 — .s00- — — — , ^ _ _ \ \\ \ ,I / L ► .l \ PROPOSED 4 / -� _ _ _ _ \ \ \ \ / �I I I D/A. MANHOLE MH-08 -c•� / . \ � W/VENTED FRAME & COVER — STEVENS CREEK ASSOC LLC ' \ PID# 19505131 \ DB 18751 PG 36 J PARIS FAMILY LLC MB 43-903 / PID 19507368 & 19507399 DB 17710-978 & MB 56-160 & / MB 63, PG 9310 I f — BAINS FARM INC. PID# 19507362 — \ ��.� — � _�\��\--.DB 28946 PG 867 � \ — — — — — — — / ' \ ���\ — — MB 58-407 ERIK & KK REN` — — — — — \ — — REDDING — — STA. A31 +98.18 PID# 19507364 — — s DB 28954 PG 670 - _ -PROPOSED 4 — — _ — — MB 53-484 =DIA. MANHOLE MH-12 ���; \\- \---- -'-\- ✓ III ` �r �\ \ — — — _ %; = W WATERTIGHT \ l ll\ �I/ I I \ I \ \ � _- _ / �' — — PAUL & MEREDITH /�/� I < 1 LEDFORD — FRAME & COVER . PID 19507361 \ # \\ DB 31803 PG 37 _ MB 58-407 SILT FENCE T ) \ \ \ �� \ EINFORCED STABILIZATION - SEE DETAIL SHEET 21 124 SEDETOUTLET AILPSHEET2 %�.�\- / TEMP. DIVERSION DITCH TYP \ -SEE DETAIL SHEET 2a / O STA. A29+62.39 / // �ji , / �`: : : 1"E E �ti+ \ �� �+' \ \ STONE CHECK DAM (TYP) ` / ` - 0 PROPOSED 4' / / ' / :.:. .Z o _ -� SHEET /� / / 0 \ _ SEE DETAIL SHEET 00 \ D/A. MANHOLE MH-11 ���' , / / \ / 235'sp o\, �'-' / ` \\ , ^ ►`� X � � -W WATERY/GHT !� � / — � . • • ` •.. • .: •• � ..; • xoo• .: ' • .: • . • / .: • . �.. � :. p sos, • • �.. ...��' � — �-�""�"" \\\ ` �\� V 1 _ �O \ / . P.S' MPORARY ROCK '- �... ... FRAME & COVER , ' �/ / �!: s : Rp ...... / : • ,�,� o- q . (�\� / / �% �>> •�p,33 .• . • ' • SEDIMENT DAM �/ /� � 1� �\\/I `",-'���-_ �// i / .-: ' •• • : 0• �' j•- � 'S�p, � %Op .. ,. � - WEIR - 4' TYPE �� :. • . SEE DETAIL SHEET ?a (TYP) - _ / _ _ : ' • ' p t3 :. /� / - _ / _� - _ _ _ �P __ / (� �i �-^ _•. _ *N- \ \ \ \ \ S21.19'32 "E A35 A36+00 J LL /► / _ / - \ \ :� ' ' PROPOSEQ -12" N/ ARY S34-04'49'E L _ T / / — _ _ _ _ / — _ — \ —�\\ \ \ — \ \ r — % l S LJ o .Ev 12p Ir S I r''\�\\ �� LL.I 1000,/ / /_/ '�-- STA. A33+69.19\� \\\\\ �� \\`- —/'� _ Q PROPOSED 4' wow *00 // /' // DIA. MANHOLE MH_—\--- / STEVENS CREEK / // _\100'_BI�FER LINE �19505131� ASSOC LLC PID# / DB18751PG36 I / / FRAME & COVER\-- \ STA. A27+47.88— / \ PROPOSED 4' \ \ \ —� ,// I / _ \\/\—_ ��� — \�-------- D/A. MANHOLE MH-10— \ W/WA TER TIGHT FRAME & COVER\' --- LEGEND: ZONE 1-STREAM BANK ZONE 2A - PIEDMONT ALLUVIAL FOREST ® ZONE 2B - PIEDMONT SEEDING ONLY EimZONE 3 - WETLAND FOREST CHARLOTTE CHARLOTTE WATER W j)TER CHARLOTTE, NORTH CAROLINA 11144299 Scales PLAN 1" = 40' PROFILE Hor. Vert. STEVENS CREEK TRUNK SEWER PHASE 2 PLANTING PLAN FIGURE 2 N / \ No. I Date I By As Built Date L. ASSOC JEM Revision I Surveyed By I Designed By I Drown By Sheet Of BMG 11 19 27 28 Project-Engr Approved By Date A CITY OF CHARLOTTE DEPARTMENT STA. 80+06 --, -- / EXISTING MANHOLE. S16e54ms,37 W / Tom--- _34.89' //,/ / // // / // ►'ll I / \ \\\\ ` ` \ \\ ` \\ \—_�. _ �� "/--__ ; —/'— ti PROPOSED 12_„ SANITA.RY.SEWER - — / _ ,STA A43+52 36 ° / / STA. A43+ 17.48 �, .s ` -= �'' PROPOSED 4' �.,..._..., TBM #5 - // PROPOSED 4 ./ NAIL IN 25' HACKBERRY _ _ _'_ % ��� \ �1 / �`� A. / / / / ��/ / \ EL = 691.58 - _ _ _ = DIA. DOGHOUSE MANHOLE r _ 1 DIA. MANHOLE MH-18 STA. A36+60.14 / �/ STA. A38+49.57 `� — _ _ _ 10074 MH-17 W/VENTED — ► f _ / ��% \ \ XIS I NSW/WATERTIGHTDO C. f--DIA OSED 4' / PROPOSED 4' \ — — - 691.58 FRAME & COVER�:'/\ TO FRAME &COVERMANHOLE MH-14 —NLSTBM �/_���S5905831"W DIA. MANHOLE MH-15 \ \ — _ _ > TERTIGHT � \ TEMPORARY EROSION / = = i ° / l 20.13I W/WATERTIGHT MPORARY ROCK CONTROL MATTING (TYP.) �— —�\ ��E & COVER �\ SEDIMENT DAM \ SEE DETAIL SHEET - FRAME &COVER WEIR = 4' �/i / � PROPOSED 12 SANITARY SEWER I ° .,Tn RF AAAmnoNED� TYPE B STA. A43+72.49 / SEE DETAIL SHEET 2a (�) -X` _ PROPOSED !` � \ TEMP. DIVERSION DITCH / - �2EINF CED STABILIZATION- — —SHEET D/A. , ✓ / — `+•... SEE DETAIL �_ � � / ° -. / / / \ ~ : • ° � \ W � � DOGHOUSE MANHOLE � _n , / ( OUTLET (TYP) — W/WA \� O/ �� / \ SEE DETAIL SHEET I \ Lam. - __ MH 19 TERTIGHTco C _ / \ STONE CHECK DAM (TYP) J \� — r l _._ f j��� \ \, (/ / / \ �� �• E :::� 9k' a FRAME & COVER SEE DETAIL SHEET 22, C \ ° _ v \1 , � � • :.. .51 $ •X � • ?x0 / \\ SILT FENCE (TYP) \00 �851 11 FX' I / _ is �. 2X %f n 8 p \ — \ SEE DETAIL SHEET 21 \ \ Q 1. ' / az vC \ \ •tea . •'• / Oslo WOOL A38+00 A39+00 O A40+00 :/ A37+00 S02'00'03"W S02 00 03 W ° r .189.43' I ROP • lb- 2 SANI . Y S ° / C� OSED 1 S N A R ` _ , \-� EIS" • \ J / PLO 0 � _ / ���r \ \ / ova SE9�.12+95.14 �' EXISTING\ MANHOLE \ J / � � �� / / / / / / EXISTING CHEVAL LIFT STATION SEE SHEET 13 \ 0' BUFFER LINE ^� FOR DEMO PLAN � STA. A41 +31. 69 CHEVAL PROPERTY I / / — _ _ �/ PROPOSED 4 OWNERPSD� SS�OCI TII$N INC CITY OF CHARLOTTE \ _ DIA. MANHOLE MH— 16 DB 32382 PG 639 PID# 19505176 W/WATER TIGHT 0 59-976 DB 30613 PG 431 STEVENS CREEK FRAME & COVER _ _ R r ASSOC LLC PID# I 19505131 DBMB36 43-903' TII OTHY & SONYA r\ 7 TURNER 1 / PID# 19505514 \ / DB 28763 PG 171 \ / MB 17-296 L \\ 0 1 LEGEND: v I ZONE 2A - PIEDMONT ALLUVIAL FOREST ® ZONE 2B - PIEDMONT SEEDING ONLY _ ZONE 3 - WETLAND FOREST A CITY OF CHARLOTTE DEPARTMENT