Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Belews CBE - Appendix C_20200107
APPENDIX C ENGINEERING EVALUATIONS AND ANALYSES APPENDIX Cl STORMWATER ASCOM Job Description Duke Energy — Belews Creek Closure Project No. 60603274 Sheet 1 of 6 Stormwater Management Plan Computed by KDO Date 9/10/19 Checked by AN/HR Date 9/18/19 The purpose of this analysis is to demonstrate the stormwater management plan for Belews Creek Ash Basin closure design meets the required North Carolina Department of Environmental Quality (NCDEQ) and Duke Energy (Duke) design criteria. It is important to note, Duke design criteria satisfies or exceeds the NCDEQ requirements. This stormwater management calculation package will address the post closure stormwater attenuation and impacts to existing downstream infrastructure. This calculation package does not address erosion and sediment control during construction, or the design of channels and culverts associated with the landfill. Construction related erosion and sediment control will be addressed during the detailed design phase of the ash basin closure. In addition, a detailed stormwater management system design will be developed for the proposed CCR landfill as part of its permit design, and hence not addressed herein. I. SITE AND PROJECT DESCRIPTION Belews Creek Ash Basin is located north and west of Pine Hall Road and south and east of Middleton Loop Road. The Ash Basin is part of the Dan River watershed. An unnamed tributary is located downstream of the Ash Basin and channels surface water flows to the Dan River. The unnamed tributary is hereon referred to as Tributary 52 to mimic the Federal Emergency Management Agency (FEMA) nomenclature. Belews Creek Ash Basin has a drainage area of 670 acres to the Main Dam (State Dam ID Stoke-116). The land use outside the Ash Basin footprint primarily consists of forested areas, industrial development, and vegetated farmland. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service's (NRCS) Web Soil Survey (WSS), the Tributary 52 watershed outside of the influence of settled ash in the Ash Basin and adjacent landfill caps has a hydraulic soil group of approximately 60% C and 40% B. The Ash Basin closure project will consist of (1) removing the free water from the Ash Basin, (2) excavating and placing the existing in -place coal combustion residual (CCR) (also referred to as "ash") to create a landfill located within the ash basin footprint, and (3) attenuating stormwater runoff to prevent impacts to Tributary 52, North Carolina Department of Transportation (NCDOT) Middleton Loop Road culvert, and Norfolk Southern (NS) railroad culvert downstream of the closed Ash Basin. The stormwater management system for this closure project relies on the construction of the detention and retention basins to attenuate storm flows. The following sections summarize the design criteria, procedures, assumptions, and results of the design of the stormwater management system. Belews Creek Basin Design Memo ASCOM Job Description Duke Energy — Belews Creek Closure Project No. 60603274 Sheet 2 of 6 Stormwater Management Plan II. DESIGN CRITERIA Computed by KDO Date 9/10/19 Checked by AN/HR Date 9/18/19 The design criteria for the Ash Basin closure design is to meet or exceed the requirements set forth by the NCDEQ solid waste guidelines. The Belews Creek closure design is a closure -by - removal method and will result in the partial removal of the Ash Basin Main Dam. The Pine Hall Road Embankment will not be impounding water following this. Therefore, solid waste rules govern the design of the stormwater management system. The design storm set forth by the NCDEQ solid waste guidelines is the 25 year, 24 hour average recurrence synthetic design storm (25yr storm) for all surface water components. Furthermore, when evaluating downstream impacts to the Middleton Loop Road and NS railroad culverts the 100yr storm was used. The 100yr storm is the design criteria set forth by NS Public Projects Manual effective August 1, 2015. The design criteria set forth by NCDOT Guidelines for Drainage Studies and Hydraulic Design effective November 21, 2016, Table 7-1 Design Frequency is the 25yr storm, however due to unknown tailwater effects by the Dan River, the 100yr storm was used for both culvert evaluations. The 100yr tailwater is established by FEMA Flood Insurance Rate Map, NC, Panel 6982. Detention Basin Design Criteria The proposed Ash Basin closure design includes the establishment of a detention basin located within the existing Ash Basin footprint, prior to breaching the existing dam. The detention basin will attenuate post construction stormwater runoff to not exceed pre -Ash Basin (pre - development) peak discharge rates for the 100yr storm. The detention basin is created by installing an approximately 26 foot tall earthen berm. The embankment is not intended to hold water during dry weather conditions and a bottomless culvert will be utilized to attenuate peak stormwater discharge rates below pre -development conditions along Tributary 52. Pre - development conditions refer to pre -ash basin and pre -dam conditions and are different from existing conditions. It is not possible to limit post -closure downstream flows to be less than existing conditions as the dam will be removed. At this level of conceptual design for permitting purposes, it is unknown if the detention basin will be classified as a regulated dam by NCDEQ due to the retention basin located downstream, therefore a conservative approach was taken and the detention basin was designed to route the 100yr storm through the structures primary spillway without activating the emergency spillway, corresponding to a small intermediate (Class B) hazard dam according to North Carolina Administrative Code Subchapter 2K and the North Carolina Dam Safety Law of 1967. For the definition of the 100yr storm, see section IV. Retention Basin Design Criteria The proposed Ash Basin closure design includes the establishment of a retention basin located where the existing ash basin main dam crosses the historical stream, after the dam is breached. Belews Creek Basin Design Memo ASCOM Job Description IV. Duke Energy — Belews Creek Closure Project No. 60603274 Sheet 3 of 6 Stormwater Management Plan Computed by KDO Date 9/10/19 Checked by AN/HR Date 9/18/19 The retention basin will create a permanent pool of water to allow suspended solids collected by stormwater runoff to settle prior to discharging to Tributary 52. The retention basin is created by installing an approximately 31 foot tall embankment near the toe of the downstream side of the main dam. A riser structure will be utilized to maintain and control the normal water elevation within the permanent pool as well as route the 100yr storm to Tributary 52 without activating the emergency spillway. Based on a design maximum height of 33.56 feet, the permanent pool within the retention basin will have an approximate height of 8.75 feet above the downstream toe of the dam. PROCEDURE Historical grades, as well as a conceptual landfill grading plan, located within the ash basin footprint were used to establish a stormwater management plan. The stormwater management plan was used to analyze and design (1) onsite detention basin, (2) onsite retention basin, and (3) impacts to Tributary 52 and downstream existing infrastructure. HydroCAD (Version 10.00-20) modeling software was used to conduct the hydrologic and hydraulic calculations for this analysis with design inputs based on the drainage areas, runoff curve numbers, rainfall data, and other design assumptions in accordance with NCRS hydrologic and hydraulic design criteria. The model was used to generate peak water surface elevations at both the detention and retention basins, as well as design and analyze the proposed detention basin and downstream impacts to Tributary 52 and its associated appurtenances. NOTES/ASSUMPTIONS The following is a list of key notes and assumptions made in completing this analysis. Cover system basin design • Runoff Method: SCS TR-20 • Reach Routing Method: Storage-indication+translation method • Pond Routing Method: Storage -indication method • 24 hour Design Storm Distribution: Type II • 24 hour Rainfall Depth Source: NOAA Atlas 14 Point Precipitation Frequency Estimates • 100 year, 24 hour Rainfall Depth: 7.94 inches • Time of Concentration: TR-55 Segmental Method Belews Creek Basin Design Memo ASCOM Job Description Duke Energy — Belews Creek Closure Project No. 60603274 Sheet 4 of 6 Stormwater Management Plan Computed by KDO Date 9/10/19 Checked by AN/HR Date 9/18/19 • Runoff curve numbers (CN): In accordance with Natural Resource Conservation Services (NRCS) Curve Number Description o 80 for the existing and proposed landfill cover due to grass cover and assumed hydraulic soil group D. V. SUMMARY OF RESULTS Detention Basin The detention basin has been designed to route the runoff from the 100yr storm through the primary spillway while maintaining a minimum of 1 foot of freeboard. The 1 foot of freeboard is compliant with the Duke programmatic criteria, but the NC Dam Safety Rules require that wave action be considered for design floods not based upon the PMP to demonstrate no overtopping will occur. Wave action has not been analyzed at this time though using 1 foot of freeboard is anticipated to be adequate based on the size of the pond, but should be confirmed as part of a detailed design process. The primary spillway is designed to control runoff from the 100 year storm without activating the emergency spillway. Additionally, the detention basin attenuates the peak 100yr runoff to under pre -development conditions. This attenuation mitigates the impacts to Tributary 52 and its associated appurtenances including the Middleton Loop Road and NS railroad culverts when compared to the baseline pre -development conditions (i.e. pre -ash basin and pre -dam). Retention Basin The retention basin has been designed to maintain a permanent pool through the use of a riser structure as its primary spillway. The runoff from the 100yr storm will be routed through this primary spillway. Additionally, the retention basin attenuates the peak 100yr runoff to under pre -development conditions while maintaining a minimum of 1 foot of freeboard. This attenuation mitigates the impacts to Tributary 52 and its associated appurtenances including the Middleton Loop Road and NS railroad culverts when compared to the baseline pre -development conditions (i.e. pre - ash basin and pre -dam). For a summary of flows at various locations downstream of the ash basin, see Table 1 below. As previously stated, it is not possible to maintain flows at or below existing conditions due to the dam being breached. Therefore, pre -ash basin flows were used as the maximum allowable flows. Belews Creek Basin Design Memo ASCOM Job Description Duke Energy — Belews Creek Closure Stormwater Management Plan Project No. 60603274 Sheet 5 of 6 Computed by KDO Date 9/10/19 Checked by AN/HR Date 9/18/19 Table 1: Stormwater Runoff Summary Table Pre Ash Closure By Excavation and Existing Basin Dam Breach with Detention Conditions (CN:61) and Retention Basins 0031 1117 322 688 Qioo, Cfs MLR 2 1281 528 855 RR 1166 437 759 Footnotes 1 003 = NPDES Outfall 003 z MLR = Middleton Loop Road 3 RR = Norfolk Southern Rail Road VI. CONCLUSIONS The proposed Ash Basin closure design meets or exceeds the requirements set forth by NCDEQ, as well as additional Duke design criteria. The detention and retention basins are designed to attenuate the peak 100yr storm discharge rates below pre -development conditions to eliminate the potential of downstream impacts (i.e. pre -ash basin and pre -dam). Additional design work will be conducted related to the structural designs of the stormwater management system, especially related to the detention and retention basins. The design shown for the detention and retention basins are conceptual at this time. These two structures are not directly part of the ash basin closure structure from a regulatory aspect, and therefore, additional refinement will be pursued separately prior to construction. Furthermore, detailed design of landfill and associated channels and culverts will be performed at a later stage. Belews Creek Basin Design Memo ASCOM Job Duke Energy — Belews Creek Closure Project No. 60603274 Sheet 6 of 6 Description Stormwater Management Plan Computed by KDO Date 9/10/19 Checked by AN/HR Date 9/18/19 VII. ATTACHMENTS Figures: Figure 1: Final Surface Water Management Figure 2: Final Surface Water Management Attachments: Attachment A: HydroCAD Calculations for Basin Design A-1: Pre Ash Basin 100yr storm A-2: Existing Conditions 100yr storm A-3: Post development 100yr storm Belews Creek Basin Design Memo Figures Final Surface Water Management Belews Creek Basin Design Memo N FIGURE 1 I REV. 0 u C r it I/Ijl, II l %! I ��I If�\J'/ '' /i%/ ��i� i^� �`\�� — 1\I0Ir/f/��' IIIII, \\\ \11 \\; \\\\ \\ \` \ \ lii 1 I Ii1�% .��� I ♦ >) ►` 1 ! `\\`\Qx. � I / - \ \\\ /// / /! / IN \ //// 'i'i/''i_-���\ (\� 1 I \ l !-� IIII IIIIII III/// I ►I„ ]l/\ `\ ,` ` \��\ )Ij/%%'///�\\ \\\\,"`\\\1\ 1 jlllj�lll\\II\I�1 I \� --_I EXISTING NORFOLK SOUTHERN , ,/ul\\II /! /� N\N, ,\\`\\ \ \ \ / I IIII\I..111 11► 1\�\ � .1_.::�``;_;` RAILROAD CULVERT ,.• .___ ,I/ / \t f. �I\\\`\I11 /f 1 \\ \ \ \\\ \�\ - !/Jl 1u111 1 \\\, = >,>J �� 1 1\Ill\\\\1\ - \\ I/ \,J r1\lam �`\\\\ ►/,// , /'iii- \`1\\`\\ / \ ` `\ _ NN ` \\ MIDDLETON LOOP ROAD 11 -' III/ \,/j11I�II�I�\\\\ylll///%'i�`-J \ \ EXISTING MIDDLETON 11,, Ikk, /ice/ / ,1'-/�,r, \i�/�� Ili c !` c \?\\`:, LOOP ROAD CULVERT I\'�/ / i//' i�\;,;';�i�; f, \:��\���\�\�\ 11�\`-J�II\ c-,�� / / / / /- I 1 1 11 ► 1 1 IQ%!( I I}I III I / 1 I ) It t 'II�- / I If 11111 IIIlk \\\ 1\1I\\` \ \\ Iljl Illrlllll ' �\' l\\l \♦ \ ,� `I\\1' 11\11 IN ♦\ \ 1 I f //� \\">`�`a,\\\\\\\ I 1\/--- 11\\. \ \_� II } ► ► I / ,-- / �,,// /,/,,,,i //i/--- \\\\\III//l \\ \ \ 1 I / ' EXISTING REGULATED STREAM\\II (1\\`\\� ` _;_ `\ o c�0 ' I `\\\��,I <• c� _ / ,\\\ \ ,FURTHER CALCULATIONS NEEDED ..— dill/// \-- `\\\ lki\\\��\/�/�/� I `I 1\\` ` FOR STABILIZATION AND /'I f\ \\ \`_- -- \ i �` `�� -.EROSION PREVENTION MEASURES. IMPACT BASIN OUTLET STRUCTURE \\ \ \ \ \ , NEW DISCHARGE PIPE POTENTIAL SURFACE (NPDES OUTFALL 003) �\,-, / JI`_ TO OUTFALL 006 ; - - WATER POND v\/ice ��`� 1\�. \i%///VV ` / /_i Q \ \\\I ✓�� _=--- - \/ \` j��___ �// j \�_ _J, STORMWATER TO BE PIPED FROM BORROW , ---_ AREA TO STORMWATER CHANNEL. PIPE TO / ACCESS ROAD /� (� �)► `� ,_- 1/I'I"��=`` `� �`. \ \. ----�� ` l!-' BE SIZED TO CREATE SEDIMENT POND. \\ '���� I �// i�i� _ � \}\mil,\\\ \� �_ �,�//�/ /, '� •►�� '�s.1. \ • _.,c !p � SPILLWAY \ ` ii%. rr4��i/i i'/ ��_=_�\``� \ \a` . _>%�//�i'�'/�i! •�. / �\ (,\f/ l„I�/ r ��,___�• \\\\\\\\\\\\\ i•��� /, - / .�� PERIMETER DITCH HIGH POINT -LET CONDUIT ��\\ \ Il �' "` \\ \\\\ \\ ,- \\ / ►„ �'I \ ///�/'_ ►, 1 ►)\ a I, Ill!/!� / 7/ / ( _ -__'/ �-`-----` - � _ --- � � POTENTIAL BORROW AND SURFACE.—. - \�\\` // �I1 %� //�- 1I ///111 II ,' Ill/ /!�// 1 --'ii' i- %__ \\\ I Iiii \ _--, \��, \ i I�Ill - _ - WATER DIVERSION AREA \\��"! ./�J•-�' \\ %/', 1 ////�// :;. 11 1 //lI \ �'�/ ~ /—'�� J'/"/ //'/' I l( `�-� / \` \ _ �f�f�`�\� �� l/ // l\♦��,\ ^\` WET WELL/PUMP STATION, rll\\ - \`\,` \ \\�:;�I� ,;-.PARTIAL DAM BREACH `� - / \\ \`, ` _ ;\ "`` //' \ t \ � � , IIIII \ /i / • --::: ,--- �c r � - '.� I � _--- 1 � � l �\ ` 4,.� \ �' /l< <<I h\i Ilf('f,'.'_ `\\ \ I - PERIMETER DITCH LOW POINT )J1 >� PROPOSED RETENTION BASIN I\\ \\\ \I 'I / /� • , !/// /,' = _ \� /, \. ,\ , �:`\�' / % ,� %I,\\ • ,/ /ice ' ,i�� ^7 i, / \ \�_ SEE SHEET FIGURE 2 '/ 'I/►II II)(1� 1 I I .- r'// / "�'-_--'-_-' '' '/ "" ` CULVERT TO BORROW AREA !I \ IIii' /r'/ \�\\ \ / I' I N\ 11 II►1 'i� ���� \\\\ `� `� ` I IIII l II ♦)/ \ �/ '_ 111 II(1}\1j1 t i / III �1►��\\ !J /l1 \ \M 11\\ \\\ \\�`\\� i \(\�(tI\\\��I-1111'II/i\\ I I \ \� \w _1\h�\\ _\\\\\\ \`\\<< �J�-� PERIMETER DITCH — A\ \�\\�\\\`V�i LOW POINT _ . / // 1► 11111111j11/,I ,I,I II�\ . \\� `_� \�\I�\Ilihll1ln 111 / r ii'i(f IIIII IIIII \�\ \�- \ \ \\\ \ �, I , - 1 // /r I I 11 \\ \\ 1\ \`` PINE HALL ROAD EMBANKMENT 1\ If lit IIt� IIII It�l� �i I111 •� ��„�_�-_.-.,� I I I I / /// / � _- - l/ IIIII -= DAM (STOKE-116) III III-- / I / / • -' ` �` 1 1 / ,IIII II II I 111 - / /ice / I /I,-_ `� \` i / / // /// / /�/i/ /, ice- - - -�� \ ` /// /' /// / 1/1 //. /, // // / , / i /'' /// /1/ / //,1 /1 //// // 1j // -�_ii' // / 1/ //% I /j % ,l/% .�? / / // / / // //// 1,' / ��//iG_ �\ \ `�\�/ // %/iii/ / ,\IN ` \\ / / 1/�, ////////j, ///, //�/// l//// 11 I,I; II// /// lit "It ' _ \\ I \ i \\.. � � ,. //�%i�li � /i////i /i11/ 1j 1//i/ii/i/f// 11►'ill�f \` \ ► p'� /`'',', ;�::%/.i/ _L \� S` \ PROPOSED CCR //i/i//J /,// Y 1 I // / /�/ // \\ I' 'I'I/, 1\ / / / //// / / / // LANDFILL \ \\ \ �\ / /�,♦ / j' i'i- \ \ 1\ 1 III I \\ // ///l // / // r,\I IIII 11\ \ ,, //1,1 ,//,b'ii ,/ / ,/// //,/�'_ �\ \\It',,\ IIII I t, ljI' I I I rl ,\\\\ /- ri , /1/ /1 /1 // // /// / /fill / / / if PROPOSED DETENTION BASIN AND OUTLET 1 IIII~�1/ /„r „ 111,11 II I 1 1 \\ \ 7 W1/ p SEE SHEET FIGURE 2 ii,/�/i / I II 1� I \ \\\\ 2 i1///i///�//// \ \ \ /, /, l / 1/ / //1/ / ///i ///// / b�'// IN if //,/• co, I 1 , // r 11 / / \ JIN ITZ 14 (1 �\� ` \� \=-/ //'Wh1,// 1i !ii /1 /1 __-��--:��\\\IN \\�i\\ `�` -�J r!�/� I / r� \IN \\ \\Il IIIII 111 ' ! ! I / / " Q\\ \ \ IIII /// i / / \ \ . �___ ----• II I 1 I ' / 1 / / / ,' / \\\�\\\ \� _ _ - 1(�71i . �- I ( h _____- / / ULx1 _ _ lc ___—,_ _---==- 111 l 1I I I , ` Ill I III 1 1 IIII II \ \11 \ 1 l \ _ IN I NIN ILI!< ."%Ji_ �II! 1 I 1 l �\ \ —J,^J'� I/ IIII I 1 I\ \\ \ \ ' l /" 'iii'/ J 1 11 , / \ O.`� EXISTING POWER ,/, '� �/```r ^�J )`� IN IN LINE EASEMENT - / 1 1 = _ �`\ I ' 0 1 -- // • _ RELOCATE LRB '' IN\� \ \ \ ! 1, _0g0 i/„'i., EMERGENCY SPILLWAY \ `� / rr / ( / / ( I \ ' / / //\ / / '/ // / ,/ /l / // / / �- `�\ "`••T OJT \��\``� ��- 1, 1 /<� .. \ �_ � ,c /i,�/�-_�\II of 16 IN I ~�I/ III\\`\\ / I I I +I►IIfJ / /,! / / � _`\ ► //i(r I ) \ r / 11 !hl l/ //,:��1\ � ^`-�\\\\\\ /� ��� \ \ --� ,/�--,�t'1 I �- / 1ItRiI/��f / 111/I11/ I \ (;, THIS AREA TO BE FILLED WITH COMPACTED SOIL �\ ;i TO PROMOTE POSITIVE j \\1ii �r lii \! SURFACE DRAINAGE /"'•//;ram PERIMETER DITCH HIGH POINT N. 70 // / / / I I \I \\\\, \ \, I\ \ 11 1IRWA1 1 \ \ 1 111 /1// ii1 �11\ \\ `\ \`\ \`\I III/�, 11 \ \\ \ \ \I ABANDON LRB I I \\ \\\`��\\ \II )I'/i'/ � EMERGENCY SPILLWAYIN '\ i ;NIN 1 /'-� ��1/1�i\\`I\,11\ `, ` ffF t ` \ \`\� \� ZbyF' ! \►\\\ BELEWS LAKE . No, \ \` \�``\�� NORMAL WATER SURFACE ELEVATION = 725 It \ <\\� ram_ .11\\\ \' \`,`I 1 // qQ (, ll �/ice � \\�� ���t'y �=� ♦ 1\(\,� \\\ 1 I / ,1, / / \Il \\\ \ \111b� �\. 11 11\\ 1 I l/, \II III \\\` I \\\\ \ \ \ 'Will ,11 I \ \\\N , II , ,. <� \ 71 ll \ \\ /�/o/jJ A, /%/ /\ I /,�\�i♦ �\/ 1 /III s` \�l11� 1 `\�\` I I �// \///1�, \�/ l III�l� `�,_/ \ (`�✓/ \ /1 I 1 � ,r11 (( r,l\ ..- - j/ , l / / `�i 1 '` _Jll 11 \�\- COAL PILE 1 1It \�`lll/ .J } �/ �/^ // /� �� �• �� \ �' , I 1 \`J %r 1 /-`/��\ ' \ `-JJ �' "/ / '-'-_ 111 \ / ♦ '� `� _'11\ / ( , ���� ` ! 1\ I,_-_�/�i`� ._ -I I\\�� \. � 1\ CLOSED PINE HALL \\\ \��� \I \_ // ,�I\I�� \ .�� ` nJ ' , J! Ww /'ROAD ASH LANDFILL oo-__ PERMIT # 8503 ///' Ij/ / �/ / / �>/ ,�''' / T \ //�=mac=\� //i/ \\` \� J,/'�I r l \ ,I - ip - \ i 1/// //////// / /' /' 1 i' %� yrrl \` \ /// --�11 (/i,' I, AN 11 ' 1 (f 1 \ / i� / _ %_ ' , 1� \ //\I / l //r CLOSED \I II / / r' \Jil IIII/ ii 00 / / r I \ \, ///^ �1 1 , (/ 1 /1 1 / . Q �. , J , I r\\ 1e1\ /// 11///// 1, IIIII / . ///!\• r! ; / // ///i/ /i /°' �' OP /. ///, Ali 1�/11\.////�\// .\I/ ///g STRUCTURAL n r �� . / l l l /�� �' R / / / ,�1}\111\ // , (/ I (II / _ ///I 111 ,, �// �\-, /� / 1 t d \ 1/, 1^ 1 IIIII ,11 _�// �' N� / ! / �/ / // //1\J" \ //��/I I / III 1 141 FILL---.,�/l1�// \ 1 1 „\\\ 11a%= NP / / / 1 !/i / /i///��; 1 , / //ill I 11h II 41 %-r= \\ _�����'I� �\`c� I / J j -//,l (/( 1 / 1\IIIVI ''/i � Q`\�i -_- � ir/ / / \\\Ill 1\\\\�_-_- ��__ ,�p`� � 1 I I / I /' Jr 1(�1 411 \1114,\1 /�j/,�Jii'-��=:i��/ ���'�/ ' '�i", 1 / fl\\ /i�� \\`�%% I �,_\ II\\ lil,,\\`J//�,!/.•-��t\�-'/jf/ii- i �1�/�-,////�_J\_/ , v 1 �`� ' \\\ \ �� o ! / 1 //�- j Iosop II \\� \\\ \` I \ \\\\\\\�/ l/l/% / `\� Q 1 %ll//J/ - I , III\/l�/+ \ 1 III 1 1 (i ////!/ / / 1 Ifl 1 / / / //'i'/' 1 \,\ -/l .\\ All `�`\\�` II�/1�11 1 \� \ �JIIII III\\\ I ( '/%1�` /Il\; /♦ P:\PROJECTS2\60603274_BELEWS_CREEK\900_CAD_GIS\910_CAD\05_MODELS\CIVIL\X-SURFACE WATER MANAGEMENT PLAN.DWG 9/26/2019 1105:12 AV--,- ��^'i��� `\\\\\ \ 'I (\ \�M-N!ll�j1 0 1 2 3 1 TENTHS 10 20 30 1 1 1 40 LEGEND / CCR UNIT BOUNDARY (APPROXIMATE) — — — — — — — EXISTING SITE FEATURE (APPROXIMATE) -� DUKE ENERGY PROPERTY BOUNDARY EXISTING MINOR CONTOUR (5 FT) EXISTING MAJOR CONTOUR (25 FT) PROPOSED DAM BREACH MINOR CONTOUR (5 FT) PROPOSED DAM BREACH MAJOR CONTOUR (25 FT) �._ FLOW ARROW PERMANENT POOL SURFACE WATER PEAK WATER SURFACE ELEVATION FOR 100-YR, 24-HR STORM EVENT POTENTIAL SURFACE WATER DIVERSION DITCH WETLANDS NOTE 1. PROPOSED STORMWATER BASIN DESIGN IS CONCEPTUAL AND WILL NEED DETAILED DESIGN AS PART OF DAM MODIFICATION AND DECOMMISSIONING PLAN APPLICAITON. 2. ADDITIONAL STREAM RESTORATION, STORMWATER CHANNEL, AND CULVERT DESIGN MAY BE REQUIRED WITHIN AND OUTSIDE THE ASH BASIN. TITLE 0 500 1000 1500 GRAPHIC SCALE (IN FEET) NOT FOR CONSTRUCTION FINAL SURFACE WATER MANAGEMENT BELEWS CREEK STEAM STATION STOKES COUNTY, NORTH CAROLINA FOR ISSUED FOR REVIEW _ DUKE ENERGY® SCALE: ASSHOWN DES: SD/KO DWG TYPE:.DWG DFTR: SD/KO JOB NO: 60603274 CHKD: SD [DATE. 09-18-2019 ENGR : KO FILENAME: X-SURFACE WATER MANAGEMENT PLAN.DWG APPD: KK DWG SIZE DRAWING NO. REVISION ANSI D. O N.C. ENGINEERING LICENSE NO. 22.0"x340" FIGURE 1 F-0342 -n C m _L 70 m Q FIGURE 2 REV. 0 C ,- \ // / / ' / / / ' / / / - /j �i'_— j — — _ —, I\ '\ ' \ I I I % \ \ \ \ \ ,\-- -- � — --�//i'/ ,,/, // ,' ,/ , / / / / / / / � 4 �n — _�� t�:i���/ • \ i / )lll l / / , l , / / / / I I /-% / ___-__ `\ \ \\ \ \ \ \ \ \ \ \ \ \ \ !/i-� i_ i,/ ,' i' / /'ll / 11 /' / / / / 11 / / ' I""A0!an \ �' 1 / I / / 1 / / /-- __------- \ \ \ ` \ \ \ \ \ \ \ \ \ - j//, / -- - ,__ -- ,' ,- ,- / ,, / , / / / / , / -�_\ \`` -/ \ \ \�- ____ IIIII 1 I I I // /�/,,/ \ \ \1 \ - _ _ / 1 1 I - , , ,- \ \ \ \ \ \ \ \ \ \ ` /// l l / .e -' , - , - / , , ,- / / / / / _-_ ---- ---_-\ \ 1 ,,, , - "-'' __---_ \ \ \ \ \ \ \ \ \ 1 \ // / / / / , FURTHER CALCULATIONS NEEDED --- _ _ I / \ `,- `, \ / / / / / / / / / \ — / / 11\\ 1 I l f ► I , ,'//' _---- `, \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ �/ 4'1 / / /,/ /' / - •- •- -- / , ,/ FOR STABILIZATION AND / `\__ ' \ \\ �� `�` \ ` 111\11 I I I /-'' -''" --- \\\ \\\ \ \ / l 1, / I I / / , f , / ,. / // \ , \ \ \11 1 III 1 \ \/ / // / - — — \ \ \ \ \ \ \ \ \ \ `\ i /' I I / I ' / / - I / ' EROSION PREVENTION MEASURES. — i / / / ,\ `-- , , _ ___� 4 1 \\\\ 11 I III \ I / //'' — \ \ \ 1 \ \ \ \ \ \ \ I I / / , / / , / / / / /---- — \ / / / / \ \ POTENTIAL SURFACE / --- I \111 I I I I 1 ///of '/I ,e / --'' 1 1 I 1 \ I I , 1 1 1 1 I I I / I I I I I / / , / , / / , , , - r--, / / I --' /-- -- --- - - -��' 1 / I / `\ t 11 I I 1 I I 1 /// ' / -' -t \ I I I I I 1 I 1 I I 1 I I / / / / f , , I I I / / / / / r / / / / ,' / / / l / /- - --- --- - \, / ` I 1 f \- - , _- _\ \ � 1 111 111 , I 1 // // / / ,' __ I / / I I , I I I I l / / 'I / +, , I I I I , I / I , / , / , / / / .=-- , 00 --�C / / \ / _"- // / \ \ / / / --\ I / / / / I / / / / / I 1 I I / / / / ,•.,.,,,,,,• r I // / I I , \ I / , / I I // /i / + I I I / / 1 / ' I I \ t / / / / / /' --' \ I , / / , 1 1 1' l/ .11i__ + + + I I 1 I I I I 1 I / I / / / / f / / // eui , -\11 I I q \ / / /1 I / / / / / I Ill 'ice"+ + /+ 1 1 I I I 1 1 / / / /- \\ / 1 / / / / / / I I I / / / / -- \ I I / I I I \ \,// /' / /' // - -\\ I I / , / -/ / , / // l,/�//� + �I + 1 I I I 1 / 1 / / / 1 C' 11 \ -- // ./ 1 , 1 I l / I f ,, // //// + + + + 1 I 1 I 1 / ' " / , ` /' I I /// / / / I / / // t~11I I . I / // I /I I l / I I \ - / / / ./ I / / , l I //' /, /, / , + +� +1 , 1 / / 1 / I / l I I , \\ I \ \ I t\ \ r\/// ,' / / -_", 1 / / / / / / 1 /' .,/,, 11 + + + 4 l 1 / I 1 I I l l l l / l -X-- - \/ / 1 / , / / I / / I I / / I l / /// / / 1 1 / 1 / / / / I /'' -' ,' \ 1 I \ \ \ // / / / ) , / I I -,, // It + + +/ l I l / I l l I �a \ \ \\ ` \ - / / % /'/ I, I / / / // / /i / / % 1/,,, u ++ ++f � l l l 1 I l I I I / /.part' t \�\ 0 //' --'- - "' / \ \` l/ , / I l / I // _/ / ) Illr// I / / / I / / / / / / ---' \ \ \ / / / / , / //lI l / (/ + + + I l / l / l 1 ) , y / / / /' _/ -/ \ \ \ l I ,-' WE WELL PUMP STATION : ///%:' YYY + I , / / / I l / , I ! `\ '� ,r// / ,/ ; � / --- ��, \ \ `\1 / I / — I i l / '/ / /',/ ' / i 1/) (t / 11 /�y / /"\ I' _�+ / NEW OSOU TFALL 0GE 106 PE \N, \\ I ,'/ ,-----�'--'-�Ie'-- - \ \ / / / \ t 1 \ I(I\\/ /,// / / ./ ` \ \/ \ I / /' / \ \ 1 t 1 \ 1 \1<% _ //// 1 / / /' / ' / / ' I 1 I I / ,' \ I 1 \/ / / / \ \ \ \ \ 1 1 1 1 I 1 I 1 / //////ll / / / / / / I I l / I I 1 1 `\ I <I �` - / / / -- "--- __ 1 / \ , / / ---\ \ \ , , I 1 I I I I //// I I / / / I I I \ 1 \ \ I / \_ / / �' - ' I / ` / / / ,' \ \ \ I 1 1 1 1' 1111f- /Il f I I / f I I I 1 l \ \ \\ �\____ -"'% / , / + + -- I 1 / \ \/ / - \ , I , I I ,III 1'' I I I/1 / I /^1/ / / \ \ \ _ --_ \/' ,' ,' j - / + + - 1 / I I // \ / / ,., -^ 1 I I I j I 1 1 I 1 1 I I'' I I III/ /1 /+++ / I.t�/rI��11 ' I '\ - - \ , /' / / \ / ', - I I I / I / - > > - / , ' I / \/ / / - ' I 1 1 1 I 1 I I I 1111 1 +, ,- / /',- ,- - �/ /,) // / /' �L=—_ ,/ ,/ ,- + + + + ,\ 1 / ,,/ \ / /- I I I l I I r 1111 1IIIII 1 / / / - ., / / / / / / / 1 1 1 1 I I I 1 / I Ill \l l \ / / / 1 1 I I 1 I III► \ + / /, , / / �, / /' / rM`� /' /' / \ +++++++ r ' I l + / / , / / / / / / I I I 1 / I / , I 1 l 1 \ + / /, /, / / /, - " ��� \\ \ ) � / I , I / / ,'\ \ + + + 1 //1 / ,� \ �/ /' I I / // /� //� lrll llll\ \ + {/ '/' / / /' i I L Y / I I- \ / /l I 111 " / / / // /// , /j/,//1 /lI \ \ + + \ I l / // / / / ,"� / I l ' I l \ + + / / / l I // 1 / '\---,, ' / I I //////// j f � / I //� , /,�/ I\I\\1\11 1 � I I I I I I // //' ' ,11 ,( ,�, , \\ /� + /' // / / / I Ill // r I I \ \ \` \\ \t,\\ ` `\\ \\\\1\\ 1 + �`�\ 1 I I I I �/ / / / / l I ,,�I/ I I \ \ \\\\\ \\\\ `� \ 1 ++++ + I I I I r �� ' PROPOSED RETENTION BASIN l I / I / 1// __,/ // I , \ \ \\ \ \\ \ 0\\,111\ + + t I I I I I I I I� // / CREST LENGTH _ I I/ I / III//� /, ,/ I I I `t I\\ `I 1 \\ \\\� \\ \\ i i I I �+\ + + 1 O l 1 / - I I / // I / ' I I ' I ' 1 1 l \ \ `\\"` \ ` 1 1 ' I CREST ELEVATION = 666 I I l I / / /,// / , / / '--' / / , / II /' // / it / i I I I III,) \1 \I \\� `'� '6' `\ ii 111 1 1 1 1 II I I 1 / / , I I HEIGHT = 31 FT I/ l /l /' 1�/ /' ,'' // ,'' I / i I/ i I I J I i` I \\ `� \ I I 1 I I I 1 I I I ,, / - /, / , I \ t , _ , \- _- \ \ , t , , 11 1 PERMANENT STORAGE VOLUME = 10.4 AC —FT I / %/�'/' // '-'''%,% / �) i \` :`ls�\- \ \ \ ,,; �I i\i\ \ 100 YR RUNOFF STORAGE VOLUME = 60.4 A( Il l 1, / / e I /' /' /-' / / / I I \ ' ' / t tj \ (100 YR STORAGE IS STORAGE ABOVE PERMA /// \ / , / / / /, ,/ , , / / / I I' \- �� l 11 / I I l /I i /' !� ' %' " , I / ' / ' ' �'```\\` 72"X72" RISER STRUCTURE WITH 72" ROUND 1 I / , / - , / // \ %l / \\ \\ \ , 1 1 // �v r� ///l / // , ; \\ _EMERGENCY SPILLWAY ELEVATION =,665 ----- /11.11 ---- _--_ vllx� — ` ,; __;;'; — -, \�\�\\\\\I WATER POND ----- ' \_\\`\\ `\\/,__- — — -_ �,;;- —;,'' -_____ `\`\\ \ \ POTENTIAL BORROW AND SURFACE -----' ----- \ \\--- -' / / - _ /,/ i /,, _.---------- `> `\,,\\ WATER DIVERSION AREA _ -----' I — — \ `\\ \\\ / / /' I IF I \ / / / \ \ \ / / / , / / / / , 11 / I \ , 1 / \ \ \ +++++++ �' / \ \\ I I I I STORMWATER TO BE PIPED FROM BORROW \\ �_\ - ,'-'' /.1,,' '\\ \ I I \\ m +-__---' 1\ N \ \ `\ \\ \ \ AREA TO STORMWATER CHANNEL. PIPE TO \ \�\ - _____/ / \ \ 1 \ `\ + ^--- - 1\ \\ \ `\ `\\\ BE SIZED TO CREATE SEDIMENT POND. ,-'\ �� / '� ,-\\ \\ I \ \ -\ \ / \ ___ ___________ — / — \ \ \\ \ \ / / v / _III _ \� \ \`\` \\ \\ `PERIMETER DITCH HIGH POINT _ / > \ _ —FT /' /' ''"— /// I r— __ '--,'- / -'- --- —_— --- --` \ __ -`_ -`_— `\ n _/ \ ♦ \_ \_ \ I / / ' ___ // I `\ ' '/ --•, / --'/ -'- - - ,`_ — _ `_-_ — _ \ � _- \\ `\ \ <`_/ ` \ , `__ \` I TENT POOL) //'/-_/ I l , I - --_ _-- - - _ \ \ \ \ , 'IPE / / / / I I I I 1 \ I I I -- --- 1-1 -- _ \ --\ ___ _\ \\\ \\ \\ \\ _-\ _\ l 1 I / / / / I 1 I I \ ` I r , -- / ' -` __ `_ `__ \ \ \ \ \ ` \ _ `, ` ' / ////// / / F" I I I 1 I I I I I 1 \ , / --' J `__ _ \ __ __ \ \ \ \\ \ \ \ \ \ \�\ �\\ \ \ �\ \\\ I I I I / , / / / / / I I ' 1 I \ I \ \ 1 1 1 1 -- -4 - `_— `_� __ \ `_ \ \ \ \ \\ \ \ \\ \ �`_ `\ `� _ _ `_ _\ I I I I // 1 I / I \ - I_ -- / / / / , , / - / / / I I I I I I I I I - - �- _ _ \ \ \ \ \ _ _ _ _ _ _ , 1 I '/ / 1 \ \ I I I I I I /' \\ \ ` \ - - - _1 - - , / / / / / / / , // ,' / ,' / / / , / / / / I I I I 1 I I I I I \ \ \ \ \ \ _ - \ _ I I I I /,, I \� \ \ \ \ \ N l l I ,/ \ \ \ ' / ' / / / ' ' / /-----__ , I \ I I I I I I I f �� `_- \ \ \ \ \ ` • _ _ _ l l 1 \ / l r I I,, \ \ \ 0 I � ♦ � % / / / , /, /, / / / - _ / / / /i _-/ 1 I I I I I - _ __- - ` \ \ \ \ \ \ \ ` _ \\ \ _ \\ _` \- \\ \ \ I / / k/ (! \ \ \ \ \ \ ����� / / / / / / / , - / / / / --- -`_ / I , 1 , I , I I I I I I I I I I �\�_ \ __ _ \ \ \ \ \ \ \ `, \\ _\ _\ \ _\ _\ _- \ \ \ 1 I // ' I � 1\ \ \ \ \ I. \ \ \ \ \\ \\. I - / / / , __ / --_ -\ _ / / / //I/ / 1 1 1 I 1 1 1 I _, \ -- 1 I I I I I I \ \ \ \ \ \ I I `C11 \ \ /' \ \ / I 1 -I I I I I I I I I I - \` \ .- \\ \\ �\ \ 1 1 / \ \ \ �� 1 \ \ 100 YR PEAK WATER SURFACE " / I l 1 < , \ \ 1 \ \ \ : I /' / \ `\ / / / // ' I I I I I I I I I I I I I I- I I I _ \ \ \ `\ ` \ \ \ \ __ • \ 1 1 / I \ t \ � \ %= I i ' ♦' �� \_ ` %'/// / /I I I l 1 I I I I I I I I I- I I I I -`_ \- -\ \ \ \ \ \ \ \ \ N, `!♦ , \ , `� 4 ` \ ` ` 1 .� I I , \ \ \ ELEVATION 663.56 / #, 1 1 I III I _ t , 1 1 \. �� 1 - - , - /_ \ - ' / // /^ _ _` \ I I I I I ' I I I I I I I , \ , \ ` \ \ \ ` \_ �� \ \ \\ _\ \ \ \ \ II 11 \ 1 / \ \ t, -'� - _ / , , / - \ \ ///% / , I I l 1 I I I I I I I `\ \ \ \\ \ \ \ - , \ \ . _ \ , \ NORMAL WATER SURFACE - ' '-J-,:--, \ , / / I I I l I I I I I I I I I , I I 1�� ��`_ ,r` , \ _ \ - "-- -- -' / -' ' / ` '� /' - ',' ` / I I I , I , I I , I , I I I I I I I , I ' ' \� \ , \ \\ `\\ ` ` ` \ \ \ �\ `_ \, \ �_ ,- `\ \ 1 1 , 1 w`""ieae* -�� 2 - "-'' - - - �� -- / / /\ / / /-- I ri I 1 I , I I I I I I I I I I f I ' _ \ \ ♦ \ , _ _ _ \ \ _,�,mo. �� ELEVATION — 644.00 _ \ , - /_-;-'' �� - _ `-_ . _ - ' / ' /------- `\ , / y// ,�' I I j I I I ; ' ' ' 11 1' I ; I \„�,�\�\ \\ \ , \ \ \ \ 1 ` 11\ \ 1 1 ` 1 ,- \ \ \ . , . . \ , t t \ 1 Eawm¢tw a ' — / / /I / / I I I ---- _ _ ) ' - _ -------------- --POW POINR DITCH / / / /Ill / ,/ I f i 1 i i i i I I I I I I 'I I I 1 I I 1 , I , I I ' \ `\ \ \ \ \ \ I I I I , I \ \ \ \ \ \ . \ 1 1 1 \ '? ,_-- - �r�- , % 1 1 I I \ \ `. \CULVERT TO BORROW AREA t 1 \ \\ 1 --`---/`�� - l l / _- 'i `-- --- \ / / / / / / / I I I I I I I /r I 1 I I X I I I I I I \ \ \ \ \ \ \ \_ `\ `\ `\\� �\ \ \ \ \ \ \\ \ \ 1 / _ _ \ -_�__ ti / -- I / / / / I I I \ \ \ \ \ _ \ \ _ ♦ \ \ \ \ \ \ \ 1 _ _ ----- - --\ --- , , , / , / , 1 I I I I I I I ' I I \ \\ \ `_ - \ \ _ \ \ \ \\ 1\ 1\ \1 Gj \ r - / / / I I I 1 I 1 I I I \ . . \ . \ \ �� ' '~� - _ i------------------- _ I I I l I \\ \ \ \ \ _ \ , \ \ \\ \\ \\ \ \ \ \\ \\ \ \ \ - - - - / " _ . I / / _ -' �--/ ,� _ -----_ - - - - -72 --` \\ - J / // / / / % / % / / 1 I I I 1 1 I I I I I I I I \\\ \ \ \ _- _ `, `� \ \ \ \ \ \\ ` \ \ \ \�\ - - r/ , � _ - _ -'%�✓ 5� `\ `, /," / / / / / / / / / / / / I I I 1 1 1 I 1 I I I I ' I \ \`\ , \` _- \ , _ `\ 1 \ \\ , , \ 1 1 I / / / / / / / 1 1 I \ , , , . _ _ l I \ 1 , I I \ %' I / _ - __/s_�_ = '' PARTIAL DAM BREACH -------------- l l / / / / I / l / 1 1 I 1 I I 1 ► 1 1 1 \ _ I I , \ I / / - --' _-' _- _, -& - _ -------------- l/' I I 11 I I 1 1 \` __ __ ,\ ,\ 1 I I I I I I I I I \ 1 - - --' /� -__� - -- -\\ \ \ / J/ / / / / / / / l / / l l / / l I I I . \ \ I I I I 1 I I I \ T I / =_ ~ --_ - - ` \ \ \ / / / / l / / / / / / / l / / l / l / 1 I I I I I I II I I I \ \\ \ \ \ \ I I 1 I I I I I I / ^-, / 1 - i ♦ _ ` \ / f // l/ / // 1/ l l/// // l I 1 1 I 1 1 \ __ -, ` .\ I I I I I I I I 1 I,' I i - \ / 1 / l -_-_ l _ i -''i/� - --_ ------ , \� \ / / I / / / / / / / / / l l / / / / I r r 1 r I I 1 / \ \ \-` \ \� I , I I I I I I I I I 1 I _/ / / - - / ----' / _ _ -` -----_ __ ---- �\ ``_ \ / / / / / / / / / / I / ' l l / / / / / / l I l / / / I / 1 , 1 I \ _ \ I I I , I I I I I I I / / ---_ `--`_ 1 1 / l ' I I L - - _-_ _- i s -_` `_-_ - - - --__- ___ `\, _ - / / / / / / / / / / l / / l l / / / / / , 1 1 I l \ ,\ ,\ ,I I I I I I l , I , I I I , , l I , I I �/ 1 I 1 ` -`_ ' / l I l _----- --_ - __ __ _ -_� l / / / / / / ' / / / / / / / / / I / / \ \ \ I I I I I I 1 I I , I I I I I 1 1 I \ - _ --_ \ / / / / / 1 / / / / l 1 / / / 1 \ I I I I I. `__ `\ \\ \ I / / / I / --_- ���----------- --- ----- -`z ---__ ----- - -` \\ \\ / / / / / / / / ' / / / / / / / 1 I I I I I I I I� 1 I 1 I 1 1 _ . I / l 1 ----- � -_---- ----- - \� - %p _ \ ---/ ' / / / / / / / / / l / / / l / / l / I / / / / % I I I I I I I I I I I I I I \ `\ i > / I / i - _ �. -- ------------ --_ --__ ---_ - ' / / / / / / / / / / / / / / / / / / , / / / , , I 1 r , I I / \ . \ \ \ I / / / l I l - - ! - __ - -------------- -- \ - �pp \ `_ / / /i I / / / / / / / / , / / / / / / / / 1 'y 1 'M'r I I I 1 I 1 \ \\ \ \\ / \ / / / / I --moo '' - - - - - - --_ - ___ ---_ ` \ ' / / / / , / / , / / / / / / / / / / / / / / , / / / / I � I I I I I I I I I / /� r \ `, \\ \\ I I / / % , / �, / '' _ / - -`_ / / / / / / / / / / / / / / l / l l / / / / / 1 I , I I I I I I / I / \ \ % _� f I / / / / / / / ,, /,' -- - j ------------------- \ _, _- - ,- _� \" \\ \ N. / / / / / / I / , / / / / / / / / / / / / 11 - 1 1 \ \ \ 1 / /I I / � � / , , - -- i - \ \ `_ \ \ . / / / / / / / / / / / , / I / / / / I / / / / / / / ' ' / / l / l / / l / / / / / I I / I I 1 I / I \ `\ \\ ' I / le / ______----- _------------- ` ___ _`- --- `\ `\ \L / / / / l / / / / , / / / / / / / / r / I r / I / / / �"!• / I I I// i --- \\,\ / / , / I l / - - // /, // / // //// ///I /l I' - - -__ \ `\ /' <d / ,' ,/ / / / / / / / / / ,/- / ,' "., I, - "--- --- `` -___ __ __ \ ` -`_- \ 1 S / / / / l / l / / I / / / I / / ' / / / / / / / / / / / / / r r , / , / , / , / / / , / / / / / / 1 --- `-_- `-__ \ \__-' '\� /' ,/ ,/ /' / / / / / / / - ,/' /'e /,',' - / - - \ -__ `, `_- __ _ \_`` \\ )/ / / / / % / / / / / / / / / / / / / / / / / / / / / / / / / / / / I / I1./ '--` ` \ - - \ / /' /' / / / / / / '' - /'/', -"-' / \ \ \ `\ \\ / / / / / / / r / / / / / / / / / / / / / / / / / // / / // PERIMETER /DITCH HIGH POINT / / / / / ' ' - '- -__ -`_ \\`_ \ - / / ' /' /' / / / / / / -- -' , , -- / \ , \_ __ _ \ ___ __ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / , I \ ` _ \ / / // l / / / / / / / / / / / / / / / / , / / / / / r I / / / / / -__ `_ `_-__---- / / / / / / / / - - --' / / \ _ `_ `_ 00I. `, �// / / / / / / / / / / / / / / / / / / / / / / / / / / ' / / ' I / / (// / /� / / / I /' / / --_ \ \ , _ _ _- / / / / / / / - -' /' / \ \ \, __ `,_ % I / / /, / / / / / / / / / / / / / / / / / / / , / / / / / / / / / / / / , \ `, `_------' /' /' �� % / / / / // \ / ' /' / ' /' ,' -' / / \ `\ `\ `___ p\/; // / / / / / / / / / / / / / / / / / / / / / / / / / 1 / / , / / / ' / / /- - _ \ , , O / / I / / / / \ \ _ / / / / / / / / / / I I I I/ I / / // / % \ r / / -� \ \\ `, \ \ `_,— —___-- /' / // ' / / I I / \/ // / // / // / / / /, / \ \\ - `_ ` 1 / / / / / / / / / / / / / / / / / / / / / / / I I I 141 I / / / / / / \ _ -- / / / / / / // / , // // / / / // �', - ,` / / / / / / , / / ' ' ' ' / / / / / / / / / / / / , / / / , / I I I I I I I I I / , / / / 1 /, / / \ \ \ \ --- / / / , / I // / / I /i / I i \- .� // / / / / / / / , / / / / / / / / / / / / / / / , / , / I I I I I I I I l / / \ \ \ -'-__ `,\ \ -- / /' /' / / / // / / // // // \ -,_- \ // / / / / / / / / / / / / / / / / / / / / , , , , , r I I, I I I I I I I / I -, II/ \ _ //r / PROPOSED DETENTION BASIN AND OUTLET \ / / ' / ' / / , / / / / / / / / / / / / I 1 1 l I I ► I 1 I 1 / `\` \`\ \ \\ \` -` - .1 /'/ /' //' / / /' / // / / `, <. y / / / / / , / , / / / / / / / / / / / / / / / / / / / / / / / I I ► I I I ' t 1 I I 1 I CREST LENGTH = 185 FT // / / //, ///////,/ // , // / ,/ I, I I II I, ,I \ I I\\\ \ \ \ \ `__ _- - ----- -/ ,' / ! / I / / / // , / / / / \1 ` ' / / / / ' / ' / / / / / / / / / / / / / / / / / , / / , I I I I 1 \ I \ \ \ \ \ \ \ \ _ _ - - - -) / / / / / / / / / / / / / / I \ 1 \ \ \ \\ __- - - -' 1 ' / , / / / / / = , / / / , / , / / / / / / / / / / / / / / , , / , / / / / I I I I I I 1 ' 1 t' \ \\ 1 O \ \\ \\ `_ ' _ ; 'o % / , %//I/ / ' %� �'� CREST ELEVATION 675 \` / r ' / / / / r / / / / / / i / / / / / / / / / / / / / I I I 1 I "TIC \ \ 1\ \ \\_ __ i \ \ \ \ \\ \ \\ `_-\ ----- _-- / / ,/ ,' / / / l / l / III //, HEIGHT 26 FT \ \ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / I / / 1 I I I I I I I III I , I \ ' \ \ \- I\ \ I I \ \------' //'/11" / /,�/ / / ' / //// 100 YR RUNOFF STORAGE VOLUME = 25.9 AC —FT / / / / / / / / ; / / / / / / / / / / / / / / / / / / / / / I I I I 1 ► \ \ ,\ \ \ \_ \ \\__, _, I I I I \ \ / /i' /' / / / / / / / I / / / / / / / / , / , / / / / / / / / / / / / / / / , / / / / , / / / / , / , I \ \ 1 \ \ \ \ . \ I ' 1 I _ / /-- , ' I I r / / / / /// / / A / / / / / / / / / / / / / / / / / / / / / , , , , PROPOSED CCR /�i , / t t \ \ \ \ \` I / / � I; I ► I \\_— _-- //,/ /// / 72X72 BOX CULVERT j //I // ///////// /I/////// //,, ///,// //, ,,..�G,/,) \ 1 II\\ I __\ / , , / / I ► I I 1 /; ,-/ / / ,/ l / , ' ,/// EMERGENCY SPILLWAY ELEVATION = 674 ? /// I / / / / / / / / / / / / / / / / / / / / / / / ; ; / / / / , / / / LANDFILL , y / I I / / , / / ,/ /,/ , l 1't I -1: \ / / I % / / / / / / } -' \ �/ ' /' / // / / / / / / / I / / / / / / , / / / / / / / / / / / / / / ' / / / / / / / I / /"ice /' / / I / / / / I If ' ` I / / l `_�\ _ \- / / / / / / / / / / / / / / / / / / / / / , / / / / / , / I l / / / / / , / , / / , / , , / / / / I / / / , / I I / / / I I _` �` ,/ ; ; /; /// / / L� --_` 11 '/%//'I/ IIIII 100 YR PEAK WATER SURFACE // l //////,// ///////////'/ // / / / /// /I IX / / I _-._. / / / / / / / / / / / / I / ,' /' i / i / I i (- - � \ \ \\ `\ / / / / / / 11 /11 // l / / / / ' / ' / / / / / / / I / / / / / / / / / / / / / / / 1 / / ' )' / / / / / / / / / / r / / I /' / /' /' / / --- -6; �\ \\ \ I / // / / I / I II11 I ELEVATION = 671.58 // l / / I ; / / / / / / I / I / / / / / / , / / , / / / / / / / / / , , / / , , , , , l , ---_ / , / I I _--- --_ S� \\\ \ \ l i % / / / l li'i i I / / // / /O/ / , / / / / / / / / / / / / / / / / / / / / / / / / / / / �L / / / / / /. / / , -101- ' --- \ \ I I / , I I / / / / /l�� / / / / / / / / / / / / / / / / / / / / / / / / ' / / I / / / , I / / // / I / / Y✓ / / / I _ / / - \ '/ / /'/,'/ /'/�,' __ i - �- _� \`\ `\ \ �\ 1\ I I I I I I I � I I III I / % / / / / / / / / / / / / / / / / / / / / / / I / / / / / / / / / / / / / / , / / / / / I / , / / / / / / _ __ \ 11 / / / / / / / / / / / / / _ _ 11 OF \ \ \ \ \ 1 /I I I I / / ' : / , / -\ \ \ \ 1 1 I / / I I I I I 1 i , / / / / / / / , / / / , / / I / / / / / / / I ' ' - \ \\I / 1 1 / i / / / / / / / / / / / / ' / ' ' / ' ' ' ' ' / ' ' / _ \ \ / 1 I / I / / / / / / / / / / / / / / / / / / ,' // /. / �" _\ \ \ \ \ I \ / I I l l 1 I I 1 \ / / / / , / , / / / / / , / / / / / / / / / / / / / / / / / I / I / / / / / / / I / / I I /) / / / I / / / / // ,/ ,/---------\ ♦\ \ \\\ \ \ \ 11 I \I I II I I I I III ,/ , I / / / / / / / / / / / / / / / / / / / / / / / / / / ' / / / I / I/ ' / / / / / / /' / \ \ \ I I � ► 1 / I I I l I I I \ \ ' ' / // / / / / / / / / // / / / / / / / / / / / / / , / / , / / I I /_ / / . I / / / / / / / / / / / / I / / / / - ----_— \ \ I 1 1 I I I l/ / / / / / / / / / / / / --'' \ \ \ \ \ 1 I 11 I , I , 1 1 // / / l / / / / / / / / / / / / / / / / / / / / / / / / / I / /' ,' �' /' ,' __ ___, \ \ \ \ \ \ \ \I I I l II I I I I I I I I \\ \\ \ / /,/11 „ / / / / / , / / / / / / / / / / / / / / / / / / / / / , / / , / / / / / / jt/ , / / / _// / /11 11 --' \ \ \ 1 \ \ t \ 11 1 , I I I I I 1 , , l/ / / / / / / / / / / / / / I / / 1 I I / / / / / / / / / / / / / / / I,' ,/,/ ,',/ /--- \ \ \ \ , 1 , 1 , \\ I I I I I 1 I \ \ \ I / / / / / / / / / / / / / / / / / / / / / / / / , / / / / / / / / / / / / / \ \ I I 1 \ / / / / / / / / / / / / / , / / , / / / / / , / / / / r / / / / / I ' /' /' /' /' / / \ \ \\ \ 1 I I \I 1 1 11 \ ` I I I I I I I I \ \\ \\ : I /,e1 / / / / I / / / / / / / / / / / / / / / / / / / / / h ' / ' / / / / / / / / / I / I / I / / I / / / / / / / / ' 1 / / / I I / / / / ;' /' /' /' / "-'--_\ \ `\ \ \\ 1\ I , 1 1 I I I, ,I I I I ; I I \ tt \ \\ \ ,---' ,' % I / / / / I / / / / / / / / / / / l / / / / O / / / / /� , / / / / / / / / , / , / / / I / I , / / / / / / / / P / , , , / , , , / / / / / / -- \ \ I I , I I I I \ \ I \ / / / / / / / / / / / / h / / / / h / / /co/1 / / / / / / , / / / / / / / / / / / / I ' / / / / I ' / // ,/ // /,. \ \ I \ t\ I I I I I I I 11 II I I I I 1 1 t \\ \\ `\ / ,�"/ I / ,I / / / / / / 1 40 / / / / �Oi / / /Q7''/ / / / �/ / /, / / / / I O , , /, /, / / / // I I I // � /I // , / / / // / , / /, / / / , / / _ _ \ I 1 \ \ I I I I I ,I I I I I ` \ \ ` \ / /r / ,' \ , / O , / , / /� / , / / ,v / / / / / / / / / / / / h / / / O / , , / , , , / / / I / I I / , , �/ , / I / / ' ' ' / / / I / ' /' ' / /' , • t I I I I I I I I I I \ / . I h / / /� / / / O / / I ' / / / / , / , / , , / / I I I , / / / / / / // , /' \ I I 11 1 I I I I I t III I I I I 1 l `\ `\ \ / / // // / / , \ I I I I I I I \ 1 , / /� / / / h / ' / ' / ' / O / / / / / , / / / / / / / / /'/ // \ I I , I I 1 I I I 1 , I 1 I , 1 I l 1\ \\ `\ \ \ / / , / , / / / / / /�/ / / /Q / / / /fin// / / / W/ / / / / / , / / , /, , / / , / , , // I , / /// /// // / ,'/' 1 I I I I I I I I I I I I I, , I I I l I I \ \ \ `\ \ /l / I 1 / / hO/ / ^ / / I / / / / / / / / / / / / / / // / / / / / I /, / / / I / / // I I I / 1 I I I , I 11 I / / /� / / / / / / / / / / / / / / / / / / / / / I / / / / / O / / / I I , I / / r l I / / W / / / / / 0) I , / / I I , / / / I I I I I I I I I 1 11 I I I I ; \\ \\ \\ / \ ,,G� I I / I� / I / /� / / / I / / / / / / / / / / / / / / / / / / / / / / / / / I / / / / I / / / // / / / / / /' / / / / / / / I / I / / I / / ,' ; 1 I I I I I I I I I I I I It I I I I I I I 1 \ \ \ '11�5-�- \ / / I , I / / / / / / / / / / / / / / / / / / / / / / , , / , / , , / , / , / , / / / / / / / / / / / / / / I II I / I / / I / / / I 1 I ' I I I 1 1 l 1 11 I I , I 1 \ \ \ \ 25 � % / l l , / / / / / / ' / / / / / / / / / / l / / / / / / / / / / / / I / / / / / / / / / II / / / : / / / ,' / 11 ' / /, r , I I / / / / / I I I I 1 I I I I I I I II I1II I J \ \ \ \ \/ S / / / / / / / / / / / / / /I I I I / /I, / I / // /// /// 1// //' / I I I / Ii/ I II1,nII 1JIII i O \ \\ \\ \`\ � / / / f l / /////////// ///l////////. I/ /I//// ///// //////////If I// // II/' /// /"/ / 1 I I II I V\tt t(z \ \ \ I , , l l / / / ///////// /////// / / / ,/,/ ,// ,/,I // / // , ,,,,, r/ / / NI I , I I1N I I I I � \ \ \\ / / / / / I l / / / / / / / / / / / / I / / / / / / / / / / / / / / / / / / I I I If I I / / / ;' '/ / / / / / / 1\ � ! / , / I I I I I \\ \\ \\ O \\ \\ \ \ / / , , / / / / / / , / , / / / / / / / / / / / / / / , / / / / 00 / / / / ' / / / / / / / 1 / , I I O , I I ' `�\ \ \ \ \ \ \ \ ` \ / ' / I / l ' / / I / / / / / / / / / / / / / / / / / / / / / l / / / / / / / / / / / / / / / / / / / / / / ' ' / /' ' / / . / / / / / I / `� \/ / / I I I \\l / 1 , 11- , I I I1 \ \ \ \ \ ♦ \ . ; / I / I / / - / / I / / / / / / / / / /_/�/ / / , / / , , / / / , / / I I / , / I I - / / I I / , _ •_/ / I / I I /\ / , 1 1 I I I I I 1 \ . \\ \ \ \\ \\ \\ \\ / / /' / / l l / / / / I / / / / / / / / / / / / / / / / / / , / / / / / / / / / h I, / / I / / / / / / i ./ , / / / / / / I / I / / "_*1` `—_' I / I ' / / / 1 I I I I I I I \ \ \\ \\ \ \ \ \\ \ / /' I' I' / / l ' / / / / / ' / ' / I / / / / / / / / / l / , / / , / , I / / , / / / � / / / / / / / / / / / / / , / , / //I / / I / I /I / . ._. 1 \ I / / / / / j I I I I I 1 \ `\ `\ \ \ \ `\ ` \ ` I / / / ' l ' / ( / / / / l / / I / / / / / / / / / / / / / / , / / / / / / I I I / / I I / / I _ ` \ \ / l / / / I � / I / I / I / // / / / / _ / / / I / / I I / / / / — / / , / —, _ _ / l I \ \ \ \ \ \ / / / l / / / / / / / , / / / / / / / / / / / / / / // / / / // / / / / / I / r / / / / / �__ I / / / / l I I I 1 1 I l /' ,—_ \ \ \ \\ \` \ \ \` \ — / I ' / / l /l / / / / / ' / / / / / / / / / / / �l�i�[ / / , / / / / I / / / / / I /� / /I. I / / / / / I / \ \ \ / / / / / / / , / , / / / I / I / / /L� T / / / / / / / / / / . \ I , / / / / / I 1 1 I I It // ` \ \ \ \ ._ \ \ \ / / / / l 11 / l / , / / / / / / / / / / / / / / /�� / / / // / / / /Qi ' / / / I / / / I I , / I I /, , / / / `\ �/ I / / I \\ \ `\ \\ ` \ 1 \ / / / / / / / / / I /� /wP / / / I / / / I I / / / / / / / / / \ \ \ -, \ \ \ \ S / I /, l/ / / / / / / / / / / I / / / / / , /, Q / / � / I / / // / / / / I // / , / /,, //I / / / I / I /O / / / / I I / / / / / / / \\ \ / / / / / / / / / / / / / / / / / ' 0 / / / // / / / / / / \ 1 11 / / / / / I I / l l / — ~ \ `\\ `\ `\ �• \, \ `\ \ \ \ `II, \\ \ / l / / / / / / / / / / / / / / / / / / / / / / / I / / / /' / / I I / / I I / / / / / / OF I / / l / / / I // II/\/ ' \\ \ \ \ \ , l 1 \ \ \ \ ,I / , // //,//////// //////// //, ,//, ��//,/ /////I I zIf //, // / /,//, /,, /// l I / / / / / / / / : `\ \\ \\ I \ ► I i t t 1 \ \ ` \ I I / / / / / / / / , / / / / / / / / / / / I /'/ , / / , / , , / / / ,� /�/ I / / / I / I , ['�v / / / / /fl / / / / I / / / /I I / / / 1 1 /' I / / / / / ' \\ \ \\ 11 I I I I I t \ \ \\ \ `\ `\�' /' / I / I / / / / / / / / / / / / / / / ' / / / / ' / / / / I 1�/ / / I , ,rII / I I , I / / / I ' , / , / _ , , / , I , ' / / / \ I 1 , I , I / / I / / :, � / / / r / / /I / / / / / / / / / / ,/' -\, \\ \ \ I I I I I I I 1 , I\ \\ \ \\ \\ \.� I I / 1 / ' / I / / / / / / / / / / / / / / / / , / ' / / / / I / / 1 ' I-A-4 / / / / /�/ / / 1 ' ' / 1 / / Q / I 1 / / / / I / /' /I /' ; / / / / I / - 1� \ \\j III / 1 I I I I I\ \ \ \ \�'-' \\\I I / I / I / / / / / / / / / / / i/y I-/ / I�, / /, / / / / // I I I / / /I / / I�� /- I / I / / I / / // I / I / j^' I I , / /I/ I , // / / / , / I I I , \`\ \ 1 I \ \ \ \ \ \--f , l I / / / ' / / / / / / / / / / / / / / / / / / / / / / / / / I / , / / / \ 11 I / / I / I / I / / / / / / / / / / ' / ' / / , I / , , , / / / I I / / / I / I / / / / / / / / / / / // /-- ---\ `♦ \ \\ If I I \ \ \ \ \ `\ \ / / ',( / / I / / , / / / / / / / / / / / / / / / / / / / / 1 / / / / ' / / / / / / / ' / / /� II / 1 / / l / / / / / ,' I ,/ /' `\ \ ` \ \\I I I \ `\ `\ \ , \ //rl r / l / / / / / / / / / / I / / / / / �1 , , I / / / I I / , / / I I I / / / / / / / / \ y\I I t\ \ `\ -`� \ / / -< <Is► l / I / ' / / / I / / / / / / / / I / / �7 / / , , , , / / , / / / , / / / / / / / / / / / // _ / I / / / I // / 11 t' 1 \ \ IN', _ - , III / / I , / I / I / / I / / / / . / �l ' �� / , / / / ' / / / / , , / I / I / 11 / / / / , , // / / "- -\ \ \ \\\ I t \ \\\ .� // I111/ / / / - ' / / I / / / / / / / / / /I// / /�1 , / I / , /I /I / / / , I/ / / I I/ ,// I I I, i �r_�r\In CCR UNIT BOUNDARY (APPROXIMATE) — — — — — — — EXISTING SITE FEATURE (APPROXIMATE) --- DUKE ENERGY PROPERTY BOUNDARY EXISTING MINOR CONTOUR (5 FT) EXISTING MAJOR CONTOUR (25 FT) PROPOSED DAM BREACH MINOR CONTOUR (5 FT) PROPOSED DAM BREACH MAJOR CONTOUR (25 FT) PERMANENT POOL SURFACE WATER PEAK WATER SURFACE ELEVATION FOR 100-YR, 24-HR STORM EVENT POTENTIAL SURFACE WATER DIVERSION DITCH .`.`+++'+ WETLANDS NOTE 1. PROPOSED STORMWATER BASIN DESIGN IS CONCEPTUAL AND WILL NEED DETAILED DESIGN AS PART OF DAM MODIFICATION AND DECOMMISSIONING PLAN APPLICAITON. 2. ADDITIONAL STREAM RESTORATION, STORMWATER CHANNEL, AND CULVERT DESIGN MAY BE REQUIRED WITHIN AND OUTSIDE THE ASH BASIN. TITLE FOR 0 150 300 450 GRAPHIC SCALE (IN FEET) NOT FOR CONSTRUCTION FINAL SURFACE WATER MANAGEMENT BELEWS CREEK STEAM STATION STOKES COUNTY, NORTH CAROLINA ISSUED FOR REVIEW DUKE SCALE: AS SHOWN tm* DWG TYPE:.DWG / / / / , , // / / / \ \ \ \ \ \ \ \ \ `\ \ l / / / / ' / / / / / / / / / / / / ( / \ � / , / / I I / / / I , I / I / / / / / , / ' / , ,'- ' O JOB N0: 60603274 I / / / / / / /; / ,',' /' ,' / - \ \ \ \ \ \ \ \ \ \ `� `-_ - -'^\ , / / / / / / / / / / / / / / / / / / \ \ \ \ / I / / , / I / / / 1 / ' / / / / �' I I E N E R YR DATE: 09-18-2019 / / / / / / / / / / \ \ \ \ \ \ \ \ ` \ \ `\ `_ _- - '- \ / / / / / / / / / / / / / / / / \ \ \ \ \ \ \ , I I �L / , / , / / , / , / / / / / / / /,/ 1 _-,/ // ,' / / \ \ `\ \ \\ \ `\ `\ `. `. - �, I/1j / I I / 1 / ' / / / ( I / / < l \ \ \ \1 \ \ \ \ \\ \\ ♦ / / /%-/-L/ / / '/ / / / / 1 / / / 1 r �C/ l / / \ \ , / , / ", , \ \ - _-_ \ \ \ \ \ \ \ I� \ \ \ \ 7 ,�/-LI `� , r , , / , I , _ l \ I %40RI-.ACE WATER MANAGEMENT BASIN INFORMATI ,I , i ,' / , ,/// -'' /' /' / ----\ \ \ \ \\ \ \ \ `. -`-_- ' ' I I/lll I / I I I ` / < \ \ \ \ \ \ \ \ \ \ \ \ \ / / r / / � I I \ \ \ \ \ ,,1 III , 1 / \ \ , / / / / / / / / I/ I / / / , / / ,/ , - _- / / / -,- _ \ \ \ \ \ \ \ ` _--_- sip I I 1 I 1 I \ ` \ \ \ \ \ \ \ \ \ \ \ \ \ `\ \ \ `\ `\ \ \ ' ' I ' , / I / I / / / / / ' I ' // I t / ' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ , , / , r , T/ �/ , , / , / , \ \ I DWG SIZE DRAWING NO. / , / , / - / - \ \ \ j 11 \ \ \ \ \ \ I / / / I , I \ / / I , I , / . / -- / / / - \ \ \ \ \ \ \ \ ` - - __ /-\\1z\\\ 1 ` \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ / , / , , / / / / I I / I \ \ / ' / / '/ -'' � ___-' /' / /' \\ \ \ 1 1 \ \ \ \• `L- , / \\ \\\\ \\\ \ ♦\ \ \ \ \ \ \ \ \ \ \ \` \ \ \ \ \ \ \ \ \ `\ \ / / / , I , r / , / / , / , , / / // 1 I \ \ \ / / / / _ ,- , ' / \� \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ �\ \ \ \ \ \ \ \ \ / / / I I / , , / I / I / I , , / / / / / / 1 / \\ \- - --/ / // / / f ` 1\-`- -'' / / //' -_\\` \\ \ I\ \ �\ \ 1\ \ , I \\�\", \\\ \ \\ \\ \\\\\ \\ ` `\ \\ \ `\ \\ \ \ \\ \ \ \\ \\ \ \\ \ \\ \ \\ \ ` / / I , / , , I I I I I I , , I / `-__- / ANSI D / / / J/ / / / / / /, - P:\PROJECTS2\60603274_BELEWS_CREEK\900_CAD_GIS\910_CAD\05_MODELS\CIVIL\X-SURFACE WATER MANAGEMENT BASIN INFORMATION.DWG 9/26/2019 11:08�37 AM \\�\\�\`\\\�`\\`\\\\�`\\\ `\ \ \\,\ \\ \,�\ `\\\�� \�� �` ` \ `\,`\\\\=-',/% / / /; /////// ///I,/ //; / �/ /Ij,/,1 ,//// //// ////;/ N.C. ENGINEERING LICENSENO. 22.0"x34.0" FIGURE 2 DES: SD/KO DFTR : SD/KO CHKD: SD ENGR : KO ff.VV45K REVISION C m N 70 m < O 6 1 2 g i ITENTHS j0 20 30 C1J ATTACHMENT A-1 HydroCAD Calculations for Basin Design: Pre Ash Basin 100yr storm Belews Creek Basin Design Memo F3OR o Dan iver ` 15 (14 DA 15 DA 14 29R Q- 13 12 RR Culv rt DA 13 DA 12 11 281] DA 11 DA 10 Road Cu vert 9 DA 9 77 R 6 Spillway utfall DA 6 C) DA7 F16R] '' (4� v — 2 DA5 DA1 Subcat Reach on Link DA4 15R 2 1 DA2 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1: DA1 Runoff = 232.01 cfs @ 12.77 hrs, Volume= 40.493 af, Depth> 3.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 79.701 70 Woods, Good, HSG C 53.134 55 Woods, Good, HSG B 132.835 64 Weighted Average 132.835 100.00% Pervious Area Tc Length (min) (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 10.1 100 0.1263 0.16 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 59.9 3,746 0.0435 1.04 Shallow Concentrated Flow, Down sideslope Woodland Kv= 5.0 fDs 70.0 3,846 Total 240 220 200 180 160 140 0 120 FL 100 80 60 40 20 0 Subcatchment 1: DA1 Hydrograph 232.01 cfs F7 Type-112"r 100 ears - 24 hrs, Rainf 11=7A" Run�ff Are=132.835 a Run�ff Volume=40.493�f Runoff [Ye->3.66— Flow-Length=3,46— — Tc=70.0 min CN=44 - - 4- 7 7 7 - I rt I I fi L I L — - J- 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 3 Hydrograph for Subcatchment 1: DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.01 9.50 1.29 0.00 0.10 9.75 1.36 0.01 0.33 10.00 1.44 0.02 0.75 10.25 1.52 0.03 1.35 10.50 1.62 0.04 2.15 10.75 1.73 0.06 3.23 11.00 1.87 0.09 4.68 11.25 2.03 0.13 6.66 11.50 2.25 0.19 9.46 11.75 3.07 0.50 14.12 12.00 5.26 1.75 31.16 12.25 5.61 1.99 95.00 12.50 5.84 2.15 190.94 12.75 6.00 2.26 231.80 13.00 6.13 2.36 209.55 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 156.46 13.50 6.34 2.51 115.27 13.75 6.43 2.58 87.94 14.00 6.51 2.63 68.98 14.25 6.58 2.69 55.86 14.50 6.65 2.74 46.41 14.75 6.72 2.79 39.68 15.00 6.78 2.83 34.88 15.25 6.83 2.88 31.42 15.50 6.89 2.92 28.81 15.75 6.94 2.96 26.52 16.00 6.99 2.99 24.72 16.25 7.03 3.03 23.25 16.50 7.08 3.06 21.83 16.75 7.12 3.09 20.62 17.00 7.16 3.12 19.59 17.25 7.20 3.15 18.76 17.50 7.24 3.18 18.11 17.75 7.28 3.21 17.50 18.00 7.31 3.24 16.97 18.25 7.35 3.27 16.46 18.50 7.38 3.29 15.94 18.75 7.41 3.32 15.46 19.00 7.45 3.34 14.96 19.25 7.48 3.37 14.47 19.50 7.50 3.39 13.98 19.75 7.53 3.41 13.48 20.00 7.56 3.43 12.99 20.25 7.58 3.45 12.49 20.50 7.61 3.47 12.00 20.75 7.64 3.49 11.58 21.00 7.66 3.51 11.22 21.25 7.68 3.53 10.98 21.50 7.71 3.55 10.79 21.75 7.73 3.57 10.64 22.00 7.76 3.59 10.53 22.25 7.78 3.61 10.40 22.50 7.80 3.63 10.31 22.75 7.83 3.64 10.21 23.00 7.85 3.66 10.10 23.25 7.87 3.68 10.02 23.50 7.90 3.70 9.91 23.75 7.92 3.72 9.82 24.00 7.94 3.73 9.73 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2: DA2 Runoff = 271.54 cfs @ 12.57 hrs, Volume= 39.458 af, Depth> 3.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 77.289 70 Woods, Good, HSG C 51.526 55 Woods, Good, HSG B 128.815 64 Weighted Average 128.815 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.7 100 0.0881 0.14 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 42.5 2,510 0.0387 0.98 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 54.2 2,610 Total 300 250 MIN 3 150 0 U- 11' 50 1 Subcatchment 2: DA2 Hydrograph 271.54 cfs Type II 24-11ir 100 years -24 hrs Rainf 11=7.9, " Runoff Area=128.815 a� Run?ff Volume=39.458 of Runoff Depth>3.68" Flo* Length=2,610' Tc=54.2 min CN=44 �— t 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 5 Hydrograph for Subcatchment 2: DA2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.03 9.50 1.29 0.00 0.20 9.75 1.36 0.01 0.58 10.00 1.44 0.02 1.15 10.25 1.52 0.03 1.89 10.50 1.62 0.04 2.88 10.75 1.73 0.06 4.20 11.00 1.87 0.09 5.98 11.25 2.03 0.13 8.43 11.50 2.25 0.19 12.00 11.75 3.07 0.50 18.59 12.00 5.26 1.75 51.23 12.25 5.61 1.99 167.78 12.50 5.84 2.15 267.48 12.75 6.00 2.26 242.83 13.00 6.13 2.36 165.61 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 113.63 13.50 6.34 2.51 81.86 13.75 6.43 2.58 62.43 14.00 6.51 2.63 50.15 14.25 6.58 2.69 41.83 14.50 6.65 2.74 35.95 14.75 6.72 2.79 31.69 15.00 6.78 2.83 28.67 15.25 6.83 2.88 26.76 15.50 6.89 2.92 25.20 15.75 6.94 2.96 23.79 16.00 6.99 2.99 22.44 16.25 7.03 3.03 21.12 16.50 7.08 3.06 19.87 16.75 7.12 3.09 18.85 17.00 7.16 3.12 18.07 17.25 7.20 3.15 17.45 17.50 7.24 3.18 16.92 17.75 7.28 3.21 16.42 18.00 7.31 3.24 15.94 18.25 7.35 3.27 15.47 18.50 7.38 3.29 14.99 18.75 7.41 3.32 14.52 19.00 7.45 3.34 14.04 19.25 7.48 3.37 13.56 19.50 7.50 3.39 13.08 19.75 7.53 3.41 12.60 20.00 7.56 3.43 12.12 20.25 7.58 3.45 11.64 20.50 7.61 3.47 11.18 20.75 7.64 3.49 10.83 21.00 7.66 3.51 10.59 21.25 7.68 3.53 10.42 21.50 7.71 3.55 10.30 21.75 7.73 3.57 10.19 22.00 7.76 3.59 10.08 22.25 7.78 3.61 9.99 22.50 7.80 3.63 9.89 22.75 7.83 3.64 9.80 23.00 7.85 3.66 9.70 23.25 7.87 3.68 9.61 23.50 7.90 3.70 9.52 23.75 7.92 3.72 9.43 24.00 7.94 3.73 9.34 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 3: DA3 Runoff = 143.46 cfs @ 12.44 hrs, Volume= 18.316 af, Depth> 3.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 35.779 70 Woods, Good, HSG C 23.853 55 Woods, Good, HSG B 59.632 64 Weighted Average 59.632 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 100 0.0132 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 20.4 1,484 0.0587 1.21 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 45.3 1,584 Total 160 140 120 100 3 80 0 60 40 20 0 0 Subcatchment 3: DA3 Hydrograph 143.46 cfs Type�ll 24-fir 100 ears - 24 hrs Rainfall=7.94" Runoff ►ire';59.632 ac Run�ff Volume=1�8.316 f Runoff [Ye-pth—>3.69— Flowl Length=1,584' Tc=45.3 min CN=64 L I — t 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 7 Hydrograph for Subcatchment 3: DA3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.03 9.50 1.29 0.00 0.15 9.75 1.36 0.01 0.37 10.00 1.44 0.02 0.68 10.25 1.52 0.03 1.07 10.50 1.62 0.04 1.59 10.75 1.73 0.06 2.29 11.00 1.87 0.09 3.23 11.25 2.03 0.13 4.55 11.50 2.25 0.19 6.52 11.75 3.07 0.50 10.49 12.00 5.26 1.75 34.26 12.25 5.61 1.99 111.51 12.50 5.84 2.15 141.08 12.75 6.00 2.26 99.72 13.00 6.13 2.36 62.21 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 41.91 13.50 6.34 2.51 30.56 13.75 6.43 2.58 24.07 14.00 6.51 2.63 19.91 14.25 6.58 2.69 17.01 14.50 6.65 2.74 14.80 14.75 6.72 2.79 13.51 15.00 6.78 2.83 12.61 15.25 6.83 2.88 11.91 15.50 6.89 2.92 11.26 15.75 6.94 2.96 10.65 16.00 6.99 2.99 10.04 16.25 7.03 3.03 9.45 16.50 7.08 3.06 8.89 16.75 7.12 3.09 8.48 17.00 7.16 3.12 8.17 17.25 7.20 3.15 7.92 17.50 7.24 3.18 7.69 17.75 7.28 3.21 7.47 18.00 7.31 3.24 7.25 18.25 7.35 3.27 7.04 18.50 7.38 3.29 6.82 18.75 7.41 3.32 6.60 19.00 7.45 3.34 6.38 19.25 7.48 3.37 6.16 19.50 7.50 3.39 5.94 19.75 7.53 3.41 5.71 20.00 7.56 3.43 5.49 20.25 7.58 3.45 5.26 20.50 7.61 3.47 5.07 20.75 7.64 3.49 4.93 21.00 7.66 3.51 4.84 21.25 7.68 3.53 4.78 21.50 7.71 3.55 4.73 21.75 7.73 3.57 4.68 22.00 7.76 3.59 4.64 22.25 7.78 3.61 4.60 22.50 7.80 3.63 4.56 22.75 7.83 3.64 4.51 23.00 7.85 3.66 4.47 23.25 7.87 3.68 4.43 23.50 7.90 3.70 4.39 23.75 7.92 3.72 4.34 24.00 7.94 3.73 4.30 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 4: DA4 Runoff = 164.24 cfs @ 12.42 hrs, Volume= 20.365 af, Depth> 3.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 39.758 70 Woods, Good, HSG C 26.505 55 Woods, Good, HSG B 66.263 64 Weighted Average 66.263 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.4 100 0.0622 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 29.9 2,054 0.0525 1.15 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 43.3 2,154 Total 160 ` 11 120 100 0 80 u- 60 ,M 20 0L 0 Subcatchment 4: DA4 Hydrograph 164.24 cfs Type�ll 24lir 100 years -24 hrs Rai nfall=7.94" Runoff Area=66.263 ac Run�ff Volume=20.365 of f Runoff Depth>3.69" Flout Length=�154' f Tc=43.3 min C N b-4 t _ t 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 9 Hydrograph for Subcatchment 4: DA4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.03 9.50 1.29 0.00 0.18 9.75 1.36 0.01 0.44 10.00 1.44 0.02 0.79 10.25 1.52 0.03 1.24 10.50 1.62 0.04 1.84 10.75 1.73 0.06 2.64 11.00 1.87 0.09 3.72 11.25 2.03 0.13 5.23 11.50 2.25 0.19 7.52 11.75 3.07 0.50 12.21 12.00 5.26 1.75 42.10 12.25 5.61 1.99 134.97 12.50 5.84 2.15 158.55 12.75 6.00 2.26 105.18 13.00 6.13 2.36 65.41 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 43.99 13.50 6.34 2.51 32.37 13.75 6.43 2.58 25.69 14.00 6.51 2.63 21.47 14.25 6.58 2.69 18.32 14.50 6.65 2.74 16.18 14.75 6.72 2.79 14.82 15.00 6.78 2.83 13.88 15.25 6.83 2.88 13.12 15.50 6.89 2.92 12.42 15.75 6.94 2.96 11.75 16.00 6.99 2.99 11.08 16.25 7.03 3.03 10.41 16.50 7.08 3.06 9.81 16.75 7.12 3.09 9.36 17.00 7.16 3.12 9.04 17.25 7.20 3.15 8.77 17.50 7.24 3.18 8.51 17.75 7.28 3.21 8.27 18.00 7.31 3.24 8.03 18.25 7.35 3.27 7.79 18.50 7.38 3.29 7.55 18.75 7.41 3.32 7.30 19.00 7.45 3.34 7.06 19.25 7.48 3.37 6.81 19.50 7.50 3.39 6.57 19.75 7.53 3.41 6.32 20.00 7.56 3.43 6.07 20.25 7.58 3.45 5.82 20.50 7.61 3.47 5.60 20.75 7.64 3.49 5.46 21.00 7.66 3.51 5.37 21.25 7.68 3.53 5.30 21.50 7.71 3.55 5.25 21.75 7.73 3.57 5.20 22.00 7.76 3.59 5.15 22.25 7.78 3.61 5.10 22.50 7.80 3.63 5.06 22.75 7.83 3.64 5.01 23.00 7.85 3.66 4.96 23.25 7.87 3.68 4.92 23.50 7.90 3.70 4.87 23.75 7.92 3.72 4.82 24.00 7.94 3.73 4.77 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 5: DA5 Runoff = 126.63 cfs @ 12.54 hrs, Volume= 17.916 af, Depth> 3.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 35.071 70 Woods, Good, HSG C 23.381 55 Woods, Good, HSG B 58.452 64 Weighted Average 58.452 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.2 100 0.0648 0.13 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 39.0 2,495 0.0454 1.07 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 52.2 2,595 Total 140 120 100 80 3 �° 60 40 20 0 Subcatchment 5: DA5 Hydrograph 126.63 cfs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Runoff Area=58.452 ac Runoff Volume=17.916 of Runoff Depth>3.68" Flow Length=2,595' Tc=52.2 min CN=64 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 11 Hydrograph for Subcatchment 5: DA5 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.02 9.50 1.29 0.00 0.10 9.75 1.36 0.01 0.28 10.00 1.44 0.02 0.55 10.25 1.52 0.03 0.90 10.50 1.62 0.04 1.36 10.75 1.73 0.06 1.98 11.00 1.87 0.09 2.81 11.25 2.03 0.13 3.95 11.50 2.25 0.19 5.64 11.75 3.07 0.50 8.80 12.00 5.26 1.75 24.98 12.25 5.61 1.99 82.51 12.50 5.84 2.15 126.10 12.75 6.00 2.26 108.73 13.00 6.13 2.36 71.89 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 49.18 13.50 6.34 2.51 35.47 13.75 6.43 2.58 27.18 14.00 6.51 2.63 21.96 14.25 6.58 2.69 18.40 14.50 6.65 2.74 15.88 14.75 6.72 2.79 14.02 15.00 6.78 2.83 12.83 15.25 6.83 2.88 12.02 15.50 6.89 2.92 11.34 15.75 6.94 2.96 10.71 16.00 6.99 2.99 10.10 16.25 7.03 3.03 9.51 16.50 7.08 3.06 8.95 16.75 7.12 3.09 8.50 17.00 7.16 3.12 8.16 17.25 7.20 3.15 7.88 17.50 7.24 3.18 7.64 17.75 7.28 3.21 7.42 18.00 7.31 3.24 7.20 18.25 7.35 3.27 6.99 18.50 7.38 3.29 6.78 18.75 7.41 3.32 6.56 19.00 7.45 3.34 6.34 19.25 7.48 3.37 6.13 19.50 7.50 3.39 5.91 19.75 7.53 3.41 5.69 20.00 7.56 3.43 5.48 20.25 7.58 3.45 5.26 20.50 7.61 3.47 5.05 20.75 7.64 3.49 4.89 21.00 7.66 3.51 4.79 21.25 7.68 3.53 4.72 21.50 7.71 3.55 4.66 21.75 7.73 3.57 4.62 22.00 7.76 3.59 4.57 22.25 7.78 3.61 4.53 22.50 7.80 3.63 4.48 22.75 7.83 3.64 4.44 23.00 7.85 3.66 4.40 23.25 7.87 3.68 4.36 23.50 7.90 3.70 4.32 23.75 7.92 3.72 4.27 24.00 7.94 3.73 4.23 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 6: DA 6 Runoff = 142.54 cfs @ 12.11 hrs, Volume= 10.205 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 19.776 70 Woods, Good, HSG C 13.184 55 Woods, Good, HSG B 32.960 64 Weighted Average 32.960 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.4 100 0.0624 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 4.9 657 0.2014 2.24 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 18.3 757 Total 140 120 N 100 3 80 0 U- 60 40 20 0 0 Subcatchment 6: DA 6 Hydrograph 142.54 cfs Type II 24-fir 100 years - 24 hrs Rainfall=7.94" Runoff Area=32.960 ac Runoff Vol} rne=10.205 of Runoff Depth>1. 2" Flo* Length=757, Tc=18.3 min CN=64 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 13 Hydrograph for Subcatchment 6: DA 6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.01 9.25 1.23 0.00 0.11 9.50 1.29 0.00 0.29 9.75 1.36 0.01 0.47 10.00 1.44 0.02 0.72 10.25 1.52 0.03 1.05 10.50 1.62 0.04 1.50 10.75 1.73 0.06 2.09 11.00 1.87 0.09 2.94 11.25 2.03 0.13 4.16 11.50 2.25 0.19 6.32 11.75 3.07 0.50 16.68 12.00 5.26 1.75 100.53 12.25 5.61 1.99 94.37 12.50 5.84 2.15 35.22 12.75 6.00 2.26 19.61 13.00 6.13 2.36 14.48 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 12.07 13.50 6.34 2.51 10.54 13.75 6.43 2.58 9.29 14.00 6.51 2.63 8.28 14.25 6.58 2.69 7.42 14.50 6.65 2.74 6.97 14.75 6.72 2.79 6.63 15.00 6.78 2.83 6.31 15.25 6.83 2.88 5.99 15.50 6.89 2.92 5.66 15.75 6.94 2.96 5.33 16.00 6.99 2.99 5.00 16.25 7.03 3.03 4.69 16.50 7.08 3.06 4.52 16.75 7.12 3.09 4.40 17.00 7.16 3.12 4.28 17.25 7.20 3.15 4.17 17.50 7.24 3.18 4.05 17.75 7.28 3.21 3.93 18.00 7.31 3.24 3.81 18.25 7.35 3.27 3.69 18.50 7.38 3.29 3.57 18.75 7.41 3.32 3.45 19.00 7.45 3.34 3.32 19.25 7.48 3.37 3.20 19.50 7.50 3.39 3.08 19.75 7.53 3.41 2.95 20.00 7.56 3.43 2.83 20.25 7.58 3.45 2.71 20.50 7.61 3.47 2.67 20.75 7.64 3.49 2.64 21.00 7.66 3.51 2.62 21.25 7.68 3.53 2.60 21.50 7.71 3.55 2.57 21.75 7.73 3.57 2.55 22.00 7.76 3.59 2.53 22.25 7.78 3.61 2.50 22.50 7.80 3.63 2.48 22.75 7.83 3.64 2.46 23.00 7.85 3.66 2.43 23.25 7.87 3.68 2.41 23.50 7.90 3.70 2.38 23.75 7.92 3.72 2.36 24.00 7.94 3.73 2.34 Pre Ash Basin Type 1124-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 7: DA7 Runoff = 638.42 cfs @ 12.23 hrs, Volume= 59.464 af, Depth> 3.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 115.573 70 Woods, Good, HSG C 77.049 55 Woods, Good, HSG B 192.622 64 Weighted Average 192.622 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 100 0.0762 0.13 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 15.4 2,866 0.0369 3.09 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.5 1,430 0.0410 47.03278,600.50 Trap/Vee/Rect Channel Flow, Bot.W=24.00' D=35.60' Z= 4.0 '/' Top.W=308.80' n= 0.045 28.3 4,396 Total 700 600 500 400 3 �° 300 200 100 0 Subcatchment 7: DA7 Hydrograph 638.42 cfs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Runoff Area=192.622 ac Runoff Volume=59.464 of Runoff Depth>3.70" Flow Length=4,396' Tc=28.3 min CN=64 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 15 Hydrograph for Subcatchment 7: DA7 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.01 9.25 1.23 0.00 0.30 9.50 1.29 0.00 1.10 9.75 1.36 0.01 2.10 10.00 1.44 0.02 3.34 10.25 1.52 0.03 4.99 10.50 1.62 0.04 7.20 10.75 1.73 0.06 10.12 11.00 1.87 0.09 14.21 11.25 2.03 0.13 19.97 11.50 2.25 0.19 29.50 11.75 3.07 0.50 56.38 12.00 5.26 1.75 287.86 12.25 5.61 1.99 635.69 12.50 5.84 2.15 349.68 12.75 6.00 2.26 182.48 13.00 6.13 2.36 113.42 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 84.17 13.50 6.34 2.51 68.20 13.75 6.43 2.58 59.11 14.00 6.51 2.63 52.21 14.25 6.58 2.69 46.53 14.50 6.65 2.74 42.58 14.75 6.72 2.79 40.12 15.00 6.78 2.83 38.10 15.25 6.83 2.88 36.18 15.50 6.89 2.92 34.27 15.75 6.94 2.96 32.35 16.00 6.99 2.99 30.41 16.25 7.03 3.03 28.50 16.50 7.08 3.06 27.10 16.75 7.12 3.09 26.21 17.00 7.16 3.12 25.47 17.25 7.20 3.15 24.77 17.50 7.24 3.18 24.08 17.75 7.28 3.21 23.39 18.00 7.31 3.24 22.69 18.25 7.35 3.27 21.99 18.50 7.38 3.29 21.28 18.75 7.41 3.32 20.57 19.00 7.45 3.34 19.86 19.25 7.48 3.37 19.14 19.50 7.50 3.39 18.42 19.75 7.53 3.41 17.69 20.00 7.56 3.43 16.96 20.25 7.58 3.45 16.26 20.50 7.61 3.47 15.79 20.75 7.64 3.49 15.55 21.00 7.66 3.51 15.39 21.25 7.68 3.53 15.25 21.50 7.71 3.55 15.12 21.75 7.73 3.57 14.98 22.00 7.76 3.59 14.85 22.25 7.78 3.61 14.71 22.50 7.80 3.63 14.57 22.75 7.83 3.64 14.44 23.00 7.85 3.66 14.30 23.25 7.87 3.68 14.16 23.50 7.90 3.70 14.02 23.75 7.92 3.72 13.88 24.00 7.94 3.73 13.74 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 9: DA 9 Runoff = 249.24 cfs @ 12.19 hrs, Volume= 21.439 af, Depth> 3.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 41.628 70 Woods, Good, HSG C 27.752 55 Woods, Good, HSG B 69.380 64 Weighted Average 69.380 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 100 0.1018 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 14.0 1,342 0.1020 1.60 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 25.0 1,442 Total 250 200 150 3 _o " 100 50 0 Subcatchment 9: DA 9 Hydrograph 249.24 cfs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Runoff Area=69.380 ac Runoff Volume=21.439 of Runoff Depth>3.71" Flow Length=1,442' Tc=25.0 min CN=64 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 17 Hydrograph for Subcatchment 9: DA 9 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.14 9.50 1.29 0.00 0.46 9.75 1.36 0.01 0.83 10.00 1.44 0.02 1.30 10.25 1.52 0.03 1.93 10.50 1.62 0.04 2.77 10.75 1.73 0.06 3.88 11.00 1.87 0.09 5.45 11.25 2.03 0.13 7.66 11.50 2.25 0.19 11.42 11.75 3.07 0.50 23.54 12.00 5.26 1.75 129.85 12.25 5.61 1.99 236.15 12.50 5.84 2.15 108.28 12.75 6.00 2.26 56.34 13.00 6.13 2.36 36.54 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 28.03 13.50 6.34 2.51 23.61 13.75 6.43 2.58 20.66 14.00 6.51 2.63 18.32 14.25 6.58 2.69 16.36 14.50 6.65 2.74 15.08 14.75 6.72 2.79 14.27 15.00 6.78 2.83 13.57 15.25 6.83 2.88 12.89 15.50 6.89 2.92 12.20 15.75 6.94 2.96 11.51 16.00 6.99 2.99 10.81 16.25 7.03 3.03 10.13 16.50 7.08 3.06 9.67 16.75 7.12 3.09 9.38 17.00 7.16 3.12 9.12 17.25 7.20 3.15 8.87 17.50 7.24 3.18 8.62 17.75 7.28 3.21 8.37 18.00 7.31 3.24 8.12 18.25 7.35 3.27 7.87 18.50 7.38 3.29 7.61 18.75 7.41 3.32 7.36 19.00 7.45 3.34 7.10 19.25 7.48 3.37 6.84 19.50 7.50 3.39 6.58 19.75 7.53 3.41 6.32 20.00 7.56 3.43 6.06 20.25 7.58 3.45 5.81 20.50 7.61 3.47 5.66 20.75 7.64 3.49 5.59 21.00 7.66 3.51 5.53 21.25 7.68 3.53 5.48 21.50 7.71 3.55 5.44 21.75 7.73 3.57 5.39 22.00 7.76 3.59 5.34 22.25 7.78 3.61 5.29 22.50 7.80 3.63 5.24 22.75 7.83 3.64 5.19 23.00 7.85 3.66 5.14 23.25 7.87 3.68 5.09 23.50 7.90 3.70 5.04 23.75 7.92 3.72 4.99 24.00 7.94 3.73 4.94 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 10: DA 10 Runoff = 112.70 cfs @ 12.08 hrs, Volume= 7.472 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 14.468 70 Woods, Good, HSG C 9.646 55 Woods, Good, HSG B 24.114 64 Weighted Average 24.114 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.9 100 0.1343 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 5.8 595 0.1187 1.72 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.7 695 Total 120 110 100 90 N 80 70 3 60 FZ 50 40 30 20 10 0 Subcatchment 10: DA 10 Hydrograph 112.70 cfs Type�ll 24-fir 100- tears — 24-hrs Rainfatl=7 ,4" Runoff Are=24.`IIU ac Runoff Volume=7I.472 aft Runoff Depth>3.72" Flow-Length=695' Tc=15.7 -min CN=64 T T T T T T — T 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 19 Hydrograph for Subcatchment 10: DA 10 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.01 9.25 1.23 0.00 0.10 9.50 1.29 0.00 0.23 9.75 1.36 0.01 0.37 10.00 1.44 0.02 0.56 10.25 1.52 0.03 0.81 10.50 1.62 0.04 1.15 10.75 1.73 0.06 1.61 11.00 1.87 0.09 2.26 11.25 2.03 0.13 3.22 11.50 2.25 0.19 4.91 11.75 3.07 0.50 14.94 12.00 5.26 1.75 89.59 12.25 5.61 1.99 57.26 12.50 5.84 2.15 21.97 12.75 6.00 2.26 12.93 13.00 6.13 2.36 10.21 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 8.59 13.50 6.34 2.51 7.55 13.75 6.43 2.58 6.66 14.00 6.51 2.63 5.94 14.25 6.58 2.69 5.35 14.50 6.65 2.74 5.05 14.75 6.72 2.79 4.81 15.00 6.78 2.83 4.58 15.25 6.83 2.88 4.34 15.50 6.89 2.92 4.10 15.75 6.94 2.96 3.86 16.00 6.99 2.99 3.62 16.25 7.03 3.03 3.40 16.50 7.08 3.06 3.29 16.75 7.12 3.09 3.21 17.00 7.16 3.12 3.12 17.25 7.20 3.15 3.03 17.50 7.24 3.18 2.95 17.75 7.28 3.21 2.86 18.00 7.31 3.24 2.77 18.25 7.35 3.27 2.68 18.50 7.38 3.29 2.60 18.75 7.41 3.32 2.51 19.00 7.45 3.34 2.42 19.25 7.48 3.37 2.33 19.50 7.50 3.39 2.24 19.75 7.53 3.41 2.14 20.00 7.56 3.43 2.05 20.25 7.58 3.45 1.98 20.50 7.61 3.47 1.95 20.75 7.64 3.49 1.93 21.00 7.66 3.51 1.91 21.25 7.68 3.53 1.90 21.50 7.71 3.55 1.88 21.75 7.73 3.57 1.86 22.00 7.76 3.59 1.85 22.25 7.78 3.61 1.83 22.50 7.80 3.63 1.81 22.75 7.83 3.64 1.79 23.00 7.85 3.66 1.78 23.25 7.87 3.68 1.76 23.50 7.90 3.70 1.74 23.75 7.92 3.72 1.72 24.00 7.94 3.73 1.71 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 11: DA 11 Runoff = 136.61 cfs @ 12.25 hrs, Volume= 13.221 af, Depth> 3.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 25.710 70 Woods, Good, HSG C 17.140 55 Woods, Good, HSG B 42.850 64 Weighted Average 42.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.4 100 0.0936 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 18.7 1,561 0.0776 1.39 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 30.1 1,661 Total 140 120 100 80 3 FL 60 40 20 0 0 Subcatchment 11: DA 11 Hydrograph 136.61 cfs Type II 24-hr 100 years - 24 hrs-Rainfall=7 94" Runoff Area=42.850 ac Run?ff Volume=13.221 of Runoff Depth>3.70" FlovA(Length=1,661' Tc=30.1 m i n CN=64 F fi 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 21 Hydrograph for Subcatchment 11: DA 11 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.06 9.50 1.29 0.00 0.22 9.75 1.36 0.01 0.44 10.00 1.44 0.02 0.71 10.25 1.52 0.03 1.07 10.50 1.62 0.04 1.54 10.75 1.73 0.06 2.18 11.00 1.87 0.09 3.06 11.25 2.03 0.13 4.30 11.50 2.25 0.19 6.31 11.75 3.07 0.50 11.69 12.00 5.26 1.75 57.05 12.25 5.61 1.99 136.60 12.50 5.84 2.15 83.59 12.75 6.00 2.26 43.89 13.00 6.13 2.36 26.89 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 19.57 13.50 6.34 2.51 15.68 13.75 6.43 2.58 13.38 14.00 6.51 2.63 11.79 14.25 6.58 2.69 10.49 14.50 6.65 2.74 9.56 14.75 6.72 2.79 8.99 15.00 6.78 2.83 8.53 15.25 6.83 2.88 8.09 15.50 6.89 2.92 7.67 15.75 6.94 2.96 7.24 16.00 6.99 2.99 6.81 16.25 7.03 3.03 6.38 16.50 7.08 3.06 6.06 16.75 7.12 3.09 5.85 17.00 7.16 3.12 5.68 17.25 7.20 3.15 5.53 17.50 7.24 3.18 5.38 17.75 7.28 3.21 5.22 18.00 7.31 3.24 5.06 18.25 7.35 3.27 4.91 18.50 7.38 3.29 4.75 18.75 7.41 3.32 4.60 19.00 7.45 3.34 4.44 19.25 7.48 3.37 4.28 19.50 7.50 3.39 4.12 19.75 7.53 3.41 3.95 20.00 7.56 3.43 3.79 20.25 7.58 3.45 3.63 20.50 7.61 3.47 3.52 20.75 7.64 3.49 3.47 21.00 7.66 3.51 3.43 21.25 7.68 3.53 3.40 21.50 7.71 3.55 3.37 21.75 7.73 3.57 3.34 22.00 7.76 3.59 3.31 22.25 7.78 3.61 3.28 22.50 7.80 3.63 3.25 22.75 7.83 3.64 3.21 23.00 7.85 3.66 3.18 23.25 7.87 3.68 3.15 23.50 7.90 3.70 3.12 23.75 7.92 3.72 3.09 24.00 7.94 3.73 3.06 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 12: DA 12 Runoff = 4.92 cfs @ 12.08 hrs, Volume= 0.326 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 0.632 70 Woods, Good, HSG C 0.421 55 Woods, Good, HSG B 1.053 64 Weighted Average 1.053 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.3 100 0.0630 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 2.4 229 0.1036 1.61 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.7 329 Total 3 3 0 2 il Subcatchment 12: DA 12 Hydrograph 4.92 cfs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Runoff Area=1.053 ac Runoff Volume=0.326 of Runoff Depth>3.72" Flow Length=329' Tc=15.7 min CN=64 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 23 Hydrograph for Subcatchment 12: DA 12 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.00 9.50 1.29 0.00 0.01 9.75 1.36 0.01 0.02 10.00 1.44 0.02 0.02 10.25 1.52 0.03 0.04 10.50 1.62 0.04 0.05 10.75 1.73 0.06 0.07 11.00 1.87 0.09 0.10 11.25 2.03 0.13 0.14 11.50 2.25 0.19 0.21 11.75 3.07 0.50 0.65 12.00 5.26 1.75 3.91 12.25 5.61 1.99 2.50 12.50 5.84 2.15 0.96 12.75 6.00 2.26 0.56 13.00 6.13 2.36 0.45 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 0.38 13.50 6.34 2.51 0.33 13.75 6.43 2.58 0.29 14.00 6.51 2.63 0.26 14.25 6.58 2.69 0.23 14.50 6.65 2.74 0.22 14.75 6.72 2.79 0.21 15.00 6.78 2.83 0.20 15.25 6.83 2.88 0.19 15.50 6.89 2.92 0.18 15.75 6.94 2.96 0.17 16.00 6.99 2.99 0.16 16.25 7.03 3.03 0.15 16.50 7.08 3.06 0.14 16.75 7.12 3.09 0.14 17.00 7.16 3.12 0.14 17.25 7.20 3.15 0.13 17.50 7.24 3.18 0.13 17.75 7.28 3.21 0.12 18.00 7.31 3.24 0.12 18.25 7.35 3.27 0.12 18.50 7.38 3.29 0.11 18.75 7.41 3.32 0.11 19.00 7.45 3.34 0.11 19.25 7.48 3.37 0.10 19.50 7.50 3.39 0.10 19.75 7.53 3.41 0.09 20.00 7.56 3.43 0.09 20.25 7.58 3.45 0.09 20.50 7.61 3.47 0.09 20.75 7.64 3.49 0.08 21.00 7.66 3.51 0.08 21.25 7.68 3.53 0.08 21.50 7.71 3.55 0.08 21.75 7.73 3.57 0.08 22.00 7.76 3.59 0.08 22.25 7.78 3.61 0.08 22.50 7.80 3.63 0.08 22.75 7.83 3.64 0.08 23.00 7.85 3.66 0.08 23.25 7.87 3.68 0.08 23.50 7.90 3.70 0.08 23.75 7.92 3.72 0.08 24.00 7.94 3.73 0.07 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 13: DA 13 Runoff = 37.71 cfs @ 12.04 hrs, Volume= 2.214 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 4.282 70 Woods, Good, HSG C 2.855 55 Woods, Good, HSG B 7.137 64 Weighted Average 7.137 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 100 0.2842 0.23 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 4.8 532 0.1367 1.85 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 12.1 632 Total 4 3 3 Subcatchment 13: DA 13 Hydrograph 37.71 cfs Type II 24-h r 100 ears - 24 hrsl Rainf111=7.94 " -Ruzff Are 7.13Zac Run?ff Volume=2.214 of -Runoff Depth->3.7 Flo* Length=632'I Tc=12.1 min — — — — - - - CN=64 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 25 Hydrograph for Subcatchment 13: DA 13 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.04 9.50 1.29 0.00 0.08 9.75 1.36 0.01 0.12 10.00 1.44 0.02 0.18 10.25 1.52 0.03 0.26 10.50 1.62 0.04 0.37 10.75 1.73 0.06 0.51 11.00 1.87 0.09 0.72 11.25 2.03 0.13 1.04 11.50 2.25 0.19 1.58 11.75 3.07 0.50 6.09 12.00 5.26 1.75 34.68 12.25 5.61 1.99 11.88 12.50 5.84 2.15 5.34 12.75 6.00 2.26 3.49 13.00 6.13 2.36 2.89 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 2.46 13.50 6.34 2.51 2.17 13.75 6.43 2.58 1.92 14.00 6.51 2.63 1.71 14.25 6.58 2.69 1.55 14.50 6.65 2.74 1.48 14.75 6.72 2.79 1.41 15.00 6.78 2.83 1.34 15.25 6.83 2.88 1.27 15.50 6.89 2.92 1.20 15.75 6.94 2.96 1.13 16.00 6.99 2.99 1.05 16.25 7.03 3.03 1.00 16.50 7.08 3.06 0.97 16.75 7.12 3.09 0.94 17.00 7.16 3.12 0.92 17.25 7.20 3.15 0.89 17.50 7.24 3.18 0.87 17.75 7.28 3.21 0.84 18.00 7.31 3.24 0.81 18.25 7.35 3.27 0.79 18.50 7.38 3.29 0.76 18.75 7.41 3.32 0.74 19.00 7.45 3.34 0.71 19.25 7.48 3.37 0.68 19.50 7.50 3.39 0.66 19.75 7.53 3.41 0.63 20.00 7.56 3.43 0.60 20.25 7.58 3.45 0.58 20.50 7.61 3.47 0.58 20.75 7.64 3.49 0.57 21.00 7.66 3.51 0.57 21.25 7.68 3.53 0.56 21.50 7.71 3.55 0.56 21.75 7.73 3.57 0.55 22.00 7.76 3.59 0.55 22.25 7.78 3.61 0.54 22.50 7.80 3.63 0.53 22.75 7.83 3.64 0.53 23.00 7.85 3.66 0.52 23.25 7.87 3.68 0.52 23.50 7.90 3.70 0.51 23.75 7.92 3.72 0.51 24.00 7.94 3.73 0.50 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 14: DA 14 Runoff = 6.30 cfs @ 12.01 hrs, Volume= 0.341 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 0.660 70 Woods, Good, HSG C 0.440 55 Woods, Good, HSG B 1.100 64 Weighted Average 1.100 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.4 100 0.2027 0.20 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 1.3 80 0.0443 1.05 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.7 180 Total 7 6 5-- 4- 2 3 U- 2 1 0 0 Subcatchment 14: DA 14 Hydrograph 6.30 cfs Type II 24-hr 100 years - 24 hrsl Rainfa11=7.94" Runoff Areaa=1.100 ac Runoff Volume=0:341 of Runoff Depth>3.72" Flow Length=180'I Tc=9.7 min EN=64 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 27 Hydrograph for Subcatchment 14: DA 14 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.01 9.50 1.29 0.00 0.01 9.75 1.36 0.01 0.02 10.00 1.44 0.02 0.03 10.25 1.52 0.03 0.04 10.50 1.62 0.04 0.06 10.75 1.73 0.06 0.08 11.00 1.87 0.09 0.12 11.25 2.03 0.13 0.17 11.50 2.25 0.19 0.26 11.75 3.07 0.50 1.18 12.00 5.26 1.75 6.23 12.25 5.61 1.99 1.40 12.50 5.84 2.15 0.74 12.75 6.00 2.26 0.52 13.00 6.13 2.36 0.43 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 0.37 13.50 6.34 2.51 0.33 13.75 6.43 2.58 0.29 14.00 6.51 2.63 0.26 14.25 6.58 2.69 0.24 14.50 6.65 2.74 0.23 14.75 6.72 2.79 0.22 15.00 6.78 2.83 0.20 15.25 6.83 2.88 0.19 15.50 6.89 2.92 0.18 15.75 6.94 2.96 0.17 16.00 6.99 2.99 0.16 16.25 7.03 3.03 0.15 16.50 7.08 3.06 0.15 16.75 7.12 3.09 0.14 17.00 7.16 3.12 0.14 17.25 7.20 3.15 0.14 17.50 7.24 3.18 0.13 17.75 7.28 3.21 0.13 18.00 7.31 3.24 0.12 18.25 7.35 3.27 0.12 18.50 7.38 3.29 0.12 18.75 7.41 3.32 0.11 19.00 7.45 3.34 0.11 19.25 7.48 3.37 0.10 19.50 7.50 3.39 0.10 19.75 7.53 3.41 0.10 20.00 7.56 3.43 0.09 20.25 7.58 3.45 0.09 20.50 7.61 3.47 0.09 20.75 7.64 3.49 0.09 21.00 7.66 3.51 0.09 21.25 7.68 3.53 0.09 21.50 7.71 3.55 0.09 21.75 7.73 3.57 0.08 22.00 7.76 3.59 0.08 22.25 7.78 3.61 0.08 22.50 7.80 3.63 0.08 22.75 7.83 3.64 0.08 23.00 7.85 3.66 0.08 23.25 7.87 3.68 0.08 23.50 7.90 3.70 0.08 23.75 7.92 3.72 0.08 24.00 7.94 3.73 0.08 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 15: DA 15 Runoff = 17.91 cfs @ 12.09 hrs, Volume= 1.208 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 2.339 70 Woods, Good, HSG C 1.559 55 Woods, Good, HSG B 3.898 64 Weighted Average 3.898 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.1 100 0.0654 0.13 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 3.2 208 0.0462 1.07 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs M011-311111111[*M. 2 1 1 1 3 1 0 FL Subcatchment 15: DA 15 Hydrograph 0-- 17.91 cfs 8 Type) 1124-hr 6 0 arm 24-hrslRain Runoff Are=3.898 1=7-4A" 4 ac Run?ff Volume=1.208 of 2 -Runoff Depth>3.7 — — — Flowl Length=308'I c 16.3 min 8 CN14 6 4 - —I - - 2 - 0 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 29 Hydrograph for Subcatchment 15: DA 15 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.02 9.50 1.29 0.00 0.04 9.75 1.36 0.01 0.06 10.00 1.44 0.02 0.09 10.25 1.52 0.03 0.13 10.50 1.62 0.04 0.18 10.75 1.73 0.06 0.26 11.00 1.87 0.09 0.36 11.25 2.03 0.13 0.51 11.50 2.25 0.19 0.78 11.75 3.07 0.50 2.30 12.00 5.26 1.75 13.84 12.25 5.61 1.99 9.72 12.50 5.84 2.15 3.68 12.75 6.00 2.26 2.14 13.00 6.13 2.36 1.66 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 1.40 13.50 6.34 2.51 1.23 13.75 6.43 2.58 1.08 14.00 6.51 2.63 0.96 14.25 6.58 2.69 0.87 14.50 6.65 2.74 0.82 14.75 6.72 2.79 0.78 15.00 6.78 2.83 0.74 15.25 6.83 2.88 0.70 15.50 6.89 2.92 0.66 15.75 6.94 2.96 0.63 16.00 6.99 2.99 0.59 16.25 7.03 3.03 0.55 16.50 7.08 3.06 0.53 16.75 7.12 3.09 0.52 17.00 7.16 3.12 0.50 17.25 7.20 3.15 0.49 17.50 7.24 3.18 0.48 17.75 7.28 3.21 0.46 18.00 7.31 3.24 0.45 18.25 7.35 3.27 0.43 18.50 7.38 3.29 0.42 18.75 7.41 3.32 0.41 19.00 7.45 3.34 0.39 19.25 7.48 3.37 0.38 19.50 7.50 3.39 0.36 19.75 7.53 3.41 0.35 20.00 7.56 3.43 0.33 20.25 7.58 3.45 0.32 20.50 7.61 3.47 0.32 20.75 7.64 3.49 0.31 21.00 7.66 3.51 0.31 21.25 7.68 3.53 0.31 21.50 7.71 3.55 0.30 21.75 7.73 3.57 0.30 22.00 7.76 3.59 0.30 22.25 7.78 3.61 0.30 22.50 7.80 3.63 0.29 22.75 7.83 3.64 0.29 23.00 7.85 3.66 0.29 23.25 7.87 3.68 0.28 23.50 7.90 3.70 0.28 23.75 7.92 3.72 0.28 24.00 7.94 3.73 0.28 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 30 Summary for Reach 15R: 1 Inflow Area = 261.650 ac, 0.00% Impervious, Inflow Depth > 3.67" for 100 years - 24 hrs event Inflow = 489.01 cfs @ 12.64 hrs, Volume= 79.951 of Outflow = 488.72 cfs @ 12.66 hrs, Volume= 79.906 af, Atten= 0%, Lag= 1.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 6.65 fps, Min. Travel Time= 0.5 min Avg. Velocity = 3.32 fps, Avg. Travel Time= 1.0 min Peak Storage= 14,699 cf @ 12.65 hrs Average Depth at Peak Storage= 2.20' Bank -Full Depth= 25.63' Flow Area= 9,138.2 sf, Capacity= 251,265.09 cfs Custom cross-section, Length= 200.0' Slope= 0.0267 T (104 Elevation Intervals) Constant n= 0.045 Inlet Invert= 689.16', Outlet Invert= 683.82' Offset Elevation Chan.Depth (feet) (feet) (feet) 234.50 705.00 0.00 282.04 699.37 5.63 361.70 693.69 11.31 457.53 679.37 25.63 470.80 679.37 25.63 587.16 689.38 15.62 657.34 692.40 12.60 941.48 699.37 5.63 1,026.55 705.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 13.3 0 0.00 10.01 1,050.5 197.8 210,097 17,254.73 13.03 1,780.8 288.5 356,152 32,334.78 14.32 2,190.5 349.8 438,097 40,155.70 20.00 5,052.3 661.3 1,010,453 105,749.64 25.63 9,138.2 794.4 1,827,642 251,265.09 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 31 500 450 400 N 350 300 0 250 " 200 150 100 50 0 Reach 15R: 1 Hydrograph 488.72 cfs Inflow Area=261.650 a� Avg. Flow Depth�2.2 L I Ma Vel= 6.6� fps 1 n=;04;) L=200-.01 fi 1 s=o.02617 T- Cajac=25I 2I 6 .09 cfs 1 I L I L-111 -4 1 1 L I 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 32 Hydrograph for Reach 15R: 1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 689.16 0.00 0.50 0.00 0 689.16 0.00 1.00 0.00 0 689.16 0.00 1.50 0.00 0 689.16 0.00 2.00 0.00 0 689.16 0.00 2.50 0.00 0 689.16 0.00 3.00 0.00 0 689.16 0.00 3.50 0.00 0 689.16 0.00 4.00 0.00 0 689.16 0.00 4.50 0.00 0 689.16 0.00 5.00 0.00 0 689.16 0.00 5.50 0.00 0 689.16 0.00 6.00 0.00 0 689.16 0.00 6.50 0.00 0 689.16 0.00 7.00 0.00 0 689.16 0.00 7.50 0.00 0 689.16 0.00 8.00 0.00 0 689.16 0.00 8.50 0.00 0 689.16 0.00 9.00 0.00 0 689.16 0.00 9.50 0.30 26 689.17 0.25 10.00 1.89 179 689.22 1.73 10.50 5.03 486 689.32 4.74 11.00 10.66 936 689.45 10.32 11.50 21.46 1,506 689.59 20.76 12.00 82.40 3,858 690.05 75.72 12.50 458.42 13,954 691.29 451.13 13.00 375.16 12,152 691.11 381.79 13.50 197.13 7,578 690.59 200.99 14.00 119.13 5,243 690.27 120.94 14.50 82.37 4,008 690.08 83.30 15.00 63.54 3,332 689.96 63.99 15.50 54.01 2,970 689.90 54.32 16.00 47.15 2,682 689.84 47.41 16.50 41.71 2,453 689.79 41.92 17.00 37.66 2,281 689.76 37.78 17.50 35.03 2,170 689.74 35.11 18.00 32.91 2,082 689.72 32.99 18.50 30.94 1,999 689.70 31.02 19.00 29.00 1,918 689.69 29.08 19.50 27.07 1,837 689.67 27.15 20.00 25.11 1,732 689.65 25.20 20.50 23.19 1,627 689.62 23.27 21.00 21.81 1,552 689.60 21.86 21.50 21.09 1,512 689.59 21.11 22.00 20.61 1,486 689.58 20.63 22.50 20.20 1,464 689.58 20.22 23.00 19.81 1,443 689.57 19.84 23.50 19.43 1,422 689.57 19.45 24.00 19.06 1,402 689.56 19.08 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 33 Summary for Reach 16R: 2 Inflow Area = 445.997 ac, 0.00% Impervious, Inflow Depth > 3.67" for 100 years - 24 hrs event Inflow = 885.03 cfs @ 12.55 hrs, Volume= 136.502 of Outflow = 854.68 cfs @ 12.80 hrs, Volume= 135.393 af, Atten= 3%, Lag= 14.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 4.77 fps, Min. Travel Time= 8.4 min Avg. Velocity = 2.66 fps, Avg. Travel Time= 15.1 min Peak Storage= 431,430 cf @ 12.66 hrs Average Depth at Peak Storage= 1.66' Bank -Full Depth= 60.63' Flow Area= 28,198.4 sf, Capacity= 802,050.80 cfs Custom cross-section, Length= 2,406.0' Slope= 0.0114 T (104 Elevation Intervals) Constant n= 0.045 Inlet Invert= 683.82', Outlet Invert= 656.38' Offset Elevation Chan.Depth (feet) (feet) (feet) 0.00 730.00 0.00 68.44 724.78 5.22 126.80 719.37 10.63 424.60 669.37 60.63 524.82 669.37 60.63 626.53 699.37 30.63 847.38 719.37 10.63 986.41 725.00 5.00 1,221.05 730.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 100.2 0 0.00 30.00 7,212.4 387.4 17,353,155 178,655.60 50.00 18,224.3 730.0 43,847,786 548,986.52 55.41 22,641.9 922.3 54,476,489 674,462.61 55.63 22,843.6 930.6 54,961,714 680,414.00 60.63 28,198.4 1,231.1 67,845,269 802,050.80 Pre Ash Basin Type 1124-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 34 900 800 700 600 3 500 ,° 400 300 200 100 0 Reach 16R: 2 Hydrograph 854.68 cfs Infllow Area=1445.�97 a� Avg. Flaw Dppth�1.661 Ma Vet 417 fps n= . 451 1 —I L=2,406�0' S=�.011 I I Capacity — 02;M"O cfs -III �-4- 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 35 Hydrograph for Reach 16R: 2 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 683.82 0.00 0.50 0.00 0 683.82 0.00 1.00 0.00 0 683.82 0.00 1.50 0.00 0 683.82 0.00 2.00 0.00 0 683.82 0.00 2.50 0.00 0 683.82 0.00 3.00 0.00 0 683.82 0.00 3.50 0.00 0 683.82 0.00 4.00 0.00 0 683.82 0.00 4.50 0.00 0 683.82 0.00 5.00 0.00 0 683.82 0.00 5.50 0.00 0 683.82 0.00 6.00 0.00 0 683.82 0.00 6.50 0.00 0 683.82 0.00 7.00 0.00 0 683.82 0.00 7.50 0.00 0 683.82 0.00 8.00 0.00 0 683.82 0.00 8.50 0.00 0 683.82 0.00 9.00 0.00 0 683.82 0.00 9.50 0.67 232 683.82 0.08 10.00 3.75 2,059 683.83 1.37 10.50 9.54 6,238 683.85 4.94 11.00 20.08 13,933 683.88 11.61 11.50 40.43 28,362 683.93 24.00 12.00 177.06 81,982 684.15 53.80 12.50 876.85 405,029 685.38 554.73 13.00 581.30 363,890 685.23 767.47 13.50 299.39 243,089 684.78 420.81 14.00 184.28 175,217 684.52 238.10 14.50 130.16 142,938 684.40 156.48 15.00 103.30 113,535 684.28 124.59 15.50 89.34 94,578 684.20 101.93 16.00 78.63 82,122 684.15 87.84 16.50 69.58 72,351 684.11 77.19 17.00 63.16 64,690 684.08 68.57 17.50 58.95 59,531 684.06 62.63 18.00 55.47 55,720 684.04 58.43 18.50 52.16 52,377 684.03 54.91 19.00 48.87 49,159 684.02 51.57 19.50 45.57 45,954 684.01 48.27 20.00 42.24 42,738 683.99 44.96 20.50 38.99 39,520 683.98 41.63 21.00 36.86 36,890 683.97 38.65 21.50 35.75 35,329 683.96 36.76 22.00 34.99 34,384 683.96 35.66 22.50 34.32 33,666 683.96 34.88 23.00 33.67 33,021 683.95 34.20 23.50 33.03 32,395 683.95 33.56 24.00 32.38 31,770 683.95 32.91 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 36 Summary for Reach 27R: Spillway Outfall Inflow Area = 740.959 ac, 0.00% Impervious, Inflow Depth > 3.67" for 100 years - 24 hrs event Inflow = 1,117.29 cfs @ 12.68 hrs, Volume= 226.501 of Outflow = 1,114.18 cfs @ 12.75 hrs, Volume= 225.993 af, Atten= 0%, Lag= 4.3 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 9.49 fps, Min. Travel Time= 2.4 min Avg. Velocity = 5.94 fps, Avg. Travel Time= 3.8 min Peak Storage= 157,350 cf @ 12.71 hrs Average Depth at Peak Storage= 3.95' Bank -Full Depth= 94.66' Flow Area= 78,667.2 sf, Capacity= 6,461,392.31 cfs Custom cross-section, Length= 1,338.8' Slope= 0.0303 T (112 Elevation Intervals) Constant n= 0.040 Inlet Invert= 656.55', Outlet Invert= 615.97' Offset Elevation Chan.Depth (feet) (feet) (feet) 74.42 700.66 0.00 168.56 695.66 5.00 283.63 671.68 28.98 442.63 620.00 80.66 514.29 610.00 90.66 733.65 611.99 88.67 754.40 606.24 94.42 764.63 606.00 94.66 771.19 608.00 92.66 843.45 612.00 88.66 1,316.83 682.00 18.66 1,444.58 690.00 10.66 1,552.47 688.51 12.15 1,647.76 678.00 22.66 1,658.48 678.00 22.66 1,792.16 700.66 0.00 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 37 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.24 1.3 11.1 1,770 2.08 2.00 31.4 23.7 42,014 244.87 4.00 121.0 67.4 162,010 1,156.69 5.99 528.7 344.6 707,812 4,548.84 6.00 532.1 344.8 712,409 4,595.93 14.00 3,725.8 457.4 4,988,068 97,555.18 65.68 40,375.4 977.9 54,054,6443,119,567.13 72.00 46,695.1 1,062.8 62,515,3823,760,494.23 76.00 51,096.1 1,170.2 68,407,4474,098,013.65 82.51 59,361.3 1,404.6 79,472,9081,658,383.64 84.00 61,536.3 1,552.5 82,384,8164,626,837.94 89.66 70,387.6 1,614.1 94,234,8915,640,154.10 94.66 78,667.2 1,738.3 105,319,63C6,461,392.31 1,200 1,100 1,000 900 800 700 3 600 rL 500 400 300 200 100 0 Reach 27R: Spillway Outfall Hydrograph 1,114.18 cfs Infll w �ea=140.9�9 act Avq. Flow Depth=�.95' Max VeT 9.49 fps n=0:0404 L=1,33 . ' � S=0.03 '/' - - Capacity=6,461,3913l cfs T T T T T T T T 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) - Inflow - Outflow Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 38 Hydrograph for Reach 27R: Spillway Outfall Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 656.55 0.00 0.50 0.00 0 656.55 0.00 1.00 0.00 0 656.55 0.00 1.50 0.00 0 656.55 0.00 2.00 0.00 0 656.55 0.00 2.50 0.00 0 656.55 0.00 3.00 0.00 0 656.55 0.00 3.50 0.00 0 656.55 0.00 4.00 0.00 0 656.55 0.00 4.50 0.00 0 656.55 0.00 5.00 0.00 0 656.55 0.00 5.50 0.00 0 656.55 0.00 6.00 0.00 0 656.55 0.00 6.50 0.00 0 656.55 0.00 7.00 0.00 0 656.55 0.00 7.50 0.00 0 656.55 0.00 8.00 0.00 0 656.55 0.00 8.50 0.00 0 656.55 0.00 9.00 0.02 2 656.55 0.00 9.50 1.92 775 656.66 0.75 10.00 6.74 2,704 656.84 5.38 10.50 16.40 4,898 656.96 13.85 11.00 34.22 8,941 657.19 29.47 11.50 71.24 16,434 657.57 62.75 12.00 572.04 74,433 659.30 352.84 12.50 1,047.90 149,117 660.40 1,042.63 13.00 931.91 139,789 660.28 994.71 13.50 523.16 87,357 659.52 567.36 14.00 316.92 55,646 658.87 341.95 14.50 221.10 39,614 658.47 231.21 15.00 182.58 33,861 658.25 188.32 15.50 154.07 29,527 658.08 157.89 16.00 134.05 26,521 657.97 136.97 16.50 118.47 24,172 657.87 120.60 17.00 107.45 22,510 657.81 109.01 17.50 99.38 21,293 657.76 100.53 18.00 93.06 20,350 657.73 94.01 18.50 87.37 19,511 657.69 88.27 19.00 81.85 18,699 657.66 82.74 19.50 76.35 17,890 657.63 77.23 20.00 70.81 17,077 657.60 71.70 20.50 65.74 16,317 657.57 66.45 21.00 62.19 15,780 657.55 62.68 21.50 59.88 15,427 657.53 60.19 22.00 58.37 15,198 657.52 58.59 22.50 57.17 15,020 657.52 57.36 23.00 56.07 14,857 657.51 56.25 23.50 55.00 14,700 657.50 55.17 24.00 53.93 14,542 657.50 54.10 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 39 Summary for Reach 28R: Road Culvert Inflow Area = 807.923 ac, 0.00% Impervious, Inflow Depth > 3.66" for 100 years - 24 hrs event Inflow = 1,280.73 cfs @ 12.29 hrs, Volume= 246.686 of Outflow = 1,162.75 cfs @ 12.90 hrs, Volume= 244.896 af, Atten= 9%, Lag= 36.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 5.74 fps, Min. Travel Time= 7.3 min Avg. Velocity = 3.41 fps, Avg. Travel Time= 12.3 min Peak Storage= 624,558 cf @ 12.79 hrs Average Depth at Peak Storage= 3.55' Bank -Full Depth= 39.37' Flow Area= 11,690.1 sf, Capacity= 402,588.09 cfs Custom cross-section, Length= 2,511.7' Slope= 0.0111 T (109 Elevation Intervals) Constant n= 0.040 Inlet Invert= 615.97', Outlet Invert= 588.00' Offset Elevation Chan.Depth (feet) (feet) (feet) 16.74 629.37 0.00 46.74 623.76 5.61 73.81 616.00 13.37 87.73 610.00 19.37 95.22 604.48 24.89 103.27 590.00 39.37 137.81 590.00 39.37 140.51 592.00 37.37 332.24 594.00 35.37 348.56 596.04 33.33 362.15 598.63 30.74 410.71 616.00 13.37 420.31 622.00 7.37 445.73 629.37 0.00 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 40 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 34.5 0 0.00 2.00 72.9 40.2 183,083 425.00 4.00 342.4 234.2 860,100 1,729.33 6.04 831.9 253.0 2,089,423 7,211.20 8.63 1,495.3 269.8 3,755,840 18,359.59 14.48 3,095.2 293.9 7,774,219 58,305.65 20.00 4,722.2 319.6 11,860,740 111,480.77 26.00 6,651.5 352.5 16,706,610 184,811.49 32.00 8,764.5 385.6 22,013,810 275,694.39 33.76 9,421.9 398.3 23,665,058 304,365.07 39.37 11,690.1 449.0 29,362,117 402,588.09 1,400 1,200 1,000 N 800 3 �° 600 400 200 0 0 Reach 28R: Road Culvert Hydrograph 1,280.73 cfs Inflow Area=807.923 1,162.75 cfs Avg. Flow Depth=3.55' Max Vet=5.74 fps n=0.040 L=2, 511.7' S=0.0111 V, Capacity=402,588.09 cfs 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) - Inflow - Outflow Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 41 Hydrograph for Reach 28R: Road Culvert Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 615.97 0.00 0.50 0.00 0 615.97 0.00 1.00 0.00 0 615.97 0.00 1.50 0.00 0 615.97 0.00 2.00 0.00 0 615.97 0.00 2.50 0.00 0 615.97 0.00 3.00 0.00 0 615.97 0.00 3.50 0.00 0 615.97 0.00 4.00 0.00 0 615.97 0.00 4.50 0.00 0 615.97 0.00 5.00 0.00 0 615.97 0.00 5.50 0.00 0 615.97 0.00 6.00 0.00 0 615.97 0.00 6.50 0.00 0 615.97 0.00 7.00 0.00 0 615.97 0.00 7.50 0.00 0 615.97 0.00 8.00 0.00 0 615.97 0.00 8.50 0.00 0 615.97 0.00 9.00 0.01 1 615.97 0.00 9.50 1.20 500 615.98 0.19 10.00 6.65 3,959 616.02 2.16 10.50 16.55 12,398 616.11 8.14 11.00 34.80 28,012 616.29 19.27 11.50 73.98 51,314 616.55 47.23 12.00 499.48 152,571 617.65 154.99 12.50 1,148.19 623,150 619.52 1,119.50 13.00 1,031.80 597,661 619.46 1,152.28 13.50 590.59 402,397 618.96 794.01 14.00 359.68 243,333 618.37 484.52 14.50 245.82 135,243 617.47 292.76 15.00 201.43 116,502 617.27 218.74 15.50 169.66 104,973 617.14 182.06 16.00 147.40 95,407 617.04 157.38 16.50 129.95 87,697 616.95 137.63 17.00 117.81 82,228 616.89 123.22 17.50 108.85 78,232 616.85 112.83 18.00 101.85 75,181 616.82 105.05 18.50 95.62 72,545 616.79 98.53 19.00 89.59 70,035 616.76 92.43 19.50 83.59 66,981 616.73 86.88 20.00 77.55 63,562 616.69 80.93 20.50 71.92 60,215 616.65 74.94 21.00 68.03 57,700 616.62 70.12 21.50 65.44 55,993 616.60 66.80 22.00 63.74 54,885 616.59 64.65 22.50 62.41 54,073 616.58 63.14 23.00 61.21 53,368 616.57 61.88 23.50 60.03 52,695 616.57 60.69 24.00 58.87 52,028 616.56 59.52 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 42 Summary for Reach 29R: RR Culvert Inflow Area = 816.113 ac, 0.00% Impervious, Inflow Depth > 3.64" for 100 years - 24 hrs event Inflow = 1,166.32 cfs @ 12.90 hrs, Volume= 247.436 of Outflow = 1,165.96 cfs @ 12.91 hrs, Volume= 247.332 af, Atten= 0%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 10.95 fps, Min. Travel Time= 0.4 min Avg. Velocity = 5.56 fps, Avg. Travel Time= 0.7 min Peak Storage= 25,836 cf @ 12.91 hrs Average Depth at Peak Storage= 5.73' Bank -Full Depth= 27.36' Flow Area= 3,723.4 sf, Capacity= 91,794.33 cfs Custom cross-section, Length= 242.5' Slope= 0.0165 T (104 Elevation Intervals) Constant n= 0.040 Inlet Invert= 584.00', Outlet Invert= 580.00' Offset Elevation Chan.Depth (feet) (feet) (feet) 34.01 607.36 0.00 66.97 600.00 7.36 118.99 600.00 7.36 176.43 590.00 17.36 213.63 588.00 19.36 228.46 580.00 27.36 238.68 580.00 27.36 244.95 585.91 21.45 342.59 607.36 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 10.2 0 0.00 5.91 111.3 31.3 26,991 1,237.62 8.00 182.7 45.4 44,294 2,203.63 10.00 310.6 92.0 75,327 3,335.52 20.00 1,696.8 248.9 411,474 29,104.81 27.36 3,723.4 317.0 902,916 91,794.33 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 43 3 0 FL 7 1 Reach 29R: RR Culvert Hydrograph 1,165.96 cfs 1 1 1 nflo"rea�M.11-43 �c L 1 --1 kvg- F40w-Dppth�4. 7� -t t -t %apacty=9-1,M133 C#s T 7 7 T --1 0 2 4 6 8 10 12 14 16 Time (hours) 18 20 22 24 Inflow — Outflow Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 44 Hydrograph for Reach 29R: RR Culvert Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 584.00 0.00 0.50 0.00 0 584.00 0.00 1.00 0.00 0 584.00 0.00 1.50 0.00 0 584.00 0.00 2.00 0.00 0 584.00 0.00 2.50 0.00 0 584.00 0.00 3.00 0.00 0 584.00 0.00 3.50 0.00 0 584.00 0.00 4.00 0.00 0 584.00 0.00 4.50 0.00 0 584.00 0.00 5.00 0.00 0 584.00 0.00 5.50 0.00 0 584.00 0.00 6.00 0.00 0 584.00 0.00 6.50 0.00 0 584.00 0.00 7.00 0.00 0 584.00 0.00 7.50 0.00 0 584.00 0.00 8.00 0.00 0 584.00 0.00 8.50 0.00 0 584.00 0.00 9.00 0.00 0 584.00 0.00 9.50 0.28 29 584.01 0.22 10.00 2.36 261 584.10 2.05 10.50 8.56 866 584.33 8.18 11.00 20.09 1,541 584.57 19.54 11.50 49.02 2,752 584.97 47.67 12.00 193.59 6,941 586.14 182.32 12.50 1,125.80 25,100 589.62 1,113.59 13.00 1,155.62 25,678 589.71 1,157.62 13.50 796.51 19,612 588.73 806.16 14.00 486.49 13,713 587.64 491.58 14.50 294.45 9,594 586.77 298.89 15.00 220.28 7,790 586.35 221.39 15.50 183.44 6,855 586.12 184.29 16.00 158.59 6,195 585.95 159.19 16.50 138.74 5,644 585.81 139.23 17.00 124.27 5,233 585.70 124.61 17.50 113.83 4,930 585.62 114.09 18.00 105.98 4,688 585.55 106.19 18.50 99.41 4,487 585.49 99.59 19.00 93.25 4,298 585.44 93.43 19.50 87.64 4,126 585.39 87.81 20.00 81.62 3,931 585.33 81.81 20.50 75.60 3,728 585.27 75.78 21.00 70.76 3,563 585.22 70.89 21.50 67.44 3,450 585.19 67.53 22.00 65.28 3,377 585.17 65.34 22.50 63.76 3,325 585.15 63.80 23.00 62.48 3,282 585.14 62.52 23.50 61.28 3,241 585.13 61.32 24.00 60.10 3,201 585.11 60.14 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 45 Summary for Reach 30R: To Dan River Inflow Area = 821.111 ac, 0.00% Impervious, Inflow Depth > 3.64" for 100 years - 24 hrs event Inflow = 1,168.20 cfs @ 12.91 hrs, Volume= 248.881 of Outflow = 1,167.93 cfs @ 12.93 hrs, Volume= 248.729 af, Atten= 0%, Lag= 1.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 7.34 fps, Min. Travel Time= 0.6 min Avg. Velocity = 3.98 fps, Avg. Travel Time= 1.1 min Peak Storage= 41,117 cf @ 12.92 hrs Average Depth at Peak Storage= 3.78' Bank -Full Depth= 10.54' Flow Area= 1,563.4 sf, Capacity= 19,048.17 cfs Custom cross-section, Length= 258.3' Slope= 0.0157 T (103 Elevation Intervals) Constant n= 0.040 Inlet Invert= 583.01', Outlet Invert= 578.96' Offset Elevation Chan.Depth (feet) (feet) (feet) 43.40 593.14 0.00 226.12 588.00 5.14 252.69 586.00 7.14 285.16 582.83 10.31 293.21 582.60 10.54 342.47 588.00 5.14 411.43 593.14 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.23 1.2 10.2 301 1.28 3.40 130.6 71.9 33,743 905.02 5.40 318.5 116.9 82,274 2,890.90 10.54 1,563.4 368.8 403,820 19,048.17 Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 46 Reach 30R: To Dan River Hydrograph 1,300 1,167.93 cfs 1,200 - — 1,100 nfl0"rea�82-1.1141 �c - I I —i 1,000 Avg-. Row Dpptlh4 7� - t � 090 _7-34 #PS N 800 700 =2-58-.4' I I - 3 600 0 500 S=0.0 7 ' ' I apaC y=491,� c#s 1 400 -4 1 I �-- I -4 200 100 0 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Pre Ash Basin Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 47 Hydrograph for Reach 30R: To Dan River Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 583.01 0.00 0.50 0.00 0 583.01 0.00 1.00 0.00 0 583.01 0.00 1.50 0.00 0 583.01 0.00 2.00 0.00 0 583.01 0.00 2.50 0.00 0 583.01 0.00 3.00 0.00 0 583.01 0.00 3.50 0.00 0 583.01 0.00 4.00 0.00 0 583.01 0.00 4.50 0.00 0 583.01 0.00 5.00 0.00 0 583.01 0.00 5.50 0.00 0 583.01 0.00 6.00 0.00 0 583.01 0.00 6.50 0.00 0 583.01 0.00 7.00 0.00 0 583.01 0.00 7.50 0.00 0 583.01 0.00 8.00 0.00 0 583.01 0.00 8.50 0.00 0 583.01 0.00 9.00 0.00 0 583.01 0.00 9.50 0.27 66 583.12 0.16 10.00 2.16 385 583.27 1.84 10.50 8.43 1,043 583.47 7.87 11.00 20.01 1,961 583.68 19.06 11.50 48.71 3,766 584.00 46.57 12.00 202.39 10,599 584.81 183.68 12.50 1,118.01 39,524 586.71 1,094.95 13.00 1,159.71 40,928 586.78 1,162.37 13.50 807.72 31,190 586.27 823.39 14.00 492.80 21,546 585.68 501.01 14.50 299.93 14,923 585.19 307.85 15.00 222.34 11,867 584.93 224.11 15.50 185.14 10,356 584.79 186.51 16.00 159.94 9,284 584.68 160.92 16.50 139.92 8,406 584.59 140.70 17.00 125.26 7,736 584.52 125.82 17.50 114.70 7,246 584.46 115.12 18.00 106.76 6,868 584.42 107.09 18.50 100.13 6,553 584.38 100.42 19.00 93.93 6,247 584.34 94.22 19.50 88.27 5,967 584.31 88.55 20.00 82.23 5,667 584.27 82.53 20.50 76.18 5,352 584.23 76.46 21.00 71.29 5,095 584.20 71.49 21.50 67.91 4,918 584.17 68.05 22.00 65.72 4,797 584.16 65.81 22.50 64.18 4,712 584.14 64.25 23.00 62.89 4,641 584.13 62.95 23.50 61.68 4,575 584.12 61.74 24.00 60.49 4,510 584.11 60.55 ATTACHMENT A-2 HydroCAD Calculations for Basin Design: Existing Conditions 100yr storm Belews Creek Basin Design Memo 26R ZI-Dan ive0 17 - DA 17 DA 16 25R a- 15 RCuv rt DA 15 14 .All 24R 4-- ad Ctrt DA 13 12 DA 12 23R o--, 11 Stream Beginning 1 O DA 11 DA 10 18-1 18-1 O � 17-1 9 DA9 O DA6 8_1 O 6-1 7-1 8-1 DA8 O� � 7 O DA5 5_1 O DA7 4-1 4-1 \ O D 3 2 O ,,,ppp 4 DA3 Dr y-2 I DA4 3-1QQ p 8S 1-1 2-1 / 11 21 O DA18 O O DA1 DA2 Subcat Reach on Link Routing Diagram for Existing Conditions Prepared by AECOM, Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Existing Conditions Type 1124-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n o1089 ©2017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1: DA1 Runoff = 975.62 cfs @ 12.02 hrs, Volume= 54.893 af, Depth> 4.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 23.263 80 Pine Haul Road Landfill Liner 31.561 70 Woods, Good, HSG C 59.634 80 >75% Grass cover, Good, HSG D 21.040 55 Woods, Good, HSG B 135.498 74 Weighted Average 135.498 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 100 0.1635 0.40 Sheet Flow, Grass: Short n= 0.150 P2= 3.31" 0.4 180 0.2536 7.55 Shallow Concentrated Flow, Down sideslope Grassed Waterway Kv= 15.0 fps 3.7 829 0.0636 3.78 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 2.1 978 0.0231 7.95 1,621.95 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=4.00' Z= 13.5 & 12.0'/' Top.W=102.00' n= 0.045 10.4 2,087 Total Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 3 1,000 900 800 700 600 _0 500 400 300 200 100 0 Subcatchment 1: DA1 Hydrograph 975.62 cfs Type II 24-1�r 100 years - 24 hrs Rainfall=7.94" Runoff Area=135.498 ac — - Runoff Volume=54.893I of Runoff Depth>4. 6" Flow Length=2,0�7'- t Tc=10.4 min CN=74 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 4 Hydrograph for Subcatchment 1: DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.24 7.00 0.79 0.00 0.69 7.25 0.83 0.00 1.17 7.50 0.87 0.01 1.67 7.75 0.91 0.01 2.18 8.00 0.95 0.02 2.72 8.25 1.00 0.02 3.39 8.50 1.05 0.03 4.34 8.75 1.11 0.04 5.46 9.00 1.17 0.05 6.74 9.25 1.23 0.07 7.92 9.50 1.29 0.09 8.77 9.75 1.36 0.10 10.04 10.00 1.44 0.13 12.18 10.25 1.52 0.16 14.91 10.50 1.62 0.19 18.44 10.75 1.73 0.23 23.11 11.00 1.87 0.29 29.48 11.25 2.03 0.37 39.52 11.50 2.25 0.47 55.60 11.75 3.07 0.95 214.59 12.00 5.26 2.58 961.94 12.25 5.61 2.86 228.00 12.50 5.84 3.05 112.11 12.75 6.00 3.18 76.06 13.00 6.13 3.29 63.41 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 3.39 53.93 13.50 6.34 3.48 47.52 13.75 6.43 3.55 41.93 14.00 6.51 3.62 37.36 14.25 6.58 3.68 33.98 14.50 6.65 3.74 32.34 14.75 6.72 3.80 30.77 15.00 6.78 3.85 29.19 15.25 6.83 3.90 27.60 15.50 6.89 3.95 26.01 15.75 6.94 3.99 24.40 16.00 6.99 4.03 22.79 16.25 7.03 4.07 21.58 16.50 7.08 4.11 20.98 16.75 7.12 4.15 20.41 17.00 7.16 4.18 19.84 17.25 7.20 4.22 19.27 17.50 7.24 4.25 18.70 17.75 7.28 4.28 18.12 18.00 7.31 4.32 17.55 18.25 7.35 4.35 16.97 18.50 7.38 4.38 16.39 18.75 7.41 4.41 15.80 19.00 7.45 4.43 15.22 19.25 7.48 4.46 14.63 19.50 7.50 4.49 14.04 19.75 7.53 4.51 13.46 20.00 7.56 4.53 12.86 20.25 7.58 4.56 12.46 20.50 7.61 4.58 12.33 20.75 7.64 4.60 12.22 21.00 7.66 4.62 12.11 21.25 7.68 4.64 11.99 21.50 7.71 4.67 11.88 21.75 7.73 4.69 11.77 22.00 7.76 4.71 11.65 22.25 7.78 4.73 11.54 22.50 7.80 4.75 11.42 22.75 7.83 4.77 11.31 23.00 7.85 4.79 11.19 23.25 7.87 4.81 11.08 23.50 7.90 4.83 10.96 23.75 7.92 4.85 10.85 24.00 7.94 4.87 10.73 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 2: DA2 Runoff = 516.52 cfs @ 12.20 hrs, Volume= 44.885 af, Depth> 4.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 43.498 70 Woods, Good, HSG C 49.167 80 Liner 0.710 74 >75% Grass cover, Good, HSG C 28.998 55 Woods, Good, HSG B 0.473 61 >75% Grass cover, Good, HSG B 122.846 70 Weighted Average 122.846 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 11.0 100 0.1026 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 14.8 904 0.0415 1.02 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 25.8 1,004 Total 550 500 450 400 4 350 300 o 250 FL 200 150 100 50 0 Subcatchment 2: DA2 Hydrograph 516.52 cfs Type ll24--hr 100 ars - 24-hr Rainfall=7.94" - Runbff Area=122.846 ac' Run?ff Volume=4�.885 �f Runoff Depth>4.38" Flo*-Length=1 094' Tc=25.8 min CN=iO -1 - 1- 1- - T I T T T T- - 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 6 Hydrograph for Subcatchment 2: DA2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.05 8.00 0.95 0.00 0.31 8.25 1.00 0.00 0.70 8.50 1.05 0.01 1.20 8.75 1.11 0.01 1.83 9.00 1.17 0.02 2.61 9.25 1.23 0.03 3.51 9.50 1.29 0.04 4.37 9.75 1.36 0.05 5.16 10.00 1.44 0.07 6.29 10.25 1.52 0.09 7.86 10.50 1.62 0.12 9.97 10.75 1.73 0.15 12.68 11.00 1.87 0.19 16.45 11.25 2.03 0.25 21.60 11.50 2.25 0.34 30.24 11.75 3.07 0.76 56.81 12.00 5.26 2.23 274.65 12.25 5.61 2.50 493.77 12.50 5.84 2.68 230.31 12.75 6.00 2.80 117.73 13.00 6.13 2.91 74.54 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 3.00 56.31 13.50 6.34 3.08 46.76 13.75 6.43 3.15 40.77 14.00 6.51 3.22 36.06 14.25 6.58 3.27 32.13 14.50 6.65 3.33 29.51 14.75 6.72 3.38 27.87 15.00 6.78 3.43 26.47 15.25 6.83 3.48 25.10 15.50 6.89 3.53 23.75 15.75 6.94 3.57 22.38 16.00 6.99 3.61 21.00 16.25 7.03 3.65 19.67 16.50 7.08 3.68 18.74 16.75 7.12 3.72 18.15 17.00 7.16 3.75 17.64 17.25 7.20 3.79 17.15 17.50 7.24 3.82 16.66 17.75 7.28 3.85 16.17 18.00 7.31 3.88 15.67 18.25 7.35 3.91 15.18 18.50 7.38 3.94 14.68 18.75 7.41 3.97 14.18 19.00 7.45 3.99 13.68 19.25 7.48 4.02 13.18 19.50 7.50 4.04 12.67 19.75 7.53 4.07 12.17 20.00 7.56 4.09 11.65 20.25 7.58 4.11 11.17 20.50 7.61 4.13 10.87 20.75 7.64 4.15 10.72 21.00 7.66 4.17 10.61 21.25 7.68 4.19 10.52 21.50 7.71 4.22 10.42 21.75 7.73 4.24 10.32 22.00 7.76 4.26 10.23 22.25 7.78 4.28 10.13 22.50 7.80 4.30 10.03 22.75 7.83 4.32 9.93 23.00 7.85 4.34 9.83 23.25 7.87 4.36 9.74 23.50 7.90 4.37 9.64 23.75 7.92 4.39 9.54 24.00 7.94 4.41 9.44 Existing Conditions Type 1124-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 3: DA3 Runoff = 473.29 cfs @ 12.16 hrs, Volume= 38.573 af, Depth> 4.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 63.990 80 Liner 16.446 70 Woods, Good, HSG C 1.140 74 >75% Grass cover, Good, HSG C 10.964 55 Woods, Good, HSG B 0.760 61 >75% Grass cover, Good, HSG B 93.300 75 Weighted Average 93.300 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 100 0.0753 0.13 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 8.4 584 0.0541 1.16 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 2.3 973 0.0186 7.13 1,426.77 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=4.00' Z= 13.0 & 12.0'/' Top.W=100.00' n= 0.045 23.1 1,657 Total 500 450 400 350 300 3 250 0 u- 200 150 100 50 0 Subcatchment 3: DA3 Hydrograph 473.29 cfs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Runoff Area=93.300 ac Runoff Volume=38.573 of Runoff Depth>4.96" Flow Length=1,657' Tc=23.1 min CN=75 L 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 8 Hydrograph for Subcatchment 3: DA3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.04 6.75 0.75 0.00 0.24 7.00 0.79 0.00 0.54 7.25 0.83 0.01 0.87 7.50 0.87 0.01 1.22 7.75 0.91 0.02 1.58 8.00 0.95 0.02 1.95 8.25 1.00 0.03 2.35 8.50 1.05 0.04 2.91 8.75 1.11 0.05 3.63 9.00 1.17 0.07 4.47 9.25 1.23 0.08 5.38 9.50 1.29 0.10 6.13 9.75 1.36 0.12 6.79 10.00 1.44 0.14 7.93 10.25 1.52 0.17 9.52 10.50 1.62 0.21 11.64 10.75 1.73 0.26 14.31 11.00 1.87 0.32 18.03 11.25 2.03 0.40 23.02 11.50 2.25 0.51 31.57 11.75 3.07 1.01 61.41 12.00 5.26 2.67 291.58 12.25 5.61 2.95 413.42 12.50 5.84 3.14 167.44 12.75 6.00 3.28 84.98 13.00 6.13 3.39 55.90 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 3.49 43.29 13.50 6.34 3.58 36.99 13.75 6.43 3.65 32.34 14.00 6.51 3.72 28.64 14.25 6.58 3.78 25.52 14.50 6.65 3.84 23.59 14.75 6.72 3.90 22.33 15.00 6.78 3.95 21.20 15.25 6.83 4.00 20.09 15.50 6.89 4.05 18.98 15.75 6.94 4.10 17.86 16.00 6.99 4.14 16.74 16.25 7.03 4.18 15.67 16.50 7.08 4.22 14.98 16.75 7.12 4.25 14.53 17.00 7.16 4.29 14.12 17.25 7.20 4.33 13.72 17.50 7.24 4.36 13.32 17.75 7.28 4.39 12.92 18.00 7.31 4.43 12.52 18.25 7.35 4.46 12.12 18.50 7.38 4.49 11.71 18.75 7.41 4.52 11.31 19.00 7.45 4.54 10.90 19.25 7.48 4.57 10.49 19.50 7.50 4.60 10.09 19.75 7.53 4.62 9.68 20.00 7.56 4.65 9.27 20.25 7.58 4.67 8.88 20.50 7.61 4.69 8.67 20.75 7.64 4.71 8.56 21.00 7.66 4.74 8.48 21.25 7.68 4.76 8.40 21.50 7.71 4.78 8.32 21.75 7.73 4.80 8.24 22.00 7.76 4.82 8.16 22.25 7.78 4.84 8.08 22.50 7.80 4.87 8.00 22.75 7.83 4.89 7.92 23.00 7.85 4.91 7.84 23.25 7.87 4.93 7.76 23.50 7.90 4.95 7.68 23.75 7.92 4.97 7.60 24.00 7.94 4.99 7.52 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 4: DA4 Runoff = 481.89 cfs @ 11.95 hrs, Volume= 23.460 af, Depth> 5.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 35.330 80 Liner 8.930 98 Water Surface, HSG C 2.574 70 Woods, Good, HSG C 1.716 55 Woods, Good, HSG B 48.550 82 Weighted Average 39.620 81.61 % Pervious Area 8.930 18.39% Impervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 1.8 100 0.0685 0.91 Sheet Flow, n= 0.035 P2= 3.31 " 1.4 559 0.0563 6.76 188.50 Channel Flow, Area= 27.9 sf Perim= 50.8' r= 0.55' n= 0.035 3.2 500 450 400 350 300 0 250 " 200 150 100 50 0 659 Total, Increased to minimum Tc = 5.0 min Subcatchment 4: DA4 Hydrograph 481.89 cfs Type II 24-hr 100�year - 24 hrs Rainfall=7.94" Run ffArea�-48.550 ac Runoff IVolume=23.460 of Runoff Depth>5.80" 7 -1 r- Flow Length=659' Tc=5.0 min CN=82 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 10 Hydrograph for Subcatchment 4: DA4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.11 5.00 0.50 0.00 0.28 5.25 0.53 0.00 0.46 5.50 0.57 0.01 0.64 5.75 0.60 0.01 0.84 6.00 0.64 0.02 1.04 6.25 0.67 0.02 1.25 6.50 0.71 0.03 1.46 6.75 0.75 0.04 1.68 7.00 0.79 0.05 1.91 7.25 0.83 0.06 2.14 7.50 0.87 0.07 2.37 7.75 0.91 0.08 2.62 8.00 0.95 0.10 2.86 8.25 1.00 0.11 3.31 8.50 1.05 0.13 3.88 8.75 1.11 0.16 4.52 9.00 1.17 0.18 5.20 9.25 1.23 0.21 5.63 9.50 1.29 0.24 5.91 9.75 1.36 0.27 6.72 10.00 1.44 0.31 7.84 10.25 1.52 0.36 9.34 10.50 1.62 0.41 11.10 10.75 1.73 0.48 13.64 11.00 1.87 0.56 16.71 11.25 2.03 0.67 22.53 11.50 2.25 0.82 30.14 11.75 3.07 1.44 156.36 12.00 5.26 3.32 409.05 12.25 5.61 3.63 57.21 12.50 5.84 3.84 37.21 12.75 6.00 3.98 27.87 13.00 6.13 4.11 23.29 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 4.21 20.17 13.50 6.34 4.30 17.70 13.75 6.43 4.39 15.70 14.00 6.51 4.46 13.92 14.25 6.58 4.53 12.94 14.50 6.65 4.59 12.32 14.75 6.72 4.65 11.71 15.00 6.78 4.71 11.08 15.25 6.83 4.76 10.46 15.50 6.89 4.81 9.83 15.75 6.94 4.86 9.20 16.00 6.99 4.90 8.57 16.25 7.03 4.95 8.22 16.50 7.08 4.99 8.00 16.75 7.12 5.03 7.78 17.00 7.16 5.07 7.55 17.25 7.20 5.10 7.33 17.50 7.24 5.14 7.11 17.75 7.28 5.18 6.88 18.00 7.31 5.21 6.66 18.25 7.35 5.24 6.43 18.50 7.38 5.27 6.20 18.75 7.41 5.31 5.98 19.00 7.45 5.34 5.75 19.25 7.48 5.36 5.53 19.50 7.50 5.39 5.30 19.75 7.53 5.42 5.07 20.00 7.56 5.44 4.84 20.25 7.58 5.47 4.74 20.50 7.61 5.49 4.70 20.75 7.64 5.51 4.65 21.00 7.66 5.54 4.61 21.25 7.68 5.56 4.56 21.50 7.71 5.58 4.52 21.75 7.73 5.61 4.47 22.00 7.76 5.63 4.43 22.25 7.78 5.65 4.39 22.50 7.80 5.67 4.34 22.75 7.83 5.70 4.30 23.00 7.85 5.72 4.25 23.25 7.87 5.74 4.21 23.50 7.90 5.76 4.16 23.75 7.92 5.78 4.12 24.00 7.94 5.80 4.06 Existing Conditions Type 1124-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 5: DA5 Runoff = 321.66 cfs @ 12.12 hrs, Volume= 23.744 af, Depth> 4.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 12.312 70 Woods, Good, HSG C 35.810 80 Liner 1.448 74 >75% Grass cover, Good, HSG C 8.208 55 Woods, Good, HSG B 0.965 61 >75% Grass cover, Good, HSG B 58.743 74 Weighted Average 58.743 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.7 100 0.0884 0.14 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 6.4 611 0.0517 1.59 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 1.3 846 0.0338 11.16 3,347.11 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=5.00' Z= 11.0 & 13.0'/' Top.W=120.00' n= 0.045 19.4 1,557 Total 350 1 250 200 3 F 150 100 50 0 Subcatchment 5: DA5 Hydrograph 321.66 cis Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Runoff Area=58.743 ac Runoff Volume=23.744 of Runoff Depth>4.85" Flow Length=1,557' Tc=19.4 min CN=74 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 12 Hydrograph for Subcatchment 5: DA5 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.04 7.00 0.79 0.00 0.19 7.25 0.83 0.00 0.39 7.50 0.87 0.01 0.60 7.75 0.91 0.01 0.82 8.00 0.95 0.02 1.05 8.25 1.00 0.02 1.30 8.50 1.05 0.03 1.65 8.75 1.11 0.04 2.10 9.00 1.17 0.05 2.61 9.25 1.23 0.07 3.16 9.50 1.29 0.09 3.59 9.75 1.36 0.10 4.02 10.00 1.44 0.13 4.78 10.25 1.52 0.16 5.79 10.50 1.62 0.19 7.15 10.75 1.73 0.23 8.85 11.00 1.87 0.29 11.26 11.25 2.03 0.37 14.54 11.50 2.25 0.47 20.28 11.75 3.07 0.95 45.60 12.00 5.26 2.58 228.82 12.25 5.61 2.86 226.89 12.50 5.84 3.05 82.49 12.75 6.00 3.18 43.92 13.00 6.13 3.29 31.16 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 3.39 25.62 13.50 6.34 3.48 22.21 13.75 6.43 3.55 19.50 14.00 6.51 3.62 17.32 14.25 6.58 3.68 15.48 14.50 6.65 3.74 14.45 14.75 6.72 3.80 13.72 15.00 6.78 3.85 13.04 15.25 6.83 3.90 12.35 15.50 6.89 3.95 11.66 15.75 6.94 3.99 10.97 16.00 6.99 4.03 10.27 16.25 7.03 4.07 9.62 16.50 7.08 4.11 9.25 16.75 7.12 4.15 8.99 17.00 7.16 4.18 8.74 17.25 7.20 4.22 8.49 17.50 7.24 4.25 8.25 17.75 7.28 4.28 8.00 18.00 7.31 4.32 7.75 18.25 7.35 4.35 7.50 18.50 7.38 4.38 7.24 18.75 7.41 4.41 6.99 19.00 7.45 4.43 6.74 19.25 7.48 4.46 6.48 19.50 7.50 4.49 6.23 19.75 7.53 4.51 5.98 20.00 7.56 4.53 5.72 20.25 7.58 4.56 5.49 20.50 7.61 4.58 5.38 20.75 7.64 4.60 5.33 21.00 7.66 4.62 5.28 21.25 7.68 4.64 5.23 21.50 7.71 4.67 5.18 21.75 7.73 4.69 5.13 22.00 7.76 4.71 5.08 22.25 7.78 4.73 5.03 22.50 7.80 4.75 4.98 22.75 7.83 4.77 4.93 23.00 7.85 4.79 4.88 23.25 7.87 4.81 4.83 23.50 7.90 4.83 4.78 23.75 7.92 4.85 4.73 24.00 7.94 4.87 4.68 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 6: DA6 Runoff = 133.12 cfs @ 12.04 hrs, Volume= 8.029 af, Depth> 4.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 4.248 70 Woods, Good, HSG C 12.750 80 liner 2.832 55 Woods, Good, HSG B 19.830 74 Weighted Average 19.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.6 100 0.1265 0.36 Sheet Flow, Grass: Short n= 0.150 P2= 3.31" 8.1 675 0.0389 1.38 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fDs 12.7 775 Total 140 120 100 80 3 ,0 60 40 20 0 Subcatchment 6: DA6 Hydrograph 133.12 cfs Typo II 24-hr 100 years - 24 hrs Rainfall=7.94" Runoff Area=19.830 ac Runoff Volume=8.029 of Runoff Depth>4.86" Flout Length=7751 Tc=12.7 min CN=J4 L 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 14 Hydrograph for Subcatchment 6: DA6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.03 7.00 0.79 0.00 0.09 7.25 0.83 0.00 0.16 7.50 0.87 0.01 0.23 7.75 0.91 0.01 0.31 8.00 0.95 0.02 0.39 8.25 1.00 0.02 0.48 8.50 1.05 0.03 0.61 8.75 1.11 0.04 0.77 9.00 1.17 0.05 0.96 9.25 1.23 0.07 1.14 9.50 1.29 0.09 1.27 9.75 1.36 0.10 1.44 10.00 1.44 0.13 1.74 10.25 1.52 0.16 2.12 10.50 1.62 0.19 2.62 10.75 1.73 0.23 3.27 11.00 1.87 0.29 4.18 11.25 2.03 0.37 5.52 11.50 2.25 0.47 7.78 11.75 3.07 0.95 25.62 12.00 5.26 2.58 122.56 12.25 5.61 2.86 43.67 12.50 5.84 3.05 18.33 12.75 6.00 3.18 11.62 13.00 6.13 3.29 9.53 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 3.39 8.05 13.50 6.34 3.48 7.09 13.75 6.43 3.55 6.24 14.00 6.51 3.62 5.56 14.25 6.58 3.68 5.03 14.50 6.65 3.74 4.77 14.75 6.72 3.80 4.54 15.00 6.78 3.85 4.30 15.25 6.83 3.90 4.07 15.50 6.89 3.95 3.84 15.75 6.94 3.99 3.60 16.00 6.99 4.03 3.37 16.25 7.03 4.07 3.18 16.50 7.08 4.11 3.08 16.75 7.12 4.15 3.00 17.00 7.16 4.18 2.92 17.25 7.20 4.22 2.83 17.50 7.24 4.25 2.75 17.75 7.28 4.28 2.66 18.00 7.31 4.32 2.58 18.25 7.35 4.35 2.50 18.50 7.38 4.38 2.41 18.75 7.41 4.41 2.32 19.00 7.45 4.43 2.24 19.25 7.48 4.46 2.15 19.50 7.50 4.49 2.07 19.75 7.53 4.51 1.98 20.00 7.56 4.53 1.89 20.25 7.58 4.56 1.83 20.50 7.61 4.58 1.81 20.75 7.64 4.60 1.79 21.00 7.66 4.62 1.77 21.25 7.68 4.64 1.76 21.50 7.71 4.67 1.74 21.75 7.73 4.69 1.72 22.00 7.76 4.71 1.71 22.25 7.78 4.73 1.69 22.50 7.80 4.75 1.67 22.75 7.83 4.77 1.66 23.00 7.85 4.79 1.64 23.25 7.87 4.81 1.62 23.50 7.90 4.83 1.61 23.75 7.92 4.85 1.59 24.00 7.94 4.87 1.57 Existing Conditions Type 1124-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n o1089 ©2017 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 7: DA7 Runoff = 366.57 cfs @ 12.30 hrs, Volume= 39.286 af, Depth> 5.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Adj Description 52.705 80 Liner 20.490 98 Unconnected pavement, HSG C 7.275 70 Woods, Good, HSG C 4.850 55 Woods, Good, HSG B 85.320 82 80 Weighted Average, UI Adjusted 64.830 75.98% Pervious Area 20.490 24.02% Impervious Area 20.490 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.9 100 0.1054 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 24.2 1,471 0.0410 1.01 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.3 154 0.0430 8.97 1,936.85 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=3.00' Z= 15.0 & 33.0'/' Top.W=144.00' n= 0.045 35.4 1,725 Total Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 16 Subcatchment 7: DA7 Hydrograph 400 350 300 250 3 200 0 " 150 100 50 0 366.57 cfs Type II 24-hr 1 - 4- 100 years - 24 hrs Rainfall=7.94" Runoff Area=85.320 ac - L Runoff Volume=39.286 of Runoff Depth>5.53" Flow Length=1,725' Tc=35.4 min UI Adjusted CN=80 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 17 Hydrograph for Subcatchment 7: DA7 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.01 5.50 0.57 0.00 0.08 5.75 0.60 0.00 0.28 6.00 0.64 0.01 0.55 6.25 0.67 0.01 0.85 6.50 0.71 0.02 1.18 6.75 0.75 0.02 1.51 7.00 0.79 0.03 1.86 7.25 0.83 0.04 2.22 7.50 0.87 0.05 2.60 7.75 0.91 0.06 2.98 8.00 0.95 0.07 3.37 8.25 1.00 0.08 3.78 8.50 1.05 0.10 4.31 8.75 1.11 0.12 5.04 9.00 1.17 0.14 5.94 9.25 1.23 0.17 6.94 9.50 1.29 0.19 7.87 9.75 1.36 0.22 8.59 10.00 1.44 0.26 9.49 10.25 1.52 0.30 10.91 10.50 1.62 0.35 12.85 10.75 1.73 0.41 15.34 11.00 1.87 0.48 18.62 11.25 2.03 0.58 23.00 11.50 2.25 0.72 29.67 11.75 3.07 1.30 44.92 12.00 5.26 3.12 148.10 12.25 5.61 3.43 358.11 12.50 5.84 3.63 280.80 12.75 6.00 3.78 148.51 13.00 6.13 3.90 87.08 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 4.00 58.62 13.50 6.34 4.09 44.39 13.75 6.43 4.17 36.14 14.00 6.51 4.25 30.69 14.25 6.58 4.31 27.05 14.50 6.65 4.37 24.35 14.75 6.72 4.43 22.60 15.00 6.78 4.49 21.29 15.25 6.83 4.54 20.13 15.50 6.89 4.59 19.03 15.75 6.94 4.64 17.95 16.00 6.99 4.68 16.88 16.25 7.03 4.72 15.81 16.50 7.08 4.76 14.91 16.75 7.12 4.80 14.30 17.00 7.16 4.84 13.84 17.25 7.20 4.88 13.43 17.50 7.24 4.92 13.04 17.75 7.28 4.95 12.65 18.00 7.31 4.98 12.26 18.25 7.35 5.02 11.87 18.50 7.38 5.05 11.48 18.75 7.41 5.08 11.09 19.00 7.45 5.11 10.71 19.25 7.48 5.14 10.31 19.50 7.50 5.16 9.92 19.75 7.53 5.19 9.52 20.00 7.56 5.21 9.13 20.25 7.58 5.24 8.75 20.50 7.61 5.26 8.44 20.75 7.64 5.28 8.26 21.00 7.66 5.31 8.15 21.25 7.68 5.33 8.06 21.50 7.71 5.35 7.98 21.75 7.73 5.38 7.91 22.00 7.76 5.40 7.83 22.25 7.78 5.42 7.75 22.50 7.80 5.44 7.67 22.75 7.83 5.46 7.60 23.00 7.85 5.49 7.52 23.25 7.87 5.51 7.44 23.50 7.90 5.53 7.36 23.75 7.92 5.55 7.28 24.00 7.94 5.57 7.21 Existing Conditions Type 1124-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 8: DA8 Runoff = 317.22 cfs @ 12.17 hrs, Volume= 26.227 af, Depth> 4.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 12.770 80 Liner 2.290 98 Water Surface, HSG C 36.360 70 Woods, Good, HSG C 24.240 55 Woods, Good, HSG B 75.660 68 Weighted Average 73.370 96.97% Pervious Area 2.290 3.03% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.4 100 0.0620 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 9.4 753 0.0714 1.34 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.9 390 0.0293 7.40 1,849.03 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=3.00' Z= 33.0 & 22.5 '/' Top.W=166.50' n= 0.045 23.7 1,243 Total 350 1 W 200 3 150 u- �7% 0 Subcatchment 8: DA8 Hydrograph 317.22 cfs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Runoff Area=75.660 ac Runoff Volume=26.227 of Runoff Depth>4.16" Flow Length=1,243' Tc=23.7 min CN=68 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 19 Hydrograph for Subcatchment 8: DA8 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.04 8.50 1.05 0.00 0.25 8.75 1.11 0.01 0.57 9.00 1.17 0.01 0.99 9.25 1.23 0.02 1.48 9.50 1.29 0.02 1.96 9.75 1.36 0.03 2.43 10.00 1.44 0.05 3.09 10.25 1.52 0.06 3.99 10.50 1.62 0.09 5.19 10.75 1.73 0.11 6.75 11.00 1.87 0.15 8.94 11.25 2.03 0.21 11.96 11.50 2.25 0.28 17.14 11.75 3.07 0.66 34.75 12.00 5.26 2.07 181.54 12.25 5.61 2.32 287.00 12.50 5.84 2.50 122.02 12.75 6.00 2.62 62.87 13.00 6.13 2.72 41.38 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.81 32.00 13.50 6.34 2.89 27.29 13.75 6.43 2.96 23.90 14.00 6.51 3.02 21.19 14.25 6.58 3.08 18.91 14.50 6.65 3.13 17.47 14.75 6.72 3.18 16.55 15.00 6.78 3.23 15.73 15.25 6.83 3.28 14.92 15.50 6.89 3.32 14.12 15.75 6.94 3.36 13.30 16.00 6.99 3.40 12.48 16.25 7.03 3.44 11.69 16.50 7.08 3.47 11.17 16.75 7.12 3.51 10.84 17.00 7.16 3.54 10.54 17.25 7.20 3.57 10.25 17.50 7.24 3.60 9.96 17.75 7.28 3.64 9.66 18.00 7.31 3.66 9.37 18.25 7.35 3.69 9.07 18.50 7.38 3.72 8.78 18.75 7.41 3.75 8.48 19.00 7.45 3.77 8.18 19.25 7.48 3.80 7.88 19.50 7.50 3.82 7.57 19.75 7.53 3.85 7.27 20.00 7.56 3.87 6.96 20.25 7.58 3.89 6.67 20.50 7.61 3.91 6.51 20.75 7.64 3.93 6.43 21.00 7.66 3.95 6.37 21.25 7.68 3.97 6.31 21.50 7.71 3.99 6.26 21.75 7.73 4.01 6.20 22.00 7.76 4.03 6.14 22.25 7.78 4.05 6.08 22.50 7.80 4.07 6.03 22.75 7.83 4.09 5.97 23.00 7.85 4.11 5.91 23.25 7.87 4.13 5.85 23.50 7.90 4.15 5.79 23.75 7.92 4.17 5.73 24.00 7.94 4.18 5.67 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n o1089 ©2017 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 8S: DA18 Runoff = 195.32 cfs @ 12.06 hrs, Volume= 12.677 af, Depth> 5.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 8.820 80 Landfill 6.006 70 Woods, Good, HSG C 9.770 91 Urban industrial, 72% imp, HSG C 4.004 55 Woods, Good, HSG B 28.600 78 Weighted Average 21.566 75.40% Pervious Area 7.034 24.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.6 100 0.3300 0.36 Sheet Flow, Grass: Dense n= 0.240 P2= 3.31" 7.6 565 0.0620 1.24 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 1.5 823 0.0240 9.13 328.81 Channel Flow, Area= 36.0 sf Perim= 22.0' r= 1.64' n= 0.035 1.0 624 0.0320 10.55 379.68 Channel Flow, Area= 36.0 sf Perim= 22.0' r= 1.64' n= 0.035 14.7 2,112 Total Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 21 Subcatchment 8S: DA18 Hydrograph 200 180 160 140 120 0 100 80 60 40 20 0 11=74'9' 2 cfs Type- II 24-hr _ _ 100 years - 24 hrs Rainf— Runoff Area=28.600 ac Runoff Volume=12.677 Runoff Depth>5.3�2" Flow-Length=2; 12'-t Tc=14.7 min CN=78 L -1 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 22 Hydrograph for Subcatchment 8S: DA18 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.02 6.00 0.64 0.00 0.11 6.25 0.67 0.00 0.21 6.50 0.71 0.01 0.32 6.75 0.75 0.01 0.42 7.00 0.79 0.02 0.54 7.25 0.83 0.02 0.66 7.50 0.87 0.03 0.78 7.75 0.91 0.04 0.90 8.00 0.95 0.05 1.03 8.25 1.00 0.06 1.18 8.50 1.05 0.07 1.43 8.75 1.11 0.09 1.71 9.00 1.17 0.11 2.04 9.25 1.23 0.13 2.35 9.50 1.29 0.15 2.55 9.75 1.36 0.18 2.80 10.00 1.44 0.21 3.29 10.25 1.52 0.24 3.92 10.50 1.62 0.29 4.76 10.75 1.73 0.34 5.80 11.00 1.87 0.41 7.27 11.25 2.03 0.50 9.34 11.50 2.25 0.63 12.91 11.75 3.07 1.18 36.17 12.00 5.26 2.94 169.30 12.25 5.61 3.23 83.19 12.50 5.84 3.43 31.36 12.75 6.00 3.58 18.50 13.00 6.13 3.69 14.81 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 3.80 12.42 13.50 6.34 3.88 10.89 13.75 6.43 3.96 9.57 14.00 6.51 4.03 8.51 14.25 6.58 4.10 7.65 14.50 6.65 4.16 7.22 14.75 6.72 4.22 6.87 15.00 6.78 4.27 6.52 15.25 6.83 4.33 6.17 15.50 6.89 4.37 5.81 15.75 6.94 4.42 5.46 16.00 6.99 4.46 5.10 16.25 7.03 4.50 4.79 16.50 7.08 4.54 4.64 16.75 7.12 4.58 4.51 17.00 7.16 4.62 4.39 17.25 7.20 4.66 4.26 17.50 7.24 4.69 4.13 17.75 7.28 4.73 4.01 18.00 7.31 4.76 3.88 18.25 7.35 4.79 3.75 18.50 7.38 4.82 3.62 18.75 7.41 4.85 3.50 19.00 7.45 4.88 3.37 19.25 7.48 4.91 3.24 19.50 7.50 4.94 3.11 19.75 7.53 4.96 2.98 20.00 7.56 4.98 2.85 20.25 7.58 5.01 2.74 20.50 7.61 5.03 2.70 20.75 7.64 5.05 2.68 21.00 7.66 5.08 2.65 21.25 7.68 5.10 2.63 21.50 7.71 5.12 2.60 21.75 7.73 5.15 2.58 22.00 7.76 5.17 2.55 22.25 7.78 5.19 2.53 22.50 7.80 5.21 2.50 22.75 7.83 5.23 2.48 23.00 7.85 5.25 2.45 23.25 7.87 5.27 2.43 23.50 7.90 5.29 2.40 23.75 7.92 5.32 2.38 24.00 7.94 5.34 2.35 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 9: DA9 Runoff = 19.74 cfs @ 12.00 hrs, Volume= 1.072 af, Depth> 5.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 2.314 80 Liner 2.314 100.00% Pervious Area Tc Length (min) (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 5.8 100 0.0710 0.29 Sheet Flow, Grass: Short n= 0.150 P2= 3.31" 3.1 765 0.0775 4.18 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fos 8.9 865 Total 1 Subcatchment 9: DA9 Hydrograph 19.74 cfs hype II 14-hr 1Q0 yeas - 24 hrs R infall=7.94" - -Runoff Area=2.314 ac IRunoflf Volu a=1.072 of T Runoffepth>5.56" T T T IRow "ngth=8W Tc=8.9 min T T T T CN=80 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 24 Hydrograph for Subcatchment 9: DA9 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.01 5.75 0.60 0.00 0.02 6.00 0.64 0.01 0.03 6.25 0.67 0.01 0.04 6.50 0.71 0.02 0.05 6.75 0.75 0.02 0.06 7.00 0.79 0.03 0.07 7.25 0.83 0.04 0.08 7.50 0.87 0.05 0.09 7.75 0.91 0.06 0.10 8.00 0.95 0.07 0.11 8.25 1.00 0.08 0.13 8.50 1.05 0.10 0.15 8.75 1.11 0.12 0.18 9.00 1.17 0.14 0.21 9.25 1.23 0.17 0.23 9.50 1.29 0.19 0.24 9.75 1.36 0.22 0.27 10.00 1.44 0.26 0.32 10.25 1.52 0.30 0.38 10.50 1.62 0.35 0.46 10.75 1.73 0.41 0.56 11.00 1.87 0.48 0.70 11.25 2.03 0.58 0.92 11.50 2.25 0.72 1.25 11.75 3.07 1.30 5.12 12.00 5.26 3.12 19.74 12.25 5.61 3.43 3.56 12.50 5.84 3.63 1.96 12.75 6.00 3.78 1.36 13.00 6.13 3.90 1.14 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 4.00 0.97 13.50 6.34 4.09 0.86 13.75 6.43 4.17 0.76 14.00 6.51 4.25 0.67 14.25 6.58 4.31 0.61 14.50 6.65 4.37 0.58 14.75 6.72 4.43 0.56 15.00 6.78 4.49 0.53 15.25 6.83 4.54 0.50 15.50 6.89 4.59 0.47 15.75 6.94 4.64 0.44 16.00 6.99 4.68 0.41 16.25 7.03 4.72 0.39 16.50 7.08 4.76 0.38 16.75 7.12 4.80 0.37 17.00 7.16 4.84 0.36 17.25 7.20 4.88 0.35 17.50 7.24 4.92 0.34 17.75 7.28 4.95 0.33 18.00 7.31 4.98 0.32 18.25 7.35 5.02 0.30 18.50 7.38 5.05 0.29 18.75 7.41 5.08 0.28 19.00 7.45 5.11 0.27 19.25 7.48 5.14 0.26 19.50 7.50 5.16 0.25 19.75 7.53 5.19 0.24 20.00 7.56 5.21 0.23 20.25 7.58 5.24 0.22 20.50 7.61 5.26 0.22 20.75 7.64 5.28 0.22 21.00 7.66 5.31 0.22 21.25 7.68 5.33 0.22 21.50 7.71 5.35 0.21 21.75 7.73 5.38 0.21 22.00 7.76 5.40 0.21 22.25 7.78 5.42 0.21 22.50 7.80 5.44 0.20 22.75 7.83 5.46 0.20 23.00 7.85 5.49 0.20 23.25 7.87 5.51 0.20 23.50 7.90 5.53 0.20 23.75 7.92 5.55 0.19 24.00 7.94 5.57 0.19 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 10: DA 10 Runoff = 156.18 cfs @ 12.02 hrs, Volume= 8.637 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 16.698 70 Woods, Good, HSG C 11.132 55 Woods, Good, HSG B 27.830 64 Weighted Average 27.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.2915 0.23 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 3.0 430 0.2216 2.35 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 10.2 530 Total 160 140 120 100 0 80 U- :1t .M 20 0-+ 0 Subcatchment 10: DA 10 Hydrograph 156.18 cfs Type II 24-11ir 100 rears-,24-hr 1Zainfaal=7-3,4" Runoff Area=27.830 ac Runr Volume=8.637 of Runoff Depth>3.72" Flo* Length=5301 Tc=10.2 min _ CN=44 T I 1 T T 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 26 Hydrograph for Subcatchment 10: DA 10 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.02 9.25 1.23 0.00 0.16 9.50 1.29 0.00 0.32 9.75 1.36 0.01 0.49 10.00 1.44 0.02 0.73 10.25 1.52 0.03 1.05 10.50 1.62 0.04 1.48 10.75 1.73 0.06 2.07 11.00 1.87 0.09 2.90 11.25 2.03 0.13 4.24 11.50 2.25 0.19 6.46 11.75 3.07 0.50 28.46 12.00 5.26 1.75 153.20 12.25 5.61 1.99 37.39 12.50 5.84 2.15 19.15 12.75 6.00 2.26 13.15 13.00 6.13 2.36 11.03 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 9.43 13.50 6.34 2.51 8.34 13.75 6.43 2.58 7.38 14.00 6.51 2.63 6.59 14.25 6.58 2.69 6.01 14.50 6.65 2.74 5.73 14.75 6.72 2.79 5.47 15.00 6.78 2.83 5.19 15.25 6.83 2.88 4.92 15.50 6.89 2.92 4.64 15.75 6.94 2.96 4.36 16.00 6.99 2.99 4.08 16.25 7.03 3.03 3.87 16.50 7.08 3.06 3.76 16.75 7.12 3.09 3.67 17.00 7.16 3.12 3.57 17.25 7.20 3.15 3.47 17.50 7.24 3.18 3.37 17.75 7.28 3.21 3.27 18.00 7.31 3.24 3.17 18.25 7.35 3.27 3.06 18.50 7.38 3.29 2.96 18.75 7.41 3.32 2.86 19.00 7.45 3.34 2.75 19.25 7.48 3.37 2.65 19.50 7.50 3.39 2.54 19.75 7.53 3.41 2.44 20.00 7.56 3.43 2.33 20.25 7.58 3.45 2.26 20.50 7.61 3.47 2.24 20.75 7.64 3.49 2.22 21.00 7.66 3.51 2.20 21.25 7.68 3.53 2.18 21.50 7.71 3.55 2.16 21.75 7.73 3.57 2.14 22.00 7.76 3.59 2.12 22.25 7.78 3.61 2.10 22.50 7.80 3.63 2.08 22.75 7.83 3.64 2.06 23.00 7.85 3.66 2.04 23.25 7.87 3.68 2.02 23.50 7.90 3.70 2.00 23.75 7.92 3.72 1.98 24.00 7.94 3.73 1.96 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 11: DA 11 Runoff = 229.53 cfs @ 12.23 hrs, Volume= 21.250 af, Depth> 3.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 41.298 70 Woods, Good, HSG C 27.532 55 Woods, Good, HSG B 68.830 64 Weighted Average 68.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.2 100 0.0542 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 13.9 1,342 0.1040 1.61 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 28.1 1,442 Total 240 220 200 180 160 140 0 120 FL 100 80 60 40 20 0 Subcatchment 11: DA 11 Hydrograph 229.53 cfs Type -ill 2". r - 100 ars� 2" Rainfall=79,4" Run ff Are=68.8'30 ac — Run�ff Volume=2I1.250 f Runoff [Ye-pth—>3.70— FloW Length=l-,442' Tc=28.1 min CN=44 1 7 7 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 28 Hydrograph for Subcatchment 11: DA 11 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.11 9.50 1.29 0.00 0.40 9.75 1.36 0.01 0.75 10.00 1.44 0.02 1.20 10.25 1.52 0.03 1.79 10.50 1.62 0.04 2.58 10.75 1.73 0.06 3.63 11.00 1.87 0.09 5.10 11.25 2.03 0.13 7.16 11.50 2.25 0.19 10.59 11.75 3.07 0.50 20.32 12.00 5.26 1.75 104.39 12.25 5.61 1.99 228.05 12.50 5.84 2.15 123.58 12.75 6.00 2.26 64.54 13.00 6.13 2.36 40.22 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 29.93 13.50 6.34 2.51 24.28 13.75 6.43 2.58 21.08 14.00 6.51 2.63 18.62 14.25 6.58 2.69 16.60 14.50 6.65 2.74 15.19 14.75 6.72 2.79 14.32 15.00 6.78 2.83 13.60 15.25 6.83 2.88 12.92 15.50 6.89 2.92 12.24 15.75 6.94 2.96 11.55 16.00 6.99 2.99 10.86 16.25 7.03 3.03 10.17 16.50 7.08 3.06 9.68 16.75 7.12 3.09 9.36 17.00 7.16 3.12 9.10 17.25 7.20 3.15 8.85 17.50 7.24 3.18 8.60 17.75 7.28 3.21 8.36 18.00 7.31 3.24 8.11 18.25 7.35 3.27 7.86 18.50 7.38 3.29 7.60 18.75 7.41 3.32 7.35 19.00 7.45 3.34 7.09 19.25 7.48 3.37 6.84 19.50 7.50 3.39 6.58 19.75 7.53 3.41 6.32 20.00 7.56 3.43 6.06 20.25 7.58 3.45 5.81 20.50 7.61 3.47 5.64 20.75 7.64 3.49 5.56 21.00 7.66 3.51 5.50 21.25 7.68 3.53 5.45 21.50 7.71 3.55 5.40 21.75 7.73 3.57 5.35 22.00 7.76 3.59 5.31 22.25 7.78 3.61 5.26 22.50 7.80 3.63 5.21 22.75 7.83 3.64 5.16 23.00 7.85 3.66 5.11 23.25 7.87 3.68 5.06 23.50 7.90 3.70 5.01 23.75 7.92 3.72 4.96 24.00 7.94 3.73 4.91 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 12: DA 12 Runoff = 112.70 cfs @ 12.08 hrs, Volume= 7.472 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 14.468 70 Woods, Good, HSG C 9.646 55 Woods, Good, HSG B 24.114 64 Weighted Average 24.114 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.9 100 0.1343 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 5.8 595 0.1187 1.72 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.7 695 Total 120 110 100 90 N 80 70 3 60 FZ 50 40 30 20 10 0 Subcatchment 12: DA 12 Hydrograph 112.70 cfs Type�ll 24-fir 100- tears — 24-hrs Rainfatl=7 ,4" Runoff Are=24.`IIU ac Runoff Volume=7I.472 aft Runoff Depth>3.72" Flow-Length=695' Tc=15.7 -min CN=64 T T T T T T — T 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 30 Hydrograph for Subcatchment 12: DA 12 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.01 9.25 1.23 0.00 0.10 9.50 1.29 0.00 0.23 9.75 1.36 0.01 0.37 10.00 1.44 0.02 0.56 10.25 1.52 0.03 0.81 10.50 1.62 0.04 1.15 10.75 1.73 0.06 1.61 11.00 1.87 0.09 2.26 11.25 2.03 0.13 3.22 11.50 2.25 0.19 4.91 11.75 3.07 0.50 14.94 12.00 5.26 1.75 89.59 12.25 5.61 1.99 57.26 12.50 5.84 2.15 21.97 12.75 6.00 2.26 12.93 13.00 6.13 2.36 10.21 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 8.59 13.50 6.34 2.51 7.55 13.75 6.43 2.58 6.66 14.00 6.51 2.63 5.94 14.25 6.58 2.69 5.35 14.50 6.65 2.74 5.05 14.75 6.72 2.79 4.81 15.00 6.78 2.83 4.58 15.25 6.83 2.88 4.34 15.50 6.89 2.92 4.10 15.75 6.94 2.96 3.86 16.00 6.99 2.99 3.62 16.25 7.03 3.03 3.40 16.50 7.08 3.06 3.29 16.75 7.12 3.09 3.21 17.00 7.16 3.12 3.12 17.25 7.20 3.15 3.03 17.50 7.24 3.18 2.95 17.75 7.28 3.21 2.86 18.00 7.31 3.24 2.77 18.25 7.35 3.27 2.68 18.50 7.38 3.29 2.60 18.75 7.41 3.32 2.51 19.00 7.45 3.34 2.42 19.25 7.48 3.37 2.33 19.50 7.50 3.39 2.24 19.75 7.53 3.41 2.14 20.00 7.56 3.43 2.05 20.25 7.58 3.45 1.98 20.50 7.61 3.47 1.95 20.75 7.64 3.49 1.93 21.00 7.66 3.51 1.91 21.25 7.68 3.53 1.90 21.50 7.71 3.55 1.88 21.75 7.73 3.57 1.86 22.00 7.76 3.59 1.85 22.25 7.78 3.61 1.83 22.50 7.80 3.63 1.81 22.75 7.83 3.64 1.79 23.00 7.85 3.66 1.78 23.25 7.87 3.68 1.76 23.50 7.90 3.70 1.74 23.75 7.92 3.72 1.72 24.00 7.94 3.73 1.71 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment 13: DA 13 Runoff = 133.38 cfs @ 12.25 hrs, Volume= 12.908 af, Depth> 3.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 25.102 70 Woods, Good, HSG C 16.734 55 Woods, Good, HSG B 41.836 64 Weighted Average 41.836 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.4 100 0.0936 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 18.7 1,561 0.0776 1.39 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 30.1 1,661 Total 140 120 100 80 3 rL 60 40 20 0 0 Subcatchment 13: DA 13 Hydrograph 133.38 cfs Type II 24-11ir 100 years - 24-hrsRainf� 1=7�4" Runoff Area=41.836 ac Runoff Volume=12.908 of Runoff Depth>3.70" Flow-Length=1,661' Tc=30.1 min C N 14 L I 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 32 Hydrograph for Subcatchment 13: DA 13 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.06 9.50 1.29 0.00 0.22 9.75 1.36 0.01 0.43 10.00 1.44 0.02 0.70 10.25 1.52 0.03 1.04 10.50 1.62 0.04 1.51 10.75 1.73 0.06 2.13 11.00 1.87 0.09 2.99 11.25 2.03 0.13 4.19 11.50 2.25 0.19 6.17 11.75 3.07 0.50 11.42 12.00 5.26 1.75 55.70 12.25 5.61 1.99 133.37 12.50 5.84 2.15 81.61 12.75 6.00 2.26 42.85 13.00 6.13 2.36 26.25 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 19.10 13.50 6.34 2.51 15.31 13.75 6.43 2.58 13.07 14.00 6.51 2.63 11.51 14.25 6.58 2.69 10.24 14.50 6.65 2.74 9.34 14.75 6.72 2.79 8.78 15.00 6.78 2.83 8.32 15.25 6.83 2.88 7.90 15.50 6.89 2.92 7.49 15.75 6.94 2.96 7.07 16.00 6.99 2.99 6.65 16.25 7.03 3.03 6.23 16.50 7.08 3.06 5.92 16.75 7.12 3.09 5.71 17.00 7.16 3.12 5.55 17.25 7.20 3.15 5.40 17.50 7.24 3.18 5.25 17.75 7.28 3.21 5.10 18.00 7.31 3.24 4.94 18.25 7.35 3.27 4.79 18.50 7.38 3.29 4.64 18.75 7.41 3.32 4.49 19.00 7.45 3.34 4.33 19.25 7.48 3.37 4.17 19.50 7.50 3.39 4.02 19.75 7.53 3.41 3.86 20.00 7.56 3.43 3.70 20.25 7.58 3.45 3.55 20.50 7.61 3.47 3.44 20.75 7.64 3.49 3.38 21.00 7.66 3.51 3.35 21.25 7.68 3.53 3.32 21.50 7.71 3.55 3.29 21.75 7.73 3.57 3.26 22.00 7.76 3.59 3.23 22.25 7.78 3.61 3.20 22.50 7.80 3.63 3.17 22.75 7.83 3.64 3.14 23.00 7.85 3.66 3.11 23.25 7.87 3.68 3.08 23.50 7.90 3.70 3.05 23.75 7.92 3.72 3.02 24.00 7.94 3.73 2.99 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment 14: DA 14 Runoff = 4.92 cfs @ 12.08 hrs, Volume= 0.326 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 0.632 70 Woods, Good, HSG C 0.421 55 Woods, Good, HSG B 1.053 64 Weighted Average 1.053 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.3 100 0.0630 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 2.4 229 0.1036 1.61 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.7 329 Total 3 3 0 2 il Subcatchment 14: DA 14 Hydrograph 4.92 cfs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Runoff Area=1.053 ac Runoff Volume=0.326 of Runoff Depth>3.72" Flow Length=329' Tc=15.7 min CN=64 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 34 Hydrograph for Subcatchment 14: DA 14 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.00 9.50 1.29 0.00 0.01 9.75 1.36 0.01 0.02 10.00 1.44 0.02 0.02 10.25 1.52 0.03 0.04 10.50 1.62 0.04 0.05 10.75 1.73 0.06 0.07 11.00 1.87 0.09 0.10 11.25 2.03 0.13 0.14 11.50 2.25 0.19 0.21 11.75 3.07 0.50 0.65 12.00 5.26 1.75 3.91 12.25 5.61 1.99 2.50 12.50 5.84 2.15 0.96 12.75 6.00 2.26 0.56 13.00 6.13 2.36 0.45 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 0.38 13.50 6.34 2.51 0.33 13.75 6.43 2.58 0.29 14.00 6.51 2.63 0.26 14.25 6.58 2.69 0.23 14.50 6.65 2.74 0.22 14.75 6.72 2.79 0.21 15.00 6.78 2.83 0.20 15.25 6.83 2.88 0.19 15.50 6.89 2.92 0.18 15.75 6.94 2.96 0.17 16.00 6.99 2.99 0.16 16.25 7.03 3.03 0.15 16.50 7.08 3.06 0.14 16.75 7.12 3.09 0.14 17.00 7.16 3.12 0.14 17.25 7.20 3.15 0.13 17.50 7.24 3.18 0.13 17.75 7.28 3.21 0.12 18.00 7.31 3.24 0.12 18.25 7.35 3.27 0.12 18.50 7.38 3.29 0.11 18.75 7.41 3.32 0.11 19.00 7.45 3.34 0.11 19.25 7.48 3.37 0.10 19.50 7.50 3.39 0.10 19.75 7.53 3.41 0.09 20.00 7.56 3.43 0.09 20.25 7.58 3.45 0.09 20.50 7.61 3.47 0.09 20.75 7.64 3.49 0.08 21.00 7.66 3.51 0.08 21.25 7.68 3.53 0.08 21.50 7.71 3.55 0.08 21.75 7.73 3.57 0.08 22.00 7.76 3.59 0.08 22.25 7.78 3.61 0.08 22.50 7.80 3.63 0.08 22.75 7.83 3.64 0.08 23.00 7.85 3.66 0.08 23.25 7.87 3.68 0.08 23.50 7.90 3.70 0.08 23.75 7.92 3.72 0.08 24.00 7.94 3.73 0.07 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment 15: DA 15 Runoff = 37.71 cfs @ 12.04 hrs, Volume= 2.214 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 4.282 70 Woods, Good, HSG C 2.855 55 Woods, Good, HSG B 7.137 64 Weighted Average 7.137 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 100 0.2842 0.23 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 4.8 532 0.1367 1.85 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 12.1 632 Total 4 3 3 Subcatchment 15: DA 15 Hydrograph 37.71 cfs Type II 24-h r 100 ears - 24 hrsl Rainf111=7.94 " -Ruzff Are 7.13Zac Run?ff Volume=2.214 of -Runoff Depth->3.7 Flo* Length=632'I Tc=12.1 min — — — — - - - CN=64 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 36 Hydrograph for Subcatchment 15: DA 15 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.04 9.50 1.29 0.00 0.08 9.75 1.36 0.01 0.12 10.00 1.44 0.02 0.18 10.25 1.52 0.03 0.26 10.50 1.62 0.04 0.37 10.75 1.73 0.06 0.51 11.00 1.87 0.09 0.72 11.25 2.03 0.13 1.04 11.50 2.25 0.19 1.58 11.75 3.07 0.50 6.09 12.00 5.26 1.75 34.68 12.25 5.61 1.99 11.88 12.50 5.84 2.15 5.34 12.75 6.00 2.26 3.49 13.00 6.13 2.36 2.89 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 2.46 13.50 6.34 2.51 2.17 13.75 6.43 2.58 1.92 14.00 6.51 2.63 1.71 14.25 6.58 2.69 1.55 14.50 6.65 2.74 1.48 14.75 6.72 2.79 1.41 15.00 6.78 2.83 1.34 15.25 6.83 2.88 1.27 15.50 6.89 2.92 1.20 15.75 6.94 2.96 1.13 16.00 6.99 2.99 1.05 16.25 7.03 3.03 1.00 16.50 7.08 3.06 0.97 16.75 7.12 3.09 0.94 17.00 7.16 3.12 0.92 17.25 7.20 3.15 0.89 17.50 7.24 3.18 0.87 17.75 7.28 3.21 0.84 18.00 7.31 3.24 0.81 18.25 7.35 3.27 0.79 18.50 7.38 3.29 0.76 18.75 7.41 3.32 0.74 19.00 7.45 3.34 0.71 19.25 7.48 3.37 0.68 19.50 7.50 3.39 0.66 19.75 7.53 3.41 0.63 20.00 7.56 3.43 0.60 20.25 7.58 3.45 0.58 20.50 7.61 3.47 0.58 20.75 7.64 3.49 0.57 21.00 7.66 3.51 0.57 21.25 7.68 3.53 0.56 21.50 7.71 3.55 0.56 21.75 7.73 3.57 0.55 22.00 7.76 3.59 0.55 22.25 7.78 3.61 0.54 22.50 7.80 3.63 0.53 22.75 7.83 3.64 0.53 23.00 7.85 3.66 0.52 23.25 7.87 3.68 0.52 23.50 7.90 3.70 0.51 23.75 7.92 3.72 0.51 24.00 7.94 3.73 0.50 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 16: DA 16 Runoff = 6.30 cfs @ 12.01 hrs, Volume= 0.341 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 0.660 70 Woods, Good, HSG C 0.440 55 Woods, Good, HSG B 1.100 64 Weighted Average 1.100 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.4 100 0.2027 0.20 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 1.3 80 0.0443 1.05 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.7 180 Total 7 6 5-- 4- 2 3 U- 2 1 0 0 Subcatchment 16: DA 16 Hydrograph 6.30 cfs Type II 24-hr 100 years - 24 hrsl Rainfa11=7.94" Runoff Areaa=1.100 ac Runoff Volume=0:341 of Runoff Depth>3.72" Flow Length=180'I Tc=9.7 min EN=64 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 38 Hydrograph for Subcatchment 16: DA 16 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.01 9.50 1.29 0.00 0.01 9.75 1.36 0.01 0.02 10.00 1.44 0.02 0.03 10.25 1.52 0.03 0.04 10.50 1.62 0.04 0.06 10.75 1.73 0.06 0.08 11.00 1.87 0.09 0.12 11.25 2.03 0.13 0.17 11.50 2.25 0.19 0.26 11.75 3.07 0.50 1.18 12.00 5.26 1.75 6.23 12.25 5.61 1.99 1.40 12.50 5.84 2.15 0.74 12.75 6.00 2.26 0.52 13.00 6.13 2.36 0.43 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 0.37 13.50 6.34 2.51 0.33 13.75 6.43 2.58 0.29 14.00 6.51 2.63 0.26 14.25 6.58 2.69 0.24 14.50 6.65 2.74 0.23 14.75 6.72 2.79 0.22 15.00 6.78 2.83 0.20 15.25 6.83 2.88 0.19 15.50 6.89 2.92 0.18 15.75 6.94 2.96 0.17 16.00 6.99 2.99 0.16 16.25 7.03 3.03 0.15 16.50 7.08 3.06 0.15 16.75 7.12 3.09 0.14 17.00 7.16 3.12 0.14 17.25 7.20 3.15 0.14 17.50 7.24 3.18 0.13 17.75 7.28 3.21 0.13 18.00 7.31 3.24 0.12 18.25 7.35 3.27 0.12 18.50 7.38 3.29 0.12 18.75 7.41 3.32 0.11 19.00 7.45 3.34 0.11 19.25 7.48 3.37 0.10 19.50 7.50 3.39 0.10 19.75 7.53 3.41 0.10 20.00 7.56 3.43 0.09 20.25 7.58 3.45 0.09 20.50 7.61 3.47 0.09 20.75 7.64 3.49 0.09 21.00 7.66 3.51 0.09 21.25 7.68 3.53 0.09 21.50 7.71 3.55 0.09 21.75 7.73 3.57 0.08 22.00 7.76 3.59 0.08 22.25 7.78 3.61 0.08 22.50 7.80 3.63 0.08 22.75 7.83 3.64 0.08 23.00 7.85 3.66 0.08 23.25 7.87 3.68 0.08 23.50 7.90 3.70 0.08 23.75 7.92 3.72 0.08 24.00 7.94 3.73 0.08 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 17: DA 17 Runoff = 17.91 cfs @ 12.09 hrs, Volume= 1.208 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 2.339 70 Woods, Good, HSG C 1.559 55 Woods, Good, HSG B 3.898 64 Weighted Average 3.898 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.1 100 0.0654 0.13 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 3.2 208 0.0462 1.07 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs M011-311111111[*M. 2 1 1 1 3 1 0 FL Subcatchment 17: DA 17 Hydrograph 0-- 17.91 cfs 8 Type) 1124-hr 6 0 arm 24-hrslRain Runoff Are=3.898 1=7-4A" 4 ac Run?ff Volume=1.208 of 2 -Runoff Depth>3.7 — — — Flowl Length=308'I c 16.3 min 8 CN14 6 4 - —I - - 2 - 0 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 40 Hydrograph for Subcatchment 17: DA 17 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.02 9.50 1.29 0.00 0.04 9.75 1.36 0.01 0.06 10.00 1.44 0.02 0.09 10.25 1.52 0.03 0.13 10.50 1.62 0.04 0.18 10.75 1.73 0.06 0.26 11.00 1.87 0.09 0.36 11.25 2.03 0.13 0.51 11.50 2.25 0.19 0.78 11.75 3.07 0.50 2.30 12.00 5.26 1.75 13.84 12.25 5.61 1.99 9.72 12.50 5.84 2.15 3.68 12.75 6.00 2.26 2.14 13.00 6.13 2.36 1.66 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 1.40 13.50 6.34 2.51 1.23 13.75 6.43 2.58 1.08 14.00 6.51 2.63 0.96 14.25 6.58 2.69 0.87 14.50 6.65 2.74 0.82 14.75 6.72 2.79 0.78 15.00 6.78 2.83 0.74 15.25 6.83 2.88 0.70 15.50 6.89 2.92 0.66 15.75 6.94 2.96 0.63 16.00 6.99 2.99 0.59 16.25 7.03 3.03 0.55 16.50 7.08 3.06 0.53 16.75 7.12 3.09 0.52 17.00 7.16 3.12 0.50 17.25 7.20 3.15 0.49 17.50 7.24 3.18 0.48 17.75 7.28 3.21 0.46 18.00 7.31 3.24 0.45 18.25 7.35 3.27 0.43 18.50 7.38 3.29 0.42 18.75 7.41 3.32 0.41 19.00 7.45 3.34 0.39 19.25 7.48 3.37 0.38 19.50 7.50 3.39 0.36 19.75 7.53 3.41 0.35 20.00 7.56 3.43 0.33 20.25 7.58 3.45 0.32 20.50 7.61 3.47 0.32 20.75 7.64 3.49 0.31 21.00 7.66 3.51 0.31 21.25 7.68 3.53 0.31 21.50 7.71 3.55 0.30 21.75 7.73 3.57 0.30 22.00 7.76 3.59 0.30 22.25 7.78 3.61 0.30 22.50 7.80 3.63 0.29 22.75 7.83 3.64 0.29 23.00 7.85 3.66 0.29 23.25 7.87 3.68 0.28 23.50 7.90 3.70 0.28 23.75 7.92 3.72 0.28 24.00 7.94 3.73 0.28 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 41 Summary for Reach 1-1: 1-1 Inflow Area = 135.498 ac, 0.00% Impervious, Inflow Depth > 4.86" for 100 years - 24 hrs event Inflow = 975.62 cfs @ 12.02 hrs, Volume= 54.893 of Outflow = 802.45 cfs @ 12.19 hrs, Volume= 54.377 af, Atten= 18%, Lag= 10.4 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 6.60 fps, Min. Travel Time= 6.6 min Avg. Velocity = 1.95 fps, Avg. Travel Time= 22.4 min Peak Storage= 321,191 cf @ 12.08 hrs Average Depth at Peak Storage= 3.88' Bank -Full Depth= 9.00' Flow Area= 613.7 sf, Capacity= 4,320.05 cfs Custom cross-section, Length= 2,618.0' Slope= 0.0104 T (103 Elevation Intervals) Constant n= 0.045 Inlet Invert= 760.00', Outlet Invert= 732.74' Offset Elevation Chan.Depth (feet) (feet) (feet) -71.43 9.00 0.00 0.00 7.00 2.00 10.00 6.72 2.28 35.71 6.00 3.00 53.71 0.00 9.00 73.71 0.00 9.00 91.71 6.00 3.00 129.68 9.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 20.0 0 0.00 6.00 228.0 57.9 596,904 1,914.79 6.72 280.9 92.8 735,282 1,980.00 7.00 308.2 106.4 806,822 2,110.53 9.00 613.7 203.2 1,606,560 4,320.05 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 42 1,000 900 800 ^, 700 600 _0 500 400 300 200 100 0 Reach 1-1: 1-1 Hydrograph 975.62 cfs lnfllow-Area�1-5.498 g02.45 cfs Avg. Few Dpptth� Max Ve =6.6Q fps, n4-04 L=2,61 0.0' I - I - Capacity=A, 21. 5-cf�- rI- L - I - -4 —�— �— - -t 1 � _I _ I_ L 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 43 Hydrograph for Reach 1-1: 1-1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 760.00 0.00 0.50 0.00 0 760.00 0.00 1.00 0.00 0 760.00 0.00 1.50 0.00 0 760.00 0.00 2.00 0.00 0 760.00 0.00 2.50 0.00 0 760.00 0.00 3.00 0.00 0 760.00 0.00 3.50 0.00 0 760.00 0.00 4.00 0.00 0 760.00 0.00 4.50 0.00 0 760.00 0.00 5.00 0.00 0 760.00 0.00 5.50 0.00 0 760.00 0.00 6.00 0.00 0 760.00 0.00 6.50 0.00 0 760.00 0.00 7.00 0.69 430 760.01 0.06 7.50 1.67 2,015 760.04 0.40 8.00 2.72 4,480 760.08 0.99 8.50 4.34 7,354 760.14 2.27 9.00 6.74 10,793 760.20 4.14 9.50 8.77 14,083 760.26 6.73 10.00 12.18 17,196 760.31 9.23 10.50 18.44 22,253 760.40 13.64 11.00 29.48 30,033 760.53 21.61 11.50 55.60 44,431 760.76 38.10 12.00 961.94 273,906 763.45 304.00 12.50 112.11 105,937 761.63 233.98 13.00 63.41 61,495 761.02 81.33 13.50 47.52 49,348 760.84 55.52 14.00 37.36 42,076 760.72 42.98 14.50 32.34 37,361 760.65 34.97 15.00 29.19 34,887 760.61 31.20 15.50 26.01 32,511 760.57 28.04 16.00 22.79 30,100 760.53 24.84 16.50 20.98 28,077 760.50 22.11 17.00 19.84 26,981 760.48 20.65 17.50 18.70 26,022 760.46 19.48 18.00 17.55 25,072 760.45 18.33 18.50 16.39 24,044 760.43 17.23 19.00 15.22 22,970 760.41 16.08 19.50 14.04 21,885 760.39 14.91 20.00 12.86 20,794 760.38 13.73 20.50 12.33 19,972 760.36 12.71 21.00 12.11 19,638 760.36 12.32 21.50 11.88 19,378 760.35 12.07 22.00 11.65 19,130 760.35 11.84 22.50 11.42 18,884 760.34 11.61 23.00 11.19 18,637 760.34 11.38 23.50 10.96 18,389 760.33 11.15 24.00 10.73 18,140 760.33 10.92 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 44 Summary for Reach 2-1: 2-1 Inflow Area = 151.446 ac, 4.64% Impervious, Inflow Depth > 4.56" for 100 years - 24 hrs event Inflow = 654.14 cfs @ 12.15 hrs, Volume= 57.562 of Outflow = 589.00 cfs @ 12.36 hrs, Volume= 56.995 af, Atten= 10%, Lag= 12.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 6.03 fps, Min. Travel Time= 7.3 min Avg. Velocity = 1.91 fps, Avg. Travel Time= 23.0 min Peak Storage= 258,934 cf @ 12.24 hrs Average Depth at Peak Storage= 3.29' Bank -Full Depth= 9.00' Flow Area= 588.5 sf, Capacity= 4,252.14 cfs Custom cross-section, Length= 2,636.0' Slope= 0.0103 T (101 Elevation Intervals) Constant n= 0.045 Inlet Invert= 760.00', Outlet Invert= 732.74' Offset Elevation Chan.Depth (feet) (feet) (feet) 0.00 9.00 0.00 96.77 6.00 3.00 114.77 0.00 9.00 134.77 0.00 9.00 152.77 6.00 3.00 184.35 9.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 20.0 0 0.00 6.00 228.0 57.9 601,008 1,908.24 9.00 588.5 186.5 1,551,352 4,252.14 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 45 Reach 2-1: 2-1 Hydrograph 700 654.14 cfs — Inflow f1514 589.00 cfs 1 — Outflow 600 now►rea= - - Av�. Flbw Qepthl=3.29' 500 -Mai V—e'=6.93-fp� 400n=1-04� 1 L=2,636.0300- Capacity=4,1252.�14 cfs 200 - - 100- -I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 46 Hydrograph for Reach 2-1: 2-1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 760.00 0.00 0.50 0.00 0 760.00 0.00 1.00 0.00 0 760.00 0.00 1.50 0.00 0 760.00 0.00 2.00 0.00 0 760.00 0.00 2.50 0.00 0 760.00 0.00 3.00 0.00 0 760.00 0.00 3.50 0.00 0 760.00 0.00 4.00 0.00 0 760.00 0.00 4.50 0.00 0 760.00 0.00 5.00 0.00 0 760.00 0.00 5.50 0.00 0 760.00 0.00 6.00 0.11 58 760.00 0.01 6.50 0.32 352 760.01 0.07 7.00 0.54 850 760.02 0.18 7.50 0.78 1,499 760.03 0.34 8.00 1.34 2,411 760.05 0.54 8.50 2.62 4,370 760.08 0.95 9.00 4.65 7,539 760.14 2.24 9.50 6.91 11,255 760.21 4.36 10.00 9.58 14,567 760.27 6.83 10.50 14.73 19,112 760.34 10.43 11.00 23.71 26,010 760.46 16.73 11.50 43.15 37,693 760.65 28.94 12.00 443.95 143,532 762.08 112.74 12.50 261.67 182,631 762.52 495.24 13.00 89.34 83,367 761.32 142.45 13.50 57.64 57,628 760.96 72.24 14.00 44.57 47,646 760.81 51.93 14.50 36.74 41,386 760.71 41.01 15.00 32.99 38,050 760.66 35.41 15.50 29.56 35,549 760.62 31.76 16.00 26.10 32,973 760.58 28.39 16.50 23.39 30,585 760.54 25.05 17.00 22.03 29,133 760.51 23.04 17.50 20.79 28,045 760.49 21.68 18.00 19.55 27,009 760.48 20.43 18.50 18.31 25,971 760.46 19.19 19.00 17.05 24,912 760.44 17.95 19.50 15.78 23,756 760.42 16.74 20.00 14.50 22,568 760.40 15.48 20.50 13.57 21,490 760.39 14.25 21.00 13.27 20,967 760.38 13.55 21.50 13.02 20,686 760.37 13.22 22.00 12.78 20,450 760.37 12.97 22.50 12.53 20,220 760.36 12.72 23.00 12.29 19,989 760.36 12.47 23.50 12.04 19,736 760.36 12.24 24.00 11.79 19,469 760.35 12.00 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 47 Summary for Reach 3-1: 3-1 Inflow Area = 286.944 ac, 2.45% Impervious, Inflow Depth > 4.66" for 100 years - 24 hrs event Inflow = 1,223.94 cfs @ 12.23 hrs, Volume= 111.373 of Outflow = 1,220.77 cfs @ 12.24 hrs, Volume= 111.333 af, Atten= 0%, Lag= 0.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 6.89 fps, Min. Travel Time= 0.2 min Avg. Velocity = 2.00 fps, Avg. Travel Time= 0.8 min Peak Storage= 17,742 cf @ 12.23 hrs Average Depth at Peak Storage= 3.51' Bank -Full Depth= 9.00' Flow Area= 667.8 sf, Capacity= 6,464.84 cfs Custom cross-section Constant n= 0.045 Inlet Invert= 732.74', Length= 100.0' Slope= 0.0108 T (101 Elevation Intervals) Outlet Invert= 731.66' Offset Elevation Chan.Depth (feet) (feet) (feet) 0.00 9.00 0.00 29.90 6.10 2.90 48.20 0.00 9.00 88.20 0.00 9.00 106.50 6.10 2.90 138.72 9.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 40.0 0 0.00 6.10 355.6 78.6 35,563 3,339.19 9.00 667.8 141.0 66,784 6,464.84 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 48 Reach 3-1: 3-1 Hydrograph 1,220.77 cfs 1,200 Inflow �►rea�286.1944 ac 1,000 Avg. Flow Depth=3.51' Max Ve =6.8� fps, N n=0.04� 800 L=100.0' 0 600 S � 01�8 T M Capacity=6,464.84 cfs Ann 1 � L 0 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 49 Hydrograph for Reach 3-1: 3-1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 732.74 0.00 0.50 0.00 0 732.74 0.00 1.00 0.00 0 732.74 0.00 1.50 0.00 0 732.74 0.00 2.00 0.00 0 732.74 0.00 2.50 0.00 0 732.74 0.00 3.00 0.00 0 732.74 0.00 3.50 0.00 0 732.74 0.00 4.00 0.00 0 732.74 0.00 4.50 0.00 0 732.74 0.00 5.00 0.00 0 732.74 0.00 5.50 0.00 0 732.74 0.00 6.00 0.01 1 732.74 0.00 6.50 0.07 9 732.74 0.06 7.00 0.24 31 732.75 0.21 7.50 0.74 101 732.77 0.69 8.00 1.53 212 732.79 1.45 8.50 3.22 407 732.84 3.12 9.00 6.38 615 732.89 6.18 9.50 11.10 878 732.96 10.92 10.00 16.07 1,116 733.01 15.89 10.50 24.08 1,426 733.09 23.76 11.00 38.34 1,903 733.20 37.88 11.50 67.04 2,688 733.38 66.08 12.00 416.73 8,497 734.60 396.11 12.50 729.22 12,583 735.37 743.48 13.00 223.78 5,811 734.06 227.16 13.50 127.76 4,059 733.69 128.72 14.00 94.91 3,365 733.53 95.41 14.50 75.98 2,926 733.44 76.28 15.00 66.62 2,695 733.38 66.77 15.50 59.80 2,518 733.34 59.94 16.00 53.23 2,343 733.30 53.38 16.50 47.16 2,174 733.26 47.28 17.00 43.69 2,071 733.24 43.76 17.50 41.16 1,996 733.22 41.22 18.00 38.76 1,925 733.20 38.82 18.50 36.42 1,855 733.19 36.48 19.00 34.03 1,775 733.17 34.09 19.50 31.65 1,696 733.15 31.71 20.00 29.21 1,614 733.13 29.27 20.50 26.96 1,539 733.11 27.00 21.00 25.87 1,502 733.11 25.89 21.50 25.29 1,482 733.10 25.31 22.00 24.81 1,464 733.10 24.82 22.50 24.33 1,445 733.09 24.34 23.00 23.86 1,427 733.09 23.87 23.50 23.40 1,409 733.08 23.41 24.00 22.92 1,390 733.08 22.94 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 50 Summary for Reach 3-2: DA 3-2 Inflow Area = 380.244 ac, 1.85% Impervious, Inflow Depth > 4.73" for 100 years - 24 hrs event Inflow = 1,663.43 cfs @ 12.22 hrs, Volume= 149.907 of Outflow = 1,589.17 cfs @ 12.33 hrs, Volume= 149.096 af, Atten= 4%, Lag= 6.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 7.41 fps, Min. Travel Time= 3.8 min Avg. Velocity = 2.20 fps, Avg. Travel Time= 12.7 min Peak Storage= 364,995 cf @ 12.27 hrs Average Depth at Peak Storage= 4.13' Bank -Full Depth= 9.00' Flow Area= 667.8 sf, Capacity= 6,336.03 cfs Custom cross-section Constant n= 0.045 Inlet Invert= 732.74', Length= 1,685.0' Slope= 0.0104 T (101 Elevation Intervals) Outlet Invert= 715.26' Offset Elevation Chan.Depth (feet) (feet) (feet) 0.00 9.00 0.00 29.90 6.10 2.90 48.20 0.00 9.00 88.20 0.00 9.00 106.50 6.10 2.90 138.72 9.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 40.0 0 0.00 6.10 355.6 78.6 599,237 3,272.66 9.00 667.8 141.0 1,125,317 6,336.03 Existing Conditions Type 1124-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 51 1,800 1,600 1,400 1,200 1,000 3 0 800 FL • 11] � 11] MEER U111i 0 Reach 3-2: DA 3-2 Hydrograph 1,589.17 cfs 1n& w kaaa 380.1244 c -4 Avg. Few-Dppth�Al:�L -4 MaVel=7.41 fp L=4-,685.0' 1 I S- .01 4 '/'I I p y=6,336.03 C c ti cf�- - + -f I I - I- - t-f I I t- I I fi-t I -t-fII�-- --fI 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 52 Hydrograph for Reach 3-2: DA 3-2 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 732.74 0.00 0.50 0.00 0 732.74 0.00 1.00 0.00 0 732.74 0.00 1.50 0.00 0 732.74 0.00 2.00 0.00 0 732.74 0.00 2.50 0.00 0 732.74 0.00 3.00 0.00 0 732.74 0.00 3.50 0.00 0 732.74 0.00 4.00 0.00 0 732.74 0.00 4.50 0.00 0 732.74 0.00 5.00 0.00 0 732.74 0.00 5.50 0.00 0 732.74 0.00 6.00 0.00 1 732.74 0.00 6.50 0.09 45 732.74 0.01 7.00 0.76 556 732.75 0.18 7.50 1.90 2,025 732.77 0.71 8.00 3.40 4,470 732.81 1.64 8.50 6.03 7,867 732.86 3.54 9.00 10.65 12,220 732.92 7.12 9.50 17.04 17,593 733.00 13.29 10.00 23.82 22,447 733.06 20.10 10.50 35.40 28,646 733.15 29.57 11.00 55.91 38,113 733.28 46.35 11.50 97.66 53,671 733.49 78.87 12.00 687.68 161,644 734.82 312.86 12.50 910.92 271,226 735.98 1,215.81 13.00 283.05 124,822 734.39 362.27 13.50 165.71 85,165 733.90 187.27 14.00 124.05 69,972 733.71 134.62 14.50 99.87 60,616 733.59 106.42 15.00 87.97 55,484 733.52 91.50 15.50 78.92 51,848 733.47 81.98 16.00 70.12 48,266 733.42 73.30 16.50 62.26 44,776 733.37 64.79 17.00 57.88 42,512 733.34 59.38 17.50 54.54 40,911 733.32 55.79 18.00 51.34 39,436 733.30 52.56 18.50 48.19 37,989 733.28 49.39 19.00 44.99 36,424 733.26 46.29 19.50 41.80 34,810 733.24 43.11 20.00 38.54 33,164 733.22 39.87 20.50 35.67 31,601 733.19 36.71 21.00 34.37 30,682 733.18 34.87 21.50 33.63 30,184 733.17 33.95 22.00 32.98 29,799 733.17 33.27 22.50 32.35 29,433 733.16 32.63 23.00 31.71 29,069 733.16 32.00 23.50 31.09 28,709 733.15 31.37 24.00 30.46 28,347 733.15 30.74 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 53 Summary for Reach 4-1: 4-1 Inflow Area = 48.550 ac, 18.39% Impervious, Inflow Depth > 5.80" for 100 years - 24 hrs event Inflow = 481.89 cfs @ 11.95 hrs, Volume= 23.460 of Outflow = 373.95 cfs @ 12.12 hrs, Volume= 23.265 af, Atten= 22%, Lag= 9.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 6.27 fps, Min. Travel Time= 6.6 min Avg. Velocity = 1.85 fps, Avg. Travel Time= 22.5 min Peak Storage= 151,964 cf @ 12.01 hrs Average Depth at Peak Storage= 3.14' Bank -Full Depth= 9.00' Flow Area= 512.3 sf, Capacity= 3,928.79 cfs Custom cross-section, Length= 2,493.0' Slope= 0.0139 T (101 Elevation Intervals) Constant n= 0.045 Inlet Invert= 750.00', Outlet Invert= 715.26' Offset Elevation Chan.Depth (feet) (feet) (feet) 0.00 9.00 0.00 100.00 6.00 3.00 118.00 0.00 9.00 128.00 0.00 9.00 146.00 6.00 3.00 183.50 9.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 10.0 0 0.00 6.00 168.0 47.9 418,824 1,510.77 9.00 512.3 185.6 1,277,039 3,928.79 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 54 500 450 400 350 4 300 0 250 " 200 150 100 50 0 Reach 4-1: 4-1 Hydrograph 481.89 cfs -A�f "ri 1a=4i5501- c I 1 373.95 cfs rimmin fh=,q i14' ep "x-/eL=�.27 fps 0. 45 S=01.013� T gapa¢1ty=P,920.79 pfs IL—L11 �Ia-4i 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Inflow — Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 55 Hydrograph for Reach 4-1: 4-1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 750.00 0.00 0.50 0.00 0 750.00 0.00 1.00 0.00 0 750.00 0.00 1.50 0.00 0 750.00 0.00 2.00 0.00 0 750.00 0.00 2.50 0.00 0 750.00 0.00 3.00 0.00 0 750.00 0.00 3.50 0.00 0 750.00 0.00 4.00 0.00 0 750.00 0.00 4.50 0.00 0 750.00 0.00 5.00 0.28 180 750.01 0.03 5.50 0.64 759 750.03 0.19 6.00 1.04 1,618 750.06 0.43 6.50 1.46 2,645 750.10 0.79 7.00 1.91 3,491 750.13 1.36 7.50 2.37 4,246 750.16 1.86 8.00 2.86 4,976 750.19 2.36 8.50 3.88 5,853 750.22 3.05 9.00 5.20 7,151 750.27 4.12 9.50 5.91 8,221 750.30 5.33 10.00 7.84 9,468 750.34 6.44 10.50 11.10 11,774 750.42 8.88 11.00 16.71 15,347 750.53 13.08 11.50 30.14 22,298 750.73 21.97 12.00 409.05 151,709 753.14 222.98 12.50 37.21 37,020 751.11 68.95 13.00 23.29 23,318 750.76 29.51 13.50 17.70 18,854 750.64 20.77 14.00 13.92 16,020 750.55 16.13 14.50 12.32 14,324 750.50 13.29 15.00 11.08 13,342 750.47 11.88 15.50 9.83 12,412 750.44 10.63 16.00 8.57 11,406 750.41 9.42 16.50 8.00 10,688 750.38 8.40 17.00 7.55 10,283 750.37 7.87 17.50 7.11 9,912 750.36 7.41 18.00 6.66 9,511 750.35 6.98 18.50 6.20 9,091 750.33 6.54 19.00 5.75 8,667 750.32 6.09 19.50 5.30 8,241 750.30 5.64 20.00 4.84 7,815 750.29 5.18 20.50 4.70 7,535 750.28 4.82 21.00 4.61 7,421 750.27 4.68 21.50 4.52 7,333 750.27 4.59 22.00 4.43 7,247 750.27 4.50 22.50 4.34 7,150 750.27 4.42 23.00 4.25 7,049 750.26 4.33 23.50 4.16 6,947 750.26 4.24 24.00 4.06 6,843 750.25 4.15 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 56 Summary for Reach 5-1: 5-1 Inflow Area = 428.794 ac, 3.72% Impervious, Inflow Depth > 4.82" for 100 years - 24 hrs event Inflow = 1,725.47 cfs @ 12.32 hrs, Volume= 172.361 of Outflow = 1,720.11 cfs @ 12.32 hrs, Volume= 172.296 af, Atten= 0%, Lag= 0.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 7.00 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.08 fps, Avg. Travel Time= 0.9 min Peak Storage= 28,306 cf @ 12.32 hrs Average Depth at Peak Storage= 4.58' Bank -Full Depth= 10.00' Flow Area= 823.4 sf, Capacity= 7,199.07 cfs Custom cross-section Constant n= 0.045 Inlet Invert= 715.26', Length= 115.0' Slope= 0.0083 '/' Outlet Invert= 714.31' Offset Elevation Chan.Depth (feet) (feet) (feet) 0.00 10.00 0.00 43.33 6.10 3.90 61.63 0.00 10.00 101.63 0.00 10.00 119.93 6.10 3.90 163.26 10.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 40.0 0 0.00 6.10 355.6 78.6 40,897 2,920.40 10.00 823.4 165.6 94,686 7,199.07 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 57 1,800 1,600 1,400 N 1,200 1,000 3 ,° 800 0 Reach 5-1: 5-1 Hydrograph 1,720.11 cfs lnflow-4 rea�428J94 ac Avg. Flew Dppth�4.5§ J =046 Vey=7.OQ fps, L S==�.00�3 T Capacity=7,'199.07 cf� - -4 1 I � - -4 I 1 4- + -i � IILL-i 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 58 Hydrograph for Reach 5-1: 5-1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 715.26 0.00 0.50 0.00 0 715.26 0.00 1.00 0.00 0 715.26 0.00 1.50 0.00 0 715.26 0.00 2.00 0.00 0 715.26 0.00 2.50 0.00 0 715.26 0.00 3.00 0.00 0 715.26 0.00 3.50 0.00 0 715.26 0.00 4.00 0.00 0 715.26 0.00 4.50 0.00 0 715.26 0.00 5.00 0.03 4 715.26 0.02 5.50 0.19 30 715.27 0.16 6.00 0.43 73 715.28 0.40 6.50 0.80 133 715.29 0.74 7.00 1.54 261 715.32 1.45 7.50 2.57 438 715.35 2.44 8.00 4.00 574 715.38 3.90 8.50 6.59 781 715.43 6.37 9.00 11.25 1,102 715.50 11.01 9.50 18.62 1,516 715.58 18.36 10.00 26.54 1,896 715.66 26.23 10.50 38.45 2,381 715.76 37.96 11.00 59.43 3,115 715.91 58.69 11.50 100.84 4,339 716.14 99.36 12.00 535.84 12,565 717.59 506.85 12.50 1,284.76 23,233 719.17 1,309.60 13.00 391.78 10,488 717.24 399.02 13.50 208.03 6,938 716.63 209.97 14.00 150.75 5,641 716.39 151.64 14.50 119.71 4,873 716.25 120.28 15.00 103.38 4,440 716.16 103.67 15.50 92.61 4,139 716.11 92.86 16.00 82.72 3,860 716.05 82.98 16.50 73.19 3,571 716.00 73.40 17.00 67.24 3,390 715.96 67.36 17.50 63.20 3,257 715.93 63.30 18.00 59.54 3,137 715.91 59.64 18.50 55.93 3,019 715.89 56.03 19.00 52.38 2,902 715.86 52.48 19.50 48.74 2,772 715.84 48.85 20.00 45.05 2,637 715.81 45.16 20.50 41.53 2,509 715.78 41.62 21.00 39.55 2,436 715.77 39.59 21.50 38.53 2,398 715.76 38.56 22.00 37.77 2,368 715.76 37.79 22.50 37.04 2,339 715.75 37.07 23.00 36.32 2,309 715.74 36.35 23.50 35.61 2,279 715.74 35.63 24.00 34.89 2,250 715.73 34.91 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 59 Summary for Reach 5-2: 5-2 Inflow Area = 487.537 ac, 3.27% Impervious, Inflow Depth > 4.83" for 100 years - 24 hrs event Inflow = 1,886.67 cfs @ 12.31 hrs, Volume= 196.040 of Outflow = 1,862.41 cfs @ 12.38 hrs, Volume= 195.375 af, Atten= 1 %, Lag= 4.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 8.38 fps, Min. Travel Time= 2.5 min Avg. Velocity = 2.52 fps, Avg. Travel Time= 8.3 min Peak Storage= 278,549 cf @ 12.33 hrs Average Depth at Peak Storage= 4.23' Bank -Full Depth= 10.00' Flow Area= 818.9 sf, Capacity= 9,010.35 cfs Custom cross-section Constant n= 0.045 Inlet Invert= 715.26', Length= 1,250.0' Slope= 0.0129 7' Outlet Invert= 699.09' Offset Elevation Chan.Depth (feet) (feet) (feet) 0.00 10.00 0.00 43.33 6.10 3.90 61.63 0.00 10.00 101.63 0.00 10.00 119.93 6.10 3.90 160.98 10.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 40.0 0 0.00 6.10 355.6 78.6 444,538 3,654.51 10.00 818.9 163.3 1,023,639 9,010.35 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 60 2,000 1,800 1,600 1,400 1,200 0 1,000 FL 800 600 400 200 0 Reach 5-2: 5-2 Hydrograph 1,862.41 cfs Inflavre4�7.537c Avg-. Flpw-Dppth�4.2� Ma Ve =8.3$ fps n 104 L='�,25q•0' s=q- o s -- Capaci y=9,b 1-0 cf�- I -A 4 -4 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 61 Hydrograph for Reach 5-2: 5-2 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 715.26 0.00 0.50 0.00 0 715.26 0.00 1.00 0.00 0 715.26 0.00 1.50 0.00 0 715.26 0.00 2.00 0.00 0 715.26 0.00 2.50 0.00 0 715.26 0.00 3.00 0.00 0 715.26 0.00 3.50 0.00 0 715.26 0.00 4.00 0.00 0 715.26 0.00 4.50 0.00 0 715.26 0.00 5.00 0.02 7 715.26 0.00 5.50 0.16 106 715.26 0.06 6.00 0.40 354 715.27 0.21 6.50 0.74 738 715.27 0.45 7.00 1.64 1,538 715.29 0.93 7.50 3.04 3,084 715.32 1.89 8.00 4.95 5,364 715.37 3.42 8.50 8.02 7,425 715.41 6.26 9.00 13.63 10,823 715.47 11.03 9.50 21.95 14,929 715.55 18.84 10.00 31.01 18,850 715.63 27.91 10.50 45.10 23,767 715.72 40.39 11.00 69.94 31,267 715.86 62.28 11.50 119.64 43,581 716.08 104.81 12.00 735.67 126,814 717.44 448.92 12.50 1,392.09 238,729 718.99 1,627.59 13.00 430.18 109,904 717.18 507.79 13.50 232.18 71,962 716.57 252.50 14.00 168.96 58,222 716.34 178.37 14.50 134.73 50,211 716.20 140.45 15.00 116.71 45,609 716.12 119.82 15.50 104.52 42,563 716.06 107.06 16.00 93.25 39,642 716.01 95.83 16.50 82.65 36,794 715.96 84.82 17.00 76.10 34,777 715.92 77.43 17.50 71.55 33,426 715.90 72.59 18.00 67.39 32,231 715.88 68.39 18.50 63.28 31,041 715.85 64.31 19.00 59.21 29,764 715.83 60.28 19.50 55.08 28,460 715.81 56.16 20.00 50.88 27,136 715.78 51.97 20.50 47.00 25,867 715.76 47.90 21.00 44.87 24,998 715.74 45.34 21.50 43.74 24,546 715.73 44.02 22.00 42.87 24,225 715.73 43.11 22.50 42.05 23,930 715.72 42.28 23.00 41.23 23,636 715.72 41.46 23.50 40.41 23,343 715.71 40.64 24.00 39.59 23,051 715.71 39.82 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 62 Summary for Reach 6-1: 6-1 Inflow Area = 19.830 ac, 0.00% Impervious, Inflow Depth > 4.86" for 100 years - 24 hrs event Inflow = 133.12 cfs @ 12.04 hrs, Volume= 8.029 of Outflow = 120.34 cfs @ 12.16 hrs, Volume= 7.981 af, Atten= 10%, Lag= 6.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 6.14 fps, Min. Travel Time= 4.1 min Avg. Velocity = 1.81 fps, Avg. Travel Time= 13.9 min Peak Storage= 29,980 cf @ 12.09 hrs Average Depth at Peak Storage= 1.40' Bank -Full Depth= 9.00' Flow Area= 466.2 sf, Capacity= 6,384.82 cfs Custom cross-section, Length= 1,502.0' Slope= 0.0322 T (101 Elevation Intervals) Constant n= 0.045 Inlet Invert= 747.38', Outlet Invert= 699.09' Offset Elevation Chan.Depth (feet) (feet) (feet) 0.00 9.00 0.00 43.48 5.00 4.00 58.50 0.00 9.00 68.50 0.00 9.00 83.50 5.00 4.00 130.56 9.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 10.0 0 0.00 5.00 125.1 41.6 187,825 1,541.18 9.00 466.2 132.5 700,247 6,384.82 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 63 Reach 6-1: 6-1 Hydrograph 140 133.12 J Inflow Inflow �rea�19.60 120.34 cfs — Outflow 120 - - A4 Flow Dlepth=1.410' 100 a� Ve'=6.114 fps- --TF I F7 0 _ FL 60 S=0.0322 T- L-i I L-t 1 Capacity=6,1384.02 cfjs 40 - - - 20 0 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 64 Hydrograph for Reach 6-1: 6-1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 747.38 0.00 0.50 0.00 0 747.38 0.00 1.00 0.00 0 747.38 0.00 1.50 0.00 0 747.38 0.00 2.00 0.00 0 747.38 0.00 2.50 0.00 0 747.38 0.00 3.00 0.00 0 747.38 0.00 3.50 0.00 0 747.38 0.00 4.00 0.00 0 747.38 0.00 4.50 0.00 0 747.38 0.00 5.00 0.00 0 747.38 0.00 5.50 0.00 0 747.38 0.00 6.00 0.00 0 747.38 0.00 6.50 0.00 0 747.38 0.00 7.00 0.09 43 747.38 0.02 7.50 0.23 183 747.39 0.12 8.00 0.39 361 747.40 0.26 8.50 0.61 587 747.42 0.43 9.00 0.96 938 747.44 0.69 9.50 1.27 1,358 747.47 1.01 10.00 1.74 1,672 747.49 1.46 10.50 2.62 2,136 747.52 2.17 11.00 4.18 2,930 747.56 3.36 11.50 7.78 4,303 747.65 6.09 12.00 122.56 24,879 748.59 60.46 12.50 18.33 9,603 747.93 28.47 13.00 9.53 5,692 747.72 10.93 13.50 7.09 4,626 747.66 7.77 14.00 5.56 3,959 747.63 6.09 14.50 4.77 3,508 747.60 4.99 15.00 4.30 3,288 747.59 4.48 15.50 3.84 3,078 747.57 4.02 16.00 3.37 2,866 747.56 3.55 16.50 3.08 2,668 747.55 3.19 17.00 2.92 2,555 747.54 3.00 17.50 2.75 2,452 747.54 2.83 18.00 2.58 2,349 747.53 2.66 18.50 2.41 2,244 747.52 2.49 19.00 2.24 2,139 747.52 2.32 19.50 2.07 2,034 747.51 2.15 20.00 1.89 1,928 747.50 1.98 20.50 1.81 1,850 747.50 1.84 21.00 1.77 1,824 747.50 1.79 21.50 1.74 1,803 747.50 1.76 22.00 1.71 1,783 747.49 1.72 22.50 1.67 1,762 747.49 1.69 23.00 1.64 1,742 747.49 1.66 23.50 1.61 1,721 747.49 1.62 24.00 1.57 1,700 747.49 1.59 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 65 Summary for Reach 7-1: 7-1 Inflow Area = 160.980 ac, 14.15% Impervious, Inflow Depth > 4.87" for 100 years - 24 hrs event Inflow = 660.36 cfs @ 12.31 hrs, Volume= 65.329 of Outflow = 633.40 cfs @ 12.45 hrs, Volume= 64.931 af, Atten= 4%, Lag= 8.3 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 7.24 fps, Min. Travel Time= 4.7 min Avg. Velocity = 2.32 fps, Avg. Travel Time= 14.5 min Peak Storage= 178,311 cf @ 12.37 hrs Average Depth at Peak Storage= 3.02' Bank -Full Depth= 10.00' Flow Area= 630.9 sf, Capacity= 7,020.15 cfs Custom cross-section Constant n= 0.045 Inlet Invert= 732.33', Length= 2,028.0' Slope= 0.0164 '/' Outlet Invert= 699.09' Offset Elevation Chan.Depth (feet) (feet) (feet) 0.00 10.00 0.00 45.98 6.00 4.00 63.98 0.00 10.00 83.98 0.00 10.00 101.98 6.00 4.00 145.46 10.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 20.0 0 0.00 6.00 228.0 57.9 462,384 2,402.36 10.00 630.9 147.8 1,279,506 7,020.15 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 66 Reach 7-1: 7-1 Hydrograph 700 -L- 633.40 cfs Inflow Inflow 1►rea�l601.980lac — Outflow 600 _ - Av§. Flow Depth=3.012' 500 Max Ve'=T--�4-fp�- 7 400 L-2,028.0' 300 S=0.0464-'/' L -1 _ ,° Capacity=7,1020.15 cfjs 200 - 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 67 Hydrograph for Reach 7-1: 7-1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 732.33 0.00 0.50 0.00 0 732.33 0.00 1.00 0.00 0 732.33 0.00 1.50 0.00 0 732.33 0.00 2.00 0.00 0 732.33 0.00 2.50 0.00 0 732.33 0.00 3.00 0.00 0 732.33 0.00 3.50 0.00 0 732.33 0.00 4.00 0.00 0 732.33 0.00 4.50 0.00 0 732.33 0.00 5.00 0.00 0 732.33 0.00 5.50 0.08 29 732.33 0.01 6.00 0.55 418 732.34 0.14 6.50 1.18 1,301 732.36 0.51 7.00 1.86 2,517 732.39 1.03 7.50 2.60 3,948 732.43 1.65 8.00 3.37 5,172 732.45 2.68 8.50 4.33 6,130 732.48 3.58 9.00 6.22 7,624 732.51 4.87 9.50 8.83 9,745 732.56 7.22 10.00 11.62 11,846 732.61 9.94 10.50 16.64 14,699 732.67 13.85 11.00 25.29 19,138 732.77 20.79 11.50 42.04 26,274 732.92 33.62 12.00 209.59 62,876 733.63 92.24 12.50 490.02 161,318 735.13 619.04 13.00 143.65 71,720 733.78 200.02 13.50 75.68 44,777 733.29 90.59 14.00 54.21 35,244 733.11 60.56 14.50 43.15 30,126 733.00 46.87 15.00 37.76 27,297 732.95 39.63 15.50 33.90 25,474 732.91 35.50 16.00 30.12 23,660 732.87 31.71 16.50 26.60 21,899 732.83 27.97 17.00 24.69 20,703 732.81 25.48 17.50 23.29 19,895 732.79 23.92 18.00 21.92 19,156 732.77 22.54 18.50 20.55 18,422 732.76 21.18 19.00 19.18 17,682 732.74 19.80 19.50 17.81 16,927 732.72 18.45 20.00 16.43 16,086 732.71 17.12 20.50 15.16 15,247 732.69 15.76 21.00 14.60 14,751 732.68 14.86 21.50 14.30 14,522 732.67 14.45 22.00 14.03 14,346 732.67 14.17 22.50 13.76 14,178 732.66 13.90 23.00 13.49 14,009 732.66 13.63 23.50 13.22 13,839 732.66 13.36 24.00 12.94 13,669 732.65 13.08 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 68 Summary for Reach 8-1: 8-1 Inflow Area = 75.660 ac, 3.03% Impervious, Inflow Depth > 4.16" for 100 years - 24 hrs event Inflow = 317.22 cfs @ 12.17 hrs, Volume= 26.227 of Outflow = 294.81 cfs @ 12.32 hrs, Volume= 26.043 af, Atten= 7%, Lag= 9.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 6.26 fps, Min. Travel Time= 5.2 min Avg. Velocity = 2.23 fps, Avg. Travel Time= 14.6 min Peak Storage= 92,701 cf @ 12.24 hrs Average Depth at Peak Storage= 2.64' Bank -Full Depth= 9.00' Flow Area= 469.0 sf, Capacity= 4,160.07 cfs Custom cross-section, Length= 1,957.0' Slope= 0.0101 T (101 Elevation Intervals) Constant n= 0.035 Inlet Invert= 752.15', Outlet Invert= 732.33' Offset Elevation Chan.Depth (feet) (feet) (feet) 0.00 9.00 0.00 75.00 6.00 3.00 93.00 0.00 9.00 103.00 0.00 9.00 121.00 6.00 3.00 154.70 9.00 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 10.0 0 0.00 6.00 168.0 47.9 328,776 1,655.95 9.00 469.0 156.8 917,931 4,160.07 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 69 Reach 8-1: 8-1 Hydrograph 350 300 250 200 3 150 U- 100 50 0L 0 294.81 cfs Inflow Area�75.660 ac Avg. Flow depth=2.64' 5Max Vel=6.�6 fps n=0.035 L=1,957.0' S=0.0101 T Capacity=4,160.07 cfs L 1+ 0 O I U I L I ,+ 1 0 10 L U Time (hours) — Inflow — Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 70 Hydrograph for Reach 8-1: 8-1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 752.15 0.00 0.50 0.00 0 752.15 0.00 1.00 0.00 0 752.15 0.00 1.50 0.00 0 752.15 0.00 2.00 0.00 0 752.15 0.00 2.50 0.00 0 752.15 0.00 3.00 0.00 0 752.15 0.00 3.50 0.00 0 752.15 0.00 4.00 0.00 0 752.15 0.00 4.50 0.00 0 752.15 0.00 5.00 0.00 0 752.15 0.00 5.50 0.00 0 752.15 0.00 6.00 0.00 0 752.15 0.00 6.50 0.00 0 752.15 0.00 7.00 0.00 0 752.15 0.00 7.50 0.00 0 752.15 0.00 8.00 0.00 0 752.15 0.00 8.50 0.25 109 752.16 0.02 9.00 0.99 844 752.19 0.28 9.50 1.96 2,265 752.26 0.96 10.00 3.09 3,535 752.32 2.12 10.50 5.19 5,083 752.39 3.79 11.00 8.94 7,345 752.49 6.68 11.50 17.14 11,190 752.65 12.37 12.00 181.54 46,836 753.76 61.49 12.50 122.02 59,012 754.06 209.22 13.00 41.38 25,844 753.16 56.57 13.50 27.29 18,319 752.91 31.29 14.00 21.19 15,295 752.80 23.51 14.50 17.47 13,284 752.73 18.80 15.00 15.73 12,290 752.69 16.47 15.50 14.12 11,457 752.66 14.87 16.00 12.48 10,602 752.62 13.24 16.50 11.17 9,822 752.59 11.69 17.00 10.54 9,377 752.57 10.85 17.50 9.96 9,029 752.56 10.25 18.00 9.37 8,686 752.55 9.66 18.50 8.78 8,341 752.53 9.07 19.00 8.18 7,991 752.52 8.48 19.50 7.57 7,628 752.50 7.89 20.00 6.96 7,225 752.49 7.30 20.50 6.51 6,862 752.47 6.72 21.00 6.37 6,711 752.46 6.45 21.50 6.26 6,626 752.46 6.32 22.00 6.14 6,549 752.46 6.20 22.50 6.03 6,471 752.45 6.09 23.00 5.91 6,392 752.45 5.97 23.50 5.79 6,314 752.45 5.86 24.00 5.67 6,234 752.44 5.74 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 71 Summary for Reach 17-1: 17-1 Inflow Area = 670.661 ac, 5.78% Impervious, Inflow Depth > 4.82" for 100 years - 24 hrs event Inflow = 2,513.80 cfs @ 12.39 hrs, Volume= 269.360 of Outflow = 2,509.44 cfs @ 12.40 hrs, Volume= 269.270 af, Atten= 0%, Lag= 0.4 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 24.12 fps, Min. Travel Time= 0.2 min Avg. Velocity = 7.13 fps, Avg. Travel Time= 0.8 min Peak Storage= 36,270 cf @ 12.40 hrs Average Depth at Peak Storage= 5.21' Bank -Full Depth= 6.50' Flow Area= 130.0 sf, Capacity= 3,441.46 cfs 20.00' x 6.50' deep channel, n= 0.013 Concrete, trowel finish Length= 348.0' Slope= 0.0086 '/' Inlet Invert= 694.00', Outlet Invert= 691.00' 2,500 2,000 N 1,500 3 0 U_ 1,000 500 0 Reach 17-1: 17-1 Hydrograph 2,509.44 cfs Inflow Area=670.661 ac Avg. Flow Depth=5.21' Max Vet=24.12 fps n=0.013 L=348.0' S=0.0086 '/' Capacity=3,441.46 cfs 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Inflow — Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 72 Hydrograph for Reach 17-1: 17-1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 694.00 0.00 0.50 0.00 0 694.00 0.00 1.00 0.00 0 694.00 0.00 1.50 0.00 0 694.00 0.00 2.00 0.00 0 694.00 0.00 2.50 0.00 0 694.00 0.00 3.00 0.00 0 694.00 0.00 3.50 0.00 0 694.00 0.00 4.00 0.00 0 694.00 0.00 4.50 0.00 0 694.00 0.00 5.00 0.00 0 694.00 0.00 5.50 0.08 13 694.00 0.06 6.00 0.38 68 694.01 0.33 6.50 1.00 188 694.03 0.91 7.00 2.05 387 694.06 1.89 7.50 3.75 587 694.08 3.63 8.00 6.47 835 694.12 6.26 8.50 10.41 1,122 694.16 10.21 9.00 16.79 1,507 694.22 16.44 9.50 27.31 2,036 694.29 26.92 10.00 39.64 2,563 694.37 39.24 10.50 56.87 3,199 694.46 56.26 11.00 87.13 4,155 694.60 86.18 11.50 145.76 5,703 694.82 143.97 12.00 621.36 14,063 696.02 594.20 12.50 2,277.07 33,979 698.88 2,300.51 13.00 719.89 15,792 696.27 732.09 13.50 351.71 9,970 695.43 354.83 14.00 245.69 7,948 695.14 247.05 14.50 192.89 6,832 694.98 193.69 15.00 164.46 6,183 694.89 164.89 15.50 147.05 5,768 694.83 147.40 16.00 131.50 5,385 694.77 131.86 16.50 116.36 4,993 694.72 116.67 17.00 106.26 4,717 694.68 106.44 17.50 99.68 4,537 694.65 99.82 18.00 93.91 4,371 694.63 94.04 18.50 88.27 4,208 694.60 88.40 19.00 82.68 4,045 694.58 82.82 19.50 77.01 3,870 694.56 77.15 20.00 71.30 3,693 694.53 71.45 20.50 65.72 3,513 694.50 65.85 21.00 62.20 3,393 694.49 62.27 21.50 60.44 3,334 694.48 60.48 22.00 59.21 3,293 694.47 59.24 22.50 58.07 3,255 694.47 58.10 23.00 56.94 3,217 694.46 56.97 23.50 55.81 3,179 694.46 55.84 24.00 54.69 3,139 694.45 54.72 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 73 Summary for Reach 18-1: 18-1 Inflow Area = 670.661 ac, 5.78% Impervious, Inflow Depth > 4.82" for 100 years - 24 hrs event Inflow = 2,509.44 cfs @ 12.40 hrs, Volume= 269.270 of Outflow = 2,508.23 cfs @ 12.40 hrs, Volume= 269.243 af, Atten= 0%, Lag= 0.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 67.72 fps, Min. Travel Time= 0.1 min Avg. Velocity = 19.29 fps, Avg. Travel Time= 0.2 min Peak Storage= 10,153 cf @ 12.40 hrs Average Depth at Peak Storage= 1.85' Bank -Full Depth= 6.50' Flow Area= 130.0 sf, Capacity= 16,301.76 cfs 20.00' x 6.50' deep channel, n= 0.013 Concrete, trowel finish Length= 274.0' Slope= 0.1934 '/' Inlet Invert= 691.00', Outlet Invert= 638.00' 2,500 2,000 N 1,500 3 0 U_ 1,000 500 0 Reach 18-1: 18-1 Hydrograph 2,508.23 cfs Inflow Area=670.661 ac Avg. Flow Depth=1.85' Max Vet=67.72 fps n=0.013 L=274.0' S=0.1934 '/' Capacity=16,301.76 cfs 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Inflow — Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 74 Hydrograph for Reach 18-1: 18-1 Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 691.00 0.00 0.50 0.00 0 691.00 0.00 1.00 0.00 0 691.00 0.00 1.50 0.00 0 691.00 0.00 2.00 0.00 0 691.00 0.00 2.50 0.00 0 691.00 0.00 3.00 0.00 0 691.00 0.00 3.50 0.00 0 691.00 0.00 4.00 0.00 0 691.00 0.00 4.50 0.00 0 691.00 0.00 5.00 0.00 0 691.00 0.00 5.50 0.06 2 691.00 0.06 6.00 0.33 11 691.00 0.32 6.50 0.91 31 691.01 0.90 7.00 1.89 63 691.01 1.86 7.50 3.63 122 691.02 3.59 8.00 6.26 210 691.04 6.19 8.50 10.21 343 691.06 10.12 9.00 16.44 448 691.08 16.34 9.50 26.92 612 691.11 26.80 10.00 39.24 779 691.14 39.14 10.50 56.26 968 691.18 56.07 11.00 86.18 1,256 691.23 85.88 11.50 143.97 1,723 691.31 143.43 12.00 594.20 4,094 691.75 586.76 12.50 2,300.51 9,613 692.75 2,306.64 13.00 732.09 4,687 691.86 735.62 13.50 354.83 2,996 691.55 355.75 14.00 247.05 2,400 691.44 247.44 14.50 193.69 2,068 691.38 193.93 15.00 164.89 1,874 691.34 165.01 15.50 147.40 1,752 691.32 147.50 16.00 131.86 1,633 691.30 131.95 16.50 116.67 1,517 691.28 116.75 17.00 106.44 1,438 691.26 106.49 17.50 99.82 1,381 691.25 99.86 18.00 94.04 1,329 691.24 94.09 18.50 88.40 1,279 691.23 88.44 19.00 82.82 1,228 691.22 82.86 19.50 77.15 1,177 691.21 77.19 20.00 71.45 1,126 691.21 71.49 20.50 65.85 1,076 691.20 65.89 21.00 62.27 1,037 691.19 62.29 21.50 60.48 1,017 691.19 60.49 22.00 59.24 1,003 691.18 59.25 22.50 58.10 990 691.18 58.11 23.00 56.97 978 691.18 56.98 23.50 55.84 965 691.18 55.85 24.00 54.72 953 691.17 54.73 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 75 Summary for Reach 23R: Stream Beginning Inflow Area = 96.660 ac, 0.00% Impervious, Inflow Depth > 10.87" for 100 years - 24 hrs event Inflow = 321.93 cfs @ 12.08 hrs, Volume= 87.527 af, Incl. 29.00 cfs Base Flow Outflow = 315.25 cfs @ 12.20 hrs, Volume= 87.096 af, Atten= 2%, Lag= 7.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 7.92 fps, Min. Travel Time= 2.8 min Avg. Velocity = 4.87 fps, Avg. Travel Time= 4.6 min Peak Storage= 53,325 cf @ 12.15 hrs Average Depth at Peak Storage= 2.26' Bank -Full Depth= 94.66' Flow Area= 78,667.2 sf, Capacity= 6,461,392.31 cfs Custom cross-section, Length= 1,338.8' Slope= 0.0303 T (112 Elevation Intervals) Constant n= 0.040 Inlet Invert= 656.55', Outlet Invert= 615.97' Offset Elevation Chan.Depth (feet) (feet) (feet) 74.42 700.66 0.00 168.56 695.66 5.00 283.63 671.68 28.98 442.63 620.00 80.66 514.29 610.00 90.66 733.65 611.99 88.67 754.40 606.24 94.42 764.63 606.00 94.66 771.19 608.00 92.66 843.45 612.00 88.66 1,316.83 682.00 18.66 1,444.58 690.00 10.66 1,552.47 688.51 12.15 1,647.76 678.00 22.66 1,658.48 678.00 22.66 1,792.16 700.66 0.00 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 76 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.24 1.3 11.1 1,770 2.08 2.00 31.4 23.7 42,014 244.87 4.00 121.0 67.4 162,010 1,156.69 5.99 528.7 344.6 707,812 4,548.84 6.00 532.1 344.8 712,409 4,595.93 14.00 3,725.8 457.4 4,988,068 97,555.18 65.68 40,375.4 977.9 54,054,6443,119,567.13 72.00 46,695.1 1,062.8 62,515,3823,760,494.23 76.00 51,096.1 1,170.2 68,407,4474,098,013.65 82.51 59,361.3 1,404.6 79,472,90F4,658,383.64 84.00 61,536.3 1,552.5 82,384,8164,626,837.94 89.66 70,387.6 1,614.1 94,234,8915,640,154.10 94.66 78,667.2 1,738.3 105,319,63C6,461,392.31 350 300 250 N 200 3 F 150 100 50 0 Reach 23R: Stream Beginning Hydrograph 315.25 cfs Inflow Area=96.660 ac Avg. Flow Depth=2.26' Max Vet=7.92 fps n=0.040 =1,338.8' S=0.0303 T Capacity=6,461,392.31 cfs 0 2 4 6 8 10 12 14 16 18 20 22 Time (hours) 24 - Inflow - Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 77 Hydrograph for Reach 23R: Stream Beginning Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 29.00 0 656.55 0.00 0.50 29.00 8,403 657.16 28.96 1.00 29.00 8,407 657.16 29.00 1.50 29.00 8,407 657.16 29.00 2.00 29.00 8,407 657.16 29.00 2.50 29.00 8,407 657.16 29.00 3.00 29.00 8,407 657.16 29.00 3.50 29.00 8,407 657.16 29.00 4.00 29.00 8,407 657.16 29.00 4.50 29.00 8,407 657.16 29.00 5.00 29.00 8,407 657.16 29.00 5.50 29.00 8,407 657.16 29.00 6.00 29.00 8,407 657.16 29.00 6.50 29.00 8,407 657.16 29.00 7.00 29.00 8,407 657.16 29.00 7.50 29.00 8,407 657.16 29.00 8.00 29.00 8,407 657.16 29.00 8.50 29.00 8,407 657.16 29.00 9.00 29.03 8,410 657.16 29.00 9.50 29.71 8,552 657.17 29.50 10.00 30.93 8,835 657.18 30.60 10.50 33.06 9,322 657.21 32.47 11.00 37.00 10,213 657.26 35.88 11.50 46.04 12,190 657.37 43.22 12.00 286.59 41,296 658.53 183.62 12.50 171.73 34,658 658.28 213.49 13.00 80.25 18,859 657.67 87.34 13.50 61.62 15,796 657.55 63.68 14.00 54.21 14,645 657.50 55.30 14.50 49.93 13,668 657.45 50.64 15.00 47.80 13,107 657.42 48.25 15.50 45.88 12,633 657.39 46.32 16.00 43.93 12,155 657.37 44.38 16.50 42.44 11,757 657.34 42.69 17.00 41.66 11,554 657.33 41.83 17.50 40.97 11,382 657.32 41.13 18.00 40.27 11,210 657.31 40.43 18.50 39.56 11,036 657.30 39.73 19.00 38.85 10,859 657.29 39.01 19.50 38.12 10,681 657.28 38.29 20.00 37.39 10,501 657.27 37.56 20.50 36.88 10,361 657.27 36.96 21.00 36.70 10,311 657.26 36.74 21.50 36.56 10,277 657.26 36.60 22.00 36.43 10,243 657.26 36.46 22.50 36.29 10,209 657.26 36.32 23.00 36.15 10,175 657.26 36.18 23.50 36.01 10,141 657.25 36.05 24.00 35.87 10,106 657.25 35.90 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 78 Summary for Reach 24R: Road Culvert Inflow Area = 162.610 ac, 0.00% Impervious, Inflow Depth > 7.93" for 100 years - 24 hrs event Inflow = 527.74 cfs @ 12.17 hrs, Volume= 107.476 of Outflow = 427.05 cfs @ 12.50 hrs, Volume= 106.116 af, Atten= 19%, Lag= 19.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 5.74 fps, Min. Travel Time= 7.3 min Avg. Velocity = 2.53 fps, Avg. Travel Time= 16.6 min Peak Storage= 239,275 cf @ 12.37 hrs Average Depth at Peak Storage= 2.39' Bank -Full Depth= 39.37' Flow Area= 11,690.1 sf, Capacity= 402,588.09 cfs Custom cross-section, Length= 2,511.7' Slope= 0.0111 T (109 Elevation Intervals) Constant n= 0.040 Inlet Invert= 615.97', Outlet Invert= 588.00' Offset Elevation Chan.Depth (feet) (feet) (feet) 16.74 629.37 0.00 46.74 623.76 5.61 73.81 616.00 13.37 87.73 610.00 19.37 95.22 604.48 24.89 103.27 590.00 39.37 137.81 590.00 39.37 140.51 592.00 37.37 332.24 594.00 35.37 348.56 596.04 33.33 362.15 598.63 30.74 410.71 616.00 13.37 420.31 622.00 7.37 445.73 629.37 0.00 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 79 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 34.5 0 0.00 2.00 72.9 40.2 183,083 425.00 4.00 342.4 234.2 860,100 1,729.33 6.04 831.9 253.0 2,089,423 7,211.20 8.63 1,495.3 269.8 3,755,840 18,359.59 14.48 3,095.2 293.9 7,774,219 58,305.65 20.00 4,722.2 319.6 11,860,740 111,480.77 26.00 6,651.5 352.5 16,706,610 184,811.49 32.00 8,764.5 385.6 22,013,810 275,694.39 33.76 9,421.9 398.3 23,665,058 304,365.07 39.37 11,690.1 449.0 29,362,117 402,588.09 550 500 450 HIN 350 3 300 �° 250 200 150 100 50 0 Reach 24R: Road Culvert Hydrograph 527 Infl6w-Area=l1�r2.�" at Avq. Few-Bopth�.39 42 Max Vet=5.7� fps n 4.04QI L ,511 �7' L - S=+.0111 11, I Capacity=402,588.09 cfs T 7 T- -T L -L �- 4 T- 7 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow - Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 80 Hydrograph for Reach 24R: Road Culvert Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 615.97 0.00 0.50 28.96 23,227 616.23 14.94 1.00 29.00 32,404 616.34 25.82 1.50 29.00 34,473 616.36 28.28 2.00 29.00 34,771 616.37 28.95 2.50 29.00 34,784 616.37 29.00 3.00 29.00 34,784 616.37 29.00 3.50 29.00 34,784 616.37 29.00 4.00 29.00 34,784 616.37 29.00 4.50 29.00 34,784 616.37 29.00 5.00 29.00 34,784 616.37 29.00 5.50 29.00 34,784 616.37 29.00 6.00 29.00 34,784 616.37 29.00 6.50 29.00 34,784 616.37 29.00 7.00 29.00 34,784 616.37 29.00 7.50 29.00 34,784 616.37 29.00 8.00 29.00 34,784 616.37 29.00 8.50 29.00 34,784 616.37 29.00 9.00 29.01 34,785 616.37 29.00 9.50 29.95 35,107 616.37 29.31 10.00 31.86 36,036 616.38 30.72 10.50 35.13 37,622 616.40 33.15 11.00 41.13 40,472 616.43 37.45 11.50 54.30 46,349 616.50 45.86 12.00 328.91 112,823 617.23 98.39 12.50 317.07 216,745 618.21 427.03 13.00 123.80 93,390 617.02 177.48 13.50 86.54 70,743 616.77 100.17 14.00 72.75 61,919 616.67 79.70 14.50 65.03 56,553 616.61 68.98 15.00 61.15 53,783 616.58 63.25 15.50 57.91 51,860 616.56 59.73 16.00 54.65 50,004 616.54 56.48 16.50 51.90 48,276 616.52 53.29 17.00 50.50 47,285 616.51 51.26 17.50 49.33 46,587 616.50 49.98 18.00 48.15 45,919 616.49 48.81 18.50 46.96 45,244 616.48 47.63 19.00 45.76 44,560 616.48 46.44 19.50 44.55 43,869 616.47 45.23 20.00 43.32 43,171 616.46 44.01 20.50 42.34 42,540 616.45 42.82 21.00 42.00 42,252 616.45 42.18 21.50 41.76 42,104 616.45 41.89 22.00 41.53 41,973 616.45 41.66 22.50 41.30 41,842 616.45 41.43 23.00 41.07 41,709 616.44 41.20 23.50 40.84 41,576 616.44 40.97 24.00 40.60 41,442 616.44 40.73 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 81 Summary for Reach 25R: RR Culvert Inflow Area = 170.800 ac, 0.00% Impervious, Inflow Depth > 7.63" for 100 years - 24 hrs event Inflow = 436.98 cfs @ 12.32 hrs, Volume= 108.656 of Outflow = 432.92 cfs @ 12.50 hrs, Volume= 108.572 af, Atten= 1 %, Lag= 10.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 8.37 fps, Min. Travel Time= 0.5 min Avg. Velocity = 4.14 fps, Avg. Travel Time= 1.0 min Peak Storage= 12,672 cf @ 12.32 hrs Average Depth at Peak Storage= 3.43' Bank -Full Depth= 27.36' Flow Area= 3,723.4 sf, Capacity= 91,794.33 cfs Custom cross-section, Length= 242.5' Slope= 0.0165 T (104 Elevation Intervals) Constant n= 0.040 Inlet Invert= 584.00', Outlet Invert= 580.00' Offset Elevation Chan.Depth (feet) (feet) (feet) 34.01 607.36 0.00 66.97 600.00 7.36 118.99 600.00 7.36 176.43 590.00 17.36 213.63 588.00 19.36 228.46 580.00 27.36 238.68 580.00 27.36 244.95 585.91 21.45 342.59 607.36 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 10.2 0 0.00 5.91 111.3 31.3 26,991 1,237.62 8.00 182.7 45.4 44,294 2,203.63 10.00 310.6 92.0 75,327 3,335.52 20.00 1,696.8 248.9 411,474 29,104.81 27.36 3,723.4 317.0 902,916 91,794.33 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 82 Reach 25R: RR Culvert Hydrograph 450 400 350 N 300 3 250 ,° 200 150 100 50 0 432.92 cfs Inflow �rea=l701-800 ac Avg. Flow Depth=3.413' Mai Ve'=&. 7 fps n-Q.04Q L=t42�' I L 1 Capacigy-91,794.33 cfs L —L 1 1 -4 1 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 83 Hydrograph for Reach 25R: RR Culvert Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 584.00 0.00 0.50 14.94 1,230 584.46 13.84 1.00 25.82 1,815 584.67 25.61 1.50 28.28 1,932 584.71 28.24 2.00 28.95 1,964 584.72 28.94 2.50 29.00 1,966 584.72 29.00 3.00 29.00 1,966 584.72 29.00 3.50 29.00 1,966 584.72 29.00 4.00 29.00 1,966 584.72 29.00 4.50 29.00 1,966 584.72 29.00 5.00 29.00 1,966 584.72 29.00 5.50 29.00 1,966 584.72 29.00 6.00 29.00 1,966 584.72 29.00 6.50 29.00 1,966 584.72 29.00 7.00 29.00 1,966 584.72 29.00 7.50 29.00 1,966 584.72 29.00 8.00 29.00 1,966 584.72 29.00 8.50 29.00 1,966 584.72 29.00 9.00 29.00 1,966 584.72 29.00 9.50 29.40 1,983 584.72 29.36 10.00 30.93 2,052 584.75 30.85 10.50 33.57 2,172 584.79 33.43 11.00 38.27 2,367 584.85 38.04 11.50 47.65 2,721 584.96 47.15 12.00 136.98 5,440 585.75 127.40 12.50 433.34 12,571 587.41 432.92 13.00 180.82 6,837 586.12 186.23 13.50 102.67 4,603 585.52 103.93 14.00 81.68 3,938 585.33 82.18 14.50 70.68 3,563 585.22 70.97 15.00 64.79 3,362 585.16 64.94 15.50 61.11 3,237 585.12 61.23 16.00 57.69 3,120 585.09 57.82 16.50 54.40 2,993 585.05 54.51 17.00 52.31 2,912 585.02 52.37 17.50 50.98 2,861 585.01 51.03 18.00 49.75 2,813 584.99 49.79 18.50 48.51 2,766 584.98 48.55 19.00 47.25 2,717 584.96 47.30 19.50 45.98 2,669 584.95 46.03 20.00 44.70 2,619 584.93 44.75 20.50 43.48 2,573 584.92 43.52 21.00 42.83 2,547 584.91 42.84 21.50 42.53 2,536 584.90 42.54 22.00 42.29 2,526 584.90 42.30 22.50 42.05 2,517 584.90 42.05 23.00 41.80 2,508 584.90 41.81 23.50 41.56 2,498 584.89 41.57 24.00 41.31 2,489 584.89 41.32 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 84 Summary for Reach 26R: To Dan River Inflow Area = 175.798 ac, 0.00% Impervious, Inflow Depth > 7.52" for 100 years - 24 hrs event Inflow = 439.99 cfs @ 12.33 hrs, Volume= 110.121 of Outflow = 440.91 cfs @ 12.37 hrs, Volume= 109.999 af, Atten= 0%, Lag= 2.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 5.78 fps, Min. Travel Time= 0.7 min Avg. Velocity = 3.19 fps, Avg. Travel Time= 1.3 min Peak Storage= 19,724 cf @ 12.35 hrs Average Depth at Peak Storage= 2.54' Bank -Full Depth= 10.54' Flow Area= 1,563.4 sf, Capacity= 19,048.17 cfs Custom cross-section, Length= 258.3' Slope= 0.0157 T (103 Elevation Intervals) Constant n= 0.040 Inlet Invert= 583.01', Outlet Invert= 578.96' Offset Elevation Chan.Depth (feet) (feet) (feet) 43.40 593.14 0.00 226.12 588.00 5.14 252.69 586.00 7.14 285.16 582.83 10.31 293.21 582.60 10.54 342.47 588.00 5.14 411.43 593.14 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.23 1.2 10.2 301 1.28 3.40 130.6 71.9 33,743 905.02 5.40 318.5 116.9 82,274 2,890.90 10.54 1,563.4 368.8 403,820 19,048.17 Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 85 450 400 350 300 3 250 ,° 200 150 100 50 0 Reach 26R: To Dan River Hydrograph 440.91 Cfs Inflow 1►rea�1751.7981ac Avg. F16wDepth=2.54' 1 Mai Ve'=5.78 fps 1 1 1 1 1 1 1 S=6.01$7-I' L A 1 L-1 1 Capacity=1 048�.17�fs I — I - 1 4 1 —' 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Existing Conditions Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 86 Hydrograph for Reach 26R: To Dan River Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 583.01 0.00 0.50 13.84 1,454 583.57 12.13 1.00 25.61 2,390 583.77 25.27 1.50 28.24 2,576 583.80 28.16 2.00 28.94 2,626 583.81 28.93 2.50 29.00 2,630 583.81 29.00 3.00 29.00 2,630 583.81 29.00 3.50 29.00 2,630 583.81 29.00 4.00 29.00 2,630 583.81 29.00 4.50 29.00 2,630 583.81 29.00 5.00 29.00 2,630 583.81 29.00 5.50 29.00 2,630 583.81 29.00 6.00 29.00 2,630 583.81 29.00 6.50 29.00 2,630 583.81 29.00 7.00 29.00 2,630 583.81 29.00 7.50 29.00 2,630 583.81 29.00 8.00 29.00 2,630 583.81 29.00 8.50 29.00 2,630 583.81 29.00 9.00 29.00 2,630 583.81 29.00 9.50 29.41 2,655 583.82 29.35 10.00 30.96 2,756 583.84 30.84 10.50 33.67 2,928 583.87 33.47 11.00 38.52 3,222 583.92 38.15 11.50 48.19 3,787 584.01 47.41 12.00 147.46 8,349 584.58 131.81 12.50 437.35 19,584 585.54 436.62 13.00 188.33 10,628 584.81 197.60 13.50 105.48 6,847 584.42 107.54 14.00 83.40 5,738 584.28 84.19 14.50 72.01 5,140 584.20 72.48 15.00 65.88 4,811 584.16 66.13 15.50 62.08 4,601 584.13 62.28 16.00 58.57 4,408 584.10 58.76 16.50 55.20 4,222 584.07 55.36 17.00 53.02 4,097 584.05 53.11 17.50 51.64 4,016 584.04 51.71 18.00 50.37 3,942 584.03 50.44 18.50 49.09 3,868 584.02 49.16 19.00 47.80 3,793 584.01 47.87 19.50 46.49 3,717 584.00 46.57 20.00 45.17 3,640 583.98 45.25 20.50 43.92 3,567 583.97 43.99 21.00 43.24 3,526 583.97 43.26 21.50 42.93 3,508 583.96 42.95 22.00 42.68 3,493 583.96 42.69 22.50 42.43 3,479 583.96 42.44 23.00 42.18 3,464 583.96 42.19 23.50 41.93 3,448 583.95 41.94 24.00 41.67 3,432 583.95 41.69 ATTACHMENT A-3 HydroCAD Calculations for Basin Design: Post Development 100yr storm Belews Creek Basin Design Memo /D 30R 14 To Dan ever DA 14 15 DA 15 (12 D 29R 13 DA 12 RR Cu v rt DA 13 D� 28R a (�, O Road ulvert DA 11 DA 10 DA 6 Spillwr utfall DA 9 O -V A5P DA 6 Retentiln Basin (5) 1P (new Subcat) (new Subcat) 16S 18P 15R (new Subcat) NE Drainage (new Reach) 17 DA5 Detente n Basin \ NE dfill Corner O DA7 11 R (new each) O 6R (�) 7S DA3 DA4 O new Reach) (new Subcat) 4R 5R Q\ /}� c2) / (new Reach) (new Reach) cl) DA2 DA1 Subcat Reach on Link Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1: DA1 Runoff = 291.27 cfs @ 12.56 hrs, Volume= 42.101 af, Depth> 3.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 82.455 70 Woods, Good, HSG C 54.970 55 Woods, Good, HSG B 137.425 64 Weighted Average 137.425 100.00% Pervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 17.8 100 0.0305 0.09 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 1.2 47 0.0183 0.68 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.6 78 0.2040 2.26 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 24.4 1,266 0.0298 0.86 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.7 663 0.0523 1.14 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.1 1,392 0.0852 198.75887,689.19 Channel Flow, Area= 4,466.3 sf Perim= 307.2' r= 14.54' n= 0.013 53.8 3,546 Total Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 3 Subcatchment 1: DA1 Hydrograph 300 250 N 200 0 150 U_ 100 50- 04 0 291.27 cfs Type II 24-1ir I i 100 years -,24 hrs Rainf 11=7.94" Runoff Area=137.425 a 7 Runoff Volume=42.101 of Run-off Depth>3.68— Flo* Length=3,546' Tc=53.8 min CN44 I 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 4 Hydrograph for Subcatchment 1: DA1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.03 9.50 1.29 0.00 0.22 9.75 1.36 0.01 0.63 10.00 1.44 0.02 1.24 10.25 1.52 0.03 2.04 10.50 1.62 0.04 3.10 10.75 1.73 0.06 4.51 11.00 1.87 0.09 6.42 11.25 2.03 0.13 9.05 11.50 2.25 0.19 12.89 11.75 3.07 0.50 20.01 12.00 5.26 1.75 55.10 12.25 5.61 1.99 181.62 12.50 5.84 2.15 288.72 12.75 6.00 2.26 258.55 13.00 6.13 2.36 174.73 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 120.05 13.50 6.34 2.51 86.47 13.75 6.43 2.58 65.99 14.00 6.51 2.63 53.07 14.25 6.58 2.69 44.31 14.50 6.65 2.74 38.15 14.75 6.72 2.79 33.63 15.00 6.78 2.83 30.49 15.25 6.83 2.88 28.49 15.50 6.89 2.92 26.84 15.75 6.94 2.96 25.34 16.00 6.99 2.99 23.90 16.25 7.03 3.03 22.49 16.50 7.08 3.06 21.17 16.75 7.12 3.09 20.08 17.00 7.16 3.12 19.26 17.25 7.20 3.15 18.61 17.50 7.24 3.18 18.04 17.75 7.28 3.21 17.51 18.00 7.31 3.24 16.99 18.25 7.35 3.27 16.49 18.50 7.38 3.29 15.98 18.75 7.41 3.32 15.47 19.00 7.45 3.34 14.96 19.25 7.48 3.37 14.45 19.50 7.50 3.39 13.94 19.75 7.53 3.41 13.43 20.00 7.56 3.43 12.92 20.25 7.58 3.45 12.41 20.50 7.61 3.47 11.93 20.75 7.64 3.49 11.55 21.00 7.66 3.51 11.29 21.25 7.68 3.53 11.11 21.50 7.71 3.55 10.97 21.75 7.73 3.57 10.85 22.00 7.76 3.59 10.75 22.25 7.78 3.61 10.65 22.50 7.80 3.63 10.55 22.75 7.83 3.64 10.46 23.00 7.85 3.66 10.36 23.25 7.87 3.68 10.26 23.50 7.90 3.70 10.16 23.75 7.92 3.72 10.06 24.00 7.94 3.73 9.96 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 2: DA2 Runoff = 422.40 cfs @ 12.53 hrs, Volume= 58.976 af, Depth> 4.92" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 58.998 70 Woods, Good, HSG C 39.332 55 Woods, Good, HSG B 45.387 98 Water Surface 143.717 75 Weighted Average 98.330 68.42% Pervious Area 45.387 31.58% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.2 100 0.0197 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 20.4 1,198 0.0384 0.98 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.8 699 0.0568 1.19 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 1.1 1,577 0.0220 22.93 16,334.95 Channel Flow, Area= 712.3 sf Perim= 102.5' r= 6.95' n= 0.035 52.5 3,574 Total 450 400 350 MIN 250 3 2 200 150 100 50 Subcatchment 2: DA2 Hydrograph - 422.40 cfs Type)--Il 2"r — I— -�-- ---4 100 years -124 hra Rainfall=7.94" Runoff �a=443.7'17 at. Runoff Volume=58.976 Runoff Depth>4.9'2" of Flov_Lenoh _3 574' Tc=52.5 min CN45 4 4 - + - + 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 6 Hydrograph for Subcatchment 2: DA2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.06 7.00 0.79 0.00 0.25 7.25 0.83 0.01 0.58 7.50 0.87 0.01 1.01 7.75 0.91 0.02 1.49 8.00 0.95 0.02 2.01 8.25 1.00 0.03 2.56 8.50 1.05 0.04 3.17 8.75 1.11 0.05 3.92 9.00 1.17 0.07 4.86 9.25 1.23 0.08 5.99 9.50 1.29 0.10 7.24 9.75 1.36 0.12 8.44 10.00 1.44 0.14 9.62 10.25 1.52 0.17 11.12 10.50 1.62 0.21 13.16 10.75 1.73 0.26 15.89 11.00 1.87 0.32 19.47 11.25 2.03 0.40 24.26 11.50 2.25 0.51 31.04 11.75 3.07 1.01 43.36 12.00 5.26 2.67 102.10 12.25 5.61 2.95 289.37 12.50 5.84 3.14 421.04 12.75 6.00 3.28 355.54 13.00 6.13 3.39 230.80 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 3.49 154.70 13.50 6.34 3.58 109.40 13.75 6.43 3.65 82.30 14.00 6.51 3.72 65.52 14.25 6.58 3.78 54.35 14.50 6.65 3.84 46.56 14.75 6.72 3.90 40.80 15.00 6.78 3.95 37.11 15.25 6.83 4.00 34.66 15.50 6.89 4.05 32.60 15.75 6.94 4.10 30.74 16.00 6.99 4.14 28.96 16.25 7.03 4.18 27.22 16.50 7.08 4.22 25.59 16.75 7.12 4.25 24.26 17.00 7.16 4.29 23.24 17.25 7.20 4.33 22.42 17.50 7.24 4.36 21.71 17.75 7.28 4.39 21.06 18.00 7.31 4.43 20.43 18.25 7.35 4.46 19.81 18.50 7.38 4.49 19.18 18.75 7.41 4.52 18.55 19.00 7.45 4.54 17.92 19.25 7.48 4.57 17.30 19.50 7.50 4.60 16.67 19.75 7.53 4.62 16.05 20.00 7.56 4.65 15.43 20.25 7.58 4.67 14.80 20.50 7.61 4.69 14.21 20.75 7.64 4.71 13.75 21.00 7.66 4.74 13.45 21.25 7.68 4.76 13.24 21.50 7.71 4.78 13.08 21.75 7.73 4.80 12.94 22.00 7.76 4.82 12.81 22.25 7.78 4.84 12.67 22.50 7.80 4.87 12.54 22.75 7.83 4.89 12.42 23.00 7.85 4.91 12.30 23.25 7.87 4.93 12.18 23.50 7.90 4.95 12.06 23.75 7.92 4.97 11.94 24.00 7.94 4.99 11.81 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 3: DA3 Runoff = 143.46 cfs @ 12.44 hrs, Volume= 18.316 af, Depth> 3.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 35.779 70 Woods, Good, HSG C 23.853 55 Woods, Good, HSG B 59.632 64 Weighted Average 59.632 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.9 100 0.0132 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 20.4 1,484 0.0587 1.21 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 45.3 1,584 Total 160 140 120 100 3 80 0 60 40 20 0 0 Subcatchment 3: DA3 Hydrograph 143.46 cfs Type�ll 24-fir 100 ears - 24 hrs Rainfall=7.94" Runoff ►ire';59.632 ac Run�ff Volume=1�8.316 f Runoff [Ye-pth—>3.69— Flowl Length=1,584' Tc=45.3 min CN=64 L I — t 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 8 Hydrograph for Subcatchment 3: DA3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.03 9.50 1.29 0.00 0.15 9.75 1.36 0.01 0.37 10.00 1.44 0.02 0.68 10.25 1.52 0.03 1.07 10.50 1.62 0.04 1.59 10.75 1.73 0.06 2.29 11.00 1.87 0.09 3.23 11.25 2.03 0.13 4.55 11.50 2.25 0.19 6.52 11.75 3.07 0.50 10.49 12.00 5.26 1.75 34.26 12.25 5.61 1.99 111.51 12.50 5.84 2.15 141.08 12.75 6.00 2.26 99.72 13.00 6.13 2.36 62.21 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 41.91 13.50 6.34 2.51 30.56 13.75 6.43 2.58 24.07 14.00 6.51 2.63 19.91 14.25 6.58 2.69 17.01 14.50 6.65 2.74 14.80 14.75 6.72 2.79 13.51 15.00 6.78 2.83 12.61 15.25 6.83 2.88 11.91 15.50 6.89 2.92 11.26 15.75 6.94 2.96 10.65 16.00 6.99 2.99 10.04 16.25 7.03 3.03 9.45 16.50 7.08 3.06 8.89 16.75 7.12 3.09 8.48 17.00 7.16 3.12 8.17 17.25 7.20 3.15 7.92 17.50 7.24 3.18 7.69 17.75 7.28 3.21 7.47 18.00 7.31 3.24 7.25 18.25 7.35 3.27 7.04 18.50 7.38 3.29 6.82 18.75 7.41 3.32 6.60 19.00 7.45 3.34 6.38 19.25 7.48 3.37 6.16 19.50 7.50 3.39 5.94 19.75 7.53 3.41 5.71 20.00 7.56 3.43 5.49 20.25 7.58 3.45 5.26 20.50 7.61 3.47 5.07 20.75 7.64 3.49 4.93 21.00 7.66 3.51 4.84 21.25 7.68 3.53 4.78 21.50 7.71 3.55 4.73 21.75 7.73 3.57 4.68 22.00 7.76 3.59 4.64 22.25 7.78 3.61 4.60 22.50 7.80 3.63 4.56 22.75 7.83 3.64 4.51 23.00 7.85 3.66 4.47 23.25 7.87 3.68 4.43 23.50 7.90 3.70 4.39 23.75 7.92 3.72 4.34 24.00 7.94 3.73 4.30 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 4: DA4 Runoff = 132.63 cfs @ 12.35 hrs, Volume= 14.995 af, Depth> 3.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 29.229 70 Woods, Good, HSG C 19.486 55 Woods, Good, HSG B 48.715 64 Weighted Average 48.715 100.00% Pervious Area Tc Length (min) (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 22.9 100 0.0163 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 15.1 1,183 0.0684 1.31 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 38.0 1,283 Total 140 120 100 80 3 ,° 60 40 20 0 0 Subcatchment 4: DA4 Hydrograph 132.63 cfs Type II 24-11ir 100 )ears-.24_hrs Rainf'1=T.9 " Runoff Area=48.715 ac Runoff Volume=14.995 of Runoff Depth>3.69" Flowv_Length=1,283' — Tc=38.0 min C N k4 L I 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 10 Hydrograph for Subcatchment 4: DA4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.03 9.50 1.29 0.00 0.17 9.75 1.36 0.01 0.39 10.00 1.44 0.02 0.67 10.25 1.52 0.03 1.03 10.50 1.62 0.04 1.50 10.75 1.73 0.06 2.14 11.00 1.87 0.09 3.01 11.25 2.03 0.13 4.23 11.50 2.25 0.19 6.11 11.75 3.07 0.50 10.33 12.00 5.26 1.75 40.70 12.25 5.61 1.99 121.93 12.50 5.84 2.15 115.34 12.75 6.00 2.26 66.39 13.00 6.13 2.36 40.59 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 27.67 13.50 6.34 2.51 21.00 13.75 6.43 2.58 17.16 14.00 6.51 2.63 14.49 14.25 6.58 2.69 12.71 14.50 6.65 2.74 11.43 14.75 6.72 2.79 10.59 15.00 6.78 2.83 9.98 15.25 6.83 2.88 9.46 15.50 6.89 2.92 8.96 15.75 6.94 2.96 8.48 16.00 6.99 2.99 7.99 16.25 7.03 3.03 7.50 16.50 7.08 3.06 7.08 16.75 7.12 3.09 6.78 17.00 7.16 3.12 6.57 17.25 7.20 3.15 6.38 17.50 7.24 3.18 6.20 17.75 7.28 3.21 6.02 18.00 7.31 3.24 5.84 18.25 7.35 3.27 5.67 18.50 7.38 3.29 5.49 18.75 7.41 3.32 5.31 19.00 7.45 3.34 5.13 19.25 7.48 3.37 4.95 19.50 7.50 3.39 4.77 19.75 7.53 3.41 4.58 20.00 7.56 3.43 4.40 20.25 7.58 3.45 4.22 20.50 7.61 3.47 4.07 20.75 7.64 3.49 3.98 21.00 7.66 3.51 3.92 21.25 7.68 3.53 3.88 21.50 7.71 3.55 3.85 21.75 7.73 3.57 3.81 22.00 7.76 3.59 3.78 22.25 7.78 3.61 3.74 22.50 7.80 3.63 3.71 22.75 7.83 3.64 3.67 23.00 7.85 3.66 3.64 23.25 7.87 3.68 3.60 23.50 7.90 3.70 3.57 23.75 7.92 3.72 3.53 24.00 7.94 3.73 3.50 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 4S: DA 6 Runoff = 142.54 cfs @ 12.11 hrs, Volume= 10.205 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 19.776 70 Woods, Good, HSG C 13.184 55 Woods, Good, HSG B 32.960 64 Weighted Average 32.960 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.4 100 0.0624 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 4.9 657 0.2014 2.24 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 18.3 757 Total 140 120 N 100 3 80 0 U_ 60 40 20 0 0 Subcatchment 4S: DA 6 Hydrograph 142.54 cfs Type II 24-fir 100 years - 24 hrs Rainfall=7.94" Runoff Area=32.960 ac Runoff Vol} rne=10.205 of Runoff Depth>1. 2" Flo* Length=757, Tc=18.3 min CN=64 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 12 Hydrograph for Subcatchment 4S: DA 6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.01 9.25 1.23 0.00 0.11 9.50 1.29 0.00 0.29 9.75 1.36 0.01 0.47 10.00 1.44 0.02 0.72 10.25 1.52 0.03 1.05 10.50 1.62 0.04 1.50 10.75 1.73 0.06 2.09 11.00 1.87 0.09 2.94 11.25 2.03 0.13 4.16 11.50 2.25 0.19 6.32 11.75 3.07 0.50 16.68 12.00 5.26 1.75 100.53 12.25 5.61 1.99 94.37 12.50 5.84 2.15 35.22 12.75 6.00 2.26 19.61 13.00 6.13 2.36 14.48 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 12.07 13.50 6.34 2.51 10.54 13.75 6.43 2.58 9.29 14.00 6.51 2.63 8.28 14.25 6.58 2.69 7.42 14.50 6.65 2.74 6.97 14.75 6.72 2.79 6.63 15.00 6.78 2.83 6.31 15.25 6.83 2.88 5.99 15.50 6.89 2.92 5.66 15.75 6.94 2.96 5.33 16.00 6.99 2.99 5.00 16.25 7.03 3.03 4.69 16.50 7.08 3.06 4.52 16.75 7.12 3.09 4.40 17.00 7.16 3.12 4.28 17.25 7.20 3.15 4.17 17.50 7.24 3.18 4.05 17.75 7.28 3.21 3.93 18.00 7.31 3.24 3.81 18.25 7.35 3.27 3.69 18.50 7.38 3.29 3.57 18.75 7.41 3.32 3.45 19.00 7.45 3.34 3.32 19.25 7.48 3.37 3.20 19.50 7.50 3.39 3.08 19.75 7.53 3.41 2.95 20.00 7.56 3.43 2.83 20.25 7.58 3.45 2.71 20.50 7.61 3.47 2.67 20.75 7.64 3.49 2.64 21.00 7.66 3.51 2.62 21.25 7.68 3.53 2.60 21.50 7.71 3.55 2.57 21.75 7.73 3.57 2.55 22.00 7.76 3.59 2.53 22.25 7.78 3.61 2.50 22.50 7.80 3.63 2.48 22.75 7.83 3.64 2.46 23.00 7.85 3.66 2.43 23.25 7.87 3.68 2.41 23.50 7.90 3.70 2.38 23.75 7.92 3.72 2.36 24.00 7.94 3.73 2.34 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 5: DA5 Runoff = 129.14 cfs @ 12.54 hrs, Volume= 18.272 af, Depth> 3.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 35.768 70 Woods, Good, HSG C 23.845 55 Woods, Good, HSG B 59.613 64 Weighted Average 59.613 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.2 100 0.0648 0.13 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 39.0 2,495 0.0454 1.07 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 52.2 2,595 Total 140 120 100 N 80 3 ,° 60 40 20 0 0 Subcatchment 5: DA5 Hydrograph 129.14 cfs Type II 24-11ir 100 ears - 24 hrs Rainfall=7.94" Runoff Are=59.613 ac Run?ff Volume=18.272 of Runoff Depth>3.68" FlowrLength=2;595' Tc=52.2 min CN=64 — 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 14 Hydrograph for Subcatchment 5: DA5 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.02 9.50 1.29 0.00 0.10 9.75 1.36 0.01 0.29 10.00 1.44 0.02 0.56 10.25 1.52 0.03 0.92 10.50 1.62 0.04 1.39 10.75 1.73 0.06 2.02 11.00 1.87 0.09 2.86 11.25 2.03 0.13 4.03 11.50 2.25 0.19 5.75 11.75 3.07 0.50 8.98 12.00 5.26 1.75 25.48 12.25 5.61 1.99 84.15 12.50 5.84 2.15 128.60 12.75 6.00 2.26 110.89 13.00 6.13 2.36 73.31 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 50.16 13.50 6.34 2.51 36.17 13.75 6.43 2.58 27.72 14.00 6.51 2.63 22.39 14.25 6.58 2.69 18.77 14.50 6.65 2.74 16.20 14.75 6.72 2.79 14.29 15.00 6.78 2.83 13.08 15.25 6.83 2.88 12.26 15.50 6.89 2.92 11.57 15.75 6.94 2.96 10.92 16.00 6.99 2.99 10.30 16.25 7.03 3.03 9.70 16.50 7.08 3.06 9.13 16.75 7.12 3.09 8.67 17.00 7.16 3.12 8.32 17.25 7.20 3.15 8.04 17.50 7.24 3.18 7.79 17.75 7.28 3.21 7.56 18.00 7.31 3.24 7.34 18.25 7.35 3.27 7.13 18.50 7.38 3.29 6.91 18.75 7.41 3.32 6.69 19.00 7.45 3.34 6.47 19.25 7.48 3.37 6.25 19.50 7.50 3.39 6.03 19.75 7.53 3.41 5.81 20.00 7.56 3.43 5.59 20.25 7.58 3.45 5.36 20.50 7.61 3.47 5.15 20.75 7.64 3.49 4.99 21.00 7.66 3.51 4.88 21.25 7.68 3.53 4.81 21.50 7.71 3.55 4.76 21.75 7.73 3.57 4.71 22.00 7.76 3.59 4.66 22.25 7.78 3.61 4.62 22.50 7.80 3.63 4.57 22.75 7.83 3.64 4.53 23.00 7.85 3.66 4.49 23.25 7.87 3.68 4.45 23.50 7.90 3.70 4.40 23.75 7.92 3.72 4.36 24.00 7.94 3.73 4.31 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 6: DA 6 Runoff = 36.54 cfs @ 12.15 hrs, Volume= 2.866 af, Depth> 3.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 5.560 70 Woods, Good, HSG C 3.706 55 Woods, Good, HSG B 9.266 64 Weighted Average 9.266 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.6 100 0.1115 0.16 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 10.9 1,132 0.1206 1.74 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 21.5 1,232 Total 1� N 2 y 3 2 0 " 1 1 Subcatchment 6: DA 6 Hydrograph 36.54 cfs Type 11 24.r - 100 (ears -I24 hrslRainfT11=7.94t" Rurrbff Area=9266 ac Run?ff Volume=2.I866 afl Runoff Depth->3.7f— Flowl Length=1,232' Tc=21.5 min CN=64 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 16 Hydrograph for Subcatchment 6: DA 6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.02 9.50 1.29 0.00 0.07 9.75 1.36 0.01 0.12 10.00 1.44 0.02 0.19 10.25 1.52 0.03 0.28 10.50 1.62 0.04 0.40 10.75 1.73 0.06 0.55 11.00 1.87 0.09 0.78 11.25 2.03 0.13 1.10 11.50 2.25 0.19 1.65 11.75 3.07 0.50 3.80 12.00 5.26 1.75 22.27 12.25 5.61 1.99 30.31 12.50 5.84 2.15 12.01 12.75 6.00 2.26 6.37 13.00 6.13 2.36 4.40 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 3.53 13.50 6.34 2.51 3.05 13.75 6.43 2.58 2.68 14.00 6.51 2.63 2.38 14.25 6.58 2.69 2.13 14.50 6.65 2.74 1.98 14.75 6.72 2.79 1.88 15.00 6.78 2.83 1.79 15.25 6.83 2.88 1.70 15.50 6.89 2.92 1.61 15.75 6.94 2.96 1.52 16.00 6.99 2.99 1.42 16.25 7.03 3.03 1.33 16.50 7.08 3.06 1.28 16.75 7.12 3.09 1.24 17.00 7.16 3.12 1.21 17.25 7.20 3.15 1.18 17.50 7.24 3.18 1.14 17.75 7.28 3.21 1.11 18.00 7.31 3.24 1.08 18.25 7.35 3.27 1.04 18.50 7.38 3.29 1.01 18.75 7.41 3.32 0.98 19.00 7.45 3.34 0.94 19.25 7.48 3.37 0.91 19.50 7.50 3.39 0.87 19.75 7.53 3.41 0.84 20.00 7.56 3.43 0.80 20.25 7.58 3.45 0.77 20.50 7.61 3.47 0.75 20.75 7.64 3.49 0.74 21.00 7.66 3.51 0.74 21.25 7.68 3.53 0.73 21.50 7.71 3.55 0.72 21.75 7.73 3.57 0.72 22.00 7.76 3.59 0.71 22.25 7.78 3.61 0.70 22.50 7.80 3.63 0.70 22.75 7.83 3.64 0.69 23.00 7.85 3.66 0.69 23.25 7.87 3.68 0.68 23.50 7.90 3.70 0.67 23.75 7.92 3.72 0.66 24.00 7.94 3.73 0.66 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 7: DA7 Runoff = 9.96 cfs @ 12.65 hrs, Volume= 1.570 af, Depth> 3.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 3.081 70 Woods, Good, HSG C 2.054 55 Woods, Good, HSG B 5.135 64 Weighted Average 5.135 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.7 100 0.0062 0.05 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 25.7 607 0.0062 0.39 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 1.4 229 0.2863 2.68 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 60.8 936 Total Subcatchment 7: DA7 Hydrograph 11 9.96 cfs 19 Type II 24-hr 9 00 ears - 24TirsIl�ainfall=7?S�L" 8 Runoff Are _'M3 aC 7 Runoff Vol �me=1.570 of T Runoff Depth>3.67" 6 low Leng#o=936' 2 5 Tc=60.8 min CN =4 4 3 2 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 18 Hydrograph for Subcatchment 7: DA7 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.00 9.50 1.29 0.00 0.01 9.75 1.36 0.01 0.02 10.00 1.44 0.02 0.04 10.25 1.52 0.03 0.06 10.50 1.62 0.04 0.10 10.75 1.73 0.06 0.15 11.00 1.87 0.09 0.21 11.25 2.03 0.13 0.30 11.50 2.25 0.19 0.43 11.75 3.07 0.50 0.65 12.00 5.26 1.75 1.62 12.25 5.61 1.99 5.11 12.50 5.84 2.15 9.23 12.75 6.00 2.26 9.69 13.00 6.13 2.36 7.50 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 5.20 13.50 6.34 2.51 3.78 13.75 6.43 2.58 2.86 14.00 6.51 2.63 2.26 14.25 6.58 2.69 1.86 14.50 6.65 2.74 1.57 14.75 6.72 2.79 1.37 15.00 6.78 2.83 1.22 15.25 6.83 2.88 1.11 15.50 6.89 2.92 1.04 15.75 6.94 2.96 0.97 16.00 6.99 2.99 0.92 16.25 7.03 3.03 0.86 16.50 7.08 3.06 0.81 16.75 7.12 3.09 0.77 17.00 7.16 3.12 0.73 17.25 7.20 3.15 0.71 17.50 7.24 3.18 0.68 17.75 7.28 3.21 0.66 18.00 7.31 3.24 0.64 18.25 7.35 3.27 0.62 18.50 7.38 3.29 0.61 18.75 7.41 3.32 0.59 19.00 7.45 3.34 0.57 19.25 7.48 3.37 0.55 19.50 7.50 3.39 0.53 19.75 7.53 3.41 0.51 20.00 7.56 3.43 0.49 20.25 7.58 3.45 0.47 20.50 7.61 3.47 0.45 20.75 7.64 3.49 0.44 21.00 7.66 3.51 0.43 21.25 7.68 3.53 0.42 21.50 7.71 3.55 0.41 21.75 7.73 3.57 0.41 22.00 7.76 3.59 0.40 22.25 7.78 3.61 0.40 22.50 7.80 3.63 0.40 22.75 7.83 3.64 0.39 23.00 7.85 3.66 0.39 23.25 7.87 3.68 0.38 23.50 7.90 3.70 0.38 23.75 7.92 3.72 0.38 24.00 7.94 3.73 0.37 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 7S: (new Subcat) Runoff = 46.77 cfs @ 12.16 hrs, Volume= 3.858 af, Depth> 5.54" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 8.354 80 Liner 8.354 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.6 100 0.0030 0.08 Sheet Flow, Grass: Short n= 0.150 P2= 3.31" 2.6 545 0.2507 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fDs 23.2 645 Total 5 4 4 3 3 3 2 0 'L 2 1 1 Subcatchment 7S: (new Subcat) Hydrograph 46.77 cfs Type II 24-hr I 100 ears - 24 hrslRainff 11=7.CIA" - Rundff Are=8.354 ac -Runoff Vo4ume=3.1858 OF Runoff Depth>5.54" Flo* Length=645'I Tc=23.2 min CN=60 T 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 20 Hydrograph for Subcatchment 7S: (new Subcat) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.02 5.75 0.60 0.00 0.05 6.00 0.64 0.01 0.08 6.25 0.67 0.01 0.11 6.50 0.71 0.02 0.14 6.75 0.75 0.02 0.17 7.00 0.79 0.03 0.21 7.25 0.83 0.04 0.24 7.50 0.87 0.05 0.28 7.75 0.91 0.06 0.32 8.00 0.95 0.07 0.36 8.25 1.00 0.08 0.40 8.50 1.05 0.10 0.47 8.75 1.11 0.12 0.55 9.00 1.17 0.14 0.65 9.25 1.23 0.17 0.75 9.50 1.29 0.19 0.83 9.75 1.36 0.22 0.89 10.00 1.44 0.26 1.02 10.25 1.52 0.30 1.19 10.50 1.62 0.35 1.42 10.75 1.73 0.41 1.71 11.00 1.87 0.48 2.10 11.25 2.03 0.58 2.63 11.50 2.25 0.72 3.52 11.75 3.07 1.30 6.61 12.00 5.26 3.12 29.53 12.25 5.61 3.43 40.69 12.50 5.84 3.63 16.32 12.75 6.00 3.78 8.19 13.00 6.13 3.90 5.33 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 4.00 4.11 13.50 6.34 4.09 3.50 13.75 6.43 4.17 3.06 14.00 6.51 4.25 2.71 14.25 6.58 4.31 2.41 14.50 6.65 4.37 2.22 14.75 6.72 4.43 2.10 15.00 6.78 4.49 1.99 15.25 6.83 4.54 1.89 15.50 6.89 4.59 1.78 15.75 6.94 4.64 1.68 16.00 6.99 4.68 1.57 16.25 7.03 4.72 1.47 16.50 7.08 4.76 1.41 16.75 7.12 4.80 1.36 17.00 7.16 4.84 1.32 17.25 7.20 4.88 1.29 17.50 7.24 4.92 1.25 17.75 7.28 4.95 1.21 18.00 7.31 4.98 1.17 18.25 7.35 5.02 1.13 18.50 7.38 5.05 1.10 18.75 7.41 5.08 1.06 19.00 7.45 5.11 1.02 19.25 7.48 5.14 0.98 19.50 7.50 5.16 0.94 19.75 7.53 5.19 0.90 20.00 7.56 5.21 0.87 20.25 7.58 5.24 0.83 20.50 7.61 5.26 0.81 20.75 7.64 5.28 0.80 21.00 7.66 5.31 0.79 21.25 7.68 5.33 0.78 21.50 7.71 5.35 0.78 21.75 7.73 5.38 0.77 22.00 7.76 5.40 0.76 22.25 7.78 5.42 0.75 22.50 7.80 5.44 0.75 22.75 7.83 5.46 0.74 23.00 7.85 5.49 0.73 23.25 7.87 5.51 0.72 23.50 7.90 5.53 0.72 23.75 7.92 5.55 0.71 24.00 7.94 5.57 0.70 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 8S: (new Subcat) Runoff = 444.38 cfs @ 12.87 hrs, Volume= 83.991 af, Depth> 4.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 106.251 80 Liner 69.265 70 Woods, Good, HSG C 46.176 55 Woods, Good, HSG B 221.692 72 Weighted Average 221.692 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 42.1 100 0.0005 0.04 Sheet Flow, Grass: Short n= 0.150 P2= 3.31" 2.2 457 0.2366 3.40 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.8 5,725 0.0117 6.93 249.66 Channel Flow, Area= 36.0 sf Perim= 19.4' r= 1.86' n= 0.035 21.7 1,506 0.0536 1.16 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 79.8 7,788 Total 450 400 350 300 250 200 150 100 50 0 Subcatchment 8S: (new Subcat) Hydrograph 444.38 cfs Type11124-fir 100 ears - 24-hr. 1Tainfa�,4 l=7" Runoff Are =22192 at Run?ff Volume=83.991 �f Runoff Depth>4.55" Flo* Length=7,788' Tc 79.8 min CN=f2 L 0 2 4 6 8 10 12 14 Time (hours) 16 18 20 22 24 — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 22 Hydrograph for Subcatchment 8S: (new Subcat) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.03 7.75 0.91 0.00 0.14 8.00 0.95 0.01 0.39 8.25 1.00 0.01 0.80 8.50 1.05 0.02 1.36 8.75 1.11 0.03 2.06 9.00 1.17 0.04 2.93 9.25 1.23 0.05 4.00 9.50 1.29 0.06 5.29 9.75 1.36 0.08 6.73 10.00 1.44 0.10 8.27 10.25 1.52 0.12 9.95 10.50 1.62 0.15 11.97 10.75 1.73 0.19 14.54 11.00 1.87 0.24 17.89 11.25 2.03 0.31 22.35 11.50 2.25 0.40 28.40 11.75 3.07 0.85 37.79 12.00 5.26 2.40 67.17 12.25 5.61 2.67 161.12 12.50 5.84 2.86 317.08 12.75 6.00 2.99 428.46 13.00 6.13 3.10 434.12 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 3.19 365.84 13.50 6.34 3.28 274.82 13.75 6.43 3.35 208.61 14.00 6.51 3.42 162.65 14.25 6.58 3.48 129.67 14.50 6.65 3.53 105.67 14.75 6.72 3.59 88.15 15.00 6.78 3.64 75.66 15.25 6.83 3.69 66.38 15.50 6.89 3.73 59.70 15.75 6.94 3.78 54.52 16.00 6.99 3.82 50.19 16.25 7.03 3.86 46.23 16.50 7.08 3.89 42.82 16.75 7.12 3.93 40.26 17.00 7.16 3.97 38.01 17.25 7.20 4.00 36.23 17.50 7.24 4.03 34.75 17.75 7.28 4.07 33.47 18.00 7.31 4.10 32.38 18.25 7.35 4.13 31.29 18.50 7.38 4.16 30.32 18.75 7.41 4.18 29.35 19.00 7.45 4.21 28.38 19.25 7.48 4.24 27.47 19.50 7.50 4.26 26.50 19.75 7.53 4.29 25.59 20.00 7.56 4.31 24.64 20.25 7.58 4.33 23.70 20.50 7.61 4.35 22.80 20.75 7.64 4.38 21.92 21.00 7.66 4.40 21.23 21.25 7.68 4.42 20.65 21.50 7.71 4.44 20.23 21.75 7.73 4.46 19.90 22.00 7.76 4.48 19.61 22.25 7.78 4.50 19.39 22.50 7.80 4.52 19.15 22.75 7.83 4.54 18.96 23.00 7.85 4.56 18.76 23.25 7.87 4.58 18.56 23.50 7.90 4.60 18.39 23.75 7.92 4.62 18.19 24.00 7.94 4.64 18.02 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 9: DA 9 Runoff = 243.78 cfs @ 12.20 hrs, Volume= 21.433 af, Depth> 3.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 41.628 70 Woods, Good, HSG C 27.752 55 Woods, Good, HSG B 69.380 64 Weighted Average 69.380 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.2 100 0.0385 0.10 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 9.7 1,098 0.1413 1.88 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 25.9 1,198 Total 250 200 150 3 0 LL 100 50 1 Subcatchment 9: DA 9 Hydrograph 243.78 cfs Type II 24-11ir 100 years 24 hrs Rainfall=7.94" Runoff Area=69.380 ac Runoff Volume=21.433 �f Runoff Depth>3.71" Flo*_Length=9, IJ8' Tc=25.9 min CN=44 I L I 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 24 Hydrograph for Subcatchment 9: DA 9 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.13 9.50 1.29 0.00 0.44 9.75 1.36 0.01 0.81 10.00 1.44 0.02 1.28 10.25 1.52 0.03 1.89 10.50 1.62 0.04 2.72 10.75 1.73 0.06 3.81 11.00 1.87 0.09 5.36 11.25 2.03 0.13 7.53 11.50 2.25 0.19 11.20 11.75 3.07 0.50 22.54 12.00 5.26 1.75 122.20 12.25 5.61 1.99 235.23 12.50 5.84 2.15 112.96 12.75 6.00 2.26 58.79 13.00 6.13 2.36 37.63 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 28.63 13.50 6.34 2.51 23.83 13.75 6.43 2.58 20.83 14.00 6.51 2.63 18.45 14.25 6.58 2.69 16.47 14.50 6.65 2.74 15.14 14.75 6.72 2.79 14.32 15.00 6.78 2.83 13.61 15.25 6.83 2.88 12.93 15.50 6.89 2.92 12.24 15.75 6.94 2.96 11.55 16.00 6.99 2.99 10.85 16.25 7.03 3.03 10.16 16.50 7.08 3.06 9.69 16.75 7.12 3.09 9.39 17.00 7.16 3.12 9.13 17.25 7.20 3.15 8.89 17.50 7.24 3.18 8.64 17.75 7.28 3.21 8.39 18.00 7.31 3.24 8.14 18.25 7.35 3.27 7.88 18.50 7.38 3.29 7.63 18.75 7.41 3.32 7.37 19.00 7.45 3.34 7.12 19.25 7.48 3.37 6.86 19.50 7.50 3.39 6.60 19.75 7.53 3.41 6.33 20.00 7.56 3.43 6.07 20.25 7.58 3.45 5.82 20.50 7.61 3.47 5.67 20.75 7.64 3.49 5.59 21.00 7.66 3.51 5.54 21.25 7.68 3.53 5.49 21.50 7.71 3.55 5.44 21.75 7.73 3.57 5.39 22.00 7.76 3.59 5.34 22.25 7.78 3.61 5.29 22.50 7.80 3.63 5.24 22.75 7.83 3.64 5.19 23.00 7.85 3.66 5.14 23.25 7.87 3.68 5.09 23.50 7.90 3.70 5.04 23.75 7.92 3.72 4.99 24.00 7.94 3.73 4.94 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 9S: (new Subcat) Runoff = 187.80 cfs @ 12.25 hrs, Volume= 17.975 af, Depth> 3.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 34.950 70 Woods, Good, HSG C 23.300 55 Woods, Good, HSG B 58.250 64 Weighted Average 58.250 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.6 100 0.0603 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 9.9 721 0.0595 1.22 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 0.8 62 0.0690 1.31 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 4.0 277 0.0522 1.14 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 1.3 1,049 0.0035 13.41 18,437.07 Channel Flow, Area= 1,375.1 sf Perim= 111.5' r= 12.33' n= 0.035 29.6 2,209 Total 200 180 160 140 120 3 100 80 60 40 20 0 Subcatchment 9S: (new Subcat) Hydrograph TGA" Type 11 2"- r 100 ears -i24 hr� Rainf Run�ff Area=58.250 ac Runoff Volume=17�375 Runoff Depth>3.70" _ Flo* Length=2,2Q9' Tc=29.6 inin — — — — — — — — — CN=64 L __1 J� V I 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 26 Hydrograph for Subcatchment 9S: (new Subcat) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.08 9.50 1.29 0.00 0.31 9.75 1.36 0.01 0.61 10.00 1.44 0.02 0.98 10.25 1.52 0.03 1.47 10.50 1.62 0.04 2.12 10.75 1.73 0.06 2.99 11.00 1.87 0.09 4.20 11.25 2.03 0.13 5.89 11.50 2.25 0.19 8.68 11.75 3.07 0.50 16.20 12.00 5.26 1.75 80.10 12.25 5.61 1.99 187.76 12.50 5.84 2.15 111.41 12.75 6.00 2.26 58.38 13.00 6.13 2.36 35.91 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 26.28 13.50 6.34 2.51 21.11 13.75 6.43 2.58 18.10 14.00 6.51 2.63 15.95 14.25 6.58 2.69 14.21 14.50 6.65 2.74 12.97 14.75 6.72 2.79 12.19 15.00 6.78 2.83 11.57 15.25 6.83 2.88 10.99 15.50 6.89 2.92 10.41 15.75 6.94 2.96 9.83 16.00 6.99 2.99 9.24 16.25 7.03 3.03 8.66 16.50 7.08 3.06 8.22 16.75 7.12 3.09 7.95 17.00 7.16 3.12 7.72 17.25 7.20 3.15 7.51 17.50 7.24 3.18 7.30 17.75 7.28 3.21 7.09 18.00 7.31 3.24 6.88 18.25 7.35 3.27 6.67 18.50 7.38 3.29 6.45 18.75 7.41 3.32 6.24 19.00 7.45 3.34 6.02 19.25 7.48 3.37 5.81 19.50 7.50 3.39 5.59 19.75 7.53 3.41 5.37 20.00 7.56 3.43 5.15 20.25 7.58 3.45 4.93 20.50 7.61 3.47 4.79 20.75 7.64 3.49 4.71 21.00 7.66 3.51 4.66 21.25 7.68 3.53 4.62 21.50 7.71 3.55 4.57 21.75 7.73 3.57 4.53 22.00 7.76 3.59 4.49 22.25 7.78 3.61 4.45 22.50 7.80 3.63 4.41 22.75 7.83 3.64 4.37 23.00 7.85 3.66 4.33 23.25 7.87 3.68 4.29 23.50 7.90 3.70 4.24 23.75 7.92 3.72 4.20 24.00 7.94 3.73 4.16 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 10: DA 10 Runoff = 112.70 cfs @ 12.08 hrs, Volume= 7.472 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 14.468 70 Woods, Good, HSG C 9.646 55 Woods, Good, HSG B 24.114 64 Weighted Average 24.114 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.9 100 0.1343 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 5.8 595 0.1187 1.72 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.7 695 Total 120 110 100 90 N 80 70 3 60 FZ 50 40 30 20 10 0 Subcatchment 10: DA 10 Hydrograph 112.70 cfs Type�ll 24-fir 100-years— 24-hrs Rainfatl=7 ,4" Runoff Are=24.`IIU ac Runoff Volume=7I.472 aft Runoff Depth>3.72" Flow-Length=695' Tc=15.7 -min CN=64 T T T T T T — T 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 28 Hydrograph for Subcatchment 10: DA 10 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.01 9.25 1.23 0.00 0.10 9.50 1.29 0.00 0.23 9.75 1.36 0.01 0.37 10.00 1.44 0.02 0.56 10.25 1.52 0.03 0.81 10.50 1.62 0.04 1.15 10.75 1.73 0.06 1.61 11.00 1.87 0.09 2.26 11.25 2.03 0.13 3.22 11.50 2.25 0.19 4.91 11.75 3.07 0.50 14.94 12.00 5.26 1.75 89.59 12.25 5.61 1.99 57.26 12.50 5.84 2.15 21.97 12.75 6.00 2.26 12.93 13.00 6.13 2.36 10.21 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 8.59 13.50 6.34 2.51 7.55 13.75 6.43 2.58 6.66 14.00 6.51 2.63 5.94 14.25 6.58 2.69 5.35 14.50 6.65 2.74 5.05 14.75 6.72 2.79 4.81 15.00 6.78 2.83 4.58 15.25 6.83 2.88 4.34 15.50 6.89 2.92 4.10 15.75 6.94 2.96 3.86 16.00 6.99 2.99 3.62 16.25 7.03 3.03 3.40 16.50 7.08 3.06 3.29 16.75 7.12 3.09 3.21 17.00 7.16 3.12 3.12 17.25 7.20 3.15 3.03 17.50 7.24 3.18 2.95 17.75 7.28 3.21 2.86 18.00 7.31 3.24 2.77 18.25 7.35 3.27 2.68 18.50 7.38 3.29 2.60 18.75 7.41 3.32 2.51 19.00 7.45 3.34 2.42 19.25 7.48 3.37 2.33 19.50 7.50 3.39 2.24 19.75 7.53 3.41 2.14 20.00 7.56 3.43 2.05 20.25 7.58 3.45 1.98 20.50 7.61 3.47 1.95 20.75 7.64 3.49 1.93 21.00 7.66 3.51 1.91 21.25 7.68 3.53 1.90 21.50 7.71 3.55 1.88 21.75 7.73 3.57 1.86 22.00 7.76 3.59 1.85 22.25 7.78 3.61 1.83 22.50 7.80 3.63 1.81 22.75 7.83 3.64 1.79 23.00 7.85 3.66 1.78 23.25 7.87 3.68 1.76 23.50 7.90 3.70 1.74 23.75 7.92 3.72 1.72 24.00 7.94 3.73 1.71 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 11: DA 11 Runoff = 136.61 cfs @ 12.25 hrs, Volume= 13.221 af, Depth> 3.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 25.710 70 Woods, Good, HSG C 17.140 55 Woods, Good, HSG B 42.850 64 Weighted Average 42.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.4 100 0.0936 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 18.7 1,561 0.0776 1.39 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 30.1 1,661 Total 140 120 100 80 3 FL 60 40 20 0 0 Subcatchment 11: DA 11 Hydrograph 136.61 cfs Type II 24-hr 100 years - 24 hrs-Rainfall=7 94" Runoff Area=42.850 ac Run?ff Volume=13.221 of Runoff Depth>3.70" FlovA(Length=1,661' Tc=30.1 m i n CN=64 F fi 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 30 Hydrograph for Subcatchment 11: DA 11 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.06 9.50 1.29 0.00 0.22 9.75 1.36 0.01 0.44 10.00 1.44 0.02 0.71 10.25 1.52 0.03 1.07 10.50 1.62 0.04 1.54 10.75 1.73 0.06 2.18 11.00 1.87 0.09 3.06 11.25 2.03 0.13 4.30 11.50 2.25 0.19 6.31 11.75 3.07 0.50 11.69 12.00 5.26 1.75 57.05 12.25 5.61 1.99 136.60 12.50 5.84 2.15 83.59 12.75 6.00 2.26 43.89 13.00 6.13 2.36 26.89 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 19.57 13.50 6.34 2.51 15.68 13.75 6.43 2.58 13.38 14.00 6.51 2.63 11.79 14.25 6.58 2.69 10.49 14.50 6.65 2.74 9.56 14.75 6.72 2.79 8.99 15.00 6.78 2.83 8.53 15.25 6.83 2.88 8.09 15.50 6.89 2.92 7.67 15.75 6.94 2.96 7.24 16.00 6.99 2.99 6.81 16.25 7.03 3.03 6.38 16.50 7.08 3.06 6.06 16.75 7.12 3.09 5.85 17.00 7.16 3.12 5.68 17.25 7.20 3.15 5.53 17.50 7.24 3.18 5.38 17.75 7.28 3.21 5.22 18.00 7.31 3.24 5.06 18.25 7.35 3.27 4.91 18.50 7.38 3.29 4.75 18.75 7.41 3.32 4.60 19.00 7.45 3.34 4.44 19.25 7.48 3.37 4.28 19.50 7.50 3.39 4.12 19.75 7.53 3.41 3.95 20.00 7.56 3.43 3.79 20.25 7.58 3.45 3.63 20.50 7.61 3.47 3.52 20.75 7.64 3.49 3.47 21.00 7.66 3.51 3.43 21.25 7.68 3.53 3.40 21.50 7.71 3.55 3.37 21.75 7.73 3.57 3.34 22.00 7.76 3.59 3.31 22.25 7.78 3.61 3.28 22.50 7.80 3.63 3.25 22.75 7.83 3.64 3.21 23.00 7.85 3.66 3.18 23.25 7.87 3.68 3.15 23.50 7.90 3.70 3.12 23.75 7.92 3.72 3.09 24.00 7.94 3.73 3.06 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment 12: DA 12 Runoff = 4.92 cfs @ 12.08 hrs, Volume= 0.326 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 0.632 70 Woods, Good, HSG C 0.421 55 Woods, Good, HSG B 1.053 64 Weighted Average 1.053 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.3 100 0.0630 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 2.4 229 0.1036 1.61 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 15.7 329 Total 3 3 0 2 i 0L 0 Subcatchment 12: DA 12 Hydrograph 4.92 cfs Type II 24-hr 100 years - 24 hrsl Rainf�11=7.94" Runoff Area=1.053-ac T Runoff Volume=0.326 of Runoff Depth>3.72" Flow-Length=329' Tc=15.7 min CN=64 L_ 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 32 Hydrograph for Subcatchment 12: DA 12 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.00 9.50 1.29 0.00 0.01 9.75 1.36 0.01 0.02 10.00 1.44 0.02 0.02 10.25 1.52 0.03 0.04 10.50 1.62 0.04 0.05 10.75 1.73 0.06 0.07 11.00 1.87 0.09 0.10 11.25 2.03 0.13 0.14 11.50 2.25 0.19 0.21 11.75 3.07 0.50 0.65 12.00 5.26 1.75 3.91 12.25 5.61 1.99 2.50 12.50 5.84 2.15 0.96 12.75 6.00 2.26 0.56 13.00 6.13 2.36 0.45 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 0.38 13.50 6.34 2.51 0.33 13.75 6.43 2.58 0.29 14.00 6.51 2.63 0.26 14.25 6.58 2.69 0.23 14.50 6.65 2.74 0.22 14.75 6.72 2.79 0.21 15.00 6.78 2.83 0.20 15.25 6.83 2.88 0.19 15.50 6.89 2.92 0.18 15.75 6.94 2.96 0.17 16.00 6.99 2.99 0.16 16.25 7.03 3.03 0.15 16.50 7.08 3.06 0.14 16.75 7.12 3.09 0.14 17.00 7.16 3.12 0.14 17.25 7.20 3.15 0.13 17.50 7.24 3.18 0.13 17.75 7.28 3.21 0.12 18.00 7.31 3.24 0.12 18.25 7.35 3.27 0.12 18.50 7.38 3.29 0.11 18.75 7.41 3.32 0.11 19.00 7.45 3.34 0.11 19.25 7.48 3.37 0.10 19.50 7.50 3.39 0.10 19.75 7.53 3.41 0.09 20.00 7.56 3.43 0.09 20.25 7.58 3.45 0.09 20.50 7.61 3.47 0.09 20.75 7.64 3.49 0.08 21.00 7.66 3.51 0.08 21.25 7.68 3.53 0.08 21.50 7.71 3.55 0.08 21.75 7.73 3.57 0.08 22.00 7.76 3.59 0.08 22.25 7.78 3.61 0.08 22.50 7.80 3.63 0.08 22.75 7.83 3.64 0.08 23.00 7.85 3.66 0.08 23.25 7.87 3.68 0.08 23.50 7.90 3.70 0.08 23.75 7.92 3.72 0.08 24.00 7.94 3.73 0.07 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment 13: DA 13 Runoff = 37.71 cfs @ 12.04 hrs, Volume= 2.214 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 4.282 70 Woods, Good, HSG C 2.855 55 Woods, Good, HSG B 7.137 64 Weighted Average 7.137 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 100 0.2842 0.23 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 4.8 532 0.1367 1.85 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 12.1 632 Total 4 3 3 2 3 2 0 U_ 1 1 Subcatchment 13: DA 13 Hydrograph 37.71 cfs Type II 24-h r 100 ears - 24 hrsl Rainf111=7.94 " Buzff Are 7._13Zac Run?ff Volume=2.214 of -Runoff Depth->3.7 Flo* Length=632'I Tc=12.1 min — — — — - - - CN=64 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 34 Hydrograph for Subcatchment 13: DA 13 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.04 9.50 1.29 0.00 0.08 9.75 1.36 0.01 0.12 10.00 1.44 0.02 0.18 10.25 1.52 0.03 0.26 10.50 1.62 0.04 0.37 10.75 1.73 0.06 0.51 11.00 1.87 0.09 0.72 11.25 2.03 0.13 1.04 11.50 2.25 0.19 1.58 11.75 3.07 0.50 6.09 12.00 5.26 1.75 34.68 12.25 5.61 1.99 11.88 12.50 5.84 2.15 5.34 12.75 6.00 2.26 3.49 13.00 6.13 2.36 2.89 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 2.46 13.50 6.34 2.51 2.17 13.75 6.43 2.58 1.92 14.00 6.51 2.63 1.71 14.25 6.58 2.69 1.55 14.50 6.65 2.74 1.48 14.75 6.72 2.79 1.41 15.00 6.78 2.83 1.34 15.25 6.83 2.88 1.27 15.50 6.89 2.92 1.20 15.75 6.94 2.96 1.13 16.00 6.99 2.99 1.05 16.25 7.03 3.03 1.00 16.50 7.08 3.06 0.97 16.75 7.12 3.09 0.94 17.00 7.16 3.12 0.92 17.25 7.20 3.15 0.89 17.50 7.24 3.18 0.87 17.75 7.28 3.21 0.84 18.00 7.31 3.24 0.81 18.25 7.35 3.27 0.79 18.50 7.38 3.29 0.76 18.75 7.41 3.32 0.74 19.00 7.45 3.34 0.71 19.25 7.48 3.37 0.68 19.50 7.50 3.39 0.66 19.75 7.53 3.41 0.63 20.00 7.56 3.43 0.60 20.25 7.58 3.45 0.58 20.50 7.61 3.47 0.58 20.75 7.64 3.49 0.57 21.00 7.66 3.51 0.57 21.25 7.68 3.53 0.56 21.50 7.71 3.55 0.56 21.75 7.73 3.57 0.55 22.00 7.76 3.59 0.55 22.25 7.78 3.61 0.54 22.50 7.80 3.63 0.53 22.75 7.83 3.64 0.53 23.00 7.85 3.66 0.52 23.25 7.87 3.68 0.52 23.50 7.90 3.70 0.51 23.75 7.92 3.72 0.51 24.00 7.94 3.73 0.50 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment 14: DA 14 Runoff = 6.30 cfs @ 12.01 hrs, Volume= 0.341 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 0.660 70 Woods, Good, HSG C 0.440 55 Woods, Good, HSG B 1.100 64 Weighted Average 1.100 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.4 100 0.2027 0.20 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 1.3 80 0.0443 1.05 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.7 180 Total 7 6 5 4- 3 0 3 U_ 2 1 0 0 Subcatchment 14: DA 14 Hydrograph 6.30 cfs Type II 24-hr 100 years - 24 hrsl Rainfa11=7.94" Runoff Areaa=1.100 ac Runoff Volume=0:341 of Runoff Depth>3.72" Flow Length=180'I Tc=9.7 min EN=64 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 36 Hydrograph for Subcatchment 14: DA 14 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.01 9.50 1.29 0.00 0.01 9.75 1.36 0.01 0.02 10.00 1.44 0.02 0.03 10.25 1.52 0.03 0.04 10.50 1.62 0.04 0.06 10.75 1.73 0.06 0.08 11.00 1.87 0.09 0.12 11.25 2.03 0.13 0.17 11.50 2.25 0.19 0.26 11.75 3.07 0.50 1.18 12.00 5.26 1.75 6.23 12.25 5.61 1.99 1.40 12.50 5.84 2.15 0.74 12.75 6.00 2.26 0.52 13.00 6.13 2.36 0.43 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 0.37 13.50 6.34 2.51 0.33 13.75 6.43 2.58 0.29 14.00 6.51 2.63 0.26 14.25 6.58 2.69 0.24 14.50 6.65 2.74 0.23 14.75 6.72 2.79 0.22 15.00 6.78 2.83 0.20 15.25 6.83 2.88 0.19 15.50 6.89 2.92 0.18 15.75 6.94 2.96 0.17 16.00 6.99 2.99 0.16 16.25 7.03 3.03 0.15 16.50 7.08 3.06 0.15 16.75 7.12 3.09 0.14 17.00 7.16 3.12 0.14 17.25 7.20 3.15 0.14 17.50 7.24 3.18 0.13 17.75 7.28 3.21 0.13 18.00 7.31 3.24 0.12 18.25 7.35 3.27 0.12 18.50 7.38 3.29 0.12 18.75 7.41 3.32 0.11 19.00 7.45 3.34 0.11 19.25 7.48 3.37 0.10 19.50 7.50 3.39 0.10 19.75 7.53 3.41 0.10 20.00 7.56 3.43 0.09 20.25 7.58 3.45 0.09 20.50 7.61 3.47 0.09 20.75 7.64 3.49 0.09 21.00 7.66 3.51 0.09 21.25 7.68 3.53 0.09 21.50 7.71 3.55 0.09 21.75 7.73 3.57 0.08 22.00 7.76 3.59 0.08 22.25 7.78 3.61 0.08 22.50 7.80 3.63 0.08 22.75 7.83 3.64 0.08 23.00 7.85 3.66 0.08 23.25 7.87 3.68 0.08 23.50 7.90 3.70 0.08 23.75 7.92 3.72 0.08 24.00 7.94 3.73 0.08 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 15: DA 15 Runoff = 17.91 cfs @ 12.09 hrs, Volume= 1.208 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 2.339 70 Woods, Good, HSG C 1.559 55 Woods, Good, HSG B 3.898 64 Weighted Average 3.898 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.1 100 0.0654 0.13 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.31" 3.2 208 0.0462 1.07 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs M011311111111[*M. 2 1 1 1 3 1 0 FL Subcatchment 15: DA 15 Hydrograph 0-- 17.91 cfs 8 Type) 1124-hr 6 0 arm 24-hrslRain Runoff Are=3.898 1=7-4A" 4 ac Run?ff Volume=1.208 of 2 -Runoff Depth>3.7 — — — Flowl Length=308'I c 16.3 min 8 CN14 6 4 - —I - - 2 - 0 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 38 Hydrograph for Subcatchment 15: DA 15 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.57 0.00 0.00 5.75 0.60 0.00 0.00 6.00 0.64 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.71 0.00 0.00 6.75 0.75 0.00 0.00 7.00 0.79 0.00 0.00 7.25 0.83 0.00 0.00 7.50 0.87 0.00 0.00 7.75 0.91 0.00 0.00 8.00 0.95 0.00 0.00 8.25 1.00 0.00 0.00 8.50 1.05 0.00 0.00 8.75 1.11 0.00 0.00 9.00 1.17 0.00 0.00 9.25 1.23 0.00 0.02 9.50 1.29 0.00 0.04 9.75 1.36 0.01 0.06 10.00 1.44 0.02 0.09 10.25 1.52 0.03 0.13 10.50 1.62 0.04 0.18 10.75 1.73 0.06 0.26 11.00 1.87 0.09 0.36 11.25 2.03 0.13 0.51 11.50 2.25 0.19 0.78 11.75 3.07 0.50 2.30 12.00 5.26 1.75 13.84 12.25 5.61 1.99 9.72 12.50 5.84 2.15 3.68 12.75 6.00 2.26 2.14 13.00 6.13 2.36 1.66 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 2.44 1.40 13.50 6.34 2.51 1.23 13.75 6.43 2.58 1.08 14.00 6.51 2.63 0.96 14.25 6.58 2.69 0.87 14.50 6.65 2.74 0.82 14.75 6.72 2.79 0.78 15.00 6.78 2.83 0.74 15.25 6.83 2.88 0.70 15.50 6.89 2.92 0.66 15.75 6.94 2.96 0.63 16.00 6.99 2.99 0.59 16.25 7.03 3.03 0.55 16.50 7.08 3.06 0.53 16.75 7.12 3.09 0.52 17.00 7.16 3.12 0.50 17.25 7.20 3.15 0.49 17.50 7.24 3.18 0.48 17.75 7.28 3.21 0.46 18.00 7.31 3.24 0.45 18.25 7.35 3.27 0.43 18.50 7.38 3.29 0.42 18.75 7.41 3.32 0.41 19.00 7.45 3.34 0.39 19.25 7.48 3.37 0.38 19.50 7.50 3.39 0.36 19.75 7.53 3.41 0.35 20.00 7.56 3.43 0.33 20.25 7.58 3.45 0.32 20.50 7.61 3.47 0.32 20.75 7.64 3.49 0.31 21.00 7.66 3.51 0.31 21.25 7.68 3.53 0.31 21.50 7.71 3.55 0.30 21.75 7.73 3.57 0.30 22.00 7.76 3.59 0.30 22.25 7.78 3.61 0.30 22.50 7.80 3.63 0.29 22.75 7.83 3.64 0.29 23.00 7.85 3.66 0.29 23.25 7.87 3.68 0.28 23.50 7.90 3.70 0.28 23.75 7.92 3.72 0.28 24.00 7.94 3.73 0.28 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 16S: (new Subcat) Runoff = 36.06 cfs @ 11.97 hrs, Volume= 1.818 af, Depth> 5.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100 years - 24 hrs Rainfall=7.94" Area (ac) CN Description 3.921 80 Liner 3.921 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.3 100 0.1543 0.39 Sheet Flow, Grass: Short n= 0.150 P2= 3.31" 1.8 370 0.2504 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 6.1 470 Total 4 3 3 0 2 4- 3 3 2 0 " 1 1 Subcatchment 16S: (new Subcat) Hydrograph 36.06 cfs Type IT24--hr 10 yews - 24 hrs R infall=7.94" unoo f Area=3.921-at Runoff Volu a=1.818 of Runoff Oepth>5.56" (Flow 4ength=470' —Tc=6.1 min CN=80 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Runoff Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 40 Hydrograph for Subcatchment 16S: (new Subcat) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.11 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.33 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.44 0.00 0.00 4.75 0.47 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.01 5.50 0.57 0.00 0.02 5.75 0.60 0.00 0.04 6.00 0.64 0.01 0.05 6.25 0.67 0.01 0.07 6.50 0.71 0.02 0.08 6.75 0.75 0.02 0.10 7.00 0.79 0.03 0.12 7.25 0.83 0.04 0.13 7.50 0.87 0.05 0.15 7.75 0.91 0.06 0.17 8.00 0.95 0.07 0.19 8.25 1.00 0.08 0.22 8.50 1.05 0.10 0.26 8.75 1.11 0.12 0.31 9.00 1.17 0.14 0.36 9.25 1.23 0.17 0.39 9.50 1.29 0.19 0.42 9.75 1.36 0.22 0.47 10.00 1.44 0.26 0.56 10.25 1.52 0.30 0.67 10.50 1.62 0.35 0.80 10.75 1.73 0.41 0.99 11.00 1.87 0.48 1.22 11.25 2.03 0.58 1.65 11.50 2.25 0.72 2.23 11.75 3.07 1.30 10.97 12.00 5.26 3.12 34.11 12.25 5.61 3.43 4.73 12.50 5.84 3.63 3.05 12.75 6.00 3.78 2.23 13.00 6.13 3.90 1.87 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.24 4.00 1.61 13.50 6.34 4.09 1.42 13.75 6.43 4.17 1.26 14.00 6.51 4.25 1.11 14.25 6.58 4.31 1.03 14.50 6.65 4.37 0.98 14.75 6.72 4.43 0.93 15.00 6.78 4.49 0.88 15.25 6.83 4.54 0.83 15.50 6.89 4.59 0.78 15.75 6.94 4.64 0.74 16.00 6.99 4.68 0.69 16.25 7.03 4.72 0.66 16.50 7.08 4.76 0.64 16.75 7.12 4.80 0.62 17.00 7.16 4.84 0.60 17.25 7.20 4.88 0.58 17.50 7.24 4.92 0.57 17.75 7.28 4.95 0.55 18.00 7.31 4.98 0.53 18.25 7.35 5.02 0.51 18.50 7.38 5.05 0.50 18.75 7.41 5.08 0.48 19.00 7.45 5.11 0.46 19.25 7.48 5.14 0.44 19.50 7.50 5.16 0.42 19.75 7.53 5.19 0.41 20.00 7.56 5.21 0.39 20.25 7.58 5.24 0.38 20.50 7.61 5.26 0.37 20.75 7.64 5.28 0.37 21.00 7.66 5.31 0.37 21.25 7.68 5.33 0.36 21.50 7.71 5.35 0.36 21.75 7.73 5.38 0.36 22.00 7.76 5.40 0.35 22.25 7.78 5.42 0.35 22.50 7.80 5.44 0.35 22.75 7.83 5.46 0.34 23.00 7.85 5.49 0.34 23.25 7.87 5.51 0.34 23.50 7.90 5.53 0.33 23.75 7.92 5.55 0.33 24.00 7.94 5.57 0.32 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 41 Summary for Reach 4R: (new Reach) Inflow Area = 137.425 ac, 0.00% Impervious, Inflow Depth > 3.68" for 100 years - 24 hrs event Inflow = 291.27 cfs @ 12.56 hrs, Volume= 42.101 of Outflow = 291.27 cfs @ 12.56 hrs, Volume= 42.101 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 300 250 N 200 0 150 FZ 100 50 0 0 Reach 4R: (new Reach) Hydrograph 291.27 cfs Inflow Area=137'A25 ac L 4 0 0 lu IL 14 10 10 Lu LL L4 Time (hours) — Inflow — Outflow Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 42 Hydrograph for Reach 4R: (new Reach) Time Inflow Elevation Outflow (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.25 0.00 0.00 0.50 0.00 0.00 0.75 0.00 0.00 1.00 0.00 0.00 1.25 0.00 0.00 1.50 0.00 0.00 1.75 0.00 0.00 2.00 0.00 0.00 2.25 0.00 0.00 2.50 0.00 0.00 2.75 0.00 0.00 3.00 0.00 0.00 3.25 0.00 0.00 3.50 0.00 0.00 3.75 0.00 0.00 4.00 0.00 0.00 4.25 0.00 0.00 4.50 0.00 0.00 4.75 0.00 0.00 5.00 0.00 0.00 5.25 0.00 0.00 5.50 0.00 0.00 5.75 0.00 0.00 6.00 0.00 0.00 6.25 0.00 0.00 6.50 0.00 0.00 6.75 0.00 0.00 7.00 0.00 0.00 7.25 0.00 0.00 7.50 0.00 0.00 7.75 0.00 0.00 8.00 0.00 0.00 8.25 0.00 0.00 8.50 0.00 0.00 8.75 0.00 0.00 9.00 0.00 0.00 9.25 0.03 0.03 9.50 0.22 0.22 9.75 0.63 0.63 10.00 1.24 1.24 10.25 2.04 2.04 10.50 3.10 3.10 10.75 4.51 4.51 11.00 6.42 6.42 11.25 9.05 9.05 11.50 12.89 12.89 11.75 20.01 20.01 12.00 55.10 55.10 12.25 181.62 181.62 12.50 288.72 288.72 12.75 258.55 258.55 13.00 174.73 174.73 Time Inflow Elevation Outflow (hours) (cfs) (feet) (cfs) 13.25 120.05 120.05 13.50 86.47 86.47 13.75 65.99 65.99 14.00 53.07 53.07 14.25 44.31 44.31 14.50 38.15 38.15 14.75 33.63 33.63 15.00 30.49 30.49 15.25 28.49 28.49 15.50 26.84 26.84 15.75 25.34 25.34 16.00 23.90 23.90 16.25 22.49 22.49 16.50 21.17 21.17 16.75 20.08 20.08 17.00 19.26 19.26 17.25 18.61 18.61 17.50 18.04 18.04 17.75 17.51 17.51 18.00 16.99 16.99 18.25 16.49 16.49 18.50 15.98 15.98 18.75 15.47 15.47 19.00 14.96 14.96 19.25 14.45 14.45 19.50 13.94 13.94 19.75 13.43 13.43 20.00 12.92 12.92 20.25 12.41 12.41 20.50 11.93 11.93 20.75 11.55 11.55 21.00 11.29 11.29 21.25 11.11 11.11 21.50 10.97 10.97 21.75 10.85 10.85 22.00 10.75 10.75 22.25 10.65 10.65 22.50 10.55 10.55 22.75 10.46 10.46 23.00 10.36 10.36 23.25 10.26 10.26 23.50 10.16 10.16 23.75 10.06 10.06 24.00 9.96 9.96 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 43 Summary for Reach 5R: (new Reach) Inflow Area = 143.717 ac, 31.58% Impervious, Inflow Depth > 4.92" for 100 years - 24 hrs event Inflow = 422.40 cfs @ 12.53 hrs, Volume= 58.976 of Outflow = 422.40 cfs @ 12.53 hrs, Volume= 58.976 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 450 400 350 300 250 3 U_ 200 150 100 50 0 Reach 5R: (new Reach) Hydrograph 422.40 cfs Inflow AreaL1431 M ac 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Inflow — Outflow Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 44 Hydrograph for Reach 5R: (new Reach) Time Inflow Elevation Outflow (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.25 0.00 0.00 0.50 0.00 0.00 0.75 0.00 0.00 1.00 0.00 0.00 1.25 0.00 0.00 1.50 0.00 0.00 1.75 0.00 0.00 2.00 0.00 0.00 2.25 0.00 0.00 2.50 0.00 0.00 2.75 0.00 0.00 3.00 0.00 0.00 3.25 0.00 0.00 3.50 0.00 0.00 3.75 0.00 0.00 4.00 0.00 0.00 4.25 0.00 0.00 4.50 0.00 0.00 4.75 0.00 0.00 5.00 0.00 0.00 5.25 0.00 0.00 5.50 0.00 0.00 5.75 0.00 0.00 6.00 0.00 0.00 6.25 0.00 0.00 6.50 0.00 0.00 6.75 0.06 0.06 7.00 0.25 0.25 7.25 0.58 0.58 7.50 1.01 1.01 7.75 1.49 1.49 8.00 2.01 2.01 8.25 2.56 2.56 8.50 3.17 3.17 8.75 3.92 3.92 9.00 4.86 4.86 9.25 5.99 5.99 9.50 7.24 7.24 9.75 8.44 8.44 10.00 9.62 9.62 10.25 11.12 11.12 10.50 13.16 13.16 10.75 15.89 15.89 11.00 19.47 19.47 11.25 24.26 24.26 11.50 31.04 31.04 11.75 43.36 43.36 12.00 102.10 102.10 12.25 289.37 289.37 12.50 421.04 421.04 12.75 355.54 355.54 13.00 230.80 230.80 Time Inflow Elevation Outflow (hours) (cfs) (feet) (cfs) 13.25 154.70 154.70 13.50 109.40 109.40 13.75 82.30 82.30 14.00 65.52 65.52 14.25 54.35 54.35 14.50 46.56 46.56 14.75 40.80 40.80 15.00 37.11 37.11 15.25 34.66 34.66 15.50 32.60 32.60 15.75 30.74 30.74 16.00 28.96 28.96 16.25 27.22 27.22 16.50 25.59 25.59 16.75 24.26 24.26 17.00 23.24 23.24 17.25 22.42 22.42 17.50 21.71 21.71 17.75 21.06 21.06 18.00 20.43 20.43 18.25 19.81 19.81 18.50 19.18 19.18 18.75 18.55 18.55 19.00 17.92 17.92 19.25 17.30 17.30 19.50 16.67 16.67 19.75 16.05 16.05 20.00 15.43 15.43 20.25 14.80 14.80 20.50 14.21 14.21 20.75 13.75 13.75 21.00 13.45 13.45 21.25 13.24 13.24 21.50 13.08 13.08 21.75 12.94 12.94 22.00 12.81 12.81 22.25 12.67 12.67 22.50 12.54 12.54 22.75 12.42 12.42 23.00 12.30 12.30 23.25 12.18 12.18 23.50 12.06 12.06 23.75 11.94 11.94 24.00 11.81 11.81 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 45 Summary for Reach 6R: (new Reach) Inflow Area = 389.489 ac, 11.65% Impervious, Inflow Depth > 4.14" for 100 years - 24 hrs event Inflow = 966.40 cfs @ 12.49 hrs, Volume= 134.388 of Outflow = 966.40 cfs @ 12.49 hrs, Volume= 134.388 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 1,000 900 800 700 600 0 500 400 300 200 100 0 Reach 6R: (new Reach) Hydrograph 966.40 cfs nftow-J�rea=aN.499 �c 1 -1 - k__ 4- _t 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 46 Hydrograph for Reach 6R: (new Reach) Time Inflow Elevation Outflow (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.25 0.00 0.00 0.50 0.00 0.00 0.75 0.00 0.00 1.00 0.00 0.00 1.25 0.00 0.00 1.50 0.00 0.00 1.75 0.00 0.00 2.00 0.00 0.00 2.25 0.00 0.00 2.50 0.00 0.00 2.75 0.00 0.00 3.00 0.00 0.00 3.25 0.00 0.00 3.50 0.00 0.00 3.75 0.00 0.00 4.00 0.00 0.00 4.25 0.00 0.00 4.50 0.00 0.00 4.75 0.00 0.00 5.00 0.00 0.00 5.25 0.00 0.00 5.50 0.00 0.00 5.75 0.00 0.00 6.00 0.00 0.00 6.25 0.00 0.00 6.50 0.00 0.00 6.75 0.06 0.06 7.00 0.25 0.25 7.25 0.58 0.58 7.50 1.01 1.01 7.75 1.49 1.49 8.00 2.01 2.01 8.25 2.56 2.56 8.50 3.17 3.17 8.75 3.92 3.92 9.00 4.86 4.86 9.25 6.09 6.09 9.50 7.78 7.78 9.75 9.83 9.83 10.00 12.20 12.20 10.25 15.25 15.25 10.50 19.35 19.35 10.75 24.83 24.83 11.00 32.13 32.13 11.25 42.08 42.08 11.50 56.56 56.56 11.75 84.19 84.19 12.00 232.16 232.16 12.25 704.43 704.43 12.50 966.18 966.18 12.75 780.20 780.20 13.00 508.33 508.33 Time Inflow Elevation Outflow (hours) (cfs) (feet) (cfs) 13.25 344.32 344.32 13.50 247.43 247.43 13.75 189.52 189.52 14.00 152.99 152.99 14.25 128.38 128.38 14.50 110.94 110.94 14.75 98.53 98.53 15.00 90.18 90.18 15.25 84.51 84.51 15.50 79.66 79.66 15.75 75.20 75.20 16.00 70.88 70.88 16.25 66.66 66.66 16.50 62.73 62.73 16.75 59.60 59.60 17.00 57.23 57.23 17.25 55.33 55.33 17.50 53.64 53.64 17.75 52.06 52.06 18.00 50.52 50.52 18.25 49.00 49.00 18.50 47.47 47.47 18.75 45.93 45.93 19.00 44.40 44.40 19.25 42.86 42.86 19.50 41.32 41.32 19.75 39.78 39.78 20.00 38.24 38.24 20.25 36.69 36.69 20.50 35.27 35.27 20.75 34.21 34.21 21.00 33.50 33.50 21.25 33.01 33.01 21.50 32.63 32.63 21.75 32.29 32.29 22.00 31.97 31.97 22.25 31.66 31.66 22.50 31.36 31.36 22.75 31.06 31.06 23.00 30.77 30.77 23.25 30.47 30.47 23.50 30.18 30.18 23.75 29.87 29.87 24.00 29.57 29.57 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 47 Summary for Reach 11 R: (new Reach) Inflow Area = 8.354 ac, 0.00% Impervious, Inflow Depth > 5.54" for 100 years - 24 hrs event Inflow = 46.77 cfs @ 12.16 hrs, Volume= 3.858 of Outflow = 45.81 cfs @ 12.22 hrs, Volume= 3.846 af, Atten= 2%, Lag= 4.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 6.11 fps, Min. Travel Time= 2.3 min Avg. Velocity = 1.78 fps, Avg. Travel Time= 7.8 min Peak Storage= 6,275 cf @ 12.19 hrs Average Depth at Peak Storage= 0.95' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 408.08 cfs 6.00' x 3.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 832.1' Slope= 0.0313 7' Inlet Invert= 780.15', Outlet Invert= 754.11' 50 45 40 35 30 3 25 0 FL 20 15 10 5 0 Reach 11 R: (new Reach) Hydrograph 45.81 cfs Inflow Area=8.354 ac Avg. Flow Depth=0.95} Max Vet=6.11 fps n=0.035 L=832.1' S=0.0313 '/' Capacity=408.08 cfs 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Inflow — Outflow Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 48 Hydrograph for Reach 11 R: (new Reach) Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 780.15 0.00 0.50 0.00 0 780.15 0.00 1.00 0.00 0 780.15 0.00 1.50 0.00 0 780.15 0.00 2.00 0.00 0 780.15 0.00 2.50 0.00 0 780.15 0.00 3.00 0.00 0 780.15 0.00 3.50 0.00 0 780.15 0.00 4.00 0.00 0 780.15 0.00 4.50 0.00 0 780.15 0.00 5.00 0.00 0 780.15 0.00 5.50 0.02 7 780.15 0.00 6.00 0.08 50 780.16 0.04 6.50 0.14 115 780.17 0.10 7.00 0.21 180 780.19 0.18 7.50 0.28 221 780.19 0.25 8.00 0.36 262 780.20 0.33 8.50 0.47 312 780.21 0.42 9.00 0.65 381 780.22 0.59 9.50 0.83 455 780.24 0.79 10.00 1.02 510 780.25 0.95 10.50 1.42 626 780.27 1.30 11.00 2.10 799 780.30 1.92 11.50 3.52 1,096 780.36 3.13 12.00 29.53 4,104 780.82 19.71 12.50 16.32 3,353 780.72 20.99 13.00 5.33 1,562 780.44 6.04 13.50 3.50 1,167 780.37 3.71 14.00 2.71 989 780.34 2.84 14.50 2.22 867 780.31 2.29 15.00 1.99 809 780.30 2.04 15.50 1.78 756 780.29 1.83 16.00 1.57 698 780.28 1.62 16.50 1.41 649 780.27 1.43 17.00 1.32 625 780.27 1.34 17.50 1.25 602 780.27 1.27 18.00 1.17 578 780.26 1.19 18.50 1.10 554 780.26 1.11 19.00 1.02 530 780.25 1.04 19.50 0.94 506 780.25 0.96 20.00 0.87 482 780.24 0.88 20.50 0.81 461 780.24 0.82 21.00 0.79 453 780.24 0.80 21.50 0.78 447 780.24 0.78 22.00 0.76 441 780.24 0.77 22.50 0.75 435 780.23 0.75 23.00 0.73 429 780.23 0.73 23.50 0.72 424 780.23 0.72 24.00 0.70 418 780.23 0.70 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 49 Summary for Reach 15R: (new Reach) Inflow Area = 3.921 ac, 0.00% Impervious, Inflow Depth > 5.56" for 100 years - 24 hrs event Inflow = 36.06 cfs @ 11.97 hrs, Volume= 1.818 of Outflow = 34.72 cfs @ 11.99 hrs, Volume= 1.815 af, Atten= 4%, Lag= 1.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 7.72 fps, Min. Travel Time= 1.0 min Avg. Velocity = 1.84 fps, Avg. Travel Time= 4.3 min Peak Storage= 2,210 cf @ 11.98 hrs Average Depth at Peak Storage= 0.64' Bank -Full Depth= 3.00' Flow Area= 36.0 sf, Capacity= 650.15 cfs 6.00' x 3.00' deep channel, n= 0.035 Side Slope Z-value= 2.0 7' Top Width= 18.00' Length= 477.0' Slope= 0.0794 7' Inlet Invert= 792.00', Outlet Invert= 754.11' 40 35 30= 0 25 3 20 0 " 15 10 5 Reach 15R: (new Reach) Hydrograph 34.72 cfs Inflow Area=3.921 ac Avg. Flow Depth=0.64' Max Vet=7.72 fps n=0.035 L=477.0' S=0.0794 '/' Capacity=650.15 cfs 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Inflow — Outflow Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 50 Hydrograph for Reach 15R: (new Reach) Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 792.00 0.00 0.50 0.00 0 792.00 0.00 1.00 0.00 0 792.00 0.00 1.50 0.00 0 792.00 0.00 2.00 0.00 0 792.00 0.00 2.50 0.00 0 792.00 0.00 3.00 0.00 0 792.00 0.00 3.50 0.00 0 792.00 0.00 4.00 0.00 0 792.00 0.00 4.50 0.00 0 792.00 0.00 5.00 0.00 0 792.00 0.00 5.50 0.02 7 792.00 0.01 6.00 0.05 18 792.01 0.04 6.50 0.08 31 792.01 0.07 7.00 0.12 45 792.02 0.11 7.50 0.15 59 792.02 0.14 8.00 0.19 75 792.03 0.18 8.50 0.26 95 792.03 0.25 9.00 0.36 114 792.04 0.34 9.50 0.42 126 792.04 0.41 10.00 0.56 151 792.05 0.53 10.50 0.80 192 792.07 0.77 11.00 1.22 248 792.08 1.17 11.50 2.23 361 792.12 2.11 12.00 34.11 2,177 792.63 34.67 12.50 3.05 462 792.15 3.31 13.00 1.87 335 792.11 1.94 13.50 1.42 281 792.10 1.46 14.00 1.11 242 792.08 1.15 14.50 0.98 221 792.08 0.99 15.00 0.88 207 792.07 0.90 15.50 0.78 193 792.07 0.80 16.00 0.69 179 792.06 0.70 16.50 0.64 171 792.06 0.64 17.00 0.60 164 792.06 0.61 17.50 0.57 157 792.05 0.57 18.00 0.53 150 792.05 0.54 18.50 0.50 143 792.05 0.50 19.00 0.46 136 792.05 0.46 19.50 0.42 129 792.04 0.43 20.00 0.39 122 792.04 0.39 20.50 0.37 119 792.04 0.38 21.00 0.37 118 792.04 0.37 21.50 0.36 116 792.04 0.36 22.00 0.35 115 792.04 0.35 22.50 0.35 114 792.04 0.35 23.00 0.34 112 792.04 0.34 23.50 0.33 111 792.04 0.33 24.00 0.32 110 792.04 0.33 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 51 Summary for Reach 27R: Spillway Outfall Inflow Area = 858.060 ac, 5.29% Impervious, Inflow Depth > 4.12" for 100 years - 24 hrs event Inflow = 687.83 cfs @ 13.86 hrs, Volume= 294.699 of Outflow = 687.72 cfs @ 13.94 hrs, Volume= 294.092 af, Atten= 0%, Lag= 4.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 8.74 fps, Min. Travel Time= 2.6 min Avg. Velocity = 5.90 fps, Avg. Travel Time= 3.8 min Peak Storage= 105,400 cf @ 13.90 hrs Average Depth at Peak Storage= 3.23' Bank -Full Depth= 94.66' Flow Area= 78,667.2 sf, Capacity= 6,461,392.31 cfs Custom cross-section, Length= 1,338.8' Slope= 0.0303 T (112 Elevation Intervals) Constant n= 0.040 Inlet Invert= 656.55', Outlet Invert= 615.97' Offset Elevation Chan.Depth (feet) (feet) (feet) 74.42 700.66 0.00 168.56 695.66 5.00 283.63 671.68 28.98 442.63 620.00 80.66 514.29 610.00 90.66 733.65 611.99 88.67 754.40 606.24 94.42 764.63 606.00 94.66 771.19 608.00 92.66 843.45 612.00 88.66 1,316.83 682.00 18.66 1,444.58 690.00 10.66 1,552.47 688.51 12.15 1,647.76 678.00 22.66 1,658.48 678.00 22.66 1,792.16 700.66 0.00 Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 52 Depth (feet) End Area (sq-ft) Perim. (feet) Storage Discharge (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.24 1.3 11.1 1,770 2.08 2.00 31.4 23.7 42,014 244.87 4.00 121.0 67.4 162,010 1,156.69 5.99 528.7 344.6 707,812 4,548.84 6.00 532.1 344.8 712,409 4,595.93 14.00 3,725.8 457.4 4,988,068 97,555.18 65.68 40,375.4 977.9 54,054,6443,119,567.13 72.00 46,695.1 1,062.8 62,515,3823,760,494.23 76.00 51,096.1 1,170.2 68,407,4474,098,013.65 82.51 59,361.3 1,404.6 79,472,9081,658,383.64 84.00 61,536.3 1,552.5 82,384,8164,626,837.94 89.66 70,387.6 1,614.1 94,234,8915,640,154.10 94.66 78,667.2 1,738.3 105,319,63C6,461,392.31 700 600 500 3 400 FL 300 200 100 0 0 Reach 27R: Spillway Outfall Hydrograph 687.72 cfs Inflow Arlea=8�8.066 ac Avg. Flow Depth=3�23' -T Max Vet=8.74 fps n="40H L=1,338.� S=0.0303 T Capacijy4 461 3k.31 cts 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) - Inflow - Outflow Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 53 Hydrograph for Reach 27R: Spillway Outfall Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 656.55 0.00 0.50 0.00 0 656.55 0.00 1.00 0.00 0 656.55 0.00 1.50 0.00 0 656.55 0.00 2.00 0.00 0 656.55 0.00 2.50 0.00 0 656.55 0.00 3.00 0.00 0 656.55 0.00 3.50 0.00 0 656.55 0.00 4.00 0.00 0 656.55 0.00 4.50 0.00 0 656.55 0.00 5.00 0.00 0 656.55 0.00 5.50 0.00 0 656.55 0.00 6.00 0.00 0 656.55 0.00 6.50 0.00 0 656.55 0.00 7.00 0.06 21 656.55 0.02 7.50 0.44 213 656.58 0.22 8.00 1.26 734 656.65 0.79 8.50 2.69 1,707 656.78 1.88 9.00 4.94 2,387 656.82 4.36 9.50 9.72 3,454 656.88 8.42 10.00 19.82 5,766 657.01 17.33 10.50 33.12 8,905 657.19 29.74 11.00 56.45 14,194 657.48 50.05 11.50 99.74 20,538 657.73 89.92 12.00 422.21 58,589 658.93 288.42 12.50 598.60 95,071 659.63 613.68 13.00 631.46 97,765 659.67 621.15 13.50 678.32 103,960 659.76 673.55 14.00 686.26 105,289 659.78 687.41 14.50 649.92 101,122 659.72 658.01 15.00 588.30 93,526 659.61 598.66 15.50 514.15 84,338 659.48 526.35 16.00 414.86 71,246 659.23 439.00 16.50 266.49 47,981 658.69 295.52 17.00 157.45 30,096 658.11 162.67 17.50 143.06 27,746 658.01 144.75 18.00 134.47 26,461 657.96 135.82 18.50 126.61 25,302 657.92 127.91 19.00 118.73 24,154 657.87 120.14 19.50 109.19 22,770 657.82 110.86 20.00 98.50 21,213 657.76 100.36 20.50 86.56 19,466 657.69 88.55 21.00 77.96 18,134 657.64 79.00 21.50 73.84 17,492 657.61 74.35 22.00 71.64 17,153 657.60 71.94 22.50 70.06 16,917 657.59 70.31 23.00 68.66 16,711 657.58 68.89 23.50 67.32 16,512 657.58 67.54 24.00 65.98 16,316 657.57 66.20 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 54 Summary for Reach 28R: Road Culvert Inflow Area = 925.024 ac, 4.91 % Impervious, Inflow Depth > 4.08" for 100 years - 24 hrs event Inflow = 854.99 cfs @ 12.26 hrs, Volume= 314.785 of Outflow = 753.37 cfs @ 12.57 hrs, Volume= 312.719 af, Atten= 12%, Lag= 18.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 5.78 fps, Min. Travel Time= 7.2 min Avg. Velocity = 3.41 fps, Avg. Travel Time= 12.3 min Peak Storage= 431,752 cf @ 12.45 hrs Average Depth at Peak Storage= 3.08' Bank -Full Depth= 39.37' Flow Area= 11,690.1 sf, Capacity= 402,588.09 cfs Custom cross-section, Length= 2,511.7' Slope= 0.0111 T (109 Elevation Intervals) Constant n= 0.040 Inlet Invert= 615.97', Outlet Invert= 588.00' Offset Elevation Chan.Depth (feet) (feet) (feet) 16.74 629.37 0.00 46.74 623.76 5.61 73.81 616.00 13.37 87.73 610.00 19.37 95.22 604.48 24.89 103.27 590.00 39.37 137.81 590.00 39.37 140.51 592.00 37.37 332.24 594.00 35.37 348.56 596.04 33.33 362.15 598.63 30.74 410.71 616.00 13.37 420.31 622.00 7.37 445.73 629.37 0.00 Post Closure -Dam Breach_100 ft Breach Type 1124-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 55 Depth (feet) End Area (sq-ft) Perim. (feet) Storage (cubic -feet) Discharge (cfs) 0.00 0.0 34.5 0 0.00 2.00 72.9 40.2 183,083 425.00 4.00 342.4 234.2 860,100 1,729.33 6.04 831.9 253.0 2,089,423 7,211.20 8.63 1,495.3 269.8 3,755,840 18,359.59 14.48 3,095.2 293.9 7,774,219 58,305.65 20.00 4,722.2 319.6 11,860,740 111,480.77 26.00 6,651.5 352.5 16,706,610 184,811.49 32.00 8,764.5 385.6 22,013,810 275,694.39 33.76 9,421.9 398.3 23,665,058 304,365.07 39.37 11,690.1 449.0 29,362,117 402,588.09 •le �-0111( 700 N 600 500 3 �° 400 300 200 1001 0 0 Reach 28R: Road Culvert Hydrograph 854.99 cfs Inflow-Area=925.024 a 753.37 cfs Avg. Flow Depth733.08' Ma Vet=5.7$ fps n .040 L=2,511 J' - - - - - I- S=0.0111 p='/' 02,58809C acity4cfs 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) - Inflow - Outflow Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 56 Hydrograph for Reach 28R: Road Culvert Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 615.97 0.00 0.50 0.00 0 615.97 0.00 1.00 0.00 0 615.97 0.00 1.50 0.00 0 615.97 0.00 2.00 0.00 0 615.97 0.00 2.50 0.00 0 615.97 0.00 3.00 0.00 0 615.97 0.00 3.50 0.00 0 615.97 0.00 4.00 0.00 0 615.97 0.00 4.50 0.00 0 615.97 0.00 5.00 0.00 0 615.97 0.00 5.50 0.00 0 615.97 0.00 6.00 0.00 0 615.97 0.00 6.50 0.00 0 615.97 0.00 7.00 0.02 6 615.97 0.00 7.50 0.22 111 615.97 0.05 8.00 0.79 528 615.98 0.32 8.50 1.88 1,447 615.99 0.97 9.00 4.37 3,546 616.01 2.44 9.50 8.87 7,204 616.05 5.00 10.00 18.61 15,039 616.14 10.37 10.50 32.44 28,500 616.29 20.52 11.00 55.37 44,713 616.48 39.86 11.50 101.15 66,667 616.72 73.62 12.00 435.05 147,165 617.59 178.08 12.50 719.24 428,539 619.04 741.77 13.00 658.25 380,720 618.90 663.68 13.50 696.79 396,143 618.94 679.17 14.00 705.14 405,371 618.97 703.41 14.50 672.63 394,872 618.94 693.87 15.00 611.77 365,897 618.85 645.38 15.50 538.13 328,714 618.74 578.57 16.00 449.43 278,118 618.52 505.46 16.50 304.88 168,709 617.82 422.72 17.00 171.47 107,875 617.17 204.41 17.50 153.07 97,057 617.06 159.84 18.00 143.66 92,724 617.01 147.92 18.50 135.26 89,183 616.97 139.19 19.00 127.00 85,772 616.93 130.94 19.50 117.21 81,880 616.89 121.97 20.00 106.21 77,432 616.84 111.51 20.50 94.02 72,483 616.79 99.86 21.00 84.34 67,748 616.73 88.76 21.50 79.60 64,393 616.70 82.02 22.00 77.10 62,629 616.68 78.42 22.50 75.36 61,527 616.67 76.31 23.00 73.85 60,633 616.66 74.69 23.50 72.40 59,797 616.65 73.21 24.00 70.97 58,977 616.64 71.77 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 57 Summary for Reach 29R: RR Culvert Inflow Area = 933.214 ac, 4.86% Impervious, Inflow Depth > 4.05" for 100 years - 24 hrs event Inflow = 758.81 cfs @ 12.57 hrs, Volume= 315.259 of Outflow = 757.55 cfs @ 12.58 hrs, Volume= 315.134 af, Atten= 0%, Lag= 0.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 9.75 fps, Min. Travel Time= 0.4 min Avg. Velocity = 5.71 fps, Avg. Travel Time= 0.7 min Peak Storage= 18,860 cf @ 12.57 hrs Average Depth at Peak Storage= 4.60' Bank -Full Depth= 27.36' Flow Area= 3,723.4 sf, Capacity= 91,794.33 cfs Custom cross-section, Length= 242.5' Slope= 0.0165 T (104 Elevation Intervals) Constant n= 0.040 Inlet Invert= 584.00', Outlet Invert= 580.00' Offset Elevation Chan.Depth (feet) (feet) (feet) 34.01 607.36 0.00 66.97 600.00 7.36 118.99 600.00 7.36 176.43 590.00 17.36 213.63 588.00 19.36 228.46 580.00 27.36 238.68 580.00 27.36 244.95 585.91 21.45 342.59 607.36 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 10.2 0 0.00 5.91 111.3 31.3 26,991 1,237.62 8.00 182.7 45.4 44,294 2,203.63 10.00 310.6 92.0 75,327 3,335.52 20.00 1,696.8 248.9 411,474 29,104.81 27.36 3,723.4 317.0 902,916 91,794.33 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 58 Reach 29R: RR Culvert Hydrograph 0 500 3 400 0 U_ 300 200 100 0 757.55 cfs 1 nfao"rea=9331.214lac Avg. F16w Depth=4.6I0' Max Ve'=9.75 fps n=4.0 L=242. ' _ S=0.01 65 '/' I Capadi y=_91 �9�33 ¢fs 1- T 7 T 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 59 Hydrograph for Reach 29R: RR Culvert Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 584.00 0.00 0.50 0.00 0 584.00 0.00 1.00 0.00 0 584.00 0.00 1.50 0.00 0 584.00 0.00 2.00 0.00 0 584.00 0.00 2.50 0.00 0 584.00 0.00 3.00 0.00 0 584.00 0.00 3.50 0.00 0 584.00 0.00 4.00 0.00 0 584.00 0.00 4.50 0.00 0 584.00 0.00 5.00 0.00 0 584.00 0.00 5.50 0.00 0 584.00 0.00 6.00 0.00 0 584.00 0.00 6.50 0.00 0 584.00 0.00 7.00 0.00 0 584.00 0.00 7.50 0.05 6 584.00 0.04 8.00 0.32 37 584.01 0.29 8.50 0.97 114 584.04 0.90 9.00 2.44 288 584.11 2.27 9.50 5.09 605 584.24 4.80 10.00 10.57 990 584.38 10.20 10.50 20.94 1,582 584.59 20.45 11.00 40.68 2,442 584.87 39.74 11.50 75.41 3,690 585.26 73.99 12.00 216.68 7,548 586.29 206.41 12.50 748.07 18,627 588.55 741.96 13.00 667.02 17,179 588.30 668.33 13.50 681.67 17,438 588.34 680.80 14.00 705.38 17,881 588.42 705.14 14.50 695.57 17,710 588.39 696.29 15.00 646.93 16,803 588.23 648.37 15.50 579.95 15,527 587.99 581.74 16.00 506.67 14,087 587.71 508.65 16.50 423.83 12,371 587.37 423.51 17.00 205.47 7,446 586.27 208.85 17.50 160.83 6,253 585.97 161.34 18.00 148.85 5,926 585.88 149.13 18.50 140.06 5,677 585.82 140.31 19.00 131.75 5,442 585.75 131.99 19.50 122.72 5,188 585.69 123.01 20.00 112.21 4,881 585.60 112.55 20.50 100.52 4,524 585.50 100.90 21.00 89.40 4,182 585.40 89.66 21.50 82.66 3,966 585.34 82.82 22.00 79.05 3,842 585.31 79.13 22.50 76.92 3,770 585.28 76.98 23.00 75.29 3,715 585.27 75.34 23.50 73.80 3,664 585.25 73.85 24.00 72.35 3,615 585.24 72.40 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 60 Summary for Reach 30R: To Dan River Inflow Area = 938.212 ac, 4.84% Impervious, Inflow Depth > 4.05" for 100 years - 24 hrs event Inflow = 761.23 cfs @ 12.58 hrs, Volume= 316.683 of Outflow = 760.40 cfs @ 12.60 hrs, Volume= 316.500 af, Atten= 0%, Lag= 1.4 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 6.63 fps, Min. Travel Time= 0.6 min Avg. Velocity = 4.00 fps, Avg. Travel Time= 1.1 min Peak Storage= 29,646 cf @ 12.59 hrs Average Depth at Peak Storage= 3.17' Bank -Full Depth= 10.54' Flow Area= 1,563.4 sf, Capacity= 19,048.17 cfs Custom cross-section, Length= 258.3' Slope= 0.0157 T (103 Elevation Intervals) Constant n= 0.040 Inlet Invert= 583.01', Outlet Invert= 578.96' Offset Elevation Chan.Depth (feet) (feet) (feet) 43.40 593.14 0.00 226.12 588.00 5.14 252.69 586.00 7.14 285.16 582.83 10.31 293.21 582.60 10.54 342.47 588.00 5.14 411.43 593.14 0.00 Depth End Area Perim. Storage Discharge (feet) (sq-ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.23 1.2 10.2 301 1.28 3.40 130.6 71.9 33,743 905.02 5.40 318.5 116.9 82,274 2,890.90 10.54 1,563.4 368.8 403,820 19,048.17 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 61 Reach 30R: To Dan River Hydrograph 0 .l1c 0 500 0 400 U_ 300 200 100 0 760.40 cfs I nflo"rea=9381.212lac Avg. Flbw Depth=3.117' Max Ve'=6.f3 fps n=0~.0 L=258. ' S=0.01 �7 '/' I Capacity_19,AY4"7 ¢fs I- T 7 T 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Outflow Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 62 Hydrograph for Reach 30R: To Dan River Time Inflow Storage Elevation Outflow (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 583.01 0.00 0.50 0.00 0 583.01 0.00 1.00 0.00 0 583.01 0.00 1.50 0.00 0 583.01 0.00 2.00 0.00 0 583.01 0.00 2.50 0.00 0 583.01 0.00 3.00 0.00 0 583.01 0.00 3.50 0.00 0 583.01 0.00 4.00 0.00 0 583.01 0.00 4.50 0.00 0 583.01 0.00 5.00 0.00 0 583.01 0.00 5.50 0.00 0 583.01 0.00 6.00 0.00 0 583.01 0.00 6.50 0.00 0 583.01 0.00 7.00 0.00 0 583.01 0.00 7.50 0.04 11 583.03 0.03 8.00 0.29 81 583.13 0.23 8.50 0.90 205 583.19 0.78 9.00 2.28 415 583.28 2.09 9.50 4.85 709 583.38 4.58 10.00 10.32 1,217 583.52 9.79 10.50 20.70 2,023 583.70 19.95 11.00 40.22 3,283 583.93 38.67 11.50 75.03 5,218 584.21 72.84 12.00 226.48 11,636 584.91 209.44 12.50 746.38 29,092 586.15 734.47 13.00 670.42 26,985 586.02 672.77 13.50 682.36 27,299 586.04 681.00 14.00 706.36 28,027 586.09 705.95 14.50 697.33 27,780 586.07 698.42 15.00 649.31 26,351 585.99 651.58 15.50 582.59 24,314 585.86 585.40 16.00 509.39 22,000 585.71 512.51 16.50 424.19 19,140 585.51 423.89 17.00 209.50 11,432 584.89 215.34 17.50 161.95 9,367 584.69 162.81 18.00 149.71 8,825 584.63 150.15 18.50 140.85 8,437 584.59 141.24 19.00 132.49 8,060 584.55 132.88 19.50 123.48 7,653 584.51 123.94 20.00 112.97 7,167 584.45 113.50 20.50 101.31 6,616 584.39 101.89 21.00 90.05 6,058 584.32 90.46 21.50 83.21 5,715 584.28 83.47 22.00 79.52 5,521 584.25 79.66 22.50 77.36 5,407 584.24 77.45 23.00 75.71 5,321 584.23 75.79 23.50 74.21 5,243 584.22 74.28 24.00 72.75 5,167 584.21 72.82 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 63 Summary for Pond 1 P: Detention Basin Inflow Area = 454.237 ac, 9.99% Impervious, Inflow Depth > 4.07" for 100 years - 24 hrs event Inflow = 1,104.03 cfs @ 12.50 hrs, Volume= 154.229 of Outflow = 645.05 cfs @ 12.95 hrs, Volume= 154.199 af, Atten= 42%, Lag= 27.1 min Primary = 645.05 cfs @ 12.95 hrs, Volume= 154.199 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 671.58' @ 12.95 hrs Surf.Area= 4.391 ac Storage= 25.851 of Plug -Flow detention time= 12.7 min calculated for 153.878 of (100% of inflow) Center -of -Mass det. time= 12.6 min ( 871.5 - 858.9 ) Volume Invert Avail.Storage Storage Description #1 655.00' 43.452 of Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) 655.00 0.004 61.6 0.000 0.000 0.004 660.00 0.704 1,205.2 1.268 1.268 2.652 665.00 1.511 1,572.8 5.411 6.679 4.524 670.00 3.750 3,336.7 12.736 19.415 20.347 675.00 5.949 4,172.6 24.037 43.452 31.822 Device Routing Invert Outlet Devices #1 Secondary 674.00' 100.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #2 Primary 654.68' 72.0" W x 72.0" H Box Culvert L= 144.1' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 654.68' / 649.35' S= 0.0370 '/' Cc= 0.900 n= 0.013, Flow Area= 36.00 sf Primary OutFlow Max=645.05 cfs @ 12.95 hrs HW=671.58' (Free Discharge) L2=Culvert (Inlet Controls 645.05 cfs @ 17.92 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=655.00' (Free Discharge) 1=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 64 Pond 1 P: Detention Basin Hydrograph 1,200 - 1,100 Inf�w74re�=45.2 T 1,000 Tc 900 PeAk gev�71.58' L800 StgrT-iag=2�.851 I of + � 1 N 700 645.05 cfs v 1 3 600 — — — — 500 L 1- 1 L L L L 1 ,° 400 t t_f L t d 1 300 200 000 f . cs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow Outflow — Primary Secondary Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 65 Hydrograph for Pond 1 P: Detention Basin Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (acre-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0.000 655.00 0.00 0.00 0.00 0.50 0.00 0.000 655.00 0.00 0.00 0.00 1.00 0.00 0.000 655.00 0.00 0.00 0.00 1.50 0.00 0.000 655.00 0.00 0.00 0.00 2.00 0.00 0.000 655.00 0.00 0.00 0.00 2.50 0.00 0.000 655.00 0.00 0.00 0.00 3.00 0.00 0.000 655.00 0.00 0.00 0.00 3.50 0.00 0.000 655.00 0.00 0.00 0.00 4.00 0.00 0.000 655.00 0.00 0.00 0.00 4.50 0.00 0.000 655.00 0.00 0.00 0.00 5.00 0.00 0.000 655.00 0.00 0.00 0.00 5.50 0.00 0.000 655.00 0.00 0.00 0.00 6.00 0.00 0.000 655.00 0.00 0.00 0.00 6.50 0.00 0.000 655.00 0.00 0.00 0.00 7.00 0.25 0.000 655.01 0.25 0.25 0.00 7.50 1.01 0.000 655.03 1.00 1.00 0.00 8.00 2.01 0.000 655.06 2.01 2.01 0.00 8.50 3.17 0.001 655.09 3.16 3.16 0.00 9.00 4.86 0.001 655.13 4.85 4.85 0.00 9.50 7.88 0.002 655.23 7.83 7.83 0.00 10.00 12.80 0.004 655.44 12.69 12.69 0.00 10.50 20.84 0.011 655.72 20.59 20.59 0.00 11.00 35.21 0.030 656.15 34.49 34.49 0.00 11.50 62.74 0.088 656.82 60.26 60.26 0.00 12.00 259.26 0.781 659.19 184.65 184.65 0.00 12.50 1,104.02 15.089 668.73 574.46 574.46 0.00 13.00 589.14 25.732 671.56 644.41 644.41 0.00 13.50 287.39 17.006 669.32 589.83 589.83 0.00 14.00 177.65 4.778 663.62 417.90 417.90 0.00 14.50 128.71 0.458 658.44 140.57 140.57 0.00 15.00 104.49 0.266 657.81 106.54 106.54 0.00 15.50 92.27 0.206 657.54 93.38 93.38 0.00 16.00 82.10 0.164 657.33 83.03 83.03 0.00 16.50 72.67 0.129 657.12 73.38 73.38 0.00 17.00 66.29 0.107 656.97 66.65 66.65 0.00 17.50 62.11 0.095 656.87 62.40 62.40 0.00 18.00 58.50 0.084 656.78 58.72 58.72 0.00 18.50 54.98 0.075 656.70 55.20 55.20 0.00 19.00 51.43 0.066 656.61 51.67 51.67 0.00 19.50 47.88 0.057 656.52 48.08 48.08 0.00 20.00 44.32 0.049 656.43 44.50 44.50 0.00 20.50 40.88 0.042 656.33 41.01 41.01 0.00 21.00 38.81 0.038 656.28 38.88 38.88 0.00 21.50 37.80 0.036 656.25 37.83 37.83 0.00 22.00 37.04 0.035 656.23 37.07 37.07 0.00 22.50 36.33 0.033 656.21 36.36 36.36 0.00 23.00 35.65 0.032 656.19 35.67 35.67 0.00 23.50 34.97 0.031 656.17 34.98 34.98 0.00 24.00 34.26 0.030 656.15 34.29 34.29 0.00 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 66 Summary for Pond 5P: Retention Basin Inflow Area = 755.720 ac, 6.01 % Impervious, Inflow Depth > 4.20" for 100 years - 24 hrs event Inflow = 1,127.06 cfs @ 12.89 hrs, Volume= 264.482 of Outflow = 659.86 cfs @ 13.94 hrs, Volume= 263.061 af, Atten= 41 %, Lag= 63.1 min Primary = 659.86 cfs @ 13.94 hrs, Volume= 263.061 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Starting Elev= 644.00' Surf.Area= 1.675 ac Storage= 10.362 of Peak Elev= 663.56' @ 13.94 hrs Surf.Area= 4.384 ac Storage= 70.769 of (60.408 of above start) Plug -Flow detention time= 68.4 min calculated for 252.699 of (96% of inflow) Center -of -Mass det. time= 34.8 min ( 914.8 - 880.0 ) Volume Invert Avail.Storage Storage Description #1 631.00' 77.215 of Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) 631.00 0.084 283.2 0.000 0.000 0.084 635.00 0.480 612.9 1.020 1.020 0.625 640.00 1.097 1,000.4 3.838 4.857 1.771 645.00 1.839 1,395.1 7.261 12.118 3.504 650.00 2.672 1,754.5 11.213 23.331 5.580 655.00 3.259 1,857.6 14.803 38.134 6.291 660.00 3.903 2,037.4 17.881 56.015 7.590 665.00 4.586 2,194.1 21.200 77.215 8.825 Device Routing Invert Outlet Devices #1 Secondary 665.00' 100.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #2 Device 3 644.00' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Primary 637.07' 72.0" Round Culvert L= 161.6' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 637.07' / 635.46' S= 0.0100 '/' Cc= 0.900 n= 0.013, Flow Area= 28.27 sf Primary OutFlow Max=659.83 cfs @ 13.94 hrs HW=663.56' (Free Discharge) LtCulvert (Inlet Controls 659.83 cfs @ 23.34 fps) 2=Orifice/Grate (Passes 659.83 cfs of 766.62 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=644.00' (Free Discharge) L1=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 67 Pond 5P: Retention Basin Hydrograph 1,200 1,127.06 cfs - Inflow 1,100 I46"re�=75 ac Outflow 1,000 .72d peak E�ev=§63.�6' I I I I I I I I —Primary - Secondary 900 t r800 ag =7� 70 af- N 659.86 cfs v 700 ���I TT M 500 — — 400Lcfs T 1 300 T T 1 T T 1 200 0.0 0 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 68 Hydrograph for Pond 5P: Retention Basin Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (acre-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 10.362 644.00 0.00 0.00 0.00 0.50 0.00 10.362 644.00 0.00 0.00 0.00 1.00 0.00 10.362 644.00 0.00 0.00 0.00 1.50 0.00 10.362 644.00 0.00 0.00 0.00 2.00 0.00 10.362 644.00 0.00 0.00 0.00 2.50 0.00 10.362 644.00 0.00 0.00 0.00 3.00 0.00 10.362 644.00 0.00 0.00 0.00 3.50 0.00 10.362 644.00 0.00 0.00 0.00 4.00 0.00 10.362 644.00 0.00 0.00 0.00 4.50 0.00 10.362 644.00 0.00 0.00 0.00 5.00 0.00 10.362 644.00 0.00 0.00 0.00 5.50 0.00 10.362 644.00 0.00 0.00 0.00 6.00 0.00 10.362 644.00 0.00 0.00 0.00 6.50 0.00 10.362 644.00 0.00 0.00 0.00 7.00 0.25 10.364 644.00 0.06 0.06 0.00 7.50 1.03 10.380 644.01 0.44 0.44 0.00 8.00 2.39 10.415 644.03 1.26 1.26 0.00 8.50 4.52 10.476 644.07 2.69 2.69 0.00 9.00 7.78 10.571 644.12 4.93 4.93 0.00 9.50 14.35 10.743 644.22 8.99 8.99 0.00 10.00 23.15 10.971 644.36 17.82 17.82 0.00 10.50 36.29 11.223 644.50 28.90 28.90 0.00 11.00 58.79 11.600 644.71 48.16 48.16 0.00 11.50 100.13 12.173 645.03 82.22 82.22 0.00 12.00 297.71 13.756 645.86 199.48 199.48 0.00 12.50 936.98 26.106 651.02 450.42 450.42 0.00 13.00 1,117.40 49.132 658.18 579.35 579.35 0.00 13.50 902.14 65.950 662.44 643.95 643.95 0.00 14.00 617.13 70.666 663.54 659.52 659.52 0.00 14.50 282.02 61.350 661.34 627.81 627.81 0.00 15.00 217.31 46.673 657.50 568.38 568.38 0.00 15.50 187.43 32.946 653.36 496.24 496.24 0.00 16.00 166.71 21.506 649.30 399.02 399.02 0.00 16.50 148.70 14.486 646.22 252.28 252.28 0.00 17.00 136.12 13.048 645.49 144.04 144.04 0.00 17.50 127.47 12.864 645.40 130.37 130.37 0.00 18.00 120.15 12.758 645.34 122.52 122.52 0.00 18.50 113.13 12.663 645.29 115.41 115.41 0.00 19.00 105.42 12.560 645.24 108.29 108.29 0.00 19.50 96.16 12.430 645.17 99.52 99.52 0.00 20.00 85.82 12.283 645.09 89.60 89.60 0.00 20.50 74.12 12.114 645.00 78.22 78.22 0.00 21.00 67.44 11.978 644.92 69.80 69.80 0.00 21.50 64.69 11.909 644.88 65.83 65.83 0.00 22.00 63.07 11.873 644.86 63.77 63.77 0.00 22.50 61.78 11.848 644.85 62.34 62.34 0.00 23.00 60.57 11.826 644.84 61.09 61.09 0.00 23.50 59.40 11.805 644.83 59.89 59.89 0.00 24.00 58.21 11.784 644.82 58.70 58.70 0.00 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 69 Summary for Pond 17P: NE Landfill Corner Inflow Area = 12.275 ac, 0.00% Impervious, Inflow Depth > 5.53" for 100 years - 24 hrs event Inflow = 55.61 cfs @ 12.04 hrs, Volume= 5.661 of Outflow = 56.48 cfs @ 12.04 hrs, Volume= 5.552 af, Atten= 0%, Lag= 0.3 min Primary = 56.48 cfs @ 12.04 hrs, Volume= 5.552 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 758.35' @ 12.04 hrs Surf.Area= 3,741 sf Storage= 4,627 cf Plug -Flow detention time= 17.5 min calculated for 5.541 of (98% of inflow) Center -of -Mass det. time= 6.2 min ( 819.3 - 813.0 ) Volume Invert Avail.Storage Storage Description #1 754.11' 4,627 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 754.11 0 0 0 755.00 763 340 340 756.00 2,035 1,399 1,739 757.00 3,741 2,888 4,627 Device Routing Invert Outlet Devices #1 Primary 757.67' 32.1' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=56.03 cfs @ 12.04 hrs HW=758.34' (Free Discharge) L1=Broad-Crested Rectangular Weir (Weir Controls 56.03 cfs @ 2.59 fps) Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 70 6 5 5 4 ^. 4 3 3 3 0 FZ 2 2 1 1 Pond 17P: NE Landfill Corner Hydrograph 56.48 cfs Inflow ;Area=12275__1ac P A EIIev458.L35' Stpragpe _4,027 TIIT�I �rtIIT T T 1 T T T T 1 T T T 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) — Inflow — Primary Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 71 Hydrograph for Pond 17P: NE Landfill Corner Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 754.11 0.00 0.50 0.00 0 754.11 0.00 1.00 0.00 0 754.11 0.00 1.50 0.00 0 754.11 0.00 2.00 0.00 0 754.11 0.00 2.50 0.00 0 754.11 0.00 3.00 0.00 0 754.11 0.00 3.50 0.00 0 754.11 0.00 4.00 0.00 0 754.11 0.00 4.50 0.00 0 754.11 0.00 5.00 0.00 0 754.11 0.00 5.50 0.02 10 754.26 0.00 6.00 0.08 96 754.58 0.00 6.50 0.17 320 754.97 0.00 7.00 0.28 718 755.38 0.00 7.50 0.40 1,331 755.79 0.00 8.00 0.51 2,144 756.18 0.00 8.50 0.67 3,186 756.57 0.00 9.00 0.94 4,625 757.00 0.00 9.50 1.20 4,627 757.69 0.28 10.00 1.48 4,627 757.70 0.56 10.50 2.07 4,627 757.72 1.15 11.00 3.08 4,627 757.75 2.16 11.50 5.24 4,627 757.80 4.32 12.00 54.38 4,627 758.32 53.46 12.50 24.30 4,627 758.07 23.38 13.00 7.98 4,627 757.85 7.06 13.50 5.16 4,627 757.80 4.24 14.00 3.98 4,627 757.77 3.06 14.50 3.28 4,627 757.76 2.36 15.00 2.93 4,627 757.75 2.01 15.50 2.63 4,627 757.74 1.71 16.00 2.32 4,627 757.73 1.39 16.50 2.07 4,627 757.72 1.15 17.00 1.95 4,627 757.72 1.03 17.50 1.84 4,627 757.72 0.92 18.00 1.73 4,627 757.71 0.81 18.50 1.62 4,627 757.71 0.69 19.00 1.50 4,627 757.70 0.58 19.50 1.39 4,627 757.70 0.47 20.00 1.28 4,627 757.69 0.36 20.50 1.19 4,627 757.69 0.27 21.00 1.16 4,627 757.68 0.24 21.50 1.14 4,627 757.68 0.22 22.00 1.12 4,627 757.68 0.20 22.50 1.10 4,627 757.68 0.18 23.00 1.08 4,627 757.68 0.15 23.50 1.05 4,627 757.68 0.13 24.00 1.03 4,627 757.68 0.11 Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 72 Summary for Pond 18P: NE Drainage Inflow Area = 70.525 ac, 0.00% Impervious, Inflow Depth > 4.00" for 100 years - 24 hrs event Inflow = 239.63 cfs @ 12.24 hrs, Volume= 23.528 of Outflow = 34.51 cfs @ 13.19 hrs, Volume= 23.425 af, Atten= 86%, Lag= 57.1 min Primary = 34.51 cfs @ 13.19 hrs, Volume= 23.425 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 756.56' @ 13.19 hrs Surf.Area= 148,044 sf Storage= 441,387 cf Plug -Flow detention time= 121.3 min calculated for 23.377 of (99% of inflow) Center -of -Mass det. time= 118.5 min ( 962.4 - 843.9 ) Volume Invert Avail.Storage Storage Description #1 748.40' 9,895,353 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 748.40 0 0 0 750.00 14,816 11,853 11,853 755.00 84,565 248,453 260,305 760.00 288,422 932,468 1,192,773 765.00 431,675 1,800,243 2,993,015 770.00 647,950 2,699,063 5,692,078 775.00 1,033,360 4,203,275 9,895,353 Device Routing Invert Outlet Devices #1 Primary 748.40' 24.0" Round RCP —Round 24" L= 338.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 748.40' / 745.02' S= 0.0100 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf Primary OutFlow Max=34.51 cfs @ 13.19 hrs HW=756.56' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 34.51 cfs @ 10.99 fps) Post Closure -Dam Breach-100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCADO 10.00-20 s/n 01089 © 2017 HydroCAD Software Solutions LLC Page 73 260 240 220 200 180 160 140 0 120 " 100 80 60 40 20 0 Pond 18P: NE Drainage Hydrograph T_Ja Inflow Are=70.5 Peak dlev.756.5 Storage=441,3872�0RoundCulvert _O L A S=0.040V/1 - 34.51 cfs 4 T_ _ F 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Inflow — Primary Post Closure -Dam Breach_100 ft Breach Type 11 24-hr 100 years - 24 hrs Rainfall=7.94" Prepared by AECOM Printed 9/26/2019 HydroCAD® 10.00-20 s/n 01089 ©2017 HydroCAD Software Solutions LLC Page 74 Hydrograph for Pond 18P: NE Drainage Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 748.40 0.00 0.50 0.00 0 748.40 0.00 1.00 0.00 0 748.40 0.00 1.50 0.00 0 748.40 0.00 2.00 0.00 0 748.40 0.00 2.50 0.00 0 748.40 0.00 3.00 0.00 0 748.40 0.00 3.50 0.00 0 748.40 0.00 4.00 0.00 0 748.40 0.00 4.50 0.00 0 748.40 0.00 5.00 0.00 0 748.40 0.00 5.50 0.00 0 748.40 0.00 6.00 0.00 0 748.40 0.00 6.50 0.00 0 748.40 0.00 7.00 0.00 0 748.40 0.00 7.50 0.00 0 748.40 0.00 8.00 0.00 0 748.40 0.00 8.50 0.00 0 748.40 0.00 9.00 0.00 0 748.40 0.00 9.50 0.59 904 748.82 1.16 10.00 1.54 1,593 748.98 1.99 10.50 3.27 2,758 749.17 3.34 11.00 6.36 4,929 749.43 5.64 11.50 13.00 9,593 749.83 9.82 12.00 133.56 62,682 751.84 23.62 12.50 134.79 361,889 755.97 33.43 13.00 42.96 438,785 756.54 34.47 13.50 25.35 436,622 756.52 34.45 14.00 19.02 415,795 756.38 34.19 14.50 15.33 386,788 756.17 33.80 15.00 13.58 353,946 755.91 33.31 15.50 12.12 319,261 755.61 32.75 16.00 10.64 283,053 755.25 32.06 16.50 9.38 245,642 754.82 31.22 17.00 8.75 208,239 754.35 30.25 17.50 8.21 171,655 753.84 29.18 18.00 7.69 136,155 753.29 27.98 18.50 7.15 102,011 752.69 26.60 19.00 6.60 69,825 752.01 24.42 19.50 6.06 42,139 751.27 20.70 20.00 5.50 21,095 750.50 15.88 20.50 5.06 9,255 749.81 9.55 21.00 4.90 5,913 749.52 6.59 21.50 4.79 5,184 749.46 5.91 22.00 4.69 4,977 749.43 5.69 22.50 4.59 4,861 749.42 5.57 23.00 4.48 4,759 749.41 5.46 23.50 4.37 4,658 749.40 5.35 24.00 4.27 4,556 749.38 5.25 APPENDIX C2 SOIL QUANTITIES ASCOM Job Description Duke Energy — Belews Creek Closure CCR Material and Soil Quantities Project No. 60603274 Computed by KDO/SD Sheet 1 of 4 10/09/19 Checked by KK Date 10/11/19 The purpose of this memorandum is to summarize the results of the estimated coal combustion residual (CCR) (also referred to as "ash") cut volumes, ash basin main dam cut volumes, and soil cut and fill volumes for the closure of the Belews Creek Steam Station Ash Basin. Landfill volumes will be provided as part of the landfill permit package, to be provided at a later date. It is important to note material swelling, shrinkage, and wastage were not considered at this stage of the design. These factors will be incorporated during the detailed design phase. Figures, calculations, and computer program outputs are provided as attachments and are referenced herein. METHODOLOGY Proposed Ash Removal: For the ash basin closure, a closure -by -excavation method will be utilized. Because of this all ash within the CCR unit boundary will be removed. The proposed final grades, which will match historical grades, were compared with the existing topographic and bathymetric contour grades to estimate the amount of ash within the ash basin. In addition to this, Duke Energy provided an in -place CCR tonnage as of June 2019. The proposed final ash grading, existing topography and bathymetry, and associated isopach can be found in Appendix A of the closure report and a portion has been replicated as Attachment A. It has been assumed that one foot of overcut will be required. Borrow Soil: A stormwater diversion and borrow area is being proposed to the northeast of the ash basin, near the Pine Hall Road embankment. This area will be used to provide soil where needed. The following "Soil Fill" sections will further detail how this soil will be utilized. Soil Fill: Portions of the excavated area near the Pine Hall Road embankment will be filled to promote drainage to the proposed basins. In these locations, a comparison between the existing topographic grades and historical grades was created to estimate the amount of soil fill needed. Native soil will be cut from the proposed borrow area for this use. Soil will also be used to create the detention basin berm and retention basin berm. A comparison between the proposed grades for these features and historical grades was created to estimate the amount of soil fill required. Soil from the proposed borrow area will also be used to create these basins berms. Main Dam: The Ash Basin Main Dam will be breached and partially removed during closure of the Ash Basin. The soil available from lowering the Ash Basin Main Dam was calculated by comparing the dam grades before and after removal. An isopach was created using Autocad 2018 and Civil3d to visualize this area and can be found in Attachment B. Belews Creek CCR Material and Soil Quantities Memo ASCOM Job Description Duke Energy — Belews Creek Closure CCR Material and Soil Quantities II. QUANTITY SUMMARIES Project No. 60603274 Computed by KDO/SD Sheet 2 of 4 10/09/19 Checked by KK Date 10/11/19 Proposed Ash Removal: Based on topographic and bathymetric surveys performed on April 2014 and June 2014, respectively, the Ash Basin is estimated to contain approximately 9.9 million cubic yards (9,859,304 cubic yards) of ash or an estimated 11.8 million tons (11,831,165 tons) of ash, using a density of 1.2 tons per cubic yards being assumed by Duke Energy for their fleet for reporting purposes. It is noted that based on estimates of net CCR disposal rates into the Ash Basin since the dates of these surveys, Duke Energy has reported an in -place CCR tonnage of 11.97 million tons (9.98 million cubic yards) as of June 2019. AECOM understands Duke Energy utilized plant operation data to estimate ongoing CCR placement rates. In addition to the reported quantity of ash, an assumed one foot of overcut across the 270 acre ash basin was accounted for in the volume calculations. The one foot of overcut is assumed to be a soil/CCR mix and therefore qualifies as CCR for the purpose of this memorandum. The calculated ash cut volume for this one foot of overcut is 435,599 cubic yards. Borrow Soil: The Borrow Area is estimated to provide 544,355 cubic yards of soil. This value was determined by comparing the existing and proposed grading concepts of the borrow area in Civil 3D. Soil Fill: Civil 3D was used to create volume comparison surfaces where the soil fill will be placed. Where the historical grades near the Pine Hall Road embankment are being filled the calculated soil fill volume required is 44,385 cubic yards. The detention basin will require a soil fill volume of 4,585 cubic yards. The retention basin will require a soil fill volume of 21,938 cubic yards. This is a net fill of 70,908 cubic yards of soil. Main Dam: Civil 3D was used to create volume comparison surfaces where the dam will be breached. The calculated volume of material being cut is 649,823 cubic yards. The proposed dam breach, existing topography and bathymetry, and associated isopach can be found in Attachment B. Belews Creek CCR Material and Soil Quantities Memo ASCOM Job Description Duke Energy — Belews Creek Closure CCR Material and Soil Quantities Project No. 60603274 Sheet 3 of 4 Computed by KDO/SD 10/09/19 Checked by KK Date 10/11/19 The earthwork volume demands stated above are summarized in Table 1. Table 1— Summary of Estimated Ash and Soil Quantities Material Description Cubic 3 Yards (Yd ) Comments Total Cut Volume 11,609,777 Ash Cut/Removal 9,980,000 Reported in -place CCR volume as reported by Duke Energy in June 2019. 1' Overcut 435,599 Based on multiplying the 270 acres by 1 foot. Dam Breach Cut/Removal 649,823 Based on the comparing existing topographic and bathymetric surfaces with proposed dam breach. Borrow Area Soil Cut 544,355 Based on comparing existing topographic surfaces with proposed borrow area grading. Total Soil Fill Volume 70,908 Soil Fill for Detention Basin Berm 4,585 Based on comparing historical topographic surfaces with proposed surface. Soil Fill for Retention Basin Berm 21,938 Based on comparing historical topographic surfaces with proposed surface. Soil Fill for Drainage Fill 44,385 Based on comparing historical topographic surfaces with proposed surface. III. Summary Preliminary volume estimates for the closure by excavation project are provided in Table 1. As design proceeds, these volumes may be updated. Volumes associated with the proposed landfill will be developed as part of its permit application design. Belews Creek CCR Material and Soil Quantities Memo ASCOM Job Duke Energy — Belews Creek Closure Description CCR Material and Soil Quantities IV. Attachments Project No. 60603274 Computed by KDO/SD Checked by KK Attachment A - Figure A-1— Final Ash Grading Cut Thickness Attachment B - Figure B-1— Dam Breach Grading Cut Thickness Sheet 4 of 4 in/na/la Date 10/11/19 Belews Creek CCR Material and Soil Quantities Memo ATTACHMENT A Belews Creek CCR Material and Soil Quantities Memo REV. 0 = `♦\�__\\� •/ � '-\+ \`�\ � %,' ,/ r I ! / l /l',i� Nll r /✓� r•' �`� IIII ///�,/ /Il� \ � / /// / ✓ i��_--'-'�''/'ii,; / /i . / / / // / ,i- �-i- �/�- � � � �\ �--- ,' / i / ^ ' �\_- ►�/ �` w 1 1 \ \ -� \\'\\\� � �i �w\` � / / 1w .� r `----' \\ // , r' �- \\ \ -/// ,/ // I ,� II///l�/,,�/ J �i `* 'Il//� // /l 11t I1 \ \ �r�/j i f /rr // // / / / / / -/ i i \ / / , , I I - / ^ I I \ \ \\\\\\\\ ^� i^\`\ - �i / / \-' --_ ,- - \\ ♦ \ /% ,/ / �\ \ If/ /' / \ I \!(�(\</ 9i%/I11 % �I� / /// // /// I 1 I \ // r / -� �' (/ / / / j r / / /, ,11 / / J \ `� / l / ♦ / , ___ `\ \ \\�♦`�\\`\ ♦� ♦ \ / / -- \\ 11 III(( / , / . rr I lI 1 l /� /'' '- • • • • _) I \ 1 / --- / --� \ 1 \ \\ `� /\ -i /\ `\ //' / I \J / / I I IIIII I /� , / l I 1 \ 1 - / / /'' _ \ \ I I I I tI I // ` _ //`\` _ �/ , \\ It, 1, \ \ Ij I _//\` \ _ •• / 1 / I / / / / \ \ \� `. ' _III I lI^\ / , /� 1 11 I I IIII 11j 11" / "'i II � �1 / / / i i i i /-_ 1 \ \ \ \ I 1 i ---- I- /-,\ \`� ` /�_i \ 1 / / l/ /,/ ,/ I IJI IIII IIII III / ' ii�//i" `/tfw- /i'i' :::: /'/ i� \ \�\\`\♦`\\�` \♦ \ \ \ 1 / \,,,_- --`� \ \\``------'' / / // \`` ---' I / / -__ 1 \\\111, � _�� \- � �\ \ \ \.', j //� ,'I I I/ / / II I, IIIII I \ •� ! ��/// /'-i \ \ n / •.. , / /, _� \\\\\\ \��\ ♦ `\ \ 1 \ / '//! / \-- -- - \\ _ / / / \\ ) I I 1 f//11�-\\\\ \ _/\`\\ \` ,,\ / / / /- /l1 /l/ ♦�/ , / / / 1/ 1// l /11/ l,ll` . r /i / / r .:: / '/ / \ ♦ \ \ I I ^--- _ \ -_ / /' / / - 1 1 % \ \ j _ `---' I t __-- \ \ _ - /, / / I \-�/ / //!//�//r////l�(\\\ \ •i III//// / / f` / _1 I �� t \ / /,'// /,' �;_�`� �\\\ \ \ 1 ( ,� � � _ - / // ,,/, \ � I O J / / \ \ / I 11 � \II \ 1 \\ \�\`� �.j� 1 �) / / ! / ///, 111 -/ I I \\\ \\��\\\\\\\11 • ti •. I I I III) /i /x!`/ �r ~` 1 / // / ,' / /'�-_---=-�% �\\ \ \ 1 \ 1 \ / \ _�- ,'/ / / , \ \ / / / !/-�! . \ i' /' /) / \ 'f I / % _/ / ) 1 II" \\\ \ 11 '• i 11 IIIII ' / ' / \ / • �/ '/ / // / / / __-____ _\\ \ 1 1 \ / �� �� \\ �\ ------ - / / / / \ .� - // / / �.. / ` \ W \ - \ \\\ \\l` `\\`- i♦ 1 / / / \ /1 JI �/ , I I \\ I1I�\\\\\��\\\ •• 111 / / / ,/ J /-� /'/ '% /' //'/'/' '�------_-___// / I I j ' ' /� ` ^---- / / /\ `♦ '� ' '/ r` / \ \ \ \ �`\ \\`\\`1z, \ \♦ ♦` \` \ ♦/ ! 1 i I / / / III I I1 \ \\ II ♦ //^� / / / /// / _ �/ / / / / �\ / / /1 / I r=_ \ \\ \\- �_ \ ♦ \ ` / \� / f ) I f 1 / %// % /' / ,/) / I /I j I I I I li\[\� \ u 11111"III 1I \ �`' i' \✓ / '/ ' '/' / ,' _------ /! / , �'- ' ` `� `----'', ' /, r ` �,/ 1 1 1 O. fI 1 ` �♦ \ \ ` ` \ \\ \ l / ( I I /// ,� / / / /II 1 )) \ 11 I t%/'♦\\ '/ //% /� /'/� - / } - - , // ; \ \ _ / / / ♦ I / O If { ` \ ; \` _ �` ♦\\\ \ / // / / / / I I \ \ • \ 1 II I t % ` % ' / 1 / - - \ -/ , '- / \ \ -- , - 1 /1 1`�\ - 1 ♦ `_ -` % I\ \/ / / I I \ I c r EXISTING LRB PIPELINE 11\\ \ \/ I I I -1 // ,/ , / // �� / 1/ /) 1 I` 111 III \ I, , /i'i�\,I 1 ( ( / / / /, / / / I \ - __ - - - / / r / 1 I I 1 1I ) \\` \ \ ` /1/ /ii%II 1 I\' / / fll /; / /f /'/,%/'/i' / 1\G\�\--' //'• _ �f/'/Y i 'i i / �/ 1 /j �/ / //_�_� / ' 1 I f \ `� `- --- ' J� i,� \\�� I 1 1 I 1 I I ACCESS ROAD 1111 /\\ i'^I1 \ \ / i) % �1 / �/' / / / II,// 111 � % /," / / ////// \\ \\ _S,L_y • /,// /l I / / / / / \ I I I \ ` -- , I I I l � 1 III^1\I\ / //,- \ J __ I I---- /i / 1, / I \ �1 / 7 /�� r/ I / -- a�\�\♦ i /, / /� i' l / / //' -- / ' %1 I l 1 ``--`------- 1 I / 1 1III c l 1 III /III \`/ if ` \ \ ,/ ,, - 1 \ W \\\ l / \ / --' , / Il l // ` \ \ \ (t \ \\ \ - - - / / // . / / ! / , . ) ( I I \ \ ! / �/ [ l \ I III , 1 (\ `_---\ 1 I ►/ ! \ \ \ \ \� :\ \ \ --' _� // /// // -`) \` \\ \\�. _v)` �`� - = = == _ '/ /% /j'i // ice,/_,'/ // f, / ----� _ / / / /^\J ! / / \ I / ! I \ ` J/ / !II I \\I\\ `� 1 / 1 /l/ -\ \ \ \� ----' ,/ 1'f/ ',� �< & , \\ \a \ ♦ \ \ - - / //r/////// /'�-',' / l l / I ---- - `����r' /' /' / ( I ) I / I \ j l I 1 \ 1 % / IIII \\\\ \ I )1 / ) I i/ \`\� \\\\ \ I \\\\ \ )`U\"\\ `\\ ----- ---� /_ '/ // / " _ / / _ -// / `\ , /� \ ) I 1 ,\ l I 1 \ r I�l♦fl \\ f`--' jr // Ill //``\ ` \\\`�� \`\\\ - )a �\\^,�� --- // // / / / / //' \ \ / /. / I_I I I ( \ / I/ \ I \ ♦ \I \ \.J I //. / I 1 / --- �I / I \ 14,_\ a - - - - _ = =� l '/ I 1 / ,� - ' / I I I / � 1 \`♦ 1 \ 1 I \ i 1 \ �\ r / 11.111 I 11 r \ \ \ \ \\\ I :' `\ ` - /' ' : I N 71, O 1 1 I \ \ \\ \\` I ' 1 1 I I I \ : \ \\ ` \ \ \ \ I I \ -mil / z. - ACTIVE ASH BASIN _ /. /-,✓ . _ . _ / 1 \ / Q : I� \ \t I \ \ \ I I 1 I I 1 j 11 \\\\ I r / _ l I ► 1 1 \ \ \\ �_l \ \ !� �� \ --%�-�f�� ^` �' \_ / \ \ 1 1 I 11� \\\1'1//"/ ) I IIII \\ \♦ I)111, 1 i 7�` _ _MAIN DAM STOKE-116 -� %-' - - \���_;' _ - / ' 1 I \ _ .y� / 1 \ \ \ \ \ / I \ I , , I 1 I I I I �,, \ IV / I l =_� 1 I I111 ( \\` \♦\ / r, ►/// 11 / / r_``� __ - �'- \ I `__ / l \ \ \ \ -�� 1 - / ` �\ 1 1 1 I I1 !' 1( \ill \ / ` 11111 !\ \ \` // / / l / ' �� ----AB-205-SPT I / \ ` ` ` _ -, ,)I 1 1 I1111 \ \ ��\ /// \\\ 1 1 I \\\ / /I/ / - - I ` \ -\ I ` 1 \ I \ v J I I 1 I\ I / ( / _ / / - -_-----_--- _ �s;s=% :NO ASH FOUND ` 1 I \ / \ r III 1 I - _..\`\ \� / ,II ) \\\\ \ /\ / // - - - ! ------------ - _ _ FOUND' -205-SPTb I AB-207-CPT \ / -' r 1 " _ \ \ \ \\` O , I �_ . -_ ------- ! ` ___ _ _- _ _- _ _ � �;; ;;`__.636.28 �`\711.40 \`- NO ASH FOUND \ \2 r_�-- ==-AB-201-SPT_��- - %�_ _ /) PINE HALL ROAD - / /J� iIll , I'►i�ll\\ \I\i\\`\`\ 1 Q fi /'1 I ��--- \J / --_ = _ _ 718.31 - `\ `� - _� r ) /r -'/ EMBANKMENT DAM ;=='// 111 III\\\ `.-► 1\I \\ / O% ' ) 1 /-________ __ __ _ -_ -_, - ,692.58 _�__-_ / 719.36 -----736.00 111 // I// __ = I:,---- _,fif \\\ \ `\ -/ \ \\ �, / / i l 1 i / _ - = _--== - �`710.19 --' - __ I I // I /'= -- OUTLET STRUCTURE .=_-_= 11 \ I. \\ _) \\ \ \ - - - - 756.90 fl IIII //llffi i --- ;/ \` \\ ___/I \\\\ f /' I / / - \`. \ \ ! \ !/ - _ __- c== - N `�_` \ '\ ` \__ --- / 725.35 �-- % ' �� ` -- 6 - / / I _ _ _ _ ; \` pp//r -y/ / \ \ \_/ f / / -- - _ `\ \ \ \ _ _ - / / ',' /- - > �_'�=. /O----740_30 �% /f //11 fl [ _ i�.Il= _ \ ----�\ \ \\ \ v T/'i - \ \ \� �_ /�1�/' /' AB-209-CPT -\ \` `\ �`�, _ -AB-204-SPT / / / %','� o I _ - - - - _-- rl I� if �� �_ _ ______\ !�_�\ \ \ ---- \ \ I \ . _ \ Ir ,/ AB-208-CPT \ \ /' / / / \___ -_-- / / / / \ . ( -0 - J _ _�_- ----_- \� ,/ IIL -- � \� `\\ � `-_ - \ \ \ ` \ I / / / \ / / / , , / 706.40 AB-205-SPTa \` ____ 1 1 1 l / /- - i �I` / _ - 699.00 / ' / / / 1 _ 707.90 ill 1� ) l /' i �'. \ '' �-''' / "\`\ � % \ - \ N. / ;' .' // / / / ,//,1 688.87 710.60 ---- I i 1 / ` _ / / \\ /ii / �\ I ` i f / / `, / 682.97\ \ `�__ �' /'/ / ' /i'i// `� \ 1 \ I /� -1 I / // / \ ` ` - - \\ /1l // 1 \ \ I I \\-'\\ \ .,, \ I I I /<v / , , I / / /// 703.38 679.36 \ \ .\ - \ / I I \ r \ \ ��,/ / / / //„ //i/ \ O\ __ \ \_ // I / � \ \ �. \ I I I ` / / f I /�\ ` \\ \I 1 \_i I / / / / // 710.36 \ \ \\\r _. J \ I o\ / / ��\ � \ I \ \ \ 1 I I 10 / ./ // 712.00 ---- / / //// 720.55 \ \ \\ \� I 11 I / /� \ \ --- \\\ 1 1 / / / / / /r\ \\ \ \ \\ \ Q I / / �., \\\\ / I /I�1) �\\`\\ \_ - \\\ I �,, // / /// / \\ , \I 1 \\ \\`_ I` I / / _- \ \ �` 1 \ \ I / / / /� ` I I / , 1 I \ . ` AB-202-SPT AB-202-CPT --- \\ \� /r ) / I / / r %'/1 J / Ill 1 r / I �C 663.30 %1 �. ♦ / \� \ \ ``�`\ \ `\�/!! r / / / / I / i/. /// , 1 r ) 1 1 f 11' i 1 r \ 1 // I NO ASH FOUND \ / .\ - - / / \ t\ I / /' ,/ / 659.35 �\\ \\__ \ / // / / �>,.�\ (� ( ,' i f I __ (/`----''/ / / / i 1 I 1 i I // I .� o l r / / r I I 1\ \1 1 1 / / \ / // • • • \ �L \ l r I / .\ / r 1 I I \ \ 11 ) / . J / . ,/ �/ * \ I 731.99 / / / // ' '�`` `� • Q / t /I , \\ / / I \ \ \ \ 1 I �/ / // \ ASH BASIN \ r r/r/ / ) �- , / III 11 \\ \• ,• / \ ` --- I AB-206-CPT \ / r /J Vila \ \, \ . \ \ \ ` I \ 741.10 1 �/ / r / r 9r"_ / / _ , / I Ill\\ D�♦ \\\ ` /�/1 `\ `\ . / / / / _ __- `. `\ 1 \ O f / rI /// // r r !/ / `\ 1 / ) ir' / _. / 1 \\\\\\ \ \ \\\-- / / /'' ` \\ \ �` // / // // 1 / / 1 \ \ \ \ ki \ \ \\ .\ 741.76 / / 4r/.1 // /// r ' / / f f /l I / /// /' ----- I 1 I\\ - / --`-- I I \ \\ \\ \I- I ) AB-201-CPT AB-205-CPT 740.12 r //,/////// // / „ / _ r I r_ !�///,/`:------- 1 \\)\ \ . \ \�" -_ .---- -- AB-210-CPT 732.30 �II/ /. r / CLOSURE BY EXCAVATION / / / / )� \ \ - '- / / .\I J / /i / j 745.30 689.40 \ r // l / I / '-- _ \ ` \ l \ \-� `_ .' ,i,`_-' -_ - ,_\``=! l / / /i' �/� 669.37 1 1/ // r /SHALL BE FIELD VERIFIED / �� / / i i / !'�__�\' \ \\\`\\\\\\\I \`- \\=_.', ��`_ / I / /, ♦ 739.38 /1,9" /// r � -A , r r; /'/'/ / I I \ \ \�\\\ \ \ \-_- l ICI i i '^G' 741._40 713.20 AB-204-CPT 737.64 / //,�// / I r.� = 1 / // (SEE NOTE 3 AND 4) //./ / � I 1 \ \ \\� \ / /i I\/ I / 1 732.60 l 1\ 4I /I&/ / /// O� . ,/ ( / ///�,, j,' /)''/ - ) I I / -` \\ \\ \\ \`\ \\ �` / /r rr // \ '/If1 /' , / \ \ \\ \�\\ \ (/r:�// '\ /r// /rI p J /r rr\ tI r �1 �I, 11( I I \ I' � / \ \\ \ \, "`_ ( / % / I 725.38 /\ /�d/ // r/ • / / / / r' O) 1 I \ \ \\ \ \ `\ ` \11 - / 5- 1 742.83 I n - ! / /, .. / ,,/ Z � // r r// `� r' �pQ 1\\ \ \ \ � -1 "\`, \ \ I I I \ \ \ \ `, _`�_` � I // / / � / / \ \ \ \ /,/ �- _; ,_ // rrr r r \ \ `\ \ I 1 ► I I I `� \ \ \ / , f � 1/ / / ,1 / /// /� p /... /r) /// -Ix I \ \ \ \ \ \ \ \ \ I I I I I \ `- `- \ = ' `/ // / 1 AB-203-CPT �;'I==_______ / /r ' r// I r// /r /// -v 14 I \ / / / , / \ _ / f p ►► �� �! / /// O // r !/ l I / 1 \ \ \ \\ / / _ / 699.10 � I �� ---- ----_=fit -11 / � / r/ /r 1 Q' ) i ' i 1 \ ` \ \ -.--. � %, / - I -i - _ ,! / / - O I r� /r%i/•, //' �/ �/ Ir r r// /// / / Z , I I I I / /t-'/ /. / 1 - ♦_ I /�i / _ / 675.22 I p11 �� %�.\ / O /// ///// i /<cl I ) i i /I(I�i ./; :/ \I\ \► \ \ I , --- I 1 i l _ ~�i t i/ <i it / / r , -v 2 / I I \ \ 1 r'- -`----- l f I ijd//- I /1 / 731 95 1 I! Ill 1 \ pi It I,L// / v J r r r/ r 'i 1 i / / / / , I i \ \ \ \ \ \ \ 1 \ \ ( �� -, I /v / \ _/) )�- /�ii/ / /;/ ; /- i f /;'/ - \ \\ I � ) /ii /1 %' \ / -r / r/ r/ 1 r/ l r / / ) I \ \\ \1\\\ \ I\ \ \ \ II \ 1 i " \ \ -� `--i r/ / I / I \ \ \ \ 1 /// / / r l I \ P \ I - \ I \ l " I �� 1 /\ // / r/ /, 1( /// r // / ! / / I \ 1 I \ \ \ 1► • \ 1 I \ \ \ \ I , J . \ / . _ / /r / / \ \ \ \ I �� r / r/ I \ r / / / I I I \ \\ \ I I ! //I' / / / - I \ ` AB-211-CPT \ \ \ ` I �� r� \I , / I 1 r/ / / / , ' \ \ / / 1 1 \ \ \ \ \ `\ I I / t ._/ \ \ \C_ __\_I / / / // i 1 1 )/'., \ \ ♦ \ ) 1 ` r,j / t) j! // / / (t _ _ / / I I I 1 I1 I// \ \ \ \ \ \ I 1 t I f`\ /,) r 1 I \ I . /. ; / / //i/// �721.60 ` \ \\ I 1 I f \ /' /// / / / / i // I / fi l / l i I I I i \\ \ ` ` l i J i ,) i 1,�, 1 I \` \) i I // / ' / i / I / �( O 695.22 \\ �\ I I �_ _ I / /,�/ /// 1//% //r / / / ! / / // I I I1 I // ) 1 1 \\ \ \ \`. \\I \-1 I I I i // / ,-\' �\ `\\ \ I 1 I // / W / / I tIll \ \\ \\ I / 1 � o, I I / / / �/ / �/ I / / r /i / / /� / j I 1 (; \ [ 1 I \ \ \ \\ \�`1 `\ \I I I 1 / / // I I ) 721.37 _ / // /I�18 / / / r I I I 1 I \ \ \ I I I r \ III ,// , �/ , \ 1 1 / / \ \\ I , � ` `/ / /, / /r'!( r/ -� ' , i r 1 I i i I i , \ ` \ II I I I I I / I/ / /r I I I(/ i \\ 1 / 1 r / /e, / I\ 1 f / \\ \ I ) I) J �1 // / / - / I / \ \ \ \ 1 \ I 1 If % 1 1 I. l 11\ \\ I / . / I � � \l I I � r / / / / 1 \ \ \\\ / .- %J I / \ \ "� \ I 1 11 / •c ? // / / / / 1 / / . / \ `\ \ \ I (\\ ///;=-J/ / \\\ �\ \;_ \ 11 I / /, f� \ 1 O ��� /// / / / - I 1 / / II / l `\ 1 1 / `_--_ �/ \ \ \ , I'I , 1%j / . -. \ \ - \ 1 I , / \ /� _ � �_ ,A ` / r / .- I 1 / / l 1 r 1 I / 1 / / / \ \ 11 - \ _ _- �- I 1 1 � / I --^ _ \�`\ ///%"- i /'% /�i -/ I-/lI1\\ `-� 1 I / ( _i__ \\ \ \ I 1 I I / /, / /' / / \ \ \ \`\ `� \ - - __�-_- -_-\ I \ I / /J / � / /--^�00 ! I-- ` /-_� `\ ` - // r ) / / / // / \ t r I I \ \ ` / / ! \� \ t ) I 1 / // / / 1 \ \ `♦ `\ ``-_--_ \ I I I 1 I r / ,) \ / b\ O -�\ \ --_ - /f / , _J I / r-\ \ \ \ \ t' - I I 1 I I t ` II \ IIII ,-I / / / �_-'' \ \\ \ I- _``---'-� I I I I f / \ \ `�- / ,_2__- - \ �_ ) \ j ` / �� i / / 1 \�_i \) \ ) r/ r / I \ ♦-i'' I \ \\ , / \ \✓ �`_C0. sir ) 1 / `.I \ I 1 \ /'--- \ l 1 „ -/ / / f \ �\_ I I I f I I \ _ \ / / \`_- I� _ t - / %1� / / ,/ / ) /\_ l ram♦ II I r 1 1 \ t \-- / ` I \ \� / / __-J I N \ I I I I _ \ `-) _`�\ - / -^`, \ -- \\ \ I / / / 1 -- / `___ \ \ \ I I \ \ \ --i t \ 1 / / i / ) `\ i --__ -'l 1 / I 1 I -� \ ` \ /' 1 \ _ _ - _ 1 I I --- I ` \ / � \ \ --- - \_ _ / - \ \\ \L l / /' / 1 J ram\ _-( \ \\\\ \`\�` \ - ,-' \ I / / _ / /-� -' / ,- -- ' ,/ j \\ I 1 1 \N.../\_-! \� _\ \ -- '__ \ `. -� \\ ••i • • • \ \\ \ \ / / / I `\\ f /-.-'\\ �/ \\ \ _ -\\\ \ > ,-- \ I \ ) / ♦ / / / --- �__ __ �- 1 \ � -� \ �!-� _ - /�\ . \ • • •: • 1k/ / �- If i- - 1 / \ \ \ 1\_1% III \ \I ; \ / I I / 11 r-_ /. , 1 III 1 I \ \ - - I , / /� \ \/ ( ._ \ \ / / % \ I / I 1 ,' / I I I ) ) \\ / / // 1r - - k Q \ c' / / / \ \ r \` / / / , \ I / / / / I - I 1 I 1 1 \ / / / _ U,r \\ . J \ _\ ` 1 I 11/1 / - \\ / 1I , I , `,\ -_-- , / ,- ,• I �1� ,� , \ �I,,�. /r S I \� \ \\ \ 11 \ \I 11 /_/ 1 1 `- , 1 , , ,�, --/ / ,' ,� / / \� TIC` ► \\\ \ \ \ II\\ BELEWS LAKE 1 / « / / ' /J,', . I `-___ - ( II I / /f \) ;j-/ '/ / �- ,11 � �} r�/� / ,--- \�K`\:M A� f \ \ `\ \, \\\ \� \\ \ NORMAL WATER SURFACE ELEVATION = 725 EXISTING POWER t / I h,/ / // /�, / _--__-_ .' /. ' l I / ; / I- � NN ;9 � ` \\ \ \`,`�,\ \ LINE EASEMENT ' / /'I �: - - - =-f �; `----/' l /J ,,_ ' n / i1r /' / ., - �, �} k / //�/� ♦\ \\ \\ \)\\\���NT R, -I \\ \\ \\ I ( I I ' - __ l / /� / / -- `� 'c / / \ / I IllI \ \� \0 i \ \ �_� J - / / / / \ N_ \ \ k I 1 --- _Ill \ \ 1 ( -"If � / _ � \ ( 1 11 / � 17 � „ / �/ / I 1 \ \\ ,/ I 1 I I ! X7 I-♦ \ \ _ // / - / // /--- / / \ I 1 Yi? ` \I/1_ ' / / ) `\ --- /- , / , / J / ,,-i,_- / \\ / / // // c \ - 111 // `\ \,\ \ \_\_ \ / / / /// / ,/ / �\`� �__\ / ,/ / . / //t , /_ , '-- ,/ / .I-\.,"� \ \\; \\\ \ , / \ \ \ �-' -/' ,, / 1 // /-• /,- 11 \ \\ \ ` IN.\ - \ / / / / / /' /, 11 `\ \\� \ \ j \ / /' '' / / / w i ,' /) / 1 / 1 / - IF / \ \ It \ .--- -/ /_-/ -/ /// jtk / /,//I \ I \11 7 1 , / / /// / / \\ \\ `\ I /' / \ I` //// - �� r - ` \\ --- `/ -l--_'--/ /, / -- I \ I ) / / , / / / \ \\\ -_ 1 ',� \ / / / / / / -,- I \ \ \ / / / / / / / / / ' / �/ I I / ! . -- \\� `_ \ / I I,---- -^\ I /'' x/ 1 I I / ✓ �\�� -_ - ---_ / _ �- --- _ \� \ \`\ ! //� / / // / /'// I / -'- -"` 1 1 /- �� 1�_?^�`=_ / \ l / 1 / I \ \\`\\ \\\ •••i •i•• / ,/'/ - \I°/`-- r I / /' / ,, // / I{/--�� I -i' //~l _ I_ \ �1 a � _ 1dv1 I 11/ \ \\\\ • O f ,/, \/- - `\v,_ I I I I / /i' ,/ / , / - i ` I ,-,,- //- - \\ I ' /' ^\\ -, 1 t \I 1 \--- � ) 1 \ I 1 \ ♦ • •• /'i'/ / -' -- --- \ 1\\// I \ I I f { / - �/ �/ // (- j� \ I / / ,, / / ,- - ♦`\\` \1 I / ♦ _ \ -4 4 , / �1 _ ) I I w`__ _ \` ,/ /,' �- i'' -' /,- \\I\ i O I I kc), / / r �� , / F" / ,-/,,r \) \\I -- \ \ \ t'� \ \ r \ 1 l <\\ [_ -_ = _-, , �/ / � _ \ -' 00 / I 1` �(1 1 / `\ \N � I f \ `N-J / '' �1 1 / \ ``- �\ 1 _--' `N\\� / \ ) - 1 \ � .3. _v, \ \♦ \ `---= --��� `-jam JX / / / /__ -- / I \ \ . � \ \ //jam / \ ) I / "i-X_ - .\� __-' - / -I i v /%////%, i-�� \ CD `\ \\ \�`\`- _/% / I I \ \ �`\ r \ J l\ (`-__- -) `I ``� _ / k � / I J `\\ a _X \ Op _ _ XT�� - _�J-i_-- --- / - , T'r_,_ - - - \`� / % \ !- / I -' �� \ \ ' 1` /// \ // ^b/. '- - \lid,' --- /� ( \\) I ' - // o `. 'r '-- --- ` 1\_- / - ` \ / i' � � / / � / /' \\ I � \ \ \ //-'// ♦---- = �11�1 r - - / Q \� �\ i 1 , � _'cl %% I , ice rff� \\ \ \ \ �- - = / \\\ \ I I f \\ \ "-_� \ice 1 I--- -- -,f\\ \ r/ 1 / / / ~\ \ \ !'` \ \ / 11\ r \ [ \ `11\ 1' -- ! / / \ \ II� l i, / ^ ,/ I / -- - %%,'- \ I ll - r %. / //� �O -1- I /, I \\\ / __ I I I 1 \ / / \ \ I / / ,-♦ / / / _- \ \`:, / / �\ \1 rf - % 1 1� O e \ / \\ \ `I' / i / 1 \ 1 � / `_ I I /�` \. / �1 / 1 11 / ,�j / // 1 / / / / ♦ - -- � \I`\ 1 / , / c3\ oo I \ .' I \ , , ,� / \ I, I , I/I \I \11 •/// , / �II \ t f / _-- �'^ .-,\\� / //// % oo/ " \ _ _ x�-' \ `• {'i - - J - /, i / , , \ ( . I J /1, / / / \ ► I _ �/i- ---�\ lr 1Nll I - / 1 -- G,I -�'/ 1 / l _ .J. I I/1)I, !// / 1 I1 /i / 1 , \ \ Jl IH// O \ O c� / I / - / / / /// - \ 1 I / - /\ \ \ / 1 I - __ _ \\ / O / /i---� , / ! III- / .� ` / //// \ IIII, k1 I / / - 11 // 1 �/ - \.- ( / .�-/ {/// 1 1 O C)n. I � O,Y, \♦ 1 I II I II / // ♦ / �.1 / i 1 / / \ / / / `\ `\ / / I /' \\\\ \_ ��� -\ ) l I r // / \ `\\\\\ l ////%l ``--\O J \ // I /I11111 / / / //,�/ / �II\ -�� I/ / /-\ 1\)tl I /\\I\l C�l - �\ )/) / ) /// - _ \11 1//7r/ I nj ! ♦ \ �< / / 11 ♦ / / \ 1 :--�; l I ,/ /' ' \ \\ t 1 11 I \ t ` \ /'/ / / / / ,- - \ I / / //1 / I \ / / I 1-I 11 / / / � / / , _ \ 1 1 - / I I I / / �/ _ \ \\ \ 111 f 1 I \ \�\ \ \ \ \ / / l /N - - `� \ I �c� /�1// \ }J\ 1 ' \ \ I / \ /// _ / 1tl 111 / / �/ /// - `\ 1 \\\II I / / \ '�\ III, / / / \ 1 \ [ \♦\ \ 1 I f I 1 / \ I /', I _ --_ / / \ I Il I I//lam_ \ \ 8 / \ III 1 / - � / � \ I \ 1 I / _ I II___ \ \ 1 1 ) I I I / ! <_ `\ t1 \ 1 / / -i'-"� \\ ) I '^ ♦ \ \\\ \ I l I'll / I 11\II / \ / \ I� I \ I 1 1 I / /' % I ♦ t ! `\ 1 1 "/ \ I , I I1 1/ / - Av V\1' / 1 A v ♦v v I I I 1 I V I I jlii = V vO 14 N /J - v hhh��� / / / //1 �� I \V I I / r / /-` . A\) I ( / ' V AA I IIV/ / If/ l / ! I\ IIn11 AV I r v v \ V I I r Iv� vI AI I I / 1 1 I 11� / -- vv ,, `v (/ 1 ) 1' I / A_--- I v �/ \ .\\\ \ ` \ 1 1 I / I // / \ \ , Y\ \ I \ \\, \ - / /// \n \\J 1 1\ \ \ \ \ / l l / --{ y� 9r- ---__ \\I)j // //! // / �\ ^- \ I // / \IIII \\ \\1 1IIII / // / / \ ,111 \\ N\\\ \ T \ r r l / /'" i-� \�� _ a'/ / / , / /`-z.Z---- _\\ I 1 / / 1 \11V -/rI II \ 1 I / / / \ 1�'Il � \ \ \I \ \ \ / tea. ` C5 ` \ . \ \Iqe'/ / //• // / /,/ ,,f i/,/ --� ``�°• `� 1\ 111 IIII \ \ \\\\� `1 \1\\ / / / 1 / ` \ ^ •` \ 1 I 1 \ 4,//J/ �//�I J // / ////, j /r�-_ -�\`� \ / )) l \\\ I 1 /' ! r \I\\� 1 /r / 11 1 / �` \\\ r �_ \\\ \ \ I 11 \ \ / `\ / / 1 / \ \ `- / �/ 1�������`� \ // / //// // / _ �\- --_` \ \/ / / / I .1 \ \ / ,/ / \ tll //r`�\\\\\ \�� \I`1 \ � \ / ♦\ r O /\ \ \ --." I r ����, \� ! ram, // '//'// r \ .i \ 1\ ///// ,/ \ \\\1 I / -- I �\ l I r / \ 1 �/ / \\_1 I \ \ \ \ ` \ \ \- / O \ / \ O ( ♦ all .. \\" \ \ -ii/ / / , ,/ /_ ` ` ♦ ♦ I 1 \\ I / \\ \1 I / - - \ 1\ r^ \ ♦ 11 \ I / / \ \ ( % J / /l/l� \ �♦\ r / / ,/ '/ / -/ /, /i / ,//- �`� \ I / /, / I \\ 1 / - I \ 1 I I 1 I / \ 1 \ 1 \ 1 I 11 1 / \ \ \ , .e / d11 / \N,� \ \ \ / , // / / // / ' / �\ \ III / \%. // 1 \ \ IIII I I / .\ Jl �r )UII / //// / \ \II I I \\ \ I f 1 I 1 11 J \I % I , glc6 \ \ \ / /%,I / , , / _ ` \ _ �- t\\ // // , -/ / 1 I \�\ 4 1 I 1 I. r 111 I /, \\ I I \.\ III / / ♦ ////j , / /, \ / /% / ) / / \ IIII l r / / /� \v /� \\\ I 1 I J/) /, �1 \ // / `\_i `�\ I /G=� II))I�J� . �Nl\ 1 \ /! / ,// ,, ///// /,/////,��^ `�i , ��^\ \\ /l/ / I \\\\\�\1 \I \ 1 1 //// 11 /ll 1 r `\\1111 /-_\\�\\ ✓ f 1 I I h! /// N / r /1/ ) c\\1 ,/ - II III � \ / ���/ /i' /A /i'//,/ /,,// ,-� �\`��- \ \\\ / 11 11 \\I/ /\ l// r11 1 /// \1 1 / `�`\\\\ / I I1 //� r �/ \ \J.II 1 /,/ I \ i/i-=�\�JJII' 1 I / / ♦ / / / �� - L � �� ` �. \\` f I/ / I \ I 11t �1 / 1'/ / `�\I1 f, \`�\� I I / /'1 \i` /�1�11�` //1 / \ / /,i- �`���! / IIII 1 l) / / l l�/// // �,�%,i,//,// /, / //,_ _ �� �_` �_�� `�� -_---_ �\\\II / _ �t 11 1�\��ltf /%/'/ `\\\\ ( \I I ll I/ - _ \�. 1 I I /\ `♦\\\ \% ) I /1 / i // III 1jI`- / y _\ \ \ 1 _I/- ,'% / I / / �11 ,l O _ 1 /ri/ I /'\ /ll 1 I I ll l!/ /' / / / // ///i' /' /'/ -��`� `� `� �� ` / / � \\\\I I / // ' \ I / 1 \`\\ \ % / ' / 't� ` //^II W\ // \ \\ ` \a �i I , / / l r 1 (IIII // / I// ,//� / /'/ / �_` ` `-- ` \\ //i'/�-�\`�\ 1 1\ _ `�/1/ ^\ \\\\l \\1\ lI / /r /,/ -<,", III / ) / / I , I / .1 J / I / //// / / _ 1 1\ / I L // 1 1 w- \ - /0/ r- / / 1 // 1 III / /i//. -- //i�/ /�///�/,'//'/ii' ��\`� �� �� �� `�`_I v\ //''1i' \:� �_-1J I \ �/ /- �\\\I\\\\\\ !11//I/ / \``\11I / I III\I'i/'' / %--�///\IIIII1411 I - r i./i - 1\ 1 !� / / I I // - - -/,'/ / ///, , /,/// / �_\�_ 1_�� \�� ��`� \�`� \ ��`\ I '1 \ / ^\\�� - --_-) \ \\ v/, \ I\)\ \\ I I I1 r/ / `�\ \_/ / I I I I,, // \ 1 l �- I l COAL PILE I, / I//// / I/ 1 I I/11 V�//j / / / / // // /r / ��� �`�` L �� 1 l \ \\ _ -- 1 ♦ /- 1 )1 1 \ III/ I I / --\ \\ J/ / 1 \\_/i'/ I / - ---- Ill III ^IIII\1 `_---- /1r,1• / \ � / // 1 / / / I I II ///?/ `-/ /,,/ -/ //i/ / / / /,/ ' ��` I. `�� �` �`�` ` `\ \ 1 \ \ \ \ J 1 l-_'- �\ J -/ / t \ II I1� \ II I / ! l I r \ \ . ,/ 1 �' / I -'ll )IIII \\I\ \\ `♦ //I/ �� / \\ 1 �/ %'/// / - f 1 III II(; ///fir /,/. �/ /' // / '///// // ��``� �`� ``� ��` ` \ \ I \ \ \ I / J I \ \ I I \ \1 \ \ Il / I -- Ilr l \\\�\ / / / Q / \ 111 r r / //, / / , / / -_:�- �� \ 1 \ _Jl / -' - 1 `% I \ I Ii ! / l I /� / ` 1 \ \ , I I/f/ /-/'-'/i',/' /'///,/ ///_-,--^ � `� _��� `� _`_-- \ \ _/ \ I I \ \ \ ) � �� \\ \ \ 2 \ ,// / I ! I II \\\\\\\ /1I//l ZI \ /// / -/ \ \ \ IJI l!r - / -/ / ,/ /, . �� �� `� \ \ \ ► I \ \ J l 1- r { \l - r� \ _- \ \- 1 J -- /r/ , �_ ♦ . \ _� I t \ `. Ill \ , / 1 / I 1 \1\\ 1 // / I /i / // . -= �� ��� 1 1 1 t17 \ \ \ \ \sue / I 11 �\ \\ // /// . l r / / //� , j ) I )j\ \` tIt)I) l/1 / j',','/ii'ii�//'i ♦`\ \`♦ \�� ��_`\�,\\\\\ `"/ 11\ / / / %/'/rL4j N /'/ `1\vl\1�--'" r, �/ \__ �`_ r�F --__ I�111 \\ \ q - ��/��/%/ c_\ few J.�-^--ram, ////r/ / \ / / \ III / I l 1,/� --//i/ /j/l \ \ \_- - �` \\\\� 11 1 1 -_6 �� , 00 / / \� 11 .- _'%- -/ // f''� \ 1r"� ` --__ --� / / ♦ % \ \\ (� t ///%//rjd I / I 1 Ill / / \ I - / ,\ \ t -i -,' _ ) \ - -- �_ //// /• ✓ I I - // _ \ \ \ \\\ 1 V ` ------ / t t-= i // / / - _ rtf9�t 1 ll/llr 1 r� I \/// / / I I / / / l - � _ \ / / / I I _ 11 \ _ 11 \ / f L-V / / / /i / ���ll-�/l I Il l l'- / /„ `\ \ \ _ \\,C� \\ 1 I / / \ L - 11 _ // O / IdJ / / / _-.�/ // llI/ 1, 11/ l //� ,��/ \\ `\ `\ 8 \\\ \ \\ 1 I8 I _ '/ / ','i'/ ) I --- �%�/__---'/% 1 --� - J "- tI )Ij11111\\ ^` -�\ ?`\\�\V / /' `-� _'/lr� ^/I lrljl / / / -, //ram - �/, //// 1. l- / I /, / ,---� \ \ \ S \ \ \ \ - ) - - I if < _------- / / ii' - \`\� �` ` (< 1--' ) II Q III,IIIJ / rI - -^!`-� 1\i(--^ 1J�," % - II1 `� 1 y /,,�i'lyd/il/\ l fl CLOSED PINE HALL \ \ \ \ \ \ _ ; - _ - _� - l \_____ \ . --- = - -� \ \.\` - -, -=`ter I1 \ . /1 `, r I / \ \ \ \ \\\ \\\ \\ - - - - % //r- -� I_ ----- I //-r/,� �\ \ �� 1 \\\\ \\ \ _�--_ /�i / l �.�ill// - 1 /O / / ,FjI'/'// 1� ,/i/CZj I I1 `\ \ \ \ \ \ ` - --'%� , s��'� (- - /%,-, J / \ J \\\ ,\ �v�\ rr-\I _`__- //� / / /�! ° / I / /' / r . , /:' ,, // , // /ROAD ASH LANDFILL \\ \\\\\\ -; 1� + -�.::' /' \�\ s \ C. \\ \ - ,_ /• - / \ 1., CO , / // // /,// // PERMIT 8503 ) 1 I / _ \ �" /�-'-fir--',_ " \ -//, ) X\' � 1 1� `\ 1 \ ;_ // �\\ I / / // // //�_.- / J\ , / - - / �.- X -// / / / �, , /ii, ii/' /' % ----�-1\1 :mil ' `\ ./ _ X >L-X\ x x� /I/ ,- ' / \`\\ \��- \ / 1 r 1 `i I t �' '� ^11 �Jl //'r;///I /j///,%,/// /- -//�` - T�I x �i -\= =-�`� / SED\ \\ `\l \ - ,Z I I ( i %\ ��I .II' , //// //// /// , / / - - -/ / `/ I ^\ i� --- \\\ / STRUOCTURAL 1 111 1 / / I / \ / / \ / ,/ /I/ / -� i.. // \ �f'Yd'1I-;. 1,\ \ / //-- -_C� II r/rr \ \ It k \►11I /1 / .� I \ / ,!/ ) , i 1 I i I \ -, l I 1 1 `�/ J / / -`� I1 /ice/ I/ ► ) I l r. P:\PROJECTS2\60603274_BELEWS_CREEK\900_CAD_GIS\910_CAD\05_MODELS\CIVIL\X-ASH REMOVAL ISOPACH-BELEWS CREEK.DWG 10/10/2019 12:32:36 PM / / r/ - ! I f / / /// FILL � 1 y III I11 ► / , , /r -\, r^ 0 1 2 3 2 TENTHS 10 20 30 3 4 5 CLOSURE BY EXCAVATION SHALL BE FIELD VERIFIED (SEE NOTE 3 AND 4) -_ of - • /, III/ / 1, o r A=COM N.C. ENGINEERING LICENSE NO F-0342 N LEGEND - - - - - CCR UNIT BOUNDARY (APPROXIMATE) - - - - - - - - - EXISTING SITE FEATURE (APPROXIMATE) CLOSURE MINOR CONTOUR (5 FT) CLOSURE MAJOR CONTOUR (25 FT) AB-204-BORING ID 0707.90 BOTTOM OF ASH ELEVATION 711.73 ACCORDING TO BORINGS 710.36 HISTORICAL (1969) GRADE EXISTING GRADE NOTE 1. BASIS OF BEARINGS: INC GRID NAD83/2011. ELEVATIONS ARE BASED ON NAVD88. 2. GRADES SHOWN WITHIN CCR UNIT BOUNDARY DEPICT HISTORICAL GRADES. 3. THREE SOURCES OF INFORMATION WERE CONSIDERED WITH REGARDS TO POTENTIAL FUTURE GRADES FOR THE CLOSURE BY EXCAVATION AREA, GIVEN THE ABSENCE OF ASBUILT BOTTOM OF ASH GRADES FOR THE ASH BASIN. THESE INCLUDE THE PREDEVELOPMENT HISTORICAL GRADES WHICH CAN TYPICALLY BE CONSIDERED THE BOTTOM OF ASH GRADES IN THE ABSENCE OF ASBUILT GRADES, EXISTING BATHYMETRY CONTOURS WHICH CAN BE CLOSE TO THE BOTTOM OF ASH GRADES IF ASH THICKNESS IS MINIMAL, AND INTERPRETED BOTTOM OF ASH ELEVATIONS BASED ON LIMITED NUMBER OF DISCRETE POINTS WHERE SUBSURFACE INVESTIGATION WAS CONDUCTED IN 2018. 4. THE THREE SOURCES OF INFORMATION REFERENCED ABOVE AND SHOWN ON THIS DRAWING ARE FOUND TO BE NOT CONSISTENT AT LOCATIONS FOR THE BELEWS CREEK OPEN WATER PORTION OF THE ASH BASIN. IN SOME AREAS THE HISTORICAL GRADES ARE ABOVE THE 2015 BATHYMETRY GRADES. THEREFORE, CHANGES TO THE PROPOSED FINAL ELEVATIONS WILL NEED TO BE BASED ON ACTUAL FIELD CONDITIONS UNCOVERED DURING CONSTRUCTION AND/OR PRE -CONSTRUCTION INVESTIGATION. ASH DEPTH Number Minimum Depth Maximum Depth Color 1 -85.00 -80.00 2 -80.00 -70.00 3 -70.00 -60.00 4 -60.00 -50.00 5 -50.00 -40.00 6 -40.00 -30.00 7 -30.00 -20.00 8 -20.00 -10.00 9 I -10.00 0.00 0 300 600 900 GRAPHIC SCALE (IN FEET) TITLE FINAL ASH GRADING CUT THICKNESS BELEWS CREEK STEAM STATION STOKES COUNTY, NORTH CAROLINA FOR ISSUED FOR REVIEW DUKEDWG - ENEK%,7Y® SCALE: AS SHOWN DES: SDIKO TYPE :.DWG DFTR : SD/KO JOB NO: 603274 CHKD: SD [DATE. 09608 2 19 ENGR: KO FILENAME( -ASH REMOVAL ISOPACH-BELEWS CREEK.DW PPD: KK DWG SIZE DRAWING NO. REVISION ANSI D 22.0"x34.0" FIGURE A-1 0 Z1 M < O ATTACHMENT 6 Belews Creek CCR Material and Soil Quantities Memo REV. 0 m M / i i , / / / // 1 / \ 'o, - ----- /A r 'ell N I + + + ♦ \`_- ----''' �I + + + + + / I- - - - - 1 1 I / /� \ `�' % / /-'' \ \ I I I I I I I I I I I I I I I l : I I I I /'^\► % / 1 '\ \ I \ \ \`��' 1 + + + + + -- I \ 1 I I 1 /--- - /- - �\ / �/ I I I I I I I I I I I I I I I I I 1 / I I ( ♦ 1 'ri r/ J l\ �x�, \ \\ \ � / ^ + ✓ ,/ / / ♦ ♦ ♦ ♦ ♦ ♦ // / / i \\ ♦ ♦ / // / / / / / ♦ / ♦ // /�' / / / ,/ / + + + + + + + + ♦ W / I I I I I \ \ / / , , / / / / / p ram' \ \ I / / + + + / / / / / / / R/ 1 \ / I 1F \\ _ _ / 1 I I \ \ 1 ( \ \ 1 ; � \ \ \ \ \ \ 1 j ♦ \ ♦ 1 I 1 I I I / / \ / /' /' / / / /' \ \ ` ` 1 . . \Y l I I / I I I / / �/ / / I I \ \ \ \ \ \ \ \ \ \ 1 1 I \ f. + ♦ 1 I \ \ \ \ \ \z I / 1 I 1 I I \ l / \ I / / / // / � , ► / r / / / I I I / / ` ` \ 1 1 I 1 1 I I I �Q� I I I 1 1 . / - \\\ \_/ � + /01,^ \ \ 1.1. 1 l / l l �`/ / l , // / // I / I 1 I I / \\ STAIRSI I 1 , / \ / / / �'100 / I % ( ♦ RIP-' \ RAP / le i I I \ - \ - / / CONC. I\ I 1 \ � ��'- / /'mom goo CONC 7 + 1�lw 46 -ot/ I J r 10M / ft L-t + I Z J I/ 1 '.1 ".1 It ago < + + + 'Ile / / ' /' / / __--_ '' HEADWALL `\ �\ \\ \\ \ `\\ \ _ _ �// // / / / �[ PIPES. E 2' \ \ \� �� / / , / / mono ell fl \ I 1 .TEST WELLS RIP_ -RAP BO I- CONTROL POI\ 6000 \\�`\ �\ \��- \ IN, R g6. 3 O NAIL SET N ��`\ --�� \ N:928778.159' — TRU E:1682155.174' `��� �� �\ �\\ ��\\ \ --_^ -_ -- -' / / ��� / �/' / �� G \ nygAl '' ELEV:770.04' / I / 'EDGE OF WATER ELEVATION ���\ \ `-- --__-_ - ---------` \ RECORDED 12/13/2018 _ CONCRETE TOWER tj� W/RELEASE VALVE �//` ���-�\ --_ - - -ASH BASIN MAIN DAMI0���' TOP CONC.=764.40' _—__,— //' ��\—_�,—�,�--___ �_ (STOKE-116)--_— _ _ __ -- - / -� - - _ - _ / ----------- - - _ N. ----- / `- - - - - - - NA -\ \ `\ / 1 / — — — — — — — �_-------------------------------------- NN -------------- �\ \ \ \ \ \ \ \ \\\\`\ \\\\ \ \`\ / \> / / j / // /l 11 l l 11 I I /�__�''-'/_ '�___ii��_� \ , le // / / / / / / / / / / / Ile CLOSURE BY EXCAVATION \ \ \ \ / / ' / , // / ' / , / //' / / SHALL BE FIELD VERIFIED NI Cl�CAII'l 1 2 CCR UNIT BOUNDARY (APPROXIMATE) — — — — — — — — — EXISTING SITE FEATURE (APPROXIMATE) CLOSURE MINOR CONTOUR (5 FT) CLOSURE MAJOR CONTOUR (25 FT) PROPOSED DAM BREACH MINOR CONTOUR (5 FT) PROPOSED DAM BREACH MAJOR CONTOUR (25 FT) NOTE BASIS OF BEARINGS: NC GRID NAD83/2011. ELEVATIONS ARE BASED ON NAVD88. GRADES SHOWN WITHIN CCR UNIT BOUNDARY DEPICT HISTORICAL GRADES. DEPTH OF EXCAVATION Number Minimum Depth Maximum Depth Color 1 —135.00 —130.00 2 —130.00 —120.00 3 —120.00 —110.00 4 —110.00 —100.00 5 —100.00 —90.00 6 —90.00 —80.00 7 —80.00 —70.00 8 —70.00 —60.00 9 —60.00 —50.00 10 —50.00 —40.00 11 —40.00 —30.00 12 —30.00 —20.00 13 —20.00 —10.00 14 10.00 0.00 TITLE 0 75 150 225 GRAPHIC SCALE (IN FEET) DAM BREACH GRADING CUT THICKNESS BELEWS CREEK STEAM STATION STOKES COUNTY, NORTH CAROLINA FOR ISSUED FOR REVIEW NN \ `\ `\ \ `\ `\ CLOSURE BY EXCAVATION / / / ; , / , ; / / , / ,',' /' / \ SHALL BE FIELD VERIFIED / / / ' � / ' DUKE SCALE: A H WN ` ` �\ �` `\ \ `\ \ ��'� / /' /' / / / i / / / l / i /'� / DWG TYPE :.DWG It—NNN/ / / / /, , / �, ENERGY® JOB N0: 60603274 \\ \ \ \ \\ \\ \ \\ \ \\ \\ `\ / ' /' i / / \ \ \ _ __ / , / / / / /, , / � DATE: 09-18-2019 FILENAMEX-DAM BREACH ISOPACH-BELEWS CREEK. DWG SIZE DRAWING NO. ANSI D N.C. ENGINEERING LICENSE NO. 22.0"x34.0" FIGURE B-1 P:\PROJECTS2\60603274—BELEWS—CREEK\900—CAD—GIS\910—CAD\05—MODELS\CIVIL\X—DAM BREACH ISOPACH—BELEWS CREEK.DWG 10/10/2019 4:58:53 PM/ / , / / 4 / ; / F-0342 DES: SD/KO DFTR : SD/KO CHKD: SD ENGR : KO APPD: KK REVISION C 0 1 2 3 i ITENTHS 1,0 20 30