Loading...
HomeMy WebLinkAboutWQ0009772_Email_20200106Strickland, Bev From: Sipe, Randy Sent: Tuesday, January 7, 2020 11:00 AM To: Tankard, Robert; Toppen, Sarah A Subject: Monteray Shores Flow Allocation Attachments: Monteray Shores Flow Allocation.pdf Dwight Randy Sipe P.G. Hydrogeologist Water Quality Regional Operations Section Division of Water Resources 252 948 3849 office randy.sipea-ncdenr.gov North Carolina Department of Environmental Quality 943 Washington Square Mall Washington, NC 27889 Nothing Compares..] Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Monteray Shores VVWrP Allocated Flow Calculation 0 ° -RO N C 0'7 `o £ n ao 0 O N R O. ikm MU) `o E a m it O V O N m °.0 COM 0)LL d o a� D° 0 0-O .R. V N T N N a X R a m ty W in( 120 114,240 GPD 120 65,040. ' GPD 34,742 GPD 16,978 GPD 120P$g0i }GPD 120 "T 12�1i ;� GPD 10WDA a,: GPD 120 47520 : GPD 120 3%240 GPD 120 $;B4D ; -;GPD 120 411;04A: GPD 0itS50, GPD i r , 30, :.GPD 120 ., 17�so GPD .... 15D00, : GPD 231,000 GPD Monteray Shores Phase One and Two Existing Residential Buck Island Existing Residential Existing 294 106 4 5.11 952 542 Monteray Shores Phase One and Two Existing Commercial Timbuck II Existing Commercial Monteray Shores Phase One and Two Future Residential 90 6 540 Buck Island Residential Future Monteray Shores Commercial Future Owned by Outer Banks Ventures Corolla Bay ( Monteray Shores Phase III) Residential Soundfront lots Semi-soundfront lots 15 36 28 7.11� 11 9 107 396 252 Committed To OBV Interior Lots 8 9 72 Villas 57 6 420 Villas Recreation Facility (585*10) Villas Bath House (293*10) Multi -family 48 3 144 Corolla Bay ( Monteray Shores Phase III) Commercial Retail (150,000 sq. ft.) Existing Total 1494 Future Total 2006 2!560,; 487,140 GPD Total Commited 3500 GPD Capacity Available 32,860 GPD 25,000 To OBV Note: From 2004 Study of Monteray Shores and Buck Island Flow Study Note: Two habitable spaces per residence add to existing building pattern of bedrooms Burgin Engineering, Inc. PO Box1804 Irmo, Sc 29063 Page 1 Last Revised 8/8112 0 u c c L m i� o'a m 'O G A. S V1 o o QEA mm ..O A F' CIS Vl Ea m d oeR d A A IL m L f/1 120 c '� o �LL K A 6 W O Ii 114,240 GPD Shores Phase One and Two Existing Residential 294 4 952 Monterey Buck Island Existing Residential Existing006 5.11 542 120 65,040 GPD MontereyShores Phase One and Two Existin Commercial 34j42 GPD Timbuck It Existing Commercial Monteray Shores Phase One and Two Future Residential Buck Island Residential Future Monterey Shores Commercial Future Owned by Outer Banks Ventures 90 15 6� 7.11 540 107 18,978 GPD 120 !1#,8p0 ^IGPD 120 :1_2S'=!GPD GPD 120 GPD 120 GPD 120 GPD 120 GPD GPD GPD 120 GPD Committed To OBV Corolla Bay (Monterey Shores Phase III 2 Residential Soundfront lots 36 11 396 bypurchase of land Semi-soundfront lots 28 9 252 Interior Lots Villas 8 57 9 6 72 420 Villas Recreation Facility 585*10 Villas Bath House 293`10 Multi-farnity 48 3 144 Corolla Ba(Monterey Shores Phase III Commercial Retail 150,000 s . ft.)GPD Existing Total 1494 - 231,000 ;GPD Future Total 2008 487,140 32,860 GPD Total Committed I 1 3500 GPD Capacity Available `Note: From 2004 Study of Montera Shores and Buck Island Flow Study 270,000 60,320 jGFD -205,920 -22J00 5,884 ry 5.800 5.000 -24,000 -25,000 -293504 Ownedb OBV r'46,816i GPD 32860 GPD Capacity Available to CWS in Montere Shores •• Burgin Engineering, Inc. PO Box 1804 Last Revised Irmo, Sc 29063 Paget 10/30/13 `o CJ `o Q p$ Y02 Nf o` Q mSNLLm Q° a LN 120 3 Wl]U' 114,240 Monterey Shores Phase One and Two Dilating Residential 294 4 952 GPD Buck Island Existing Residential Existing106 5.11 542 120 65,040 GPD _ 34,742 GPD 16.976 GPD Monterey Shores Phase One and Two Existing Commercial 71mbuck ll Emsting Commercial Montere Shores Phase One and Two Future Residential 90 6 540 120 64,800 GPD Buck Island Residential Future 15 _ 7.11- 107 Shores Commercial Future Owned b Outer Banks Ventures GPD Committed To OBV Corolla Ba Residential urchase of land Soundfront lots 36 11 9 9 396 252 72 GPDSemi-soundfront . GPDInterior GPDVillas lots 28 Lots 8 57 6 420 *1202GPDMontere GPDVillas - GPDVllles Recreation FaciX 585'10 Bath House 293.10 GPDMulti-fami1 3 144 GPOComlle GPD 5 250 120 I 30.000 GPD 3560 _. J 511.140 GPD 2,860 GPD 48 Ba MontereShores Phase III CommercialRetail (150,000 s . g. Corolla Shores 50 Total C°mmiletl Capacity Available CWS Capacity ' Note: From 2004 Study of Monterly Shores and Buck Island Flow Study " Note: Two habitable spaces per residence add to existing building pattern of bedrooms Therefore, 0BV Total Initial Capacity Corolla Light and Monterey Shores 270000 GPD Plus Monterey Shores Phase II Upgrade 60,320 GPD Total Constmctedor Purchased OBV Ca aci g4l 60,320 GPD GPD Owned by OBV Less Corolla Light Existing Residential 429 120 -205,920 GPD Less Co ila Light Existing Commercial -22,100 GPD Less dedicated to Doug Twiddy in Village 5,684 GPD Less dedicated to Doug Brindley Laundry 5,800 GPD Less dedicated Phase 13 5,000 GPD Less Phase 12 32 Duplex Units -24.000 JGPID Less 25,000 GPD for Disposal in Corolla Light W WTP 2 Removed I -25,000 GPD Less Existing and Committed Total -293,504 GPD OBV Excess Capacity less Corolla Light(Existing and Proosetl Total GPD Committed by OBV Capacity Available to OBV in Corolla Light and Montemay Shores Capacity Available to CWS in Monterey Shores GPD GPD Burgin Engineering, Inc. Last Revised PO Box 1804 2124115 Irmo, Sc 29063 Page 1