HomeMy WebLinkAboutWQ0009772_Email_20200106Strickland, Bev
From:
Sipe, Randy
Sent:
Tuesday, January 7, 2020 11:00 AM
To:
Tankard, Robert; Toppen, Sarah A
Subject:
Monteray Shores Flow Allocation
Attachments:
Monteray Shores Flow Allocation.pdf
Dwight Randy Sipe P.G.
Hydrogeologist
Water Quality Regional Operations Section
Division of Water Resources
252 948 3849 office
randy.sipea-ncdenr.gov
North Carolina Department of Environmental Quality
943 Washington Square Mall
Washington, NC 27889
Nothing Compares..]
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Monteray Shores VVWrP Allocated Flow Calculation
0
°
-RO
N C
0'7
`o
£ n ao
0
O N R O.
ikm MU)
`o
E a m
it O V
O N m °.0
COM 0)LL
d o a� D° 0
0-O .R. V N T
N N a X R a
m ty W in(
120 114,240 GPD
120 65,040. ' GPD
34,742 GPD
16,978 GPD
120P$g0i }GPD
120 "T 12�1i ;� GPD
10WDA a,: GPD
120 47520 : GPD
120 3%240 GPD
120 $;B4D ; -;GPD
120 411;04A: GPD
0itS50, GPD
i r ,
30, :.GPD
120 ., 17�so GPD
....
15D00, : GPD
231,000 GPD
Monteray Shores Phase One and Two Existing Residential
Buck Island Existing Residential Existing
294
106
4
5.11
952
542
Monteray Shores Phase One and Two Existing Commercial
Timbuck II Existing Commercial
Monteray Shores Phase One and Two Future Residential
90
6
540
Buck Island Residential Future
Monteray Shores Commercial Future Owned by Outer Banks Ventures
Corolla Bay ( Monteray Shores Phase III) Residential
Soundfront lots
Semi-soundfront lots
15
36
28
7.11�
11
9
107
396
252
Committed To OBV
Interior Lots
8
9
72
Villas
57
6
420
Villas Recreation Facility (585*10)
Villas Bath House (293*10)
Multi -family
48
3
144
Corolla Bay ( Monteray Shores Phase III) Commercial
Retail (150,000 sq. ft.)
Existing Total
1494
Future Total
2006
2!560,;
487,140
GPD
Total Commited
3500
GPD
Capacity Available
32,860
GPD
25,000 To
OBV
Note: From 2004 Study of Monteray Shores and Buck Island Flow Study
Note: Two habitable spaces per residence add to existing building pattern
of bedrooms
Burgin Engineering, Inc.
PO Box1804
Irmo, Sc 29063
Page 1
Last Revised
8/8112
0
u
c
c L
m i�
o'a m
'O G A.
S V1
o
o
QEA
mm
..O A
F' CIS Vl
Ea m d
oeR
d A A
IL m L f/1
120
c
'� o
�LL
K A 6
W O Ii
114,240 GPD
Shores Phase One and Two Existing Residential
294
4
952
Monterey
Buck Island Existing Residential Existing006
5.11
542
120 65,040 GPD
MontereyShores Phase One and Two Existin Commercial
34j42 GPD
Timbuck It Existing Commercial
Monteray Shores Phase One and Two Future Residential
Buck Island Residential Future
Monterey Shores Commercial Future Owned by Outer Banks Ventures
90
15
6�
7.11
540
107
18,978 GPD
120 !1#,8p0 ^IGPD
120 :1_2S'=!GPD
GPD
120 GPD
120 GPD
120 GPD
120 GPD
GPD
GPD
120 GPD
Committed
To OBV
Corolla Bay (Monterey Shores Phase III 2 Residential
Soundfront lots
36
11
396
bypurchase
of land
Semi-soundfront lots
28
9
252
Interior Lots
Villas
8
57
9
6
72
420
Villas Recreation Facility 585*10
Villas Bath House 293`10
Multi-farnity
48
3
144
Corolla Ba(Monterey Shores Phase III Commercial
Retail 150,000 s . ft.)GPD
Existing Total
1494
- 231,000
;GPD
Future Total
2008
487,140
32,860
GPD
Total Committed
I
1
3500
GPD
Capacity Available
`Note: From 2004 Study of Montera Shores and Buck Island Flow Study
270,000
60,320
jGFD
-205,920
-22J00
5,884
ry
5.800
5.000
-24,000
-25,000
-293504
Ownedb OBV
r'46,816i GPD
32860 GPD
Capacity Available to CWS in Montere Shores
••
Burgin Engineering, Inc.
PO Box 1804 Last Revised
Irmo, Sc 29063 Paget 10/30/13
`o
CJ
`o
Q p$
Y02 Nf
o`
Q
mSNLLm
Q° a
LN
120
3
Wl]U'
114,240
Monterey Shores Phase One and Two Dilating Residential
294
4
952
GPD
Buck Island Existing Residential Existing106
5.11
542
120 65,040 GPD
_ 34,742 GPD
16.976 GPD
Monterey Shores Phase One and Two Existing Commercial
71mbuck ll Emsting Commercial
Montere Shores Phase One and Two Future Residential
90
6
540
120 64,800 GPD
Buck Island Residential Future
15
_
7.11-
107
Shores Commercial Future Owned b Outer Banks Ventures
GPD
Committed
To OBV
Corolla Ba Residential
urchase
of land
Soundfront lots
36
11
9
9
396
252
72
GPDSemi-soundfront
. GPDInterior
GPDVillas
lots
28
Lots
8
57
6
420
*1202GPDMontere
GPDVillas
- GPDVllles
Recreation FaciX 585'10
Bath House 293.10
GPDMulti-fami1
3 144 GPOComlle
GPD
5 250 120 I 30.000 GPD
3560 _. J 511.140 GPD
2,860 GPD
48
Ba MontereShores Phase III CommercialRetail
(150,000 s . g.
Corolla Shores
50
Total C°mmiletl
Capacity Available
CWS Capacity
' Note: From 2004 Study of Monterly Shores and Buck Island Flow Study
" Note: Two habitable spaces per residence add to existing building pattern
of bedrooms
Therefore, 0BV Total Initial Capacity Corolla Light and Monterey Shores
270000
GPD
Plus Monterey Shores Phase II Upgrade 60,320 GPD
Total Constmctedor Purchased OBV Ca aci
g4l
60,320
GPD
GPD
Owned by
OBV
Less Corolla Light Existing Residential
429
120
-205,920
GPD
Less Co ila Light Existing Commercial
-22,100
GPD
Less dedicated to Doug Twiddy in Village
5,684
GPD
Less dedicated to Doug Brindley Laundry
5,800
GPD
Less dedicated Phase 13
5,000
GPD
Less Phase 12 32 Duplex Units
-24.000 JGPID
Less 25,000 GPD for Disposal in Corolla Light W WTP 2 Removed
I
-25,000
GPD
Less Existing and Committed Total
-293,504
GPD
OBV Excess Capacity less Corolla Light(Existing and Proosetl Total
GPD
Committed
by OBV
Capacity Available to OBV in Corolla Light and Montemay Shores
Capacity Available to CWS in Monterey Shores
GPD
GPD
Burgin Engineering, Inc. Last Revised
PO Box 1804 2124115
Irmo, Sc 29063 Page 1