Loading...
HomeMy WebLinkAboutNC0021628_Other Agency Documents_20191204"ECCIVEDRdCR6NRIOWR DEC - 9 NO t�uc�ras NORWM�i�� ��.��,����FFI�� %/ce oeeaoar� December 4, 2019 TOWN OF NORWOOD WASTEWATER TREATMENT PLANT RENOVATIONS EMC SOC WQ 518-011 QUARTERLY REPORT - December 2019 Mooresville Regional Supervisor Division of Water Resources Water Quality Operations Section 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Water Quality Permitting Section/NPDES 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Sirs: On August 12, 2019 the Town was approved for a State Reserve Loan (SRP) from the Water Infrastructure Fund in the amount of $4,271,000. Design is submitted by Willis Engineers for the renovation project which consists of constructing a new headworks, aeration basin weirs, splitter box, clarifiers, sludge pump station, chlorine contact chamber, and other site improvements. On October 30, 2019 Willis Engineers, Inc. submitted the construction drawings and contract documents and final design package to the DWR for review which met the November 1, 2019 deadline. Willis Engineers, Inc. is awaiting comments at this time and will respond to the comments once received. Please let me know if you have any questions. Sincerely, Town of Norwood Scott Howard Town Administrator