Loading...
HomeMy WebLinkAbout310123_Compliance Evaluation Inspection_20191212Facility Number Type of Visit: 0 Com Reason for Visit: ® R Date of Visit: j Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts HBoars Other Other _Discharges and Stream J. is any discharge obser Discharge original a. Was the co b. Did the dis c, %Wk kS ki d. Does the Ische�ee���e�ce� ikh i.b acility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ©-150'_ ❑ A ❑ NE /a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No WNNA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: _I Spillway?: Designed Freeboard (in): Observed Freeboard (in): 7io 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [jNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes E24o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes To ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes to ❑ NA ❑ NE maintenance or improvement? I I. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 2rNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [�No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [2Ko ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes []'vo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ]Yes �o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? Yes ❑ No ❑ NA ❑ NE '0. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes E3*No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: )oes record keeping need im ovement? If yes, check the appropriate box below. es -❑ No ❑ NA ❑ NE nste Application — - Veekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code fall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ie facility fail to install and maintain a rain gauge? ❑ Yes E]-<_� ❑ NA ❑ NEE led, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA 3_, '3 21412015 Continued Facili Number:31 jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E?Ko ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check F2�—es ❑ No ❑ NA ❑ NE the appropriate box(es) below. ailure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: Ji? ' 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes io ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA 0,1�E Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Ejq<o❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 10 ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes EXo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑,NE'� ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes E No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes N ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA VNo ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). '= re c�\o v�r-oQ Ope— -z—. k �ii.-� j — �� i J '^vim P\(1n trv� y y C_'I'V� ' c r� ate" j �p `� c' c_- Reviewer/Inspector Name: J V "r Phone: �� O�Ci —% % Reviewer/Inspector Signature: Page 3 of 3 Date: l Z i% 2/4/ 015