HomeMy WebLinkAboutNCC200053_ESC Approval Submitted_20200107CITY OF BURLINGTON ENGINEERING DEPARTMENT W. Todd Lambert, P.E. City Engineer December 11, 2019 LETTER OF APPROVAL D. R. Horton, Inc. 4008 Mendenhall Oaks Parkway, Suite 101 High Point, NC 27265- Subject: The Cove at Mackintosh Phase 213 Bonnar Bridge Parkway Guilford Tax Map: Dear Jessica Meyer: The Engineering Department has reviewed the sedimentation and erosion control plans received on 10/18/2019, and find these plans to be acceptable and hereby issue this "Letter of Approval." This plan approval shall expire no more than three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. The City's Sedimentation and Erosion Control Ordinance is a performance -oriented program requiring protection of the natural resources and adjoining properties. If following commencement of this project it is determined that the plan needs to be modified, then this office will require that the plan be modified to comply with the City's ordinance. Please consider this letter the Notice required by Section 31.5-18 of our right of periodic inspection to insure compliance with the approved plan. Please be aware that effective April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lucas ncdenr. ov or Paul Clark at Paul. clark(cb-ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A copy of the Fact Sheet on the New NCG01 Permit enclosed with this letter for your convenience. Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. NIA11,1NC ADI)RkSS: TFIL1?Pl IONS: (336) 222-5050 425 S. LFIX1NGTON AV1?. FAX: (336) 513-5407 BURI.INCTON, NC 27215 W1VW.RUR[.INGCC?NNC.GUV Erosion & Sedimentation Control Permit Letter 12/11/2019 Page 2 of Please understand that the person financially responsible for conducting this land disturbing activity is also responsible for borrow material brought onto the site and waste material from the site that is disposed elsewhere. Separate sites from which borrow material is obtained, and which is not regulated by the provisions of the Mining Act of 1971, shall be considered as part of the land - disturbing activity for this site. Separate sites to which waste material is disposed of, other than permitted landfills regulated by the NCDEQ's Division of Waste Management, shall also be considered as part of the land -disturbing activity for this site. These off site areas shall therefore be included and shown on the approved erosion control plan and have the necessary erosion control measures in place. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. This could include the Division of Water Quality under storm water or water quality regulations; the U.S. Army Corps of Engineers under Article 404 jurisdiction; county, city or town agencies under other local ordinances; or other approvals that may be required. Please be aware that this approval does not supersede any other permit or approval. Check with the local North Carolina Department of Transportation office to determine if an encroachment will be needed for any operations on DOT right-of-way. Permits will be required for driveways. Please have your contractor notify the Engineering Department, phone number (336-222-5050), to schedule a preconstruction conference so that we may discuss the Erosion Control Plan prior to initiation of construction. Please be advised that the Engineering Department will request a copy of your COC and applicable NCDOT encroachments be submitted prior to the request for a preconstruction conference. Your cooperation is appreciated and we look forward to working with you on this project. Enclosures cc: Mr. Zac Lentz Division of Land Resources 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Mr. Jay Mebane Director of Inspections Sincerely, 4LIOIL, lAaoll` Brandon Holt, PE Erosion Control Administrator Mr. Lee Bryant Evans Engineering, Inc. PO Box 10285 Greensboro, NC 27404 Ms. Amy Cameron Stormwater Manager uc ova o fD =° m o. o OF $ZJ x �• v, a' c ee eo ..F O wri�� CD �on CD as p w Z R f G cto rr cA� �tj ft . 7co � � y�O 'r ro Qn -*, Q fD I� fD OD C n y W 0 t o 152� fD y A 1-4 M CD to bU�Q• Mti-rt � oa �� � � p H b H 7y C� b e uII'a c c� O � � � � � aw., � • n `" � c � w � � jam( �G CD v, � II o' c y wr �14o a a-°�w o � ¢ w�,op a`'° � � � � � p +• FC�i�-n R � n Lei �, fD Z o Cn c C o }• c� t� V V ¢ p go c = o y `E p pEl cp ro n o' n �d CD R. KO �J CD �.0 C n O krJ Fw a' .0 °' o. c Olt N� �¢, ~ � rt �• C � � O CD �� o •p p y � C o • � o co N � f , CITY OF BURLINGTON ° ENGINEERING DEPARTMENT { s� a- @ 1A.ta93 February 23, 2018 LETTER OF APPROVAL. D. R. Horton 4008 Mendenhall Oaks Pkwy, Suite 101 High Point, NC 27265- Subject: The Cove at Mackintosh - Phase 1A Bonnar Bridge Pkwy Guilford Tax Map: Dear Mr. Jonathan Cook: W. Todd Lambert, P.E. City Engineer The Engineering Department has reviewed the sedimentation and erosion control plans received on 2/15/2018, and find these plans to be acceptable and hereby issue this "Letter of Approval." Groundcover shall be provided within 14 calendar days from the completion of any phase of grading operations, and within 7 calendar days for perimeter dikes, swales, ditches, and slopes, and within 7 days for any other slope steeper than 3:1. Please have your contractor notify the Engineering Department, phone number (336-222-5050), when a preconstruction conference has been scheduled so that we may attend and discuss the Erosion Control Plan. The City's Sedimentation and Erosion Control Ordinance is a performance -oriented program requiring protection of the natural resources and adjoining properties. If following commencement of this project it is determined that the plan needs to be modified, then this office will require that the plan be modified to comply with the City's ordinance. Also, please be advised that the ordinance requires that a copy of the approved erosion control plan be on file at the job site. You should consider this letter to give the Notice required by Section 31.5-18 of our right of periodic inspection to insure compliance with the approved plan. Please be advised that effective March 10, 2003 the conditions of the General Permit to Discharge Stormwater under the National Pollutant Discharge Elimination System (revised Permit NC G010000) shall apply to all projects with land disturbance of more than -one acre. Also be advised that you are subject to the General Permit requirements and subject to enforcement by the Division of Water Quality for any violations of the General Permit. A copy of the General Permit is enclosed with this Letter, NIA.11ANG Al)DRFI5S: TFII,V'HONI_`.: (336) 222-5050 425 S. lk,,XiNG ON AVE. FIX: (336) 5'13-5467 13URI.IN(r'ION,NC; 27215 W1ClW.f3L11tl,NC;'1'(>NNi:.i:,()V The Cove at Mackintosh - Phase lA Erosion & Sedimentation Control Permit Letter 2/23/2018 Page 2 of 2 Furthermore, effective October 1, 2010, all persons conducting land -disturbing activities larger than one acre must inspect their project after each phase of the project, and document the inspection in writing as required as required by NCGS 113A-54.1. This self -inspection program will be performed in addition to the NPDES self -monitoring report required for the General Permit mentioned above. A copy of the Announcement of the Self -Inspection Program letter, Frequently Asked Questions for,the program and a sample Self -Inspection Report is enclosed with this letter. Also be advised that the person financially responsible for conducting this land disturbing activity is also responsible for borrow material brought onto the site and waste material from the site that is disposed elsewhere. Separate sites from which borrow material is obtained, and which is not regulated by the provisions of the Mining Act of 1971, shall be considered as part of the land - disturbing activity for this site. Separate sites to which waste material is disposed of, other than landfills regulated by the NCDENR's Division of Waste Management, shall also be considered as part of the land -disturbing activity for this site. These off site areas shall therefore be included and shown on the approved erosion control plan and have the necessary erosion control measures in place. The land -disturbing activity described in this plan may be subject to the approval of other Local, state or federal agencies. This could include the Division of Water Quality under storm water or water quality regulations; the U.S. Army Corps of Engineers under Article 404 jurisdiction; county, city or town agencies under other local ordinances; or other approvals that may be required. This approval cannot supersede any other permit or approval. Check with the local North Carolina Department of Transportation office to determine if an . encroachment will be needed for any operations on DOT right-of-way. Permits will be required for driveways. Your cooperation is appreciated and we look forward to working with you on this project. Enclosures cc: Ms. Sue White Division of Land Resources 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27107 Mr. Ray Rice Chief Inspector Sincerely, Brandon Holt, PE Erosion Control Administrator Mr. Lee Bryant Evans Engineering, Inc. P.O. Box 10285 Greensboro, NC 27404 Mr. Bob Patterson, PE Water Resources Director x�do� n d y OF ILQ n ro y U,r a s Ca As A G. `'po 0 , O 00 Zo °-:r�:�'w o {? CON. t" � IV p o G p 9 w aa,p A r+ 02�1 C � � t•'• row ro� o � a, `_` M M n to 7d ro ro c n A 8 xton o toU' d w'o ro'� ©vi �00 o ro G "� C O co r' 5- O p H, C rr x ��a ° o 9. i cooul rw Le' n �i cryy ro` U) �ixY cep " y R. !V (� �M r El 'arm Oto A�cnIt 0o a �' a' P D..s rr ro o. n, Ul p H p. w r+ � L Ct w m O 00 o O N CITY OF BURLINGTON ENGINEERING DEPARTMENT o W. Todd Lambert, P.F. City Engineer October 1, 2018 LETTER OF APPROVAL WITH MODIFICATIONS DR Horton 4008 Mendenhall Oaks Parkway, Suite 101 High Point, NC 27265- Subject: MOTL Parcel I, Phase 1 B "The Cove" Bonnar Bridge Parkway Guilford Tax Map: Dear Ms. Meredith Armeni: The Engineering Department has reviewed the sedimentation and erosion control plans received on 09/24/2018, and find these plans to be acceptable and hereby issue this "Letter of Approval with Modifications" as listed on the attached page. Groundcover shall be provided within 14 calendar days from the completion of any phase of grading operations, and within 7 calendar days for perimeter dikes, swales, ditches, and slopes, and within 7 days for any other slope steeper than 3:1. Please have your contractor notify the Engineering Department, phone number (336-222-5050), when a preconstruction conference has been scheduled so that we may attend and discuss the Erosion Control Plan. The City's Sedimentation and Erosion Control Ordinance is a performance -oriented program requiring protection of the natural resources and adjoining properties. If following commencement of this project it is determined that the plan needs to be modified, then this office will require that the plan be modified to comply with the City's ordinance. Also, please be advised that the ordinance requires that a copy of the approved erosion control plan be on file at the job site. You should consider this letter to give the Notice required by Section 31.5-18 of our right of periodic inspection to insure compliance with the approved plan. Please be advised that effective March 10, 2003 the conditions of the General Permit to Discharge Stormwater under the National Pollutant Discharge Elimination System (revised Permit NC G010000) shall apply to all projects with land disturbance of more than one acre. Also be advised that you are subject to the General Permit requirements and subject to enforcement by the Division of Water Quality for any violations of the General Permit. A copy of the General Permit is enclosed with this letter. Furthermore, effective October 1, 2010, all persons conducting land -disturbing activities larger than one acre must inspect their project after each phase of the project, and document the inspection in writing as required as required by NCGS 113A-54.1. This self -inspection program will be performed in addition to the NPDES self -monitoring report required for the General Permit mentioned above. A MAILING AODR1:SS: TI-[A71'1ION E;: (336) 222-5050 425 S. I.I:XIN(:'['ON AVE'. FAX: (336) 513-5467 BURIANGT )N,NC 27215 Erosion & Sedimentation Control Permit Letter 10/1/2018 Page 2 of 3 copy of the Announcement of the Self -Inspection Program letter, Frequently Asked Questions for the program and a sample Self -Inspection Report is enclosed with this letter. Also be advised that the person financially responsible for conducting this land disturbing activity is also responsible for borrow material brought onto the site and waste material from the site that is disposed elsewhere. Separate sites from which borrow material is obtained, and which is not regulated by the provisions of the Mining Act of 1971, shall be considered as part of the land - disturbing activity for this site. Separate sites to which waste material is disposed of, other than landfills regulated by the NCDEQ's Division of Waste Management, shall also be considered as part of the land -disturbing activity for this site. These off site areas shall therefore be included and shown on the approved erosion control plan and have the necessary erosion control measures in place. The land -disturbing activity described in this plan may be subject to the approval of other local, state or federal agencies. This could include the Division of Water Quality under storm water or water quality regulations; the U.S. Army Corps of Engineers under Article 404 jurisdiction; county, city or town agencies under other local ordinances; or other approvals that may be required. This approval cannot supersede any other permit or approval. Check with the local North Carolina Department of Transportation office to determine if an encroachment will be needed for any operations on DOT right-of-way. Permits will be required for driveways. Your cooperation is appreciated and we look forward to working with you on this project. Enclosures cc: Mr. Zac Lentz Division of Land Resources 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Mr. Ray Rice Chief Inspector Sincerely, Brandon Holt, PE Erosion Control Administrator Mr. Lee Bryant Evans Engineering, Inc. PO Box 10285 Greensboro, NC 27404 Ms, Amy Cameron Water Resources Director Erosion & Sedimentation Control Permit letter 10/1/2W Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL PROJECT NAME: LOCATION: FINANCIAL RESPONSIBLE PARTY: MOTL Parcel I, Phase 1 B "The Cove" Bonnar Bridge Parkway Meredith Armeni DATE APPROVED. 10/01/2018 1. Refer to most current erosion control details. NOTE: Be advised that the above "Modifications Required for Approval' is considered to be a part of the approved plan unless an equally effective alternative is submitted to and approved by this department prior to beginning this land -disturbing activity. All above "Modifications Required for Approval" shall be incorporated into the plans and approved by this department prior to beginning this land -disturbing activity. x�Ci� m m cn oc Oda p Q, ►+ M' 00 ��/- 0 � �} 9 CrN C �• G' ,P f) � 04 J F� ry * l�D � C C• �� O o f D a. o l rr °�. rr '.4 CD D C �d e' CD OF (D CD �O+ p NS" hi b o CN a b� �' �c o �.o 0o CD fD h eb anti a te. o a w o $CD o' J CD h O R ti N O G O CD En cD w t- P. v, , cp h m C ❑ 5,0 0 7 $ 9, n O O LT K Cis O Q cr d m: In D e c CD CD cM CIO K n 0 P-I ��., IrDcr CL � n O f6 IQ rt P�F J�z O 00 A � � n CL � 4d r O O O U1 O� O N O W 91 ON W CITY OF BURLINGTON I l 1 ENGINEERING DEPARTi.1rIEN"I � W. Todd Lambert, P.B. Cite Engineer May 15, 2019 LETTER OF APPROVAL. D. R. Horton, Inc. 4008 Mendenhall Oaks Pkwy, Suite 101 High Point, NC 27265- Subject: The Cove at Mackintosh Phase 2A Bonnar Bridge Parkway Guilford Tax Map: 12-58-1 Dear Meredith Armeni: The Engineering Department has reviewed the sedimentation and erosion control plans received on 05108/2019, and find these plans to be acceptable and hereby issue this "Letter of Approval." This plan approval shall expire no more than three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. The City's Sedimentation and Erosion Control Ordinance is a performance -oriented program requiring protection of the natural resources and adjoining properties. if following commencement of this project it is determined that the plan needs to be modified, then this office will require that the plan be modified to comply with the City's ordinance. Please consider this letter the Notice required by Section 31.5-18 of our right of periodic inspection to insure compliance with the approved plan. Please be aware that effective April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NO] form may be accessed at deg.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.ciark@ncdenr. ocovv. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A copy of the Fact Sheet on the New NCG01 Permit enclosed with this letter for your convenience. Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. MAILING ;ll)l)RI:SS: TI+.I.I?Pl R )NI{: (336) 222-5050 ,125 S. 1,I-.\li`fG'TONi ,11'I.. I It: (33G) 513-51G7 M.11 .1NIC1'ON, NC 27215 W1G11V1WRI.INGTONW.GO1' Erosion & Sedinientotion Control Pertnil LOW" 5/15/2019 Page 2 of 2 Please understand that the person financially responsible for conducting this land disturbing activity is also responsible for borrow material brought onto the site and waste material from the site that is disposed elsewhere. Separate sites from which borrow material is obtained, and which is not regulated by the provisions of the Mining Act of 1971, shall be considered as part of the land - disturbing activity for this site. Separate sites to which waste material is disposed of, other than permitted landfills regulated by the NCDEQ's Division of Waste Management, shall also be considered as part of the land -disturbing activity for this site. These off site areas shall therefore be included and shown on the approved erosion control plan and have the necessary erosion control measures in place. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. This could include the Division of Water Quality under storm water or water quality regulations; the U.S. Army Corps of Engineers under Article 404 jurisdiction; county, city or town agencies under other local ordinances; or other approvals that may be required. Please be aware that this approval does not supersede any other permit or approval. Check with the local North Carolina Department of Transportation office to determine if an encroachment will be needed for any operations on DOT right-of-way. Permits will be required for driveways. Please have your contractor notify the Engineering Department, phone number (336-222-5050), to schedule a preconstruction conference so that we may discuss the Erosion Control Plan prior to initiation of construction. Please be advised that the Engineering Department will request a copy of your COC and applicable NCDOT encroachments be submitted prior to the request for a preconstruction conference. Your cooperation is appreciated and we look forward to working with you on this project. Enclosures cc: Mr. Zac Lentz Division of Land Resources 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Mr. Jay Mebane Chief Inspector Brandon Holt, PE Erosion Control Administrator Mr. Lee Bryant Evans Engineering, Inc. PO Box 10285 Greensboro, NC 27404 Ms, Amy Cameron Stormwater Manager