Loading...
HomeMy WebLinkAbout20070309 Ver 1_More Info Letter_20070308~QF W ATF,4Q Michael F. Easley, Governor `(~ ~i William G. Ross Jr., Secretary ~ lam.- North Carolina Department of Environment and Natural Resources ~ ~ p ~ Alan W. Klimek, P.E. Director Division of Water Quality March 8, 2007 DWQ Project # 07-0309 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Ms. Dianne B. Jones 7885 Panther Lake Road Willow Springs, NC 27592 Subject Property: Blalock's Glen Subdivision Ut to Middle Creek [030402, 27-43-15-(4), C, NSW] REQUEST FOR MORE INFORMATION Dear Ms. Jones: On February 16, 2007, the Division of Water Quality (DWQ) received your application dated February 16, 2007, to impact 0.008 acres of 404/wetland, 0.007 acres of isolated wetland, and 14,520 square feet of Zone 1 Neuse River basin protected riparian buffers and 5,646 square feet of Zone 2 Neuse River basin protected riparian buffers to construct the proposed residential subdivision at the site. On February 28, 2007, the DWQ received additional information from you, however, the DWQ has determined that your application remains incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: Your proposed project design includes a stub road after crossing an unnamed tributary of Middle Creek (Stream Impact No. 2). You have not provided details related to the development planned on the other side of the stream, or a potential connecting road to be tied to your proposed road. Please revise your site plan to either eliminate this stub road altogether, or re-design it so that it ends as a cul-de-sac with the surrounding properties, including the area adjacent to the stream, incorporated into the lots. If this stub road has been required by the local municipality, please note that a full alternatives analysis must be provided to justify the future crossing currently being established at this location. If this stream crossing would merely provide for interconnectivity where reasonable access already exists, the proposed crossing would not be approvable. If the crossing would be required No e h Carolina 401 Oversight/Express Review Permitting Unit J1~atura!!y 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Ms. Dianne B. Jones Page 2 of 2 March 8, 2007 within or between developments for safety purposes, please provide documentation from the local municipality or emergency services to support this claim. 2. Please relocate wells on lots numbers 35 and 36 to avoid impacts to isolated wetland. 3. Please indicate the diffuse flow provision measures on the site plan and submit diffuse flow provision measure worksheets and signed and notarized Operations and Maintenance Agreement for your diffuse flow provision measures. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact me in writing and Mike Horan of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786, and Annette Lucas, the DWQ stormwater engineer, at 919-715- 3425, if you have any questions regarding, or would like to set up a meeting to discuss, this matter. Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/ijm cc: Mike Horan, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Jennifer Burdette, Burdette Land Consulting, Inc., 308D W. Millbrook Road, Raleigh, NC 27609 Filename: 070309BIalocksGlenSD(W ake)On_Hold