HomeMy WebLinkAboutNCC200047_NOI Application_20200107Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 1/6/2020 9:05:08 AM (NCG01 NOI Submission)
Approve by McCoy, Suzanne 1/6/2020 10:26:00 AM (Review- Construction NOI 20207)
• The task was assigned to McCoy, Suzanne by round robin distribution 1/6/2020 9:05 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: January 8, 2020 5:00
PM 1/6/2020 9:05 AM
Submit by McCoy, Suzanne 1/7/2020 7:30:09 AM (Payment Verification for NCC200047)
* Terramore Development.
• McCoy, Suzanne assigned the task to McCoy, Suzanne 1/7/2020 7:29 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: February 17, 2020 5:00
PM 1/6/2020 10:26 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
1. Project Name * Dollar General - Conover Store #21582
2. County* Catawba
3. Highway or Street Springs Road
Address * Street narre only is acceptable if no address number assigned yet
4. City or Township* Conover
5. State * NC
6. Zip Code * 28613
7. Latitude * Enter the latitude in decimal degrees
35.7825
8. Longitude* Enter the longitude in decimal degrees (M. ST be negative)
-81.2306
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
05/11/2020
Estimated Construction Project Start Date
10. Date to End*
10/07/2020
Estimated Construction Project End Cute
11. SIC (Primary)*
Commercial (1542)
Standard Industrial aassification for Developrrent
12. Acres to be
1.73
disturbed*
(including off -site borrow and waste areas)
13. Total site area
1.64
(acres) *
14. Post-
0.73
construction
(Estimated)
impervious area
(acres) *
NCC Project
NCC-CATAW-2020-Dollar General - Conover Store #21582
Tracking ID
Assigned automatically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Bakers Creek
Waterbody * %rre of waterbody into which stornwater runoff will discharge
15b. Waterbody 11-76-3
Index No.* NCWaterbody Index Nunber
Stormwater r No
discharges will flow Pf Yes
to additional
wate rs *
15c. Additional Lyle Creek
Receiving Waterbody narre
Waterbody
15d. Waterbody 11-76-(0.5)
Index No. NCWaterbody Index Nunber
15e. Additional Waterbody narre
Receiving
Waterbody
15f. Waterbody NCWaterbody Index Nunber
Index No.
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fternittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Teramore Consturction
Name *
2. First Name* Zach
IF Corporation, enter Fbgistered Agent First Barre
3. Last Name* Crumley
If Corporation, enter FZegistered Agent Last %rre
3b. Title Senior Vice President
4. Permitee E-mail tglass@teramore.net
Address *
5. Permittee 229-516-4289
Telephone No.*
6. Permittee Mailing Street Address
Address* PO Box6460
Address Line 2
city
Thomasville
Fbstal / Zip Code
31758
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
r Yes
Street Address
165 Big Star Drive
Address Line 2
City
Thomasville
Fbstal / Zip Code
31757
State / Frovince / Faegion
GA
Country
USA
State / Frovince / Fbgion
GA
Country
US
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Type of
Non -Government
Ownership *
2. Primary Site
Dean
Contact - First
Name *
3. Primary Site
Bush
Contact - Last
Name *
4. Title
Project Superintendent
5. Site Contact E-
tglass@teramore.net
mail Address*
6. Site Contact
704-213-0320
Telephone No.*
7. Organization
Teramore Construction
Name
8. Site Contact
Street Address
Mailing Address*
PO Box6460
Address Line 2
City
Thomasville
Fbstal / Zip Code
31758
9. Consultant Name
(Optional)
Jennifer Edwards
First and Last narre
10. Consultant E-
jennifer@brec.biz
mail
This person will be copied on all correspondence.
11.Consultant
336-844-4088
Telephone No.
State / Rovince / Fbgion
GA
Country
us
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 12/17/2019
Approved *
2. E&SC Plan Project CBPR-12-2019-33478
Number/ID * Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by* r Local Program
4. Local Program* Catawba County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan APPROVED _ESC_PERMIT.pdf 494.67KB
Approval Wst be RDFfornat
letter/documentation
6. NOI Certification Notice of Intent _Conover.pdf 397.27KB
Form Mist be R7Ffon-rat
This is an Express F No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name* Zach Crumley
Title Senior Vice President
Organization Teramore Construction
Date * 01 /06/2020
F. Tracking and COC Info
NOI Tracking No. 20207
NC Reference No. NCG01-2020-0047
Uses 'count number' variable (incremrented by SP)
Certificate of NCC200047
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 47
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)