HomeMy WebLinkAboutNC0003425_Rox_Appendix L_20191231Corrective Action Plan Update December 2019
Roxboro Steam Electric Plant
APPENDIX L
SUSTAINABILITY CALCULATIONS
SynTerra
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
ROXBORO STEAM ELECTRIC PLANT
SOURCE AREA 1 (EAB/INDUSTRIAL LANDFILL/LCID LANDFILL)
DUKE ENERGY PROGRESS, LLC, SEMORA, NC
Alternative
Remedial Alternative 1 -
Groundwater Remediation by
MNA
Remedial Alternative 2 -
Groundwater Remediation by
Extraction
New Monitoring Wells
Number of MWs
Average depth of MWs (ft. bgs)
Average screen length of MWs (ft.)
Casing material
Well diameter
Borehole diameter
Extraction Wells
Number of Extraction Wells
32
Average depth (ft. bgs)
190
Average screen length (ft.)
151
Total flow (gpm)
23
Casing material
Sch 80 PVC
Well diameter
6
Borehole diameter
12
Horizontal Wells
Number of Horizontal Wells
Length of Each Horizontal Well (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Clean Water Infiltration Wells
Number of Clean Water Infiltration Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Number of pumps
Infiltration Galleries
Number of Infiltration Galleries
Total area (acres)
Total flow (gpm)
Pipe material
Pipe diameter
Chemical Injection Wells
Number of Injection Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Injection Pumps
Page 1 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
ROXBORO STEAM ELECTRIC PLANT
SOURCE AREA 1 (EAB/INDUSTRIAL LANDFILL/LCID LANDFILL)
DUKE ENERGY PROGRESS, LLC, SEMORA, NC
Alternative
Remedial Alternative 1 -
Groundwater Remediation by
MNA
Remedial Alternative 2 -
Groundwater Remediation by
Extraction
Tree Wells
Total area (acres)
Trenches
Number of trenches
Length (ft.)
Width (ft.)
Depth (ft.)
Conveyance Pipe
Pipe length
2330
Pipe material
Sch 80 HDPE
Pipe diameter
6
Number of conveyance pumps
2
Permeable Reactive Barriers
Number of PRBs
Fill Material
Length (ft.)
Width (ft.)
Depth (ft.)
Removal of Waste Materials
Tons of waste
Waste Profile
Treatment Media
Media
Pounds
Well Abandonment
Number of wells
Average well depth
Well diameter
Fill Material
La oratory Analysis
$ of laboratory analysis spent
Length of Active Remediation
Years of Active Remediation
0
9
Notes:
ft. - foot
gpm - gallon per minute
Sch - schedule
HDPE
- high density polyethylene
bgs -
below ground surface
PVC -
polyvinyl chloride
PRB -
permeable reactive barrier
MW -
monitoring wells
MNA -
monitored natural attenuation
EAB -
East Ash Basin
LCID
- land clearing and inert debris
Prepared By: GTC Checked By: SIB
Page 2 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES-SUSTAINABILITY
CORRECTIVE ACTION PLAN UPDATE
ROXBORO STEAM ELECTRIC PLANT - SOURCE AREA 1 (EAB/INDUSTRIAL LANDFILL/LCID LANDFILL)
DUKE ENERGY PROGRESS, LLC, SEMORA, NC
Remedial Alternative 1 - Groundwater Remediation by MNA
Activities
CO2
Emissions
Percent
Total
Onsite NOx
Emissions
Percent
Total
Onsite SOx
Emissions
Percent
Total
Onsite
PM10
Emissions
Percent
Total
Total NOx
Emissions
Percent
Total
Total SOx
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
0.00
-
NA
-
NA
-
NA
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Transportation -Personnel
1.14
100.00
NA
-
NA
-
NA
-
4.2E-04
100.0
1.5E-05
100.0
8.6E-05
100.0
1.4E+01
NA
100.0
Transportation-Equip/materials
0.00
-
NA
-
NA
-
NA
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Equipment Use and Misc
0.00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
0.0E+00
-
Residual Handling
0.00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00-
Total
1.14
100
0.00E+00
0.0
0.00E+00
0
0.00E+00
0
4.23E-04
100
1.49E-OS
100
8.58E-OS
100
1.44E+01
0.00E+00
100
Remedial Alternative 2 - Groundwater Remediation by Extraction
Activities
CO2
Emissions
Percent
Total
Onsite NOx
Emissions
Percent
Total
Onsite SOx
Emissions
Percent
Total
Onsite
PM10
Emissions
Percent
Total
Total NOx
Emissions
Percent
Total
Total SOx
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
%
Material Productions
516.33
64.11
NA
-
NA
-
NA
-
1.3E+00
47.1
9.4E-01
53.3
2.8E-01
66.1
7.9E+05
NA
99.69
Transportation -Personnel
5.81
0.72
NA
-
NA
-
NA
-
1.1E-02
0.4
1.0E-03
0.1
2.2E-04
0.1
7.6E+01
NA
0.0
Transportation-Equip/materials
0.98
0.12
NA
-
NA
-
NA
-
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
281.98
35.01
6.2E-01
100.0
6.3E-02
100.0
5.5E-02
100.0
1.4E+00
52.5
8.2E-01
46.6
1.4E-01
33.8
2.4E+03
1.8E-01
0.3
Residual Handling
0.27
0.03
0.0E+00
-
0.0E+00
-
0.0E+00
-
8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
805.37
100
6.16E-01
100.0
6.30E-02
100
5.54E-02
100
2.74E+00
100
1.76E+00
100
4.28E-01
100
7.97E+05
1.80E-01
100
Notes:
CO, - Airborne emissions of carbon dioxide
MMBTU - Million British Thermal Units
NOx - Airborne emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide)
SOx - Airborne emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others)
PMjr - Airborne emissions of particulate matter that is 10 micrometers or less in diameter
EAB - East Ash Basin
LCID - land clearing and inert debris
Prepared By: GTC Checked By: SIB
Page 1 of 1
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
ROXBORO STEAM ELECTRIC PLANT - SOURCE AREA 3 (GSA AND DFAHA)
DUKE ENERGY PROGRESS, LLC, SEMORA, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 -
Groundwater Remediation
by Extraction
Remedial Alternative 3 -
Groundwater Remediation
by Clean Water Infiltration
and Extraction
New Monitoring Wells
Number of MWs
Average depth of MWs (ft. bgs)
Average screen length of MWs (ft.)
Casing material
Well diameter
Borehole diameter
Extraction Wells
Number of Extraction Wells
18
18
Average depth (ft. bgs)
190
190
Average screen length (ft.)
151
151
Total flow (gpm)
48
48
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
Borehole diameter
12
12
Horizontal Wells
Number of Horizontal Wells
Length of Each Horizontal Well (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Clean Water Infiltration Wells
Number of Clean Water Infiltration Wells
27
Average depth (ft. bgs)
120
Average screen length (ft.)
120
Total flow (gpm)
48
Casing material
Sch 80 PVC
Well diameter
6
Borehole diameter
12
Number of pumps
1
Infiltration Galleries
Number of Infiltration Galleries
Total area (acres)
Total flow (gpm)
Pipe material
Pipe diameter
Chemical Injection Wells
Number of Injection Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Injection Pumps
Tree Wells
Total area (acres)
Trenches
Number of trenches
Length (ft.)
Width (ft.)
Depth (ft.)
Page 1 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
ROXBORO STEAM ELECTRIC PLANT - SOURCE AREA 3 (GSA AND DFAHA)
DUKE ENERGY PROGRESS, LLC, SEMORA, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 -
Groundwater Remediation
by Extraction
Remedial Alternative 3 -
Groundwater Remediation
by Clean Water Infiltration
and Extraction
Conveyance Pipe
Pipe length
2320
4965
Pipe material
Sch 80 HDPE
Sch 80 HDPE
Pipe diameter
6
6
Number of conveyance pumps
6
6
Permeable Reactive Barriers
Number of PRBs
Fill Material
Length (ft.)
Width (ft.)
Depth (ft.)
Removal of Waste Materials
Tons of waste
Waste Profile
Treatment Media
Media
Pounds
Well Abandonment
Number of wells
Average well depth
Well diameter
Fill Material
Laboratory Analysis
$ of laboratory analysis spent
Length of Active Remediation
Years of Active Remediation 0 180 9
Notes:
ft. - foot
gpm - gallon per minute
Sch - schedule
HDPE - high density polyethylene
bgs - below ground surface
PVC - polyvinyl chloride
PRB - permiable reactive barrier
MW - monitoring wells
MINA - monitored natural attenuation
GSA - gypsum storage area
DFAHA - dry fly ash silos, transport, and handling area
Prepared By: GTC Checked By: SIB
Page 2 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES-SUSTAINABILITY
CORRECTIVE ACTION PLAN UPDATE
ROXBORO STEAM ELECTRIC PLANT - SOURCE AREA 3 (GSA AND DFAHA)
DUKE ENERGY PROGRESS, LLC, SEMORA, NC
Remedial Alternative 1 - Groundwater Remediation by MNA
Activities
CO2
Emissions
Percent
Total
Onsite NO.
emissions
Percent
Total
Onsite SO.
Emissions
Percent
Total
Onsite
PMld
Emissions
Percent
Total
Total NO.
emissions
Percent
Total
Total SO.
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
%
Material Productions
0.00
-
NA
-
NA
-
NA
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Transportation -Personnel
1.14
100.00
NA
-
NA
-
NA
-
4.2E-04
100.0
1.5E-05
100.0
8.6E-05
100.0
1.4E+01
NA
100.0
Transportation-Equip/materials
0.00
-
NA
-
NA
-
NA
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Equipment Use and Misc
0.00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
0.0E+00
-
Residual Handling
0.00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Total
1.14
100
0.00E+00
0.0
0.00E+00
0
0.00E+00
0
4.23E-04
100
1.49E-05
100
8.58E-05
100
1.44E+01
0.00E+00
100
Remedial Alternative 2 - Groundwater Remediation by Extraction
Activities
COz
Emissions
Percent
Total
Onsite NO.
emissions
Percent
Total
Onsite SO.
Emissions
Percent
Total
Onsite
Emissions
Percent
Total
Total NO.
emissions
Percent
Total
Total SO.
Emissions
Percent
Total
Total PMto
Emissions
Percent
Total
Total
Energy
Total
Eusedy
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
%
Material Productions
413.03
4.34
NA
-
NA
-
NA
-
1.2E+00
3.4
7.7E-01
2.4
2.6E-01
6.9
7.7E+05
NA
91.85
Transportation -Personnel
11.11
0.12
NA
-
NA
-
NA
-
1.3E-02
0.0
1.1E-03
0.0
6.2E-04
0.0
1.4E+02
NA
0.0
Transportation-Equip/materials
0.98
0.01
NA
-
NA
-
NA
-
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
9,099.95
95.53
3.5E-01
100.0
3.5E-02
100.0
3.1E-02
100.0
3.3E+01
96.6
3.1E+01
97.6
3.5E+00
93.1
6.9E+04
1.5E-01
8.1
Residual Handling
0.27
0.00
1 0.0E+00
0.0E+00
0.0E+00
8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
9,525.34
100
1 3.47E-01
100.0
1 3.54E-02
100
1 3.12E-02
100
1 3.45E+01
100
3.17E+01
100
3.80E+00
100
8.43E+05
1.50E-01
100
Remedial Alternative 3 - Groundwater Remediation by Clean Water Infiltration and Extraction
Activities
CO2
Emissions
Percent
Total
Onsite NO.
emissions
Percent
Total
Onsite SO.
Emissions
Percent
Total
Onsite
PMld
Emissions
Percent
Total
Total NO.
emissions
Percent
Total
Total SO.
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
%
Material Productions
901.84
31.59
NA
-
NA
-
NA
-
2.5E+00
16.8
1.6E+00
32.8
5.5E-01
16.9
1.7E+06
NA
98.96
Transportation -Personnel
19.26
0.67
NA
-
NA
-
NA
-
1.6E-02
0.1
1.2E-03
0.0
1.2E-03
0.0
2.5E+02
NA
0.0
Transportation-Equip/materials
0.98
0.03
NA
-
NA
-
NA
-
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
1,932.07
67.69
9.2E+00
100.0
9.4E-01
100.0
8.3E-01
100.0
1.2E+01
83.1
3.4E+00
67.2
2.7E+00
83.1
1.7E+04
1.6E-01
1.0
Residual Handling
0.27
1
0.01
0.0E+00
-
0.0E+00
-
I 0.0E+00
-
I 8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
2,854.43
100
9.21E+00
100.0
9.41E-01
100
1 8.28E-01
100
1 1.49E+01
100
5.01E+00
100
3.29E+00
100
1.67E+06
1.60E-01
1 100
notes:
CO, - Airborne emissions of carbon dioxide
MMBTU - Million British Thermal Units
NOx - Airborne emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide)
Sox - Airborne emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others)
PM,r - Airborne emissions of particulate matter that is 10 micrometers or less in diameter
GSA - gypsum storage area
DFAHA - dry fly ash silos, transport, and handling area
Page 1 of 1