HomeMy WebLinkAboutNC0003425_02_Rox_CAP Update 2019_Figures_20191231Corrective Action Plan Update December 2019 Roxboro Steam Electric Plant FIGURES CAP Content Section 10 SynTerra 10 I♦11ItINK-51 (APPROXIMATE GYPSUM STORAGE AREA -ING AREA POWER PLPLANT.I r EAB MAIN W 1 / \ I LCID LANDFII DECOMMISIONED BOUNDAF SLUICE LINE AREA �l W, AB MAIN DIM oo ♦ ASH BASIN WASTE � WASTE BOUNDARY00 / A v U WEST ASH BASIN s W�N DISCHAR E AN U N—z " WNJ WESTERN DISCHARGE CANAL FILERT 77 57 1 ROXBORO PLANT PARCEL LINE 1 7 \ EAST ASH BASIN I♦ I t � :/ EASTERN DISCHARGE CANAL \/ �HIUST�OR�ICAL,D/E(P/(O/SITION AREA Q ASH BASIN WASTE BOUNDARY-1� EASTERN DISCHARGE ANAL i SEPARATOR �\O F� q SEPARATOR DIKE U o INDUSTRIAL LA FILL BOUNDARY SOLID WASTE LANDFILL sso COMPLIANCE BOUNDARY 550� CURRENT 50SH BASIN° 0 COMPLIANCE BOUNDARY- v � v J G NO 1. ALL BOUNDARIES ARE APPROXIMATE. v O L� U v 2. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY O BOUNDARIES AND CURRENT PERSON COUNTY G IS. C'll `P\ 3. 2016 USGS TOPOGRAPHIC MAP, OLIVE HILL QUADRANGLE, OBTAINED FROM THE USGS STORE AT https:#stom.usgs.gov/map-locator. 0 DUKE PERSON COUNTY FIGURE ES-1 USGS LOCATION MAP ENERGY WINSTON-SALEM CORRECTIVE ACTION PLAN UPDATE PROGRESS �RALEIGH ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA CHARLOTTE DRAWN BY. J. KI RTZ DATE: 06/11/2019 GRAPHIC SCALE REVISED BY: C. WYATT DATE: 12/19/2019 0 500 1,000 2,000 3,000 WnTerra CHECKED BY: K. LAWING DATE: 12/19/2019 LAWI APPROVED BY: K. CAWING DATE: 12/19/2019 www.synterracorp.com PROJECT MANAGER: C. EADY (IN FEET) I� LCID LANDFILL INTAKE j amL EASTASH BASIN tEDUKE ERGY PROGRESS TRICAL STATION 4 r GRAPHIC SCALE 0 150 300 600 900 (IN FEET) DRAWN BY: J. KIRTZ DATE: 06/05/2019 REVISED BY: C. WYATT/K. KING DATE: 12/18/2019 CHECKED BY: K. LAWING DATE: 12/18/2019 APPROVED BY: K. LAWING DATE: 12/18/2019 PROJECT MANAGER: C. EADY I I I r� I LEGEND AREAS PROPOSED FOR ACTIVE GROUNDWATER REMEDIATION ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY SOLID WASTE LANDFILL BOUNDARY SOLID WASTE LANDFILL COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS PROPERTY LINE EFFLUENT DISCHARGE CANAL > STREAMS (AMEC NRTR) WETLANDS (AM EC NRTR) NOTES: 1. THE OUTLINE OF AREA 1 BEYOND THEASH BASIN COMPLIANCE BOUNDARY REPRESENTS THE MAXIMUM FUTURE EXTENT OF BORON PLUME (MAX-B)ABOVE 02L STANDARD PREDICTED FOR ALL FLOW LAYERS AND ALL YEARS, BASED ON FLOW AND TRANSPORT MODELING. 2. ALL BOUNDARIES ARE APPROXIMATE. 3. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT PERSON COUNTY GIS. 4. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERSAT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROMAMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. 5. AERIAL PHOTOGRAPHY OBTAINED FROM GOGGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. 6. DRAWING HAS BEEN SET WITH APROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). FIGURE ES-2 AREAS PROPOSED FOR CORRECTIVE ACTION EAST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA Corrective Action Plan Update December 2019 Roxboro Steam Electric Plant SynTerra Figure ES-3 Proposed Corrective Action Approach Provided in separate electronic figure file as a large sheet size I -- aVtt� (APPROXIMATE GYPSUM STORAGE AREA ®' WPOWER I (`TAKE CANAL ■ PLANT EAB MAIN. /1 I LCID L DECOMMISIONED BOUNDARY EAST ASH BASIN SLUICE LINE AREA �l I/v_�'I , MAIN DAM � � � , WAB AB AC ASH BASIN WASTE BOUNDARY A /, u �s ■ WEST ASH BASIN WE TERN DISCHARE CANAL _ .. , C. ■ EASTERN DISCHARGE ,"HIIST�OR'ICAL,D/E(P/(O/SITION AREA/ ASH BASIN WASTE BOUNDARY 0 ��i� o EASTERN DISCHARGE CANAL 1 SEPARATOR \\O FEE SEPARATOR DIKE INDUSTRIAL LANDFILL BOUNDARY nAVV� SOLID WASTE LANDFILL COMPLIANCE BOUNDARY ■ � 550� CURRENT 50SH BASIN' O COMPLIANCE BOUNDARYCssa v � v J m - NOTES _ 3� - 1. ALL BOUNDARIES ARE APPROXIMATE. 2. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY O BOUNDARIES AND CURRENT PERSON COUNTY G IS. Q` 3. 2016 USGS TOPOGRAPHIC MAP, OLIVE HILL QUADRANGLE, OBTAINED FROM THE USGS STORE AT O https:#stom.usgs.gov/map-locator DUKE PERSON COUNTY FIGURE 1-1 ENERGY USGS LOCATION MAP CORRECTIVE ACTION PLAN UPDATE WINSTON-SALEM PROGRESS 0RALEIGH ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA 40 CHARLOTTE DRAWN BY. J. KI RTZ DATE: 06/11/2019 GRAPHIC SCALE REVISED BY: C. WYATT CHECKED BY: K. LAWING DATE: 12/19/2019 DATE: 12/19/2019 0 500 1,000 2,000 3,000 synTerra APPROVED BY: K. LAWING DATE: 12/19/2019 PROJECT MANAGER: C. EADY www.synterracorp.com (IN FEET) Il ,j HYCO RESERVOIR •. -�� RSW-5 COAL PILE IN /"> . EDC-5 (j RSW-7 DFA r . INTAHANDLING RSW-3 RSW-4 I AREA DTI' CAN EDC-4 0 '' 1W GYPSUM X t3„� vrvn oa.vv�uvv '®�, RSW-1 IRS TOWER PON . �IF �, POWER � � - � ® � PLANT �,.m 5 r. M UNIT 3 HEATED WATER EATED WATER �" DISCHARGE POND CHARGE POND MW-27BR MW-22D FMW-2,?BR/BRL S-21 GCCR-1056R CCR-106BR CW71 lie lie � ®MW-1 BR/BRL GMW-11 CCR-107BR� <�" - MW ' 5D MW-37D MW-6BR CCR-101BR® ABMW-5 3 [ S-23 MW-11D ABMW-5D C S-19 CW-2-2D MW-5D CCR-100D CCR-100BR ' CCR-203S CW MW-5BR ®CW-5 WMW-1BRJS-KgKg20 CCR-203D CCR-200BR t MW-1� ABMW6 CCR-203BR rt ABMW-6BR S 2 S-7 S-4 wi CCR-201 BR S-8 ❑ S-1 S 6 S 5 S-3 ABMW-3 CCR-202D a CCR-202BR MW-2B� O INSET SCALE: 1" = ® MW-35BR' MW-37B ABMW-7 ABMW-7BR/BRL/BRLL IGMW-71 INDUSTRIAL LANDFILL GMW-8~ wMW-21 BRL MW-13BR ;•' IWMW-19BRL MW-10BR ` 0 S-10 ` CCR-109BR ED S-1 D-6-OS4;.:: '. 11B PRSW-6 MW-14S MW-14D MW-14BR MW-29BR I LEGEND WELL IN ASH PORE WATER ` WELL IN SHALLOW ZONE I WELL IN TRANSITION ZONE CCR-112BR-BG WELL IN BEDROCK ZONE WELLABANDONED PIEZOMETER - — MW-23BR/BRR I MW-20BRL ' I D NL-8 SL-8 MW-24BR MW-17BR AL -k' • a. s• 1�1 a / IN DUKE * It' ENERGY �.�. PROGRESS GRAPHIC SCALE 400 0 400 800 (IN FEET) DRAWN BY: C. DAVIS DATE: 05/03/2019 REVISED BY: C. WYATT/K. KING DATE: 12/20/2019 CHECKED BY: K. LAWING DATE: 12/20/2019 APPROVED BY: K. LAWING DATE: 12/20/2019 PROJECT MANAGER: C. EADY SOIL SAMPLE LOCATION CONSTRUCTED SEEP NON -CONSTRUCTED SEEP DISPOSITIONED SEEP SURFACE WATER/SEDIMENTSAMPLE LOCATION SURFACE WATER/SEDIMENTSAMPLE LOCATION EFFLUENT WATER SAMPLE LOCATION EFFLUENT WATER/SEDIMENT SAMPLE LOCATION SEDIMENT SAMPLE LOCATION WATER SUPPLY WELL 0 IN -STREAM SURFACE WATER SAMPLE LOCATION PER SOC ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY EFFLUENT DISCHARGE CANAL SOLID WASTE LANDFILL BOUNDARY SOLID WASTE LANDFILL COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS PROPERTY LINE STREAMS (AMEC NRTR) WETLANDS (AMEC NRTR) NOTES: 1. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND AREA MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED APPROXIMATE. 2. SPECIAL ORDER BY CONSENT (SOC) LOCATIONS ARE DESCRIBED IN SOC WQ S18-005. 3. ALL BOUNDARIES ARE APPROXIMATE. 4. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT PERSON COUNTY GIS. 5.4.)THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERSAT THE TIME OF THE MAP CREATION. THIS MAP ISA PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDSAND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL&INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. 6. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. 7. DRAWING HAS BEEN SET WITH PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM RIPS 3200(NAD83). FIGURE 1-2 SITE LAYOUT MAP - EAST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA CCR-102BR MW-35S MW-37S MW-6D CCR-101D PZ-14 MW-35D MW-37D MW-108BRL/BRLL CCR-101BR® S MW-6BR S 23 ABMW-5 MW-35BR MW-376R , *� tye3d. y MW-11 D ' ABMW-5D ABMW-7 *` MW-11BR® ABMW-7BR/BRL/BRLL EDC-00 0 CW-2D MW 5D MW 23BR/BRR S-19FCW ®CCR-100BR ABMW-4RR ` _ ? os MW-20BRL CCR-203S MW 5BR ®CW_5 _ PZ-12 WMW-1BR � S 20 T MW-9BR CCR-203D S-18 ABMW6 a '- — - • ' � CL-4 �� MW-1 CCR-200BR _• NL-4 CCR-203BR S 2 ABMW-6BR CCR-110BIR NL-8 SL-8 S-7 S-4 CCR-201 BR► I J -2BR GMW-7 +1 CV-1 �' • CCR-2046R g 6 S-5 S-3 ABMW-3 CCR-202D MW-246R CCR-202 B R MW-2 ABMW-36R/BRL � " ROX-1 GMW-ft MW-21BRL �. ABMW-1 GMW-9 CCR-205BR MW-205BRL/BRLL/BRLLL GMW-8R , MW-216RLR MW-25BR ' ABMW-16R CCR-206S ����� MW-12BR ' t CCR-206BR LEGEND CCR-207S • I WELL IN ASH PORE WATER CCR-207 B R WELL IN SHALLOW ZONE MW-33BR CCR-208S �, • MW-13BR WELL IN TRANSITION ZONE CCR-208BR AB WELL IN BEDROCK ZONE ' WELLABANDONED � ABM R MW-16BR Y„ MW-208BRL/BRLL/BRLLL ROX-2 PIEZOMETER k' MW-19BRL SOIL SAMPLE LOCATION z CCR-209S _ +MW-10BR CONSTRUCTED SEEP MW-7BR CCR-209BR � NON -CONSTRUCTED SEEP CCR-210S CCR-212BR DISPOSITIONED SEEP MW-32BR ' CCR-213BR CCR-210BR - k, SURFACE WATER/SEDIMENTSAMPLE LOCATION CCR-211S % SURFACE WATERISEDIMENT SAMPLE LOCATION CCR-211 BR EFFLUENT WATER SAMPLE LOCATION CCR-214BR ; EFFLUENT WATER/SEDIMENT SAMPLE LOCATION � SEDIMENT SAMPLE LOCATION WATER SUPPLY WELL CCR-215BR IN -STREAM SURFACE WATER SAMPLE LOCATION PER SOC �_ / j'n✓+ .' \J`I _�J� CCR-2166R - / MW-26BR ASH BASIN WASTE BOUNDARY ty - ASH BASIN COMPLIANCE BOUNDARY 31�EFFLUENT DISCHARGE CANAL MW-31 BR CCR-217BR SOLID WASTE LANDFILL BOUNDARY • Z� BR-1BRL/BRLR . _ SOLID WASTE LANDFILL COMPLIANCE BOUNDARY �; ♦ MW-4BR/BRL CCR-218BR DUKE ENERGY PROGRESS PROPERTY LINE a d � �ij � I ��` � ♦ ♦ BG-1 � STREAMS (AMEC NRTR) WF-1 CF_1 Ia, WETLANDS (AMEC NRTR ) �NOTES CW-4 1. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES ANDARE A MIX OF SURVEYEDAND v� ` �` / /%�11 r-I f ♦ ♦ �/ APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED APPROXIMATE. 2. SPECIAL ORDER BY CONSENT (SOC) LOCATIONS ARE DESCRIBED IN SOC WO 518-005. CF-3 3. ALL BOUNDARIES ARE APPROXIMATE. MW-15BR a 4. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF 5 �/� �L / �� ♦ WIF HISTORICAL DOCUMENTED PROPERTY BOUNDARIESAND CURRENT PERSON COUNTY GIs. �^ ♦ MW-39D 5. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS 0.�� \ nj�'(�/ �� �[y�° J • MW-39BR AT E PRELIMINARY THE MAP LANDSCREATION. NDSTE MAP IS A BOUNDARIES WERE OBTAINED DETERMINATION ONLY. E VIRO MENARYWETLASTR CTURE, STREAMS BOUNDARISOURCE OBTAINED FROM AM E RTR)F FOSTER WHEELER ENVIRONMENTAL&INFRASTRUCTURE,INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR)FOR MW_18BR ' ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. '=�1 � I� � � � \ \� -1� � y 6.AERIAL PHOTOGRAPHY OBTAIN ED FROM GOGGLE EARTH PRO ON OCTOBER 11, 2017.AERIAL WAS /�/J1 r`J l ` CF-rJ COLLECTED ON JUNE 13, 2018. 7. DRAWING HAS BEEN SET WITHA PROJECTION OF NORTH CAROLINASTATE PLANE COORDINATE SYSTEM ,�- i��' ". �11 .� \ ;\ yr++ ♦� MW-38D _ RIPS 3200(NAD83). GRAPHIC SCALE DUKE aao O 440 aao FIGURE 1-3 t� ENERGY � ���,� 1 ��♦�' PROGRESS (IN FEET) SITE LAYOUT MAP - WEST ASH BASIN 1 \ (/\ ♦ DRAWN BY: C.DAVIS DATE:05//2019 CORRECTIVE ACTION PLAN UPDATE REVISED BY: C. WYKING DATE: 12/2020/2019 CHECKED BY: K.L4WINGWING DATE:12/20/2019 ROXBORO STEAM ELECTRIC PLANT APPROVED BY: K. LAWING DATE: 12/20/2019 / _� `' •/ PROJECT MANAGER: C. EADY SEMORA, NORTH CAROLINA INSET SCALE: 1" = 2500 \ ,ter U� o a� ,�- synTerra www.synterracorp.com / \ 1�FUTUREYCOR�� �--i�pNP� xFUTURE NPD ROXBORO STEAM F ELECTRIC PLANT ( ■ram FUTURE PLANT INTAKE POND ---- J ( ! r—-UNNAMED CREEK �i f —_--� FUTURE POWER BLOCK / (\r-----� FUTURE HEATED WATER �— 1 ` FUTURE UNIT 3 —� ��DISCHARGEDCANAL L.� �^ COOLING TOWER POND 1 FUTURE HEATED WATER / /--� HYCO RIVER dDISCHARGE POND i-----==�/el / J� / \ i FUTURE EAB MAIN DAM f i\FUTURE UNIT 3 HEATED WATER DID S�CH�ARGE FUTURE NPDES OUTFALL 003 ( FUTURE HYCO RESERVOIR I � 1 II f I I 1 I11 \\t I HYCO RIVER IK ■rai FUTURE EFFLUENT DISCHARGE CANAL I f I II - II FUTURE HYCO� f I \ RESERVOIR I 1 —, DUKE ENERGY PROGRESS \ ! ' PROPERTY LINE II WOODLANDELEMENTARYSCHOOL SFM�RARp 1 I I f SOURCE: MARCH 12, 1964 AERIAL PHOTOGRAPH OBTAINED FROM THE USGS EARTH EXPLORER WEB SITE http,.//earthexplorer.usgs.gov/ ' I FUTURE EAST ASH BASIN I } W. ' S FUTURE FILTER DIKE W .p,r e • Z� 3ECANAL *EKj/ FUTURE SEPARATOR DIKE l* I DUK RGY PROGRE I I .'t I PROPERTY LINE ;T7yy r FUTURE iINDUST2RIALLANDFILL ' f �! a FIGURE 1-4 1964 AERIAL PHOTOGRAPH CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA �4 'DUKE 'I ENERGY PROGRESS IY t- 4 Tesynrra NOT TO SCALE DRAWN BY: J. CHASTAIN DATE: 1 REVISED BY: DATE: - CHECKED BY: K. LAWING DATE: 1 APPROVED BY: K. LAWING DATE: 1 PROJECT MANAGER: C. EADY www.synterracorp.com ROxgORO P"Aim PN SW-1 sFM �j1 � MW-15BR oRq Ro • 0 MW-14BR Ia 1 I y . � W 1 � MW-18D ♦�'' - MW-18BR 1,1 -1; • ,.%; ke,DUKE GRAPHIC SCALE 7000 700 1,400 ' ENERGY � ■ (IN FEET) ' PROGRESS I DRAWN BY: J. KIRTZ DATE: 06/11/2019 REVISED BY: C. WYATT DATE: 12/16/2019 1 ■ CHECKED BY: K. LAWING DATE: 12/16/2019 APPROVED BY: K. CAWING DATE: 12/16/2019 synTerra PROJECT MANAGER: C. EADY www.synterracorD.com ri LEGEND O GROUNDWATER SAMPLE LOCATION SOIL SAMPLE LOCATION SEDIMENT SAMPLE LOCATION SURFACE WATER SAMPLE LOCATION ASH BASIN WASTE BOUNDARY - — ASH BASIN COMPLIANCE BOUNDARY SOLID WASTE LANDFILL BOUNDARY - SOLID WASTE LANDFILL COMPLIANCE BOUNDARY • DUKE ENERGY PROGRESS PROPERTY LINE EFFLUENT DISCHARGE CANAL STREAMS (AMEC NRTR) ® WETLANDS (AMEC NRTR) NOTES 1. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND AREA MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED APPROXIMATE. 2. ALL BOUNDARIES ARE APPROXIMATE. 3. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT PERSON COUNTY GIS. 4. THE WATERS OR THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL& INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. 5. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. 6. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE FIGURE 4-1 BACKGROUND SAMPLE LOCATION MAP CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA SITE FEATURES KEY OGROUNDWATER FLOWS FROM RIDGES THAT COINCIDE WITH GROUNDWATER DIVIDES WHICH PROVIDE HYDRAULIC CONTROL KEEPING CONSTITUENT MIGRATION WITHIN THE FORMER STREAM VALLEY AND AWAY FROM POTENTIAL RECEPTORS AND WATER SUPPLY WELLS ©LIMITED COI MIGRATION THROUGH TRANSITION ZONE AND INTERCONNECTED BEDROCK FRACTURES. BEDROCK FRACTURE OCCURRENCE AND APERTURE DIMINISHES WITH DEPTH © FORMER STREAM CHANNELS IN ASH BASINS OPONDED WATER IN THE ASH BASIN CAUSES LIMITED AREA OF DOWNWARD VERTICAL MIGRATION OF CONSTITUENTS NEAR THE DAM/DIKE DUE TO ELEVATED HYDRAULIC HEAD ©GROUNDWATER DISCHARGES TO INTAKE CANAL AND HEATED WATER DISCHARGE POND O DOWNGRADIENT ADDITIONAL SOURCE AREAS CONTRIBUTE TO AFFECTED GROUNDWATER BEYOND THE COMPLIANCE BOUNDARY AREA OF COI CONCENTRATION IN GROUNDWATER GREATER THAN CRITERIA (SEE GENERAL NOTE 1) FFs► GENERALIZED GROUNDWATER FLOW DIRECTION FFs► GENERALIZED ASH PORE WATER FLOW DIRECTION -- APPROXIMATE FORMER STREAM WITH FLOW DIRECTION ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY SOLID WASTE LANDFILL BOUNDARY SOLID WASTE LANDFILL COMPLIANCE BOUNDARY ®GENERAL AREA OF WATER SUPPLY WELL USERS (SEE GENERAL NOTE 2) - - GENERALIZED BEDROCK FRACTURE F- EAST ASH BASIN CONCEPTUAL CROSS-SECTION OF PRE -DECANTING CONDITIONS I (NOT TO SCALE - APPROX. 2,000 LINEAR FEET) IA ASK GYPSUM TRANSITION / STORAGE ZONE 2 AREA 6 BEDROCK I WEST ASH BASIN CONCEPTUAL I CROSS-SECTION OF PRE -DECANTING CONDITIONS (NOT TO SCALE - APPROX. 1,000 LINEAR FEET) IP �......�,. 11i r � \ I GENERAL NOTES 1) GENERI NCAC 0; 2) PERMAI SO SURF THIS W( SUBSE( 3) ALL BO G Corrective Action Plan Update December 2019 Roxboro Steam Electric Plant SynTerra Figure 5-2 LeGrand Slope Aquifer System Included in Section 5 text Corrective Action Plan Update December 2019 Roxboro Steam Electric Plant SynTerra Figure 5-3 General Profile of Ash Basin Pre - Decanting Flow Conditions In The Piedmont Provided In Section 5 Text Corrective Action Plan Update December 2019 Roxboro Steam Electric Plant SynTerra Figure 5-4a Water Level Map — East Ash Basin — Transition/Bedrock Flow Zone Provided in separate electronic figure file as a large sheet size Corrective Action Plan Update December 2019 Roxboro Steam Electric Plant SynTerra Figure 5-4b Water Level Map - West Ash Basin - Transition/Bedrock Flow Zone Provided in separate electronic figure file as a large sheet size NOTES: loop,~ I IL ell •' �— G ' r■sp rt 1 X ., .. -+`,�_ A .r � LEGEND AAA woo f I d ell DUKE GRAPHIC SCALE FIGURE 5-5a 390 0 390 780 *� • #� �� ENERGY VELOCITY VECTOR MAP , / - ' • - (IN FEET) FOR PRE -DECANTING CONDITIONS •' PROGRESS DRAWN BY: J.KIRTZ DATE:06/06/2019 TRANSITION FLOW ZONE (LAYER 13) REVISED BY: A. ROBINSON/K. DATE: 12/20/2019 ! •. �/' I l ! s �� �� CHECKED BY:K.LAWING DATE:12/20/2019 CORRECTIVE ACTION PLAN UPDATE APPROVED BY: K.LAWING DATE:12/20/2019 ROXBORO STEAM ELECTRIC PLANT synTerra PROJECT MANAGER: C. EADY SEMORA, NORTH CAROLINA ■ www.synterracorp.com NOTES: low \ ► it aN, gar 110- 1 t � i � � tom. • -. ''`~ f �, rr f �'�: ~``•'.��� r � • t � t � r •� LEGEND Mao ter` f / f ►. � - 'r" war f 1 � • r rs ro 1 1 fILop / �. r r f +� I ell 1-0 f f ♦ • • ` 4 i .GRAPHIC SCALE r .�� '� 1 • ` r *�ENERGY DUKE 400 0 400 800FIGURE 5-5b VELOCITY VECTOR MAP (IN FEET) FOR CLOSURE -IN -PLACE CONDITIONS - PROGRESS DRAWN BY: J.KIRTZ DATE:06/06/2019 TRANSITION FLOW ZONE (LAYER 13) • + REVISED BY: A. ROBINSON DATE: 12/20/2019 r ♦fit♦♦ I _ `� CHECKED BY: K.LAWING DATE:12/20/2019 CORRECTIVE ACTION PLAN UPDATE APPROVED BY: K.LAWING DATE:12/20/2019 ROXBORO STEAM ELECTRIC PLANT synTerra PROJECT MANAGER: C. EADY SEMORA, NORTH CAROLINA www.synterracorp.com NOTES: 1 Nx,* ` +� - is 0. ow vf ` r LEGEND 1 r.� •ti s • •+, r�%f 00, f� •� r� ram, •r WIN,JAN V w rf a f ell / Ave f� � •ram — z .- �- f • r ~ • • % DUKE GRAPHIC SCALE FIGURE 5-5c 390 0 390 780 f 1 �� ENERGY VELOCITY VECTOR MAP ' r (IN FOR CLOSURE -BY -EXCAVATION CONDITIONS +f A` l PROGRESS DRAWN BY: J.KIRTZ DATE:06/06/2019 TRANSITION FLOW ZONE (LAYER 13) r / •, REV IBEDBY: ALAWI DATE:12/20/2019 CHECKED BY: K.. L4WING DATE: 12/20/2019 CORRECTIVE ACTION PLAN UPDATE APPROVED BY: K.LAWING DATE:12/20/2019 ROXBORO STEAM ELECTRIC PLANT synTerra PROJECT MANAGER: C. EADY SEMORA, NORTH CAROLINA www.synterracorp.com NOTES: 'Mill 1r� r 1 L �► '� r �7 j� f loo le le, ep At N4 7 ell .00 .110 I-N ! d •� ell. f Y r r Awl 10, Ik ♦ �.,_• op �� 1t flJJr •- •- ; �` !; f �'� �. ��It t 1 j LEGEND -' Ael Ae � trf�/� � � f � r �� s ■ �� �� � ,- +-�'� .�r ! r � 'r � Sri � ' ,� r f � � 'mod.//►/f �fJ ♦ r� -a J f r r r X r. J f✓ � r r r.� `� • ,� d r ti 1 r'.` ✓ r 1 f f '� 00 1-4 ♦ ` ` r r J ` / . % d GRAPHIC SCALE t r tr `� l / j *�ENERGY DUKE 390 O 390 780 FIGURE 5-6a f -10 VELOCITY VECTOR MAP f • J 1 f d . (IN FEET) FOR PRE -DECANTING CONDITIONS •— '� '� .� '1 f % .� PROGRESS DRAWN BY: J.KIRTZ DATE:06/06/2019 f BEDROCK FLOW ZONE LAYER 15 r• �"r n� / 1• f f t REVISED BY: A. ROBINSON DATE: 12/20/2019 *� '� ♦♦ I %, J J► / / �•� ■ �� CHECKED BY: K. LAWING DATE: 12/20/2019 CORRECTIVE ACTION PLAN UPDATE APPROVED BY: K. LAWING DATE:12/20/2019 ROXBORO STEAM ELECTRIC PLANT �♦ PROJECTMANAGER:C.EADY SEMORA, NORTH CAROLINA synTerid j r / www.synterracorp.com NOTES: N Ff KJ97 O� r • _ ' .� tit , %• ` '` ti ' � 1 ''� r / • 7r, ell *•,wsi • �, ``���1♦t jJr �Irr 1 �� 1 � � •� •,. t� j � r`��f �� I t ; S t mow► Spt�APF f � ��� �� � ems_ ►C, �' .. ff ! � j/ j,Ff � '� �t .� ' dr L•� t� � � ` ��q � � ti ,.r � +- //jam . � � r �� r� t ti .� .��— r •— �/ , flf r d�r r Ab 't j/ tt 1r ` ,,f j �� f rr ♦� rJI! ti !,00 LEGEND I f , `� r 1.0 oe *■Illy 110 olo LE t �'r�t— � l f •�' r f DUKE 400 ORAPHICSC400 800 FIGURE 5-6b VELOCITY VECTOR MAP / ' • *�ENERGY (IN FEET) FOR CLOSURE -IN -PLACE CONDITIONS PROGRESS DRAWN BY:J.KIRTZ DATE:06/06/2019 / / t / • BEDROCK FLOW ZONE (LAYER 15) REVISED BY: A. ROBINSON DATE:12/20/2019 CHECKED BY: K.L4WING DATE:12/20/2019 CORRECTIVE ACTION PLAN UPDATE APPROVED BY: K. L4WING DATE:12/20/2019 ROXBORO STEAM ELECTRIC PLANT r+ ^ . �" • ` PROJECT MANAGER: C. EADY • �/r�Terra SEMORA, NORTH CAROLINA 1 j %'�/ 1 1 - - " www.synterracorp.com NOTES: ! 1 ` �� ! N1 fit/lk ,r r ! t , �� �ti� I ,�►, ter.---._ 10, N .' i ell All "� L � ` ' ��'�.. LL���,•� ff� f t� 1 jar ■ or �ti ��► r � 1 r r i� � � � � t r r:� ref � � � ' � - �� r r -� all A*f 4 oll r r'' LEGEND elo AM t f del a �/j _ t � ► err .. �.__R1 f-01 A ell MEMO 00 I .� '• �/� J �' „� �►{ 1 GRAPHIC SCALE FIGURE 5-6c 1 DUKE 400 0 400 800 VELOCITY VECTOR MAP f f *�ENERGY • ffff (IN FEET) FOR CLOSURE -BY -EXCAVATION CONDITIONS PROGRESS DRAWN BY: J. KIRTZ DATE: 06/06/2019 ■� `"! REVISED BY: A. ROBINSON DATE:12/20/2019 BEDROCK FLOW ZONE (LAYER 15) l f f •' -� +� � ♦r ` ♦ / f % CHECKED BY: K. CAWING DATE: 12/20/2019 CORRECTIVE ACTION PLAN UPDATE fr f f r J - ' AP PROVED BY:K.LAWING DATE:12/20/2019 ROXBORO STEAM ELECTRIC PLANT r+ �" • ` PROJECT MANAGER: C. EADY •— • r % t ynSEMORA, NORTH CAROLINA sTerra 1 � ' wwwsynterracorp.com �I ,r p mom � HYCO II � INTAKE l� ` 1 M a RESERVOIR UNIT 3 COOLING CANAL � ,GYPSUM �� � y `,,��� ��'� � `■ � �� ELECTRICAL SUBSTATION HEATED WATER \> _ \ • `�'�� DISCHARGE PONDNO VA�� • �1 r���F �� BASIN %RA R DIKE_ � HYCO ► /� LV RESERVOIR i1 � y � - ��� � _ mi� .. • 11 LCID LANDFILL ► ^ - • 1 �� 1 INDUSTRIAL :f ®V �■� ���� �' � LANDFILL I �l r 1 WATERSUPPLYWELL ,� ��►; 116 -ASH BASIN WASTE BOUNDARY --- ASH BASIN COMPLIANCE BOUNDARY --- 0.5-MILE RADIUS FROM ASH BASIN COMPLIANCE BOUNDARY SOLID WASTE LANDFILL BOUNDARY SOLID WASTE LANDFILL COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS PROPERTY LINE EFFLUENT DISCHARGE CANAL mow wmk) NOTES 1. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND AREA MIX OF SURVEYED AND I Wro 11" APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED APPROXIMATE. all 2ALL BOUNDARIES ARE APPROXIMATE. OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT PERSON COUNTY G IS, IN ENGINEERS AT THE TIME OF MAP CREATION.THIS MAP IS A PRELIMINARY JURISDICTIONAL D TERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. 5. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS 6 DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE >�z / '\► FILTER DIKE r M`�.1 ��• / � /. � w ♦ �� _� ail ��� ,UPDATE. �I(IIIa*�ENERGY (JN FEET) WATER SUPPLY WELL SAMPLE LOCATIONS DRAWN BY: C. WYATT DATE: 12/05/2019 CORRECTIVE ACTION PLAN UPDATE REVIS BY. K. LAWING DATE: PROGRESS APPROVEDol : ■ . SEMORA, NORTH CAROLINA : �jPROJECT MANAGER: C. EADY '��rr.�w•_..�s�n.�ra�:wi�trrr.►���.,wer«+��-��1`ii��w�` �/! ��\� i����. '1\ • ■ FOR ADD THE NORTH SEE INSET TO THE NORTH SEE INSET A / I ..�►' ' , 01 O OEM NI o •� ® a �� BQ ,gym 4 Q C� • • > o C ✓ p' i 1 • • i • SHORE RD INSET A . _ 1 •77 LEGEND _ J WATER TREATMENT SYSTEM OPT OUT OR NON -RESPONSIVE • . ° LOCATIONS DEEMED NOT ELIGIBLE PER HOUSE BILL 630 (BUSINESS/CHURCH/SCHOOL) BUT VOLUNTARILY • SUPPLIED PERMANENT WATER SOLUTION ♦ . • OVACANT PARCELS WITHIN HALF -MILE RADIUS Y RD � ' • WATER SUPPLY WELL DUNNAWA� O�` © ♦�• ASH BASIN WASTE BOUNDARY d �•� — - — ASH BASIN COMPLIANCE BOUNDARY \ • C, 0.5-MILE RADIUS FROM ASH BASIN COMPLIANCE _BOUNDARY I SOLID WASTE LANDFILL BOUNDARY Q • �� SOLID WASTE LANDFILL COMPLIANCE BOUNDARY • ♦ • ' • DUKE ENERGY PROGRESS PROPERTY LINE a i ♦' \ ° ` EFFLUENT DISCHARGE CANAL �' Q • Q D TOPOGRAPHIC CONTOURS (10' INTERVAL) • - - — - - %' /// Y e • - I STREAMS (AMEC NRTR) ♦i 6 a NOTES WETLANDS (AMEC NRTR) 1. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED APPROXIMATE. 2. ALL BOUNDARIES ARE APPROXIMATE. - ` 3. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION ♦ OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT PERSON COUNTY GIS. O 4. THE WATERS OR THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ' ENGINEERS AT THE TIME OF MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL `` `- • DETERMINATION ONLY. FFROM AMECOSTER WHEELWETLANDS BOUNDARIES EOBTAINED ER ENVIRONMENTAL ENTAL& INFRASTRUCTURE, NATURALRE RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. _ 5. AERIAL PHOTOGRAPHY OBTAINED FROM GOGGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS • COLLECTED ON JUNE 13, 2016. (\\ ♦ 6. DRAW ING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE \ .!/./�,�j ♦ SYSTEM FIPS 3200 (NAD83). L ♦�♦ • J-- ♦ ♦ 7. 0.5-MILE RADIUS DRAWN FROM ESTABLISHED COMPLIANCE BOUNDARY OF THE IM POUNDM ENT AS DEPICTED IN THE 2017 CSA UPDATE. OQO ', + GRAPHIC SCALE DUKE 770FIGURE 5-7b '0 770 1,e40 HB630 PERMANENT WATER SUPPLY 1* ENERGY (IN FEET) O ` % PROGRESS COMPLETION MAP DRAWN BY: C. WYATT DATE: 12/05/2019 REVISEDBY: C.WYATT/K.KING DATE:12/12/2019 CORRECTIVE ACTION PLAN UPDATE A PROVDBv:K.CAWING DATE:12/12/2019 ROXBORO STEAM ELECTRIC PLANT APPROVED BY: K. CAWING DATE: 12/12/2019 9Ra ' 1"=1,500' FORADDITIONALAREASTO synTerra PROJECT MANAGER: C.EADv SEMORA, NORTH CAROLINA THE SOUTH SEE INSET B www.synterracori).com 1A\�� me: rA;zl lc., W HYCO SERVOIR �111` COA ,' PILI s� O � a, ♦ F �R4 R 0 \ ` NOTES: 1. THE INTAKE CANAL (HYCO RESERVOIR) IS A RECEIVING WATERBODY (CLASS B, WS-V) COVERED BY SOC NO. S18-005. 2. GROUNDWATERTO SURFACE WATER (02L-02B) SAMPLES WERE COLLECTED TO ASSESS WHETHER GROUNDWATER MIGRATION IS CAUSING CONSTITUENT CONCENTRATIONS IN THE INTAKE CANALTO BE GREATERTHAN THE APPLICABLE 02B STANDARDS. 02L-02B SAMPLING WAS CONDUCTED FROM APRIL 30, 2018 TO MAY 3, 2018 FOLLOWING DIVIDION APPROVED LOCATION AND PROTOCOLS. IN THE FIVE DAYS PRIOR TO SAMPLING 0.65 INCHES OF RAINFALL WAS OBSERVED AT THE ROXBORO STEAM At ELECTRIC PLANT. DURING THE FOUR DAY SAMPLING EVENT, NO RAINFALL WAS OBSERVED AT ROXBORO STEAM ELECTRIC PLANT. 3.) SUPPLEMENTAL 02L-02B SAMPLES WERE COLLECTED TO ASSESS WHETHER GROUNDWATER , MIGRATION IS CAUSING CONSTITUENT CONCENTRATIONS IN STREAM 11ATO BE GREATER THAN THE APPLICABLE 02B STANDARDS. SUPPLEMENTAL 02L-02B SAMPLING WAS CONDUCTED FROM MAY 20, 2019 TO MAY 23, 2019 FOLLOWING DIVISION APPROVED LOCATION AND PROTOCOLS. IN THE FIVE DAYS PRIOR TO SAMPLING AND DURING THE FOUR DAY SAMPLING EVENT, NO MEASURABLE RAINFALL WAS OBSERVED AT ROXBORO STEAM ELECTRIC PLANT. 4. DISSOLVED COPPER CONCENTRATIONS WERE GREATER THAN THE APPLICABLE 02B STANDARDS AT THE FOLLOWING 02L-02B SAMPLE LOCATION: RSW-4. 5. NO COI CONCENTRATIONS WERE GREATERTHAN THE APPLICABLE 02B STANDARDS IN 02L-02B SAMPLES COLLECTED AT THE ROXBORO STEAM ELECTRIC PLANT. 6. THE WATER OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONALDETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINEDLaVFROM AMEC FOSTER WHEELER ENVIRONMENTAL& INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. R.�A`R�'-`� RSW, _�� � ��.r✓/�! P. P i 7 EAST ASH W% I BASIN LANDFILLLIj®� 1 A'fr!>. '�►y��`I^�+^-1 � � �.��� =ter �� � � / i — LCID LANDFILL i \► r f 1y • v v LEGEND d 11A STREAM 11A AREA � ■ ozL-oze SAMPLE LOCATION ■ SURFACE WATER SAMPLE LOCATION .Q • ` ' CONSTRUCTED SEEP (APPROXIMATE) 7 \ DUNN,AWAY RD NON -CONSTRUCTED SEEP (APPROXIMATE) DISPOSITIONED SEEP (APPROXIMATE) (� ❑ IN -STREAM SURFACE WATER SAMPLE LOCATION PER SOC (APPROXIMATE) A NPDES OUTFALL LOCATION .. • _ �� � ♦ ASH BASIN WASTE BOUNDARY _ - ASH BASIN COMPLIANCE BOUNDARY 0.5-MILE RADIUS FROM ASH BASIN COMPLIANCE BOUNDARY % SOLID WASTE LANDFILL BOUNDARY ° y SOLID WASTE LANDFILL COMPLIANCE BOUNDARY • DUKE ENERGY PROGRESS PROPERTY LINE EFFLUENT DISCHARGE CANAL TOPOGRAPHIC CONTOURS (10' INTERVAL) e3110 STREAMS (AMEC NRTR) WETLANDS (AMEC NRTR) V "§. NOTES: �} 7. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S S./ INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT PERSON F COUNTY GIS. t• B. ALL BOUNDARIES ARE APPROXIMATE. 9. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED ' • APPROXIMATE. a 10. SPECIAL ORDER BY CONSENT (SOC) LOCATIONS ARE DESCRIBED IN SOC WQ 518-005. 11. AERIAL PHOTOGRAPHY OBTAINED FROM GOGGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS COLLECTED ON JUNE 13, 2011 12. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE Ik u SYSTEM FIRS 3200 (NAD83). e \ 1 O-� 13. 0.5-MILE RADIUS DRAWN FROM ESTABLISHED COMPLIANCE BOUNDARY OF THE IMPOUNDMENT \74 AS DEPICTED IN THE 2017 CSA UPDATE. %' DUKE 800 GORAPHICSCA800 1,600 FIGURE 5-8 1* ENERGY MAP OF SURFACE WATERS o (IN FEET) ,. PROGRESS DRAWN BY: J.KIRTZ DATE:06/11/2019 CORRECTIVE ACTION PLAN UPDATE •b . � � REVISED BY: C. WYATT DATE: 12/19/2019 ROXBORO STEAM ELECTRIC PLANT • • _ ' CHECKED BY: K. LAWING DATE: 12/19/2019 V _ APPROVED BY: K.LAWING DATE: 12/19/2019 SEMORA, NORTH CAROLINA synTerra PROJECT MANAGER: C. EADY www.synterracorp.com ROXgORO P V PNI� . — t f � � � I w f � I ` •�y r DUNNAW. �.` ,r sFMORq Ro � w IJ I L. 1 ♦ \� I 1 1 1 1 1 A •<•.1[r4l�af. �. . I 1 1 pj 1 = 1 � 1 ((R�D I � 1 r • I 1 f 1 � • i J ♦1� J L •I D U KE GRAPHIC SCALE 700 0 700 1,400 ENERGY (IN FEET) IPROGRESS DRAWN BY: J. KIRTZ DATE: 06/11/2019 REVISED BYA. ROBINSON DATE: 12/16/2019 1 CHECKED BY: K. LAWING DATE: 12/16/2019 / APPROVED BY: K. CAWING DATE: 12/16/2019 PROJECT MANAGER: C. EADY s)mTerra I www.s nterracor .com LEGEND SOURCE AREA 1 SOURCEAREA2 L :: ISOURCEAREA3 -ASH BASIN WASTE BOUNDARY - ASH BASIN COMPLIANCE BOUNDARY SOLID WASTE LANDFILL BOUNDARY • - SOLID WASTE LANDFILL COMPLIANCE BOUNDARY LINED LANDFILL LIMIT OF WASTE EFFLUENT DISCHARGE CANAL STREAMS (AMEC NRTR) ® WETLANDS (AMEC NRTR) NOTES 1. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCESAND AREA MIX OF SURVEYED ANDAPPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONSARE TO BE DEEMED APPROXIMATE. 2. ALL BOUNDARIES ARE APPROXIMATE. 3. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIESAND CURRENT PERSON COUNTY GIs. 4. THE WATERS OR THE US DELINEATION HAS NOT BEENAPPROVED BY THE USARMY CORPS OF ENGINEERS ATTHE TIME OF MAP CREATION. THIS MAP ISA PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDSAND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. 5. AERIAL PHOTOGRAPHY OBTAINED FROM GOGGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. 6. DRAWING HAS BEEN SET WITHA PROJECTION OF NORTH CAROLINASTATE PLANE COORDINATE FIGURE 6-1 MAP OF SOURCE AREAS CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA Corrective Action Plan Update December 2019 Roxboro Steam Electric Plant SynTerra Figure 6-2 Fly Ash and Bottom Ash Interbedded Depiction Included in Section 6 text A A' (NORTH) �-� DUKE ENERGY PROGRESS PROPERTY LINE APPROXIMATE EAST ASH BASIN / INDUSTRIAL LANDFILL COMPLIANCE BOUNDARY (SOUTH) APPROXIMATE EAST ASH BASIN WASTE BOUNDARY �w m � rn m U w ao — LU N uj O M 0 �3: 0� r 500 I 7 a soo m mAPPROXIMATE PHASE 6 grw NNN- APPROXIMATE PHASE 1-5 ENGINEERED BASE �tiY �i '�fi d'ti O 1✓ r Y�. lr Ir \r 1/r✓ y� �j o__________________ ENGINEERED BASE LINER ELEVATION 1.�i?\' f` w --------------------------------------- ___________C14___ LINER ELEVATION '�'i$ '',l. zd. 550 m C9 0 ------------------=--ASH=-==--_--_--_--_ - -_ - _-_-_-- td�Y4 550 GYPSUM ¢ w -- -- I STORAGE REGOLITH � a --------------------------_------_--_--_--_------------ =ASH------------- AREA ¢ j -_-__ __-_-_-_- _____� -_- - _________________________ _ ________________ 0 0 - - - - - --- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- - STRUCTURAL _ 500 s SOIL FILL w_______ FILL \ - - \� 500 aa z --= --= --= --=------------------------------------= --= --=------------= --= --= -_= --= --= --= --= - - ------o STIR T'�. -- _-______________i-'\_\i n1 Q iFCLL -------------------------_-_-_-_-_-_-__-_Z - 450 I UO �' /1;'\/\ - ASH PORE--=--------------- \/\'/1"\/\'/1��\/\'/1 �\\'/1���/\'/1"\/\'/1���/\'/1`\/\'/1���/\'/1"\/\'/1���/\'/1"\/\'/1���/\'/1"\/\'/1���/\'/1"\/\'/1"-/\' D _ _=______ _____ _ _ _ ____ WATER - -_ _ --_ / / w� a f l-I -\ 84.60' / \ \',-------- \-1'/- \ \'' \-1'/- '' \-1'/�,y�• aW /\�:/"`_./. �:`r/I�`_________________ -- ,;; ZW 55' -- /\; /r1-'\\'\/.' ./-/ 1BI"E, DR�O\Clr- r REGOLITH 400-400 . 413.77' r 350 / \i l �`r I � \ \ l / i t / I \ \ l/-i l i l I \ \ l/ i lily`/ I � \ \ // i /i l �`/ I � \ \ l/-i l i l �`r I � \ \ l/-i l i / ��r l � \ \ l/ i l i l ��r l \ \ l/ l i l ��/ I \ \ // i /i l �\/ I \ \ l / i lily`/ 1 � \ \ l/-i l i l �`r I � \ \ l �- `�� � \; \ i � i _ \ i �`/ 1 � \ \ / r-i _ \ 1 ��7- \ / r-i 350 `/i \ I _/i \ I \ _/i \ I \ _lI-\l'-\ ♦�./-/'-`lei. l '\lI-\I'-\I'-\/'-`lam: I_\lam -lam: I_`l'i./-lam: '- \'\/1" \ X�-1 \ - �'/ � \'/ BEDROCK- HYCO l/\il`rI,�BEDROCK�I;rI.\`i/./I/\.l�rl. \`i 1./I/\.l�rl\`�l.rl/\i/�rl.\`.�.rl/\il�rl.\`. �. �i/\il�rl. \`i l.rl/\.l�rl'\`� RESERVOIR ' /1\'/I�i\'/1\'/1/\'/1\'/I�i\'/1\'/I�i\'/1\'/I�i\'/1\'/1\I`/,�i\'/1"�i\'•/��-i\I./``\�.�./��_-i 300 , , ,�_ , ,� , r \ /1, ram\ /1, \il� - r _� �/ _�i / \ice/- -`' / _�i�/- _♦ �/- _♦ /- _♦ �/ _♦ /- _� �/ _♦ /- _� �/ _♦ /- _♦ �/ _♦ /- _`'" _♦ /- _♦ �/ _♦ /- _� �/ _♦ /- _� �/ _♦ /- -� BEDROCK:1\'_ t'\/\'/1"\/\'/1/'\/\'/1"\/\'/1�'\/\'/1"\/\'/1�'\/\'/1"\/♦'/1�'\/\'/1"\/\'/1"'\ /\'/1"\/ POWER PLANT -- -250 `,-;�\i/.-\ \/`,-;�li/.-\ \/i \rl/\li � \ice/ - _`' / ♦��/ - _�'`/ \��/ - _\ / EAST ASH -200 BASIN '//1"\/\'/1 WEST ASH BASIN LEGEND NOTES DUNNAWgy RD MW-16D WELL IN TRANSITION ZONE TRANSITION ZONE FLOW LAYER GROUNDWATER 1. WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR APRIL 22-23, 2019 MW-16BR WELL IN COMPETENT BEDROCK LEVEL ELEVATION FOR EACH WELL. ELEVATIONS WITHIN EACH CLUSTER ARE MEASURED IN THE SAME DAY. REFERENCED TO NORTH AMERICAN VERTICAL DATUM, 1988. MY-1001 WATER SUPPLY WELL BEDROCK FLOW LAYER GROUNDWATER 2, DISPLAYED WATER SUPPLY WELL LOCATIONS REFLECT INFORMATION AVAILABLE UP TO DECEMBER LEVEL ELEVATION 31, 2015. GENERALIZED WATER TABLE WATER LEVEL ELEVATION (NAVD 88) 3. FRACTURE OCCURRENCE AND ORIENTATION NOT DEPICTED. won-*- GENERALIZED GROUNDWATER (LABEL COLORING BY FLOW ZONE) NO GEOPHYSICAL LOGGING CONDUCTED IN DEEP BEDROCK BOREHOLES SHOWN ON sgyD NOTE: FLOW DIRECTION CROSS-SECTION. CROSS SECTION A -A' IS LINEAR IN NATURE AND NOT ALL THE CSS GENERALIZED SUBSURFACE ASH WELLSCREEN 4. ALL BOUNDARIES ARE APPROXIMATE. /N sr� PROJE TEDDNS O TOLONG TTHECROSS 8 CTON.TIONARE PORE WATER FLOW DIRECTION LITHOLOGIC CONTACT — — — COMPLIANCE BOUNDARY CROSS SECTION LOCATION 0 ASH WASTE BOUNDARY 0 ASH PORE WATER GRAPHIC SCALE BEDROCK DUKE 0 100 250 500 0 FIGURE 6-3 ENERGY HORIZONTAL SCALE: 1" = 500' REGOLITH VERTICAL SCALE: 1" = 100' GENERAL CROSS-SECTION A -A' 0 SOIL FILL 5XVERTICAL EXAGGERATION EAST ASH BASIN PROGRESS DRAWN BY: A.FEIGL DATE: 08/02/2019 ® STRUCTURAL FILL REVISED BY: D. KREFSKI DATE: 12/12/2019 CORRECTIVE ACTION PLAN UPDATE SURFACE WATER CHECKED BY: K. LAWING DATE: 12/12/2019 161P APPROVED BY: C. EADY DATE: 12/12/2019 ROXBORO STEAM ELECTRIC PLANT 1 GENERALIZED VERTICAL PROJECT MANAGER: C. EADY SEMORA, NORTH CAROLINA TLAYOUT: SECTION A -A' (6-3) HYDRAULIC GRADIENT syneiid www.synterracorp.com i:3 3 600 550 500 (NORTHWEST) INTAKE 450 CANAL WATER ELEV. I, =409.0 DUKE ENERGY PROGRESS PROPERTY LINE APPROXIMATE EAST ASH BASIN COMPLIANCE BOUNDARY APPROXIMATE EAST ASH BASIN WASTE BOUNDARY (SOUTHEAST) 0 � w w Z w J Z J U W z o w 0 w in w w - v:✓vi vi r,r v „ w w �o —mac 20 r — Wi ------------------ APPROXIMATE TOP OF DAM ATTHE-===---------------- ---------- -EASTERN IMPOUNDMENT IN1993 AERIAL-----,-__ ___ ___________ ASH PORE ���� - _____ ASH - -► - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ ASH PORE WATER =Iol -_� WATER WATER ELEVATION =465'l'`� \ " \ i `� I ; - \ /\- " \ j /`� - \-- j /`� - \ ' --- _----_- ---_=-=i- -— — — — — — — — - - _ REGOLITH 472.39 ,�_ / WATER ELEVATION=409' x N� / I - \I i l\, / I , \I i \ / I \/i \ / I' \l i \ / I , \/ / \ / I , \/ i / 1 / \/ l \ r I , \, , _ ,� i \ i , v - •i i \�-1-V� �\ r I ' \l i \ / I , \l i ♦ / I \l ���- / \ / I' \/i / \ / I , \/ TT�/ I ' \/i l \ / I' \l i / \ / I \/i l \ I ,-\/400- \, ram\ I ram\ 419.30'\r\,r\, I \ ` \ I \/- _\-\ 7/---1`\/7- BEDROCK`\/I350 i\-BEDROCK`\i r OCK, BEDROCK R l` / r / I . i \ / , , \/ � I \ , 1 , \/ � \ / I , \/ � I \ / I , \/� � / I , \/� / \ / I , \/� � / I , \/� / \ / I , \/ � � / , / \/� / \300 / I , \/ � � / / \/i l \ / I , \/i \ / , / \/ � / \ / , , \ / , , \l ♦/ ,\I \/'I \/ / I ♦/ I ♦/ / I ♦/ , / / I ♦/ I ♦/ / I \/ I / / I \/ \/ / I \/- \/ / I ♦/ I \/ , ♦/- I` \/ \i.\l ./ .I♦ // \- . I. \II``/,\♦///r�\_\. mi/,'.♦II ./ .I\\ /// \-.'1. \I `/\,\\,//r�\ \mi/�l.\II./ .I\///�\- \ ,l.\I�`/`/1I\,\,/i�\\.-�/d'1.\Il ,�/I♦// \ \ l \ 1\I,\,/ TESIAWELL A-/ \ / \ \I�/ /\I\/am\-\-T'4l \I— \/250 1\I\, LEGEND ;�� ' _I���i\' PZ-12 PIEZOMETER ASH PORE WATER `\ ``r'/ -, / ABMW-7 WELL IN ASH PORE WATER LEVEL ELEVATION NOTES 200v TRANSITION ZONE FLOW LAYER N N � UNIT 3 COOLING TOWER POND --------------- -----------=====ASH-- m m m == _=--AP_PROXIMATE _ _______=ENGINEERED BASE= ___==LNER ELEVATIO EAST ASH BASINO Oa�N� SEPARATOR DIKE Q __ __ __ - _- - a - an a a a ====-- --------------------- /_, GMW-2 WELL IN TRANSITION ZONE GROUNDWATER LEVEL ELEVATION 1. WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR APRIL 22-23, 2019 / i % \/� / �`/ i : \/: ���/ i % \/� / _,\' r i % y / ; ABMW-7BR WELL IN COMPETENT BEDROCK 0 BEDROCK FLOW LAYER GROUNDWATER FOR EACH WELL. ELEVATIONS WITHIN EACH CLUSTER ARE MEASURED IN THE SAME DAY. \ I, \\ 1, 1\ 1/ I; �, RO4 LEVEL ELEVATION CTHIS S \ i �/\ \ \ �� \ ��\ \ \ ��i \ 1 ��. \ 1'/i \ 1, \ \%, D W 26 WATER SUPPLY WELL 2. FRACTU ESREFEENCEDCONC CTO ONCEPTH TUALLY DEPICTED ONCCROSS C$TION REPRESENT GENERALIZED 150 \ / I , \\� �\ / 1 / \ / I , \\� �\ , I / \ / I , \\� �\ ` /\ ` /\ , I / � � / \ /\ WATER LEVEL ELEVATION (NAND 88) COLORING BY FLOW ZONE) ORIENTATIONS OF FRACTURES OBSERVED BASED ON TELEVIEWER LOGGING AT THE ABMW-7BRLL \'i /� , _ \ i ` \'� / , -� i ` \'� / , -� i e ` \'� GENERALIZED WATER TABLE (LABEL BOREHOLE. THE DEPICTED FRACTURE ORIENTATIONS ACCOUNT FOR APPARENT DIP WITHIN THE GENERALIZED GROUNDWATER WELLSCREEN PLANE OF THE CROSS SECTION AND VERTICAL EXAGGERATION. THE ACTUAL NUMBER OF FRACTURES FLOW DIRECTION IS FAR TOO NUMEROUS TO ILLUSTRATE AT THIS SCALE. IN ADDITION, THE DEPTHS AND LENGTHS OF �� GENERALIZED SUBSURFACE ASH FRACTURES VERSUS DEPTH ARE CONCEPTUAL ONLY. RHYCOESERVOIR e \ 1 . . _ PORE WATER FLOW DIRECTION COMPLIANCE BOUNDARY 3. DISPLAYED WATER SUPPLY WELL LOCATIONS REFLECT INFORMATION AVAILABLE UP TO DECEMBER /' �\ GENERALIZED VERTICAL WASTE BOUNDARY 31, 2015. POWER PLANT HYDRAULIC GRADIENT 4. ALL BOUNDARIES ARE APPROXIMATE. LITHOLOGIC CONTACT 0 ASH 0 ASH PORE WATER/ WASTEWATER EAST ASH BASIN e' 0 SAPROLITE ® TRANSITION ZONE GRAPHIC SCALE WEST ASH I 0 BEDROCK REGOLITH DUKE ENERGY o 100 250 500 HORIZONTAL SCAL:BASIN VERTICAL SCALE: 1 1100 �� FIGURE 6-4 GENERAL CROSS-SECTION B-B' o SOIL FILL PROGRESS 5X VERTICAL EXAGGERATION EAST ASH BASIN DUNNAWAv RD ® STRUCTURAL FILL DRAWN BY: A.FEIGL DATE: O8/02/2019 REVISED BY: D. KREFSKI DATE: 12/12/2019 CORRECTIVE ACTION PLAN UPDATE NOTE: NOT MEASURED CHECKED BY: K. LAWING DATE: 12/12/2019 ROXBORO STEAM ELECTRIC PLANT rv, CROSS SECTION B-B' IS LINEAR IN NATURE AND NOT ALL LOCATIONS ALONG THE CROSS SECTION ARE _ _ PREDOMINANT BEDROCK FRACTURE ORIENTATION 161PAPPROVED BY: C.EADY DATE: 12/12/2019 PROJECT MANAGER: C. EADY SEMORA NORTH CAROLINA ' PROJECTED ONTO THE CROSS SECTION. LAYOUT: SECTION B-B'(6-4) CROSS SECTION LOCATION � SURFACE WATER I ...�� ■ ■T�� www.synterracorp.com ,. PRE -DECANTING CONDITIONS - POST CLOSURE CONDITIONS FOR CLOSURE -IN -PLACE . I oil 1If it UIC �-• ��`1��1�� l� `'i ' ��� � � ^ `,,..� % ,� { M ♦ / . e I •: SATURATED ASH THICKNESS (FEET) SATURATED ASH THICKNESS (FEET) ter. ♦ _ ♦ ' . �+�. . r ,y . ._. � it • � . - _ ' DUKE l' 375 GRAPHIC SCALE 0 375 75o FIGURE 6-5 ENERGY SATURATED ASH THICKNESS MAP _ PROGRESS (IN FEET) PRE -DECANTING AND CLOSURE -IN -PLACE CONDITIONS EAST ASH BASIN DRAWN BY:C.WYATT DATE:10/30/2019 } REVISED BY. C. WYATT/K. KING DATE:12/12/2019 CHECKED BY: K. LAWING DATE: 12/12/2019 APPROVED BY: K.LAWING DATE:12/12/2019 CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT ® s)mTerra PROJECT MANAGER: C.EADY SEMORA, NORTH CAROLINA www.synterracorp.com A ---a (NORTH) - A' (SOUTH) I� DUKE ENERGY PROGRESS PROPERTY LINE APPROXIMATE EAST ASH BASIN / INDUSTRIAL LANDFILL COMPLIANCE BOUNDARY I APPROXIMATE EAST ASH BASIN WASTE BOUNDARY 600 do 550 m � N N GYPSUM STORAGE a a AREA cn SOIL FILL \ 500 I Q STRUCTURAL o FILL 450 Z II Qz O z� J -_-_------ ---- 041 N____________________________________= APPROXIMATI ===================================== ENGINEERED 2 o LINER ELEVAI o 0 ASH =====__________--_ w_ ________ 400 REGOLITH _ a 350 / i / \�/ I \ 1 i / cwnvo 300 'BEDROCK,, 200 LEGEND MW-16D WELL IN TRANSITION ZONE MW-16BR WELL IN COMPETENT BEDROCK J i L m m W U N - m w O 2 p 0 E D- yr yr Y yi r rt w � I APPROXIMATE PHASE 6 1-5 ENGINEERED BASE QO /LINER ELEVATION „ /,� ✓ y� yr.*1'r` zt;r`ij` V Y Y Y -- - - - - - - ASH _ REGOLITH o w __-__---------------__--_--_--_--_--_--_____-___-- ___--_--_--_--_--_- ----- ---- _ __ __-- ------------------------------------ ------------------------------- -------------------------_---_---__-_________------ ___= STRUCTURAL ---- — _ FILL\ -I ` - / — l \ \ \,l `r+Tll/\ \ , I� _________________________________________________________ ���/ \ \ Mw-196RL I \ / \ / 1/ M W 139 -11 a ____ < Sao / �\ /1, / �\ ♦ /1, �\ /1,\/\ /1/. .-7777 \ -__-_ -_ ____ _ ______ /1\�\/\ --------- -- ASH PORE--==_-____________/I"\/\I/1\� \'/ --=- =4�= WATER \/\/1 \ /1, \/� /1 ' /.-BEDROCK'- \- \'/.-- \ _ \ / . / - - ♦ . / _ - / \ � `��+� ,I � \/ i ♦. I' \/� � I � \� � � . /I / \/ `� \ ,I � \li \; 1 \l i � 1 � \/ ; i . /I � \/ ; � \ ,I � \/i ♦` I / \li \ I ! \/ ; i . /I � \/ ; � \ ,I � \li ♦; I / \/i \ I � \li ♦; I � \l i \ 1 � \ / 1,�\/\I/1`�\/\I/1, �\/♦'/1`�\/\I/1/�\/\I/1` �\/\I/1/�\/\I/1` �\/\'/1, �\/\I/1` �\/♦'/1\ �\/\I/1\ �\/\'/1, �\/♦'/1`�\/♦I/1, �\/\'/1` �\/♦I/1, �\/\I/1` �\/\'/1, �\/\I/1` �\/\'/1,�\/\I/1`�\/♦'/1, �\/♦'/1`�\/♦I/1, �\/\'/1\ \I/1��\/\I/1\�\/\'/1,� me \/\'/1��\/\'/1\ \/\I/1��\/\'/1\ \/\I/1��\/\I/1\ \/\'/1��\/\I/1\ \/\'/1��\/\I/1\ \/\'/1��\/\'/1\�\/\I/I '/\I/1`" ' I� \/ i l\\/ l i \l i l♦\/ I� \/ i l♦\/ l i\ l i l\\/ I/ \/ i l\\/ l i \l i l♦\/ I� \/ i l\\/ l i\ l i l\\/ I� \/ i/\\/ l i \/ i l♦\/ I� \/ i l\\/ ,`\ l i l♦\/ 1�\ \ l/\/ i l i/\\/ I/\ \ l/\/ i l i/\\/ I�\ \ l/\/ i l i l\\/ I�\ \//\/ i / i l♦\/ 1�\ \ l'\/ i l i l\\/ 1�\ \ l/\/ i l i l♦\/ I�\ \ l/\/ i \/-`'./-_♦/./- \/ /- _\'./- -lei /I-\_♦/./-/�i /I-\_\/./-li \ I \ _li \ I_\_ _li � I \ _lid I \ _/i� I 1, �\/\I/1"\/\I/ 1 �' �/\'/1" \/\I/1�' �/\'/1"\/\I/1 �' �/\I/1" \/\'/1�' �/\I/1"\/\'/ 1�' �/\I/1" \/\'/ 1 �' �/\'/1"\/\I/ 1 �' �/\'/1" \/\I/ �\ / -i /,\;♦ / �/\'/1�' �/\I/1" \/ / � i _ - / � / - - • / - BEDROCK./\% /1\'\%\/1;'%\'/1"�i\'/1;'/\I/1"\%\'/1�'%\I/1`\%\'/1;'%\I/1\'\%\'/1;'%\'/1\'\%\/1;'%\'/1"\%\�/1;'�%\I/1`/\%\'/1\'`/\I\ 1�'�/\I/1"\/\I/1�'�/\'/1"\/\I/1�'�/\'/1"\/♦I/1�'�/\I/1"\/\'/1�'�/\I/1"\/\'/1�'�/\I/1"\/\'/1�'�/\'/1"\/\I/1�'�/\'/1"\/♦I/1\'�/\I/1"\/\'/1\'�/\I/1\'\/ POWER PLANT _NOTES: 1. CONCENTRATIONS SHOWN ARE STATISTICAL MEAN \ - \'/ -'� - \'' - \ - \'/ -'� - \'' - \ - \'/ -'� - \'' - \ - \'/ -'\ - \ EAST ASH BASIN `\ \,,,I'CALCULATED BASED ON CENTRAL TENDENCY OF DATASET / 1 .USING DATA RANGING FROM JANUARY 2018 TO JUNE 2019. / � �.'.I _ ?.'.I WEST ASH -2. BORON (B) CONCENTRATIONS ARE IN MICROGRAMS PER - - - BASIN LITER (w4/L) TRANSITION ZONE FLOW LAYER GROUNDWATER LEVEL ELEVATION MY-1001 WATER SUPPLY WELL BEDROCK FLOW LAYER GROUNDWATER LEVEL ELEVATION _ I _ GENERALIZED WATER TABLE MEAN BORON (B) CONCENTRATION (ug/L) GENERALIZED GROUNDWATER 6 MEAN SULFATE (SO4) CONCENTRATION (mg/L) �► FLOW DIRECTION ns oo MEAN TOTAL DISSOLVED SOLIDS (TDS) GENERALIZED SUBSURFACE ASH CONCENTRATION PORE WATER FLOW DIRECTION WELL SCREEN LITHOLOGIC CONTACT H ASH — — — COMPLIANCE BOUNDARY 0 ASH PORE WATER WASTE BOUNDARY 0 BEDROCK REGOLITH SOIL FILL ® STRUCTURAL FILL SURFACE WATER GENERALIZED VERTICAL HYDRAULIC GRADIENT NS NOT SAMPLED 3. SULFATE (SO4) AND TOTAL DISSOLVED SOLIDS (TDS) CONCENTRATIONS ARE IN MILLIGRAMS PER LITER (mg/L) * WELLS WITH DATASETS CONTAINING FEWER THAN FOUR VALID RESULTS, THE MOST RECENT VALID SAMPLE DATA UP TO JUNE 2019 WAS USED. - NO DATA AVAILABLE ANALYTICAL PARAMETER B SO4 TDS REPORTING UNITS Ng/L 15A NCAC 02L STANDARD 700 BACKGROUND THRESHOLD VALUES 50 (TRANSITION FLOW ZONE)' BACKGROUND THRESHOLD VALUES 50 (BEDROCK FLOW ZONE)' mg/L mg/I 250 500 NOTES 1. WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR APRIL 22-23, 2019 FOR EACH WELL. ELEVATIONS WITHIN EACH CLUSTER ARE MEASURED IN THE SAME DAY. REFERENCED TO NORTH AMERICAN VERTICAL DATUM, 1988. 2. DISPLAYED WATER SUPPLY WELL LOCATIONS REFLECT INFORMATION AVAILABLE UP TO DECEMBER 31, 2015. 3. FRACTURE OCCURRENCE AND ORIENTATION NOT DEPICTED. NO GEOPHYSICAL LOGGING CONDUCTED IN DEEP BEDROCK BOREHOLES SHOWN ON CROSS-SECTION. 4. ALL BOUNDARIES ARE APPROXIMATE. 38 710 �� DUKE ENERGY 69 560 PROGRESS 1 - BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM BACKGROUND GROUNDWATER SAMPLES COLLECTED NOVEMBER 2010 TO DECEMBER 2018 AS SUBMITTED JUNE 2019. L' synTerra GRAPHIC SCALE 0 100 250 500 HORIZONTAL SCALE: 1" = 500' VERTICAL SCALE: 1" = 100' 5X VERTICAL EXAGGERATION DRAWN BY: A.FEIGL DATE: 08/02/2019 REVISED BY: D. KREFSKI DATE: 12/12/2019 CHECKED BY: K.LAWING DATE:12/12/2019 APPROVED BY: C. EADY DATE: 12/12/2019 PROJECT MANAGER: C. EADY LAYOUT: SECTION A -A' (6-6A) www.synterracorp.com NOTE: CROSS SECTION A -A' IS LINEAR IN NATURE AND NOT ALL LOCATIONS ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. CROSS SECTION LOCATION FIGURE 6-6a GENERAL CROSS-SECTION A -A' EAST ASH BASIN - CONSERVATIVE GROUP MEAN OF BORON, SULFATE AND TOTAL DISSOLVED SOLIDS CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA A AV (NORTH) O m GYPSUM STORAGE a a AREA \ s SOIL FILL U 61 Q STRUCTURAL �a o FILL z II O y j Q � w z w / t (SOUTH) DUKE ENERGY PROGRESS PROPERTY LINE APPROXIMATE EAST ASH BASIN / INDUSTRIAL LANDFILL COMPLIANCE BOUNDARY APPROXIMATE EAST ASH mmi BASIN WASTE BOUNDARY-1 LUm m rn Cep N W m U z w L O LL t (n N N _____________ _____ ------------------------------------- CL XIMATE ENGIINOEEREDBASESE6 Lu 1y '1✓ tir r r'Ir r ry 0 =1 �j''i r r N N p _ ___ ___ ___ ___ ___ __ APPROXIMATE PHASE 1-5 ENGINEERED BASE LINER ELEVATIONI ! jr o =-------------------------------------= LINER ELEVATION (9 p o J - - --- --- --- --- --- --- --- --- --- ASH _ --_ --_ --_ --_ --_ --_ --_ -- _ � -------------- - - > ------------ --------------- - ASH ---- ---- v REGOLITH 0 --------------- ------------------------------------- _- - -- --- --- --- --- --- -----_---_---__ --_ --_ --_ --_ ------_--- -------------------------------------------------------- -------------- STRUCTURAL ----- _ p_ Z __ __ __ __ _______________________________________________________________ __ ____-_--_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ --__ --__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-__ -_-_ --_ --- _\/II , j FILL /// MW-]36R �w1 RRL1 - _ / \ . I : / I \_/I\/\II\/\/-\/I\'I I , - \\� / \ rT -400 REGOLITH Se M 22BR F 7.7 -350 000 \ \ \ /.`mil-300 'BEDROCK;,00 `/_-j\I -250 \ / / -200 .rl \Nr,/\`mil\ LEGEND I; N N' - V SH PORE \/\/1�\/1, �\\/I�J/1�\/I�\/1�\/I�\/1�\/1\/\/1\\'.�i\I/1`��i\'/I���i\I/1`��i\'/I; _ WATER /1�\/♦I/ 1`\/ \ ____/�1\\/\ /1,\/\'/ 1`\/\I/1 ��\/\I/1`\/\'/1��\/\I/1`\/\'/1�\/\'/1`\/\'/1�\/\'/1\\/\I/1�\/\'/1`\/\I/ 1�\/\I/ 1`\/\'/1�\/\I/ 1\ / �/\'/1�\/\I/1�: J-\�/\-�\-\i/`�- I/ 1/;''/1`'''/1`'''/1`'''/1`'/1;��/\'/1`�\/\'/1�'�/\'/1`��/\'''/1`'''/1`'''/1`'''/1`'''/1`I IN �\/\'/1;'�/\/1 I/\/\/I•\`,\�I/\/\/I•\`,\�I/\//\/I•\`,\/I/\/�\/I•\`�,\/I/\/�\/1•\`�,\' I\`,\�I/\/\/I•\`,\�I/\//\/I•\`,\�1/\/\/I•\`/\/I/\/\/1•\`,\/I/\/\/I•\`�,\�I/\/�\/I•\`�,\�I/\/�\/I. /1\♦/\I\/"/\'/1\♦/\I`/,/\I/1`\/\I\/"�/♦I/1`�\/\I\/\�`/♦I/1\♦/\I\/`\\'/1\♦/\I\/`/\\'/1`�\/\I\/�/\\/I/1`�\/\I\/\�\\ I/1\�\/\I\/\�\\'/1\�♦/♦I \/\\'/1\�♦/\I \: \/ \ / /♦/ l ♦\/ I i \ \ /./ i l / l ♦`/ I i \ \ /./ i l / / \\/ I / \ \ l'\/ i l / l \\/ I i \ \ /.� - I j ;\� \ ; \ /./ i / / l \\/ I i \ /\/ i l / l ♦`/ I i \ \ /./ i l / / \\/ I i \ \ /./ i l / / \\/ I i \ \ /./ i l / l \\/ I i \ \ j /./ i / / l ♦`/ I i \ \ /\� _ \ // \ I \ /� ♦ I \ /� ♦ I \ // \ I \ // \ 1 \ // \ I \ /� ♦ I \ /� ♦ I \ I/ \ I \ // \ I \ // \ I \ /� ♦ I \ /� ♦ I _ \ / - \ / - _ \ / - _ \ / - - 1 N' �/\I/1�'\/\'/1�'/\I/ 1 �'\/\'/1�'/\'/1�'\/\I/1�'/\'/1�\/\I/1�\/\'/1�\/\I/1 �'/\I/1�\/\'/1�'/\I/ j/ 'IN IN /I ,1i \`1E \ \/\,\ \;♦� ii`�'\\ri \ /'ter!/ /\\ i `\�//�/i-\�;` i\``���;`i\`\i�/BEDROCK ;� \\\� BEDROCK / \� / / \/ \ / \ I \ / . \ I \ / . \ 1 \ r . ♦ I \ r HYCO �/�\-\%/\�_\-\�/� �\�\j/\�-\-\�/� �\-1%/\�-\-\�/� �\-1%/\7-\-\�/� RESERVOIR ,I=\// \ / I• \// I-\// \ / I_\// I_\// \ / I_\// I_\// \ / 1 \// I_\// \ / 1 \// I-\l/ \ / I_\I/ POWER PLANT '/1"\/\I/1\/\I/1" \/\'/1\/\I/1"\/\''\/\'/1" \/\'/1\/\'/1"\/\I/1�'\/\'/1" \/ . \`i �\ / I / \ / / / . \`/ / \ / I / \ / / / I • \`/ �\ / I / \ / �\ I • \`� �\ / I / \ / �� / 1 • \`� �♦ / I / \ / �\ I • \`� �\ / I / \ / / / I • \`/ �\ / I / \ / / / . \`/ �\ / 1 / \ i �� / , /1 /�;`\��\;.I�\ / i /i �\I�\ \l'\/ i lil\1�\ \l'\/ i li/♦I�\ \l/\/ i l� - l ei\/'-`_\ \/ - l Ni\ / - l ei\/'-` \ \/ - l ei\/'-`_` \/ - l ;�\/I_\ \ \, _ l/ \ 1 \ _ _ _ NOTES: _ _ _ _ _ _ `' \' -_ ''1�'/\I/ �'\/\''I' EAST NH BAS /,1. CONCENTRATIONS SHOWN ARE STATISTICAL MEAN CALCULATED BASED ON CENTRAL TENDENCY OF DATASET USING DATA RANGING FROM ]ANUARY 2018 TO DUNE 2019. i'\7-; - \/\-_; - \ �'`�-; - \/`-_; - \ i'`�-; - \/`-_; - \ WEST ASH /' -'._ BASIN 2. SELENIUM (Se) AND STRONTIUM (Sr) CONCENTRATIONS ARE NOTES IN MICROGRAMS PER LITER (Ng/L) DUNNAWAV MW-16D WELL IN TRANSITION ZONE v MW-16BR WELL IN COMPETENT BEDROCK MY-1001 WATER SUPPLY WELL 1 GENERALIZED WATER TABLE _ _ GENERALIZED GROUNDWATER B FLOW DIRECTION ns uoo GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION — LITHOLOGIC CONTACT 0 ASH — — — 0 ASH PORE WATER 0 BEDROCK 0 REGOLITH 0 SOIL FILL ® STRUCTURAL FILL SURFACE WATER GENERALIZED VERTICAL HYDRAULIC GRADIENT NS NOT SAMPLED TRANSITION ZONE FLOW LAYER GROUNDWATER LEVEL ELEVATION * WELLS WITH DATASETS CONTAINING FEWER THAN FOUR BEDROCK FLOW LAYER GROUNDWATER VALID RESULTS, THE MOST RECENT VALID SAMPLE DATA UP TO LEVEL ELEVATION JUNE 2019 WAS USED. MEAN BORON (B) CONCENTRATION (ug/L) NO DATA AVAILABLE MEAN SULFATE (SO4) CONCENTRATION (mg/L) MEAN TOTAL DISSOLVED SOLIDS (TDS) ANALYTICAL PARAMETER Se Sr CONCENTRATION (mg/L) WELLSCREEN REPORTING UNITS Ng/L Ng/L 15A NCAC 02L STANDARD 20 NE COMPLIANCE BOUNDARY BACKGROUND THRESHOLD WASTE BOUNDARY VALUES 2 760 (TRANSITION FLOW ZONE)' BACKGROUND THRESHOLD VALUES 1 438 (BEDROCK FLOW ZONE)' ' BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM BACKGROUND GROUNDWATER SAMPLES COLLECTED NOVEMBER 2010 TO DECEMBER 2018 AS SUBMITTED JUNE 2019. NE - NOT ESTABLISHED 1. WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR APRIL 22-23, 2019 FOR EACH WELL. ELEVATIONS WITHIN EACH CLUSTER ARE MEASURED IN THE SAME DAY. REFERENCED TO NORTH AMERICAN VERTICAL DATUM, 1988. 2. DISPLAYED WATER SUPPLY WELL LOCATIONS REFLECT INFORMATION AVAILABLE UP TO DECEMBER 31, 2015. 3. FRACTURE OCCURRENCE AND ORIENTATION NOT DEPICTED. NO GEOPHYSICAL LOGGING CONDUCTED IN DEEP BEDROCK BOREHOLES SHOWN ON CROSS-SECTION. 4. ALL BOUNDARIES ARE APPROXIMATE. 4'DUKE ENERGY PROGRESS WnTem GRAPHIC SCALE 0 100 250 500 HORIZONTAL SCALE: 1" = 500' VERTICAL SCALE: 1" - 100' 5X VERTICAL EXAGGERATION DRAWN BY: A.FEIGL DATE: 08/02/2019 REVISED BY: D. KREFSKI DATE: 12/12/2019 CHECKED BY: K. LAWING DATE: 12/12/2019 APPROVED BY: C. EADY DATE: 12/12/2019 PROJECT MANAGER: C. EADY LAYOUT: SECTION A -A' (6-613) www.synterracorp.com NOTE: CROSS SECTION AA'IS LINEAR IN NATURE AND NOT ALL LOCATIONS ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. CROSS SECTION LOCATION FIGURE 6-6b GENERAL CROSS-SECTION A -A' EAST ASH BASIN - VARIABLE GROUP MEANS OF SELENIUM AND STRONTIUM CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA (NORTHWEST) .550 .500 INTAKE CANAL UNIT 3 �m: WATER ELEV. COOLING 0 0 =409.0 TOWER POND 250 DUKE ENERGY PROGRESS PROPERTY LINE APPROXIMATE EAST ASH BASIN COMPLIANCE BOUNDARY APPROXIMATE EAST ASH BASIN WASTE BOUNDARY ASH --------------- ------------- m m m r� o _______ _--_____________- APPROXIMATE -______- ________ ---------------------------- LINER ELEVATION o 0 EAST ASH BASIN SEPARATOR DIKE Q==== _ ---------------- -=-=-=-=-=-_-= IL a a a a ------------ ----------------------------------------- ---------------- APPROXIMATE TOPOF DAMAT THE-===________________ ----------------- SOIL ASH PORE EASTERN UNDMENT IN 1993 AERIAL -----=__=::IM ����� _ - -_-__ ____-- --- ---- -- -- ASH WATER ---- ----- : ASH PORE WATER _ WATER ELEVATION --- ------ --- REGOLITH - 71 WAI ER ELEVATION=409'/ NS Tos Izsa ` / I. /. \ I . \ i / / / / 'J"C s sago I \`� \/�/, �rl/\`�/\'I/\/\/I . /\'/ 1"\/ ♦ I � - � /1�/ \'/ 1"\/ ' 1�/\'/ " ♦` 1 / \/i / \ / I / \/i ♦ / I r \/i l \\/ I / \/i r 1 _ \/••.ABJIW-0]aR \ / . I `/ - l/I' \//-BEDROCK- r_ \; / ".'../BEDRO ♦'/1 \/\ /1, \/\'/ 1 ' \/ , �\ 'f�C�jl V , ♦ \ / \ _4 \ — LEGEND I/\/mil PIEZOMETER ASH PORE WATER (SOUTHEAST) 3. SULFATE (SO4) AND TOTAL DISSOLVED SOLIDS (TDS) CONCENTRATIONS ARE IN MILLIGRAMS PER LIFER (mg/L) * WELLS WITH DATASEFS CONTAINING FEWER THAN FOUR WELL IN ASH PORE WATER VALID RESULTS, THE MOST RECENT VALID SAMPLE DATA UP TO LEVEL ELEVATION NOTES JUNE 2019 WAS USED. \/\/_I,,\/\/1 \/\/_I,,_\/•/_I _\/\/_I,�\/ _I,,_\/• GMW2 WELL INTRANSITIONZONE TRANSITION ZONE LAYER GROUNDWATER 1. WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR WELL IN COMPETENT BEDROCK LEVEL ELEVATION APRIL 22-23, 2019 FOR EACH WELL. ELEVATIONS WITHIN EACH CLUSTER ARE WATER SUPPLY WELL V BEDROE FLOWN LAYER GROUNDWATER MEASURED INNTHE SAME DAY. REFERENCED TO NORTH AMERICAN VERTICAL DW--26 DATUM, 1988. _ GENERALIZED WATER TABLE e�wwo MEAN BORON (B) CONCENTRATION (IJg/L) MEAN SULFATE (SO4) CONCENTRATION (mg/L) 2. FRACTURES CONCEPTUALLY DEPICTED ON THIS CROSS SECTION REPRESENT GENERALIZED ORIENTATIONS OF FRACTURES OBSERVED BASED ON TELEVIEWER GENERALIZED GROUNDWATER MEAN TOTAL DISSOLVED SOLIDS LOGGING AT THE ABMW-7BRLL BOREHOLE. THE DEPICTED FRACTURE FLOW DIRECTION (TDS) GENERALIZED SUBSURFACE ASH CONCENTRATION (mg/L) ORIENTATIONS ACCOUNT FOR APPARENT DIP WITHIN THE PLANE OF THE CROSS HYCO e � �- / RESERVOIR / PORE WATER FLOW DIRECTION WELL SCREEN SECTION AND VERTICAL EXAGGERATION. THE ACTUAL NUMBER OF FRACTURES IS ` / I ` I / \ GENERALIZED VERTICAL FAR TOO NUMEROUS TO ILLUSTRATE AT THIS SCALE. IN ADDITION, THE DEPTHS POWER PLANT HYDRAULIC GRADIENT AND LENGTHS OF FRACTURES VERSES DEPTH ARE CONCEPTUAL ONLY. — — — COMPLIANCE BOUNDARY 3. DISPLAYED WATER SUPPLY WELL LOCATIONS REFLECT INFORMATION AVAILABLE UP — LITHOLOGIC CONTACT WASTE BOUNDARY TO DECEMBER 31, 2015. 0 ASH 4. ALL BOUNDARIES ARE APPROXIMATE. NOTE: CROSS SECTION B-B' IS LINEAR IN NATURE AND NOT ALL LOCATIONS ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. CROSS SECTION LOCATION ASH PORE WATER / WASTEWATER 0 SAPROLITE ® TRANSITION ZONE GRAPHIC SCALE 0 100 250 500 o BEDROCK ' D UK E REGOLITH ENERGY HORIZONTAL SCALE: 1" = VERTICAL SCALE: 1" = 100' SOIL FILL 5X VERTICAL EXAGGERATION ® STRUCTURAL FILL PROGRESS DRAWN BY: A.FEIGL DATE:08/02/2019 REVISED BY: D.. I DATE: 12/13/2019 - NOT SAMPLED CHECKED BY: K. CAWING DATE: 12/13/2019 LAWIN APPROVED BYC EADY DATE:12/13/2019 PREDOMINANT BEDROCK FRACTURE ORIENTATION SURFACE WATER PROJECT MANAGER: C. EADY synTeiid LAYOUT: SECTION B B' (6 7A) www.synterracorp.com - NO DATA AVAILABLE ANALYTICAL PARAMETER B SO4 TDS REPORTING UNITS Ng/L mg/L mg/L 15A NCAC 02L STANDARD 700 250 500 BACKGROUND THRESHOLD VALUES 50 38 710 (TRANSITION FLOW ZONE)' BACKGROUND THRESHOLD VALUES 50 69 560 (BEDROCK FLOW ZONE)' ' - BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM BACKGROUND GROUNDWATER SAMPLES COLLECTED NOVEMBER 2010 TO DECEMBER 2018 AS SUBMITTED JUNE 2019. FIGURE 6-7a GENERAL CROSS-SECTION B-B' EAST ASH BASIN - CONSERVATIVE GROUP MEAN OF BORON, SULFATE AND TOTAL DISSOLVED SOLIDS CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA B BI (NORTHWEST) DUKE ENERGY PROGRESS PROPERTY LINE APPROXIMATE EAST ASH BASIN COMPLIANCE BOUNDARY APPROXIMATE EAST ASH BASIN WASTE BOUNDARY (SOUTHEAST) APPROXIMATE INDUSTRIAL LANDFILL WASTE BOUNDARY Z o _ o M N u 600 W r r z. W Hw--mj _____________ m w i✓� �i y-wcf d'd'--ASH�d0-_-____ _________-----==_-_ a �p �•i¢�f 550 o m ¢--------------- ==-=APPROXIMATE ------ a0 J i NIA } � d'r N p� i" 4 LINER ELEVATION __ ------ �� C `i✓•i Qp �? -_---------- _ N EAST ASH BASIN o m m m m---_____-------------------_______ -- ---- a SEPARATOR DIKE (� -----------=--=--= -- APPROXIMATE TOP OF DAM AT THE ---==_=_==============-= OIL ASH PORE N N w __-_-__-__--__==--EASTERN IMPOUNDMENT IN 1993 AERIAL -- __�__---__---_ ----- -- ASH WATER - ----- -s-- - -- - _ ASH PORE WATER WATER ELEVATION�� INTAKE 0 II -- __-- wr — — — — — — CANAL 00- ---- UNIT 90 J�REGOL 450 WATER ELEV. =409.0 COOLING I I \ I \ f TOWER POND_I"-/\' WAT R ELEVATION=409' _ _ __ / ` I / / ` / \ / - / \ I�/i-\I_\/i i \ I_\/i \/I�\_ ♦/I _ I_\/i �'�Ft�/i1 ♦ I_\/i \/I/\li ♦ I_ I_\/i \/I/\li ♦ I \ N /\' 400 /\ / T+'T-"-r�r'� �/I/\`il\/I/\il�rl���l\rl/\il�/I \-'\/I/\i/�/I//\i/�/I/� �/I/\i/♦/�/\`i��/I/\/�/I/�i/\%1/\i/�/�/\`�/�/I/\-/�/�/�`�/�/I \-/ /�/�/�/�/�`i/�/I/\-/�/�/\`i/�/I/\-/�/I/\�I/\-/�/I _\ _\� \ I 1� \�\'/` - \l/�-\�1'`� �i lil\♦ 1�\ \'\`/�i li/\♦ I/\ \'\`/�i lil\♦ I�\ \'//-\ 1%/�-\�1'/� -\ \%/� -\�1 \ �- \ / / \l / / l _\ ./ \/./- \/ -\/./- _\ ./ _ / _/i ♦ I�\li I_\l ♦/-I�\li I�\li ♦ I/\/i I�\li \ _/i \ _li \ _li ♦ I/\li ♦ I/\ / _ _ /� I• \/• \ I� \/� 1� \ I'BEDROCK.\/� BEDROCK- 1 / \`� / / i / \ . /: / 1 _ `- / / i / \- `i I • BEDROCK\ . / \`/ 1 /BEDROCKS, i / \ . /: / I / \`� ;: / i / \ . /: / I \`' ;\ i / \ / : / I \`' ;\ i / \ . /: / I \`�' \ ' I / \ ' \ 1 / \`� / \ ' I / \- / \ / I \`'' ♦ / I / \ \/ : //11 \` \ ;� /-\\ _\/ /-♦?�_ \\ ,/-_\ \\ ./-_\ ./-\\ ./-_\ ./-\\ ,/-_\ ./-\\ ./-_\ /-♦\, ,__\' /- /--`' /-\:' /--`' /-\' NOTES: _ _ / I%\/�/\/I/4 /\/1%\/ /\/I!\/�/\�/I%\/�/♦/I!\/�/\�/1% \' r1!\l I\\/I%\l l\/I!\/:/\/I%\/ �/\�7Tk /;, ; / %`�i�\/ /;, ;`/ %;`�i�\/ /\-,\/1�;\�i�\/�/;/�;`/�%;`�i�\/�I\`, i; \I�j;���\/�1;7T,\ -\ ,1. CONCENTRATIONS SHOWN ARE STATISTICAL MEAN \/ j\I•/\�,•/\,-j'I`/�/-`'I`/\�-j'I�/�/-`'I`/ ,-� , /\/-`',`/\�-i\I•/„_\/i./ �_„I•/\�_\' \/-`'I`/�/_ /•/\�_\/i./\,_\/i./„_\� /\,/./- _\'I./\/_\/ / '. / /„_\\' CALCULATED BASED ON CENTRAL TENDENCY OFDATASET MW-206 � \-\'/-� ARTESIAN WELL / ,\-1'/-`��\'/ USING DATA RANGING FROM JANUARY 2018 TO JUNE 2019. ,/\ �� I/ � r,/\�� I/\ \r,/\ �� 1/\ r,/\. 1/\ ♦ I/\ \ I/ - �` ,/\ \ I/\ \r,/\ \ I/\ \r,/\ � I/\ r,/\ \ 1/\\ r,/\ : ,Ir\\ r,.\ \ I/\ rI.\ I/\ \/I/\ :;2.SELENIUM(Se)ANDSTRONTIUM(Sr)CONCETRATIONSARE LEGEND (Ng/L) IN MICROGRAMS PER LITER T, 71,'\ / 1, I, \ / NOTES _\ WELLS WITH DATASETS CONTAINING FEWER THAN FOUR PZ-12 PIEZOMETER VALID RESULTS, THE MOST RECENT VALID SAMPLE DATA UP TO ,' ABMW- WELL IN ASH PORE WATER ASH PORE WATER 1. WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED JUNE 2019 WAS USED. -i \ / - ♦ `'I� /\ -i \ ♦ `�I ` /\ -i \ / - \ `/I /\ -i / - \ ` GMW-2 WELL IN TRANSITION ZONE LEVEL ELEVATION FOR APRIL 22-23, 2019 FOR EACH WELL. ELEVATIONS WITHIN EACH - NO DATA AVAILABLE / \ ,� 1 /� �; �/` /; \ �/� 1 /� ; ' / /� DEEP FLOW LAYER GROUNDWATER CLUSTER ARE MEASURED IN THE SAME DAY. REFERENCED TO NORTH i%\/ /` �/,I %\/ `;�`/�1 %\/ ;♦� ,I / y� / ♦ / I / \lWELL IN COMPETENT BEDROCK LEVEL ELEVATION AMERICAN VERTICAL DATUM, 1988. ANALYTICAL PARAMETER Se Sr DW-26 WATER SUPPLY WELLS CROSS SECON BEVE�ELEVATCK FLOW IONLAYER GROUNDWATER 2 REPRESENT GENERALI EDORIENTATIONSOF. FRACTURES CONCEPTUALLY DEPICTED ON IFRACTTURESOBSERVED REPORTING UNITS Ng/L Ng/L r . \`� \ / i . �\ \ \`r . \`� �\ \ l BASED ON TELEVIEWER LOGGING AT THE ABMW-7BRLL BOREHOLE. THE 15A NCAC 02L STANDARD 20 NE \ ` / - ♦ \ / . / - _ \' \ / - ♦ \' . / - _ \ \ / - \ \' . / - _ \ / - \ \' _ _ GENERALIZED WATER TABLE 6R,N,-0]8R MEAN SELENIUM (Se) CONCENTRATION (Hg/L) \' / 1 , ,� \/�''; _` / \' / 1 , , / \/� 1 ,; `/ \' / \ '_ \ /•\/ �_' �` \ GENERALIZED GROUNDWATER MEAN STRONTIUM (Sr) CONCENTRATION (Hg/L) DEPICTED FRACTURE ORIENTATIONS ACCOUNT FOR APPARENT DIP WITHIN BACKGROUND THRESTHE HOLD THE PLANE OF THE CROSS SECTION AND VERTICAL,I%\/� �♦ /,I' \/i ��`/-1%\/� �♦ //I! \/i/�`/-I%\/� �♦ //I! \/%/, `i /,1! \/%/ —� LUES FLOW DIRECTION ACTUAL NUMBER OF FRACTURES IS FAR TOO NUMEROUS TO ILLIUUSTRATE N. AT (TRANSITION FLOW ZONE)' 2 760 GENERALIZED SUBSURFACE ASH WELL SCREEN THIS SCALE. IN ADDITION, THE DEPTHS AND LENGTHS OF FRACTURES BACKGROUND THRESHOLD \ PORE WATER FLOW DIRECTION VERSUS DEPTH ARE CONCEPTUAL ONLY. VALUES GENERALIZED VERTICAL - - COMPLIANCE BOUNDARY 3. DISPLAYED WATER SUPPLY WELL LOCATIONS REFLECT INFORMATION 1 a36 (BEDROCK FLOW ZONE) HYDRAULIC GRADIENT WASTE BOUNDARY = AVAILABLE UP TO DECEMBER 31, 2015. — LITHOLOGIC CONTACT 4. ALL BOUNDARIES ARE APPROXIMATE. 1 BACKGROUND THRESHOLD VALUES WERE CALCULATED 0 ASH ASH PORE WATER/ WASTEWATER EAST ASH BASIN B, 0 SAPROLITE ® TRANSITION ZONE 0 BEDROCK WESTASH 0 REGOLITH BASIN 0 SOIL FILL OUNNAWAY ® STRUCTURAL FILL RO NOTSAMPLED NOTE: CROSS SECTION B-B' IS LINEAR IN NATURE AND NOT PREDOMINANT BEDROCK ALL LOCATIONS ALONG THE CROSS SECTION ARE FRACTURE ORIENTATION PROJECTED ONTO THE CROSS SECTION. CROSS SECTION LOCATION 0 SURFACE WATER GRAPHIC SCALE D 100 250 500 44*)DUKE ENERGY HORIZONTAL SCALE: 1= ' VERTICAL SCALE: 1" = AT 5X VERTICAL EXAGGERATION PROGRESS DRAWN BY: AY IGL DATE:08/02/2019 REVISED BY: D. KREFSKI DATE: 12/13/2019 CHECKED BY: K. LAWING DATE: 12/13/2019 APPROVED BY: C. EADY DATE: 12/13/2019 PROJECT MANAGER: C. EADY LAvouwww .synterracorp.com s mTerra USING DATA FROM BACKGROUND GROUNDWATER SAMPLES COLLECTED NOVEMBER 2010 TO DECEMBER 2018 AS SUBMITTED JUNE 2019. NE - NOT ESTABLISHED FIGURE 6-7b GENERAL CROSS-SECTION B-B' EAST ASH BASIN - VARIABLE GROUP MEAN OF SELENIUM AND STRONTIUM CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA Note' Affected *-Sampling 0 events prior to Transition Zone Groundwater a 1/1/2018 Legend a ■ CCR-100D AL GMW-6 • MW-22D • CCR-101D ■ GPMW-1D A MW-34D � A CCR-113D • GPMW-2D MW-35D ■ ■ GMW-IA Ak GPMW-3D ♦ MW- • GMW-2 ■ MW-11D Z -37D Ash Pore Water Legend ABMW-4 ABMW-5 ABMW-6 ABMW-7* Bedrock Groundwater Legend ■ ABMW-4BR Z CCR-105BR 0 GMW-11 A MW-11BR Z MW-24BR • ABMW-6BR * CCR-106BR A GMW-7 V MW-13BR * MW-25BR d A ABMW-7BR ❑ CCR-107BR V GMW-8 ♦ MW-166R MW-276R s V ABMW-7BRL 0 CCR-108BR ♦ GMW-BR Z MW 17BR MW 28BR o a \ ♦ ABMW-7BRLL L�, CCR-109BR Z GMW-9 7Y MW-1BR MW-2BR o ■ CCR-100BR p CCR-1106R ■ GPMW-1BR ❑ MW-16RL MW-34BR 10 CCR-101BR 0 CCR-111BR 0 GPMW-2BR O MW-20BRL AL MW-35BR A CCR-102BR Z CCR-113BR A GPMW-3BR A MW-21BRLR MW-36BR CCR-103BR ■ CW-1 IN MW-108BRL 0 MW-22BR MW-37BR ♦ CCR-104BR ■ GMW-10 • MW-108BRLL 0 MW-23BRR MW-3BR / a \ Ca — Transition Zone — ci Potential J Mixing ik ■ BG-01 ❑ MW-15D Generally Rom • • BG-0113R 0 MW-1813R Unaffected V A A BG-02BR A MW-18D / CCR-112BR-BG p MW-19BRL e 6 80°% ao \ '' " �Q 80% ♦ MW-1013R O MW-26BR / Z MW-14BR X MW-2913R ao°� e 60% � � so 60% so * MW-15BR 5'T MW-30BR 20% /40% ■'me 40% Background °# Co Groundwater 20% * g A 20% Legend 00. % Shallow Zone — cl — Shallow Groundwater Legend 1 GPMW-1S E MW-35S 0 MW-37S (' DUKE ENERGY PROGRESS DRAWN BY: R. BADUM DATE: 12/8/2019 REVISED BY: R. BADUM CHECKED BY: K. LAWING APPROVED BY: K. LAWING PROJECT MANAGER: C.EADY 47 www.synterracorp.com synTerra 9 I Affected I Potential Mixing w m `o \ Generally Unaffected 80% R 0" S_ 0 ZV 60°% `no Z = 40%\ s �- 20 Bedrock Zone — cl --' FIGURE 6-8 ASH PORE WATER AND GROUNDWATER PIPER DIAGRAMS EAST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA Note: *sampling events prior to 1/1/2018 Background Surface Water Legend ■ RSW-6 SW-3* t SW-1* SW-2* Downgradient Surface Water Legend ■ RSW-1 • RSW-2 A RSW-3 RSW-4 RSW-5 Z RSW-9 Seep Legend ■ S-14 • S-21* A S-13 I Affected I Potential Mixing Generally Unaffected 80 °/a �.� 60% /40% 4 o Z 20% 0 0 E—Ca- 0 I' DUKE DRAWN BY: R. BADUM DATE: 12/8/2019 ENERGY REVISED BY: R. BADUM PROGRESS CHECKED BY: K. LAWING APPROVED BY: K. LAWING �1 PROJECT MANAGER: C. EADY synTerra www.synterracorp.com F Cl FIGURE 6-9 SEEP AND SURFACE WATER QUALITY PIPER DIAGRAMS EAST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA w f / i • • / •• _0 00000 � � I UNIT 3 COOLING TOWER POND UNIT 3 HEATED WATER DISCHARGE POND r' EASTASH SEPARATOR DIKE BASIN Af1 ■ LCID LANDFILL INDUSTRIAL , k �-� LANDFILL a RN DISCHARGE CANAL -, t I f I ..i f I , - I '--- f' DUKE ENERGY _f PROGRESS (IN FEET) DRAWN BY: C. WYATT DATE: 06/11/2019 REVISED BY: C. WYATT/K. KING DATE: 12/13/2019 CHECKED BY: K. LAWING DATE: 12/13/2019 APPROVED BY: K. LAWING DATE: 12/13/2019 PROJECT MANAGER: C. EADY LEGEND Izz NOTES: FIGURE 6-10a ISOCONCENTRATION MAP BORON IN TRANSITION FLOW ZONE EAST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA ru m INTAKE CANAL a I op ��N . ` IS WEST ASH BASIN Ll .`T, GYPSUM - STORAGE AREA ME m ` I♦ • EASTERN DISCHARGE CANAL A- I I1 1 — j C 1 - 1 /� ' • .�♦ DUKE ENERGY (IN FEET) PROGRESS DRAWN BY: C. WYATT REVISED BY: C. WYATT/K. KING CHECKED BY: K. CAWING APPROVED BY: K. LAWING sWTerm PROJECT MANAGER: C. EADY www.synterr LEGEND FIGURE 6-10b ISOCONCENTRATION MAP BORON IN BEDROCK FLOW ZONE DATE: 06/11/2019 EAST ASH BASIN DATE: 12/18/2019 DATE: 12/18/2019 CORRECTIVE ACTION PLAN UPDATE DATE: 12/18/2019 ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA 0 7-7 UNIT 3 COOLING , TO UNIT 3 HEATED WATER DISCHARGE POND • EAST ASH y_ BASIN I WESTASH BASIN i • 1 1 1 I s �-- DUKE ENERGY ENERGY PROGRESS LEGEND ' I NOTES: ■ FIGURE 6-11a ISOCONCENTRATION MAP (IN FEET) SULFATE IN TRANSITION FLOW ZONE EAST ASH BASIN DRAWN BY: C. WYATT DATE: 06/11/2019 DBY:C.ATT/K. KING DATE: 12/27/2019 CORRECTIVE ACTION PLAN UPDATE CHECK CHECKED BY: K.. CAWING DATE: 12/27/2019 APPROVED BY: K. LAWING DATE: 12/27/2019 ROXBORO STEAM ELECTRIC PLANT ••� LEGEND • r � � I EASTERN DISCHARGE CANAL I i • 1 ' , I1 � � NOTES: r ..—.. .I -4 ♦ '� ` , i • t�ENERGY DUKE FIGURE 6-11b ISOCONCENTRATION MAP (IN FEET) 41 PROGRESS SULFATE IN BEDROCK FLOW ZONE 4 DRAWN BY: C.WYATi DATE:06/11/2019 EAST ASH BASIN REV ISEDBY: C.ATT/K. KING DATE: 12/18/2019 CORRECTIVE ACTION PLAN UPDATE 1 CHECKED BY: K.. CAWING DATE: 12/18/2019 APPROVED BY: K.LAWING DATE:12/18/2019 ROXBORO STEAM ELECTRIC PLANT synTerra PROJECT MANAGER: ADY www.synterracorp.com me rracorp.com SEMORA, NORTH CAROLINA .� / mp ,ems-- 4�. � - - / � • a •' ll "Pro / f \ n LEGEND • EASTERN DISCHARGE CANAL ♦� s . V I I NOTES: r----- 00 �4 ; V J ♦ , ♦ I - �\ � 0 ram♦ / � •• �a�rl ♦.�� ��41. ('DUKE ENERGY PROGRESS (IN FEET) DRAWN BY: C. WYATT DATE: 06/11/2019 REVISED BY: C. WYATT/K. KING DATE: 12/18/2019 CHECKED BY: K. LAWING DATE: 12/18/2019 APPROVED BY: K. LAWING DATE: 12/18/2019 PROJECT MANAGER: C. EADY FIGURE 6-12a ISOCONCENTRATION MAP TDS IN TRANSITION FLOW ZONE EAST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA LEGEND f f • 0000 f GYPSUM % f- ` EASTERN DISCHARGE CANAL •,El ' i f I � i v . I ♦� NOTES: DUKE FIGURE 6-12b ENERGY ISOCONCENTRATION MAP (IN FEET) TDS IN BEDROCK FLOW ZONE PROGRESS DRAWN BY: C. WYATT DATE: 06/11/2019 EAST ASH BASIN REVISED KING DATE: 12/18/2019 CORRECTIVE ACTION PLAN UPDATE CHECKED BY: K.. CAWING DATE: 12/18/2019 APPROVED BY: K. LAWING DATE: 12/18/2019 ROXBORO STEAM ELECTRIC PLANT synTerra PROJECT MANAGER: C. EADY SEMORA, NORTH CAROLINA www.synterracorp.com ' •• �� LEGEND f f 000, IEASTERN DISCHARGE CANAL (' DUKE V ENERGY PROGRESS (IN FEET) DRAWN BY: C. WYATT DATE: 06/11/2019 REVISED BY: C. WYATT/K. KING DATE: 12/18/2019 CHECKED BY: K. LAWING DATE: 12/18/2019 APPROVED BY: K. LAWING DATE: 12/18/2019 PROJECT MANAGER: C. EADY NOTES: FIGURE 6-13a ISOCONCENTRATION MAP SELENIUM IN TRANSITION FLOW ZONE EAST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA ••� LEGEND 00 ♦ I L \� ♦ I " I WESTASH BASIN - 00 jj, ,' , , • • . p -41 - o �-- (' DUKE ' ENERGY " (IN FEET) PROGRESS DRAWN BY: C. WYATT DATE: 06/11/2019 REVISED BY: C. WYATT/K. KING DATE: 12/18/2019 CHECKED BY: K. LAWING DATE: 12/18/2019 ' APPROVED BY: K. LAWING DATE: 12/18/2019 •, synTerid PROJECT MANAGER: C. EADY www.synterracorp.com 110 NOTES: FIGURE 6-13b ISOCONCENTRATION MAP SELENIUM IN BEDROCK FLOW ZONE EAST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA I e ♦ % 4. EASTERN DISCHARGE CANAL] Ll J ♦ f , ► ' ♦ \ .o♦, _ra � , I f � s I • f v `♦ I 1 I . . I 10 t DUKE ENERGY PROGRESS (IN FEET) DRAWN BY: C. WYATT DATE: 06/11/2019 REVISED BY: C. WYATT/K. KING DATE: 12/16/2019 CHECKED BY: K. LAWING DATE: 12/16/2019 APPROVED BY: K. LAWING DATE: 12/16/2019 PROJECT MANAGER: C. EADY LEGEND • NOTES: FIGURE 6-14a ISOCONCENTRATION MAP STRONTIUM IN TRANSITION FLOW ZONE EAST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA ' / l 000*1 �•r• �nnevu�uvv _ AREA 1 / INTAKE CANAL UNIT 3 COOLING TOWER POND �. • �� UNIT 3 HEATED �• WATER DISCHARGE POND -� EASTASH BASIN :ID LANDFILL a WEST ASH BASIN0-.., ♦ J ♦ 1 \ ♦ 1 ♦ � EASTERN DISCHARGE CANAL LEGEND • NOTES: • rs_ DUKE FIGURE 6-14b ENERGY ISOCONCENTRATION MAP (IN FEET) STRONTIUM IN BEDROCK FLOW ZONE PROGRESS DRAWN BY: C. WYATT DATE:06/11/2019 EAST ASH BASIN �jp REVISED BY: C. WYATT/K. KING DATE: 12/18/2019 CORRECTIVE ACTION PLAN UPDATE CHECKED BY: K. LAWING DATE: 12/18/2019 C APPROVED BY: K.LAWING DATE: 12/18/2019 ROXBORO STEAM ELECTRIC PLANT synTerra PROJECT MANAGER: C. EADY SEMORA, NORTH CAROLINA f7 www.svnterracorD.COM �� .. ♦ Sample ID (Depth) � -�..�..�..�"-♦♦ MW-03BR(0-2) SULFATE MW-03BR (21-23) r Sample ID (Depth) MW-34D (2-4)♦� - CHROMIUM MW-34D (8-9) UNIT 3 •• TOWERPON IRON Sample ID(Depth) FA PSB-49 (1.5-2) ,• UNIT 3 HEATED WATER ♦�` J I I I t � 1 ' 1 Sample ID(Depth) MW-11 BR (1.5-2) EASTASH BASIN ■ I Sample ID(Depth) MW-02BR (2-2.5) CHROMIUM s fJ #Y"`f SamplelD(Depth) PSB-05 (1.5-2) i 0 Sample ID(Depth) PSB-48 (1.5-2) Sample ID(Depth) BGSB-14 (2-3) BGSB-14 (4-5) BGSB-14 (7-8) BGSB-14 (9-10) Sample ID (Depth) MW-01 BRL (0-2) M W -01 B RL (4-5) ' Sample ID(Depth) PSB-47 (1.5-2) IRON � a i IF, - Sample ID(Depth) PSB-46 (1.5-2) Sample ID(Depth) PSB-39 (1.5-2) Sample ID(Depth) PSB-40 (1.5-2) INDUSTRIAL LANDFILL Sample ID (Depth) Sample ID (Depth) GMW-OSR (6-7) pth) PSB-04 (1.5-2) Sample ID (De PSB-01 (1.5-2) CHROMIUM Sample ID MOLYBDENUM (Depth) PSB-03 (1.5-2) Sample ID (Depth) GMW-08R (10.5-11.5) � PSB-02 (1.5-2) Sample ID (Depth) MW-16 (0-2) Sample ID (Depth) MW-13BR (0-2) MW-13BR (22-24) Sample ID(Depth) MW-14BR (1-1.25) MW-14BR (31-31.5) MW-14BR (37.5-38) CHROMIUM 4 A I 1 ■ 1 1 ■ I y, Sample ID(Depth) PSB-45 (1.5-2) IRON MANGANESE Sample ID(Depth) PSB-44 (1.5-2) MANGANESE Sample ID(Depth) PSB-43 (1.5-2) Sample ID(Depth) PSB-42 (1.5-2) ♦ Sample ID(Depth) PSB-41 (1.5-2) Sample ID(Depth) PSB-38 (1.5-2) IRON Sample ID(Depth) PSB-37 (1.5-2) IRON %'DUKE ENERGY PROGRESS 14' synTerra Sample ID(Depth) MW-17 (29-31) r•♦ l . ■ I r'♦ ' I ■ I Sample ID (Depth) BGSB-112 (2-3) BGSB-112 (4-5) IBGSB-112 (7-8) BGSB-112 (9-10) BGSB-112 (14-15) BGSB-112 (19-20) 1 FrFAIn O BACKGROUND LOCATION WITH NO EXCEEDANCES O LOCATION WITH NO EXCEEDANCES BACKGROUND LOCATION WITH ONE OR MORE EXCEEDANCES LOCATION WITH ONE OR MORE EXCEEDANCES ASH BASIN WASTE BOUNDARY - - - - ASH BASIN COMPLIANCE BOUNDARY SOLID WASTE LANDFILL BOUNDARY SOLID WASTE LANDFILL COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS PROPERTY LINE EFFLUENT DISCHARGE CANAL 0 STREAMS (AMEC NRTR) ® WETLANDS (AMEC NRTR) NOTES: 1. DISCRETE SOIL SAMPLES EXCEED COMPARATIVE CRITERIA FOR CONSTITUENTS LISTED UNDER THE SAMPLE ID. REFER TO TABLE 6.3 FOR ASUMMARY OF UNSATURATED SOIL ANALYTICAL RESULTS. 2. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT PERSON COUNTY GIS. 3. ALL BOUNDARIES ARE APPROXIMATE 4. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED APPROXIMATE. 5. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. 6. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). GRAPHIC SCALE FIGURE 6-15 330 0 330 660 UNSATURATED SOIL SAMPLE (IN FEET) LOCATIONS AND EXCEEDANCES EAST ASH BASIN DRAWN BY: C. WYATT DATE:05/03/2019 REVISED BY: C. WYATT/K. KING DATE:12/18/2019 CORRECTIVE ACTION PLAN UPDATE CHECKED BY: K. LAWING DATE: 12/18/2019 APPROVED BY: K. LAWING DATE:12/18/2019 ROXBORO STEAM ELECTRIC PLANT PROJECT MANAGER: C. EADY SEMORA, NORTH CAROLINA www.synterracorp.com Corrective Action Plan Update December 2019 Roxboro Steam Electric Plant SynTerra Figure 6-16 Pourbaix Diagram for Iron -Water System Included in Section 6 text Corrective Action Plan Update December 2019 Roxboro Steam Electric Plant SynTerra Figure 6-17a Remedial Alternative 3 - Well System Layout - Groundwater Remediation by Extraction combined with Clean Water Infiltration and Treatment Provided in separate electronic figure file as a large sheet size BASED ON INFORMATION FROM DUKE ENERGY PROGRESS VAULT LID WITH VEHICLES USING THE PLANT ROADS WHERE EXTRACTION AND CHANNEL FRAME INFILTRATION WELLS WILL BE LOCATED ARE LIMITED TO LESS THAN 6,000 LBS AND SPEEDS LESS THAN 25 MPH. WELL VAULTS IN THE ROAD MUST BE RATED AS H2O ENCLOSURES. FLOW SHUTOFF PRESSURE CONTROL VALVE SOLENOID FINISHED GRADE MAGNETIC FLOW METER VALVE \ (NORMALLY PRESSURE GAUGES CLOSED) AIR VENT BALL VALVE' ♦FLOWCONCRETE ULT �TER LEVEL SENSOR SEAL I —SS FLANGE / D DRAIN' CAP P/X�C/A/I/NG CK BEDDING w/COMPRESSIONS C E N/ R ALIZERWELL HEAD PESSURE a MONITORING TRANSDUCER d�F GROUNDWATER I a WELL PIPE GUIDES I ° LEVEL a a CONTROL SENSOR CABLE / ® CEMENT WITH 5 % BENTON F1Z" tSVKtKVLt 11; WELL CASING 6" WELL SCREEN THREADED JOINT r MAGNETIC FLOW METER SIGNAL FROM: LOW LEVEL SHUT-OFF SENSOR VAULT WATER LEVEL SENSOR I INSTRUMENTATION CONDUIT SIGNAL FROM: FLOW SHUTOFF SOLENOID MAGNETIC FLOW METER PRESSURE CONTROL VALVE WELL HEAD PRESSURE TRANSDUCEf INSTRUMENTATION CONDUIT HEADER ELE%�/���� ) OPENING (TYP.)�/ iECHARGE PIPE, 1" HDPE /RECHARGE HEADER PIPE NOT FOR CONSTRUCTION/ FIGURE 6-17b DUKE 4*5 NOT TO SCALE REMEDIAL ALTERNATIVE 3 CONCEPTUAL VERTICAL CLEAN WATER ENERGY INFILTRATION WELL SCHEMATIC PROGRESS DRAWN BY:J.CHASTAIN DATE:12/26/2019 GROUNDWATER REMEDIATION BY EXTRACTION REVISEDVISEDBYDATE: - CHECKED BY: J. CLEMMER DATE:12/26/2019 COMBINED WITH CLEAN WATER INFILTRATION APPROV41PPROJECEDBY:J.G DATE:12/26/2019 AND TREATMENT R:C.EAR PROJECT MANAGER: C. EADY CORRECTIVE ACTION PLAN UPDATE www.synterracorp.com synTerm " " ROXBORO STEAM ELECTRIC PLANT � SEMORA, NORTH CAROLINA BASED ON INFORMATION FROM DUKE ENERGY PROGRESS VAULT LID WITH VEHICLES USING THE PLANT ROADS WHERE EXTRACTION AND INFILTRATION WELLS WILL BE LOCATED ARE LIMITED TO LESS CHANNEL FRAME THAN 6,000 LBS AND SPEEDS LESS THAN 25 MPH. WELL VAULTS IN THE ROAD MUST BE RATED AS H2O ENCLOSURES. MAGNETIC FLOW METER FINISHED GRADE\ PRESSURE GAUGE\ MANUAL FLOW SAMPLE VALVE,, CONTROL VALVE I SUBMERSIBLE PUMP V V FLOW MAGNETIC FLOW METER y WELL CAP \� --- ---- — d CONCRETE VAULT D --=---- ----- — SS FLANGE LT WATER LEVELS NSOR P CASING CENTRAL (IMATE LEVEL CONTROL SENSOF TABLE��HIGH LEVEL CONTROL / THREADED JOINT VEX OW -LOW SHUT-OFF SENSOR ELL PIPE GUIDES BOREHOLE C SI L CASNG lFfl I(]INTS IATER LEVEL PRESSURE TRANSDUCER ELL PUMP POWER CABLE LEVEL CONTROL SENSOR LEVEL CONTROL SENSOR SIGNAL FROM: MAGNETIC FLOW METER —'111PRESSURE TRANDUCER INSTRUMENTATION CONDUIT HEADER LE , /,CONDUIT AL SEALED OPENING (TYP.) j//� DISCHARGE PIPE, T' HOPE ,HEADER PIPE I= NOT FOR CONSTRUCTION HIJUKL b-1 !C DUKE 4*5 NOT TO SCALE REMEDIAL ALTERNATIVE 3 CONCEPTUAL VERTICAL EXTRACTION WELL ENERGY SCHEMATIC PROGRESS DRAWN BY: J. CHASTAIN DATE:12/26/2019 GROUNDWATER REMEDIATION BY EXTRACTION REVISED BY: DATE: - CHECKED BY: J. CLEMMER DATE:12/26/2019 COMBINED WITH CLEAN WATER INFILTRATION APPROVPROJECEDBY:J.G DATE:12/26/2019 AND TREATMENT R:C.EAR PROJECT MANAGER: C. EADY CORRECTIVE ACTION PLAN UPDATE synTerm www.synterracorp.com ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA 36" MIN AGGREGATE OR TOPSOIL TO /MATCH EXISTING SURFACE FABRIC 6" MAGNETIC LOCATION TAPE 12" DEEP _CLASS II BACKFILL (EXISTING FILL MAYBE USED IF ACCEPTABLE) INTAIN VERTICAL SLOPED FACE MINIMUM 4" SEPARATION BETWEEN PIPES CLASS I BEDDING 6" MIN ELECTRICAL CONDUIT ELECTRICAL CONDUIT O O"or, HDPE CLEAN WATER OR GROUNDWATER CONVEYANCE 6" +MIN 1 4" MIN 24" MIN 4" MIN NOTES: 1. 4" MINIMAL HORIZONTAL SEPARATION BETWEEN ALL PIPE AND CONDUIT. 2. 6" VERTICAL SEPARATION WHEN CROSSING OVER ALL PIPE AND CONDUIT. 3. 36" MINIMUM COVER FOR ALL PIPE AND CONDUIT. 4. PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT MORE THAN 8" IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HEAVY COMPACTION EQUIPMENT AND NOT MORE THAN 4 INCHES LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND OPERATED TAMPERS. 5. PLACE BACKFILL AND FILL MATERIALS EVENLY ON ALL SIDES OF STRUCTURES TO REQUIRED ELEVATIONS AND UNIFORMLY ALONG THE FULL LENGTH OF EACH STRUCTURE. 6. COMPACT SOIL MATERIALS TO NOT LESS THAN 95 PERCENT OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 698. 4*DUKE ENERGY NOT TO SCALE PROGRESS DRAWN BY: J. CHASTAIN DATE:12/26/2019 REVISED BY: DATE: - CHECKED BY: J. CLEMMER DATE: 12/26/2019 APPROVED BY: J. CLEMMER DATE: 12/26/2019 PROJECT MANAGER: C. EADY synTero www.synterracorp.com NOT FOR CONSTRUCTION FIGURE 6-17d REMEDIAL ALTERNATIVE 3 CONCEPTUAL TRENCH DETAIL GROUNDWATER REMEDIATION BY EXTRACTION COMBINED WITH CLEAN WATER INFILTRATION AND TREATMENT CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA MODEL TIMEFRAME: MODEL TIMEFRAME: MODEL TIMEFRAME: SYSTEM STARTUP AND OPERATION 000-0* f • APPROXIMATELY 5 YEARS AFTER . SYSTEM STARTUP AND OPERATION • j APPROXIMATELY 9 YEARS AFTER �. SYSTEM STARTUP AND OPERATION / I 10 'o G: • .� 000 s* 4. "s F'. '_ `4 �. `. %,% cl In - -•,.- ._ � ® _:�?-- . .' ®�-%—ft . ' / ♦ 40, , � ■ I ♦ , % ♦, , ♦% ' Ole 4. 7 ' ♦ I I ti � I I I r I LEGEND ,A' ,A' •,A a NOTES: DUKE GRAPHICSCALE soo o soo 1,000 FIGURE 6-17e REMEDIAL ALTERNATIVE 3 ENERGY w FEET: GROUNDWATER REMEDIATION BY EXTRACTION COMBINED WITH PROGRESS CLEAN WATER INFILTRATION DRAWN BY: C. WYATT DATE:05/15/2019 REVISED BY: C. DAVIS DATE:12/26/2019 SIMULATED BORON CONCENTRATIONS IN ALL NON -ASH FLOW ZONES — - — CHECKED BY: K. LAWING DATE:12/26/2019 APPROVED BY: K. LAWING DATE: 12/26/2019 CORRECTIVE ACTION PLAN UPDATE PROJECT MANAGER: C. EADY ROXBORO STEAM ELECTRIC PLANT synTerra SEMORA, NORTH CAROLINA www.s nterracor .com GROUNDWATER WELL GROUNDWATER Not to Scale �I r EQ TANK m EQ TANK �a FILTRATION I 0,11 I I FILTRATION m m m m ION EXCHANGE ox ox ION c � QCD<iN m m EXCHANGE�V J I I I I I -- V ————————L————— I--- I I I I RECHARGE SUPPLY TANK m DRAIN AND SOLIDS REMOVAL PRESSURE GAUGE AND SHUTOFF VALVE AT EACH WELL HE RECHARGE WELLS NOTE: PUMP AS NEEDED LEGEND ® Rotameter r� DUKE DRAWN BY: L. LOTRAKUL DATE:10/18/2019 FIGURE 6-18a HH - High high H - High low L — Low TYP - Typical ECXI Flow totalizer O I Pressure gauge sP Sampling port Check valve >V< Three-way valve Ball valve, normally closed CCQ >< 1 H Ball valve, normally open Diaphragm valve, normally open Diaphragm valve, normally closed EN ERGY OGRESS REVISED BY: B. GREEN CHECKED BY: T. VOLSKAY APPROVED BY: C. EADY PROJECT MANAGER: C. EADY CONCEPTUAL PROCESS FLOW DIAGRAM CLEAN WATER INFILTRATION SYSTEM CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA 1, SynTerra I www.synterracorp.com EXTRACTION WELLS I is EXISTING LINED RETENTION BASIN Not to Scale LEGEND ® Rotameter DUKE 4n DRAWN BY: B. GREEN DATE: 10/17/2019 FIGURE 6-18b HH - High high H - High low L — Low TYP -Typical ECD Flow totalizer OCD I Pressure gauge sP Sampling port Check valve Three-way valve Ball valve, normally closed CCQ >< ►/ Ball valve, normally open Diaphragm valve, normally open Diaphragm valve, normally closed E N ERGY PROGRESS REVISED BY: T. VOLSKY CHECKED BY: C. EADY APPROVED BY: K. LAWING PROJECT MANAGER: C. EADY CONCEPTUAL PROCESS FLOW DIAGRAM GROUNDWATER EXTRACTON SYSTEM CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA tip SynTerm I www.synterracorp.com Submit CAP to NCDEQ (1 day) NCDEQ Review and Comment Period (90 days) Duke Energy Responds to CAP Comments (60 days) CAP Approved by NCDEQ (1 day) Implement Effectiveness Monitoring Plan (30 days) Submit Pilot Test Work Plan and Associated Permit Applications to NCDEQ (30 days) Implement Quarterly Progress Reporting to NCDEQ (30 days) Permit Applications Approved by NCDEQ (60 days) Conduct Pilot Test (182 days) Submit Detailed Design and Specifications Report (182 days) Review Design Report with NCDEQ (1 day) Bid documents, Procurement, Permitting (182 days) Installation of Full -Scale Groundwater Remediation System (243 days) System Start -Up and Optimization (90 days) Submit As -Built Construction and Start -Up Information Report (90 days) Notes: * - Either submittal of the Effectiveness Monitoring Plan or the pilot test work plan and permit applications (as applicable) will fulfill section G.S.130A-309.209.(b)(3). ** - Actual time may vary due to a variety of factors including agency review and approvals, weather delays, equipment availability, etc. Ongoing System Operation Days 0 150 300 450 600 750 900 1050 1200 1350 I�� MWER, \\ ��� \\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\ ME \\\\\\\\\ \\\\\\\\\ EME \\\\ \\\\\\\\\ \\\\\\\\\ JUMBO \\\\\\\\\VNEER \\\\\\ \\\\\\\\\ \�� \\\\\\\\ \\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\ IN 1 \\\\\\\\ \\ \ \ \\J \0\' \ \ I El \\\\\\\\ \\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ IN \\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\ \\\\\\\\\ \\\\\\\\\ OMM \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ M \\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\ \\\\\\\\\ \\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\ \\ \\\\\\\\\ \\\\\\\\\ '\X "mmmoll \\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ \\\\\\\\\ DUKE ENERGY DRAWN BY: R.ISHAM DATE:12/5/2019 REVISED CHECKED BY: S.WOOD PROGRESS APPROVED BY: K. LAWING PROJECT MANAGER: C. EADY 14' synTerra www.synterracorp.com FIGURE 6-19 CAP IMPLEMENTATION GANTT CHART CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTIC PLANT SEMORA, NORTH CAROLINA je WESTASH BASIN Z73 000 .•/ �.• s � ••00000 ...0000 , / ' • � MW-286R WNW. �' $ GPMW-3D/BR *' , 4' i to MW-3BR GPMW-2D/BR ,+ ` % � MW-296R ♦ ` PE PMW-1S/D/BR ®� 1 %♦ ♦ Q�MW-27BR MW-36D/BR MW-=4D/BR � � MW-22D/BR ♦ MW-37S/D/BR . MW-35S/D/BR MW-1 BR/BRL CCR-103B; `• GM�W-10 CCR-105BR-106B CW-1 GMW 2 --%% ®GM� GMW-11 CCR-107BR CCR-104BR r� OR EASTASH BASIN i EASTERN DISCHARGE CANA )IIIBJBRLL 1 1 I ELECTRICAL I�I ly,♦ •' �' I I � + 41 • • EXXTRUlwo 4 V I ♦ 1 'A ♦, +� + ' DUKE `* GRAPHIC,♦'• 325 GSCALE 650 ENERGY (IN FEET) r ♦, ♦�,�-a PROGRESS DRAWN BY: C. WYATT DATE: 10/30/2019 _•'.� ♦ ' REVISED BY: J. KIRTZ DATE: 12/23/2019 • MW-19BRL CHECKED BY: K. LAWING DATE: 12/23/2019 APPROVED BY: K. LAWING DATE: 12/23/2019 , PROJECT MANAGER: C. EADY s)mTerra + www.synteracori).com LEGEND lie PROPOSED PERFORMANCE MONITORING WELL +�- EFFECTIVENESS MONITORING FLOW PATH —ASH BASIN WASTE BOUNDARY -ASH BASIN COMPLIANCE BOUNDARY SOLID WASTE LANDFILL BOUNDARY • SOLID WASTE LANDFILL COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS PROPERTY LINE EFFLUENT DISCHARGE CANAL --*- STREAMS (AMEC NRTR) ® WETLANDS (AMEC NRTR) NOTES: 1. WELLS INDICATED WITH RED FONT WILL HAVE GEOCHEMICAL SONDES FORTELEMETRY MONITORING. 2. CCR-112BR-BO, MW-14BR, MW-19BRL, MW-2913RAND MW30BR ARE APPROVED BACKGROUND GROUNDWATER MONITORING LOCATIONS. 3. ALL BOUNDARIES ARE APPROXIMATE. 4. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES ANDAREA MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED APPROXIMATE. 5. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE USARMY CORPS OF ENGINEERSAT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDSAND STREAMS BOUNDARIES WERE OBTAINED FROMAMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. 6.AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINASTATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). FIGURE 6-20 EFFECTIVENESS MONITORING PLAN SYSTEMS AND FLOW PATHS EAST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA Interim Monitoring Plan Corrective Action (IMP) sampling Plan Approval Effectiveness Monitoring Plan (EMP) monitor downgradient, sidegradient, and background groundwater in accordance with G.S. 130A- 309.214(a)(4)k for compliance with NCAC 02L .0202 Groundwater Quality applicable Standards Based on annual evaluation, Yes is the remedial system performance effective? -0re Adjust remedial system components; continue with EMP or Implement contingency plan in accordance with CAP Update Section 6.8.9; continue with EMP Notes: NCAC - North Carolina Administrative Code 02L - NCAC Title 15A, Subchapter 02L. Groundwater Classification and Standards No Continue EMP sampling and Continue PCMP sampling Annual Review and and Annual Review and Reporting I I Reporting / \ Is the ash basin Yes certified closed? Post -Closure Monitoring Plan (PCMP) Post -closure monitoring to begin following closure certification. Monitoring parameters and locations to be determined at that time and in accordance with G.S. 130A- 309.214(a)(4)k.2. No Are the groundwater Based on monitoring results Yes annual evaluation, below applicable is the plume stable standards at the at the compliance compliance boundary boundary? for three years? No Yes Request completion of active remediation or Request completion of PCMP post -closure monitoring in accordance with G.S. 130A-309.214(a)(3)b DUKE ENERGY. PROGRE55 DRAWN BY: T. PLATING REVISED BY: J. WYLIE/K SHECK CHECKED BY: K. LAWING DATE: 10/112019 DATE: 12/16/2019 DATE: 12/16/2019 APPROVED BY: C. EADY MANAGER: C. EADY DATE: 12/16/2019 tPROJECT ip www.synterracorp.com synTem FIGURE 6-21a EFFECTIVENESS MONITORING PLAN WORK FLOW AND OPTIMIZATION FLOW DIAGRAM CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA Submit Request for Termination Request shall include: • Discuss duration and cost for continuation • Evaluate success of CAP • Evaluate alternate technologies • Discuss health an safety impacts if constituent levels remain Demonstrate • Continuation of CAP will not result in significant reduction of constituents • Constituents have not and will not migrate onto adjacent properties • GW discharge to surface water will not violate 02B standards Public notice of the request per Rule 0.0114 (b) Proposed termination is consistent with all other environmental laws Has the site been identifie for resource development? Implement GW nation monitoring planJat orized Fafter location of no le health than one year' predicted time safety analysistravel upgradienany existing oforeseeable rece Is thereFr , sufficient evidence that concentrations are less than 02L standards from multiple sampling, events? No further action C— (NORTH) J Q a Z Q U w C9 d' Q 2 U ABANDONED SLUICE D PIPE TRENCH w ZF o a PLANT o a o¢ �f \ W W ELECTRIC �? a ' ?� SUBSTATION :E a OQ w ''\ kr� r e o // 2 REGOLITH 1 I / /— 400 452. 411. - - 95' �. ♦ / / / . / 300 r,. B_ EDROCK\/'/`' 1' \/:/\ i\'/I;C�i\'/I;C�i`I•/„�i\'/I;C�i\'/I;��i\'/I;C�i`'/1;��^' \r1/\ I I I I l LEGEND DUKE ENERGY PROGRESS PROPERTY LINE APPROXIMATE WEST ASH BASIN COMPLIANCE BOUNDARY APPROXIMATE WEST ASH BASIN WASTE BOUNDARY 0 K 0 J W 00 > ENGINEERED a BASE LINER 0 J Q J J Z Q m m an o o W WEST FGD SETTLING POND BIO-REACTOR BUILDING 000 N N N a N w a N w (9 Z W W Q C' (SOUTH) J O O 2 U 0 jZ Lu 05 OW ov m m m N �W ui C9 C7 - 0� m m m m �� tir ,'"�P o REGOLITH SH Q Q U (� SOIL FILL I1 `, , _ ASH = 77 ASH PORE -_ � - -- / WATER VM10:1 / / I . \ I . \ I / BEDROCK,\/I'\/1r''\ �i\'; \`457.35' �- / / - J3 �:♦/ \/ CCR-208S WELL IN SHALLOW MATERIAL SHALLOW ZONE FLOW LAYER MW 6D WELL IN TRANSITION ZONE GROUNDWATER LEVEL ELEVATION MW-6BR WELL IN COMPETENT BEDROCK V TRANSITION ZONE FLOW LAYER GROUNDWATER LEVEL ELEVATION :I'd'k'fvkm I ABMW-3 WELL IN ASH PORE WATER R010 WATER SUPPLY WELL D W-46 _ —GENERALIZED WATER TABLE GENERALIZED 000001- GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION GENERALIZED VERTICAL HYDRAULIC GRADIENT — — LITHOLOGIC CONTACT 0 ASH ASH PORE WATER / WASTEWATER BEDROCK 0 REGOLITH SOIL FILL NOTE: PREDOMINANT BEDROCK CROSS SECTION C-C' IS LINEAR IN NATURE AND NOT — ALL LOCATIONS ALONG THE CROSS SECTION ARE FRACTURE ORIENTATION PROJECTED ONTO THE CROSS SECTION. CROSS SECTION LOCATION V BEDROCK FLOW LAYER GROUNDWATER LEVEL ELEVATION ASH PORE WATER LEVEL ELEVATION WATER LEVEL ELEVATION (NAVD 88) (LABEL COLORING BY FLOW ZONE) WELL SCREEN — — — COMPLIANCE BOUNDARY WASTE BOUNDARY �� , _ i'7 - \/. \ I 1 / \ I , \/� ;\, BEDROCK'/'� \lam;\/I�\/i/,/,, XA NOTES 1. WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR APRIL 22-23, 2019 FOR EACH WELL. ELEVATIONS WITHIN EACH CLUSTER ARE MEASURED IN THE SAME DAY. REFERENCED TO NORTH AMERICAN VERTICAL DATUM, 1988. 2. FRACTURES CONCEPTUALLY DEPICTED ON THIS CROSS SECTION REPRESENT GENERALIZED ORIENTATIONS OF FRACTURES OBSERVED BASED ON TELEVIEWER LOGGING AT THE MW-208 BOREHOLE. THE DEPICTED FRACTURE ORIENTATIONS ACCOUNT FOR APPARENT DIP WITHIN THE PLANE OF THE CROSS SECTION AND VERTICAL EXAGGERATION. THE ACTUAL NUMBER OF FRACTURES IS FAR TOO NUMEROUS TO ILLUSTRATE AT THIS SCALE. IN ADDITION, THE DEPTHS AND LENGTHS OF FRACTURES VERSUS DEPTH ARE CONCEPTUAL ONLY. 3. DISPLAYED WATER SUPPLY WELL LOCATIONS REFLECT INFORMATION AVAILABLE UP TO DECEMBER 31, 2015. 4. ALL BOUNDARIES ARE APPROXIMATE. 5. CROSS SECTION REPRESENTATIVE OF PRE -DECANTING CONDITIONS. GRAPHIC SCALE 0 100 250 500 `� DUKE ENERGY HORIZONTAL SCALE: 1" = ' VERTICAL SCALE: 1" = 100 5X VERTICAL EXAGGERATION PROGRESS DRAWN BY:A.FEIGL DATE:08/02/2019 REVISED BY: D. KREFSKI DATE: 12/13/2019 CHECKED BY: K. LAWING DATE: 12/13/2019 APPROVED BY: C. EADY DATE: 12/13/2019 PROJECT MANAGER: C. EADY LAYOUT: SECTION C-C' (6-22) www.synterracorp.com synTeiid FIGURE 6-22 GENERAL CROSS-SECTION C-C' WEST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA D D' (NORTH) DUKE ENERGY PROGRESS PROPERTY LINE (SOUTH) APPROXIMATE WEST ASH BASIN COMPLIANCE BOUNDARY soo APPROXIMATE WEST ASH BASIN WASTE BOUNDARY soo 550 "0 WEST ASH BASIN o o pip — MAIN DAM o r N m j OUTLET STRUCTURE 500 w ASH BASIN FILTER DIKE 500 0 Q co co Q PRE -DECANTING WATER WAB EXTENSION IMPOUNDMENT _ ----- -- ASH =________ - _ ______ -- ELEVATION-462 — r - - - - - - - - _ — — — — — — — —� `�`"` — — - -- -- - — — — — WATER ELEVATION=446' ASH — 450---------� ��..---------------------- ���� ----------- ------------------------------------------- HEATED WATER----------_-_-_-_-_-_-_-_-------------------------------------------------- _-_-_-------------------- — — — — _ _ -- Z _ _ _ _ _ _ _ _ -- DISCHARGE POND-450 -------- — _= ASH PORE -------------------- ---------------------- —ASH PORE ------------------------------_ - ___ _____ WATER WATER ELEVATI N= ---- ----------------------------_------------------_---------- 0 412' - - - - - - - - - - - WATER ----------------- - — ------------------------ - - - - - ----------------- -�� ------ .. �e-rT. —L -- ------ - - - - - - - ------ - - - - - - - - - - - - - - - -++�-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_----------------- - - - - - -- - ��• . / . . / 400 ---- ---- ----------__ --y -- 'r'�-CTZ'/1'_ _ ----------------------- - _ _ _ / r /-------------------------------� �y ��Ti�i\liil\`�`\\l��.-.-�\';.\.-�\';.400 _ . r ` \ r \ / 1 ` r EGOLITH/PWR I . / . , I \ / 463.39' ,,mil \ �/� i \/\'/1"\/\'/I"\/\'/1 '\/\'/1;�\/\'/1" \/\'/1"\/\ /1 / \/\ /1 \/\ /1 /\ \/\. ,�\• /1 \/\ /I, ,\/\ /1 \/\ /1,\/\'/1" \/\'/1 461.48' ' '- ' '- ' '- ' ;- ' '- / ' -1'i-\\ � \\ EGOLITH/PWR-\-\'/- \ \'/- \-\'/- \ \'/- \-\'/- \ \'/- \-\'/- \ \'/- \-\'/- \ \'/- / r / /.� I \ i� I,\•�/ / \: �/ 462. � \/I \`'I/\/I ''. I,\\rl/\/I \`''; rl/\� .�i\`';. I 350\'rl"/\'/I"\/\'/1"/\'/1"\/'/1"'/I"/\'/1"\/\'/I"/\'\'/1 350 '��%./I-`l' \/I�\/i \ I_\li \/I�\li \ 1_\li ♦/I�\lid I-\���./I�`��%./I-`/' `/�� I-\�./I�`/;�I_\/i \/I�\/i \ 1_\li \/I�\li \ I_\/i ♦/I�\l'� I_\�`�./1�`��%./I-`/' \'I'`/�� IN IN \/I 1N�\/\'/1"\/\'/1��\/\'/1" 1'/�-,-, 300`'/\/I/\:�I�\./I/\�I�\./1/\.rl.\./I/\:rl.\./I/\:rl.\.rl/\:/I.\\/I/\:�I�\./1/\rl.\./I/\:rl.\./I/\:rl.\./I/\:rl.\./I/\:/I.\./I/\:/.BEDROCK/1/\:/:rl.�`:�./I/\:/:rtl300 �i\'/�`C�i�l./`��i\'il`C�i�l./„�i\'/�`��i�l./„�i\'/�`;�i�l./`��i\'/�`;�iJ•/`%�i\'/�`C�i�l./���i\'/�`C�i�l./`��i\'i�`��i�l./„�i\'/�`;�iJ./`��i\'/�`,�iJ•/`��i\'/�`��iJ./`��i\'/�`C�i�l./���i\'/1`C�i�l./„�i\'/�`��i\I./"�i\'/�`;�i\I./ `---\-\'/- /. / BEDROCK \'/I"\/\'/1;'\/\'/1" \/\'/1;'\/\'/1"\/\'/I;'\/\'/1" \/.'i l;'\/\'/1"\/.'i t;'\/\'/I" \/\'i l;'\/\I�BEDROCK 1�'\/\'/1" \/\'/1�'\/\'/1"\/\'/I,' \/\'/1" \/\'/IN'\/\'/I"\/\'/IN'\/\'/I" \/\'/1N'\/\'/1 250 250 N�,\'/I�``�%//I/`\�i\'/I�``�%r/I/`\;/ \'/1` \/\'/1��\/\'/1`\/\'/1��\/\'/1`�\/\'/1N'/1`�\: .1` ♦r-i\I/1\'/1��\/\'/1` \/\'/1��\/\'/1` \/\'/1��\/\'/1` \/\'/IN/ 1\'/1` \/\'/1N�\/\'/1` \/\'/1N�\/\'/1` / / / _ BEDROCK / / / l'`i-: I : 200/I,,\/\'/1"\/\'/I;��/\'/I"\/\'/1;��/\'/I"\/\'/1;,�i\'/1"\i\'/1;'�i\'/1"\i\'/I,'�i\'/1"\i\'/I;'�i\'/1"\i\'/1;'�i\'/I"\i\'/1;�\i\'/I"\i\'/1`r i\\i./`� \I./.r_-\I\\i./`/_ \/I/\ i I_\ \/I/\ i \/I/\ I/\ i ♦ i \/1/\ I/\ i \/I/\ /1`\/\I./;,/\'/1`�\/\I./;,/\'/1`\/\I./`��/\'/1`\/\I./`��/\'/1`\/\I./`��/\'/1`\/\I./`��/\'/1`\/\I`/,/\'/1`\/\I./;,/\'/1`\/\I./�/\'/1`\/\I./�/\'/1`\/\I./`��/\'/1`�\/\I./"�/\'/1`�\ _, \ /1, _ _ , \ /1, _ \ /1, _ _ , \ /1, _ _, \ /1, _ _, \ / 1, _ _, \ /1_, \ /1, _ \ /1, _ _ , \ /1, _ \ / 1, _ _, \ /1, �- :.//l�ltel�\/l`\l'\`/ -1i \/�\ l NN"I 1 ' \/"\ / /`-/-\ l /\ `�-I 150 N ` NOTE: — HYCO LEGEND RESERVOIR CROSS SECTION D-D' IS LINEAR IN NATURE AND NOT ALL LOCATIONS ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. n ABMW-1 WELL IN ASH PORE WATER ASH PORE WATER NOTES POWER PLANT ABMW-1BR WELL IN COMPETENT BEDROCK LEVEL ELEVATION BEDROCK FLOW LAYER GROUNDWATER 1. WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR APRIL 22-23, 2019 _ Z _ GENERALIZED WATER TABLE LEVEL ELEVATION FOR EACH WELL. ELEVATIONS WITHIN EACH CLUSTER ARE MEASURED IN THE SAME DAY. GENERALIZED GROUNDWATER WATER LEVEL ELEVATION (NAND 88) REFERENCED TO NORTH AMERICAN VERTICAL DATUM, 1988. FLOW DIRECTION (LABEL COLORING BY FLOW ZONE) 2. FRACTURE OCCURRENCE AND ORIENTATION NOT DEPICTED. GENERALIZED SUBSURFACE ASH NO GEOPHYSICAL LOGGING CONDUCTED IN DEEP BEDROCK BOREHOLES SHOWN ON PORE WATER FLOW DIRECTION WELL SCREEN CROSS-SECTION. EAST ASH BASIN GENERALIZED VERTICAL — — — 3. ALL BOUNDARIES ARE APPROXIMATE. 4. CROSS SECTION REPRESENTATIVE OF PRE -DECANTING CONDITIONS. HYDRAULIC GRADIENT COMPLIANCE BOUNDARY - LITHOLOGIC CONTACT WASTE BOUNDARY t' WEST ASH 0 ASH BASIN \ 0 ASH PORE WATER / WASTEWATER Du BEDROCK RD 0 BEDROCK REGOLITH SOIL FILL GRAPHIC SCALE a' o �00 2so 50oDDUKE FIGURE 6-23 HORIZONTAL SCALE: 1" = 500' ENERGY VERTICAL SCALE: 1" = 100' GENERAL CROSS-SECTION D-D' 5X VERTICAL EXAGGERATION WEST ASH BASIN DRAWN BY: A.FEIGL DATE: SF,�ORq RD PROGRESS REVISED BY: D. KREFSKI DATE:012/014/2019 CORRECTIVE ACTION PLAN UPDATE /yam APPROVED BY: C. EADYG DATE: 12/14/2019 ROXBORO STEAM ELECTRIC S MORA, ORTH CA OLINA PLANT PROJECT MANAGER: C. EADY LAYOUT: www CROSS SECTION LOCATION synTeria.synterracorp.com 1 PRE -DECANTING CONDITIONS r ,/ ��� POST CLOSURE CONDITIONS FOR CLOSURE -IN -PLACE � III \�-�'% \` `- 1���1� �� > > ��'�� �� �.�• `<< �' 1` / f \\111 (� (�� �r�"-='� `f -, Ji • r \ 5 _ r v \ Stirr j L J' l\� (Q��J J - --�-�i( ) - \" J � � � / � {'� \1�� 1- I I ' J \ if 1► SATURATED ASH ��/ '• `.` THICKNESS (FEET) SATURATED ASH ` �., THICKNESS (FEET) J LEGEND / UKE DUKE �' GRAPHIC SCALE 375 0 375 750 FIGURE 6-24 E SATURATED ASH THICKNESS MAP PROGRESS (IN FEET) PRE -DECANTING AND CLOSURE -IN -PLACE CONDITIONS WEST ASH BASIN DRAWN BY:C.WYA17 DATE:10/30/2019 10011 � } ® REVISED BY. C. WYATT/K. KING DATE: 12/12/2019 CHECKED BY: K. LAWING DATE: 12/12/2019 APPROVED BY: K. LAWING DATE: 12/12/2019 CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT synTerra PROJECT MANAGER: C.EADY SEMORA, NORTH CAROLINA www.synterracorp.com C — — IIIIIIIIII—C (NORTH) J Q Z Q U w O m Q x U ABANDONED SLUICE PIPE TRENCH fY ~W 0 ur U2 J Q 0 M L) M a o PLANT W LOU ELECTRIC a o¢ �rttc SUBSTATION g a O IQ .' o a x REGOLITH \/1'\/./. 1.\/. \/I/\/./\/I.\li \/I 300 /�; I• \/� \ / 1; \/�/. / I. BEDROCK\/�/. / 1/ \/�/\ / I%\/• �• / 1' \/:/r�r i♦'/�;,�iJi�;'�i♦'/�;C�i�'ii;' �i♦'/I�C�i�'ii;'�i♦'/I;;�i�'/� HYCO \� ; i . /I - v / \; /I RESERVOIR / ♦, ♦ ` _ ♦ 'I , LEGEND NOTE: CROSS SECTION C-C' IS LINEAR IN NATURE AND NOT ALL LOCATIONS ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. CROSS SECTION LOCATION DUKE ENERGY PROGRESS PROPERTY LINE APPROXIMATE WEST ASH BASIN COMPLIANCE BOUNDARY APPROXIMATE WEST ASH BASIN WASTE BOUNDARY 0 � mm mm O J J ZLu m ¢ ENGINEERED ¢ pip pip m w A rNi "� v14zd•. BASE LINER o 0 o cm N Z0 i:�y s� (SOUTH) J O O x U JZ pw 06 OJ ov �w AEC- 0 0 U) LL BIO-REACTOR BUILDING N N N ,r'Y' S sr� REGOLITH - \' WEST FGD SETTLING POND w Q \' ''� \ ♦ / 1 \ " / ♦' ASH ��� U U ' - ` SOIL FILL LLN ♦,�,_ _♦../'i\\�:. I _♦�./ :',''`_♦:./I�\ �:'/1' �: ---------------- - — wp\/_\/\'/1"-/.' ,\/.'/1" /♦I` ,♦ ``�- ,♦I ---------7-7------- ASH l \i/` -\ l 1i -\ -_-_-_-_-_-_-_-_-_--_-_- ' ----ASH PORE -- --- --,;,,4���/ /1♦'/1;�'/1\'/1;' /I\'/ '�/\'/1�'�i\'/1`��i.'/I���i\' ��; i♦' ----WATER_ — 1_7_7_7�0%-/ -♦ I, - �'/ - -� , \ ♦ 1' -♦ - 1 / -, \ -� 1'/ -, \ - 1'/ / -` / -� _♦ / -- / / ` \mil `/'. ♦ ♦: .-1 / -1//\ \ ♦� / /-,l/♦ \♦�/ / /-,l/� \ \�/ / /-`l/♦ \.�/ / --- --- _-_-- IL1��/I.\ 1 \i/I.\ -__ -�1� -_'�I`I���i\'/1��_`'�I/1`��i\'/1��\'�I,/. I`'.i-♦'/����i\'/1��\� /����i ♦'/1�����'/����i\'/1� ���'/����i\'/ '��\'/� �i\'/I���i\'/I���i\'/1�� "I \� % /I - `� /I' \/ i`. /I - ♦ %♦ /I / \/i / \ TI i \l i \ / I . \ / r I / \/i / \ / I / \/ ' 1' \/ / ♦ / I / \/� / I' \/ i / / 1 / \/� / I' \l i l I l i / \ / I / \/i r I / I/i l \ / \/♦'/ 1 � �\/ ♦ ♦�/ 1`/ \ �/ �,♦I ♦ / �/\'/1��\%♦'/1"_!-LLL1� \'/ 1"\i\'/1� ��%\'/1" \/ / 1 �' �%\'/1"\%♦'/1�' �%♦'/1" \%♦'/ 1" -%♦'` '\/\'/1" %♦I. /` � -%\I♦ /� / _♦.I�, -' �;I \\ ; � '/ _ ` \ ` ,I , \♦�♦/ \ //I / `/ \ // _ \-i'T\�' ` -//1 , \` ; �� /,I / \` ;/ � /,I / \` ;/ � //I' \ / \♦, I , \ - / � / I / \ � l � r 1 / \\� l ' I' \- l ; r I , \`� / � / I' \ l ; r 1 , \`� / � / I' \ /; I - / ` / I , \`� / ` / I / \- / ` / I / i l � /\/\'/1`� /♦' ♦/\/\'/1` // '/1`� /♦'` \/ /\'` `�- I` ♦/ /\'` ` `'I`/`/ /♦�/♦,�♦ I./;/_i ./`j\�.I./ %;I./♦j\�.I. /`�_%'I�/\��\'�` ,�♦ I./; _i 'I`/;/\�'I"�/ ♦/I /1 , \ /1 \ /1, \/♦ /1 \ /1, ♦ / 1 �\ 1, \/♦ /1 \ / 1, \/\ /1�\ /1, \/♦ /1 \ \ / 1, \/♦ / \ /1, \/♦ / 1 \ \ /1,\/♦ /1 /\ � - 1 i /.-- \ - 1 ' /.-- \ 1 i /.-- \ - 1 ' /♦-- \ " \ / /.-- \ - 1' /♦-- \ 1 i /.-- \ - 1 ' /.-- \ 1 i /.-- / -- \ - \ i /.-- � - 1 ' /.-- \ 1 i ` - � - 1 ' /♦-- \ " \ i /.-- � - \ ' /♦-- \ 1 i /.-- � - \' /. - � - 1 i /.-- \ \' /.-- \ /.-- \ - 1 ',�-_ \ 1 i / \/. \ / I . \/ / ` / I . \/. \ / I . \/ / ` / I . \/. \ / I . \/ / / \ / I . \/. \ / I \/. / \ / I \/ . / I / \ i / I , \/i / I • i l \ / 1 , \l i / 1 • \/i l ♦ r l , V i ',I /�\ '/1`� '�I /�\ '/1`� ',I /�\ '/1`"' '/1" /�� `�1�1\`\,il/1♦`-/ I./�`\/ /1`� %�I♦/�`\/il/1♦, _%♦I. /``\/�'/1" %\'`\/�'/1" i;l. /``�%\'/1" i♦'` /♦' T'T I/\\///I�\`;\"1/\\�/�\\�1�\♦�`�\„1/\\,/�//I/\-�, ,I/\///I�\``\',I/\\///I�\`'♦/\/,I'\\///I�\`;�\/,I/\\�/�//1�\`;�\/,I/\\sue/'�I \'�`1/\/♦'/1`\/'/1,\/♦/\/'/1��\%\'/1`�L\/�'/1��\%\'/1`�\/�'/1� `�I�1\`\/\'/1��\%\'/1`�\//1��\%\'/1`\/'/1��\%\'/1`\/'/I���i♦'/\vv/�������'�/1�'\/\'/1`�\/♦'/I���i\'/1`� "I (-\l�♦/1�\ �''/`//i tits♦/li-\i/.-�\"\//`/--1i/.-\"\l'` -\-i;�, I�\/il\•/Ii \l� ♦ - "� I \ _\/. \/I/\/�� BEDROCK� / '\./♦/ . /� ./I/ / / . I �. /-_♦�./ _♦../- _♦ ./- _. \�./-_♦�./- �../- _♦�./- .. _.�./- ♦. BEDROCK/-_♦. /\'/1;' \/\'/1"\/♦'/1;' \/\'/1" \/♦'/ 1;' �/♦'/1"�/♦'/1�' �%♦'/1" \/\'/1;' ♦'/ 1 \/\'/1;'\/\'/1♦ / \/ 1♦ /\/♦'/1" /♦' ♦ / ,♦I ♦ / , , I ♦ / ` ♦ / ` \ I \`./:/i/\�/:ri.\`:/�/i/\./:ri.\`./:� \.l:r�.\♦mil:/i/\��:/�'�.`/i.\`:/.�i/\�/:ri.\`./`/i/\:/:ri.\`�/:/i/\ /:r�.\♦�/:/i/\NS i\`�/\�i/\�/:/i.\`./�/i/\-/:/�.\:/\ ����♦'/1i��%♦'/1`C�i\'/1���%♦'/1`C�i\'/1���%♦'/1``\%♦'/1�C�i ♦'/1`��/\'/1��♦♦'/1``\%♦'/1���%♦'/1``\%♦'/1���%♦'/1`C�i\'/1���%♦`1``\%♦'/1���/♦' `\%♦'/1���%♦'/1``\%♦'/1�C�i ♦'/1`� '\' /� - 1 i /� - \ - \ ' /♦ - 1 i /� / / I / \ / / `\/♦ /1, \/ /1 \/♦ /1, �\ ♦ /1 \/♦ / 1, /♦ /1 \/\ /1 \/♦ / 1, �\/\ / 1 \/\ /1, �\/\ / 1 \ /1, �\/\'/1 ' /♦ / / NO7ES: , I / \ i / / I . \`i �\ / I / \ i l I \`� �\ / I / \ i �\ 1 \♦' �\ / 1 / \ �� / I \`- / ` / I / \ / 1. CONCENTRATIONS SHOWN ARE STATI STICAL MEAN �\�/,�\ / / 1 . \`i �\ / I / \ / / /\/♦'/1�'�/♦'/1"\/♦'/1��\/♦'/1 ' ♦'/1�'�/\'/1"\/\'/1�'� \'/1" ,♦ 1�/\ CALCV LA BASED ON CENTRAL 7ENDENLY OF DA7ASET /♦'/1�'�/♦'�1"\/♦'/1��\/\'/1 ' '/1��\/\'/1"\/\'/1"�/\'/1" '♦' US]NG DATA RANGING FROM )AN VARY 2018 TO JUNE 2019. _ _ __/ \ l i t �`/ 1 \/ i t \`/ l i \lit ♦/ I \/ i t \`/ I/ /\♦/ I \/ i t \`/ I i \l i l\♦/ I \ \`/ l i\ l i l ♦/ \/ l ! ��`/ I/ \/ 1 l \`/ l IN\l `/`�Z-BORON[B]CONCENTRA7ION5 ARE [N MICROGRAMS PER /'LITER [N41L)`,I • WELLS WITH DATASETS CONTAINING FEWER THAN FOUR NOTES ` ♦'I /♦ ♦ VALID RESULTS, THE MOST RECENT VALID SAMPLE DATA UP TO . ,I \ ♦' 'JUNE 2019 WAS USED. / 1 ` ' ♦I CCR-208S WELL IN SHALLOW MATERIAL SHALLOW ZONE FLOW LAYER DATA 1. WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR MW-6D WELL IN TRANSITION ZONE GROUNDWATER LEVEL ELEVATION NO AVAILABLE APRIL 22-23, 2019 FOR EACH WELL. ELEVATIONS WITHIN EACH CLUSTER ARE ANALYTICAL PARAMETER B MEASURED IN THE SAME DAY. REFERENCED TO NORTH AMERICAN VERTICAL / 1 ' ♦� MW-6BR WELL IN COMPETENT BEDROCK TRANSITION ZONE FLOW LAYER REPORTING UNITS Ng/L DATUM, 1988. ABMW-3 WELL IN ASH PORE WATER GROUNDWATER LEVEL ELEVATION 15A NCAC 02L STANDARD Boa 2. FRACTURES CONCEPTUALLY DEPICTED ON THIS CROSS SECTION REPRESENT GENERALIZED ORIENTATIONS OF FRACTURES OBSERVED BASED ON / / ♦1 BEDROCK FLOW LAYER GROUNDWATER BACKGROUND THRESHOLD TELEVIEWER LOGGING AT THE MW-208 BOREHOLE. THE DEPICTED FRACTURE DW-46 WATER SUPPLY WELL LEVEL ELEVATION VALUES ga ORIENTATIONS ACCOUNT FOR APPARENT DIP WITHIN THE PLANE OF THE ASH PORE WATER (TRANSITION ROW ZONE)' CROSS SECTION AND VERTICAL EXAGGERATION. THE ACTUAL NUMBER OF L GENERALIZED WATER TABLE BACKGROUND THRESHOLD FRACTURES IS FAR TOO NUMEROUS TO ILLUSTRATE AT THIS SCALE. IN GENERALIZED LEVEL ELEVATION VALUES SD ADDITION, THE DEPTHS AND LENGTHS OF FRACTURES VERSUS DEPTH ARE �/ I • \ �\ I•► GROUNDWATER FLOW (BEDROCK ROW ZONE)' CONCEPTUAL ONLY. "� / ♦I DIRECTION ® MEAN BORON (B) CONCENTRATION (ug/L) - BA CICGROVND THRESHOLD VALUES WERE CALCULATED 3. DISPLAYED WATER SUPPLY WELL LOCATIONS REFLECT INFORMATION '� - \ / GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION n WELL SCREEN CUSINGOLLE DATA FROM BACKGROUND 2010 TO EC EMBER 2018 SAMPLES COLLECTED NOV EMBER 2a10 TO DECEMBER 2018 AS SUBMITTED JUNE 2019. 4. 5. AVAILABLE UP TO DECEMBER 31, 2015. ALL BOUNDARIES ARE APPROXIMATE. CROSS SECTION REPRESENTATIVE OF PRE -DECANTING CONDITION. / I _ \ ": / / 1 , - _ 1 ' \ / �I 1'/ IMWMI► GENERALIZED VERTICAL HYDRAULIC GRADIENT LITHOLOGIC CONTACT 0 ASH 0 ASH PORE WATER BEDROCK 0 REGOLITH 0 SOIL FILL — — PREDOMINANT BEDROCK FRACTURE ORIENTATION — — — COMPLIANCE BOUNDARY WASTE BOUNDARY 'DUKE ENERGY PROGRESS 161P synTena GRAPHIC SCALE 0 100 250 500 HORIZONTAL SCALE: 1" = 500' VERTICAL SCALE: 1" = 100' 5X VERTICAL EXAGGERATION DRAWN BY: A.FEIGL DATE: 08/02/2019 REVISED BY: D. KREFSKI DATE: 12/13/2019 CHECKED BY: K. LAWING DATE: 12/13/2019 APPROVED BY: C. EADY DATE: 12/13/2019 PROJECT MANAGER: C. EADY LAYOUT: SECTION C-C' (6-26) www.synterracorp.com FIGURE 6-25 GENERAL CROSS-SECTION C-C' WEST ASH BASIN - CONSERVATIVE GROUP MEAN OF BORON CORRECTION ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA D D' (NORTH) DUKE ENERGY PROGRESS PROPERTY LINE APPROXIMATE WEST ASH BASIN COMPLIANCE BOUNDARY APPROXIMATE WEST ASH BASIN WASTE BOUNDARY 600 550 WEST ASH BASIN o o InMAIN DAM ¢o r In co 500 w Q N Q m N OUTLET STRUCTURE FILTER DIKE ED PRE -DECANTING WATER 450 400 350 300 250 200 150 (SOUTH) 600 550 1500 0 _ _ Q Q - ELEVATION=462' _ - -- ASH- - -- ____ _- 1 ASH r------- --- --____-------- t___��� --- _---------------- -- ����__ - -------------------------------------------- -------------------------------------------------------------------------------------------- 450 HEATED WATER - - - - - - - - ------------------------- - - - - ---------------------------_-_-_-_-_-_-_-_-------_-_-_- _ ------�---- DISCHARGEPOND-- - - - - -- _-- ------------------- - - - - - - ----------------------___=ASH -- - - - - -- ---------- _ -_-- _ WATER ELEVATION=412'-_-_-_- _-_-_-_- - - WATER _ - - - - - - - - - - - - - - - - - -- _------_------------------ - WATER ------------------ - - - - - - - - - - -_- ♦ / I�/%�/ —L --- ---------------------------------_---------------------------------------- --- ---------!�-----------------------------------�� -��-------------------- — - -- `�/\`'./'/I/�\\i/�/I/\�l�/I���♦'I/\ / / I/\�/♦/1�\`��♦/I/\i/�/I�\`�♦ /----- _-- - 40077 ��/,7/ ---RE-G-O-L-IT�H-�/_-P/W-\'R-/--1\"-\/-��-i�\-/'./- — ♦ I/\`�i♦'Ir\ ���//I�\��i'/I'`♦�i♦`/I�\`\/♦/,I/\`;/♦`//I/\`;�♦//I/\`;/♦`//I�\`;�♦//1/\\;/♦\//I�\`�i♦'/Ir`♦�i♦`//I�\`��♦'/I/\♦;�♦`//1/\`�i♦'/I'`��i♦`//I/\`;�♦//I/\`i/�/I /\'/1���/\'/1"\/\'/1���/\'/1"\/\'/\���/\' \��\/♦'/1"\/\'/\���/\'/1",\/\'/\"\/\'/1���/\'/1"\/\'/1`�-/\' ♦i /�'� `�- i .i /\'� `�- i ♦i /\'� `�- i ♦-i /\'� `/- I .i /\'� ���/1`/\/\'/1���/\'/1"\/\'/I���/\'/1 350 ,l i ♦ / I . \/� / ♦ / I , \/� / I . \/ / ♦ , 1 , \/� ♦ / I . \/ / ♦ , I , \/� / I . \/� / ♦ , I , \/� / I . \/� / ♦ , I , \/ / 1 . \/� / ♦ / I , \/� / I . \/� / ♦ / 1 , \/i / I . \ l , / - /� / ♦ I , \/� / I . \ / , / / / / / / / / / / _ _ _ _ _ _ _ _ _ l i ♦ I . 0, ♦ I � \ / _ - /i ♦ I � \/ i � 1 � \/i ♦ / I � \l i � I � \/i ♦ / I . \li ♦ I _ \/ i ♦ / 1 / \lam � I _ \/i / _ _ \�/.♦/ii\ �l/`i`. `:/♦`/ii\ ,l/`ice. `:l♦`/ii\ 1 //`i�. `:l♦`/ii\ ,l/`ice. `:l♦`/ii\ ,l/`i`. `:l♦`/ii\ �l/`i`. `�/.`/ii\ `l/`i�. `:l♦`/ii\ ,l/`ice. `:l♦`/ii\ 1 //`i�. `:l♦`/ii\ ,l/`ice. `:l♦`/ii\ ,l/`i`. `:l♦�/ii\ �l/`i`. `�/♦`/ii\ BEDROCK./��\!�/���\ _/./-♦�i./I-\_`'./-♦�i./I-\-`'./-♦�i./I_\♦/./-♦�i./I-\-`'./-♦�i./I-\/./-♦�i./I-\-`'./-♦�i. /1-` ♦/./-♦�i./I-\-`'./-♦�i./I_\ ♦/./-♦�i./I_\-`,./_♦ii I \ `,`/-♦i ♦ I \ ♦ ♦ I \ ♦ 1300 _I�'�/\'/1` l i l ♦`/ I � \i \ l'`/ i li / ♦`/ I � \ \ l /`/ i li l ♦`/ I � \ \ / / i /i l ♦`/ I / \ \ l / i /i l ♦♦/ I / \ \ l / i l i l ♦♦/ I / \ \ l/ i li / ♦`/ I / \ \ l/ i li l ♦`/ 1 � \ \ l / i li l ♦`/ I � \ \ / / i /i l ♦`/ I / \ \ l / i l i l ♦♦r 1 / \ \ l /`/ i l i l ♦`/ I � \ \ l'`/ i li / ♦`/ I / \ \ l /`/ i li l ♦`/ I � \ \ / /`/ i li l ♦♦/ I / \ \ / / ♦ I_\ - /i ♦ I_\ - /� ♦ I_\ - /� ♦ I_\ - /� ♦ I \ _ /� ♦ I \ - /i ♦ 1 \ - /� ♦ I \ - li ♦ I \ - l� ♦ I \ - /� ♦ I \ _ /� ♦ I \ - li ♦ 1 \ - / I-\ \, - li ♦ 1 BEDROCKi�'��"�i♦''�i\'1�'�iJ/1"�i\''�i\'/\"�i\''/\"�i\'/1" /\' ./ I ./ I ./ I ./ I ./ I ./ `BEDROCK `/ ./ I ./ `mil./�/\.;�rj. \`i �./�/\.��rj.� ice./�/\.;�/j. \`i �♦��/\ i;�/j.� i�♦��/\ i;�rj. \`i �♦��/\.;�rj/� ice./�/\.;�rj. \`i �./�/\.;�/j/� ice./�/\ i;�/j. \`i �♦��/\.;�rj.� i�♦��/\ i;�rj.\`.�./�/\.;�rj. �`i �./�/\.;�rj. \`i �./�/\i;:/I/� ��./�/\ i;�r� 250 hi\I./♦i�i\'/1`��i\I./`i�i\'/\`Chi♦I./♦i�i\'/\`Chi♦I`/�,�i\'/\`C�i\I./�/�.'��"` >I"♦/�i\'/1\I./♦i�i\'/1\/\♦I./♦i�i\'/\\/1\/1\/1\/\`/\\I./` BEDROCK, /1, , \ /1, , \ /1, / \ /1, / \ /1, / \ /1, , \ /\, �_ , \ /1, / \ /1, l ♦ ' I \/i l ♦ / I \li / I / \/ i l ♦ / I . \li / / I / \/ i / ♦ I . \/i / I / \/i l ♦ / I . \/i / I / \/i l ♦ / I . \l i / I = \/i l ♦ / I . \li / I / \/i l ♦ / 1 . \li / I / \/ i l \ / I . \li / I / \/i / / I . \/i / I / \/i l / I . \l i / 1 / \/i l ♦ i I . \l i / I / \/i l ♦ i I . \li / I . \i l .`/ 0i ♦ / 1 . \i /.`/ i . /i ♦ / I . \i /.`/ i : NOTES: �� l `r' _ - l ` �� l `/' - / ` �- l `/' - l ` �� l `/' - l ` �- l `r' _ - l ` �� / `r' 1. CONCENTRATIONS SHOWN ARE STATISTICAL MEAN ♦ I \ � �rl/\ � I/\ �/I/\ � I/\ � �/I/\�i I/\ � ♦/I�\ � I/\ � �/I.\ � I/\ � �rl/\ � I/_\ � �rl/\ � I/\ i� /I/\ � I/\ � �/I/\�i I/\ � �/I.\ � 1/\ � �rl.\ i� I/\ i� /I�\ i \iJ/ICALCULATED BASED DNCENTRALTENDENCYOF DATA ET ' / / / / / / / USING DATA RANGING FROM IANUARY 2018 TO IUNE 2019. //I�/I../` \/ �. /IBC . /` \/ �. /�' �- � /` \/ i . /� i"I� . %. /� �� i` /I� . %. /� . /` \/ �. /I� �� . /` \/ �. /I�� / 2. BORON (B) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (IJg/Q NOTE. LEGEND ERVOIR CROSS SECTION D-D' IS LINEAR IN NATURE AND NOT ALL LOCATIONS ALONG THE CROSS SECTION ARE PROJECTED ONTO THE CROSS SECTION. ABMW-1 WELL IN ASH PORE WATER ASH PORE WATER NOTES ABMW-1BR WELL IN COMPETENT BEDROCK LEVEL ELEVATION 1. WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR " BEDROCK FLOW LAYER GROUNDWATER APRIL 22-23, 2019 FOR EACH WELL. ELEVATIONS WITHIN EACH CLUSTER ARE POWER PLANT L GENERALIZED WATER TABLE LEVEL ELEVATION MEASURED IN THE SAME DAY. REFERENCED TO NORTH AMERICAN VERTICAL GENERALIZED GROUNDWATER DATUM, 1988. FLOW DIRECTION MEAN BORON B ( ) CONCENTRATION (ug/L) 2. FRACTURE OCCURRENCE AND ORIENTATION NOT DEPICTED. GENERALIZED SUBSURFACE ASH NO GEOPHYSICAL LOGGING CONDUCTED IN DEEP BEDROCK BOREHOLES SHOWN PORE WATER FLOW DIRECTION WELL SCREEN ON CROSS-SECTION. GENERALIZED VERTICAL 3. ALL BOUNDARIES ARE APPROXIMATE. HYDRAULIC GRADIENT — — COMPLIANCE BOUNDARY 4. CROSS SECTION REPRESENTATIVE OF PRE -DECANTING CONDITIONS. EAST ASH BASIN LITHOLOGIC CONTACT WASTE BOUNDARY ASH WESTAS ASH PORE WATER / WASTEWATER BASIN 0 BEDROCK REGOLITH DUNNgI.Vq� RO a SOIL FILL GRAPHIC SCALE '°° 250 500 DUKE HORIZONTAL SCALE: VERTICAL SCALE: 1" = 100' ENERGY 10 5X VERTICAL EXAGGERATION PROGRESS DRAWN BY:A.FEIGL DATE:08/02/2019 REVISED BY: D. KREFSKI DATE: 12/14/2019 CHECKED BY: K. LAWING DATE: 12/14/2019 APPROVED BY: C. EADY DATE: 12/14/2019 O MANAGER: C. PROJECINttiyS/� LAYOUT: SECTION D D' 6-D27) s)mTerra www.synterracorp.com WAB EXTENSION IMPOUNDMENT WATER ELEVATION=446' ' WELLS WITH DATASETS CONTAINING FEWER THAN FOUR VALID RESULTS, THE MOST RECENT VALID SAMPLE DATA UP TO TUNE 2019 WAS USED. NO DATA AVAILABLE ANALYTICAL PARAMETER REPORTING UNITS Hg/L 15A NCAC 02L STANDARD 700 BACKGROUND THRESHOLD VALUES 50 ORANSITION FLOW ZONE]' BACKGROUND THRESHOLD VALUES 50 (BEDROCK FLOW ZONE)' ' - BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM BACKGROUND GROUNDWATER SAMPLES COLLECTED NOVEMBER 2010 TO DEC EMBER 2018 AS SUBMITTE❑ ]UNE 2019. FIGURE 6-26 GENERAL CROSS-SECTION D-D' WEST ASH BASIN - CONSERVATIVE GROUP MEAN OF BORON CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA CCR-208S CW-4 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 8 R 8 7 7 V) 6 a a 6 5 Sampling event 5 600 400 ; 200 E Sampling events 0 -200 O 450 -400 375 i 300 E +—+ 6500 225 IL 19 O 3 6000 150 -0 E 0 5500 7 77 75 V M 5000 - w U 4500 a) a to Sampling events C 452 Sampling event 3 p 3 451 M 452 � ^ ^ 2 Go C '.C-i 11J 00 450 2 _ 1L ()02 450 — N � �> >a w 4- 448 C y Q 1 C J Z 1 J Z 449 f0 L L V O: N I1F r M 446 3 448 0 0 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 Date Date CCR-208S: Shallow flow zone monitoring well located CW-4: Transition flow zone monitoring well located along the waste boundary. See Figure 6-28 for southwest of the WAB. See Figure 6-28 for monitoring location. monitoring location. LEGEND NOTES NAVD 88 - North American Vertical Datum — pH (S.U.) in - inches — Oxidation Reduction Potential (ORP) (mV) mV - millivolts — Specific Conductivity (pS/cm) S.U. - standard unit Daily Total Rainfall (inches) fenDUKE DRAWN BY: D. AVARD DATE:: 10/31/2019 ENERGY. REVISED BY: M. ROZIER FIGURE 6-27 PROGRESS CHECKED BY: K. LAWING GEOCHEMICAL WATER QUALITY PLOTS APPROVED BY: K. LAWING CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT trip PROJECTMANAGER: C. EADY SEMORA, NORTH CAROLINA www.synterracorp.com synTerm Note: Transition Zone Groundwater Legend Affected Bedrock Groundwater Legend *-Sampling ■ CCR-202D o ■ ABMW-1BR ElCCR-207BR ■ CW-2D A MW-24BR R events prior to CW-5 1� ■ ` • ABMW-2BR O CCR-208BR • CW-3D p MW-25BR 1/1/2018 • CCR-203D Cr � �w A ABMW-3BR A CCR-209BR 0 HWMW-iBR 0 MW-31BR ■ CW-2 • MW-39D o' ■ MW-12BR v �o s ABMW-36RL p CCR-210BR Z MW-32BR • CW-3 A MI+V-5D / �' • P \ ■ BG-iBRLR 0 CCR-211BR ■ MW-205BRL y MW-33BR A CW-4 V MTV-6D ■ CCR-200BR X CCR-212BR A MW-205BRLL MW-39BR V ■ CCR-201BR * CCR-213BR V MW-205BRLLL MW-4BR # A CCR-202BR ■ CCR-214BR ♦ MW-208BRL MW-6BR Potential V CCR-203BR • CCR-215BR z MW-208BRLL MW-5BR Ash Pore Water �� Legend Mixing • ♦ CCR-204BR A CCR-216BR * MW 208BRLLL MW-7BR ' Z CCR-205BR V CCR-217BR ❑ MW-22BR MW-8BR ■ ABMW-1 Generally O MW-23BRR • Unaffected aoo * CCR 206BR ♦ CCR 2186R MW 9BR ABMW-2 Una 80% df - 80% R o' a� ` Affected 40 60% a � ZU 60% (P r Affected x / � e, \ 1 440% * q ■ R 1r r ono , • Potential • � ` � 0% 1• � " ' • �`y Mixing Potential 20% *ik • 20% / \ Mixing `y • v Ca — Transition Zone — cl -.* Generally Generally ' Unaffected Unaffected* ■ • 0 •�� • ■ BG-01 ❑ MW-15D • BG-01BR O MW-18BR I A BG-02BR A MW-18D ' R CCR-112BR-BG p MW-19BRL ♦ MW-10BR 0 MW-26BR � 6 60' sQ Z MW-1413R g MW-2913R /40% /40% • ' 40_�,\ * MW-15BR * MW-3013R j • V", V Background ZOO' of •fly • 3; zo+b+ T i Groundwater It • 0 0 ' Legendst�} 4, f r r $ ♦- Ce — Bedrock Zone — a Ca — Shallow Zone — CI DUKE DRAWN BY: R. BADUM DATE: 12/8/2019 FIGURE 6-28 Shallow Groundwater Legend ENERGY REVISED BY: R. BADUM ASH PORE WATER AND PROGRESS CHECKED BY: K. LAWING GROUNDWATER PIPER DIAGRAMS ■ CCR-203S ♦ CCR-209S APPROVED BY: K. LAWING WEST ASH BASIN • CCR-206S Z CCR-210S PROJECT MANAGER: C. EADY CORRECTIVE ACTION PLAN UPDATE A CCR-207S * CCR-211S 47 ROXBORO STEAM ELECTRIC PLANT CCR-208S ■ MW-2 synTerra www.synterracorp.com SEMORA, NORTH CAROLINA MW-2 ABMW-3 ABMW-3BR ABMW-1 FGD� ABMW-1BR CCR-206S POND ABMW-1 OWAU 30' I, ABMW-1 OWAM 30' WEST ASH BAST ABMW-2 CCR-208BR S ABMW-2BR CCR-213BR n sFMORq Ro , ' , DFA HANDLING AREA .0000 • � . V � ♦ �t I a,� I - - o , I 1000, NOTES: J♦ L.O. � *'EDUKE ERGY -I PROGRESS synTerra GRAPHIC SCALE 700 0 700 1,400 (IN FEET) DRAWN BY: J. KIRTZ DATE: 05/30/2019 REVISED BY: J. KIRTZ DATE: 12/26/2019 CHECKED BY: K. LAWING DATE: 12/26/2019 APPROVED BY: K. LAWING DATE: 12/26/2019 PROJECT MANAGER: C. EADY FIGURE 6-29 DECANTING MONITORING NETWORK WEST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA ABMW-1 Ash Pore Cluster ABMW-1 Cluster ABMW-2 Cluster 3 3 3 463 464 464 00 00 00 0 G G 462 Q Q Q Z 463 11 2 Z 463 2 Z 2 o „ o „ o 4.1 i `C ��"I _ + > _ w +� > 461 _ ,m w 462 I w 462 w L a 461 L a 461 L a 460 3 3 3 0 459 0 460 460 0 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 Date Date Date ABMW-1 OWAU Water Elevation (NAVD 88) ABMW-1 Water Elevation (NAVD 88) ABMW-2 Water Elevation (NAVD 88) ABMW-1 OWAM Water Elevation (NAVD 88) ABMW-1 BR Water Elevation (NAVD 88) ABMW-2BR Water Elevation (NAVD 88) ABMW-3 Cluster CCR-206S 452 CCR-208 Cluster 3 466 3 456 3 00 00 464 00 00 00 00 > > 455 0451 z 2 z 2 z 2 0 462 o V o > > 454 >450 d w 0 a) C a� 0 Z @ @ +�,,� L L W 453 L aA., M 3 M 3 M 3 444 � I � I ' I 0 452 0 t 448 0 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 Date Date Date ABMW-3 Water Elevation (NAVD 88) CCR-206S Water Elevation (NAVD 88) CCR-208S Water Elevation (NAVD 88) ABMW-3BR Water Elevation (NAVD 88) CCR-208BR Water Elevation (NAVD 88) LEGEND DUKE tl�ENERGY DRAWN BY:D.AVARD DATE:12/8/2019 FIGURE 6-30a Daily Total Rainfall (inches) Notes: REVISED BY: D.AVARD HYDROGRAPHS Ash Pore Water in - inches PROGRESS CHECKED BY:K.LAWING WEST ASH BASIN Secondary Ash Pore Well NAVD 88 - North American Vertical Datum 1988 BY: K.LAWING CORRECTIVE ACTION PLAN UPDATE Passive decanting began December 2018 Shallow Flow Zone Data range from March 29 to August 31, 2019 0APPROVED ROXBORO STEAM ELECTRIC PLANT Bedrock Flow Zone wnTerra PROJECT MANAGER: SEMORA, NORTH CAROLINA www.synterracorp.com CCR-213BR CCR-217BR CW-4 472 3 456 3 3 00 00 00 00 454 �. 00 00 452 0 470 ; Z Z ; 2 2 Z 2 c c c 452 c c ° 450 ^ = :. > 468 w > w > � c � c 2 _ > 1 > 450 L L i 448 4W, 466 I �, 3 M 3 448 - 0 446 0 464 0 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 Date Date Date - CCR-213BR Water Elevation (NAVD 88) CCR-217BR Water Elevation (NAVD 88) CW-4 Water Elevation (NAVD 88) MW-2 412 3 00 00 G 411 Z 2 c O c V f6 410 � c W M > a� 1 J 409 3 408 0 4/1/2019 5/1/2019 6/1/2019 7/1/2019 8/1/2019 9/1/2019 Date MW-2 Water Elevation (NAVD 88) LEGEND r' DUKE DRAWN BY: D.AVARD DATE:12/8/2019 FIGURE 6-30b Dail Total Rainfall inches Y (inches) Notes: ENERGY REVISED BY:D. AVARD HYDROGRAPHS Shallow Flow Zone in - inches PROGRESS CHECKED BY: K. LAWING WEST ASH BASIN Transition Flow Zone NAVD 88 - North American Vertical Datum 1988 BY:K. LAWING CORRECTIVE ACTION PLAN UPDATE Bedrock Flow Zone Passive decanting began December 2018 0APPROVED ROXBORO STEAM ELECTRIC PLANT Data range from March 29 to August 31, 2019 PROJECT MANAGER: C. EADY syrlTerra SEMORA, NORTH CAROLINA www.synterracorp.com I p DECOMMISSIONED SLUICE LINEAREA T, • � 1 • a �•• w 1100 I It o � ■ .-. 4 `. ♦ i--.• 1 �- •�� J ♦ � ♦ / I � .10 �. .�• It(' DUKE ENERGY PROGRESS ..001 -7 r-j ol L (IN FEET) DRAWN BY: C. WYATT DATE: 10/30/2019 REVISED BY: C. WYATT/K. KING DATE: 12/26/2019 CHECKED BY: K. LAWING DATE: 12/26/2019 APPROVED BY: K. LAWING DATE: 12/26/2019 PROJECT MANAGER: C. EADY LEGEND NOTES: FIGURE 6-31a ISOCONCENTRATION MAP BORON IN SAPROLITE/TRANSITION FLOW ZONE WEST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA I EASTASH HEATED WATER 6'"PDECOMMI: SIONED SLUICE BASIN DISCHARGE EAREA POND �� 4 l ' ,;,A400MER �( 1% l • � oo le r♦ / 1 • / ♦ ■ / � I FILTER DIKE � % I .�� ` I 1 It(' DUKE ENERGY PROGRESS L (IN FEET) DRAWN BY: C. WYATT DATE: 10/30/2019 REVISED BY: C. WYATT/K. KING DATE: 12/26/2019 CHECKED BY: K. LAWING DATE: 12/26/2019 APPROVED BY: K. LAWING DATE: 12/26/2019 PROJECT MANAGER: C. EADY LEGEND FIGURE 6-31b ISOCONCENTRATION MAP BORON IN BEDROCK FLOW ZONE WEST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA i Sample ID(Depth) PSB-29 (1.5-2) CHROMIUM IRON Sample ID(Depth) MW-208BRL (4-5) IRON Sample ID(Depth) PSB-28 (1.5-2) IRON Sample ID (Depth) MW-09 (0-2) Sample ID(Depth) MW-205BRL (4-5) Sample ID (Depth) 9 PSB-31 (1.5-2) { r IRON Sample ID (Depth) 12BR (0-2) Sample ID (Depth) MW-08 (0-2) MW-08 (14-16) MW-08 (21-23)� Y A Sample ID (Depth) Sample ID(Depth) .. MW-07 (0-2) PSB-25 (1.5-2) IRON I COBALT r ■ IRON / MANGANESE r �•J �� .1e / Sample ID(Depth) BGSB-02 (4-5) k' IRON BGSB-02 (7-8) Sample ID (Depth) MW-15 (0-2) CHROMIUM IRON Sample ID(Depth) MW-05BR (1-2) MW-05BR (5-6) Sample ID(Depth) PSB-32 (1.5-2) CHROMIUM COBALT IRON MANGANESE : .. i (:�7� Sample ID(Depth) PSB-34 (1.5-2) IRON Sample ID(Depth) PSB-35 (1.5-2) Sample ID(Depth) �J PSB-27 (1.5-2) IRON Sample ID(Depth) - ` PSB-26 (1.5-2) Sample ID (Depth) SB-31 (0.5-1) COBALT Sample ID(Depth) MANGANESE PSB-24 (1.5-2) `•. Sample ID (Depth) `.� MW-04 (0-2) • MW-04 (23-25) Sample ID (Depth) CHROMIUM ` BG-01BR (0-2) \' .- L�) � Sample ID (Depth) PSB-23 (1.5-2) CHROMIUM COBALT IRON MANGANESE Sample ID (Depth) PSB-20 (1.5-2) Sample ID(Depth) PSB-19 (1.5-2) 6 � - r--t -1 Sample ID (Depth) PSB-18 (1.5-2) Sample ID(Depth) PSB-33 (1.5-2) IRON Sample ID(Depth) PSB-13 (1.5-2) CHROMIUM COBALT IRON MANGANESE Sample ID (Depth) PSB-36 (1.5-2) Sample ID(Depth) PSB-17 (1.5-2) v Sample ID(Depth) PSB-06 2) CHROMIUM COBALT MANGANESE V, Sample ID (Depth) PSB-12 (1.5-2) �/■ Q / V■ Sample ID(Depth) PSB-14 (1.5-2) • Sample ID(Depth) PSB-15 (1.5-2) MANGANESE Sample ID(Depth) PSB-16 (1.5-2) CHROMIUM tDUKE ENERGY PROGRESS 141P synTerra ■ ww ' I 1 � Sample ID (Depth) , I MW-10BR (0-2) ■ IRON Sample ID(Depth) PSB-07 (1.5-2) CHROMIUM L COBALT . IRON MANGANESE `. J: ' • 1 w ■ Sample ID (Depth) ' • ' • � I PSB-08 (1.5-2) .. _ CHROMIUM COBALT IRON MANGANESE LEGEND O BACKGROUND LOCATION WITH NO EXCEEDANCES O LOCATION WITH NO EXCEEDANCES Sample ID(Depth) PSB-09 (1.5-2) CHROMIUM BACKGROUND LOCATION WITH ONE OR MORE EXCEEDANCES COBALT LOCATION WITH ONE OR MORE EXCEEDANCES IRON ASH BASIN WASTE BOUNDARY MANGANESE . _ . ASH BASIN COMPLIANCE BOUNDARY Sample ID (Depth) SOLID WASTE LANDFILL BOUNDARY SOLID WASTE LANDFILL COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS PROPERTY LINE EFFLUENT DISCHARGE CANAL PSB-10 (1.5-2) Sample ID (Depth) PSB-11 (1.5-2) STREAMS (AMEC NRTR) Sample (Depth) r/WETLANDS (AMEC NRTR) � BGSB-18 (2-3) NOTES: BGSB-18 (4-5) 1. DISCRETE SOIL SAMPLES EXCEED COMPARATIVE CRITERIA FOR CONSTITUENTS LISTED BGSB-18 (7-8) UNDER THE SAMPLE ID. REFER TO TABLE 6.23 FORA SUMMARY OF UNSATURATED SOIL ANALYTICAL RESULTS. BGSB-18 (9-10) 2. DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S BGSB 18 12-13 INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT ( ) PERSON COUNTY GIS. Sample ID (Depth) MW-18 (0-2) MW-18 (31-33) MW-18 (37-38) Sample ID(Depth) MW-39D (2-4) MW-39D (6-8) GRAPHIC SCALE 580 0 580 1,160 (IN FEET) DRAWN BY: C. WYATT DATE: 05/03/2019 REVISED BY: C. WYATT/K. KING DATE: 12/18/2019 CHECKED BY: K. LAWING DATE: 12/18/2019 APPROVED BY: K. LAWING DATE: 12/18/2019 PROJECT MANAGER: C. EADY 3. ALL BOUNDARIES ARE APPROXIMATE 4. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED APPROXIMATE. 5. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. 6. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). FIGURE 6-32 UNSATURATED SOIL SAMPLE LOCATIONS AND EXCEEDANCES WEST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA i r CW-2/D MW-5D/BR M y 9BR �' r � HWMW-1 BR CCR-200BR •� CCR-203S/D/� CCR-201BR � _ CCR-202D/BR 1 CCR-204BR CCR-205BR Y ®MW-205BRL/BRLL/BRLLL MW-8BR� ♦ •' 1 MW-12BR ■ � CCR-206S/BR ♦ CCR-207S/BR MW-33BR � r. CCR-208S/BR MW-208BRL/BRLL/BRLLL ♦ ♦ ♦ CCR-209S/BR I�1 M MW-32BR CCR-210S/BR i ♦ CCR-211S/BR ♦, r WESTERN DISCHARGE CANAL WESTASH BASIN 1 1 'r •. MW-15D/BR .�•-�, sFMoaq Ro � �' s I EASTASH BASIN LCID LANDFILL ��E M � t �r•A• 1 ICI ♦ • DUNNAWAY RD ♦• ter.—.�� MW-10BR i r • I I A � MW-26BR � r - 1 1 I+ f f , . I • I1 AV ■ T �. / • i r. LEGEND t Q� PROPOSED PERFORMANCE MONITORING WELL x ` '♦ 1 II DUKE GRAPHIC SCALE • 500 0 500 ENERGY PROGRESS s)mTerra —ASH BASIN WASTE BOUNDARY - -ASH BASIN COMPLIANCE BOUNDARY SOLID WASTE LANDFILL BOUNDARY • SOLID WASTE LANDFILL COMPLIANCE BOUNDARY EFFLUENT DISCHARGE CANAL DUKE ENERGY PROGRESS PROPERTY LINE STREAMS (AMEC NRTR) ® WETLANDS (AMEC NRTR) ■ I NOTES: 1,000 (IN FEET) DRAWN BY: J. KIRTZ DATE: 06/05/2019 REVISED BY: J. KIRTZ DATE: 12/23/2019 CHECKED BY: K. LAWING DATE: 12/23/2019 APPROVED BY: K. LAWING DATE: 12/23/2019 PROJECT MANAGER: C. EADY 1. WELLS INDICATED WITH RED FONT WILL HAVE GEOCHEMICAL SONDES FORTELEMETRY MONITORING 2. 130-1, BG-1BR, BG-2BR, MW-10BR, MW-15BPJD, MW-18BRID, AND MW-26BR ARE APPROVED BACKGROUND GROUNDWATER MONITORING LOCATIONS. 3. ALL BOUNDARIES ARE APPROXIMATE 4. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON OCTOBER 11, 2017. AERIAL WAS COLLECTED ON JUNE 13, 2016. 5. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT(NRTR)FOR ROXBORO STEAM ELECTRIC PLANT DATED JUNE 2015. 6. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINASTATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). FIGURE 6-33 CONFIRMATION MONITORING PLAN NETWORK WEST ASH BASIN CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA Interim Monitoring Plan Corrective Action (IMP) sampling H Plan Approval Confirmation Monitoring Plan (CMP) monitor downgradient and background groundwater in accordance with G.S. 130A- 309.214(a)(4)k for compliance with NCAC 02L .0202 Groundwater Quality applicable Standards Based on annual evaluation, is the boron plume stable at the compliance boundary?/ 1►[7 Evaluate contingency to determine if additional data needed to validate conditions and/or to update CAP; continue with CMP Notes: NCAC - North Carolina Administrative Code 02L - NCAC Title 15A, Subchapter 02L. Groundwater Classification and Standards Yes Continue CMP sampling Continue PCMP sampling and Annual Review and and Annual Review and Reporting I I Reporting ""I\ Is the ash basin certified closed? No Are the groundwater monitoring results below applicable standards at the compliance boundary for three years? Post -Closure Monitoring Plan (PCMP) Post -closure monitoring to begin Yes following closure certification. Monitoring parameters and locations to be determined at that time and in accordance with G.S. 130A- 309.214(a)(4)k.2. Yes Based on \ annual evaluation, is the plume stable at the compliance boundary? 1►C7 Yes Request completion of CMP corrective action plan monitoring or Request completion of PCMP post -closure monitoring in accordance with G.S. 130A-309.214(a)(3)b DUKE tENERGY PROGRESS DRAWN BY: T. PLATING REVISED BY: J. WYLIE /K SHECK CHECKED BY: K. LAWING APPROVED BY: K. LAWING PROJECT MANAGER: C. EADY DATE: 10/112019 DATE: 12/16/2019 DATE: 12/16/2019 DATE: 12/16/2019 trip I www.synterracorp.com s)"Terra FIGURE 6-34 CONFIRMATION MONITORING PLAN WORK FLOW DIAGRAM CORRECTIVE ACTION PLAN UPDATE ROXBORO STEAM ELECTRIC PLANT SEMORA, NORTH CAROLINA