NC0038377_02_Mayo_CAP Update 2019_Figures_20191231
Corrective Action Plan Update December 2019 Mayo Steam Electric Plant FIGURES (CAP Content Section 10) SynTerra �- - - <- DUKE ENERGY PROGRESS S� PROPERTY LINE ^ iF ASH BASIN COMPLIANCE 4 ~ BOUNDARY 60' RIGHT-OF-WAY {'--�• .'; HALIFAX COUNTY v C , .ram j- NORTH CAROLINA-VIRGINIA STATE LINE (APPROXIMATE) `, • PER SONCOUNTY ♦ ����axw APPROXIMATE ASH BASIN WASTE BOUNDARY I ir• , �' 100' HWY 501 RIGHT-OF-WAY FGD SETTING 100' RAILROAD c I� '` RIGHT-OF-WAY 17 BASIN t� .. - 2 CCP MONOFILL Y� APPROXIMATE 1981 FGDf C&D LANDFILL PONDS l' C ' f . AREA (CLOSED) LINED RETENTION BASIN AREA APPROXIMATE FUTURE ASH BASIN POWER PLANT WASTE BOUNDARY GYPSUM STORAGE. t COAL PAD AREA • � n ♦ ` .......J L►! %.4 PILE AREA - a �.. r .' ti •� . AZF Ire rP-=.tea Mont SOURCE: 2016 USGS TOPOGRAPHIC MAP, CLUSTER SPRINGS QUADRANGLE, QUAD ID: 36078E8, OBTAINED FROM THE USGS STORE AT https://store.usgs.gov/map-locator. �,�a _ _ DUKE PERSON COUNTY FIGURE ES-1 USGS LOCATION MAP ENERGY CORRECT IVEACTION PLAN UPDATE PROGRESS WINSTON-SALEM RA`EIGH • CHARLOTTE • MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA A MTA.�.�... DRAWN BY: A. ROBINSON DATE: 05/02/2019 REVISED BY: A. ROBINSON DATE: 12,06/2019 CHECKED BY: P. DATE: 12/06/2019 GRAPHIC SCALE 1,000 0 1.000 2.000 (IN FEET) ,�r 1 � rd WYLIE APPROVED BY: J. WYLIE DATE: 12/O6/2019 PROJECT MANAGER:J.WYLIE www.synterracorp.com O�W ASH BASIN COMPLIANCE _..� t o y DUKE ENERGY PROGRESS BOUNDARY �_• i� 4l ,� PROPERTY LINE r • s\ =�1 rl��l 60' RIGHT-OF-WAY NORTH CAROLINA-VIRGINIA STATE LINE HALIFAX COUNTY � st (APPROXIMATE) PERSON • PERSON COUNTY APPROXIMATE ASH BASIN e �. = WASTE BOUNDARY (100'HWY501 RIGHT-OF-WAY\ siFGD - �� \�.• •_'r�r�%� Z II ]► / py - I��SETTTING 100' RAILROAD "P �� BASIN 1 RIGHT -OF CCP MONOFILL APPROXIMATE 1981 FGD C&D LANDFILL I r jj PONDS - AREA (CLOSED) 7. LINED RETENTION/ t�,Yq/ r :'•� �I r V 1��-} ff � / BASIN AREA APPROXIMATE FUTURE ASH BASIN - _ POWER PLANT (� WASTE BOUNDARY / 'GYPSUM STORAGE- f�!� I COAL PAD AREA: n� STORAGE *� .' �i.�..�. li►! �.+.j PILE Ne., d y AREA - Mon1a u4_ 1 � - " Y - SOURCE: 2016 USGS TOPOGRAPHIC MAP, CLUSTER SPRINGS QUADRANGLE, QUAD ID: 36078E8, OBTAINED FROM THE USGS STORE AT hftps://store.usgs.gov/map-locator. DUKE PERSON COUNTY ENERGY PROGRESS WN,STO,-SAiEM _ AZ _17 ■- _ .-jar FIGURE 1-1 USGS LOCATION MAP CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA DRAWN BY: A. ROBINSON DATE: 05/02/2019 GRAPHIC SCALE REVISED BY: A. ROBINSON CHECKED BY: P. ALTMAN DATE: 12/06/2019 DATE: 12/06/2019 1,000 0 1,000 2,000 APPROVED BY: J. WYLIE PROJECT MANAGER: J. WYLIE DATE: 12/06/2019 (IN FEET) I- L��# o • • • # MW-14BR .0/ Q cW-5 r, r, A: SCALE 1" = 2000ft / �i, wpR '� �F -•y CCR-104S y� MW-156R MY-3 CCR-103S CW-4 CCR-104BR 7 + y CW-3 MW-16S • �►/ MAY9IAK CCR-103D MW-1046RL MW-16D 11 CCR-103BR MW-104BRM MW-3BR MW-103BRL' _ CCR- 009BR MW-16BR ~' MW-2 CCR-106BR PSB-2f + + ' • MW-103BRM PS ,r CW75 S-1 M% i MW-5BR ® PSB-1 S 1A S-4 C HAUFAxcouNry Y ! / PSB-2 CCR-105S r + PERsoN couNry / SB-1 CCR-105D �� +CCR-102BR- CCRCCR-ip3S / CCR-1056R MW-105BRL S-2B MW-105BRM PSB-25 R PSB-26 r rr PSB-27 - MW-13BR F + + AP-6 LOST IN SETTLING EVENT PSB-9—'"WAOSEPTEMBER 2019 , PSB-10 r I ABMW-2 AB-2 AB-1 ABMW-3 ABMW-3S ABMW-2BR AB-3 PSB-11 LRB-2 PSB-14 PSB-16 ® • uvv ~ MW-6B S-2 I TREAM CCR-107BR FGD-2BR TCHFIELD _ IVjW-7D ANCHI MW-107BRMWCBI MW-7BR FGD-1D1D Q MW-107BRL FGD j CCR-108BR � - 3B-24 MW-4 SB-5 FGD-10BR a FGD-9BR LANDFILLAREA IFGD-8BR ® (CLOSED) • MW-9BR PSB-23 SB-6 MW-9BRL w + + ABMW-2BRL PSB-21 ABMW-4 -• • • PSB-12 ABMW-4X PSB-22 BGBG_1 BGSB-3 LRB-1 PSB-15 ABMW-4D w �` + + ABMW-4BR I 1 1 f • SB 2 ® PSB-17 AB-4 .... r + � `�' � BGSB • _ __ + r rSB-5 APPROXIMATEFUTURE SB-18 PASH BASIN WASTE BOUNDARY (SEE NOTE 2) - ,1 SW-BB1 + LRB-3 ®BGSB-2 CPA-SB-6 NOTES: 1. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. 2. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT PRESENT IN THISAREAOF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES PERMIT NCO038377 PART I, 5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED JULY 13, 2018. 3. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE APPROXIMATE. 4. ALL BOUNDARIES ARE APPROXIMATE. 5. MAYO PLANT PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. 6. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019. AERIAL WAS COLLECTED ON FEBRUARY 6, 2017. 7. DRAWING HAS BEEN SET WITH PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). BGSB-1 BG-2PSB-19 FsB-3 CCR-101S-BG R-101 D-BGrCICPA-2B CPA-3D CPA-3BR BGSB-9 BGSB-8 CPA-4D CPA-4BR MW-12S I�..MY-1001 z� + MY-1002 MY-1003 _ *MULLINS LN• N o � O ■ CW-1 D P MW-18BR MW-19D Outfall 002 MW-19BR MW-106R SB-4 r � a V Wift, S-9 SW-REF2 S-6 0, REF1 - DKE ENERGY PROGRESS NORTH CAROLINA-VIRGINIA STATE LINE HALIFAX COUNTY - (APPROXIMATE) - - - _ - -- PERSON COUNTY 44 RI A 3BR t 3D ` 3R 2BR , GRAPHIC SCALE 490 0 490 980 (IN FEET) DRAWN BY: A. ROBINSON DATE: 06/06/201; REVISED BY: A. ROBINSON DATE: 12/08/2019 CHECKED BY: P. ALTMAN DATE: 12/08/2019 APPROVED BY: J. WYLIE DATE: 12/08/2019 PROJECT MANAGER: J. WYLIE I FrFnln e WELL IN ALLUVIUM OR WELL IN TRANSITION ZONE WELL IN BEDROCK WELL IN ASH PORE MONITORING WELL (ABANDONED) + SOIL SAMPLE LOCATION IN -STREAM SURFACE WATER LOCATION PER SOC/SEDIMENT SAMPLE LOCATION SURFACE WATER SAMPLE LOCATION SURFACE WATER/SEDIMENT SAMPLE LOCATION CONSTRUCTED SEEP (APPROXIMATE) NON -CONSTRUCTED SEEP (APPROXIMATE) ♦ NPDES OUTFALL LOCATION WATER SUPPY WELL ASH BASIN WASTE BOUNDARY • ASH BASIN COMPLIANCE BOUNDARY — - — - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) DUKE ENERGY PROGRESS PROPERTY LINE 310 STREAM (AMEC NRTR) ® WETLAND (AMEC NRTR) FIGURE 1-2 SITE LAYOUT MAP CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA _ _ _ PROGRESS A FUTURE 60' MAYO LAKE MPROPERTY LINE RORIGHT-OF-WAY zz )U N DARY -OF-WAY �W" I I FUTURE DUKE /ENERGY PROGRESS PROPERTY LINE i SOURCE: MARCH 22, 1951 AERIAL PHOTOGRAPH OBTAINED FROM THE USGS EARTH EXPLORER WEB SITE AT http://earthexplorer.usgs.gov/ GRAPHIC SCALE E pf D N ERGY 500 0 IN FEET 500 1000 DRAWN BY: J. CHASTAIN DATE: 5/03/2019 REVISED BY: C. NEWELL DATE: 10/2/2019 CHECKED BY: P. ALTMAN DATE: 10/2/2019 PROGRESS APPROVED BY: J. WYLIE DATE: 10/2/2019 141P PROJECT MANAGER: J. WYLIE WnTem www.synterracorp.com FUTURE POWER PLANT FIGURE 1-3 1951 AERIAL PHOTOGRAPH CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA I HALIFAX COUNTY r _ PERSON COUNTY ,l • ♦ T -MAY AK • ._, . ♦ I / ®� — _ O L_ E R°ADS - � - .' .. • � _ — - �Z MW-14BR ♦ - _��---- HFSTFRRO l l ■ a ` `` ` _ - �_ l � CCR-1028R-BG / �, �. / 1 �o.�a/e.■ LANDFILL 6 " • ' ♦ MW-13BR • �__ U ♦ I I NORTH CAROLINA-VIRGINIA STATE LINE (APPROXIMATE) ► ► ,�°P LEGEND \�; \ • ♦ 41:, J GROUNDWATER BACKGROUND SAMPLE LOCATION SOILAND GROUNDWATER SAMPLING LOCATION BG-1 • SOIL SAMPLE LOCATION I ► ' • . r, . _ ■ SURFACE WATER SAMPLE LOCATION ► I • APPROXIMATEFUTURE E ASH BASIN WASTE BOUNDARY ASH BASIN WASTE BOUNDARY ` 'd : _ . _ . / / ► ► (SEENOTE2) - ASH BASIN COMPLIANCE BOUNDARY ' ' ✓ — - — - - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) DUKE ENERGY PROGRESS PROPERTY LINE I 1STORA_ \>, /, /• �o� BG 2 - iPOWE 0 STREAM (AMEC NRTR) I IZ, rAREA ® WETLAND (AMEC NRTR) / c \ ? i ' ,.7 NOTES: • . STORAGE + `� 1. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE US /PILE ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A I/ 1' PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY AREA / / I `n, WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER 1 ' E WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE I 1 RIGHT -OF -WAR`' t -,� } TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT DATED JANUARY I , 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE PREVIOUSLY I I MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. /� `♦ .p 2. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT = = ' PRESENT IN THIS AREA OF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH a♦ ` I I •' BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES La a I - PERMIT NCO038377 PART I, 5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED JULY 13, r a, ■ • • ' 2018. `\, I 3. ALL BOUNDARIES ARE APPROXIMATE. i Ail ■ n 4. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. Fir-i'll-fra• " • " • 0 MW-12S ...� 5. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019. REFI AERIAL WAS COLLECTED ON FEBRUARY 6, 2017. 9� "'" ♦ ■ 6. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). ■ GRAPHIC SCALE ,ate'♦� DUKE 500 0 500 1,000 FIGURE 4-1 = MULLINSLN `* ENERGY (IN FEET) BACKGROUND SAMPLE LOCATIONS I PROGRESS CORRECTIVE ACTION PLAN UPDATE y o DRAWN BY: A. ROBINSON DATE: 06/05/2019 REVISED BY: A. ROBINSON DATE:12/03/2019 MAYO STEAM ELECTRIC PLANT CHECKED BY: P. ALTMAN DATE: 12/03/2019 ROXBORO NORTH CAROLINA .tWOOL APPROVED BY: J. WYLIE DATE: 12/03/2019 .- •-��- :.2 - �a+'�-�•-�+• _ _ T ._._ PROJECT MANAGER: J. WYLIE NORTH TRARR CONCEPTUAL CROSS-SECTION OF PRE -DECANTING CONDITIONS (NOT TO SCALE) ASH BASIN DAM (FILL) MAYO LAKE RD. Awl �' DUKE ENERGY PROGRESS 161P synTerra / GENERAL NOTES SITE FEATURES KEY O RIDGES EAST, WEST, AND SOUTH OF THE ASH BASIN COINCIDE WITH GROUNDWATER DIVIDES WHICH PROVIDE HYDRAULIC CONTROL KEEPING CONSTITUENT MIGRATION WITHIN THE FORMER CRUTCHFIELD BRANCH STREAM VALLEY AND AWAY FROM POTENTIAL RECEPTORS AND WATER SUPPLY WELLS ©LIMITED VERTICAL COI MIGRATION THROUGH TRANSITION ZONE AND INTERCONNECTED BEDROCK FRACTURES © FORMER STREAM CHANNEL IN ASH BASIN O PONDED WATER IN THE ASH BASIN CAUSES LIMITED AREA OF DOWNWARD VERTICAL MIGRATION OF CONSTITUENTS NEAR THE DAM DUE TO ELEVATED HYDRAULIC HEAD © UPWARD VERTICAL GRADIENTS IN GROUNDWATER IMMEDIATELY DOWNGRADIENT OF THE ASH BASIN DAM LIMIT VERTICAL MIGRATION OF CONSTITUENTS CURRENT AREA OF BORON CONCENTRATION IN GROUNDWATER GREATER THAN CRITERIA (SEE GENERAL NOTE 1) FREE PONDED WATER GENERALIZED GROUNDWATER FLOW DIRECTION 11110-► GENERALIZED ASH PORE WATER FLOW DIRECTION STREAM - - - INTERMITTENT STREAM GENERALIZED BEDROCK FRACTURE -- APPROXIMATE FORMER STREAM WITH FLOW DIRECTION ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY ®GENERAL AREA OF WATER SUPPLY WELL USERS (SEE GENERAL NOTE 2) WATER LEVEL 1) GENERALIZED AREAL EXTENT OF BORON MIGRATION REPRESENTED BY NCAC 02L EXCEEDANCE IN MULTIPLE FLOW ZONES BASED ON FLOW AND TRANSPORT (APPENDIX G). 2) PERMANENT WATER SUPPLY HAS BEEN IMPLEMENTED PROVIDING 16 SURROUNDING WELL USERS WITH WATER TREATMENT SYSTEMS. THIS WORK WAS COMPLETED IN ACCORDANCE WITH HB630 AND SUBSEQUENTLY APPROVED BY NCDEQ ON OCTOBER 12, 2018. 3) THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT DATED JANUARY 2014 AND UPDATED ON JULY 11,2018 TO REMOVE ONE PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. 4) ALL BOUNDARIES ARE APPROXIMATE. VISUAL AID ONLY - DEPICTION NOT TO SCALE DRAWN BY: A. FEIGL DATE: 6/2/2019 REVISED BY: C. NEWELL DATE: 12/8/2019 CHECKED BY: P. ALTMAN DATE: 12/8/2019 APPROVED BY: J. WYLIE DATE: 12/8/2019 PROJECT MANAGER: J. WYLIE www.synterracorp.com FIGURE 5-1 CONCEPTUAL SITE MODEL PRE -DECANTING CONDITIONS CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA Corrective Action Plan Update December 2019 Mayo Steam Electric Plant SynTerra Figure 5-2 Legrand Slope Aquifer System Included in Section 5 Text Corrective Action Plan Update December 2019 Mayo Steam Electric Plant SynTerra Figure 5-3 General Profile of Ash Basin Pre - Decanting Flow Conditions in the Piedmont Included in Section 5 Text Corrective Action Plan Update December 2019 Mayo Steam Electric Plant SynTerra Figure 5-4a Water Level Map — Surficial Flow Zone — April 2019 Provided in separate electronic figure file as a large sheet size Corrective Action Plan Update December 2019 Mayo Steam Electric Plant SynTerra Figure 5-4b Water Level Map — Transition Flow Zone — April 2019 Provided in separate electronic figure file as a large sheet size Corrective Action Plan Update December 2019 Mayo Steam Electric Plant SynTerra Figure 5-4c Water Level Map — Bedrock Flow Zone — April 2019 Provided in separate electronic figure file as a large sheet size 47 NORTH CAROLINA-VIRGINIA STATE LINE HALIFAX COUNTY -- / (APPROXIMATE) -��.- ' f y-_� _ •-_ l �+ y PERSON COUNTY ell ov elk "'M R ; i � ��� F �+•� y. �' r 4�r ` � � � _ � � rr r ,r, r i % _, 7~ w ! I i rrlr} t t �_FGD SETTLING �• f \ ` , If eo 0-1 k. /*� f } � LEGEND � � � I � ti \ ail. �► Nk WIL Pv NOTES: `!+ �♦ 1. VELOCITY MAGNITUDES IN FEET PER DAY (FT/DAY). 2. VELOCITY VECTORS ARE IN THREE DIMENSIONS. I i1 a �t _ — Y�► ! `! = , f - r 3. VELOCITY VECTOR DIRECTIONS SHOWN AS BLACK ARROWS. 4. UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT FOR h ` ` l ~ r ASH BASIN WASTE BOUNDARY MAYO STEAM ELECTRIC PLANT, ROXBORO, NORTH CAROLINA, 2019 (MURDOCH APPROXIMATE FUTURE ET AL, 2019). _ ._ . ASHBAS(SEENOTE6)IN WASTE BOUNDARY f f ■ ■ 1 ASH BASIN COMPLIANCE BOUNDARY y _ (SEE NOTE 6) 5. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE - — - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) U.S. ARMY CORPS OF ENGINEERS ATTHE TIME OF THE MAP CREATION. THIS e + 1, . , y _ r ti DUKE ENERGY PROGRESS PROPERTY LINE MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE ; • V �, �, ` i 1 1 PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM `♦ AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURALS . y , r 1 STREAM (AMEC NRTR) RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT ' _ \ • DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE 1 r \ \ + f PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL.► GRAPHIC SCALE FIGURE 5-5a �` y ti DUKE 380 0 380 760 �+ +� 6. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT r � � r F "-+ ` " FLOW VELOCITY VECTORS AND MAGNITUDES FOR � ENERGY PRESENT IN THIS AREA OF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH �, r� ' �` (IN FEET) PRE -DECANTING CONDITIONS BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES PROGRESS \ DRAWNBY: A.ROBINSON DATE:06/06/2019 TRANSITION ZONE (MODEL LAYER 13) 20E$MITNC0038377PARTI,5.A.(18.)ATTACHMENTBFIGURE1.1DATEDJULYI3, f . L REV ISEDBY: A.ROBINSON DATE:12/06/2019 CORRECTIVE ACTION PLAN UPDATE I �' CHECKED BY: P. ALTMAN DATE: 12/06/2019 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE APPROVED BY:J. WYLIE DATE:12/06/2019 MAYO STEAM ELECTRIC PLANT / PROJECT MANAGER: ROXBORO NORTH CAROLINA PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). � 'IN �. � - � �/�'�Terra , —� " ' www.synterracorp.com { ! f f f f f I . !l "ice f `! !! 1� 11 \ t ■ ti� �: ` �, NORTH CAROLINA-VIRGINIA STATE LINE f HALIFAX COUNTY J / l (APPROXIMATE) �l-� - .Ff A -_—� f 1 ,F ��i—^"-l� f / ! �ti -__ PERSON COUNTY r lb41 LAW Imp y + + ■ +.�.� �' LEGEND 40 ; ■ - `, "�1 �`�', it �� '� •rr ; `*,`'�1w- NOTES: +l '1 1 ' / ` Z �� ` 1 ~ 0 1 1. VELOCITY MAGNITUDES IN FEET PER DAY (FT/DAY). `�► r� ' f r ` �_ - r 2. VELOCITY VECTORS ARE IN THREE DIMENSIONS. I ` �-. ` �. 1 ►'. •1. �` 3. VELOCITY VECTOR DIRECTIONS SHOWN AS BLACK ARROWS. LINEDON `-' : i : 1 A` j �+ t 4. UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT FOR ■ t . FUTUASH BASIN WASTE BOUNDARY MAYO STEAM ELECTRIC PLANT, ROXBORO, NORTH CAROLINA, 2019 (MURDOCH APPROXIMATE RE ` ti AREA ASHBASINWASTE BOUNDARY ET AL, 2019. 1 Y _ (SEE NOTE 6) .� l 1� { J SEEN ASH BASIN COMPLIANCE BOUNDARY �. � ► � " 5 5. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE La RIGHT-OF-WAY (DUKE ENERGY PROPERTY) U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS �.� _ f►' - = L { �. �' `. 1,� r DUKE ENERGY PROGRESS PROPERTY LINE MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE ► 1 I - ,...1► ti _ ` t ••' ' ► , r PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM , �' ti 1 ` • • . �' AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL �r 1 �' �_ ti t • t ` 1 STREAM (AMEC NRTR) RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT �, DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE + f PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE ` ` ■ ' CHANNEL. 1 I ■ ~ ` e GRAPHIC SCALE FIGURE 5-5b DUKE 380 0 380 760 6. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT FLOW VELOCITY VECTORS AND MAGNITUDES FOR PRESENT IN THIS AREA OF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH �� �.�ENERGY (IN FEET) CLOSURE -BY -EXCAVATION SCENARIO BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES I \ - ' y --,. PROGRESS PERMIT NCO038377PART I,5.A.(18.)ATTACHMENT BFIGURE 1.1 DATED JULY13, a - 1 DRAWN BY: A. ROBINSON DATE:06/06/2019 TRANSITION ZONE (MODEL LAYER 13) REVISED BY: A. ROBINSON DATE: 12/06/2019 2018. \ :` ti CHECKED BY.'P.ALTMAN DATE:12/06/2019 CORRECTIVE ACTION PLAN UPDATE 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE f APPROVED BY:J. WYLIE DATE:12/06/2019 MAYO STEAM ELECTRIC PLANT PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). `.. f synTerrd PROJECT MANAGER:J. WYLIE ROXBORO, NORTH CAROLINA ' 1 www.synterracorp.com r — 1 \ _ ■ j Af t \ L NORTH CAROLINA-VIRGINIA STATE LINE 1 ` • .� r� HALIFAX COUNTY op � l � } � � _ t (APPROXIMATE) +'� -.ram,.-�•�.- ,.�.•' .-.•�� �. ,.-�� F� —.�--- — _ -7 T� �^ } -�-- - r PERSON COUNTY -- �' r r • YAYO LAKE •..�� I 7 f �" f r, f' eo tw A. 10 �• ti _ \ 1 1 ! .• A LEGEND sk Ad T ti NOTES:- 1. VELOCITY MAGNITUDES IN FEET PER DAY (FT/DAY).` a `� •� Imo' �4 ` �� 40 2. VELOCITY VECTORS ARE IN THREE DIMENSIONS. lk 3. VELOCITY VECTOR DIRECTIONS SHOWN AS BLACK ARROWS. ■ r • _ \ ` t /� 1 4. UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT FOR I �' Isr • Y \ ` `4 1 ~ { '1 \ ASH BASIN WASTE BOUNDARY MAYO STEAM ELECTRIC PLANT, ROXBORO, NORTH CAROLINA, 2019 (MURDOCH ; APPROXIMATEFUTURE = �'J a ASH BASIN WASTEBOUNDARY ET AL, 2019). (SEE NOTE 6) ■ ■ ASH BASIN COMPLIANCE BOUNDARY 1 5. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE r �I +�-• r ~ ti '\ / ti ~ .� — - — - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS f - ` R MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE J �' ` ` N • ' ' �. `' ti ` ' ' DUKE ENERGY PROGRESS PROPERTY LINE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM ' I �� AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL r r r 1 ~ 1 , STREAM (AMEC NRTR) RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT ■ _ , DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE I y� f • PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE r CHANNEL. _ _ ` t' 'r 380 GORAPHICSC380 76o FIGURE 5-5c 6. AREA OFINVESTIGATION THAT DETERMINED SETTLED CCRMATERIALISNOT f 1 `� �� DUKE FLOW VELOCITY VECTORS AND MAGNITUDES FOR PRESENT IN THIS AREA OF THE ASH BASIN. AFUTURE REPRESENTATIVEASH r1 r =ti • �. ENERGY (IN FEET) BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDCLOSURE-IN-PLACE SCENARIO P�20GRE55 ES f ?� 1 ti • y PERMITNC0038377PART1,5.A.(18.)ATTACHMENTBFIGUREI.1 DATEDJULYI3, I 1 DRAWN BY: A. ROBINSON DATE:06/06/2019 TRANSITION ZONE (MODEL LAYER 13) IS BY: A. ROBINSON DATE: 12/06/2019 2018. r T.., CHECKED BY: P.ALTMAN DATE:12/06/2019 CORRECTIVE ACTION PLAN UPDATE 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE ` f = APPROVED BY:J. WYLIE DATE:12/06/2019 MAYO STEAM ELECTRIC PLANT PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). f` ` synTerra PROJECT MANAGER:J. WYLIE ROXBORO NORTH CAROLINA —� 4 , www.synterracorp.com NORTH CAROLINA-VIRGINIA STATE LINE HALIFAX COUNTY (APPROXIMATE) I I ' 1 I ♦ I♦ 0♦ J# f PERSON COUNTY ,♦ I♦ RT NEST R P Ro I 1 1 CCP MONOFILL 1 0 MY-L000 MY2018-C _ ♦ r ♦ t ' I ♦ AYO LAKE ROAO ♦ r •1 ` I � a 1 1 r I r `■ R ( • jAREA i ! • • 1 � 1 I • 1 ► v 0P° i APPROXIMATE FUTURE + ASH BASIN WASTE BOUNDARY 1 (SEE NOTE 2) 1 100' HWY 501 W,dRIGHT-OF-WAYM ♦ MY-L - ♦ ! MY-2011 MY-2008 N M -2005 ., �^ MY2007 MULLINS LN MY2009 I I♦ I ♦I ♦I I I I I I I♦ 1 1 1 ■ 1 1 DUKE �� ENERGY 650 GRAPHIC SCALE 0 (IN FEET) 650 1,300 PROGRESS DRAWN BY: A. ROBINSON REVISED BY: A. ROBINSON DATE: 06/05/2019 DATE: 12/12/2019 CHECKED BY: P. ALTMAN DATE: 12/12/2019 APPROVED BY: J. WYLIE DATE: 12/12/2019 PROJECT MANAGER: J. WYLIE LEGEND WATER TREATMENT SYSTEM 0 OPT OUT OR NON -RESPONSIVE OF WATER TREATMENT SYSTEM LOCATION DEEMED NOT ELIGIBLE PER HOUSE BILL 630 (BUSINESS/CHURCH/SCHOOL) BUT VOLUNTARILY SUPPLIED PERMANENT WATER SOLUTION VACANT PARCELS PARTIALLY OR ENTIRELY WITHIN HALF -MILE RADIUS NOT OWNED BY DUKE ENERGY CITY OF ROXBORO WATER LINE HALF MILE RADIUS FROM ASH BASIN COMPLIANCE BOUNDARY ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY — - — - - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) DUKE ENERGY PROGRESS PROPERTY LINE STREAM (AMEC NRTR) T� WETLAND (AMEC NRTR) 10 GENERALIZED GROUNDWATER FLOW DIRECTION NOTES: 1. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. 2. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT PRESENT IN THIS AREA OF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES PERMIT NCO038377 PART I, 5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED JULY 13, 2018. 3. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY IS BASED ON LIDAR BARE EARTH DATA OBTAINED FROM THE NORTH CAROLINA SPATIAL DATA SITE AT https://sdd.nc.gov/sdd/DataDownload.aspx. 4. ALL BOUNDARIES ARE APPROXIMATE 0w2i]»:71va ii11LIBill :Ya,:1iP/b]A.1:17.111 /:1411ml:ZH'd,:1i1c]:1*R 6. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019. AERIAL WAS COLLECTED ON FEBRUARY 6, 2017. 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). FIGURE 5-6 HB630 PROVISION OF PERMANENT WATER SUPPLY COMPLETION MAP CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA HALIFAX COUNTY PERSON COUNTY r --- i ♦4* �• — I I �♦ `. NORTOCAROLINA-VIRGINIA STATE LINE ♦ , Iown*-ifto (APPROXIMATE) 40 • • ♦ S=MAYOLq `•� INSTREA • • I LAKE RO_gp_ , CRUTCHFI 1 • _ _ __� ; ♦I �� / /i , _.� ; :Z I BRA NCWSW-CBI I • �•♦ I S-lA S-4 r� r ♦ RT NFSTe • g_1 S-2 5-10 �' Ro • . • a i 1 1990 1430 0 774 ' — - - - • ` 7 / ♦ S-2B 1 . \ \ / � I / �• 1830 � � � • sLANDFILL 1 • 1 1 II �1 G I � ' 1 • 11 1 1 • �00 1' 11 � i r♦ • 9 ♦I 1 At _ APPROXIMATE FUTURE 1 1 BASIN= A)NTE BOUNDARY r 1 (SEE NOTE ^y I 0 0 •♦ �� •00 ♦� oo MULLINS LN o ♦ I ♦ h ♦ I ♦ A 1.0 I ♦ Outfall 001 I - ♦ I I 0 S6 It ENERGY PROGRESS 1 1 ♦ I I I LEGEND ■ 02L -02B SURFACE WATER SAMPLE LOCATION BORON CONCENTRATION SURFACE WATER IMIIIIIIII CONSTRUCTED SEEP MONITORED UNDER THE SOC (APPROXIMATE) 5430 BORON CONCENTRATION CONSTRUCTED SEEP NON -CONSTRUCTED SEEP MONITORED UNDER THE SOC (APPROXIMATE) 774 BORON CONCENTRATION NON -CONSTRUCTED SEEP DISPOSITIONED SEEP (APPROXIMATE) IN -STREAM SURFACE WATER LOCATION PER SOC (APPROXIMATE) NPDES OUTFALL LOCATION GRAPHIC SCALE 580 0 580 1,160 (IN FEET) DRAWN BY: A. ROBINSON DATE: 06/05/2019 REVISED BY: A. ROBINSON DATE: 12/16/2019 CHECKED BY: P. ALTMAN DATE: 12/16/2019 APPROVED BY: J. WYLIE DATE: 12/16/2019 PROJECT MANAGER: J. WYLIE �:69 :1:1_F911 \�P/_F91 � :i•11J I L7_1:>! 1 — • — - - ASH BASIN COMPLIANCE BOUNDARY — - — - - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) - - DUKE ENERGY PROGRESS PROPERTY LINE STREAM (AMEC NRTR) ® WETLAND (AMEC NRTR) ® ASH BASIN FREE PONDED WATER OTHER NPDES REGULATED WATER FEATURE :[•ii4.3 1. GROUNDWATER TO SURFACE WATER (02L-02B) SAMPLES WERE COLLECTED TO ASSESS WHETHER GROUNDWATER MIGRATION IS CAUSING CONSTITUENT CONCENTRATIONS IN CRUTC HFIELD BRANCH TO BE GREATER THAN THE APPLICABLE 02B STANDARDS. 02L-02B SAMPLING WAS CONDUCTED FROM APRIL 30 - MAY 3, 2018 FOLLOWING DIVISION APPROVED PROTOCOLS. IN THE FIVE DAYS PRIOR TO SAMPLING, A TOTAL OF 0.60 INCHES OF RAINFALL WAS OBSERVED AT MAYO STEAM ELECTRIC PLANT. DURING THE FOUR -DAY SAMPLING EVENT, NO RAINFALL WAS OBSERVED AT MAYO STEAM ELECTRIC PLANT. RESULTS FROM 02L-02B SAMPLING INDICATE THERE ARE NO CONSTITUENT CONCENTRATIONS GREATER THAN THE APPLICABLE 02B STANDARDS IN CRUTCHFIELD BRANCH. 2. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT PRESENT IN THIS AREA OF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES PERMIT NCO038377 PART I, 5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED JULY 13, 2018. 3. CONSTRUCTED AND NON -CONSTRUCTED SEEPS ARE COVERED UNDER THE SPECIAL ORDER BY CONSENT (SOC) EMC SOC WOS18-005. 4. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL 8 INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. 5. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLYAND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY IS BASED ON LIDAR BARE EARTH DATA OBTAINED FROM THE NORTH CAROLINA SPATIAL DATA SITE AT HTTPS:IISDD.NC.GO VISDDIDATADO W NLOAD.ASPX. 6. ALL BOUNDARIES ARE APPROXIMATE 7. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS 8. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019. AERIAL WAS COLLECTED ON FEBRUARY 6, 2017. 9. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM PIPS 3200 (NAD83). FIGURE 5-7 MAP OF SURFACE WATERS CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA Corrective Action Plan Update December 2019 Mayo Steam Electric Plant SynTerra Figure 6-1 Fly Ash and Bottom Ash Interbedded Depiction Included in Section 6 text A--ow- (SOUTHWEST) A' (NORTHEAST) /ice j _ 1 i \ ♦ /\/\I/1 �/�/\I/1� / \/\I/1 �/�/\I/1� /\/\I/1 �/�/\I/1� / \/\I/1 �/ �/\I/1� /\/\I/1 �/ �/\I/1� / \/\I/1 �/ �/\I/1� /\/\I/1 �/ �/\I/1� / \/\I/1 �/�/\I/1� /\/\I/1 �/�/\I/1� / \/\I/1 �/�/\I/1� /\. LEGEND MW 12S WELL IN ALLUVIUM OR SAPROLITE MW 16D WELL IN TRANSITION ZONE MW 16BR WELL IN BEDROCK ABMW 2 WELL IN ASH PORE WATER GENERALIZED WATER TABLE GENERALIZED GROUNDWATER FLOW DIRECTION GENERALIZED SUBSURFACE ASH PORE WATER FLOW DIRECTION GENERALIZED VERTICAL HYDRAULIC GRADENT - - - GENERALIZED FRACTURE ORIENTATIONS 0 ASH Q ASH PORE WATER / WASTEWATER 0 SAPROLITE ® TRANSITION ZONE BEDROCK NOTES ASH PORE WATER FLOW LAYER 1. WATER ELEVATIONS REPRESENT THE APRIL 2019 GAUGING EVENT FOR EACH WELL. NOTE ELEVATIONS WITHIN EACH CLUSTER ARE MEASURED IN THE SAME DAY. REFERENCED TO NORTH WATER LEVEL ELEVATION AMERICAN VERTICAL DATUM 1988. 7 ALLUVIUM OR SAPROLITE FLOW LAYER 2. WATER LEVEL IN MW-105BRL IS NOT PROVIDED BECAUSE THE WATER LEVEL HAD NOT REACHED GROUNDWATER LEVEL ELEVATION STATIC CONDITIONS. 3. FRACTURES DEPICTED ON THIS CROSS SECTION REPRESENT THE GENERALIZED TRANSITION ZONE FLOW LAYER GROUNDWATER ORIENTATIONS OF THE PREVALENT FRACTURE SETS OBSERVED AT THE SITE BASED ON TELEVIEWER LEVEL ELEVATION LOGGING AT SITE -SPECIFIC BOREHOLES. THEY ARE SHOWN WITH APPROPRIATE APPARENT DIP, WITH VERTICAL EXAGGERATION. THIS CROSS SECTION IS APPROXIMATELY PARALLEL TO THE PREDOMINANT FRACTURE STRIKE DIRECTION. THE ACTUAL NUMBER OF FRACTURES IS FAR TOO BEDROCK FLOW LAYER GROUNDWATER NUMEROUS TO ILLUSTRATE AT THIS SCALE. IN ADDITION, THE DEPTHS AND LENGTHS OF FRACTURES LEVEL ELEVATION VERSUS DEPTH ARE CONCEPTUAL ONLY. 4. ALL BOUNDARIES ARE APPROXIMATE. WELL SCREEN 5. CROSS SECTION REPRESENTATIVE OF PRE -DECANTING CONDITIONS. 381.02 WATER LEVEL ELEVATION (NAVD 88) (LABEL COLORING BY FLOW ZONE) DUKE ENERGY PROGRESS GRAPHIC SCALE PROPERTY LINE 0 135 270 540 - - - ASH BASIN COMPLIANCE BOUNDARY 'DUKE FIGURE 6-2 HORIZONTAL SCALE: 1°=540• A ENERGY VERTICAL 1"= GENERAL CROSS-SECTION A ASH BASIN WASTE BOUNDARY TI -A' 5X VERTICAL EXAGGERATION EXAGGERATION PROGRESS DRAWN BY: J. CHASTAIN DATE:08/02/2019 ASH BASIN REVISED DATE:12/2/2019 CORRECTIVE ACTION PLAN UPDATE CHECKED BY: P. ALTMAN DATE: 12/2/2019 116rip APPROVED BY: P.ALTMAN DATE:12/2/2019 MAYO STEAM ELECTRIC PLANT PROJECT MANAGER: J. WYLIE LAYOUT: FIG 6-2 (ASH BASIN-WQ ROXBORO, NORTH CAROLINA synTel'1'd www.synterracorp.com 1501 1001 11 1 =�- MAYO / - L EKE ROAD-= - - _ �.- .-.. I — _ �- / / ® Mqy—LAKE ROAD_ / r 4. ♦� 4♦. POST CLOSURE PRE -DECANTING . / / CONDITIONS ° �� ° '°•♦ �: , CONDITIONS FOR CLOSURE ♦. °�♦ rl `\� `` ���� -IN -PLACE i ; � \ ���/�, �� �,� ` .�': ,AREA LANDFILL Oe%` , r , 4D AREI , I � � lEY-�\ � � 1�� ` �///-�.%/J �`�! J � �� _ i � ; %lil, ��� �� 1 �/ � �� ✓jJ// � %//l�I� (CLOSED) - 0.0 o%�J//� l/// %� ill` ��` i" \� ^ _.I�,// /1{I iIm "1 p-� 1 1// ° {I 00 ,� �� Ao / w I 1 11 1 / /L 11 .1 1+ � APPROXIMATEFUTURE 0 ' ` / V ASH BASIN WASTE BOUNDARY/ ♦ y '- �. I fff'/// _ , • l (SEE NOTE 2) 1 1 1 I {�y�{ W . , 1/ 6 1 I /• ( I r � APPROXIMATE FUTURE , /// ` 77�SS" ASH BASIN WASTE BOUNDARY t4 ^ (SEE NOTE 2) 1 1 _ 1 I 'i'�a►. 80 FEET 1 1 1 - 80 FEET dim. W_ ' • - . 0 FEET i 0 FEET 1 1 1 - 1 1 *0 Oft LEGEND NOTES 1. ASH THICKNESS ISOPACH SURFACES FROM FLOW AND TRANSPORT MODELS (MURDOCH et al., 2019). -—SATURATEDASHTHICKNESSISOPACH(FT) 2. AREA OFINVESTIGATION THAT DETERMINED SETTLED CCRMATERIAL ISNOT PRESENT INTHIS AREA OFTHE ASH BASIN. A ASH BASIN WASTE BOUNDARY FUTURE REPRESENTATIVE ASH BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES PERMIT NCO038377 PART 1,5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED JULY 13,2018. DUKE ENERGY GRAPHIC SCALE 330 0 330 660 (IN FEET) FIGURE 6-3 SATURATED ASH THICKNESS PRE -DECANTING AND CLOSURE -IN -PLACE SCENARIOS SCENARIOS DRAWN BY: A. ROBINSON REVISEDBY: C.DAVIS CHECKED BY: P.ALTMAN DATE: 06/07/2019 DATE:12/15/2019 DATE:12/15/2019 _ - _ ASH BASIN COMPLIANCE BOUNDARY 3. SATURATED ASH THICKNESS BASED ON CLOSURE MODEL RESULTS WITH UNDERDRAINS. ---RIGHT-OF-WAY (DUKE ENERGY PROPERTY) 4. ALL BOUNDARIES ARE APPROXIMATE. • DUKE ENERGY PROGRESS PROPERTY LINE PROGRESS J CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT 5. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. 6. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019AERIAL WAS COLLECTED ON FEBRUARY 6, 2017. APPROVED BY: J. WYLIE PROJECT MANAGER: J. WYLIE DATE: 12/15/2019 ROXBORO, NORTH CAROLINA 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM PIPS 3200 synTerra www.s nterraco77m A---w-- (SOUTHWEST) now A' ASH BASIN COMPLIANCE BOUNDARY (NORTHEAST) 0 a 0 0-1 ASH BASIN WASTE BOUNDARY U) ABMW-4 WELL CLUSTER LOCATED IN THE a ORIGINAL CHANNEL OF CRUTCHFIELD BRANCH BASED ON HISTORIC USGS TOPO z v+li+\� tir AND AERIAL PHOTOGRAPHS N 03 N in N Y' m m m 2 2 2 0? m U o m m m SAPROLITE 0 00 0 ¢¢¢ mmm �� a ooLOLOLO L o 0 0 0 ¢¢¢ TOP OF ASH o -1 o 0 IW-12S 3 <50 COAL PILE AREA J J J J 00 ¢¢ °� BASIN DAM= 488 z in U U U ` m m ¢ EARTHEN DAM o 0 1W-12D TRANSITION — SAPROLITE (FILL) a d d 3 <5 ZONE _ GENERALIZED GROUND TER FLOW DIRECTION _ - =--_ TRANSITION ----- - - - - - - - -------- ----- ABMW-3 -ASH====--_ WATER ELEVATION=480 �� ��� Q < - - -_ - - - - - - - -_--- --_-_ -- -ASH---- -- 195 4 N w -4AMWa 3:BM B 5,470 B8532 AMW1,320 g L\1� U \- / \ , ABM Q B 3, - TRANSITION ZONE / / I I.�.r \I1L /-i\I./`/_ /\ -i\I/1 /-i I./ -i\I/1 /-i\'`- ABMW-2BR -i\I/1 /-i I\/\ -/\I/\ /\ TRA MW-16S \/\ /1, BEDROCK.\ \ 1, \/\ /1, \ /1, \/\ /1, \ /1,�\ /\, \ �\ /1, \ ,�\ _,�\ /1,�� _ /�\ / ,�_ TIO R-1055 ABMW-4BR B <5 \�/\ / _ \ / /. / _ \ . / _ E N 11 510 B <50 i,\/\/1/\i/�/1�`�/\'I/\i/\\/I�\`�/`'I/\ CW-2 CCR-105D .ALLUVIUM- \/\I/1�/ /\I ♦/ /\I 1`/ /\I ♦/ /\I/1\/ /\I ♦/ I ♦/- _ _ /\/1 /\I ♦/ /\I/1`/-/ I ♦/_ /\I/1 /�'�T_ �I/1�/\/\I/1�/\/ B 810 B 720 SAPROLITE 7-- �1 /\-_\ 1�/�-\�\'/�-\-1�/�-\�1'/� _\-1//` -\�,�, 1//. -\�\ /�-\-\//`-\�\'/\--\-\//`-\�\�/\--\ \/'' CCR-1056R / TRANSIT'oN ZONE MW-16D _�\I./``_\�I•/\�-i\I /`�-`'./- -�� /\/-\ /- -��-/BEDROCK'I\i-i\I /`/_\•I./`/ i\I�\B < ��Ice\\.li; _ _i�./`�_\•I./ _i�./`BEDROCK 894 B 273 \ / \ / 1 \ / 1 , \ / \ / 1 \ / 1 . \ / 1 / \ ` / \ \ I / 1 , \ / \ / 1 \ \ I / 1 CRUTCHFIELD Mw-166R - 1'/ - \ \'/ - \ - \'/ BRANCH \ B <50 /.--\1'/�\-1�/`=��/r/t/�4'/\-/\_1�/� BEDROCK B 50 \/\I/ 1� �\/\I/ 1` �\/\I/ 1� �\/\I/ 1` �\/\I/1� �\/\I/ 1` �\/\I/ 1� ��-\fj 1>✓`t'��\fly /i-LL/1` �\/\I/1� �\/\I/1` �\/\I/ 1� �\/\'/ 1 � �\/\I/1� �\/\I/1` �\/\I/ 1� �\/\I/ 1` �\/\I/ 1� ��i\I/ 1` �\/\I/1 � ��i\I/ 1` �\/\I/ 1� ��i\I/ 1` �\i\I/1� ��i\I/1` �\. \/\I/ 1; ��%\I/ 1` `\%\I/ 1; ��%\I/ 1` `\%\I/1; ��%\I/ 1` `\%\I/ 1; ��%\I/ 1` `\%\I/1; ��%\I/1` `\%\I/1; ��%\I/1` `\%\I/ 1; ��%\I/ 1` `\%\I/1; ��%\—I/1�` `\%\I/ 1; ��%\I/ 1` `\%\I/ 1; ��%\I/ 1�!r\.J��-.i+� �[i�*/ j � �\r\I/ 1; ��i\I/ 1` �\i\I/1; ��i\I/1` �\• /. � / I� \/./\ / li \/. � / I� \/./\ / li \/. � / I� \/./\ / li \/. � / I� \/./\ / I.yL. � / li \lil\ / 1, \l• � / 1' \/ ;�\ //I, \/• � / I' \/ \�\ //I, \/ �� //1' \/ ;�\ //1, \/ �� /,I' \/ \�\ //I, \/ �� /,I' \/ \�\ //I, \/ ;� //I' \/ ;�\ //I \/ ;� /,I' \/ \�\ //I, \/ ;� //1' \/ ;�\ //1, \/� - I � ♦ /- I ` ♦ / - I � ♦ /- I ` ♦ / - I � ♦ /- I ` \ / - I � ♦ /- I ` ♦ / - I � ♦ /- I ` \ / - I � ♦ /- I ` \ / - I � ♦ /- I ` ♦ / - I � ♦ /- I ` ♦ / - I � ♦ /- I ` ♦ / - I � ♦ /- I ` ♦ / - I � ♦ /- I ` , - I � ♦ /- I ` ♦ / - I � ♦ /- ` I . / \ � _ ♦ / � / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ / \ I / 1 � � \ . LEGEND MW 12S V ASH PORE WATER FLOW LAYER WELL IN ALLUVIUM OR SAPROLITE WATER LEVEL ELEVATION MW 16D WELL IN TRANSITION ZONE V ALLUVIUM OR SAPROLITE FLOW LAYER MW 16BR WELL IN BEDROCK GROUNDWATER LEVEL ELEVATION ABMW 2 WELL IN ASH PORE WATER TRANSITION ZONE FLOW LAYER GROUNDWATER _ L GENERALIZED WATER TABLE LEVEL ELEVATION BEDROCK FLOW LAYER GROUNDWATER GENERALIZED GROUNDWATER LEVEL ELEVATION FLOW DIRECTION �► GENERALIZED SUBSURFACE ASH WELL SCREEN PORE WATER FLOW DIRECTION — — — GENERALIZED FRACTURE ORIENTATIONS 0 ASH — ASH PORE WATER / WASTEWATER 0 SAPROLITE ® TRANSITION ZONE BEDROCK MW-105BRM BORON CONCENTRATION (Ng/L) B 1 <50 (LABEL COLORING BY FLOW ZONE) DUKE ENERGY PROGRESS PROPERTY LINE — — — ASH BASIN COMPLIANCE BOUNDARY ASH BASIN WASTE BOUNDARY Reporting Units Ng/L 15A NCAC 021-Standard 700 Background Threshold Values (Surficial Flow Zone)' 50 Background Threshold Values (Transition Zone)' 50 Background Threshold Values (Bedrock Flow Zone)' S0 NOTES 1. BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM BACKGROUND GROUNDWATER SAMPLES COLLECTED APRIL, 2010 TO DECEMBER 2018 AS SUBMITTED IN JUNE, 2019. 2. ALL CONCENTRATIONS SHOWN ARE STATISTICAL MEANS CALCULATED USING DATA RANGING FROM JANUARY 2018 TO APRIL 2019. 3. ALL CONCENTRATIONS ARE IN MICROGRAMS PER LITER ug/L. 4. FRACTURES DEPICTED ON THIS CROSS SECTION REPRESENT THE GENERALIZED ORIENTATIONS OF THE PREVALENT FRACTURE SETS OBSERVED AT THE SITE BASED ON TELEVIEWER LOGGING AT SITE -SPECIFIC BOREHOLES. THEY ARE SHOWN WITH APPROPRIATE APPARENT DIP, WITH VERTICAL EXAGGERATION. THIS CROSS SECTION IS APPROXIMATELY PARALLEL TO THE PREDOMINANT FRACTURE STRIKE DIRECTION. THE ACTUAL NUMBER OF FRACTURES IS FAR TOO NUMEROUS TO ILLUSTRATE AT THIS SCALE. IN ADDITION, THE DEPTHS AND LENGTHS OF FRACTURES VERSUS DEPTH ARE CONCEPTUAL ONLY. 5. ALL BOUNDARIES ARE APPROXIMATE. 6. CROSS SECTION REPRESENTATIVE OF PRE -DECANTING CONDITIONS. 4 DUKE ENERGY PROGRESS 116rip synTena GRAPHIC SCALE 0 135 270 540 HORIZONTAL SCALE: 1" = 540' FIGURE 6-4 VERTICAL ICALEX GGERA EXAGGERATION GENERAL CROSS-SECTION A -A' 5X VERTICAL EXAGGERATION DRAWN BY: J. CHASTAIN DATE:08/02/2019 ASH BASIN -BORON REVISED DATE:12/2/2019 CORRECTIVE ACTION PLAN UPDATE CHECKED BY: P. ALTMAN DATE: 12/2/2019 APPROVED BY: P.ALTMAN DATE:12/2/2019 MAYO STEAM ELECTRIC PLANT PROJECT MANAGER: J. WYLIE LAYOUT: FIG 6-4(ASH BASIN -BORON) ROXBORO, NORTH CAROLINA www.synterracorp.com - ' NORTH CAROLINA-VIRGINIA STATE LINE HALIFAX COUNTY (APPROXIMATE) . 1 ri■�r-r �■r.�r�rrrr��-.���::■� Ir-�tr __--;� �•3dii�Y,. ;--ry �Fr�r�i � __-__ PERSON COUNTY WAYO LAKE rl ► r I CCR-103D � � • 1 s a _ 4_L+�r� r r • ' � • Ir r k �ii�idlii�i � _ _ � r r l l' RAILROAD- rr , - d r r e r • � I i jk RT HFSTFHaD t ABMW-3 r I>I r r . I r ■ I■ I d r rPAD , ■ �r rAREA ■ ■ I I 1FAL ■ ' rRAGE I dt a , 1 r I r • I r APPROXIMATE FUTURE ASH BASIN WASTE BOUNDARY (SEE NOTE 42�� r � ' r '• 1 r • 3 = MULLINS LN o ENERGY GRAPHIC SCALE 500 0 500 1,000 (IN FEET) DRAWN BY: A. ROBINSON DATE: 05/03/2019 REVISED BY: A. ROBINSON DATE: 12/04/2019 CHECKED BY: P. ALTMAN DATE: 12/04/2019 APPROVED BY: J.WYLIE DATE: 12/04/2019 PROJECT MANAGER: J. WYLIE LEGEND � TRANSDUCER LOCATION GEOCHEM ICAL SONDE LOCATION ASH BASIN WASTE BOUNDARY — - — - ASH BASIN COMPLIANCE BOUNDARY — - — - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) - DUKE ENERGY PROGRESS PROPERTY LINE � STREAM (AMEC NRTR) 0 WETLAND (AMEC NRTR) NOTES: 1. GROUNDWATER MONITORING WELL TRANSDUCERS AND SONDES INSTALLED MARCH 19, 2019. ASH BASIN PONDED WATER TRANSDUCERS INSTALLED APRIL 24, 2019. 2. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT PRESENT IN THIS AREA OF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES PERMIT NC0038377 PART I, 5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED JULY 13, 2018. 3. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL &INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. 4. ALL BOUNDARIES ARE APPROXIMATE 5. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. 6. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019. AERIAL WAS COLLECTED ON FEBRUARY 6, 2017. 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). FIGURE 6-5 SITE LAYOUT DECANTING MONITORING NETWORK CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA m ABMW-3 CCR-103D CCR-105D 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 2/1/19 7.0 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 8.0 6.5 7.5 6.5 6.4 Stable trend observed > 7.0 / / 6.0 6.3 _6.2 e. CL a 6.5 5.5 6.1 Stable trend observed 6.0 6-0 5.0 / Increasing trend observed i/ 600 prior to decanting 0 commencement 600 500 600 -100 > > 400 - 400 E 200 (7 300 `-' 300 a a O 300 C 200 O Decreasing tren 200 observed prior to decanting commencement 100 -400 100 0 500 0 Total change in water level from Total change in water level from 5 c 476 decanting is approximately -2.3 5 c Sample event c decanting is approximately -1.9 O feet between decanting start date O 384 5 �0—, feet between decanting start date Z and September 12, 2019 +' > 484 and September 12, 2019 4 .. > .� 4 .-. > .-. 382 4 C ^ u100 V W pip 474 T" ' ' Sample event C Go W 00 3 _ 0 3 _ 0 Total change in water level from 380 3 Sample event M > Q decanting is approximately -0.8 Q ,M > Q W c W c 0 feet between decanting start date c Z 482 2 to Z 2 10 Z g78 and September 12, 2019 2 M i Y 472 � 41 M 1 3 1 3 376 1 470 ALI 0 11 480 0 374ILL 0 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 Date Date Date Notes: LEGEND DUKE DRAWN BY: G. KHANG DATE: 10/02/2019 — NAVD 88 - North American Vertical Datum pH (S.U.) in - inches ENERGY REVISED BY: P. ALTMAN FIGURE 6-6 — Oxidation Reduction Potential (ORP) (mv) pS/cm - micro Siemens per centimeter PROGRESS GEOCHEMICAL WATER QUALITY PLOTS — Water Level Elevation (NAVD 88) CHECKED BY: P. ALTMAN — Cease Flows into Ash Basin (06/13/2019) my - millivolts CORRECTIVE ACTION PLAN UPDATE — Decanting Start (06/27/2019) S.U. - standard unit APPROVED BY: J. WYLIE MAYO STEAM ELECTRIC PLANT � Daily Total Rainfall (inches) �� See Figure 6-5 for monitoring locations. ROXBORO NC WnTerra PROJECT MANAGER: ]. WYLIE � www.synterracorp.com Note: All sampling events occur between 1/16/2018 and 4/23/2019 Ash Pore Water Legend ABMW-01 ABMW-02 ABMW-03 ABMW-04X Surficial Groundwater Bedrock Groundwater Legend A ABMW-02BR ❑ CCR-109BR z MW-09BRL ABMW-02BRL CW-01D * * ABMW-04BR CW-02D MW-104BRL ❑ MW 104BRM ■ BG-01 CW-04 O MW-105BRM ■ CCR-102BR-BG CW-05 • CCR-103BR CW-06 a MW-10BR 7 MW-13BR CCR-104BR ■ MW-02 0 MW-14BR 7 CCR-105BR • MW 036R g MW-1 ♦ CCR-106BR MW-04 � 8BR MW-1BR Z CCR-107BR MW-056R * CCR- 108BR ♦ MW-08BR ■ MW 19BR Bedrock k Groundwater Transition Zone — c' Groundwater Transition Zone \ ao Groundwater Legend 80% 80% ■ ABMW-04D CW-03 1P ■ BG-02 ■ MW-12D g� 60% °� a ��0 60io so ■ CCR-103D • MW-16D /40% CCR-105D MW-18D 40%\ CW-02 V MW-19D 20°r° �-� i r ■ 20% .� ■ . � z i— Ca — Surficial Groundwater — CI DUKE DRAWN BY: R.BADUM Legend t� ENERGY REVISED BY: R.BADUM X ABMW-03S ■ MW-03 PROGRESS CHECKED BY ■ CCR-1035 • MW-12S APPROVED BY: PROJECT MANAGER: J. WYLIE • CCR-1045 MW-165 1P ■ CCR-105S 'k--Ca— DATE: 9/3/2019 DATE: 12/2/2019 DATE: "'y' W= 10 www.synterracorp.com — Cl ---w FIGURE 6-7 ASH PORE WATER AND GROUNDWATER PIPER DIAGRAMS CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA 484 Ash Basin Pond 5 West Ash Basin Finger Monitoring Southwest Ash Basin Finger Monitoring 5 5 Total change in water level from decanting is 488 — 488 00 00 482 approximately -6.9 feet between decanting start date and September 19, 2019 4 00 00 Total change in water level from decanting is g g 00 00 Total change in water level from decanting is Q Q approximately -0.5 feet between decanting 4 Q approximately -0.5 feet between decanting 4 > > start date and September 12, 2019 > start date and September 12, 2019 V 480 V 486 .Z 486 c 3 c c c c c y 3 r 3 y 478 - 484 c >>i 484 c a>i W W W -y 2 a y > 476 > 482 2 > � 482 2 L 0 L 3- W R 3 1 R 3 O 3 474 480 1 480 1 71 II .�� 1 I 11 1 �J . 1 ._ 1 I�L�1 ■ I I 472 0 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 478 0 478 0 Date 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 Ash Basin Pond Level Elevation (NAVD 88) Date Date Note: Data with +/- 5 feet change in water elevation is not included and no West Ash Basin Water Elevation (NAVD 88) Southwest Ash Basin Water Elevation (NAVD 88) data between 8/31/2019 and 9/19/2019 Is available due to faulty sensors. Transducer elevation: 474.940 feet Transducer elevation: 475.822 feet South Ash Basin Finger Monitoring ABMW-1 ABMW-2B1R 5 484 5 484 5 0000 00 488 Total in level from decanting is 0000 00 Total change in water level from decanting is approximately-2.4feet between decanting date September 12, 2019 0000 00 482 _ l Q change water -2.0 feet between decanting 4 Q 482 start and 4 Q 4 > Q approximately start date and September 12, 2019 > a > a Total change in water level from decanting is ~� Z 486 Z Z approximately -1.8 feet between decanting 480 start date and September 12, 2019 O O O m 3- 0 480 3— W 3 > Sample event M > 478 Sample event M y lu 484 ,M 'M {IJ •� liJ M z Ix > > 476 a>i 2 0) 478 2 J 2 L 482 L L mj 474 3 3 3 480 1 476 1 1 JJ 'I 472 'I 478 J r I�ill 470 0 0 474 0 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 Date Date Date South Ash Basin Water Elevation (NAVD 88) ABMW-1 Water Elevation (NAVD 88) ABMW-2BR Water Elevation (NAVD 88) Transducer elevation: 465.729 feet Transducer elevation: 470.614 feet Transducer elevation: 395.838 feet LEGEND Notes: DUKE DRAWN BY: G. KHANG DATE: 10/04/2019 FIGURE 6-8a NAVD 88 - North American Vertical Datum 1988 > ENERGY REVISED BY:G.KHANG DATE:12/02/2019 HYDROGRAPHS - WITHIN THE ASH BASIN Cease Flows into Ash Basin (6/13/2019) in - inches Decanting Start (6/27/2019) See Figure 6-5 for monitoring locations. PROGRESS CHECKED BY: P.ALTMAN DATE:12/07/2019 CORRECTIVE ACTION PLAN UPDATE Daily Total Rainfall (inches) Transducer elevations are approximate. APPROVED BY: J. WYLIE DATE: 12/08/2019 MAYO STEAM ELECTRIC PLANT ,0 PROJECT MANAGER: J. WYLIE ROXBORO, NC synTerra www.synterracorp.com ABMW-3 I AP-6 I CCR-103 Cluster 484 W 482 3 480 Total change in water level from decanting is approximately -1.9 feet between decanting start date and September 12, 2019 Sample event IM 5 1 484 00 00 4 > Q Z 5 c 482 3- a M > M W oC y 2 v J v 480 m 3 1 0 I 478 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 Date ABMW-3 Water Elevation (NAVD 88) Transducer elevation: 458.535 feet CCR-104 Cluster 410 00 00 > 408 Q Z c O M 406 N W GJ J 404 a� M 3 402 M1 Total change in water level from decanting is approximately -1.9 feet between decanting start date and September 12, 2019 11 �l 5 1 477 00 00 4 Q 475 Z C = :. O 3M M W 473 tY a� 2 y J a� 3 471 1 0 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 Date AP-6 Water Elevation (NAVD 88) Transducer elevation: 426.279 feet 5 1 384 00 00 4 > 382 Q Z c = 0 3 380 4-- _4) M W tY Gl 2 J 378 O m 3 1 376 0 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 Date CCR-104BR Water Elevation (NAVD 88) Transducer elevation: 369.500 feet CCR-104S Water Elevation (NAVD 88) Transducer elevation: 400.954 feet r%jWV Average total change in water level from decanting is approximately -0.8 feet between decanting start date and September 12, 2019 Sample events II _A ki, LEGEND Notes: NAVD 88 - North American Vertical Cease Flows into Ash Basin (6/13/2019) in - inches Decanting Start 6/27/2019 See Figure 6-5 for monitoring loca 9 ( ) Transducer elevations are approxim Daily Total Rainfall (inches) 374 CCR-105 Cluster Average total change in water level from decanting is approximately -0.9 feet between decanting start date and September 12, 2019 Sample event 469 Average total change in water level from decanting is approximately -2.1 feet between decanting start date and September 12, 2019 •.T t+- -. Water level has decreased below transducer elevation. Sample events f)TI 5 4 3 M c M IM 2 1 0 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 Date CCR-103BR Water Elevation (NAVD 88) Transducer elevation: 420.176 feet CCR-103D Water Elevation (NAVD 88) Transducer elevation: 461.924 feet CCR-103S Water Elevation (NAVD 88) Transducer elevation: 470.008 feet 5 1 378 00 00 4 Q Z c c 376 o 3 — +' f0 > w > C 2 m W 2 > O J 374 �a 1 3 0 372 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 tions. 7/1/19 8/1/19 9/1/19 Date CCR-105BR Water Elevation (NAVD 88) Transducer elevation: 357.507 feet CCR-105D Water Elevation (NAVD 88) Transducer elevation: 365.442 feet CCR-105S Water Elevation (NAVD 88) Transducer elevation: 376.211 feet DUKE DRAWN BY: G. KHANG Datum 1988 401) ENERGY REVISED BY: G. KHANG PROGRESS CHECKED BY: P. ALTMAN ate. APPROVED BY: J. WYLIE PROJECT MANAGER: J. WYLIE synTerra www.synterracorp.com CeleffiilZ 5 4 c 3 4- 2 1 0 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 Date CCR-106BR Water Elevation (NAVD 88) Transducer elevation: 347.734 feet DATE:10/04/2019 FIGURE 6-8b DATE:12/02/2019 HYDROGRAPHS - WITHIN AND NORTH OF THE DATE:12/07/2019 ASH BASIN DATE:12/08/2019 CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NC Sample event Total change in water level from decanting is approximately -0.1 feet between decanting start date and September 12, 2019 I CCR-107BR CCR-108BR CW-2 5 5 5 476 _- 00 Total change in water level from decanting is approximately -1.5 feet between decanting 000 377 00 Q 438 start date and September 12, 2019 4 474 C Q 472 4 0000 C Q 4 Z ^ Z ..� 470 Total change in water level from decanting is approximately -5.1 feet between decanting ^ Z A ^ C C C start date and September 12, 2019 C C C Sample event 3 — a 468 3 _ M 376 Total change in water level from decanting is 3 — M > M C > 466 Sample event C > approximately -1.2 feet between decanting start date and September 12, 2019 C LU 436 W —a— > > 464 > 2 � 2 375 2 y 462 ?� ?� 460 ?� 434 1 458 1 1 374 I 456 l I I 454 , ) 0 0 0 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 Date Date Date CCR-107BR Water Elevation (NAVD 88) CCR-108BR Water Elevation (NAVD 88) CW-2 Water Elevation (NAVD 88) Transducer elevation: 413.479 feet Transducer elevation: 437.009 feet Transducer elevation: 369.238 feet MW-3 379 5 Total change in water level from decanting is approximately -0.2 feet between decanting 00 start date and September 12, 2019 4 C Q z 378 CSample event 3 ... 4-1 W Sample event = IntentionallyLeft Blank Intentionally Left Blank 2W W 377 L Y 3 � 1 376 0 1/1/19 2/1/19 3/1/19 4/1/19 5/1/19 6/1/19 7/1/19 8/1/19 9/1/19 Date MW-3 Water Elevation (NAVD 88) Transducer elevation: 371.412 feet LEGEND Notes: % DUKE DRAWN BY: G.KHANG DATE:10/04/2019 NAVD 88 - North American Vertical Datum 1988 ' � ENERGY REVISED BY: G. KHANG DATE: 12/02/2019 FIGURE 6-8c Cease Flows into Ash Basin (6/13/2019) in -inches PROGRESS HYDROGRAPHS —NORTH OF THE ASH BASIN Decanting Start (6/27/2019) See Figure 6-5 for monitoring locations. Transducer elevations are approximate. CHECKED BY:P.ALTMAN DATE:12/07/2019 CORRECTIVE ACTION PLAN UPDATE Daily Total Rainfall (inches) 0 APPROVED BY: J. WYLIE DATE: 12/OS/2019 MAYO STEAM ELECTRIC PLANT synTerra PROJECT MANAGER:J.WYLIE ROXBORO, NC www.synterracorp.com J Sample ID (Depth) f MW-3BR (0.8-1.2) MW-3BR (14.75-15) r Sample ID (Depth) r TA TMA PSB-1 (1-2) ESample ID (Depth) • PSB-2 (1-2) RDA -_ : ■ . SamplelD(Depth) • - `� Sample ID PSB-30 (1-2) Sample ID (Depth) MW-15BR (0.5-1) •' ' Sample ID (Depth) SB-7 (1-2) Sample ID (Depth) SB-7 (4.5-7.5) PSB-27 (1-2) fl Sample ID (Depth) - RTRF SB 1 (1 2) SB-1 (13.5-14.5) Sample ID (Depth) Sample ID (Depth) PSB-3 (1-2) it.PSB-7 (1-2) ' Sample ID (Depth) Sample ID (Depth) PS13-26 (1-2) w • t PSB-8 (1-2) Sample ID (Depth) Sample ID (Depth) y + �ti PSB-9 (1-2) PSB-5 (1-2) Sample ID (Depth) + + MW-13BR (0-2) ' Sample ID (Depth) Sample ID +�, r r �, • , • i 1 - PSB-6 (1-2) TPB13 (1-2) •✓ t I Sample ID (Depth) Sample ID (Depth) J ( ) PSB-14 (1-2) SampleID(Depth) �Rqr=Ro Sample ID (Depth) PSB-13 (1-2) Sample ID (Depth) _qD PSB-11 (1-2) PSB-16 (1-2) 11 Sample ID (Depth) , BGSB-5 (4-5) Sample ID (Depth) - BGSB-5 (9-10) PSB-12 (1-2) Sample ID (Depth) BGSB-5 (14-15) , I PSB-15 (1-2) Sample ID (Depth) I + I ' Sample ID (Depth) PSB-29 (1-2) ample ID (Depth) L Sample ID (Depth) - MW-8BR (0.75-1.25) PSB-28 (1-2) • MW-8BR (25.5-26) Sample ID (Depth) PSB-25 (1-2) + t. Sample ID (Depth) Sample ID !� MW-7BR (1-2) mple ID (Depth) -2) Sample7(Dept%h)PSB-21 (1-2) o • Sample ID (Depth) BGSB-3 (4-5) I I + (Depth) PSB-22 (1-2) Sample ID (Depth) BGSB-3 (8-9) r ) r .r PSB-17 (1-2) BGSB-4 (4-5) I � v � _ I I • Sample ID (Depth) • Sample ID De BGSB-4 (9-10) Sample ID (Depth) p ( p ) BGSB4 (14-15) SB-2 (0.5-2) - • PSB-20 (1-2) PSB-18 (1-2) Sample ID (Depth) SB-2 (11.0-12.5) v. 11111wL BGSB-2 (4-5) f+ f 1 I 7 BGSB-2 (9-10) � ,tjai ► BGSB-2 (14-15) I Sample ID (Depth) � Sa f S13-3 (5-6) - PSB-19 SB-3 (17-18.5) r � , ■ f r r I t r Sample ID (Depth) t l I I 1 MW-11BR (0-2) r I • MW-11BR(30-32) 1 r Sample ID (Depth) + r BGSB-8 (4-5) r '• ' � , BGSB-8 (8-9) _ ■ . � . ■ � . ■ � . 1 r CHROMIUM 7- 1 • LVVIWAIVA I"AGIrIG f- + e ID (Depth) • 1 Sample ID BGSB-9 (4-5) BGSB-9 (9-10) BGSB-9 (14-15) 1• •.- i •• yr AREA APPROXIMATE FUTURE ASH BASIN WASTE BOUNDARY • ' (SEE NOTE 2) 1RAGE N r MANGANESE a r Sample ID (Depth) -- - MW-12D (1-2) _ MW-12D (25-26) s_rl r • y 1 ftsli`x MULLINS LN i Sample ID (De MW-10BR (0.75-1.0) 4DUKE n ENERGY 161 synTerra NORTH CAROLINA-VIRGINIA STATE LINE HALIFAX COUNTY ._ (APPROXIMATE) PERSON COUNTY a 9w EN" AL 7 I aI GRAPHIC SCALE 500 0 500 1,000 (IN FEET) DRAWN BY: A. ROBINSON DATE: 06/05/2019 REVISED BY: A. ROBINSON DATE: 12/06/2019 CHECKED BY: P. ALTMAN DATE: 12/06/2019 APPROVED BY: J. WYLIE DATE: 12/06/2019 PROJECT MANAGER: J. WYLIE LEGEND 0 BACKGROUND LOCATION WITH NO EXCEEDANCES • LOCATION WITH NO EXCEEDANCES BACKGROUND LOCATION WITH ONE EXCEEDANCE OF REGULATORY CRITERIA O LOCATION WITH ONE OR MORE EXCEEDANCES OF REGULATORY CRITERIA - ■ _ ■ ■ ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY — - — - - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) DUKE ENERGY PROGRESS PROPERTY LINE 1 STREAM (AMEC NRTR) ® WETLAND (AMEC NRTR) NOTES: 1. DISCRETE SOIL SAMPLES EXCEED COMPARATIVE CRITERIA FOR CONSTITUENTS LISTED UNDER THE SAMPLE ID. REFER TO TABLE 6-4 FOR A SUMMARY OF UNSATURATED SOILANALYTICAL RESULTS 2. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT PRESENT IN THIS AREA OF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES PERMIT NCO038377 PART I, 5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED JULY 13, 2018. 3. SAMPLE DEPTH IS FEET BELOW GROUND SURFACE. 4. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. 5. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. 6. ALL BOUNDARIES ARE APPROXIMATE 7. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019. AERIAL WAS COLLECTED ON FEBRUARY 6, 2017. 8. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). FIGURE 6-9 UNSATURATED SOIL SAMPLE LOCATIONS AND EXCEEDANCES CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA Note: *- Indicates sampling events prior to 1/1/2018 All other sampling events occur C4 4/20/2018 - 7/2/2019 goo 80% r 60% /40% V* to O°. % 10o Surface `— Ca — Water o 1 1 -Cl b Upgradient Downgradient S-6 ■ S-3 �I SW-REF1 A SW-C81 ■ SW-REF2 7 SW-C82 ■ SW-13132 SW-C83 Z SW-C84 * SW-CBT1 DUKE ENERGY 41P synTerra *— Ca — DRAWN BY: R. Badum REVISED BY: R. Badum CHECKED BY: APPROVED BY: PROJECT MANAGER: Seeps ■ S-1* S-2 ■ S-2B ■ S-8* DATE: 10/4/2019 www.synterracorp.com 60% U'p Q 40%\ 20% — Cl ---* FIGURE 6-10 SEEP AND SURFACE WATER QUALITY PIPER DIAGRAMS CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA - yy • �• r — - _ • ♦ MW-16S o- _ _ • 167 �o ' ' • ♦ i� CCR-104S >ryo �� ' n o 'S ,se • . �/ i 267 R T 3 1049 Alb - RD� .P HEST • CCR-105$Qw388 FRgO 510 (d• -,� 0.^e ,�e°i J 3-2`237 Imo( :�'a. s• �. 7$. o 35p ' �' e ` . .'— �. 92 37a_ r ' �386-3390-384 / 1 ♦ 1 \ \ N \ y \ ♦ U �� I ♦�� ABMW-113S • ♦ 0 4°6 ` o : 1320 �• 49a LEGEND ' x 1 MONITORING WELL - GREATER THAN 15A NCAC 2L .0202 I i ♦ 4 STANDARD (700 Ng/L) OR THE IMAC (EFFECTIVE DATE FOR 15A NCAC 02L .0202 STANDARD AND IMAC IS APRIL 1, 2013) 1 'I f� x �♦� (� g I� Q' " " " • • " • • • • CAMA MONITORING WELL - GREATER THAN CONSTITUENT oI/ ♦ v � r • I + BACKGROUND THRESHOLD VALUE (50 Ng/L) y 1 / ♦ �♦ MONITORING WELL- LESS THAN BACKGROUND THRESHOLD 1 m° ' • gj� ' VALUE I APPROXIMATE FUTURE • o' v BACKGROUND MONITORING WELL ASH BASIN WASTE BOUNDARY, s6^43s ll / (SEE NOTE4) 0 o BORON PLUME GREATER THAN THE USEPA DRINKING WATER NOTES: / / Spa 1 EQUIVALENT LEVEL (4000Ng/L) FROM FLOW AND TRANSPORT ,r ti MODEL PREDICTED PLUME. 1. DATA INCLUDED IN THIS FIGURE ARE THE ARITHIMETIC MEAN BASED ON - I ••. , �� a`' VALID GROUNDWATER SAMPLE DATA COLLECTED FROM JANUARY 2018 ♦ 1 ) , , • app BORON PLUME GREATER THAN NC 02L STANDARD (700 Ng/L) THROUGH APRIL 2019. / • FROM MEAN ANALYSIS. FLOW AND TRANSPORT MODEL 2. THE 02L FOR BORON IS 700 pg/L. 522 ♦ • PREDICTED PLUME IS USED WHERE EMPIRICAL DATA IS NOT 3. THE BACKGROUND VALUE FOR BORON IS 50 pg/L (AS SUBMITTED JUNE ♦ AVAILABLE. 2019). I ♦� sa° BORON PLUME GREATER THAN BTV (50 Ng/L) FROM MEAN 4. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS CCR-101S-BG ANALYSIS. FLOW AND TRANSPORT PREDICTED PLUME IS USED NOT PRESENT IN THIS AREA OF THE ASH BASIN. A FUTURE REPRESENTATIVE <50 ! •• ', �e e G/ WHERE EMPIRICAL DATA IS NOT AVAILABLE. ASH BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO 1 1 • 1 NPDES PERMIT NCO038377 PART I, 5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED v • • JULY 13, 2018. I i 540 • ♦ ASH BASIN WASTE BOUNDARY 5. GROUNDWATER FLOW AND TRANSPORT BORON PLUME IS MODIFIED FROM ' ASH BASIN COMPLIANCE BOUNDARY MODEL LAYER 10 (MURDOCH ET AL, 2019). .° RIGHT-OF-WAY (DUKE ENERGY PROPERTY) 6. HYDROLOGIC DIVIDE INDENTIFIED IN CSAUPDATE (SYNTERRA, 2017)AND UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT DUKE ENERGY PROGRESS PROPERTY LINE (MURDOCH ET AL, 2019). 7. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE ' ' 1` y B TOPOGRAPHIC CONTOUR (10' INTERVAL) U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS 536 ------ b- GROUNDWATER FLOW DIRECTION MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE 1 5pq _558� PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. I �¢sz _ STREAM (AMEC NRTR) NATURAL RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ss ELECTRIC PLANT DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO WETLAND (AMEC NRTR) REMOVE ONE PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. ) APPROXIMATE HYDROLOGIC DIVIDE 8. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND rm SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. 570 j a —a. TOPOGRAPHY IS BASED ON LIDAR BARE EARTH DATA OBTAINED FROM THE y^`D 5g2`,.586 NORTH CAROLINA SPATIAL DATA SITE AT GRAPHIC SCALE https://sdd.nc.gov/sdd/DataDownload.aspx. 578 DUKE 390 0 390 780 FIGURE 6-11a 580 �� s° 546 MAP OF BORON DISTRIBUTION 9. ALL BOUNDARIES ARE APPROXIMATE. N f" 0�� ENERGY ° (IN FEET) 10. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. yoo MW-12S SZa PROGRESS SURFICIAL ZONE 57a 598 <50 DRAWN BY: A. ROBINSON DATE:05/09/2019 CORRECTIVE ACTION PLAN UPDATE 11. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019. REVISED BY: A. ROBINSON DATE: 12/13/2019 AERIAL WAS COLLECTED ON FEBRUARY 6,2017. h 594 - y�'� s'9 CHECKED BY: P.ALTMAN DATE:12/13/2019 MAYO STEAM ELECTRIC PLANT 12. DRAWING HAS BEEN SET WITH PROJECTION OF NORTH CAROLINA "y •� ' APPROVED BY: J. WYLIE DATE:12/13/2019 ROXBORO, NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). ,�Crl� PROJECT MANAGER: J. WYLIE 606 ,02 584 www.synterracorp.com la NOTES: 1. DATA INCLUDED IN THIS FIGURE ARE THE ARITHIMETIC MEAN BASED ON VALID GROUNDWATER SAMPLE DATA COLLECTED FROM JANUARY 2018 THROUGH APRIL 2019. 2. THE 02L FOR BORON IS 700 pg/L. 3. THE BACKGROUND VALUE FOR BORON IS 50 pg/L (AS SUBMITTED JUNE 2019). 4. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT PRESENT IN THIS AREA OF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES PERMIT NCO038377 PART I, 5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED JULY 13, 2018. 5. GROUNDWATER FLOW AND TRANSPORT BORON PLUME IS MODIFIED FROM MODEL LAYER 10 (MURDOCH ET AL, 2019). 6. HYDROLOGIC DIVIDE INDENTIFIED IN CSA UPDATE (SYNTERRA, 2017)AND UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT (MURDOCH ET AL, 2019). 7. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. 8. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY IS BASED ON LIDAR BARE EARTH DATA OBTAINED FROM THE NORTH CAROLINA SPATIAL DATA SITE AT hftps:flsdd.nc.gov/sdd/DataDownload.aspx. 9. ALL BOUNDARIES ARE APPROXIMATE. 10. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. 11. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019. AERIAL WAS COLLECTED ON FEBRUARY 6, 2017. 12. DRAWING HAS BEEN SET WITHA PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). 1 / I I I I I � � o i • OEM h � it ■ n ABMW-4D (mac' 3242 ♦♦ 000 APPROXIMATE FUTURE o• ASH BASIN WASTE BOUNDARY, (SEE NOTE 4) /7 �522 ♦ � s� 0 O v 1 ®--558 552 556 r0ll� 590 0 �j MW-16D <50 FA"4% It ENERGY PROGRESS O ol GRAPHIC SCALE 390 0 390 780 (IN FEET) DRAWN BY: A. ROBINSON DATE: 05/09/2019 REVISED BY: A. ROBINSON DATE: 12/12/2019 CHECKED BY: E. KINSEY DATE: 12/12/2019 APPROVED BY: J. WYLIE DATE: 12/12/2019 PROJECT MANAGER: J. WYLIE www.synterracorp.com 11 LEGEND MONITORING WELL - GREATER THAN 15A NCAC 2L .0202 ie STANDARD (700 pg/L) OR THE IMAC (EFFECTIVE DATE FOR 15A NCAC 02L .0202 STANDARD AND IMAC IS APRIL 1, 2013) MONITORING WELL - LESS THAN BACKGROUND THRESHOLD VALUE BACKGROUND MONITORING WELL BORON PLUME GREATER THAN THE USEPA DRINKING WATER EQUIVALENT LEVEL (4000Ng/L) FROM FLOW AND TRANSPORT MODEL PREDICTED PLUME. BORON PLUME GREATER THAN INC 02L STANDARD (700 Ng/L) FROM MEAN ANALYSIS. FLOW AND TRANSPORT MODEL PREDICTED PLUME IS USED WHERE EMPIRICAL DATA IS NOT AVAILABLE. BORON PLUME GREATER THAN BTV (50 pg/L) FROM MEAN ANALYSIS. FLOW AND TRANSPORT PREDICTED PLUME IS USED WHERE EMPIRICAL DATA IS NOTAVAILABLE. ASH BASIN WASTE BOUNDARY ASH BASIN COMPLIANCE BOUNDARY - - - - - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) 0 • DUKE ENERGY PROGRESS PROPERTY LINE TOPOGRAPHIC CONTOUR (10' INTERVAL) GROUNDWATER FLOW DIRECTION 310 STREAM (AMEC NRTR) ® WETLAND (AMEC NRTR) APPROXIMATE HYDROLOGIC DIVIDE FIGURE 6-11b MAP OF BORON DISTRIBUTION TRANSITION ZONE CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA 60' RIGHT-OF-WAYSIT �---- I - plerK // w, APPROXIMATE HYDROL . ®i \ ® APPROXIMATE 1981 I LANDFILL AREA 100'RAILROAD� • i (CLOSED) �RI_GH/T-OF-WAY <50 474 � LEGEND ' 1�11• ABMW-46R \ • • 0 MONITORING WELL- GREATER THAN 15A NCAC 2L.0202 ` o� <50 a MW-196R lie STANDARD (700 Ng/L) OR THE IMAC (EFFECTIVE DATE FOR r BG-1 <50 15A NCAC 02L .0202 STANDARD AND IMAC IS APRIL 1, 2013) ImI <50 `� �t CAMA MONITORING WELL -GREATER THAN CONSTITUENT � � � �h I {"�-�g !d % Q � ' " " " • • " • • • • BACKGROUND THRESHOLD VALUE (50 Ng/L) 3 ♦ ♦ �• ` MONITORING WELL -LESS THAN BACKGROUND THRESHOLD ' _� • '000VALUE NOTES: / / ''a•I 1. DATA INCLUDED IN THIS FIGURE ARE THE ARITHIMETIC MEAN BASED ON VALID GROUNDWATER SAMPLE DATA COLLECTED FROM JANUARY 2018 THROUGH APRIL 2019. 2. THE 02L FOR BORON IS 700 pg/L. 3. THE BACKGROUND VALUE FOR BORON IS 50 pg/L (AS SUBMITTED JUNE 2019). 4. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT PRESENT IN THIS AREA OF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES PERMIT NCO038377 PART I, 5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED v JULY 13, 2018. I I 5. GROUNDWATER FLOW AND TRANSPORT BORON PLUME IS MODIFIED FROM MODEL LAYER 10 (MURDOCH ET AL, 2019). 6. HYDROLOGIC DIVIDE INDENTIFIED IN CSA UPDATE (SYNTERRA, 2017)AND UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT (MURDOCH ET AL, 2019) 7. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS 5 MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. I 8. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY IS BASED ON LIDAR BARE EARTH DATA OBTAINED FROM THE NORTH CAROLINA SPATIAL DATA SITE AT hftps:flsdd.nc.gov/sdd/DataDownload.aspx. 9. ALL BOUNDARIES ARE APPROXIMATE. 10. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS. 11. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019. AERIAL WAS COLLECTED ON FEBRUARY 6, 2017. 12. DRAWING HAS BEEN SET WITHA PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). 606 • `� soa BACKGROUND MONITORING WELL APPROXIMATE FUTURE v sus ASH BASIN WASTE BOUNDARY, MW-106R es 4ae BORON PLUME GREATER THAN THE USEPA DRINKING sa (SEE NOTE4) 0 0 <56 WATER EQUIVALENT LEVEL (4000Ng/L) FROM FLOW AND �a aao TRANSPORT MODEL PREDICTED PLUME. • "' �' �a °yam BORON PLUME GREATER THAN NC 02L STANDARD (700 Ng/L) • q9• FROM MEAN ANALYSIS. FLOW AND TRANSPORT MODEL ���✓✓✓ • 522 PREDICTED PLUME IS USED WHERE EMPIRICAL DATA IS NOT • AVAILABLE. ♦� s�o O o BORON PLUME GREATER THAN BTV (50 Ng/L) FROM MEAN O ANALYSIS. FLOW AND TRANSPORT PREDICTED PLUME IS ♦ j • ' USED WHERE EMPIRICAL DATA IS NOT AVAILABLE. ♦� • i • . ASH BASIN WASTE BOUNDARY I ASH BASIN COMPLIANCE BOUNDARY — - — - - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) a DUKE ENERGY PROGRESS PROPERTY LINE �° a• "� TOPOGRAPHIC CONTOUR (10' INTERVAL) --556=146 GROUNDWATER FLOW DIRECTION Ssa 0 STREAM (AMEC NRTR) 556 ® WETLAND (AMEC NRTR) APPROXIMATE HYDROLOGIC DIVIDE 570 yb S a ...6 $a''�`� GRAPHIC SCALE %� DUKE 390 0 390 780 FIGURE 6-11c ENERGY (IN MAP OF BORON DISTRIBUTION PROGRESS DRAWN BY: A. ROBINSON DATE: 05/09/2019 BEDROCK ZONE REVISED BY: A. ROBINSON DATE: 12/17/2019 CORRECTIVE ACTION PLAN UPDATE CHECKED BY: E.KINSEY DATE:12/17/2019 MAYO STEAM ELECTRIC PLANT • APPROVED BY: J.WYLIE DATE:12/17/2019 ROXBORO NORTH CAROLINA s)mTerra PROJECT MANAGER: A. ALBERT www.synterracorp.com .�.,.-.�.���r��-.-����.��-.--.-�tt— % ,, • «-�tt - y CCR-104S •/ C W-4 CCR-103S _ CCR-104BR CW-3 r • ��MA.��IAKE CCR-103D MW-1046RL •/ —CCR-103BR MW-104BRM -1 • •� � _ _ _ _ cc R-109B —MW-2 CCR L •� �� � ♦ MW-. r Herr , CCR-105S r CCR-105D 7 CCR-102BR-BG ��♦ CCR-105BR MW-105BRM � � - „ - - • • MW-136R ' � Rq)`RO,q `� 1 • r06BR � _ a CCR-107BR X CCR-108BR PPROXIMAT C&D LANDFILL AREA o (CLOSED) 'RE ON BASIN APPROXIMATE FUTURE y ='AREA ASH BASIN WASTE BOUNDARY / / ji , •j (SEE NOTE 2) Q CCR-101 S-BG � �� • ' ^ '� � �- � CCR-101D-BG • I I I - i , NOTES: 1. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) FOR MAYO STEAM ELECTRIC PLANT DATED JANUARY 2014 AND UPDATED ON JULY 11, 2018 TO REMOVE ONE PREVIOUSLY MISIDENTIFIED WETLAND NEAR THE ASH BASIN DISCHARGE CHANNEL. 2. AREA OF INVESTIGATION THAT DETERMINED SETTLED CCR MATERIAL IS NOT PRESENT IN THISAREAOF THE ASH BASIN. A FUTURE REPRESENTATIVE ASH BASIN WASTE AND COMPLIANCE BOUNDARY IS INCLUDED IN THE MAYO NPDES PERMIT N00038377 PART I, 5.A.(18.) ATTACHMENT B FIGURE 1.1 DATED JULY 13, 2018. 3. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE APPROXIMATE. 4. ALL BOUNDARIES ARE APPROXIMATE. 5. MAYO PLANT PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS 6. AERIAL PHOTOGRAPHY OBTAINED FROM ESRI ONLINE ON JUNE 10, 2019. AERIAL WAS COLLECTED ON FEBRUARY 6, 2017. 7. DRAWING HAS BEEN SET WITH PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). MW-12D �' I I 3 = MULLINS LN h o � O Outfall 002 V, 4 It ENERGY PROGRESS Outfall 001 NORTH CAROLINA-VIRGINIA STATE LINE IF HALIFAX COUNTY . (APPROXIMATE) PERSON COUNTY I .I l GRAPHIC SCALE 500 0 500 1,000 (IN FEET) DRAWN BY: A. ROBINSON DATE: 06/06/201; REVISED BY: A. ROBINSON DATE: 12/10/2019 CHECKED BY: P. ALTMAN DATE: 12/10/2019 APPROVED BY: J. WYLIE DATE: 12/10/2019 PROJECT MANAGER: J. WYLIE i LEGEND WELL IN ALLUVIUM OR SAPROLITE WELL IN TRANSITION ZONE WELL IN BEDROCK ccR-loss WELLS INDICATED WITH RED FONT WILL HAVE GEOCHEMICAL SONDES NPDES OUTFALL LOCATION ASH BASIN WASTE BOUNDARY • ASH BASIN COMPLIANCE BOUNDARY — - — - RIGHT-OF-WAY (DUKE ENERGY PROPERTY) DUKE ENERGY PROGRESS PROPERTY LINE 310 STREAM (AMEC NRTR) WETLAND (AMEC NRTR) FIGURE 6-12 CONFIRMATION MONITORING PLAN NETWORK CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA Interim Monitoring Plan Corrective Action (IMP) sampling H Plan Approval Confirmation Monitoring Plan (CMP) monitor downgradient and background groundwater in accordance with G.S. 130A- 309.214(a)(4)k for compliance with NCAC 02L .0202 Groundwater Quality applicable Standards Based on annual evaluation, is the boron plume stable at the compliance boundary?/ 1►[7 Evaluate contingency to determine if additional data needed to validate conditions and/or to update CAP; continue with CMP Notes: 1 - For well locations to be monitored see Figure 6-12 and Table 6-11 2 - For parameters to be monitored and frequency see Table 6-11 NCAC - North Carolina Administrative Code 02L - NCAC Title 15A, Subchapter 02L. Groundwater Classification and Standards Yes Continue CMP sampling Continue PCMP sampling and Annual Review and and Annual Review and Reporting I I Reporting ""I\ Is the ash basin certified closed? No Are the groundwater monitoring results below applicable standards at the compliance boundary for three years? Post -Closure Monitoring Plan (PCMP) Post -closure monitoring to begin Yes following closure certification. Monitoring parameters and locations to be determined at that time and in accordance with G.S. 130A- 309.214(a)(4)k.2. Yes Based on \ annual evaluation, is the plume stable at the compliance boundary? No Yes Request completion of CMP corrective action plan monitoring or Request completion of PCMP post -closure monitoring in accordance with G.S. 130A-309.214(a)(3)b (' DUKE ENERGY DRAWN BY: T. PLATING REVISED SHECK BY: J. WYLIE & K DATE: 10/112019 DATE: 12/16/2019 PROGRESS CHECKED BY: P. ALTMAN DATE: 12116/2019 APPROVED BY: J. WYLIE DATE: 12/16/2019 PROJECT MANAGER: J. WYLIE s)"Terra www.synterracorp.com FIGURE 6-13 CONFIRMATION MONITORING PLAN WORK FLOW DIAGRAM CORRECTIVE ACTION PLAN UPDATE MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA