Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 —
Groundwater Remediation
by Extraction, Clean Water
Infiltration, and In -Situ
Treatment
Remedial Alternative 3 —
Groundwater Remediation
by Extraction and Clean
Water Infiltration
New Monitoring Wells
Number of MWs
12
12
12
Average depth of MWs (ft. bgs)
80
80
80
Average screen length of MWs (ft.)
10
10
10
Casing material
Sch 80 PVC
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
6
Borehole diameter
8
8
8
Extraction Wells
Number of Extraction Wells
53
66
Average depth (ft. bgs)
181
162
Average screen length (ft.)
15
15
Total flow (gpm)
608
652
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
Borehole diameter
8
8
Horizontal Wells
Number of Horizontal Wells
Length of Each Horizontal Well (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Clean Water Infiltration Wells
Number of Clean Water Infiltration Wells
24
Average depth (ft. bgs)
60
Average screen length (ft.)
15
Total flow (gpm)
286
Casing material
Sch 80 PVC
Well diameter
6
Borehole diameter
8
Number of pumps
1
Infiltration Galleries
Number of Infiltration Galleries
1
Total area (acres)
7
Total flow (gpm)
46
Pipe material
Sch 40 PVC
Pipe diameter
1
Chemical Injection Wells
Number of Injection Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Injection Pumps
Tree Wells
Total area (acres)
Trenches
Number of trenches
1*
Length (ft.)
1400
Width (ft.)
15
De th ft.
24
Page 1 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
MARSHALL STEAM STATION
DUKE ENERGY CAROLINAS LLC, TERRELL, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 -
Groundwater Remediation
by Extraction, Clean Water
Infiltration, and In -Situ
Treatment
Remedial Alternative 3 -
Groundwater Remediation
by Extraction and Clean
Water Infiltration
Conveyance Pipe
Pipe length
5400
12300
Pipe material
Sch 80 HDPE
Sch 80 HDPE
Pipe diameter
6
6
Number of conveyance pumps
4
4
Permeable Reactive Barriers
Number of PRBs
Fill Material
Length (ft.)
Width (ft.)
Depth (ft.)
Removal of Waste Materials
Tons of waste
Waste Profile
Treatment Media
Media
Medium Impact Material
Pounds
123000
Well Abandonment
Number of wells
Average well depth
Well diameter
Fill Material
Laboratory Analysis
$ of laboratory analysis spent
Length of Active Remediation
Years of Active Remediation 0 30 9
Prepared By: GTC Checked By: WCG
Notes:
* - Remedial Alternative does not include a trench but the trench represents the equipment needs to construct the In -Situ amendment placements
ft. - foot
gpm - gallon per minute
Sch - schedule
HDPE - high density polyethylene
bgs - below ground surface
PVC - polyvinyl chloride
PRB - permeable reactive barrier
MW - monitoring wells
MNA - monitored natural attenuation
Page 2 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - SUSTAINABILITY
CORRECTIVE ACTION PLAN UPDATE
MARSHALL STEAM STATION
DUKE ENERGY CAROLINAS LLC, TERRELL, NC
Remedial Alternative 1 - Groundwater Remediation by MNA
Activities
CO2
Emissions
Percent
Total
Onsite
NOx
Emissions
percent
Total
Onsite SOX
Emissions
Percent
Total
Onsite
PM 10
Emissions
percent
Total
Total NOx
Emissions
Percent
Total
Total SOX
Emissions
Percent
Total
Total
PM 10
Emissions
percent
Total
Total
Energy
Used
Total
Energy
Used
percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
75.49
78.18
NA
-
NA
-
NA
-
3.5E-02
17.6
5.5E-02
73.0
7.9E-03
35.1
2.3E+04
NA
98.86
Transportation -Personnel
5.05
5.23
NA
-
NA
-
NA
-
1.1E-02
5.3
1.0E-03
1.4
1.7E-04
0.7
6.6E+01
NA
0.3
Transportation-Equip/materials
0.49
0.51
NA
-
NA
-
NA
-
1.5E-04
0.1
2.7E-06
0.0
1.4E-05
0.1
6.4E+00
NA
0.0
Equipment Use and Misc
15.26
15.80
1.5E-01
100.0
1.5E-02
100.0
1.3E-02
100.0
1.5E-01
76.9
1.9E-02
25.7
1.4E-02
64.0
1.8E+02
0.0E+00
0.8
Residual Handling
0.27
0.28
0.0E+00
-
0.0E+00
-
0.0E+00
-
8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
96.56
100
1.46E-01
1 100.0
1.49E-02
100
1.31E-02
100
2.00E-01
100
7.50E-02
100
2.24E-02
100
2.29E+04
0.00E+00
100
Remedial Alternative 2 - Groundwater Remediation by Extraction, Clean Water Infiltration, and In -Situ Treatment
Activities
CO2
Emissions
Percent
Total
OnO
NO
Emissions
percent
Total
Onsite SOX
Emissions
Percent
Total
Onsite
PM10
Emissions
percent
Total
Total NOx
Emissions
Percent
Total
Total SOX
Emissions
Percent
Total
Total
PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
No
Material Productions
45,368.11
68.32
NA
NA
NA
1.1E+02
59.9
1.1E+02
62.4
2.1E+01
62.7
3.9E+07
NA
99.60
Transportation -Personnel
11.91
0.02
NA
NA
NA
1.3E-02
0.0
1.1E-03
0.0
6.8E-04
0.0
1.5E+02
NA
0.0
Transportation-Equip/materials
0.98
0.00
NA
-
NA
-
NA
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
21,028.80
31.67
1.9E+00
100.0
1.4E-01
100.0
1.1E-01
100.0
7.5E+01
40.1
6.7E+01
37.6
1.3E+01
37.3
1.5E+05
3.1E-01
0.4
Residual Handling
0.27
0.00
0.0E+00
0.0E+00
0.0E+00
8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
66,410.07
100
1.90E+00
100.0
1.37E-01
100
1.10E-01
100
1.87E+02
100
1.79E+02
100
3.43E+01
100
3.87E+07
3.05E-01
100
Remedial Alternative 3 - Groundwater Remediation by Extraction and Clean Water Infiltration
Activities
CO2
Emissions
Percent
Total
Onsite
NOx
Emissions
percent
Total
Onsite SOX
Emissions
Percent
Total
Onsite
PM10
Emissions
percent
Total
Total NOx
Emissions
Percent
Total
Total SOX
Emissions
Percent
Total
Total
PM10
Emissions
percent
Total
Total
Energy
Used
Total
Energy
Used
percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
1,997.11
17.02
NA
-
NA
-
NA
-
5.8E+00
14.7
3.5E+00
12.1
1.3E+00
9.3
4.2E+06
NA
98.48
Transportation -Personnel
12.25
0.10
NA
-
NA
-
NA
-
1.3E-02
0.0
1.1E-03
0.0
7.1E-04
0.0
1.6E+02
NA
0.0
Transportation-Equip/materials
0.98
0.01
NA
-
NA
-
NA
-
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
9,720.41
82.86
4.7E+00
100.0
4.8E-01
100.0
4.3E-01
100.0
3.3E+01
85.2
2.5E+01
87.9
1.3E+01
90.7
6.5E+04
3.8E-01
1.5
Residual Handling
0.27
0.00
0.0E+00
-
0.0E+00
-
0.0E+00
-
8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
11,731.03
100
4.73E+00
100.0
4.83E-01
100
4.26E-01
100
3.91E+01
100
2.87E+01
100
1.40E+01
100
4.26E+06
3.80E-01
100
Notes•
CO, - Airborne emissions of carbon dioxide
MMBTU - Million British Thermal Units
NOx - Airborne emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide)
SOx - Airborne emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others)
PMio - Airborne emissions of particulate matter that is 10 micrometers or less in diameter
Prepared By: GTC Checked By: WCG
Page 1 of 1